Job Name:
Job Number:
Model Numbers:
PageSPECIFICATION SUBMITTAL
369369 Rev. B 1 06.02.11
Control InterfacesOMX-CI-NWK-EGRAFIK SystemsTM
OMX-CI-NWK-E Control Interface
Description
•IntegratesGRAFIK5000TM, GRAFIK 6000®, GRAFIK 7000TM, Softswitch128®, and LCP128® systems with a touchscreen or other digital equipment that supports TCP/IP communication over Ethernet.
•Providesmonitoringcommandsthatallowatouchscreen to query lighting systems to: – Determine which scene is selected. – Keep track of buttons pressed.
•Providescontrolcommandsthatallowa touchscreen or PC to operate lighting systems to: – Select or sequence lighting scenes. – Raise or Lower one or more zones. – Activate panic mode (lights go to full on).
– Simulate button actions – Disable or Enable timeclock(s)
®
Job Name:
Job Number:
Model Numbers:
PageSPECIFICATION SUBMITTAL
369369 Rev. B 2 06.02.11
Control InterfacesOMX-CI-NWK-EGRAFIK SystemsTM
Power
•IECPELV/NEC® Class 2•OperatingVoltage:12V 125mA
24V 65mA
Uses OMX RS232 Command Set
•Monitoring:Sceneselectionandscenestatusupdates.•Control:Sceneselection,scenelockout,sequencing,zonelockout,zoneraise/lower.
System Communications and Capacity
•IECPELV/NEC® Class 2 wiring connects OMX-CI-NWK-E Interface to Processor Panel.•StandardCAT5cable,328ft(100m)maximum,connectsOMX-CI-NWK-EInterfacetoPCorother
Ethernet source.•SupportsMDI/MDIXauto-crossover(nocrossovercableneeded).•MultipleControlInterfacesmaybeusedinasinglesystem.
Environment
32 to 104 °F (0 to 40 °C). Relative humidity less than 90% non-condensing.
Specifications
Dip Switch Settings
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
ON
ON
ON
ON
1 2 3 4 5 6ON
7 8
1 2 3 4 5 6ON
7 8
AddressSwitch Settings
AddressSwitch Settings
AddressSwitch Settings
AddressSwitch Settings
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
1 2 3 4 5 6
ON
7 8
ON
ON
ON
ON
1 2 3 4 5 6ON
7 8
1 2 3 4 5 6ON
7 8
Up Down(On) (Off)
Addressing
Not used
®
Job Name:
Job Number:
Model Numbers:
PageSPECIFICATION SUBMITTAL
369369 Rev. B 3 06.02.11
Control InterfacesOMX-CI-NWK-EGRAFIK SystemsTM
Dimensions 2.47 in(62.7 mm)
3.75in(95.3mm)
4.26 in(108.2 mm)
5.26in(133.6 mm)
1.06 in(26.9 mm)
Mounting Holes
Mounting
1. Mount the control interface directly on a wall, as shown in the Mounting Diagram, using screws (not included). When mounting, provide sufficient space for connecting cables.
The unit can also be placed in the LUT-19AV-1U AV rack using the screws provided with the unit. The LUT-19AV-1U will hold up to four units.
If conduit is desired for wiring, the LUT-5x10-ENC can be used to mount one unit.
2. Strip 4 in (10 mm) of insulation from wires. Each data link terminal will accept up to two 18 AWG (1.0 mm2) wires.
3. Connect wiring as shown in the Wiring Diagram (next page). LED 1 lights continuously (Power) and LED 7 blinks rapidly (Data Link RX) when the IEC PELV/NEC® Class 2 Data Link is installed correctly.
LUT-19AV-1U
Wire Strip Length
4 in (10 mm)
5.26
4.263.75
2.50
1.06
Control Interface
Wall
Mounting Diagram
LUT-5x10-ENC
0.25 (6.4)
0.34 (8.6) dia.
0.18 (4.6) dia.
0.18 (4.6) dia.
#6 or #8 (M3 or M4) screw recommended (not included)
Mounting Hole DetailDimensions: in (mm)
®
Job Name:
Job Number:
Model Numbers:
PageSPECIFICATION SUBMITTAL
369369 Rev. B 4 06.02.11
Control InterfacesOMX-CI-NWK-EGRAFIK SystemsTM
Ethernet Link Wiring
•StandardCAT5cableconnectsOMX-CI-NWK-EInterfacetoPC,router,orotherEthernet source.
•Nocrossovercableneeded.•Mustbe328ft(100m)orless.•Ethernetnetworkandcableprovidedbyothers.
RJ45 jack: Ethernet Link (to PC or A/V equipment)
Ethernet link/ activity
Ethernet speed
Data Link (to Control Units, processors, and wallstations)
DIP Switches LED 1: PowerLED 2: Ethernet linkLED 3, 4, 5: UnusedLED 6: Data link TXLED 7: Data link RX
CAT5 Cable: maximum 328 ft
(100 m) To PC or AV Equipment. For Ethernet Link, use CAT5 cable provided to connect to auxiliary equipment. The Ethernet Link LED will light continuously when link is present and will flash when there is link activity. Additional Ethernet network equipment and cables provided by others.
12 or 24 V to outlet (with optional transformer). Do not wire terminal 2 on Data Link when using optional transformer. To power separately from the Data Link, order the following Lutron transformer model numbers: 120 V : T120-15DC-9-BL 240 V : TE240-15DC-9-BL 240 V (UK): TU240-15DC-9-BL
1 2 3 4 5 6 7
•Daisy-chaintheOMX-CI-NWK-EInterfacetotheIECPELV/NEC® Class 2 Wallstation Link that connects to the Processor Panel.
•Makedaisy-chainconnectionstotheIECPELV/NEC® Class 2 Data Link terminals on the front of OMX-CI-NWK-E Interface.
•DonotuseT-taps.Runallwiresinandoutofterminalblock.•Eachterminalacceptsuptotwo18AWG(1.0mm2) wires.•LED1lightswhentheIECPELV/NEC® Class 2 Data link is installed correctly.•ConsultProcessorPanelSpecificationSubmittalformoredetails.
IEC PELV/NEC® Class 2 Wiring
®
Job Name:
Job Number:
Model Numbers:
PageSPECIFICATION SUBMITTAL
369369Rev.B506.02.11
Control InterfacesOMX-CI-NWK-EGRAFIK SystemsTM
•Two12AWG(2.5mm2)conductorsforcommon(terminal1)and24V (terminal 2). These will not fit in terminals. Connect as shown. Ensure that the terminal 2 connection is wired when not using optional transformer.
•Oneshielded,twistedpair18AWG(1.0mm2) for data link (terminals 3 and 4). •ConnectDrain/Shieldasshown.DonotconnecttoGround(Earth)orWallstation/Control
Interfaces. Connect the bare drain wires and cut off the outside shield.
IEC PELV/NEC® Class 2 Terminal Connections
4 3 2 1
IEC PELV/NEC® Class 2Power wiring:1: Common2: 24 V Power(2) 18 AWG (1.0 mm2) pigtails, 6 in (152 mm) maximum length
D: Drain/Shield
(2) 12 AWG (2.5 mm2)
(2) 12 AWG (2.5 mm2)
Data Link: (1) shielded, twisted pair 18 AWG (1.0 mm2)
4: MUX3: MUX
Note: 12 AWG (2.5 mm2) conductors for Common (terminal 1) and 24 V Power (terminal 2) will not fit in terminals; use 18 AWG (1.0 mm2) pigtails (< 6 in/152 mm).
Note: Do not connect Drain/Shield to Ground (Earth) or Wallstation/Control Interfaces. Connect the bare drain wires and cut off the outside shield.
Use Lutron Cable GRX-CBL-46L