ON
INTEGRATED WATERSHED MANAGEMENT PROGRAMME BANSWARA (IWMP-I)
(SABBALPURA-VI)
PROJECT IMPLIMENTING AGENCY
PANCHAYAT SAMITI KUSHAL GARH
DISTRICT – BANSWARA
Prepared by: 09414159729
Location:
S.No. Name of Project(as per GOI) BANSWARA (IWMP)-I KUSHAL GARH a) Name of Catchment MOR Riverb) Name of watershed area(local name) Sabbalpura-VIc ) Project Area (ha) 5322.60d) Net treatable Area (ha) 3480.00e) Cost of Project ` 417.6 Lac
f) Cost/hectare ` 12000
g) Year of Sanction 2009-10h) Watershed Code 1/12,4/5,5/4,5,6,7, 6/1,5,8i) No. of Gram Panchayats in project area 11j) No. of villages in project area 29k) Type of Project otherl) Elevation (metres) 307
m) Major streams 1n) Slope range (%) 0-10%
CHAPTER – I INTRODUCTION
Integrated Watershed Management Programme BANSWARA (IWMP)-I KUSHAL GARH
(Sabbalpura-VI) Project is located in KUSHAL GARH Block, of BANSWARA district. The project area is
between the latitudes 74˚225˙ to 74˚325˙ & 23˚05˙ to 23˚175˙ longitudes. It is at a distance of 5 km
from its Block head quarters and 58 Kms from the district head quarters. There are 29 no. of
habitations in the Project area and other details are given below.
General features of watershed
BANSWARA IWMP-I 1
Banswara IWMP I TAHSHIL KUSHALGARH
GEOGRAPHIC LOCATION OF BANSWARA IWMP-I
S.No. Macro/micro
Name of Gram Panchayat
Name of Villages Covered
Census code of villages
Total Area
Forest area
Treated
Submergence area
Net Area (Ha)
1 2 3 4 5 6 7 8 9 101 4/5 Doongri Para Devda Sath 03504400 102.4 0 0 0 102.42 4/5, 5/5 Doongri Para Himmatpura 03504500 227.9 0 0 0 227.9
Doongri Para Total 330.3 0 0 0 330.33 1/12 Timera Bara Teemera bara 03497400 213.5 0 0 0 213.54 1/12 Timera Bara Bhat-mahuri 03496600 42.5 0 0 0 42.55 1/12 Timera Bara Kotra 03497300 84.2 0 0 0 84.2
Timera Bara Total 340.2 0 0 0 340.26 1/12 Sharan Chanderi 03498100 14.8 0 0 0 14.8
Sharan Total 14.8 0 0 0 14.87 5/7 Kalinjara Bharatgarh 03510900 45.2 0 0 0 45.28 5/4,5,7 Kalinjara Jari 03515200 408.9 10 0 0 398.99 5/4,5,7 Kalinjara Kalinjara 03515500 437.7 0 0 92 345.7
Kalinjara Total 891.8 10 0 92 789.8
10 5/7,6/8 Kushalpara Hindoliya Charan
03516700 188.4 0 0 0 188.4
11 6/5 Kushalpara Nagda Khurd 03516300 49.5 5 0 0 44.5Kushalpara Total 237.9 5 0 0 232.9
12 5/5,6 Potalia Tada Barla 03511000 321.1 0 0 0 321.113 4/5, 5/6 Potalia Umrawat 03504600 168.7 0 0 0 168.7
Potalia Total 489.8 0 0 0 489.814 6/1 Ramgarh Bagaycha 03522300 1027 727.8 0 0 299.2
Macro/Micro and Village area details
BANSWARA IWMP-I 2
S.No. Macro/micro
Name of Gram Panchayat
Name of Villages Covered
Census code of villages
Total Area
Forest area
Treated
Submergence area
Net Area (Ha)
Macro/Micro and Village area details
15 6/1 Ramgarh Hindoliya Khurd
03517500 55 5.8 0 0 49.2
16 6/1 Ramgarh Khankhariya 03522000 8 8 0 0 017 6/1 Ramgarh Kotri 03522400 673 536.4 0 0 136.618 6/8 Ramgarh Naganwat 03516400 81.9 0 0 0 81.919 6/8 Ramgarh Ramgarh 03516500 122.7 0 0 0 122.720 6/5 Ramgarh Richhwani 03516100 135.4 46.6 28.8 0 6021 6/5 Ramgarh chhapri 03516200 342.2 342.2 0 0 0
Ramgarh Total 2445.2 1667 28.8 0 749.622 5/6 Thummath Churada 03504700 155.2 0 0 0 155.223 4/5 Thummath Thummath 03504800 88.4 0 0 0 88.424 4/5 Thummath Rati Mahudi 03505000 82.4 0 0 0 82.4
Thummath Total 326 0 0 0 32625 5/5 Ukala Dhanpuri 03511100 39.6 0 0 0 39.626 5/5 Ukala Jora 03514600 59 0 0 0 5927 5/5 Ukala khajura 03514700 18 18 0 0 0
Ukala Total 116.6 18 0 0 98.628 5/4,5 Vasooni Vasooni 03515300 108 0 0 0 108
Vasooni Total 108 0 0 0 10829 6/1 kakanwani Ghartara 03504900 22 22 0 0 0
kakanwani Total 22 22 0 0 0Grand Total 5322.6 1722 28.8 92 3480
BANSWARA IWMP-I 3
CLIMATIC AND HYDROLOGICAL INFORMATION
The watershed falls in Agroclimatic Zone-IV B(Sub humid Tropic) .The soil texture is Red soil &
Clay Loam The average rainfall is 92.41cm . The temperatures in the area are in the range between
21.8 – 43.8 centigrade during summer and 11.8 to 26.0 centigrade during winter. The major crops
in the area are Maize, Soyabeen, Blackgram (urd), Green gram (moong),chick pea (channa), Wheat.
38.02 % land is under cultivation 5.96% pasture, 3.7 % land is wasteland. 14.32 % land is irrigated
through.
804 No of households are BPL and 2721 household are small and marginal farmers. Average land
holding in the area is 1.02 ha. The main source of irrigation is open well & canal. The average
annual rainfall (5 years) in the area is 924.10 mm. The Major streams in the Watershed are Gargal,
The major festivals in the village are Holi ,Deewali ,Bhawari, Dashamata & Chotmata. At present
these village is having All Familes population with Communities like Meena, yadav & Kalal.
BANSWARA IWMP-I 4
RAINFALL
1S. No. Year
1 20012 20023 20034 20045 20056 20067 20078 20089 2009
10 20102
S. No.i)ii)iii)iv)3
S. No.1234
S. No. Max Min1 43.8 21.82 26 11.83 31.2 14.9
Climatic and Hydrological information
i) Summer Seasonii) Winter Seasoniii) Rainy Season
iii) 60 minute duration 123Temperature (Degree C)
Season
i) 15 minute duration 42ii) 30 minute duration 70
September 303.4
Maximum rainfall intensity (mm)Duration rainfall intensity(mm)
July 347.4August 365.4
Average Monthly rainfall (last ten years)Month Rainfall(mm)June 62.4
713.5537.4
867.31134.5896.5
2188.2
Average Annual Rainfall(mm)Average Annual Rainfall(mm)
533.6490.6
1429.7449.8
BANSWARA IWMP-I 5
5
S. No.
1
2
3
6
1
2
3
4
(Source:- Agriculture Research Station, Banswara & Agri. Dept. Banswara.)
iii) Time of return of maximum flood 6
iv)Periodicity of Drought in village area 2002, 2008
Runoff
i) Peak Rate (cum/hr) 428040
ii) Total run off volume of rainy season (ha.m.) 375.35
ii) Winter 2.2
iii) Rainy 4.4
Season PET
i) Summer 16
Potential Evaporation Transpiration (PET) (mm/day)
BANSWARA IWMP-I 6
S.No Scheme Name of the department
Key interventions under the Scheme
Targeted Beneficiaries
Provisions under the Scheme
1 Atma Ag. Department To up date culivators through latest technology.
All Familes Total amount sanction by the gov.
2 NREGS Panchyat Samiti Construction of W.H.S,Gravel road, Individual beneficiaries work.
All Familes Total amount sanction by the gov.
3 MP LAD Panchyat Samiti Construction of community hall, c.c road, H.P, Pipeline for water supply.
All Familes Total amount sanction by the gov.
4 MLA LAD Panchyat Samiti Construction of community hall,c.c road, H.P, Pipe line for water supply.
All Familes Total amount sanction by the gov.
5 TSC Panchyat Samiti Con. of low cost toilet. All Familes 2200 Rs./Toilet subsidy given by the gov.
6 BRGF Panchyat Samiti Construction of community hall,c.c road, H.P, Pipe line for water supply
All Familes Total amount sanction by the gov.
OTHER DEVELOPMENT SCHEMES IN THE PROJECT AREA
BANSWARA IWMP-I 7
S.No Scheme Name of the department
Key interventions under the Scheme
Targeted Beneficiaries
Provisions under the Scheme
7 NLM Panchyat Samiti To streanthen S.H.G by providing loan from banks & subsidy from gov.
All Familes Loan cum Subsidy by GOVT.
8 NHM Horticulture Dept. To up date horticulture culivators through latest technology.
All Familes Subsidy by GOVT.
9 IAY Panchyat Samiti construction of houses all non house BPL Familes
Subsidy by GOVT.
10 NRDWP PHED Dept. provide quality water All Familes Total amount sanction by the gov.
11 RGGVY Electricity Dept. provide Electricity All BPL Familes
Total amount sanction by the gov.
12 RGGVY Electricity Dept. provide Electricity All BPL Familes
Total amount sanction by the gov.
13Rural Devlopment Schemes
NGO's(NMSF,GVT, BAIF, Vagdara & DKS)
Rural Devlopment Schemes All FamilesTotal amount sanction by the gov./ Subsidy/ donetion etc.
BANSWARA IWMP-I 8
(i) No. of villages connected to the main road by an all-weather road(ii) No. of villages provided with electricity(iii) No. of households without access to drinking water
No. of educational institutions : (P) (S) (HS) UPS Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational
institution(VI)32 2 1 14
(v) No. of villages with access to Primary Health Centre(vi) No. of villages with access to Veterinary Dispensary(vii) No. of villages with access to Post Office(viii) No. of villages with access to Banks(ix) No. of villages with access to Markets/ mandis(x) No. of villages with access to Agro-industries(xi) Total quantity of surplus milk
No. of milk collection centres (U) (S) (PA) (O)(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O)) 0 0 10 0
(xiii) No. of villages with access to Anganwadi Centre(xiv) Any other facilities with no. of villages (please specify)(xv) Nearest KVK
(xvii) NGOs(xviii) Credit institutions
(i) Bank(ii) Cooperative Society
(xix) Agro Service Centre's00
DETAILS OF INFRASTRUCTURE IN THE PROJECT AREAS
5
1
25
50 KM
331
(xvi) cooperative society 3
20
478(xii)
NIL(iv)
4
Parameters Status2525
BANSWARA IWMP-I 9
S.No123456
S.No12
3
456
1 Amit Dangar M 25 B.E. 0 -- Engg.2 Smt. Manjusha Balse F 28 MSW 5 -- Social Science3 Hitesh Katara M 25 B.Sc. 0 -- Ag, Science4 Ramesh Chandra Machhar M 32 diploma 5 -- Vatenary
S.No
WDT PARTICULARS
DWDU DETAILS
DesignationAddress with contact no., website
TelephoneFax
ParticularsPM ,DWDU
PIA PARTICULARS
INSTITUTIONAL ARRANGEMENTS
Details of DWDU
District Watershed Development Unit, Project ManagerSh. S.N. Pareek
Experience in watershed(Yrs)
Description of professional
trainingRole/ Function
Age QualificationName of WDT member M/F
ParticularsName of PIADesignation
Address with contact no., website
TelephoneFax
ER Nemichand Meena Details of PIA
02965 27526502965 275265
Panchayat Samiti Kushal Garh Disstt.Banswaramob.9414157194
Assistant Engineer
BANSWARA IWMP-I 10
S.N. Name of WCsDate of
Gram Sabha for WC
Designation Name M/F
SC/ST/OBC/General
Landless/MF/SF
/ BF
Name of
UG/SHG
Educational
qualification
Function(s)
assigned#
President Dhulsing/ Nurji M STMF
UG 8TH B
Secretary Mahesh/ Khatu M STMF
UG 12 th C
Member Badar/ Kumchand M STMF
UG Literate H
Rangji/ Tarheng M STMF
UG Literate I
Revla/ Khimji M STSF
UG Literate I
Jagji/ Punja M STMF
UG Literate H
Rama/ Mansinh F STSF
SHG Literate I
Janta/ Ramheng F STSF
SHG Literate I
Punji/ Badar F STMF
SHG Literate I
Chhagan/ Partha M STSF
UG Literate E
Sakna/ Ranaji M STMF
UG Literate E
Ramila/ Rajheng F STMF
SHG Literate E
DETAILS OF WATERSHED COMMITTEES (WC)
1 Watershed committee Potaliya
06/08/2010
BANSWARA IWMP-I 11
S.N. Name of WCsDate of
Gram Sabha for WC
Designation Name M/F
SC/ST/OBC/General
Landless/MF/SF
/ BF
Name of
UG/SHG
Educational
qualification
Function(s)
assigned#
President Dharu/ Galiya M STMF
UG 10 th B
Secretary Ramesh/ Mansingh M STMF
12 th C
Member Ramchand/ Jogi M STMF
Literate H
Valam/ Jogi M STMF
UG Literate I
Havla/ Joti M STSF
UG Literate I
Kumchand/ Partha M STMF
UG Literate H
Ramila/ Bhurji F STSF
SHG Literate I
Savita/ Ramesh F STSF
SHG Literate I
Valseng/ Bhuma M STMF
Literate I
Kabu/ kanheng F STSF
UG Literate E
Risam/ Kanji F STMF
Literate E
Savita/ Khatra F ST MF Literate E
DETAILS OF WATERSHED COMMITTEES (WC)
1 Watershed committee
Kushalpada
06/11/2010
BANSWARA IWMP-I 12
S.N. Name of WCsDate of
Gram Sabha for WC
Designation Name M/F
SC/ST/OBC/General
Landless/MF/SF
/ BF
Name of
UG/SHG
Educational
qualification
Function(s)
assigned#
President Narji/ Makhji M STMF
UG 10 th B
Secretary Rakesh/ Manshingh M STMF
UG 12 th C
Member Magan/ Moti M STMF
UG Literate H
Mansingh/ Hardar M STMF
UG Literate I
Vishram/ Paru M STSF
UG Literate I
Sushila/ Narji M STMF
SHG Literate H
Papi/ Kamlesh M STSF
SHG Literate I
Nahti/ Parkash F STSF
Literate I
Bahudi/ Rangji F STMF
SHG Literate I
Shyamji/ Jhitra M STSF
Literate E
Ramesh/ Hadiya M STMF
UG Literate E
DETAILS OF WATERSHED COMMITTEES (WC)
1 Watershed committee Ukala
06/08/2010
BANSWARA IWMP-I 13
S.N. Name of WCsDate of
Gram Sabha for WC
Designation Name M/F
SC/ST/OBC/General
Landless/MF/SF
/ BF
Name of
UG/SHG
Educational
qualification
Function(s)
assigned#
President Udaisinh/ Dhulsinh M STMF
UG 10 th BSecretary Dinesh/ Haliya M ST MF 12 th CMember Bhimchand/ Tolsingh M ST MF UG Literate H
Gobriya/ Kika M ST MF Literate IBhimchand/ Tita M ST SF Literate IHavsinh/ Madiya M ST MF Literate HHavla/ Kanji M ST SF UG Literate IRajesh/ Chuka M ST SF UG Literate IHavji/ Kika M ST MF Literate IBadar/ Ramji M ST SF Literate ERamila/ Dilip F ST MF SHG Literate ERatan/ Bhimchand F ST MF Literate ESamudi/ Gorshingh F ST MF SHG Literate EManjula/ Sagar F ST MF SHG Literate EAnita/ Havji F ST MF SHG Literate EMariyam/ Narshingh F ST MF SHG Literate EUdaising/ vajhingh M ST MF UG Literate E
DETAILS OF WATERSHED COMMITTEES (WC)
1 Watershed committee Kalinjra
08/12/2010
BANSWARA IWMP-I 14
S.N. Name of WCsDate of
Gram Sabha for WC
Designation Name M/F
SC/ST/OBC/General
Landless/MF/SF
/ BF
Name of
UG/SHG
Educational
qualification
Function(s)
assigned#
President Lalji / Valseng M STMF
UG 10 th B
Secretary Ravji / Manguji M STMF
UG 12 th C
Member Partheng / Lalu M STMF
UG Literate H
Shyamji / Magan M STMF
UG Literate I
Hurteng / Rama M STSF
UG Literate I
Bhartu / Parkash F STMF
SHG Literate H
sugan / Badru F STMF
SHG Literate H
Dhanji / Sisa M STMF
UG Literate H
Bhura / Lalji F STSF
SHG Literate I
Lakha / Dhanji F STMF
SHG Literate I
kalu / Dhira M STMF
UG Literate I
Sabi / Parbhu F STSF
SHG Literate E
Gaptu / Valchand M ST MF UG Literate E
DETAILS OF WATERSHED COMMITTEES (WC)
1 Watershed committee
Doongari para
10-8-2010
BANSWARA IWMP-I 15
S.N. Name of WCsDate of
Gram Sabha for WC
Designation Name M/F
SC/ST/OBC/General
Landless/MF/SF
/ BF
Name of
UG/SHG
Educational
qualification
Function(s)
assigned#
President Arjun / Dhira M ST MF UG 10 th BSecretary Balvant / Bahadur M ST MF 12 th C
MemberDineshchand / Motisinh M OBC
MFLiterate H
Hukiya / Jala M ST MF Literate IPujiya / Madsiya M ST SF UG Literate IBarji / Deva M ST MF SHG Literate HTajheng / Bijiya M ST SF UG Literate IBhartu / Gajheng M ST SF SHG Literate IDalu / Jiva F ST MF Literate IBabu / Jiva M ST SF Literate EParsingh / Pitha M ST MF UG Literate EVaja / Hudiya F ST MF UG Literate ELalu / Dhuliya M ST MF UG Literate EKhaturam / Duriya M ST MF UG Literate EGabu / Dhulji F ST MF Literate EKantu / Haliya F ST MF UG Literate EDhulji / Galiya M ST MF UG Literate ELakhji / Kachra M ST MF UG Literate EBalvant / Bahadur M ST MF Literate E
DETAILS OF WATERSHED COMMITTEES (WC)
1 Watershed committee
Timedabada
06/10/2010
BANSWARA IWMP-I 16
S.N. Name of WCsDate of
Gram Sabha for WC
Designation Name M/F
SC/ST/OBC/General
Landless/MF/SF
/ BF
Name of
UG/SHG
Educational
qualification
Function(s)
assigned#
Secretary Ravji / Manguji M ST MF UG 10 th cPresident Balvant / Vesta M ST MF UG 12 th bMember Mithu / Terhingh F ST MF SHG Literate H
Vira / Homa M ST MF Literate IDipchand / Limji M ST SF UG Literate IKanta / Lalu F ST MF Literate HPuniya / Mansinh M ST SF UG Literate IKadva / Kasu M ST SF Literate I
Vesta / Lalu M ST MF Literate I
Hariya / Sama M ST SF UG Literate E
Devichand / Hurpal M ST MF UG Literate E
Ramila / Jhitra F ST MF Literate E
Mansinh / Hurta M ST MF Literate E
Ramila / Paru F ST MF SHG Literate E
Hakara / Gangji M ST MF Literate E
Pithu / Hadiya F ST MF SHG Literate E
DETAILS OF WATERSHED COMMITTEES (WC)
1 Watershed committee Tummath
02/03/2011
BANSWARA IWMP-I 17
S.N. Name of WCsDate of
Gram Sabha for WC
Designation Name M/F
SC/ST/OBC/General
Landless/MF/SF
/ BF
Name of
UG/SHG
Educational
qualification
Function(s)
assigned#
President kalsing / Dipchand M ST MF UG 10 th BSecretary Dolsing / Bhanji M ST MF UG 12 th CMember Nanu / Dhuliya M ST MF UG Literate H
Ramesh / Jogi M ST MF UG Literate IKating / Hurji M ST SF UG Literate IJitmal / Bhura M ST MF UG Literate HKika / Bhimji F ST SF UG Literate IDilip / Dalseng M ST SF UG Literate ISukan / Jhithing M ST MF SHG Literate ILokendra / Bahadur M ST SF UG Literate ELalchand / Ranpa M ST MF SHG Literate EMira / Jitmal F ST MF SHG Literate EKala / Dharu F ST MF UG Literate EVala / Narseng F ST MF Literate EKamla / Dilip F ST MF SHG Literate ESamta / Sukan F ST MF SHG Literate ESakura / Bahadur F ST MF SHG Literate Ekala / Madiya M ST MF SHG Literate EJamna / Babu F ST MF UG Literate ETeja / Vijay F ST MF SHG Literate E
DETAILS OF WATERSHED COMMITTEES (WC)
1 Watershed committee Ramgarh
08/11/2010
BANSWARA IWMP-I 18
S.N. Name of WCsDate of
Gram Sabha for WC
Designation Name M/F
SC/ST/OBC/General
Landless/MF/SF
/ BF
Name of
UG/SHG
Educational
qualification
Function(s)
assigned#
President Ruplal / Jhitara M ST MF UG 10 th B
Secretary Dineshchanra / Haliya M STMF
UG 12 th CMember Bahadursinh / Ruplal M ST MF UG Literate H
Kama / Punja M ST MF UG Literate IThavra / Nathu M ST SF UG Literate IHurting / Vira M ST MF UG Literate HHarchand / Hadiya M ST SF UG Literate IHakru / Hira M ST SF UG Literate IDita / Partheng F ST MF UG Literate IHimchand / Choka M ST SF UG Literate EPartheng / Dalheng M ST MF UG Literate EVarji / Choka M ST MF UG Literate EJhamku / Makan F ST MF SHG Literate EDunda / Ramchand F ST MF UG Literate ERamchand / Dalheng M ST MF UG Literate EMedli / Parsingh F ST MF UG Literate EDineshchandra / Haliya M ST
MFUG Literate E
1 Watershed committee Vasooni
12/05/2010
DETAILS OF WATERSHED COMMITTEES (WC)
BANSWARA IWMP-I 19
S.N. Name of WCsDate of
Gram Sabha for WC
Designation Name M/F
SC/ST/OBC/General
Landless/MF/SF
/ BF
Name of
UG/SHG
Educational
qualification
Function(s)
assigned#
President Parbhulal / Havsingh M STMF
UG 10 th B
SecretaryBalvantsingh / Badrsingh M ST
MFUG 12 th C
Member Madsiya / Pitha M STMF
UG Literate H
Mansing / Jevata M STMF
UG Literate I
Maniya / Toliya M STSF
Literate I
Chamna / Hadiya M STMF
UG Literate H
Hurpal / Jeta M STSF
Literate I
Ralu / Dalhingh M STSF
Literate I
Ditu / Dalpat F STMF
SHG Literate I
Amla / Devchand F STSF
Literate E
Kanku / Dinesh F STMF
SHG Literate E
Shrmila / Raju F STMF
Literate E
DETAILS OF WATERSHED COMMITTEES (WC)
1 Watershed committee
Sharan
02/03/2011
BANSWARA IWMP-I 20
CHAPTER II PROBLEMS AND SCOPE OF IMPROVEMENT IN
THE PROJECT AREA
The socio economic conditions of the area can be improved through increased production
which can be achieved through expansion in cultivated area and productivity enhancement. 887.63
ha land is arable wasteland and 185.37 ha is fallow can be brought under cultivation.
762.06 ha is only irrigated and with efforts this can be increased to 1192.53 ha . The productivity
gap of major crops in the area as compared with district and with areas in the same agro climatic
zones indicate potential to increase the productivity. The demonstration of improved package of
practices, improved varieties, increased irrigation facilities and soil conservation measures under the
project can bridge this gap. Due to small land holdings in the area focus of the project would be on
diversification in agriculture (horticulture, vegetables, green houses, Agro forestry, fodder crops)and
diversification in Livelihoods(Agriculture, Animal husbandry, self employment)
BANSWARA IWMP-I 21
12800 Quantal fodder scarcity can be met out through Pasture development. Improved animal
Husbandry practices can increase the productivity of livestock. 0 no of persons migrate due to
unemployment this migration can be checked through creation of employment opportunities in the
project area through increase in production and diversification in agriculture and Livelihoods as
mentioned above.
Due to heavy slope, 1774.8 Ha Area is tend to high soil erosion & Lack of water availability in
surface & sub surface zone. Most of farmers are depend on rain for crop & taking single crop.
BANSWARA IWMP-I 22
CHAPTER – II
Male Female SC
4192 4159 58
BPL household L. Less Small Farmer M. Farmer Total household SC household ST household
804 0 2454 267 2854 21 2749
S. No.
1
2
3
4
(Source:- Health Dept. Banswara.)
79518351
Sex Ratio 921
Literacy (%) 0.604 0.56
SOCIO ECONOMIC FEATURES, PROBLEMS AND SCOPE
Population & Household Details:
Development indicators
Per capita income (Rs.) 16260 12170
992
Poverty ratio 0.22 0.28
Household Details
Total Population
STTotal
Project AreaStateDevelopment Indicators
BANSWARA IWMP-I 23
Private Panchayat Government Community Total
1 Agriculture Land 2023.61 0 0 0 2023.61
2 Temporary fallow 132.8 0 0 0 132.8
3 Permanent Fallow 52.57 0 0 0 52.57
4 Cultivated Rainfed 1076.18 0 0 0 1076.18
5 Cultivated irrigated 762.06 0 0 0 762.06
6 Net Sown Area 1838.24 0 0 0 1838.24
7 Net Area sown more than once 762.06 0 0 0 762.06
8 Forest Land 0 0 1721.8 0 1721.8
9 Waste Land 887.63 0 175.1 0 1062.73
10 Pastures 0 317.45 0 0 317.45
11 Others 0 0 197.01 0 197.01
12 Total 2911.24 317.45 2093.91 0 5322.6
S. No.
LAND USE
LAND USE OF WATERSHED AREA TOTAL
Total area in Ha.Land Use
BANSWARA IWMP-I 24
Private Panchayat Government Community Total
1 Agriculture Land 135.2 0 0 0 135.2
2 Temporary fallow 2.1 0 0 0 2.1
3 Permanent Fallow 0.3 0 0 0 0.3
4 Cultivated Rainfed 39.25 0 0 0 39.25
5 Cultivated irrigated 93.55 0 0 0 93.55
6 Net Sown Area 132.8 0 0 0 132.8
7 Net Area sown more than once 93.55 0 0 0 93.55
8 Forest Land 0 0 0 0 0
9 Waste Land 68.08 0 38.97 0 107.05
10 Pastures 0 79.2 0 0 79.2
11 Others 0 0 8.85 0 8.85
12 Total 203.28 79.2 47.82 0 330.3
Total area in Ha.S. No. Land Use
LAND USE OF WATERSHED AREA G.P. DOONGRI PARA
BANSWARA IWMP-I 25
Private Panchayat Government Community Total
1 Agriculture Land 62.4 0 0 0 62.4
2 Temporary fallow 0.1 0 0 0 0.1
3 Permanent Fallow 0 0 0 0 0
4 Cultivated Rainfed 9.28 0 0 0 9.28
5 Cultivated irrigated 53.02 0 0 0 53.02
6 Net Sown Area 62.3 0 0 0 62.3
7 Net Area sown more than once 53.02 0 0 0 53.02
8 Forest Land 0 0 0 0 0
9 Waste Land 8.1 0 10.15 0 18.25
10 Pastures 0 20.4 0 0 20.4
11 Others 0 0 1.35 0 1.35
12 Total 70.5 20.4 11.5 0 102.4
S. No. Land UseTotal area in Ha.
LAND USE OF VILLAGE DEVDA SATH
BANSWARA IWMP-I 26
Private Panchayat Government Community Total
1 Agriculture Land 72.8 0 0 0 72.8
2 Temporary fallow 2 0 0 0 2
3 Permanent Fallow 0.3 0 0 0 0.3
4 Cultivated Rainfed 29.97 0 0 0 29.97
5 Cultivated irrigated 40.53 0 0 0 40.53
6 Net Sown Area 70.5 0 0 0 70.5
7 Net Area sown more than once 40.53 0 0 0 40.53
8 Forest Land 0 0 0 0 0
9 Waste Land 59.98 0 28.82 0 88.8
10 Pastures 0 58.8 0 0 58.8
11 Others 0 0 7.5 0 7.5
12 Total 132.78 58.8 36.32 0 227.9
LAND USE OF VILLAGE HIMMAT PURA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 27
Private Panchayat Government Community Total
1 Agriculture Land 316.2 0 0 0 316.2
2 Temporary fallow 30 0 0 0 30
3 Permanent Fallow 14.5 0 0 0 14.5
4 Cultivated Rainfed 204.5 0 0 0 204.5
5 Cultivated irrigated 67.2 0 0 0 67.2
6 Net Sown Area 271.7 0 0 0 271.7
7 Net Area sown more than once 67.2 0 0 0 67.2
8 Forest Land 0 0 0 0 0
9 Waste Land 9.92 0 4.61 0 14.53
10 Pastures 0 4.43 0 0 4.43
11 Others 0 0 5.04 0 5.04
12 Total 326.12 4.43 9.65 0 340.2
LAND USE OF WATERSHED AREA G.P. TIMERA BARA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 28
Private Panchayat Government Community Total
1 Agriculture Land 203.5 0 0 0 203.5
2 Temporary fallow 23 0 0 0 23
3 Permanent Fallow 12 0 0 0 12
4 Cultivated Rainfed 137.5 0 0 0 137.5
5 Cultivated irrigated 31 0 0 0 31
6 Net Sown Area 168.5 0 0 0 168.5
7 Net Area sown more than once 31 0 0 0 31
8 Forest Land 0 0 0 0 0
9 Waste Land 3.3 0 1.5 0 4.8
10 Pastures 0 2.9 0 0 2.9
11 Others 0 0 2.3 0 2.3
12 Total 206.8 2.9 3.8 0 213.5
LAND USE OF VILLAGE TIMERA BARA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 29
Private Panchayat Government Community Total
1 Agriculture Land 35.5 0 0 0 35.5
2 Temporary fallow 3 0 0 0 3
3 Permanent Fallow 1 0 0 0 1
4 Cultivated Rainfed 22 0 0 0 22
5 Cultivated irrigated 9.5 0 0 0 9.5
6 Net Sown Area 31.5 0 0 0 31.5
7 Net Area sown more than once 9.5 0 0 0 9.5
8 Forest Land 0 0 0 0 0
9 Waste Land 2.42 0 1.51 0 3.93
10 Pastures 0 1.53 0 0 1.53
11 Others 0 0 1.54 0 1.54
12 Total 37.92 1.53 3.05 0 42.5
LAND USE OF VILLAGE BHAT MAHUDI
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 30
Private Panchayat Government Community Total
1 Agriculture Land 77.2 0 0 0 77.2
2 Temporary fallow 4 0 0 0 4
3 Permanent Fallow 1.5 0 0 0 1.5
4 Cultivated Rainfed 45 0 0 0 45
5 Cultivated irrigated 26.7 0 0 0 26.7
6 Net Sown Area 71.7 0 0 0 71.7
7 Net Area sown more than once 26.7 0 0 0 26.7
8 Forest Land 0 0 0 0 0
9 Waste Land 4.2 0 1.6 0 5.8
10 Pastures 0 0 0 0 0
11 Others 0 0 1.2 0 1.2
12 Total 81.4 0 2.8 0 84.2
LAND USE OF VILLAGE KOTRA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 31
Private Panchayat Government Community Total
1 Agriculture Land 4.5 0 0 0 4.5
2 Temporary fallow 0.1 0 0 0 0.1
3 Permanent Fallow 0.2 0 0 0 0.2
4 Cultivated Rainfed 4.2 0 0 0 4.2
5 Cultivated irrigated 0 0 0 0 0
6 Net Sown Area 4.2 0 0 0 4.2
7 Net Area sown more than once 0 0 0 0 0
8 Forest Land 0 0 0 0 0
9 Waste Land 4.27 0 0.3 0 4.57
10 Pastures 0 5.53 0 0 5.53
11 Others 0 0 0.2 0 0.2
12 Total 8.77 5.53 0.5 0 14.8
LAND USE OF G.P. SHARAN, VILLAGE CHANDERI
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 32
Private Panchayat Government Community Total
1 Agriculture Land 347 0 0 0 347
2 Temporary fallow 4.5 0 0 0 4.5
3 Permanent Fallow 2.4 0 0 0 2.4
4 Cultivated Rainfed 91.13 0 0 0 91.13
5 Cultivated irrigated 248.97 0 0 0 248.97
6 Net Sown Area 340.1 0 0 0 340.1
7 Net Area sown more than once 248.97 0 0 0 248.97
8 Forest Land 0 0 10 0 10
9 Waste Land 300.26 0 37.49 0 337.75
10 Pastures 0 94.16 0 0 94.16
11 Others 0 0 102.89 0 102.89
12 Total 647.26 94.16 150.38 0 891.8
LAND USE OF WATERSHED AREA G.P. KALINJRA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 33
Private Panchayat Government Community Total
1 Agriculture Land 18.4 0 0 0 18.4
2 Temporary fallow 0.3 0 0 0 0.3
3 Permanent Fallow 0 0 0 0 0
4 Cultivated Rainfed 18.1 0 0 0 18.1
5 Cultivated irrigated 0 0 0 0 0
6 Net Sown Area 18.1 0 0 0 18.1
7 Net Area sown more than once 0 0 0 0 0
8 Forest Land 0 0 0 0 0
9 Waste Land 0.12 0 0.13 0 0.25
10 Pastures 0 25.4 0 0 25.4
11 Others 0 0 1.15 0 1.15
12 Total 18.52 25.4 1.28 0 45.2
LAND USE OF VILLAGE BHART GARH
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 34
Private Panchayat Government Community Total
1 Agriculture Land 175.9 0 0 0 175.9
2 Temporary fallow 3 0 0 0 3
3 Permanent Fallow 2.4 0 0 0 2.4
4 Cultivated Rainfed 51.8 0 0 0 51.8
5 Cultivated irrigated 118.7 0 0 0 118.7
6 Net Sown Area 170.5 0 0 0 170.5
7 Net Area sown more than once 118.7 0 0 0 118.7
8 Forest Land 0 0 10 0 10
9 Waste Land 199.14 0 4.96 0 204.1
10 Pastures 0 13.76 0 0 13.76
11 Others 0 0 5.14 0 5.14
12 Total 375.04 13.76 20.1 0 408.9
LAND USE OF VILLAGE JARI
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 35
Private Panchayat Government Community Total
1 Agriculture Land 152.7 0 0 0 152.7
2 Temporary fallow 1.2 0 0 0 1.2
3 Permanent Fallow 0 0 0 0 0
4 Cultivated Rainfed 21.23 0 0 0 21.23
5 Cultivated irrigated 130.27 0 0 0 130.27
6 Net Sown Area 151.5 0 0 0 151.5
7 Net Area sown more than once 130.27 0 0 0 130.27
8 Forest Land 0 0 0 0 0
9 Waste Land 101 0 32.4 0 133.4
10 Pastures 0 55 0 0 55
11 Others 0 0 96.6 0 96.6
12 Total 253.7 55 129 0 437.7
LAND USE OF VILLAGE KALINJRA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 36
Private Panchayat Government Community Total
1 Agriculture Land 140.92 0 0 0 140.92
2 Temporary fallow 12.3 0 0 0 12.3
3 Permanent Fallow 2 0 0 0 2
4 Cultivated Rainfed 72.12 0 0 0 72.12
5 Cultivated irrigated 54.5 0 0 0 54.5
6 Net Sown Area 126.62 0 0 0 126.62
7 Net Area sown more than once 54.5 0 0 0 54.5
8 Forest Land 0 0 5 0 5
9 Waste Land 68.7 0 19.4 0 88.1
10 Pastures 0 0 0 0 0
11 Others 0 0 3.88 0 3.88
12 Total 209.62 0 28.28 0 237.9
LAND USE OF WATERSHED AREA G.P. KUSHALA PARA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 37
Private Panchayat Government Community Total
1 Agriculture Land 98.42 0 0 0 98.42
2 Temporary fallow 12 0 0 0 12
3 Permanent Fallow 2 0 0 0 2
4 Cultivated Rainfed 72.12 0 0 0 72.12
5 Cultivated irrigated 12.3 0 0 0 12.3
6 Net Sown Area 84.42 0 0 0 84.42
7 Net Area sown more than once 12.3 0 0 0 12.3
8 Forest Land 0 0 0 0 0
9 Waste Land 67.3 0 19 0 86.3
10 Pastures 0 0 0 0 0
11 Others 0 0 3.68 0 3.68
12 Total 165.72 0 22.68 0 188.4
LAND USE OF VILLAGE Hindoliya Charan
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 38
Private Panchayat Government Community Total
1 Agriculture Land 42.5 0 0 0 42.5
2 Temporary fallow 0.3 0 0 0 0.3
3 Permanent Fallow 0 0 0 0 0
4 Cultivated Rainfed 0 0 0 0 0
5 Cultivated irrigated 42.2 0 0 0 42.2
6 Net Sown Area 42.2 0 0 0 42.2
7 Net Area sown more than once 42.2 0 0 0 42.2
8 Forest Land 0 0 5 0 5
9 Waste Land 1.4 0 0.4 0 1.8
10 Pastures 0 0 0 0 0
11 Others 0 0 0.2 0 0.2
12 Total 43.9 0 5.6 0 49.5
LAND USE OF VILLAGE Nagda Khurd
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 39
Private Panchayat Government Community Total
1 Agriculture Land 136.8 0 0 0 136.8
2 Temporary fallow 9.7 0 0 0 9.7
3 Permanent Fallow 4.1 0 0 0 4.1
4 Cultivated Rainfed 24.8 0 0 0 24.8
5 Cultivated irrigated 98.2 0 0 0 98.2
6 Net Sown Area 123 0 0 0 123
7 Net Area sown more than once 98.2 0 0 0 98.2
8 Forest Land 0 0 0 0 0
9 Waste Land 320.83 0 4.8 0 325.63
10 Pastures 0 8.1 0 0 8.1
11 Others 0 0 19.27 0 19.27
12 Total 457.63 8.1 24.07 0 489.8
LAND USE OF WATERSHED AREA G.P. POTLIYA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 40
Private Panchayat Government Community Total
1 Agriculture Land 61.1 0 0 0 61.1
2 Temporary fallow 5.7 0 0 0 5.7
3 Permanent Fallow 2.1 0 0 0 2.1
4 Cultivated Rainfed 20.3 0 0 0 20.3
5 Cultivated irrigated 33 0 0 0 33
6 Net Sown Area 53.3 0 0 0 53.3
7 Net Area sown more than once 33 0 0 0 33
8 Forest Land 0 0 0 0 0
9 Waste Land 246.7 0 3.5 0 250.2
10 Pastures 0 0 0 0 0
11 Others 0 0 9.8 0 9.8
12 Total 307.8 0 13.3 0 321.1
LAND USE OF VILLAGE TANDA BARDA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 41
Private Panchayat Government Community Total
1 Agriculture Land 75.7 0 0 0 75.7
2 Temporary fallow 4 0 0 0 4
3 Permanent Fallow 2 0 0 0 2
4 Cultivated Rainfed 4.5 0 0 0 4.5
5 Cultivated irrigated 65.2 0 0 0 65.2
6 Net Sown Area 69.7 0 0 0 69.7
7 Net Area sown more than once 65.2 0 0 0 65.2
8 Forest Land 0 0 0 0 0
9 Waste Land 74.13 0 1.3 0 75.43
10 Pastures 0 8.1 0 0 8.1
11 Others 0 0 9.47 0 9.47
12 Total 149.83 8.1 10.77 0 168.7
LAND USE OF VILLAGE UMRAWAT
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 42
Private Panchayat Government Community Total
1 Agriculture Land 535.9 0 0 0 535.9
2 Temporary fallow 65.2 0 0 0 65.2
3 Permanent Fallow 23.3 0 0 0 23.3
4 Cultivated Rainfed 403.59 0 0 0 403.59
5 Cultivated irrigated 43.81 0 0 0 43.81
6 Net Sown Area 447.4 0 0 0 447.4
7 Net Area sown more than once 43.81 0 0 0 43.81
8 Forest Land 0 0 1324.6 0 1324.6
9 Waste Land 75.76 0 38 0 113.76
10 Pastures 0 86.93 0 0 86.93
11 Others 0 0 41.81 0 41.81
12 Total 611.66 86.93 1404.41 0 2103
LAND USE OF WATERSHED AREA G.P. RAM GARH
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 43
Private Panchayat Government Community Total
1 Agriculture Land 213 0 0 0 213
2 Temporary fallow 27.5 0 0 0 27.5
3 Permanent Fallow 11.4 0 0 0 11.4
4 Cultivated Rainfed 161.8 0 0 0 161.8
5 Cultivated irrigated 12.3 0 0 0 12.3
6 Net Sown Area 174.1 0 0 0 174.1
7 Net Area sown more than once 12.3 0 0 0 12.3
8 Forest Land 0 0 727.8 0 727.8
9 Waste Land 38.88 0 26.5 0 65.38
10 Pastures 0 13.72 0 0 13.72
11 Others 0 0 7.1 0 7.1
12 Total 251.88 13.72 761.4 0 1027
LAND USE OF VILLAGE BAGAYCHA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 44
Private Panchayat Government Community Total
1 Agriculture Land 41 0 0 0 41
2 Temporary fallow 1.2 0 0 0 1.2
3 Permanent Fallow 0.45 0 0 0 0.45
4 Cultivated Rainfed 36.94 0 0 0 36.94
5 Cultivated irrigated 2.41 0 0 0 2.41
6 Net Sown Area 39.35 0 0 0 39.35
7 Net Area sown more than once 2.41 0 0 0 2.41
8 Forest Land 0 0 5.8 0 5.8
9 Waste Land 1.46 0 0.97 0 2.43
10 Pastures 0 4.37 0 0 4.37
11 Others 0 0 1.4 0 1.4
12 Total 42.46 4.37 8.17 0 55
LAND USE OF VILLAGE HINDOLIYA KHURD
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 45
Private Panchayat Government Community Total
1 Agriculture Land 0 0 0 0 0
2 Temporary fallow 0 0 0 0 0
3 Permanent Fallow 0 0 0 0 0
4 Cultivated Rainfed 0 0 0 0 0
5 Cultivated irrigated 0 0 0 0 0
6 Net Sown Area 0 0 0 0 0
7 Net Area sown more than once 0 0 0 0 0
8 Forest Land 0 0 8 0 8
9 Waste Land 0 0 0 0 0
10 Pastures 0 0 0 0 0
11 Others 0 0 0 0 0
12 Total 0 0 8 0 8
LAND USE OF VILLAGE KHANKHARIYA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 46
Private Panchayat Government Community Total
1 Agriculture Land 125 0 0 0 125
2 Temporary fallow 23.1 0 0 0 23.1
3 Permanent Fallow 4.5 0 0 0 4.5
4 Cultivated Rainfed 93.93 0 0 0 93.93
5 Cultivated irrigated 3.47 0 0 0 3.47
6 Net Sown Area 97.4 0 0 0 97.4
7 Net Area sown more than once 3.47 0 0 0 3.47
8 Forest Land 0 0 536.4 0 536.4
9 Waste Land 6.17 0 3 0 9.17
10 Pastures 0 0 0 0 0
11 Others 0 0 2.43 0 2.43
12 Total 131.17 0 541.83 0 673
LAND USE OF VILLAGE KOTRI
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 47
Private Panchayat Government Community Total
1 Agriculture Land 33.9 0 0 0 33.9
2 Temporary fallow 5.2 0 0 0 5.2
3 Permanent Fallow 2.1 0 0 0 2.1
4 Cultivated Rainfed 20.29 0 0 0 20.29
5 Cultivated irrigated 6.31 0 0 0 6.31
6 Net Sown Area 26.6 0 0 0 26.6
7 Net Area sown more than once 6.31 0 0 0 6.31
8 Forest Land 0 0 0 0 0
9 Waste Land 20.57 0 6.41 0 26.98
10 Pastures 0 19.94 0 0 19.94
11 Others 0 0 1.08 0 1.08
12 Total 54.47 19.94 7.49 0 81.9
LAND USE OF VILLAGE NAGANWAT
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 48
Private Panchayat Government Community Total
1 Agriculture Land 68.7 0 0 0 68.7
2 Temporary fallow 6.1 0 0 0 6.1
3 Permanent Fallow 2.45 0 0 0 2.45
4 Cultivated Rainfed 48.95 0 0 0 48.95
5 Cultivated irrigated 11.2 0 0 0 11.2
6 Net Sown Area 60.15 0 0 0 60.15
7 Net Area sown more than once 11.2 0 0 0 11.2
8 Forest Land 0 0 0 0 0
9 Waste Land 4.98 0 0.8 0 5.78
10 Pastures 0 47.62 0 0 47.62
11 Others 0 0 0.6 0 0.6
12 Total 73.68 47.62 1.4 0 122.7
LAND USE OF VILLAGE RAM GARH
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 49
Private Panchayat Government Community Total
1 Agriculture Land 54.3 0 0 0 54.3
2 Temporary fallow 2.1 0 0 0 2.1
3 Permanent Fallow 2.4 0 0 0 2.4
4 Cultivated Rainfed 41.68 0 0 0 41.68
5 Cultivated irrigated 8.12 0 0 0 8.12
6 Net Sown Area 49.8 0 0 0 49.8
7 Net Area sown more than once 8.12 0 0 0 8.12
8 Forest Land 0 0 46.6 0 46.6
9 Waste Land 3.7 0 0.32 0 4.02
10 Pastures 0 1.28 0 0 1.28
11 Others 0 0 29.2 0 29.2
12 Total 58 1.28 76.12 0 135.4
LAND USE OF VILLAGE RICHHWANI
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 50
Private Panchayat Government Community Total
1 Agriculture Land 227.69 0 0 0 227.69
2 Temporary fallow 4.9 0 0 0 4.9
3 Permanent Fallow 4.12 0 0 0 4.12
4 Cultivated Rainfed 80.02 0 0 0 80.02
5 Cultivated irrigated 138.65 0 0 0 138.65
6 Net Sown Area 218.67 0 0 0 218.67
7 Net Area sown more than once 138.65 0 0 0 138.65
8 Forest Land 0 0 0 0 0
9 Waste Land 30.74 0 26.66 0 57.4
10 Pastures 0 30.9 0 0 30.9
11 Others 0 0 10.01 0 10.01
12 Total 258.43 30.9 36.67 0 326
LAND USE OF WATERSHED AREA G.P. THUMMATH
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 51
Private Panchayat Government Community Total
1 Agriculture Land 93.9 0 0 0 93.9
2 Temporary fallow 3.4 0 0 0 3.4
3 Permanent Fallow 4.12 0 0 0 4.12
4 Cultivated Rainfed 78.23 0 0 0 78.23
5 Cultivated irrigated 8.15 0 0 0 8.15
6 Net Sown Area 86.38 0 0 0 86.38
7 Net Area sown more than once 8.15 0 0 0 8.15
8 Forest Land 0 0 0 0 0
9 Waste Land 28.3 0 6.2 0 34.5
10 Pastures 0 20.4 0 0 20.4
11 Others 0 0 6.4 0 6.4
12 Total 122.2 20.4 12.6 0 155.2
LAND USE OF VILLAGE CHURADA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 52
Private Panchayat Government Community Total
1 Agriculture Land 70.76 0 0 0 70.76
2 Temporary fallow 1.2 0 0 0 1.2
3 Permanent Fallow 0 0 0 0 0
4 Cultivated Rainfed 1.16 0 0 0 1.16
5 Cultivated irrigated 68.4 0 0 0 68.4
6 Net Sown Area 69.56 0 0 0 69.56
7 Net Area sown more than once 68.4 0 0 0 68.4
8 Forest Land 0 0 0 0 0
9 Waste Land 1.2 0 8.34 0 9.54
10 Pastures 0 5.7 0 0 5.7
11 Others 0 0 2.4 0 2.4
12 Total 71.96 5.7 10.74 0 88.4
LAND USE OF VILLAGE THUMMATH
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 53
Private Panchayat Government Community Total
1 Agriculture Land 63.03 0 0 0 63.03
2 Temporary fallow 0.3 0 0 0 0.3
3 Permanent Fallow 0 0 0 0 0
4 Cultivated Rainfed 0.63 0 0 0 0.63
5 Cultivated irrigated 62.1 0 0 0 62.1
6 Net Sown Area 62.73 0 0 0 62.73
7 Net Area sown more than once 62.1 0 0 0 62.1
8 Forest Land 0 0 0 0 0
9 Waste Land 1.24 0 12.12 0 13.36
10 Pastures 0 4.8 0 0 4.8
11 Others 0 0 1.21 0 1.21
12 Total 64.27 4.8 13.33 0 82.4
LAND USE OF VILLAGE RATI MAHUDI
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 54
Private Panchayat Government Community Total
1 Agriculture Land 80.4 0 0 0 80.4
2 Temporary fallow 2.3 0 0 0 2.3
3 Permanent Fallow 0.8 0 0 0 0.8
4 Cultivated Rainfed 71.42 0 0 0 71.42
5 Cultivated irrigated 5.88 0 0 0 5.88
6 Net Sown Area 77.3 0 0 0 77.3
7 Net Area sown more than once 5.88 0 0 0 5.88
8 Forest Land 0 0 0 0 0
9 Waste Land 4.68 0 1.66 0 6.34
10 Pastures 0 8.2 0 0 8.2
11 Others 0 0 3.66 0 3.66
12 Total 85.08 8.2 5.32 0 98.6
LAND USE OF WATERSHED AREA G.P. UKALA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 55
Private Panchayat Government Community Total
1 Agriculture Land 34.4 0 0 0 34.4
2 Temporary fallow 1.1 0 0 0 1.1
3 Permanent Fallow 0.2 0 0 0 0.2
4 Cultivated Rainfed 29.63 0 0 0 29.63
5 Cultivated irrigated 3.47 0 0 0 3.47
6 Net Sown Area 33.1 0 0 0 33.1
7 Net Area sown more than once 3.47 0 0 0 3.47
8 Forest Land 0 0 0 0 0
9 Waste Land 2.18 0 0.46 0 2.64
10 Pastures 0 0 0 0 0
11 Others 0 0 2.56 0 2.56
12 Total 36.58 0 3.02 0 39.6
LAND USE OF VILLAGE DHANPURI
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 56
Private Panchayat Government Community Total
1 Agriculture Land 46 0 0 0 46
2 Temporary fallow 1.2 0 0 0 1.2
3 Permanent Fallow 0.6 0 0 0 0.6
4 Cultivated Rainfed 41.79 0 0 0 41.79
5 Cultivated irrigated 2.41 0 0 0 2.41
6 Net Sown Area 44.2 0 0 0 44.2
7 Net Area sown more than once 2.41 0 0 0 2.41
8 Forest Land 0 0 0 0 0
9 Waste Land 2.5 0 1.2 0 3.7
10 Pastures 0 8.2 0 0 8.2
11 Others 0 0 1.1 0 1.1
12 Total 48.5 8.2 2.3 0 59
LAND USE OF VILLAGE JORA
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 57
Private Panchayat Government Community Total
1 Agriculture Land 99 0 0 0 99
2 Temporary fallow 1.7 0 0 0 1.7
3 Permanent Fallow 0.85 0 0 0 0.85
4 Cultivated Rainfed 85.15 0 0 0 85.15
5 Cultivated irrigated 11.3 0 0 0 11.3
6 Net Sown Area 96.45 0 0 0 96.45
7 Net Area sown more than once 11.3 0 0 0 11.3
8 Forest Land 0 0 0 0 0
9 Waste Land 4.39 0 3.21 0 7.6
10 Pastures 0 0 0 0 0
11 Others 0 0 1.4 0 1.4
12 Total 103.39 0 4.61 0 108
LAND USE OF WATERSHED AREA G.P. VASOONI, VILLAGE VASOONI
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 58
Private Panchayat Government Community Total
1 Agriculture Land 0 0 0 0 0
2 Temporary fallow 0 0 0 0 0
3 Permanent Fallow 0 0 0 0 0
4 Cultivated Rainfed 0 0 0 0 0
5 Cultivated irrigated 0 0 0 0 0
6 Net Sown Area 0 0 0 0 0
7 Net Area sown more than once 0 0 0 0 0
8 Forest Land 0 0 342.2 0 342.2
9 Waste Land 0 0 0 0 0
10 Pastures 0 0 0 0 0
11 Others 0 0 0 0 0
12 Total 0 0 342.2 0 342.2
LAND USE OF VILLAGE Chhapri
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 59
Private Panchayat Government Community Total
1 Agriculture Land 0 0 0 0 0
2 Temporary fallow 0 0 0 0 0
3 Permanent Fallow 0 0 0 0 0
4 Cultivated Rainfed 0 0 0 0 0
5 Cultivated irrigated 0 0 0 0 0
6 Net Sown Area 0 0 0 0 0
7 Net Area sown more than once 0 0 0 0 0
8 Forest Land 0 0 18 0 18
9 Waste Land 0 0 0 0 0
10 Pastures 0 0 0 0 0
11 Others 0 0 0 0 0
12 Total 0 0 18 0 18
Land UseTotal area in Ha.
LAND USE OF VILLAGE Khajura
S. No.
BANSWARA IWMP-I 60
Private Panchayat Government Community Total
1 Agriculture Land 0 0 0 0 0
2 Temporary fallow 0 0 0 0 0
3 Permanent Fallow 0 0 0 0 0
4 Cultivated Rainfed 0 0 0 0 0
5 Cultivated irrigated 0 0 0 0 0
6 Net Sown Area 0 0 0 0 0
7 Net Area sown more than once 0 0 0 0 0
8 Forest Land 0 0 22 0 22
9 Waste Land 0 0 0 0 0
10 Pastures 0 0 0 0 0
11 Others 0 0 0 0 0
12 Total 0 0 22 0 22
LAND USE OF WATERSHED AREA G.P. Kakanwani, VILLAGE Ghartara
S. No. Land UseTotal area in Ha.
BANSWARA IWMP-I 61
The project area has 887.63 ha of cultivable wasteland . 185.37 ha of fallow land (total 1073
ha) can be brought under cultivation if some irrigation source can be provided through Construction of
WHS like Khadin, Tanka, Farm ponds etc. and also through demonstration of rainfed varieties of
crops. Construction of WHS can also increase in area under irrigation which is only 14.32 %
175.1 ha. is under wastelands and can be brought under vegetative cover, with reasonable effort
.Activities like Earthen check dams, Vegetative filter strip, V-ditches, staggered trenches ,WHS,
Afforestation of wastelands and Pasture development will be taken up on these landsPasture
development the land use table shows that there is 317.45 hectare pasture land. This emphasizes the
need for taking up pastureland development works through sowing of promising species of grasses and
plantation
BANSWARA IWMP-I 62
Cropping Status
Variety Area(Ha) Production(Ton)
Productivity (kg/Ha) Area(Ha) Production
(Ton)Productivity
(kg/Ha) Area(Ha) Production(Ton)
1 2 3 4 5 6 7 8 9 10 11 121 1 Kharif Maize GANGA 2 936.28 644.16 6.88 602.03 493.66 8.20 1538.3 1137.823 Urd PU 19 75.33 17.33 2.30 15.24 0.38 0.25 90.5738 17.715 MOONG K 851 43.05 71.24 16.55 38.10 19.05 5.00 81.1502 90.296 Soyabeen raj 851 21.52 10.27 4.77 106.69 5.44 0.51 128.212 15.717 2 Rabi Wheat Lok 1 594.41 743.01 12.5 594.407 743.018 Maize kaveri 50 121.93 99.98 8.20 121.93 99.98
9 Gram DAHOD YELLOW 45.72 24.37 5.33 45.7236 24.37
11 3 Zaid moong 22.86 11.43 5 22.8618 11.4312 Total 1076.18 742.99 762.06 1397.33 2623.1618 2140.32
(Source:- Agriculture Research Station, Banswara & Agri. Dept. Banswara.)
AGRICULTURE AND HORTICULTURE STATUS AND FUEL AVAILABILITY
Abstract of cropped Area(ha)
Area under Single crop
Area under Double crop
S. No.TotalRainfed Irrigated
Season Crop sown
Area under Multiple crop
1076.18
762.06
22.86
BANSWARA IWMP-I 63
S.No
Name of crop
Present variety
Rec. variety Reason of Rec. variety.
1 Maize GANGA 2 Mahi
Dhaval
Maturity peroid 75-80 Days(early maturity),Production 35-40 q/Ha,Less water reruired but tolrent to excess water,market
value is good due to high strach &appreance,tolrent to logging.
This variety is most sutaible for this W/S Area.2 Urd PU 19 RBU-338 Maturity peroid 90 Days(early maturity),Production 10-12
q/Ha,Less water reruired,market value is good due to high
strach &appreance,tolrent to logging,resistance to bacterial
diseases . This variety is most sutaible for this W/S Area.3 Til RT 46 TC -25 White seed variety,Maturity peroid 95 Days(early
maturity),Production 6-7 q/Ha,Less water reruired,market value is good &appreance,tolrent to logging,resistance to
bacterial diseases This variety is most sutaible for this W/S Area.
4 MOONG K 851 SML 668 Maturity period 85 days plants are erect determinate and medium statured 85 cm possesses bolder green grain s with good yellow mosaic varius cercospora leaf spot and bacterial
leaf spot diseases its yield potential 15 -18 quintal/hac..This variety is most sutaible for this W/S Area.
Present used and Rec. Variety
BANSWARA IWMP-I 64
S.No
Name of crop
Present variety
Rec. variety Reason of Rec. variety.
5 Wheat Lok 1 RAJ 3765 Maturity period 110-120 days and plant height is 89-95 cm,Heat tolerant and susceptible to dust , moderately resistant
tokarnal bunt , yield porential is40-50q/Ha. This variety is
most sutaible for this W/S Area & good market value.6 Gram DAHOD
YELLOWGNG 469 Maturity period 90-95 days, Sutiable for rainfed area,
resistance to wild disease , yield porential is 20-24 q/Ha.7 Soyabee
nlocal raj 851 This variety is most sutaible for this W/S Area .
(Source:- Agriculture Research Station, Banswara & Agri. Dept. Banswara.)
Crop Rotation
Maize - MustredGramUrd - WheatMoong - Wheat Soyabeen - Wheat Fallow - GramFallow - maize
Soil and Water conservation measures besides putting fallow lands under cultivation can change the area under single cropping to double and multiple cropping.
The table shows that only 105.6 ha is double cropped area. Also the crop rotation shows that fallow lands are
there. This indicates that there is scope for change in crop rotation in fields where there are fallow lands through Soil and
Water conservation measures, crop demonstration and diversification in agriculture.
BANSWARA IWMP-I 65
India Highest Average in Rajasthan
Highest Average of Agro climatic zone District Project Area
Maize 2335 1976 2228 1273 1132
JAWAR 730 1634 1056 526 512
Urd 650 620 282 222 207
Til 585 663 292 263 250
MOONG 710 699 455 422 390
Wheat 2802 3422 2614 2107 1860
Barely 1985 2838 3061 1722 1500
Gram 762 1190 931 931 910
Mustred 1001 1619 1271 818 640
(Source:- Agriculture Research Station, Banswara & Agri. Dept. Banswara.)
Name of the crop
Productivity kg/ha
Productivity Gap Analysis
BANSWARA IWMP-I 66
3000
3500
4000
PRODUCTIVITY GAP ANALYSIS
India
Highest Average in Rajasthan
Highest Average of Agro climatic zone
District
Project Area
BANSWARA IWMP-II 67
0
500
1000
1500
2000
2500
Maize JAWAR Urd Til MOONG Wheat Barely Gram Mustred
PRO
DU
CTI
VITY
KG
/HA
CROPS
Analysis of the above table indicate that besides national gap there is wide gap in productivity within state and even
within same agro climatic zones.
The reasons for this variation are
· The farmers are using varieties Ganga 2 of Maize . whereas the recommended varieties like Mahi dhaval 35-40 q/Ha yield .
· The farmers are using varieties PU19 of Urd .whereas the recommended varieties like RBU338 provide 10-12
q/Ha yield
· The farmers are using varieties K851 of Moong .whereas the recommended varieties like SML 668 provide 15-18
Q/Ha.yield .
· The farmers are using varieties LOK 1 of WHEAT . whereas the recommended varieties like RAJ 3765 provide 35-
40q/Ha yield .
· The farmers are using varieties DAHOD YELLOW of GRAM . whereas the recommended varieties like GNG 469
provide 25-30 q/Ha. yield .
· Lack of Availability of good quality seeds of desired crop and variety in adequate quantities and time to the
farmers.
· Availability of water for cultivation 14.32 %.
BANSWARA IWMP-I 68
Activity Area Species Varieties Recommended varieties Production (Kg/ha)Horticulture 0 0 0 0 0
Vegetables
Tomato Pusha rubi Pussa Sankar 1 1500-1800
Ladyfinger Pusha sawani Sankar ganga 1200-1600
Bottle gourd Desi Sankar shramgivi 1400-1500
Gawar M43 Pussa navkhar 1500-1700
Bringal Desi Pussa sankar 1200-1300
Tomato Pusha rubi Pussa Sankar 1 1300-1500
Cabbage Desi Sankar green express 1400-1600
Floricuture 0 0 0 0 0
Medicinal plants 0 0 0 0 0
Rabi 35.6
The productivity gap and reasons of it indicate potential to increase the productivity through crop demonstration .Crop
demonstrations would be carried out on improved crops/ varieties, improved agronomic practices. INM, IPM, Mixed cropping,
distribution of fodder seed mini kit. Demonstration of improved methods and economics of fodder crops cultivation and also
distribution foundation seeds of Forage Crops for further multiplication, introduction of fodder crops in the existing crop rotations.
Existing area under horticulture/Vegetables/Floriculture (ha)
Kharif 17.33
BANSWARA IWMP-I 69
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 175 137.3 600.6 738.0 0.0 5.2 716.8 16.0 28.5
(ii) Small farmer 267 165.2 257.6 425.8 3.7 1.5 416.8 3.7 122.4
(iii) Marginal farmer 2454 459.6 1291.0 1747.5 11.3 12.4 1668.0 55.9 419.5
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 804 291.9 278.5 570.4 1.3 5.3 561.4 2.4 570.4
TOTAL 2854 762.06 2149.2 2911.2 15.0 24.4 3362.9 78.0 1140.8
LAND HOLDING PATTERN IN PROJECT AREA
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
Type of Farmer Total Households
BANSWARA IWMP-I 70
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 2 0.7 6.7 7.3 0.0 0.0 7.3 0.0 3.5
(ii) Small farmer 13 4.4 16.0 20.4 0.0 0.0 18.9 1.5 6.5
(iii) Marginal farmer 108 6.3 69.4 75.6 0.0 0.0 74.7 1.0 16.7
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 34 11.4 15.2 26.7 0.0 0.0 26.7 0.0 26.7
TOTAL 123 11.30 92.1 103.4 0.0 0.0 101.0 2.4 26.7
LAND HOLDING PATTERN IN GP VASOONI, VILLAGE VASOONI
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 71
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 3 0.2 8.3 8.5 0.0 0.0 8.5 0.0 0.0
(ii) Small farmer 9 0.5 13.7 14.1 0.0 0.0 14.1 0.0 2.1
(iii) Marginal farmer 115 5.2 57.2 62.4 0.0 0.0 62.0 0.4 27.7
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 43 2.5 27.4 29.8 0.0 0.0 29.8 0.0 29.8
TOTAL 127 5.88 79.2 85.1 0.0 0.0 84.7 0.4 29.8
LAND HOLDING PATTERN IN GP UKALA
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 72
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 2 0.1 5.6 5.7 0.0 0.0 5.7 0.0 0.0
(ii) Small farmer 5 0.3 7.5 7.9 0.0 0.0 7.9 0.0 2.1
(iii) Marginal farmer 44 3.0 20.0 23.0 0.0 0.0 23.0 0.0 19.4
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 30 2.0 19.5 21.5 0.0 0.0 21.5 0.0 21.5
TOTAL 51 3.47 33.1 36.6 0.0 0.0 36.6 0.0 21.5
DHANPURI
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 73
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 1 0.0 2.7 2.8 0.0 0.0 2.8 0.0 0.0
(ii) Small farmer 4 0.1 6.2 6.3 0.0 0.0 6.3 0.0 0.0
(iii) Marginal farmer 71 2.3 37.2 39.5 0.0 0.0 39.0 0.4 8.3
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 13 0.4 7.9 8.3 0.0 0.0 8.3 0.0 8.3
TOTAL 76 2.41 46.1 48.5 0.0 0.0 48.1 0.4 8.3
JORA
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 74
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 10 11.1 20.5 31.6 0.0 2.2 29.3 0.0 0.0
(ii) Small farmer 22 31.5 3.0 34.5 0.0 0.0 34.5 0.0 1.4
(iii) Marginal farmer 313 96.0 96.3 192.3 0.0 2.8 185.6 4.0 124.0
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 203 94.2 31.3 125.4 0.0 0.0 125.1 0.4 125.4
TOTAL 345 138.65 119.8 258.4 0.0 5.0 249.4 4.0 125.4
Land holding (ha)Social group wise
LAND HOLDING PATTERN IN GP THUMMATH
Type of Farmer Total Households
Land holding (ha) irrigation source wise
BANSWARA IWMP-I 75
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 7 1.3 20.1 21.5 0.0 0.0 21.5 0.0 0.0
(ii) Small farmer 2 1.0 2.1 3.1 0.0 0.0 3.1 0.0 0.0
(iii) Marginal farmer 114 5.8 91.8 97.6 0.0 1.6 94.9 1.1 54.1
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 77 40.4 13.7 54.1 0.0 0.0 54.1 0.0 54.1
TOTAL 123 8.15 114.1 122.2 0.0 1.6 119.5 1.1 54.1
CHURADA
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 76
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 2 6.5 0.2 6.7 0.0 0.0 6.7 0.0 0.0
(ii) Small farmer 10 15.1 0.6 15.7 0.0 0.0 15.7 0.0 1.4
(iii) Marginal farmer 108 46.8 2.7 49.5 0.0 1.2 46.8 1.5 33.4
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 63 25.2 9.7 34.9 0.0 0.0 34.5 0.4 34.9
TOTAL 120 68.40 3.6 72.0 0.0 1.2 69.3 1.5 34.9
THUMMATH
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 77
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 1 3.3 0.1 3.4 0.0 2.2 1.2 0.0 0.0
(ii) Small farmer 10 15.4 0.3 15.7 0.0 0.0 15.7 0.0 0.0
(iii) Marginal farmer 91 43.4 1.8 45.2 0.0 0.0 43.8 1.4 36.5
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 63 28.6 7.9 36.5 0.0 0.0 36.5 0.0 36.5
TOTAL 102 62.10 2.2 64.3 0.0 2.2 60.7 1.4 36.5
RATI MAHUDI
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 78
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 13 26.0 44.2 70.2 0.0 0.0 57.3 12.9 22.7
(ii) Small farmer 10 6.3 9.4 15.7 0.0 0.0 15.7 0.0 5.0
(iii) Marginal farmer 138 61.3 56.1 117.4 0.0 6.7 110.7 0.0 39.4
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 73 47.6 19.5 67.1 0.0 4.5 62.6 0.0 67.1
TOTAL 161 93.55 109.7 203.3 0.0 6.7 183.7 12.9 67.1
LAND HOLDING PATTERN IN GP DOONGRI PARA
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 79
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 7 23.4 11.0 34.5 0.0 0.0 30.9 3.5 16.7
(ii) Small farmer 4 3.8 2.5 6.3 0.0 0.0 6.3 0.0 3.4
(iii) Marginal farmer 32 25.8 3.9 29.8 0.0 0.0 29.8 0.0 23.6
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 32 30.2 13.5 43.7 0.0 0.0 43.7 0.0 43.7
TOTAL 43 53.02 17.5 70.5 0.0 0.0 67.0 3.5 43.7
Devda Sath
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 80
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 6 2.5 33.2 35.7 0.0 0.0 26.4 9.4 5.9
(ii) Small farmer 6 2.5 6.9 9.4 0.0 0.0 9.4 0.0 1.6
(iii) Marginal farmer 106 35.4 52.2 87.6 0.0 6.7 81.0 0.0 15.9
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 41 17.4 6.0 23.4 0.0 4.5 18.9 0.0 23.4
TOTAL 118 40.53 92.3 132.8 0.0 6.7 116.8 9.4 23.4
Himmatpura
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 81
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(ii) Small farmer 3 0.0 4.6 4.6 0.0 0.0 4.6 0.0 0.0
(iii) Marginal farmer 8 0.0 4.2 4.2 0.0 0.0 4.2 0.0 3.4
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 5 0.0 3.4 3.4 0.0 0.0 3.4 0.0 3.4
TOTAL 9 0.00 8.8 8.8 0.0 0.0 8.8 0.0 3.4
LAND HOLDING PATTERN IN GP SHARAN, VILLAGE CHANDERI
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 82
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 34 40.0 132.4 172.4 0.0 2.2 170.2 0.0 0.0
(ii) Small farmer 80 70.0 58.8 128.8 0.0 0.0 128.8 0.0 31.9
(iii) Marginal farmer 448 139.0 207.1 346.1 0.0 0.0 345.3 0.8 67.5
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 162 57.6 41.8 99.4 0.0 0.0 99.4 0.0 99.4
TOTAL 562 248.97 398.3 647.3 0.0 2.2 644.3 0.8 99.4
LAND HOLDING PATTERN IN GP KALINJARA
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 83
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(ii) Small farmer 1 0.0 1.6 1.6 0.0 0.0 1.6 0.0 0.0
(iii) Marginal farmer 30 0.0 17.0 17.0 0.0 0.0 17.0 0.0 4.1
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 7 0.0 4.1 4.1 0.0 0.0 4.1 0.0 4.1
TOTAL 31 0.00 18.5 18.5 0.0 0.0 18.5 0.0 4.1
BHART GARH
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 84
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 23 17.0 130.1 147.1 0.0 0.0 147.1 0.0 0.0
(ii) Small farmer 58 49.0 45.2 94.2 0.0 0.0 94.2 0.0 24.6
(iii) Marginal farmer 150 52.7 81.0 133.7 0.0 0.0 132.9 0.8 35.2
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 81 42.5 17.3 59.8 0.0 0.0 59.8 0.0 59.8
TOTAL 231 118.70 256.3 375.0 0.0 0.0 374.3 0.8 59.8
JARI
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 85
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 11 23.0 2.3 25.3 0.0 2.2 23.1 0.0 0.0
(ii) Small farmer 21 21.0 12.0 33.0 0.0 0.0 33.0 0.0 7.3
(iii) Marginal farmer 268 86.3 109.2 195.4 0.0 0.0 195.4 0.0 28.2
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 74 15.0 20.5 35.5 0.0 0.0 35.5 0.0 35.5
TOTAL 300 130.27 123.4 253.7 0.0 2.2 251.5 0.0 35.5
KALINJRA
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 86
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 47 18.4 171.7 190.1 0.0 0.0 190.1 0.0 0.0
(ii) Small farmer 22 16.6 18.3 34.9 0.0 0.0 34.9 0.0 4.3
(iii) Marginal farmer 279 63.2 169.5 232.7 0.0 0.0 230.6 2.1 8.8
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 24 10.3 2.8 13.1 0.0 0.0 12.9 0.2 13.1
TOTAL 308 98.20 359.4 457.6 0.0 0.0 455.5 2.1 13.1
LAND HOLDING PATTERN IN GP POTLIYA
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 87
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 34 5.0 122.3 127.3 0.0 0.0 127.3 0.0 0.0
(ii) Small farmer 16 8.3 17.1 25.4 0.0 0.0 25.4 0.0 0.0
(iii) Marginal farmer 193 19.7 135.3 155.0 0.0 0.0 152.9 2.1 1.8
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 7 1.6 0.3 1.8 0.0 0.0 1.6 0.2 1.8
TOTAL 203 33.00 274.8 307.8 0.0 0.0 305.7 2.1 1.8
TANDA BADLA
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 88
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 13 13.4 49.4 62.8 0.0 0.0 62.8 0.0 0.0
(ii) Small farmer 6 8.3 1.1 9.4 0.0 0.0 9.4 0.0 4.3
(iii) Marginal farmer 86 43.5 34.2 77.7 0.0 0.0 77.7 0.0 7.0
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 17 8.7 2.5 11.3 0.0 0.0 11.3 0.0 11.3
TOTAL 105 65.20 84.6 149.8 0.0 0.0 149.8 0.0 11.3
UMRAWAT
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 89
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 39 13.8 124.8 138.6 0.0 0.0 135.5 3.1 2.4
(ii) Small farmer 56 12.6 75.3 87.9 3.7 0.0 84.2 0.0 29.4
(iii) Marginal farmer 545 17.4 367.7 385.1 11.3 0.0 359.3 14.6 69.1
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 165 40.8 60.1 100.9 1.3 0.0 98.5 1.0 100.9
TOTAL 640 43.81 567.9 611.7 15.0 0.0 579.0 17.7 100.9
LAND HOLDING PATTERN IN GP RAM GARH
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 90
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 7 0.7 25.0 25.7 0.0 0.0 25.7 0.0 0.0
(ii) Small farmer 13 1.4 19.1 20.4 0.0 0.0 20.4 0.0 1.5
(iii) Marginal farmer 286 10.2 195.6 205.8 11.3 0.0 192.1 2.3 14.5
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 28 2.9 13.0 15.9 1.3 0.0 14.4 0.2 15.9
TOTAL 306 12.30 239.6 251.9 11.3 0.0 238.2 2.3 15.9
BAGAYCHA
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 91
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 5 0.8 13.6 14.4 0.0 0.0 14.4 0.0 0.0
(ii) Small farmer 5 1.2 6.7 7.9 0.0 0.0 7.9 0.0 1.8
(iii) Marginal farmer 31 0.5 19.8 20.3 0.0 0.0 18.2 2.1 1.0
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 3 1.2 1.6 2.9 0.0 0.0 2.9 0.0 2.9
TOTAL 41 2.41 40.1 42.5 0.0 0.0 40.4 2.1 2.9
HINDOLIYA KHURD
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 92
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(ii) Small farmer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(iii) Marginal farmer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 0 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0
KHANKHARIYA
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 93
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 13 1.3 61.4 62.7 0.0 0.0 62.7 0.0 0.0
(ii) Small farmer 16 1.8 23.3 25.1 0.0 0.0 25.1 0.0 2.3
(iii) Marginal farmer 53 0.4 43.0 43.4 0.0 0.0 41.2 2.2 10.8
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 11 2.9 10.2 13.1 0.0 0.0 12.7 0.4 13.1
TOTAL 82 3.47 127.7 131.2 0.0 0.0 129.0 2.2 13.1
KOTRI
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 94
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 2 3.1 1.5 4.6 0.0 0.0 1.5 3.1 2.4
(ii) Small farmer 5 2.0 5.9 7.9 0.0 0.0 7.9 0.0 3.4
(iii) Marginal farmer 71 1.2 40.9 42.0 0.0 0.0 39.9 2.1 13.7
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 57 14.8 4.7 19.4 0.0 0.0 19.4 0.0 19.4
TOTAL 78 6.31 48.2 54.5 0.0 0.0 49.2 5.3 19.4
NAGANWAT
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 95
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 9 6.0 16.4 22.4 0.0 0.0 22.4 0.0 0.0
(ii) Small farmer 11 2.5 14.8 17.3 3.7 0.0 13.6 0.0 13.7
(iii) Marginal farmer 84 2.7 31.3 34.0 0.0 0.0 29.5 4.5 18.7
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 56 12.7 19.7 32.4 0.0 0.0 32.0 0.4 32.4
TOTAL 104 11.20 62.5 73.7 3.7 0.0 65.5 4.5 32.4
RAM GARH
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 96
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 3 1.9 7.0 8.9 0.0 0.0 8.9 0.0 0.0
(ii) Small farmer 6 3.8 5.6 9.4 0.0 0.0 9.4 0.0 6.7
(iii) Marginal farmer 20 2.4 37.2 39.7 0.0 0.0 38.4 1.3 10.5
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 10 6.3 10.9 17.2 0.0 0.0 17.2 0.0 17.2
TOTAL 29 8.12 49.9 58.0 0.0 0.0 56.7 1.3 17.2
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
RICHHWANI
BANSWARA IWMP-I 97
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 13 23.0 44.8 67.7 0.0 0.0 67.7 0.0 0.0
(ii) Small farmer 19 13.5 16.5 33.0 0.0 1.5 30.4 1.1 3.7
(iii) Marginal farmer 122 18.0 93.8 108.9 0.0 0.0 88.7 20.2 6.2
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 11 6.8 3.1 9.9 0.0 0.0 9.5 0.4 9.9
TOTAL 154 54.50 155.1 209.6 0.0 1.5 186.8 21.3 9.9
LAND HOLDING PATTERN IN GP KUSHALA PARA
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 98
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 6 1.5 44.8 46.2 0.0 0.0 46.2 0.0 0.0
(ii) Small farmer 12 3.0 15.9 21.8 0.0 0.0 20.7 1.1 0.0
(iii) Marginal farmer 104 7.9 92.8 97.7 0.0 0.0 77.5 20.2 4.8
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 7 1.7 3.1 4.8 0.0 0.0 4.4 0.4 4.8
TOTAL 122 12.30 153.4 165.7 0.0 0.0 144.4 21.3 4.8
HINDOLIYA CHARAN
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 99
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 7 21.5 0.0 21.5 0.0 0.0 21.5 0.0 0.0
(ii) Small farmer 7 10.6 0.6 11.2 0.0 1.5 9.7 0.0 3.7
(iii) Marginal farmer 18 10.2 1.1 11.2 0.0 0.0 11.2 0.0 1.4
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 4 5.1 0.0 5.1 0.0 0.0 5.1 0.0 5.1
TOTAL 32 42.20 1.7 43.9 0.0 1.5 42.4 0.0 5.1
NAGDA KHURD
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 100
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 14 4.3 47.2 51.5 0.0 0.7 50.7 0.0 0.0
(ii) Small farmer 33 9.8 42.0 51.8 0.0 0.0 50.7 1.1 38.1
(iii) Marginal farmer 378 53.2 169.7 222.8 0.0 3.0 207.0 12.9 56.6
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 84 20.8 73.9 94.7 0.0 0.8 93.5 0.4 94.7
TOTAL 425 67.20 258.9 326.1 0.0 3.7 308.4 14.0 94.7
LAND HOLDING PATTERN IN GP TIMERA BARA
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
Total HouseholdsType of Farmer
BANSWARA IWMP-I 101
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 4 0.7 13.6 14.3 0.0 0.7 13.5 0.0 0.0
(ii) Small farmer 12 2.0 16.9 18.8 0.0 0.0 18.8 0.0 5.4
(iii) Marginal farmer 287 28.4 145.3 173.7 0.0 2.2 158.6 12.9 12.8
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 47 7.8 10.4 18.2 0.0 0.5 17.4 0.4 18.2
TOTAL 303 31.00 175.8 206.8 0.0 3.0 191.0 12.9 18.2
TIMERA BARA
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 102
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 5 2.0 15.9 17.9 0.0 0.0 17.9 0.0 0.0
(ii) Small farmer 6 3.0 6.4 9.4 0.0 0.0 8.3 1.1 26.4
(iii) Marginal farmer 14 4.5 6.2 10.7 0.0 0.0 10.7 0.0 0.8
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 13 5.4 21.7 27.1 0.0 0.0 27.1 0.0 27.1
TOTAL 25 9.50 28.4 37.9 0.0 0.0 36.8 1.1 27.1
BHAT MAHUDI
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 103
Irrigated (source) Rainfed Total General SC ST OBC BPL
(i)Large farmer 5 1.6 17.8 19.4 0.0 0.0 19.4 0.0 0.0
(ii) Small farmer 15 4.8 18.8 23.6 0.0 0.0 23.6 0.0 6.3
(iii) Marginal farmer 77 20.3 18.2 38.5 0.0 0.7 37.8 0.0 43.1
(iv) Landless person 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(V)No. of BPL households 24 7.7 41.7 49.4 0.0 0.3 49.0 0.0 49.4
TOTAL 97 26.70 54.7 81.4 0.0 0.7 80.7 0.0 49.4
KOTRA
Type of Farmer Total Households
Land holding (ha) irrigation source wise Land holding (ha)Social group wise
BANSWARA IWMP-I 104
40.83% land holdings belong to small and marginal farmers who own 74.65 % of total cultivated area.
Horticulture/vegetables could be more economical to Small and marginal farmers with irrigation source. For large farmers
with no irrigation facility Horticulture/vegetables will be promoted in a part of land with farm pond/Tanka construction. The following activities will be more beneficial for small land holdings and for diversification and income for large farmers
Horticulture plantation, Medicinal and Aromatic Crops, floriculture: As discussed earlier . Horticulture/vegetables
could be more economical to Small and marginal farmers with irrigation source. Also the project area has good potential
for medicinal & aromatic crops like Sonamukhi, Isabgol, Ashwagandha, Khus, Mehandi etc. Agro forestry plantation: To increase the income of farmers and also for shelter belt plantation as wind velocity is highin the project area. Setting of Vermi Compost Units - Keeping in view the side effect of residues of chemicals and fertilizers on humanhealth the emphasis would be on cultivation of organic produce through motivating farmers and providing assistance forproduction of organic input, vermi compost.Production and distribution of quality seed – There is need to ensure that good quality seed is available for cultivatorsfor which adequate seed production would be initiated in watershed areas with the assistance of private sector andagriculture department technologies Sprinklers and pipelines for efficient water management practices emphasis on demonstration of sprinklers withadequate financial support and convergence/private partnership. Establishment of Green House - For growing off season vegetables seedlings and other horticultural crops undercontrolled atmospheric conditions of green house.Establishment of nurseries: Most of the planting material is procured from other parts of the State/ country. The
procurement of planting material from distant places causes damage to the planting material and often results inuntimely supply. Hence nursery development activity in area.Innovative hi-tech/ export oriented activities: innovative hi-tech/ export oriented projects like mushroom cultivation,floriculture, etc which are in negligible existence at present, can be implemented by individual farmers / privatecompanies.Drip irrigation Drip irrigation will be promoted in all horticulture plantations, vegetables, green houses and in nurseriesfor rational use of irrigation higher yields and quality produce.(Source:- Agriculture Research Station, Banswara & Agri. Dept. Banswara.)
BANSWARA IWMP-I 105
S.No. Description of animals
Population in No.
Yield (milk/mutton /Wool)
Equ. cow units
Dry matter requirement per year in Kg.(7Kg per animal.)
Total requirement in T.
1 CowsIndigenous 2335 1.5-2.0 2335 5965925 5965.9
Hybrid 0 4 0 0 0.02 Buffaloes 460 2.5-3.0 460 1175300 1175.33 Goat 1987 0.4 993.5 1269196.25 1269.24 Sheep 0 0 0 0 0.05 ox 598 0 598 1527890 1527.96 Poultry 3796 0.5 759.2 969878 969.97 Piggery 0 0 0 0 0.0
Total 9176 10908189.25 10908.2
LIVESTOCK STATUS
In spite of the large number of livestock, production is less hence increase in productivity across all species, is a major challenge.To reduce production of unproductive cattle and improve the productivity by improving the breeds by breeding managementfollowing activities will be taken up
Castration· Artificial insemination
ANIMALS/MILK PRODUCTION / AVERAGE YIELD.
· Distribution of superior Breeding bulls for use in Cattle and Buffalo· Breeding distribution crossbred rams
Besides breed improvement other animal husbandry practices like better health, hygiene and feeding practices can increaseproductivity of livestock. Hence Activities like Animal health camps ,Urea-Molasses treatment demonstration ,demonstration ofimproved methods of conservation and utilization of Forage crops are proposed.
BANSWARA IWMP-I 106
S.No Item Unit Area/ Quantity
1 Existing Cultivable area under Fodder Ha 2911.242 Production of Green fodder Tonns/year 7218.1971713 Production of Dry fodder Tonns/ Year 1802.3030084 Area under Pastures Ha 392.225 Production of fodder Tonns/year 607.6856 Existing area under Fuel wood Ha 175.17 Supplementary feed Kgs/ day 18 Silage Pits No -9 Availability of fodder Tonns 9628.1910 Deficiency of fodder Tonns 1280.00
(Source:- Agriculture Research Station, Banswara & Agri. Dept. Banswara.)
· Increase in productivity of fodder crops· Development of pastures
· And reduction in large number of livestock production through replacement by few but productive animals
EXISTING AREA UNDER FODDER (ha)
The table above shows there is fodder deficiency (Requirement is 10908.19 T and availability 9628.19 T)
To minimize the large and expanding gap between feed and fodder resource availability and demand there is need for
· Increase in area under fodder crops
BANSWARA IWMP-I 107
1 2
S. No Implements
1 Tractor
2 Sprayers-manual/ power
3 Cultivators/Harrows
4 Seed drill
5 Any Other
AGRICULTURE IMPLEMENTS
Farm mechanization and seed banks: total cultivated area sowning of big farm implements by individual farmers is not
economical so SHG would be promoted to buy farm implements and rent to farmer.
3
Nos.
65
371
69
71
0
BANSWARA IWMP-I 108
Sr. no. Name of villageTotal No .of job
cards Employment
Status Activity taken up so far
1 DHANPURI 51 48 Gravel road, land leveling2 JORA 76 72 Gravel road, land leveling3 CHURADA 123 117 Gravel road, land leveling4 THUMMATH 120 114 Gravel road, land leveling5 RATI MAHUDI 102 97 Gravel road, land leveling6 BAGAYCHA 306 291 Gravel road, land leveling7 HINDOLIYA KHURD 41 39 Gravel road, land leveling8 KHANKHARIYA 0 0 Gravel road, land leveling9 KOTRI 82 78 Gravel road, land leveling10 NAGANWAT 78 74 Gravel road, land leveling11 RAM GARH 104 99 Gravel road, land leveling12 RICHHWANI 29 28 Gravel road, land leveling13 TANDA BADLA 203 193 Gravel road, land leveling14 UMRAWAT 105 100 Gravel road, land leveling15 HINDOLIYA CHARAN 122 116 Gravel road, land leveling16 NAGDA KHURD 32 30 Gravel road, land leveling17 BHART GARH 31 29 Gravel road, land leveling18 JARI 231 219 Gravel road, land leveling19 KALINJRA 300 285 Gravel road, land leveling
20 Chanderi 9 9 Gravel road, land leveling
NREGA Status - No. of Card Holder, activities taken so far, employment status.
BANSWARA IWMP-I 109
Sr. no. Name of villageTotal No .of job
cards Employment
Status Activity taken up so far
21 TIMERA BARA 303 288 Gravel road, land leveling
22 BHAT MAHUDI 25 24 Gravel road, land leveling
23 KOTRA 97 92 Gravel road, land leveling
24 Devda Sath 43 41 Gravel road, land leveling
25 Himmatpura 118 112 Gravel road, land leveling
26 VASOONI 123 117 Gravel road, land leveling
BANSWARA IWMP-I 110
Name of village No. of persons migrating
No. of days per year of migration
Major reason(s) for migrating
Distance of destination of migration from
the village (km)
Occupation during migration
Income from such
occupation (Rs. in lakh)
DHANPURI 66 210 Unemployment 200 Labour work 34.65
JORA 99 210 Unemployment 200 Labour work 51.98
CHURADA 160 210 Unemployment 200 Labour work 84
THUMMATH 156 210 Unemployment 200 Labour work 81.9
RATI MAHUDI 133 210 Unemployment 200 Labour work 69.83
BAGAYCHA 398 210 Unemployment 200 Labour work 208.95
HINDOLIYA KHURD 53 210 Unemployment 200 Labour work 27.83
KHANKHARIYA 0 210 Unemployment 200 Labour work 0
KOTRI 107 210 Unemployment 200 Labour work 56.18
NAGANWAT 101 210 Unemployment 200 Labour work 53.03
RAM GARH 135 210 Unemployment 200 Labour work 70.88
RICHHWANI 38 210 Unemployment 200 Labour work 19.95
TANDA BADLA 264 210 Unemployment 200 Labour work 138.6
UMRAWAT 137 210 Unemployment 200 Labour work 71.93
HINDOLIYA CHARAN 159 210 Unemployment 200 Labour work 83.48
Migration Details
BANSWARA IWMP-I 111
Name of village No. of persons migrating
No. of days per year of migration
Major reason(s) for migrating
Distance of destination of migration from
the village (km)
Occupation during migration
Income from such
occupation (Rs. in lakh)
NAGDA KHURD 42 210 Unemployment 200 Labour work 22.05
BHART GARH 40 210 Unemployment 200 Labour work 21
JARI 300 210 Unemployment 200 Labour work 157.5
KALINJRA 390 210 Unemployment 200 Labour work 204.75
Chanderi 12 210 Unemployment 200 Labour work 6.3
TIMERA BARA 394 210 Unemployment 200 Labour work 206.85
BHAT MAHUDI 33 210 Unemployment 200 Labour work 17.33
KOTRA 126 210 Unemployment 200 Labour work 66.15
Devda Sath 56 210 Unemployment 200 Labour work 29.4
Himmatpura 153 210 Unemployment 200 Labour work 80.33
VASOONI 160 210 Unemployment 200 Labour work 84
The migration can be check by creation of employment opportunities, enhancing farm level economy, increases the income of
the people engaged in animal husbandry by dairy, poultry and marketing and value addition. (As discussed earlier) and
diversification in livelihoods .
BANSWARA IWMP-I 112
Name of activity No of House holds Average annual income
cultivators 2854 7000
Dairying 11 8000
Poultry 0 0
Piggery 0 0
Landless Agri. Labourers 0 0
Name of activity Households/individuals Average annual income
Artisans -
Carpenter 59 15000
Blacksmith 0 0
Leather Craft 0 0
Porter - 0
Mason 155 40000
Others specify (Cycle Repair ,STD,Craft etc) 38 10000
Major activities (On Farm)
Major activities (Off Farm)
The existing livelihoods Village are given below
The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals
BANSWARA IWMP-I 113
S.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15 6000 …. …. 1Jagrati 10 Saving 50
19182 …. …. 1Jagran 10 Saving 100
13182 …. …. 1Holi Faliya 11 Saving 100
13684 …. …. 1Jamnababu 10 Saving 100
805 …. …. 1Arbani 10 Saving 50
6490 …. …. 1Kahani 10 Saving 50
11835 …. …. 1Lilaram 12 Saving 20
22890 …. …. 1vachlafala 10 Saving 50
12000 …. …. 1Bavdifala 10 Saving 50
19500 …. …. 1Mahovayire 15 Saving 100
16000 …. …. 1Hathidilli 10 Saving 100
15000 …. …. 1Taraghati 10 Saving 100
15000 …. …. 1
100
Hathni 10 Saving 100
1
Hanuman Faliya 10 Saving 100 16000 …. …. 1
Name of SHG Members Activity involved Monthly income
Fund available
Status of Existing SHG
Assistance available
Source of assistance
Training received
Roaen Faliya 10 Saving 16000 …. ….
BANSWARA IWMP-I 114
S.No.Name of SHG Members Activity involved Monthly
incomeFund
availableAssistance available
Source of assistance
Training received
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32 5345 …. …. 1Anpat 10 Saving 20
8509 …. …. 1navjoti 13 Saving 50
21283 …. …. 1Padmavati 11 Saving 50
6600 …. …. 1Karansinh 12 Saving 50
6600 …. …. 1Soniya gandhi 12 Saving 50
15000 …. …. 1Jyoti 13 Saving 50
11000 …. …. 1Ganesh 20 Saving 50
8800 …. …. 1Mahima 16 Saving 50
6600 …. …. 1Krishna 12 Saving 50
6050 …. …. 1Sriram 11 Saving 50
7150 …. …. 1Indra gandhi 13 Saving 50
7700 …. …. 1Parvati 14 Saving 50
18894 …. …. 1Mira 11 Saving 50
3000 …. …. 1Radha 10 Saving 50
3000 …. …. 1Gorsingh 10 Saving 50
4300 …. …. 1Kanheya 10 Saving 50
4300 …. …. 1Sriram 10 Saving 50
BANSWARA IWMP-I 115
S.No.Name of SHG Members Activity involved Monthly
incomeFund
availableAssistance available
Source of assistance
Training received
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49 17438 …. …. 1Rosani 10 Saving 50
5500 …. …. 1Krishna 10 Saving 50
5500 …. …. 1Ram 10 Saving 50
5500 …. …. 1Parvati 10 Saving 50
5500 …. …. 1Hanuman 10 Saving 50
5500 …. …. 1Sita 10 Saving 50
5500 …. …. 1Ambe 10 Saving 50
5500 …. …. 1Durga 10 Saving 50
5500 …. …. 1Radha 10 Saving 50
5500 …. …. 1Mira 10 Saving 50
16200 …. …. 1Mahadev 10 Saving 50
5500 …. …. 1Savanmata 10 Saving 50
6000 …. …. 1Parvati 10 Saving 50
6000 …. …. 1Hanuman 10 Saving 50
9000 …. …. 1Mahila 10 Saving 50
13000 …. …. 1Hanuman 10 Saving 50
10400 …. …. 1Ramdev 10 Saving 50
BANSWARA IWMP-I 116
S.No.Name of SHG Members Activity involved Monthly
incomeFund
availableAssistance available
Source of assistance
Training received
50
51
52
53
54
55
56 5500 …. …. 1Nandini 10 Saving 50
5500 …. …. 1Tripura 10 Saving 50
5500 …. …. 1Surya 10 Saving 50
2200 …. …. 1Savariyasedh 10 Saving 20
5500 …. …. 1Varsha 10 Saving 50
5500 …. …. 1Rekha 10 Saving 50
16894 …. …. 1Anand 10 Saving 50
The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance
BANSWARA IWMP-I 117
S.No Source No. Functional depth feet
Dry Area irrigated
i) Dug wells 157 450 0 99ii) tube wells 10 0 0 8iii) CANAL 6 0 656
Total 762
S.No Name of the village Drinking water requirement
Ltrs/day
Present availability of drinking water
Ltrs/day
No. of drinking water sources
available
No. functional
No. requires repairs
No. defunct
1DHANPURI 2040 1020
6 5 1 0
2 JORA 3040 1520 8 8 0 0
3CHURADA 4920 2460
11 9 1 1
4THUMMATH 4800 2400
7 6 0 1
5RATI MAHUDI 4080 2040
8 7 1 0
6BAGAYCHA 12240 6120
17 16 0 1
7HINDOLIYA KHURD 1640 820
5 4 1 0
8KHANKHARIYA 0 0
1 1 0 0
9KOTRI 3280 1640
14 12 1 1
Availability of drinking water
Technical Features
120
Ground Water
Water availability (days)
270275
BANSWARA IWMP-I 118
S.No Name of the village Drinking water requirement
Ltrs/day
Present availability of drinking water
Ltrs/day
No. of drinking water sources
available
No. functional
No. requires repairs
No. defunct
10NAGANWAT 3120 1560
7 5 1 1
11RAM GARH 4160 2080
7 7 0 0
12RICHHWANI 1160 580
5 4 1 0
13TANDA BADLA 8120 4060
8 7 0 1
14UMRAWAT 4200 2100
14 12 1 1
15HINDOLIYA CHARAN 4880 2440
8 7 0 1
16NAGDA KHURD 1280 640
14 12 1 1
17BHART GARH 1240 620
7 6 0 1
18JARI 9240 4620
26 24 1 1
19KALINJRA 12000 6000
24 23 0 1
20Chanderi 360 180
32
1 0
21TIMERA BARA 12120 6060
16 14 1 1
22BHAT MAHUDI 1000 500
5 4 1 0
23KOTRA 3880 1940
5 5 0 0
24Devda Sath 1720 860
10 0 2 1
25Himmatpura 4720 2360
13 2 1 1
26 VASOONI 4920 2460 7 6 1 0
BANSWARA IWMP-I 119
Rabi 0 106.41 655.65 762.06
1 0 to 3%
2 3 to 10%
3 10 to 35%
4 > 35%
2395.17
2682.59
Any other (pl. specify) Total
The tables above indicate need for judicious use of available Water.Encouraging optimum use of water through installation of sprinklers on every operational wells
S.No. Slope percentage
Slope of WatershedArea in hectares
As most of the area has slope less than 3% construction of contour bunds can solve the problem of water erosion in
agriculture fields and protect washing of top soil and manures/fertilisers
244.84
-
Water Use efficiency
Slope details.
Name of major crop
Area (Hectare)
through water saving devices (Drip/Sprinklers)
through water conserving agronomic practices#
BANSWARA IWMP-I 120
(A) Area (Calculated from revenue recoed)1. Good Catchment where runoff is maximum & infiltration is minimum like hillocks, plateanu etc2. Average catchment-cultivated land, forest land with vegetation.3. Bad catchment where runoff is minimum & infiltration is maximum e.g. Sandy soil
(B) AVERAGE ANNUAL RAINFAL DATA (AVAILABLE AT TEHSIL))
(a) Percentage of runoff to rainfall from strange's table.In Good Catchment - 19.50% 1802In average catchment - 14.60% 1349In Bad Catchment- 9.70% 896
Type of W/S Area of W/S Factor Cum/ha Expected Yeild CumGood 244.84 1802 441200.9592Average 2682.59 1349 3618814.45Bad 2395.17 896 2146072.32Total 5322.6 6206087.729 "A"
S.No. Name of Structure No./Area Storage Capacity (Cum)1 Tank/Talab/Nadi 61 18875602 Anicut/WHS/ Khadin 33 516003 Local Dipression Pond etc 0 0
Total 94 1939160 "B"
Balance Runoff = Expected yield-Present Storage="A"-"B" ="C" 4266927.729 "C"
75% of balance run-off may be stored by constructing new structures ="C"X0.75 = 0.75C3200196
WATER BUDGETING
PRESENT STORAGE BY EXISTING RUN OFF MANAGEMENT STRUCTURE
Propotion of Estimated Runoff of rainfall : To be worked out from strange's Table for banswara tehsil Disstt. Banswara for 924mm total mansoon rainfall.
WATERSHED AREA
BANSWARA IWMP-I 121
S.No. Name of Structure No./Area Storage Capacity (Cum)1 Gulley control /LSCD 9234 11173142 Dugout pond 0 03 whs 55 6655
Total 1123969 "D"
"D" to be less than "0.75C"
BANSWARA IWMP-I 122
S.No. Major Soil Classes1 Red Soil2 Black Cotton
B Depth (Cms.)1 0.00 to 7.502 7.50 to 45.003 > 45.00
Soil fertility Status Kg/ha Recommended1 N 23 62 P 20 303 K 4904 Micronutrients PPMA Zinc 0.4 PPM 0.8 PPMB Fe 0.4 PPM 0.5 PPMC Cu 0.2 PPM 0.25 PPMD Mg 0.2 PPM 0.22 PPM
(Source:- Agriculture Research Station, Banswara & Agri. Dept. Banswara.)
1392
Soil details
835.21392
Soil Depth :
The analysis of table shows need to improve and maintain soil fertility. Soil health card to every farmer every crop season will be
provided, which will include the recommendation for Application micro nutrient and fertilizers
Area in hectares1252.8
Soil ProfileArea in hectares
2088
BANSWARA IWMP-I 123
a Sheet 1531.20 04-10b Rill 174.00 10-15c Gully 1774.80 15-25
3480NIL
3480.00(Source:- Agriculture Research Station, Banswara & Agri. Dept. Banswara.)
Run off(mm/ year)
· To check Uncontrolled grazing and developed cattle tracks· To check Deforestation of steep slopes· To check erosive velocity of runoff, store Runoff, to arrest silt carried by runoff and to recharge Ground
The need is:· To check land degradation · To reduce excessive biotic pressure by containing the number and increase of livestock · To check cultivation on sloping lands without adequate precautions of soil and water conservation · To discourage cultivation along susceptible nallah beds· To check Faulty agriculture techniques
Average soil loss (Tonnes/ ha/ year)
Water erosion
Sub-TotalWind erosion
Total for project
Erosion details
Erosion status in project AreaCause Type of erosion Area affected (ha)
BANSWARA IWMP-I 124
S.no
1
2
3
4
5
6
7
8
9
10
Thummath 10/08/2010
Ukala 08/06/2010
08/06/2010
Ramgarh 12/03/2010
The IEC activities like Kalajathas, Group meetings, door to door campaign, slogans and wall writings etc. were carried out in all the
habitations of 1/12,4/5,5/4,5,6,7, 6/1,5,8 Micro Watershed. A series of meetings were conducted with GP members, community and
discussed about the implementation of IWMP programme. User groups were also formed.
Timera Bara 05/04/2010
Sharan 03/02/2011
Proposed Development Plan:
Grama Sabhas were conducted for approval of EPA (Village), for selecting the watershed committee and approval of DPR.
Date on which Grama Sabha approved EPA
Preparatory phase activities Capacity Building Trainings and EPA
Name of the Gram Panchayat
Doongri Para 10/08/2010
05/12/2010Vasooni
Kalinjara 20/03/2010
Kushalpara 05/03/2010
Potalia
BANSWARA IWMP-I 125
S.no
1
2
3
4
5
6
7
8
9
10 Vasooni 28/04/2011
Thummath 26/04/2011
Ukala 20-21/4/2011
Potalia 18-19/4/2011
Ramgarh 6-7/4/2011
Kalinjara 8-9/4/2011
Kushalpara 25/04/2011
Timera Bara
Sharan 27/04/2011
Doongri Para 22-23/4/2011
27/04/2011
Date on which PRA conducted
The PRA exercise was carried out in all the villages on the dates shown below:
Name of the village/Habitation
BANSWARA IWMP-I 126
DETAILS OF EPA
S. No. Names of villageAmount
earmarked for EPA
Entry Point
Activities
planned
Estimated cost
Expenditure
incurred
Balance
Expected outcome Actual outcome
1 Devda Sath 91776 Hand Pump 91776 91776 0
Scarcity of water made
availble
Scarcity of water made availble
2 Himmatpura 45888 Hand Pump
45888 45888 0Scarcity of water made
availble
Scarcity of water made availble
3 Timera Bara 91776 Hand Pump 91776 91776 0
Scarcity of water made
availble
Scarcity of water made availble
4 Kotra 91776 Hand Pump 91776 91776 0
Scarcity of water made
availble
Scarcity of water made availble
5 Jari 45888 Hand Pump 45888 45888 0
Scarcity of water made
availble
Scarcity of water made availble
6 Kalinjara 229440 Hand Pump 229440 229440 0
Scarcity of water made
availble
Scarcity of water made availble
7 Hindoliya Charan 136240Hand Pump 136240 136240 0
Scarcity of water made
availble
Scarcity of water made availble
BANSWARA IWMP-I 127
S. No. Names of villageAmount
earmarked for EPA
Entry Point
Activities
planned
Estimated cost
Expenditure
incurred
Balance
Expected outcome Actual outcome
8 Nagda Khurd 130118Hand Pump 130118 130118 0
Scarcity of water made
availble
Scarcity of water made availble
9 Tada Barla 229440 Hand Pump 229440 229440 0
Scarcity of water made
availble
Scarcity of water made availble
10 Umrawat 137664 Hand Pump 137664 137664 0
Scarcity of water made
availble
Scarcity of water made availble
11 Bagaycha 412992 Hand Pump 412992 412992 0
Scarcity of water made
availble
Scarcity of water made availble
12 Kotri 174762Hand Pump 174762 174762 0
Scarcity of water made
availble
Scarcity of water made availble
13 Naganwat 45888 Hand Pump 45888 45888 0
Scarcity of water made
availble
Scarcity of water made availble
14 Richhwani 91776 Hand Pump 91776 91776 0
Scarcity of water made
availble
Scarcity of water made availble
15 G P Ramgarh 363135 Solar light 363135 363135 0
Scarcity of Electricity made
availble
Scarcity of Electricity made
availble
BANSWARA IWMP-I 128
S. No. Names of villageAmount
earmarked for EPA
Entry Point
Activities
planned
Estimated cost
Expenditure
incurred
Balance
Expected outcome Actual outcome
16 Thummath 91776 Hand Pump 91776 91776 0
Scarcity of water made
availble
Scarcity of water made availble
17 Rati mahudi 45888 Hand Pump 45888 45888 0
Scarcity of water made
availble
Scarcity of water made availble
18 Dhanpuri 91776 Hand Pump 91776 91776 0
Scarcity of water made
availble
Scarcity of water made availble
19 Jora 45888 Hand Pump 45888 45888 0
Scarcity of water made
availble
Scarcity of water made availble
20 Vasooni 45888 Hand Pump 45888 45888 0
Scarcity of water made
availble
Scarcity of water made availble
BANSWARA IWMP-I 129
CHAPTER - V
Proposed Development Plan 330.3 39.636
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
(A) Preparatory phase activities capacity building trainings & EPA (22%)Admn. (10%) 41.760 3.96 3.96 0.00 0.00Monitoring (1%) 4.176 0.40 0.40 0.00 0.00Evaluation (1%) 4.176 0.40 0.40 0.00 0.00EPA (4%) AS per Exp 26.40 1.38 1.38 0.00 0.00I & CB (5%) 20.880 1.98 1.98 0.00 0.00DPR (1%) 4.176 0.40 0.40 0.00 0.00
Total (A) 0 8.51 8.51 0.00 0.00(B) Natural resource management (60%)1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0.484 55 26.60 0.00 26.60 0.00
1.1.2 Horticulture ha 0.880 1 0.88 0.88 0.00 0.041.1.3 Agriculture ha 0.00 0.00 0.00 0.001.1.4 Pasture ha 0.557 5 2.79 2.79 0.00 0.141.1.5 Others ha 0.00 0.00 0.00 0.00
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0.094 40 3.76 3.76 0.00 0.191.2.2 Countour Bunding ha 0.112 20 2.23 2.23 0.00 0.111.2.3 Graded Bunding ha 0.126 0.00 0.00 0.00 0.001.2.4 Bench Terracing ha 0.00 0.00 0.00 0.00
1.2.5 Others ha0.04568 /0.19300 40.00 4.77 4.77 0.00 0.24
1.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum 0.00 0.00 0.00 0.001.3.2 Brushwood Checks Rmt 0.00 0.00 0.00 0.001.3.3 Gully plugs Cum 0.00 0.00 0.00 0.001.3.4 Loose bolder Cum 0.007 965 6.28 6.28 0.00 0.311.3.5 Gabian structure Cum 0.00 0.00 0.00 0.00
2.2 1.3.6 Others nos 0.45/0.74 /1.01 3 1.19 1.19 0.00 0.061.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos 0.00 0.00 0.00 0.00
1.4.2 Check dams nos 5.000 0.00 0.00 0.00 0.001.4.3 Nallah Bunds nos 0.459 / 1.045 2 5.50 1.50 4.00 0.081.4.4 Percolation tanks nos 0.00 0.00 0.00 0.001.4.5 Ground Water recharge structure nos 0.00 0.00 0.00 0.001.4.6 Others nos 0.584 1 0.59 0.59 0.00 0.03
Total (B) 54.600 23.995 30.605 1.200
Sub ActivityActivity Unit Unit CostDOONGRI PARA
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan 330.3 39.636
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
Sub ActivityActivity Unit Unit CostDOONGRI PARA
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00 0.00 0.00 0.00 0.00
8.2 Beekeeping No. 0.00 0.00 0.00 0.00 0.008.3 Poultry No. 12.53 1.19 1.19 0.00 0.308.4 Fisheries No. 0.00 0.00 0.00 0.00 0.008.5 Bio-fuel Plantation No. 0.00 0.00 0.00 0.00 0.008.6 Others No. 50.11 4.76 4.76 0.00 1.19
Total (C) 5.95 5.95 0.00 1.49(D) Consolidation (3%) 12.53 1.19 1.19
Grand Total 12.528 12.53 70.25 39.64 30.60 2.69
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
(A) Preparatory phase activities capacity building trainings & EPA (22%)Admn. (10%) 41.760Monitoring (1%) 4.176Evaluation (1%) 4.176EPA (4%) AS per Exp 26.40I & CB (5%) 20.880DPR (1%) 4.176
Total (A)(B) Natural resource management (60%)1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0.484
1.1.2 Horticulture ha 0.8801.1.3 Agriculture ha1.1.4 Pasture ha 0.5571.1.5 Others ha
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0.0941.2.2 Countour Bunding ha 0.1121.2.3 Graded Bunding ha 0.1261.2.4 Bench Terracing ha
1.2.5 Others ha0.04568 /0.19300
1.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum
1.3.2 Brushwood Checks Rmt
1.3.3 Gully plugs Cum1.3.4 Loose bolder Cum 0.0071.3.5 Gabian structure Cum
2.2 1.3.6 Others nos 0.45/0.74 /1.011.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos
1.4.2 Check dams nos 5.0001.4.3 Nallah Bunds nos 0.459 / 1.0451.4.4 Percolation tanks nos1.4.5 Ground Water recharge structure nos
1.4.6 Others nos 0.584Total (B)
Sub ActivityActivity Unit Unit Cost
340.2 40.824
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
4.08 4.08 0.00 0.000.41 0.41 0.00 0.000.41 0.41 0.00 0.001.84 1.84 0.00 0.002.04 2.04 0.00 0.000.41 0.41 0.00 0.00
0.00 9.18 9.18 0.00 0.00
0 0.00 0.00 0.00 0.001 0.88 0.88 0.00 0.04
0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00
0.00 0.00 0.00 0.0040 4.47 4.47 0.00 0.2220 2.52 2.52 0.00 0.13
0.00 0.00 0.00 0.00
20.00 3.86 3.86 0.00 0.190.00 0.00 0.00 0.00
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
480 3.12 3.12 0.00 0.160.00 0.00 0.00 0.00
6 4.40 4.40 0.00 0.220.00 0.00 0.00 0.00
1 10.00 4.00 6.00 0.201 5.46 0.46 5.00 0.02
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.001 0.58 0.58 0.00 0.03
35.293 24.293 11.000 1.215
TIMERA BARA
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
Sub ActivityActivity Unit Unit Cost
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00
8.2 Beekeeping No. 0.008.3 Poultry No. 12.538.4 Fisheries No. 0.008.5 Bio-fuel Plantation No. 0.008.6 Others No. 50.11
Total (C)(D) Consolidation (3%) 12.53
Grand Total 12.528 12.53
340.2 40.824
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
TIMERA BARA
0.00 0.00 0.00 0.000.00 0.00 0.00 0.001.22 1.22 0.00 0.310.00 0.00 0.00 0.000.00 0.00 0.00 0.004.90 4.90 0.00 1.22
6.12 6.12 0.00 1.531.22 1.22
51.82 40.82 11.00 2.75
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
(A) Preparatory phase activities capacity building trainings & EPA (22%)Admn. (10%) 41.760Monitoring (1%) 4.176Evaluation (1%) 4.176EPA (4%) AS per Exp 26.40I & CB (5%) 20.880DPR (1%) 4.176
Total (A)(B) Natural resource management (60%)1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0.484
1.1.2 Horticulture ha 0.8801.1.3 Agriculture ha1.1.4 Pasture ha 0.5571.1.5 Others ha
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0.0941.2.2 Countour Bunding ha 0.1121.2.3 Graded Bunding ha 0.1261.2.4 Bench Terracing ha
1.2.5 Others ha0.04568 /0.19300
1.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum
1.3.2 Brushwood Checks Rmt
1.3.3 Gully plugs Cum1.3.4 Loose bolder Cum 0.0071.3.5 Gabian structure Cum
2.2 1.3.6 Others nos 0.45/0.74 /1.011.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos
1.4.2 Check dams nos 5.0001.4.3 Nallah Bunds nos 0.459 / 1.0451.4.4 Percolation tanks nos1.4.5 Ground Water recharge structure nos
1.4.6 Others nos 0.584Total (B)
Sub ActivityActivity Unit Unit Cost
14.8 1.776
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
0.18 0.18 0.00 0.000.02 0.02 0.00 0.000.02 0.02 0.00 0.000.00 0.00 0.00 0.000.09 0.09 0.00 0.000.02 0.02 0.00 0.00
0.00 0.32 0.32 0.00 0.00
0 0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00
0.00 0.00 0.00 0.000.50 0.00 0.50 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
175 1.14 1.1370 0.00 0.060.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
1.637 1.137 0.500 0.057
SHARAN
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
Sub ActivityActivity Unit Unit Cost
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00
8.2 Beekeeping No. 0.008.3 Poultry No. 12.538.4 Fisheries No. 0.008.5 Bio-fuel Plantation No. 0.008.6 Others No. 50.11
Total (C)(D) Consolidation (3%) 12.53
Grand Total 12.528 12.53
14.8 1.776
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
SHARAN
0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.05 0.05 0.00 0.010.00 0.00 0.00 0.000.00 0.00 0.00 0.000.21 0.21 0.00 0.05
0.27 0.27 0.00 0.070.05 0.05
2.28 1.78 0.50 0.12
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
(A) Preparatory phase activities capacity building trainings & EPA (22%)Admn. (10%) 41.760Monitoring (1%) 4.176Evaluation (1%) 4.176EPA (4%) AS per Exp 26.40I & CB (5%) 20.880DPR (1%) 4.176
Total (A)(B) Natural resource management (60%)1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0.484
1.1.2 Horticulture ha 0.8801.1.3 Agriculture ha1.1.4 Pasture ha 0.5571.1.5 Others ha
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0.0941.2.2 Countour Bunding ha 0.1121.2.3 Graded Bunding ha 0.1261.2.4 Bench Terracing ha
1.2.5 Others ha0.04568 /0.19300
1.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum
1.3.2 Brushwood Checks Rmt
1.3.3 Gully plugs Cum1.3.4 Loose bolder Cum 0.0071.3.5 Gabian structure Cum
2.2 1.3.6 Others nos 0.45/0.74 /1.011.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos
1.4.2 Check dams nos 5.0001.4.3 Nallah Bunds nos 0.459 / 1.0451.4.4 Percolation tanks nos1.4.5 Ground Water recharge structure nos
1.4.6 Others nos 0.584Total (B)
Sub ActivityActivity Unit Unit Cost
789.8 94.776
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
9.48 9.48 0.00 0.000.95 0.95 0.00 0.000.95 0.95 0.00 0.002.75 2.75 0.00 0.004.74 4.74 0.00 0.000.95 0.95 0.00 0.00
0.00 19.81 19.81 0.00 0.00
10 4.84 0.00 4.84 0.001 0.88 0.88 0.00 0.04
0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00
10 0.94 0.94 0.00 0.0540 4.47 4.47 0.00 0.2240 5.04 5.04 0.00 0.25
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
3817 24.85 24.85 0.00 1.240.00 0.00 0.00 0.00
12 10.15 10.15 0.00 0.510.00 0.00 0.00 0.00
1 5.00 5.00 0.00 0.254 8.08 3.08 5.00 0.15
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.006 3.50 3.50 0.00 0.18
67.742 57.90 9.837 2.895
KALINJARA
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
Sub ActivityActivity Unit Unit Cost
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00
8.2 Beekeeping No. 0.008.3 Poultry No. 12.538.4 Fisheries No. 0.008.5 Bio-fuel Plantation No. 0.008.6 Others No. 50.11
Total (C)(D) Consolidation (3%) 12.53
Grand Total 12.528 12.53
789.8 94.776
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
KALINJARA
0.00 0.00 0.00 0.000.00 0.00 0.00 0.002.84 2.84 0.00 0.710.00 0.00 0.00 0.000.00 0.00 0.00 0.00
11.37 11.37 0.00 2.8414.22 14.22 0.00 3.55
2.84 2.84104.61 94.78 9.84 6.45
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
(A) Preparatory phase activities capacity building trainings & EPA (22%)Admn. (10%) 41.760Monitoring (1%) 4.176Evaluation (1%) 4.176EPA (4%) AS per Exp 26.40I & CB (5%) 20.880DPR (1%) 4.176
Total (A)(B) Natural resource management (60%)1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0.484
1.1.2 Horticulture ha 0.8801.1.3 Agriculture ha1.1.4 Pasture ha 0.5571.1.5 Others ha
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0.0941.2.2 Countour Bunding ha 0.1121.2.3 Graded Bunding ha 0.1261.2.4 Bench Terracing ha
1.2.5 Others ha0.04568 /0.19300
1.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum
1.3.2 Brushwood Checks Rmt
1.3.3 Gully plugs Cum1.3.4 Loose bolder Cum 0.0071.3.5 Gabian structure Cum
2.2 1.3.6 Others nos 0.45/0.74 /1.011.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos
1.4.2 Check dams nos 5.0001.4.3 Nallah Bunds nos 0.459 / 1.0451.4.4 Percolation tanks nos1.4.5 Ground Water recharge structure nos
1.4.6 Others nos 0.584Total (B)
Sub ActivityActivity Unit Unit Cost
232.9 27.948
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
2.79 2.79 0.00 0.000.28 0.28 0.00 0.000.28 0.28 0.00 0.002.66 2.66 0.00 0.001.40 1.40 0.00 0.000.28 0.28 0.00 0.00
0.00 7.69 7.69 0.00 0.00
10 4.84 0.00 4.84 0.001 0.88 0.88 0.00 0.04
0.00 0.00 0.00 0.0010 5.57 5.57 0.00 0.28
0.00 0.00 0.00 0.00
10 0.94 0.94 0.00 0.0520 2.23 2.23 0.00 0.11
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
10.00 0.46 0.46 0.00 0.020.00 0.00 0.00 0.00
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
521 3.39 3.39 0.00 0.170.00 0.00 0.00 0.00
2 1.75 1.75 0.00 0.090.00 0.00 0.00 0.000.00 0.00 0.00 0.002.00 0.00 2.00 0.000.00 0.00 0.00 0.00
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
22.060 15.223 6.837 0.761
KUSHALA PARA
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
Sub ActivityActivity Unit Unit Cost
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00
8.2 Beekeeping No. 0.008.3 Poultry No. 12.538.4 Fisheries No. 0.008.5 Bio-fuel Plantation No. 0.008.6 Others No. 50.11
Total (C)(D) Consolidation (3%) 12.53
Grand Total 12.528 12.53
232.9 27.948
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
KUSHALA PARA
0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.84 0.84 0.00 0.210.00 0.00 0.00 0.000.00 0.00 0.00 0.003.35 3.35 0.00 0.84
4.19 4.19 0.00 1.050.84 0.84
34.79 27.95 6.84 1.81
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
(A) Preparatory phase activities capacity building trainings & EPA (22%)Admn. (10%) 41.760Monitoring (1%) 4.176Evaluation (1%) 4.176EPA (4%) AS per Exp 26.40I & CB (5%) 20.880DPR (1%) 4.176
Total (A)(B) Natural resource management (60%)1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0.484
1.1.2 Horticulture ha 0.8801.1.3 Agriculture ha1.1.4 Pasture ha 0.5571.1.5 Others ha
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0.0941.2.2 Countour Bunding ha 0.1121.2.3 Graded Bunding ha 0.1261.2.4 Bench Terracing ha
1.2.5 Others ha0.04568 /0.19300
1.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum
1.3.2 Brushwood Checks Rmt
1.3.3 Gully plugs Cum1.3.4 Loose bolder Cum 0.0071.3.5 Gabian structure Cum
2.2 1.3.6 Others nos 0.45/0.74 /1.011.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos
1.4.2 Check dams nos 5.0001.4.3 Nallah Bunds nos 0.459 / 1.0451.4.4 Percolation tanks nos1.4.5 Ground Water recharge structure nos
1.4.6 Others nos 0.584Total (B)
Sub ActivityActivity Unit Unit Cost
489.8 58.776
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
5.88 5.88 0.00 0.000.59 0.59 0.00 0.000.59 0.59 0.00 0.003.67 3.67 0.00 0.002.94 2.94 0.00 0.000.59 0.59 0.00 0.00
0.00 14.25 14.25 0.00 0.00
30 14.51 0.00 14.51 0.001 0.88 0.88 0.00 0.040 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.00
30 2.82 2.82 0.00 0.1430 3.35 3.35 0.00 0.1710 1.26 1.26 0.00 0.060 0.00 0.00 0.00 0.00
10.00 1.93 1.93 0.00 0.100 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.00
1732 11.28 11.28 0.00 0.560 6.00 0.00 6.00 0.006 4.40 4.40 0.00 0.220 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.006 9.70 5.70 4.00 0.290 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.004 2.33 2.33 0.00 0.12
58.460 33.948 24.512 1.697
POTALIYA
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
Sub ActivityActivity Unit Unit Cost
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00
8.2 Beekeeping No. 0.008.3 Poultry No. 12.538.4 Fisheries No. 0.008.5 Bio-fuel Plantation No. 0.008.6 Others No. 50.11
Total (C)(D) Consolidation (3%) 12.53
Grand Total 12.528 12.53
489.8 58.776
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
POTALIYA
0.00 0.00 0.00 0.000.00 0.00 0.00 0.001.76 1.76 0.00 0.440.00 0.00 0.00 0.000.00 0.00 0.00 0.007.05 7.05 0.00 1.76
8.82 8.82 0.00 2.201.76 1.76
83.29 58.78 24.51 3.90
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
(A) Preparatory phase activities capacity building trainings & EPA (22%)Admn. (10%) 41.760Monitoring (1%) 4.176Evaluation (1%) 4.176EPA (4%) AS per Exp 26.40I & CB (5%) 20.880DPR (1%) 4.176
Total (A)(B) Natural resource management (60%)1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0.484
1.1.2 Horticulture ha 0.8801.1.3 Agriculture ha1.1.4 Pasture ha 0.5571.1.5 Others ha
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0.0941.2.2 Countour Bunding ha 0.1121.2.3 Graded Bunding ha 0.1261.2.4 Bench Terracing ha
1.2.5 Others ha0.04568 /0.19300
1.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum
1.3.2 Brushwood Checks Rmt
1.3.3 Gully plugs Cum1.3.4 Loose bolder Cum 0.0071.3.5 Gabian structure Cum
2.2 1.3.6 Others nos 0.45/0.74 /1.011.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos
1.4.2 Check dams nos 5.0001.4.3 Nallah Bunds nos 0.459 / 1.0451.4.4 Percolation tanks nos1.4.5 Ground Water recharge structure nos
1.4.6 Others nos 0.584Total (B)
Sub ActivityActivity Unit Unit Cost
749.6 89.952
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
9.00 9.00 0.00 0.000.90 0.90 0.00 0.000.90 0.90 0.00 0.00
10.89 10.89 0.00 0.004.50 4.50 0.00 0.000.90 0.90 0.00 0.00
0.00 27.08 27.08 0.00 0.00
20 9.67 0.00 9.67 0.003 2.64 2.64 0.00 0.130 0.00 0.00 0.00 0.00
10 5.57 5.57 0.00 0.280 0.00 0.00 0.00 0.00
20 1.88 1.88 0.00 0.0940 4.47 4.47 0.00 0.2240 5.04 5.04 0.00 0.250 0.00 0.00 0.00 0.00
30.00 4.32 4.32 0.00 0.220 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.00
1381 8.99 8.99 0.00 0.450 0.00 0.00 0.00 0.006 4.40 4.40 0.00 0.220 0.00 0.00 0.00 0.001 25.00 5.00 20.00 0.252 6.04 2.04 4.00 0.100 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.004 2.33 2.33 0.00 0.12
80.355 46.681 33.674 2.334
RAMGARH
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
Sub ActivityActivity Unit Unit Cost
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00
8.2 Beekeeping No. 0.008.3 Poultry No. 12.538.4 Fisheries No. 0.008.5 Bio-fuel Plantation No. 0.008.6 Others No. 50.11
Total (C)(D) Consolidation (3%) 12.53
Grand Total 12.528 12.53
749.6 89.952
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
RAMGARH
0.00 0.00 0.00 0.000.00 0.00 0.00 0.002.70 2.70 0.00 0.670.00 0.00 0.00 0.000.00 0.00 0.00 0.00
10.79 10.79 0.00 2.7013.49 13.49 0.00 3.37
2.70 2.70123.62 89.95 33.67 5.71
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
(A) Preparatory phase activities capacity building trainings & EPA (22%)Admn. (10%) 41.760Monitoring (1%) 4.176Evaluation (1%) 4.176EPA (4%) AS per Exp 26.40I & CB (5%) 20.880DPR (1%) 4.176
Total (A)(B) Natural resource management (60%)1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0.484
1.1.2 Horticulture ha 0.8801.1.3 Agriculture ha1.1.4 Pasture ha 0.5571.1.5 Others ha
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0.0941.2.2 Countour Bunding ha 0.1121.2.3 Graded Bunding ha 0.1261.2.4 Bench Terracing ha
1.2.5 Others ha0.04568 /0.19300
1.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum
1.3.2 Brushwood Checks Rmt
1.3.3 Gully plugs Cum1.3.4 Loose bolder Cum 0.0071.3.5 Gabian structure Cum
2.2 1.3.6 Others nos 0.45/0.74 /1.011.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos
1.4.2 Check dams nos 5.0001.4.3 Nallah Bunds nos 0.459 / 1.0451.4.4 Percolation tanks nos1.4.5 Ground Water recharge structure nos
1.4.6 Others nos 0.584Total (B)
Sub ActivityActivity Unit Unit Cost
326 39.12
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
3.91 3.91 0.00 0.000.39 0.39 0.00 0.000.39 0.39 0.00 0.001.38 1.38 0.00 0.001.96 1.96 0.00 0.000.39 0.39 0.00 0.00
0.00 8.42 8.42 0.00 0.00
30 14.51 0.00 14.51 0.001 0.88 0.88 0.00 0.040 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.00
30 2.82 2.82 0.00 0.1410 1.12 1.12 0.00 0.0610 1.26 1.26 0.00 0.060 0.00 0.00 0.00 0.00
20 3.86 3.86 0.00 0.190 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.00
854 5.56 5.56 0.00 0.280 3.00 0.00 3.00 0.005 4.50 4.50 0.00 0.230 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.004 2.50 2.50 0.00 0.130 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.002 1.17 1.17 0.00 0.06
41.174 23.662 17.512 1.183
THUMMATH
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
Sub ActivityActivity Unit Unit Cost
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00
8.2 Beekeeping No. 0.008.3 Poultry No. 12.538.4 Fisheries No. 0.008.5 Bio-fuel Plantation No. 0.008.6 Others No. 50.11
Total (C)(D) Consolidation (3%) 12.53
Grand Total 12.528 12.53
326 39.12
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
THUMMATH
0.00 0.00 0.00 0.000.00 0.00 0.00 0.001.17 1.17 0.00 0.290.00 0.00 0.00 0.000.00 0.00 0.00 0.004.69 4.69 0.00 1.17
5.87 5.87 0.00 1.471.17 1.17
56.63 39.12 17.51 2.65
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
(A) Preparatory phase activities capacity building trainings & EPA (22%)Admn. (10%) 41.760Monitoring (1%) 4.176Evaluation (1%) 4.176EPA (4%) AS per Exp 26.40I & CB (5%) 20.880DPR (1%) 4.176
Total (A)(B) Natural resource management (60%)1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0.484
1.1.2 Horticulture ha 0.8801.1.3 Agriculture ha1.1.4 Pasture ha 0.5571.1.5 Others ha
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0.0941.2.2 Countour Bunding ha 0.1121.2.3 Graded Bunding ha 0.1261.2.4 Bench Terracing ha
1.2.5 Others ha0.04568 /0.19300
1.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum
1.3.2 Brushwood Checks Rmt
1.3.3 Gully plugs Cum1.3.4 Loose bolder Cum 0.0071.3.5 Gabian structure Cum
2.2 1.3.6 Others nos 0.45/0.74 /1.011.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos
1.4.2 Check dams nos 5.0001.4.3 Nallah Bunds nos 0.459 / 1.0451.4.4 Percolation tanks nos1.4.5 Ground Water recharge structure nos
1.4.6 Others nos 0.584Total (B)
Sub ActivityActivity Unit Unit Cost
98.6 11.832
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
1.18 1.18 0.00 0.000.12 0.12 0.00 0.000.12 0.12 0.00 0.001.38 1.38 0.00 0.000.59 0.59 0.00 0.000.12 0.12 0.00 0.00
0.00 3.51 3.51 0.00 0.00
0 0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00
0.00 0.00 0.00 0.007 0.78 0.78 0.00 0.04
20 2.52 2.52 0.00 0.130.00 0.00 0.00 0.00
10.00 1.92 1.92 0.00 0.100.00 0.00 0.00 0.00
0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00
1 0.45 0.45 0.00 0.020.00 0.00 0.00 0.000.00 0.00 0.00 0.006.00 0.00 6.00 0.000.00 0.00 0.00 0.00
0.00 0.00 0.00 0.001 0.52 0.52 0.00 0.03
12.195 6.195 6.000 0.310
UKALA
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
Sub ActivityActivity Unit Unit Cost
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00
8.2 Beekeeping No. 0.008.3 Poultry No. 12.538.4 Fisheries No. 0.008.5 Bio-fuel Plantation No. 0.008.6 Others No. 50.11
Total (C)(D) Consolidation (3%) 12.53
Grand Total 12.528 12.53
98.6 11.832
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
UKALA
0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.35 0.35 0.00 0.090.00 0.00 0.00 0.000.00 0.00 0.00 0.001.42 1.42 0.00 0.35
1.77 1.77 0.00 0.440.35 0.35
17.83 11.83 6.00 0.75
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
(A) Preparatory phase activities capacity building trainings & EPA (22%)Admn. (10%) 41.760Monitoring (1%) 4.176Evaluation (1%) 4.176EPA (4%) AS per Exp 26.40I & CB (5%) 20.880DPR (1%) 4.176
Total (A)(B) Natural resource management (60%)1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0.484
1.1.2 Horticulture ha 0.8801.1.3 Agriculture ha1.1.4 Pasture ha 0.5571.1.5 Others ha
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0.0941.2.2 Countour Bunding ha 0.1121.2.3 Graded Bunding ha 0.1261.2.4 Bench Terracing ha
1.2.5 Others ha0.04568 /0.19300
1.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum
1.3.2 Brushwood Checks Rmt
1.3.3 Gully plugs Cum1.3.4 Loose bolder Cum 0.0071.3.5 Gabian structure Cum
2.2 1.3.6 Others nos 0.45/0.74 /1.011.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos
1.4.2 Check dams nos 5.0001.4.3 Nallah Bunds nos 0.459 / 1.0451.4.4 Percolation tanks nos1.4.5 Ground Water recharge structure nos
1.4.6 Others nos 0.584Total (B)
Sub ActivityActivity Unit Unit Cost
108 12.96
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
1.30 1.30 0.00 0.000.13 0.13 0.00 0.000.13 0.13 0.00 0.000.46 0.46 0.00 0.000.65 0.65 0.00 0.000.13 0.13 0.00 0.00
0.00 2.79 2.79 0.00 0.00
0 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.0010 1.12 1.12 0.00 0.0610 1.26 1.26 0.00 0.060 0.00 0.00 0.00 0.00
10.00 1.93 1.93 0.00 0.100 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.00
131 0.85 0.85 0.00 0.040 0.00 0.00 0.00 0.002 1.19 1.19 0.00 0.060 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.001 5.90 0.90 5.00 0.050 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.001 0.58 0.58 0.00 0.03
12.834 7.834 5.000 0.392
VASOONI
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
Sub ActivityActivity Unit Unit Cost
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00
8.2 Beekeeping No. 0.008.3 Poultry No. 12.538.4 Fisheries No. 0.008.5 Bio-fuel Plantation No. 0.008.6 Others No. 50.11
Total (C)(D) Consolidation (3%) 12.53
Grand Total 12.528 12.53
108 12.96
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
VASOONI
0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.39 0.39 0.00 0.100.00 0.00 0.00 0.000.00 0.00 0.00 0.001.56 1.56 0.00 0.39
1.94 1.94 0.00 0.490.39 0.39
17.96 12.96 5.00 0.88
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
(A) Preparatory phase activities capacity building trainings & EPA (22%)Admn. (10%) 41.760Monitoring (1%) 4.176Evaluation (1%) 4.176EPA (4%) AS per Exp 26.40I & CB (5%) 20.880DPR (1%) 4.176
Total (A)(B) Natural resource management (60%)1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0.484
1.1.2 Horticulture ha 0.8801.1.3 Agriculture ha1.1.4 Pasture ha 0.5571.1.5 Others ha
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0.0941.2.2 Countour Bunding ha 0.1121.2.3 Graded Bunding ha 0.1261.2.4 Bench Terracing ha
1.2.5 Others ha0.04568 /0.19300
1.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum
1.3.2 Brushwood Checks Rmt
1.3.3 Gully plugs Cum1.3.4 Loose bolder Cum 0.0071.3.5 Gabian structure Cum
2.2 1.3.6 Others nos 0.45/0.74 /1.011.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos
1.4.2 Check dams nos 5.0001.4.3 Nallah Bunds nos 0.459 / 1.0451.4.4 Percolation tanks nos1.4.5 Ground Water recharge structure nos
1.4.6 Others nos 0.584Total (B)
Sub ActivityActivity Unit Unit Cost
3480 417.6
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
0.00 41.76 41.76 0.00 0.000.00 4.18 4.18 0.00 0.000.00 4.18 4.18 0.00 0.000.00 26.40 26.40 0.00 0.000.00 20.88 20.88 0.00 0.000.00 4.18 4.18 0.00 0.00
0.00 101.57 101.57 0.00 0.00
155.00 74.98 0.00 74.98 0.009.00 7.92 7.92 0.00 0.400.00 0.00 0.00 0.00 0.00
25.00 13.93 13.93 0.00 0.700.00 0.00 0.00 0.00 0.00
140.00 13.15 13.15 0.00 0.66217.00 24.73 24.23 0.50 1.21150.00 18.91 18.91 0.00 0.95
0.00 0.00 0.00 0.00 0.00
150.00 23.05 23.05 0.00 1.150.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00
10056.00 65.46 65.46 0.00 3.270.00 9.00 0.00 9.00 0.00
43.00 32.42 32.42 0.00 1.620.00 0.00 0.00 0.00 0.003.00 40.00 14.00 26.00 0.70
20.00 51.18 16.18 35.00 0.810.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.0020.00 11.61 11.61 0.00 0.58
386.35 240.87 145.5 12.0
TOTAL OF BANSWARA IWMP -I
BANSWARA IWMP-I
CHAPTER - V
Proposed Development Plan
Sub ActivityActivity Unit Unit Cost
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00
8.2 Beekeeping No. 0.008.3 Poultry No. 12.538.4 Fisheries No. 0.008.5 Bio-fuel Plantation No. 0.008.6 Others No. 50.11
Total (C)(D) Consolidation (3%) 12.53
Grand Total 12.528 12.53
3480 417.6
Quantity Total Cost Cost from Project Fund
Convergence Fund
Beneficiary Contribution
TOTAL OF BANSWARA IWMP -I
0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 12.53 12.53 0.00 3.130.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 50.11 50.11 0.00 12.53
62.64 62.64 0.00 15.6612.53 12.53 0.00 0.00
563.08 417.60 145.48 27.70
BANSWARA IWMP-I
Annual Action Plan (Through Convergence)
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. (10%) 0.00 0 0.00Monitoring (1%) 0.00 0 0.00Evaluation (1%) 0.00 0 0.00EPA (4%) 0.00 0 0.00I & CB (5%) 0.00 0 0.00DPR (1%) 0.00 0 0.00
Total (A) 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.1 Land Development (Productive use) 1.1.1 Afforestation ha 74.98 26.24 24.7 23.99 0 74.981.1.2 Horticulture ha 0.00 0.00 0.00 0.00 0 0.001.1.3 Agriculture ha 0.00 0.00 0.00 0.00 0 0.001.1.4 Pasture ha 0.00 0.00 0.00 0.00 0 0.001.1.5 Others ha 0.00 0.00 0.00 0.00 0 0.00
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0.00 0.00 0.00 0.00 0 0.001.2.2 Countour Bunding ha 0.50 0.18 0.17 0.16 0 0.501.2.3 Graded Bunding ha 0.00 0.00 0.00 0.00 0 0.001.2.4 Bench Terracing ha 0.00 0.00 0.00 0.00 0 0.001.2.5 Others ha 0.00 0.00 0.00 0.00 0 0.00
1.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum 0.00 0.00 0.00 0.00 0 0.001.3.2 Brushwood Checks Rmt 0.00 0.00 0.00 0.00 0 0.001.3.3 Gully plugs Cum 0.00 0.00 0.00 0.00 0 0.001.3.4 Loose bolder Cum 0.00 0.00 0.00 0.00 0 0.001.3.5 Gabian structure Cum 9.00 3.15 2.97 2.88 0 9.00
2.2 1.3.6 Others nos 0.00 0.00 0.00 0.00 0 0.001.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos 0.00 0.00 0.00 0.00 0 0.00
1.4.2 Check dams nos 26.00 9.10 8.58 8.32 0 26.001.4.3 Nallah Bunds nos 35.00 12.25 11.6 11.20 0 35.001.4.4 Percolation tanks nos 0.00 0.00 0.00 0.00 0 0.001.4.5 Ground Water recharge structure nos 0.00 0.00 0.00 0.00 0 0.001.4.6 Others nos 0.00 0.00 0.00 0.00 0 0.00
Total (B) 145.5 0.0 0.0 0.0 0.0 0.0 50.9 0.0 48.0 0.0 46.6 145.5
3rd yearActivity Unit
Quantity
Unit Cost
Total
(A) Preparatory phase activities capacity building trainings & EPA (22%)
(B) Natural resource management (60%)
4th year 5th yearTotal cost
1st year 2nd year
BANSWARA IWMP-I
Annual Action Plan (Through Convergence)
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin3rd year
Activity UnitQuant
ityUnit Cost
Total 4th year 5th yearTotal cost
1st year 2nd year
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00 0.00 0.00 0.00 0 0.00
8.2 Beekeeping No. 0.00 0.00 0.00 0.00 0 0.008.3 Poultry No. 0.00 0.00 0.00 0.00 0 0.008.4 Fisheries No. 0.00 0.00 0.00 0.00 0 0.008.5 Bio-fuel Plantation No. 0.00 0.00 0.00 0.00 0 0.008.6 Others No. 0.00 0.00 0.00 0.00 0 0.00
Total (C) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00(D) Consolidation (3%) 0.00 0 0.00
Grand Total 145.48 0.00 0.00 0.00 0.00 0.00 50.92 0.00 48.0 0.00 46.55 145.48% Targets NA NA NA NA NA NA
BANSWARA IWMP-I
Through Project Fund G.P.- DOONGRI PARA
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. (10%) 3.96 0.79 0.79 0.79 0.79 0.79 0 3.96Monitoring (1%) 0.40 0.08 0.08 0.08 0.08 0.08 0 0.40Evaluation (1%) 0.40 0.00 0.00 0.20 0.12 0.08 0 0.40EPA (4%) 1.38 0.00 1.38 0.00 0.00 0.00 0 1.38I & CB (5%) 1.98 0.79 0.40 0.40 0.40 0.00 0 1.98DPR (1%) 0.40 0.32 0.08 0 0.40
Total (A) 0 0 8.51 0 1.98 0 2.64 0 1.47 0 1.39 0 1.03 0 8.51
1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0 0.18072 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.1.2 Horticulture ha 1 0.87973 0.88 0 0.00 1 0.88 0 0.00 1 0.881.1.3 Agriculture ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.4 Pasture ha 5 0.55719 2.79 0 0.00 5 2.79 0 0.00 5 2.791.1.5 Others ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 40 0.09394 3.76 40 3.76 0.00 0 0.00 40 3.761.2.2 Countour Bunding ha 20 0.11168 2.23 0.00 20 2.23 0 0.00 20 2.231.2.3 Graded Bunding ha 0 0.12607 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.4 Bench Terracing ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00VCF 20 0.04568 0.91 20 0.91 0 0.00 0 0.00 20 0.91PRT 20 0.193 3.86 0.00 10 1.93 10 1.93 20 3.861.2.5 Others ha 40 0.04568
/0.19300 4.77 20 0.9136 10 1.93 10 1.93 40 4.77361.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.3.2 Brushwood Checks Rmt 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.3 Gully plugs Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.4 Loose bolder Cum 965 0.00651 6.28 954 6.21 0 0.00 11 0.07 965 6.281.3.5 Gabian structure Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2.2 1.3.6 Others nos 3 0.45/0.74 /1.01 1.19 3 1.19 0 0 0.00 3 1.19
1.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.4.2 Check dams nos 0 5.00 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.3 Nallah Bunds nos 2 0.459 / 1.045 1.50 0 0 2 1.50 2 1.501.4.4 Percolation tanks nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.5 Ground Water recharge structure nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.6 Others nos 1 0.58352 0.59 0 0.00 0 0.00 1 0.59 1 0.59
Total (B) 7.539 23.995 0.0 0.0 12.1 7.8 4.1 24.0( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00 0.00 0.00 0.00 0 0.00
CHAPTER – V
(A) Preparatory phase activities capacity building trainings & EPA (22%)
(B) Natural resource management (60%)
Unit Cost Total cost1st year 2nd year 3rd year 4th year
Annual Action Plan :
Total Activity Unit
Quantity
5th year
BANSWARA IWMP-I
Through Project Fund G.P.- DOONGRI PARA
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinUnit Cost Total cost1st year 2nd year 3rd year 4th year Total
Activity UnitQuanti
ty5th year
8.2 Beekeeping No. 0.00 0.00 0.00 0.00 0 0.008.3 Poultry No. 1.19 0.36 0.48 0.36 0 1.198.4 Fisheries No. 0.00 0.00 0.00 0.00 0 0.008.5 Bio-fuel Plantation No. 0.00 0.00 0.00 0.00 0 0.008.6 Others No. 4.76 1.43 1.90 1.43 0 4.76
Total (C) 0 0.00 5.95 0.0 0.00 0.0 0.00 0.00 1.78 0.00 2.38 0.00 1.78 0.00 5.95(D) Consolidation (3%) 1.19 1.19 0 1.19
Grand Total 0 7.53936 39.64075 0 1.9818 0 2.64 0 15.322 0 11.595 0 8.101366 39.64% Targets NA NA NA NA NA NA
BANSWARA IWMP-I
Through Project Fund G.P.- TIMERA PARA
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. (10%) 4.08 0.82 0.82 0.82 0.82 0.81 0 4.08Monitoring (1%) 0.41 0.08 0.08 0.08 0.08 0.08 0 0.41Evaluation (1%) 0.41 0.00 0.00 0.21 0.00 0.20 0 0.41EPA (4%) 1.84 0.00 1.84 0.00 0.00 0.00 0 1.84I & CB (5%) 2.04 0.82 0.41 0.41 0.41 0.00 0 2.04DPR (1%) 0.41 0.21 0.19 0 0.41
Total (A) 0 0 9.18 0 1.71 0 3.14 0 1.73 0 1.31 0 1.28 0 9.18
1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0 0.18072 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.1.2 Horticulture ha 1 0.87973 0.88 0 0.00 1 0.88 0 0.00 1 0.881.1.3 Agriculture ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.4 Pasture ha 0 0.55719 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.5 Others ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0 0.09394 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.2 Countour Bunding ha 40 0.11168 4.47 20 2.23 10 1.12 10 1.12 40 4.471.2.3 Graded Bunding ha 20 0.12607 2.52 10 1.26 10 1.26 0 0.00 20 2.521.2.4 Bench Terracing ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.5 Others ha 20 0.04568
/0.19300 3.86 10 1.93 10 1.93 0 0 20 3.861.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.3.2 Brushwood Checks Rmt 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.3 Gully plugs Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.4 Loose bolder Cum 480 0.00651 3.12 350 2.28 0 0.00 130 0.85 480 3.121.3.5 Gabian structure Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2.2 1.3.6 Others nos 6 0.45/0.74 /1.01 4.40 3 2.20 3 2.20 0 0.00 6 4.40
1.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.4.2 Check dams nos 1 5.00 4.00 0 0.00 0 0.00 1 4.00 1 4.001.4.3 Nallah Bunds nos 1 0.459 / 1.045 0.46 0 0 1 0.46 1 0.461.4.4 Percolation tanks nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.5 Ground Water recharge structure nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.6 Others nos 1 0.58352 0.58 0 0.00 0 0.00 1 0.58 1 0.58
Total (B) 7.539 24.293 0.0 0.0 0.0 0.0 9.9 7.4 7.0 24.3
Annual Action Plan :
Total Unit Quantity
5th year
CHAPTER – V
(A) Preparatory phase activities capacity building trainings & EPA (22%)
(B) Natural resource management (60%)
Unit CostTotal cost
1st year 2nd year 3rd year 4th yearActivity
BANSWARA IWMP-I
Through Project Fund G.P.- TIMERA PARA
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinTotal
Unit Quantity5th year
Unit CostTotal cost
1st year 2nd year 3rd year 4th yearActivity
( C ) Production System and micro enterprise(15%) 0 08.Production system & micro-enterprises 8.1 Sericulture No. 0 0.00 0.00 0.00 0.00 0 0.00
8.2 Beekeeping No. 0 0.00 0.00 0.00 0.00 0 0.008.3 Poultry No. 0 1.22 0.37 0.49 0.37 0 1.228.4 Fisheries No. 0 0.00 0.00 0.00 0.00 0 0.008.5 Bio-fuel Plantation No. 0 0.00 0.00 0.00 0.00 0 0.008.6 Others No. 0 4.90 1.47 1.96 1.47 0 4.90
Total (C) 0 0.00 6.12 0.0 0.00 0.00 0.00 0.00 1.84 0.00 2.45 0.00 1.84 0.00 6.12(D) Consolidation (3%) 1.22 1.22 0 1.22
Grand Total 0 7.53936 40.82481 0 1.715 0 3.14 0 13.469 0 11.143 0 11.35211 40.82% Targets NA NA NA NA NA NA
BANSWARA IWMP-I
Through Project Fund G.P.- SHARAN
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. (10%) 0.18 0.036 0.04 0.036 0.036 0.036 0 0.18Monitoring (1%) 0.02 0.004 0.00 0.004 0.004 0.004 0 0.02Evaluation (1%) 0.02 0.000 0.00 0.009 0.010 0.004 0 0.02EPA (4%) 0.00 0.000 0.00 0.000 0.000 0.000 0 0.00I & CB (5%) 0.09 0.036 0.02 0.018 0.018 0.000 0 0.09DPR (1%) 0.02 0.014 0.004 0 0.02
Total (A) 0 0 0.32 0 0.09 0 0.06 0 0.07 0 0.07 0 0.05 0 0.32
1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0 0.18072 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.1.2 Horticulture ha 0 0.87973 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.3 Agriculture ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.4 Pasture ha 0 0.55719 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.5 Others ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0 0.09394 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.2 Countour Bunding ha 0 0.11168 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.3 Graded Bunding ha 0 0.12607 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.4 Bench Terracing ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.5 Others ha 0 0.04568
/0.19300 0.00 0 0 0 0 0 0 0 01.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cubic meter 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.3.2 Brushwood Checks Rmt 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.3 Gully plugs Cubic meter 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.4 Loose bolder Cubic meter 175 0.00651 1.14 175 1.14 0 0.00 0 0.00 175 1.141.3.5 Gabian structure Cubic meter 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2.2 1.3.6 Others nos 0 0.45/0.74 /1.01 0.00 0 0 0 0.00 0 0.00
1.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.4.2 Check dams nos 0 5.00 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.3 Nallah Bunds nos 0 0.459 / 1.045 0.00 0 0 0 0.00 0 0.001.4.4 Percolation tanks nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.5 Ground Water recharge structure nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.6 Others nos 0 0.58352 0.00 0 0.00 0 0.00 0 0.00 0 0.00
Total (B) 7.539 1.137 0.0 0.0 0.0 0.0 1.1 0.0 0.0 0 0.0 1.1
CHAPTER – V
(A) Preparatory phase activities capacity building trainings & EPA (22%)
(B) Natural resource management (60%)
Unit CostTotal cost
1st year 2nd year 3rd year 4th year
Annual Action Plan :
Total Activity Unit
Quantity
5th year
BANSWARA IWMP-I
Through Project Fund G.P.- SHARAN
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinUnit CostTotal cost
1st year 2nd year 3rd year 4th year Total Activity Unit
Quantity
5th year
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00 0.00 0.00 0.00 0 0.00
8.2 Beekeeping No. 0.00 0.00 0.00 0.00 0 0.008.3 Poultry No. 0.05 0.02 0.02 0.02 0 0.058.4 Fisheries No. 0.00 0.00 0.00 0.00 0 0.008.5 Bio-fuel Plantation No. 0.00 0.00 0.00 0.00 0 0.008.6 Others No. 0.21 0.06 0.09 0.06 0 0.21
Total (C) 0 0.00 0.27 0.0 0.00 0.00 0.00 0.00 0.08 0.00 0.11 0.00 0.08 0.00 0.27(D) Consolidation (3%) 0.05 0.05 0 0.05
Grand Total 0 7.53936 1.77636 0 0.089 0 0.06 0 1.2849 0 0.1734 0 0.179376 1.78% Targets NA NA NA NA NA NA
BANSWARA IWMP-I
Through Project Fund G.P.- KALINJARA
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. (10%) 9.48 1.90 1.90 1.90 1.90 1.90 0 9.48Monitoring (1%) 0.95 0.19 0.19 0.19 0.19 0.19 0 0.95Evaluation (1%) 0.95 0.00 0.00 0.47 0.00 0.47 0 0.95EPA (4%) 2.75 0.00 2.75 0.00 0.00 0.00 0 2.75I & CB (5%) 4.74 1.90 0.95 0.95 0.95 0.00 0 4.74DPR (1%) 0.95 0.76 0.19 0 0.95
Total (A) 0 0 19.81 0 4.74 0 5.79 0 3.51 0 3.03 0 2.75 0 19.81
1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0 0.18072 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.1.2 Horticulture ha 1 0.87973 0.88 0 0.00 1 0.88 0 0.00 1 0.881.1.3 Agriculture ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.4 Pasture ha 0 0.55719 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.5 Others ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 10 0.09394 0.94 10 0.94 0 0.00 0 0.00 10 0.941.2.2 Countour Bunding ha 40 0.11168 4.47 25 2.79 15 1.68 0 0.00 40 4.471.2.3 Graded Bunding ha 40 0.12607 5.04 25 3.15 15 1.89 0 0.00 40 5.041.2.4 Bench Terracing ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.5 Others ha 0 0.04568
/0.19300 0.00 0 0 0 0 0 0 0 01.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cubic meter 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.3.2 Brushwood Checks Rmt 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.3 Gully plugs Cubic meter 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.4 Loose bolder Cubic meter 3817 0.00651 24.85 2500 16.28 0 0.00 1317 8.57 3817 24.851.3.5 Gabian structure Cubic meter 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2.2 1.3.6 Others nos 12 0.45/0.74 /1.01 10.15 0 6 5.07 6 5.07 12 10.15
1.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.4.2 Check dams nos 1 5.00 5.00 0 0.00 1 5.00 0 0.00 1 5.001.4.3 Nallah Bunds nos 4 0.459 / 1.045 3.08 0 2 1.54 2 1.54 4 3.081.4.4 Percolation tanks nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.5 Ground Water recharge structure nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.6 Others nos 6 0.58352 3.50 0 0.00 3 1.75 3 1.75 6 3.50
Total (B) 7.539 57.905 0.0 0.0 0.0 0.0 23.2 17.8 16.9 57.9
Annual Action Plan :
Total Unit
Quantity
5th year
CHAPTER – V
(A) Preparatory phase activities capacity building trainings & EPA (22%)
(B) Natural resource management (60%)
Unit CostTotal cost
1st year 2nd year 3rd year 4th yearActivity
BANSWARA IWMP-I
Through Project Fund G.P.- KALINJARA
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinTotal
UnitQuanti
ty5th year
Unit CostTotal cost
1st year 2nd year 3rd year 4th yearActivity
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00 0.00 0.00 0.00 0 0.00
8.2 Beekeeping No. 0.00 0.00 0.00 0.00 0 0.008.3 Poultry No. 2.84 0.85 1.14 0.85 0 2.848.4 Fisheries No. 0.00 0.00 0.00 0.00 0 0.008.5 Bio-fuel Plantation No. 0.00 0.00 0.00 0.00 0 0.008.6 Others No. 11.37 3.41 4.55 3.41 0 11.37
Total (C) 0 0.00 14.22 0.0 0.00 0.00 0.00 0.00 4.26 0.00 5.69 0.00 4.26 0.00 14.22(D) Consolidation (3%) 2.84 2.84 0 2.84
Grand Total 0 7.53936 94.77756 0 4.7388 0 5.79 0 30.93 0 26.529 0 26.79393 94.78% Targets NA NA NA NA NA NA
BANSWARA IWMP-I
Through Project Fund G.P.- KUSHALA PARA
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. (10%) 2.79 0.56 0.56 0.56 0.56 0.56 0 2.79Monitoring (1%) 0.28 0.06 0.06 0.06 0.06 0.06 0 0.28Evaluation (1%) 0.28 0.00 0.00 0.14 0.00 0.14 0 0.28EPA (4%) 2.66 0.00 2.66 0.00 0.00 0.00 0 2.66I & CB (5%) 1.40 0.56 0.28 0.28 0.28 0.00 0 1.40DPR (1%) 0.28 0.22 0.06 0 0.28
Total (A) 0 0 7.69 0 1.40 0 3.56 0 1.03 0 0.89 0 0.81 0 7.69
1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0 0.18072 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.1.2 Horticulture ha 1 0.87973 0.88 0 0.00 1 0.88 0 0.00 1 0.881.1.3 Agriculture ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.4 Pasture ha 10 0.55719 5.57 0 0.00 5 2.79 5 2.79 10 5.571.1.5 Others ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 10 0.09394 0.94 5 0.47 0 0.00 5 0.47 10 0.941.2.2 Countour Bunding ha 20 0.11168 2.23 10 1.12 10 1.12 0 0.00 20 2.231.2.3 Graded Bunding ha 0 0.12607 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.4 Bench Terracing ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.5 Others ha 10 0.04568
/0.19300 0.46 5 0.2284 5 0.2284 0 0 10 0.45681.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.3.2 Brushwood Checks Rmt 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.3 Gully plugs Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.4 Loose bolder Cum 521 0.00651 3.39 521 3.39 0.00 0 0.00 521 3.391.3.5 Gabian structure Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2.2 1.3.6 Others nos 2 0.45/0.74 /1.01 1.75 0 0 2 1.75 2 1.75
1.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.4.2 Check dams nos 0 5.00 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.3 Nallah Bunds nos 0 0.459 / 1.045 0.00 0 0 0 0.00 0 0.001.4.4 Percolation tanks nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.5 Ground Water recharge structure nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.6 Others nos 0 0.58352 0.00 0 0.00 0 0.00 0 0.00 0 0.00
Total (B) 7.539 15.223 0.0 0.0 0.0 0.0 5.2 5.0 5.0 15.2
CHAPTER – V
(A) Preparatory phase activities capacity building trainings & EPA (22%)
(B) Natural resource management (60%)
Unit CostTotal cost
1st year 2nd year 3rd year 4th year
Annual Action Plan :
Total Activity Unit
Quantity
5th year
BANSWARA IWMP-I
Through Project Fund G.P.- KUSHALA PARA
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinUnit CostTotal cost
1st year 2nd year 3rd year 4th year Total Activity Unit
Quantity
5th year
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00 0.00 0.00 0.00 0 0.00
8.2 Beekeeping No. 0.00 0.00 0.00 0.00 0 0.008.3 Poultry No. 0.84 0.25 0.34 0.25 0 0.848.4 Fisheries No. 0.00 0.00 0.00 0.00 0 0.008.5 Bio-fuel Plantation No. 0.00 0.00 0.00 0.00 0 0.008.6 Others No. 3.35 1.01 1.34 1.01 0 3.35
Total (C) 0 0.00 4.19 0.0 0.00 0.00 0.00 0.00 1.26 0.00 1.68 0.00 1.26 0.00 4.19(D) Consolidation (3%) 0.84 0.84 0 0.84
Grand Total 0 7.53936 27.948 0 1.3974 0 3.56 0 7.4983 0 7.5821 0 7.912242 27.95% Targets NA NA NA NA NA NA
BANSWARA IWMP-I
Through Project Fund G.P.- POTALIYA
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. (10%) 5.88 1.18 1.18 1.18 1.18 1.18 0 5.88Monitoring (1%) 0.59 0.12 0.12 0.12 0.12 0.12 0 0.59Evaluation (1%) 0.59 0.00 0.00 0.29 0.00 0.29 0 0.59EPA (4%) 3.67 0.00 3.67 0.00 0.00 0.00 0 3.67I & CB (5%) 2.94 1.18 0.59 0.59 0.59 0.00 0 2.94DPR (1%) 0.59 0.47 0.12 0 0.59
Total (A) 0 0 14.25 0 2.94 0 5.55 0 2.17 0 1.88 0 1.70 0 14.25
1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0 0.18072 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.1.2 Horticulture ha 1 0.87973 0.88 0 0.00 1 0.88 0 0.00 1 0.881.1.3 Agriculture ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.4 Pasture ha 0 0.55719 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.5 Others ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 30 0.09394 2.82 30 2.82 0 0.00 0 0.00 30 2.821.2.2 Countour Bunding ha 30 0.11168 3.35 20 2.23 0 0.00 10 1.12 30 3.351.2.3 Graded Bunding ha 10 0.12607 1.26 10 1.26 0 0.00 0 0.00 10 1.261.2.4 Bench Terracing ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.5 Others ha 10 0.04568
/0.19300 1.93 10 1.93 0 0 0 0 10 1.931.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.3.2 Brushwood Checks Rmt 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.3 Gully plugs Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.4 Loose bolder Cum 1732 0.00651 11.28 1000 6.51 700 4.56 32 0.21 1732 11.281.3.5 Gabian structure Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2.2 1.3.6 Others nos 6 0.45/0.74 /1.01 4.40 0 0.00 3 2.20 3 2.20 6 4.40
1.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.4.2 Check dams nos 0 5.00 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.3 Nallah Bunds nos 6 0.459 / 1.045 5.70 0 0.00 3 2.85 3 2.85 6 5.701.4.4 Percolation tanks nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.5 Ground Water recharge structure nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.6 Others nos 4 0.58352 2.33 0 0.00 0 0.00 4 2.33 4 2.33
Total (B) 7.539 33.948 0.0 0.0 0.0 0.0 14.8 10.5 8.7 33.9
Annual Action Plan :
Total Unit
Quantity
5th year
CHAPTER – V
(A) Preparatory phase activities capacity building trainings & EPA (22%)
(B) Natural resource management (60%)
Unit CostTotal cost
1st year 2nd year 3rd year 4th yearActivity
BANSWARA IWMP-I
Through Project Fund G.P.- POTALIYA
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinTotal
UnitQuanti
ty5th year
Unit CostTotal cost
1st year 2nd year 3rd year 4th yearActivity
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00 0.00 0.00 0.00 0 0.00
8.2 Beekeeping No. 0.00 0.00 0.00 0.00 0 0.008.3 Poultry No. 1.76 0.53 0.71 0.53 0 1.768.4 Fisheries No. 0.00 0.00 0.00 0.00 0 0.008.5 Bio-fuel Plantation No. 0.00 0.00 0.00 0.00 0 0.008.6 Others No. 7.05 2.12 2.82 2.12 0 7.05
Total (C) 0 0.00 8.82 0.0 0.00 0.0 0.00 0.00 2.64 0.00 3.53 0.00 2.64 0.00 8.82(D) Consolidation (3%) 1.76 1.76 0 1.76
Grand Total 0 7.53936 58.77883 0 2.9388 0 5.55 0 19.572 0 15.894 0 14.8219 58.78% Targets NA NA NA NA NA NA
BANSWARA IWMP-I
Through Project Fund G.P.- RAM GARH
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. (10%) 9.00 1.80 1.80 1.80 1.80 1.80 0 9.00Monitoring (1%) 0.90 0.18 0.18 0.18 0.18 0.18 0 0.90Evaluation (1%) 0.90 0.00 0.00 0.45 0.00 0.45 0 0.90EPA (4%) 10.89 0.00 10.89 0.00 0.00 0.00 0 10.89I & CB (5%) 4.50 1.80 0.90 0.90 0.90 0.00 0 4.50DPR (1%) 0.90 0.72 0.18 0 0.90
Total (A) 0 0 27.08 0 4.50 0 13.76 0 3.33 0 2.88 0 2.61 0 27.08
1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0 0.18072 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.1.2 Horticulture ha 3 0.87973 2.64 0 0.00 3 2.64 0 0.00 3 2.641.1.3 Agriculture ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.4 Pasture ha 10 0.55719 5.57 0 0.00 10 5.57 0 0.00 10 5.571.1.5 Others ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 20 0.09394 1.88 10 0.94 10 0.94 0 0.00 20 1.881.2.2 Countour Bunding ha 40 0.11168 4.47 10 1.12 20 2.23 10 1.12 40 4.471.2.3 Graded Bunding ha 40 0.12607 5.04 30 3.78 10 1.26 0 0.00 40 5.041.2.4 Bench Terracing ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.5 Others ha 30 0.04568
/0.19300 4.32 20 2.3868 0 0 10 1.93 30 4.31681.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.3.2 Brushwood Checks Rmt 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.3 Gully plugs Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.4 Loose bolder Cum 1381 0.00651 8.99 1381 8.99 0 0.00 0 0.00 1381 8.991.3.5 Gabian structure Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2.2 1.3.6 Others nos 6 0.45/0.74 /1.01 4.40 0 3 2.20 3 2.20 6 4.40
1.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.4.2 Check dams nos 1 5.00 5.00 0 0.00 0 0.00 1 5.00 1 5.001.4.3 Nallah Bunds nos 2 0.459 / 1.045 2.04 0 0 2 2.04 2 2.041.4.4 Percolation tanks nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.5 Ground Water recharge structure nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.6 Others nos 4 0.58352 2.33 0 0.00 0 0.00 4 2.33 4 2.33
Total (B) 7.539 46.681 0.0 0.0 0.0 0.0 17.2 14.8 14.6 46.7
CHAPTER – V
(A) Preparatory phase activities capacity building trainings & EPA (22%)
(B) Natural resource management (60%)
Unit Cost Total cost1st year 2nd year 3rd year 4th year
Annual Action Plan :
Total Activity Unit
Quantity
5th year
BANSWARA IWMP-I
Through Project Fund G.P.- RAM GARH
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinUnit Cost Total cost1st year 2nd year 3rd year 4th year Total
Activity UnitQuanti
ty5th year
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00 0.00 0.00 0.00 0 0.00
8.2 Beekeeping No. 0.00 0.00 0.00 0.00 0 0.008.3 Poultry No. 2.70 0.81 1.08 0.81 0 2.708.4 Fisheries No. 0.00 0.00 0.00 0.00 0 0.008.5 Bio-fuel Plantation No. 0.00 0.00 0.00 0.00 0 0.008.6 Others No. 10.79 3.24 4.32 3.24 0 10.79
Total (C) 0 0.00 13.49 0.0 0.00 ### 0.00 0.00 4.05 0.00 5.40 0.00 4.05 0.00 13.49(D) Consolidation (3%) 2.70 2.70 0 2.70
Grand Total 0 7.53936 89.94933 0 4.4976 0 13.8 0 24.591 0 23.12 0 23.97589 89.95% Targets NA NA NA NA NA NA
BANSWARA IWMP-I
Through Project Fund G.P.- THUMMATH
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. (10%) 3.91 0.78 0.78 0.78 0.78 0.78 0 3.91Monitoring (1%) 0.39 0.08 0.08 0.08 0.08 0.08 0 0.39Evaluation (1%) 0.39 0.00 0.00 0.20 0.00 0.20 0 0.39EPA (4%) 1.38 0.00 1.38 0.00 0.00 0.00 0 1.38I & CB (5%) 1.96 0.78 0.39 0.39 0.39 0.00 0 1.96DPR (1%) 0.39 0.31 0.08 0 0.39
Total (A) 0 0 8.42 0 1.96 0 2.63 0 1.45 0 1.25 0 1.13 0 8.42
1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0 0.18072 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.1.2 Horticulture ha 1 0.87973 0.88 0 0.00 1 0.88 0 0.00 1 0.881.1.3 Agriculture ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.4 Pasture ha 0 0.55719 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.5 Others ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 30 0.09394 2.82 10 0.94 20 1.88 0 0.00 30 2.821.2.2 Countour Bunding ha 10 0.11168 1.12 10 1.12 0 0.00 0 0.00 10 1.121.2.3 Graded Bunding ha 10 0.12607 1.26 10 1.26 0 0.00 0 0.00 10 1.261.2.4 Bench Terracing ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.5 Others ha 20 0.04568
/0.19300 3.86 15 2.895 5 0.965 0 0 20 3.861.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.3.2 Brushwood Checks Rmt 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.3 Gully plugs Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.4 Loose bolder Cum 854 0.00651 5.56 526 3.42 0 0.00 328 2.14 854 5.561.3.5 Gabian structure Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2.2 1.3.6 Others nos 5 0.45/0.74 /1.01 4.50 0 0.00 1 3.00 4 1.50 5 4.50
1.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.4.2 Check dams nos 0 5.00 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.3 Nallah Bunds nos 4 0.459 / 1.045 2.50 0 0 0.00 4 2.50 4 2.501.4.4 Percolation tanks nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.5 Ground Water recharge structure nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.6 Others nos 2 0.58352 1.17 0 0.00 1 0.58 1 0.58 2 1.17
Total (B) 7.539 23.662 0.0 0.0 0.0 0.0 9.6 7.3 6.7 23.7
Annual Action Plan :
Total Unit
Quantity
5th year
CHAPTER – V
(A) Preparatory phase activities capacity building trainings & EPA (22%)
(B) Natural resource management (60%)
Unit Cost Total cost1st year 2nd year 3rd year 4th year
Activity
BANSWARA IWMP-I
Through Project Fund G.P.- THUMMATH
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinTotal
UnitQuanti
ty5th year
Unit Cost Total cost1st year 2nd year 3rd year 4th year
Activity( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00 0.00 0.00 0.00 0 0.00
8.2 Beekeeping No. 0.00 0.00 0.00 0.00 0 0.008.3 Poultry No. 1.17 0.35 0.47 0.35 0 1.178.4 Fisheries No. 0.00 0.00 0.00 0.00 0 0.008.5 Bio-fuel Plantation No. 0.00 0.00 0.00 0.00 0 0.008.6 Others No. 4.69 1.41 1.88 1.41 0 4.69
Total (C) 0 0.00 5.87 0.0 0.00 0.00 0.00 0.00 1.76 0.00 2.35 0 1.76 0.00 5.87(D) Consolidation (3%) 1.17 1.17 0 1.17
Grand Total 0 7.53936 39.12185 0 1.956 0 2.63 0 12.844 0 10.906 0 10.787 39.12% Targets NA NA NA NA NA NA
BANSWARA IWMP-I
Through Project Fund G.P.- UKALA
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. (10%) 1.18 0.24 0.24 0.24 0.24 0.24 0 1.18Monitoring (1%) 0.12 0.02 0.02 0.02 0.02 0.02 0 0.12Evaluation (1%) 0.12 0.00 0.00 0.06 0.00 0.06 0 0.12EPA (4%) 1.38 0.00 1.38 0.00 0.00 0.00 0 1.38I & CB (5%) 0.59 0.24 0.12 0.12 0.12 0.00 0 0.59DPR (1%) 0.12 0.09 0.02 0 0.12
Total (A) 0 0 3.51 0 0.59 0 1.76 0 0.44 0 0.38 0 0.34 0 3.51
1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0 0.18072 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.1.2 Horticulture ha 0 0.87973 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.3 Agriculture ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.4 Pasture ha 0 0.55719 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.5 Others ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0 0.09394 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.2 Countour Bunding ha 7.000 0.11168 0.78 7 0.78 0 0.00 0 0.00 7.00 0.781.2.3 Graded Bunding ha 20 0.12607 2.52 15 1.89 5 0.63 0 0.00 20 2.521.2.4 Bench Terracing ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.5 Others ha 10 0.04568
/0.19300 1.92 5 0.965 5 0.965 0 0 10 1.931.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.3.2 Brushwood Checks Rmt 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.3 Gully plugs Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.4 Loose bolder Cum 0 0.00651 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.5 Gabian structure Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2.2 1.3.6 Others nos 1 0.45/0.74 /1.01 0.45 0 1 0.45 0 0.00 1 0.45
1.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.4.2 Check dams nos 0 5.00 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.3 Nallah Bunds nos 0 0.459 / 1.045 0.00 0 0 0 0.00 0 0.001.4.4 Percolation tanks nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.5 Ground Water recharge structure nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.6 Others nos 1 0.58352 0.52 0 0.00 1 0.52 0 0.00 1 0.52
Total (B) 7.539 6.195 0.0 0.0 0.0 0.0 3.6 2.6 0 0.0 6.2
CHAPTER – V
(A) Preparatory phase activities capacity building trainings & EPA (22%)
(B) Natural resource management (60%)
Unit CostTotal cost
1st year 2nd year 3rd year 4th year
Annual Action Plan :
Total Activity Unit Quantity
5th year
BANSWARA IWMP-I
Through Project Fund G.P.- UKALA
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinUnit CostTotal cost
1st year 2nd year 3rd year 4th year Total Activity Unit Quantity
5th year
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00 0.00 0.00 0.00 0 0.00
8.2 Beekeeping No. 0.00 0.00 0.00 0.00 0 0.008.3 Poultry No. 0.35 0.11 0.14 0.11 0 0.358.4 Fisheries No. 0.00 0.00 0.00 0.00 0 0.008.5 Bio-fuel Plantation No. 0.00 0.00 0.00 0.00 0 0.008.6 Others No. 1.42 0.43 0.57 0.43 0 1.41
Total (C) 0 0.00 1.77 0.0 0.00 0.00 0.00 0.00 0.53 0.00 0.71 0.00 0.53 0.00 1.77(D) Consolidation (3%) 0.35 0.35 0 0.35
Grand Total 0 7.53936 11.83132 0 0.59 0 1.76 0 4.608 0 3.6539 0 1.230528 0 11.83% Targets NA NA NA NA NA NA
BANSWARA IWMP-I
Through Project Fund G.P.- VASOONI
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. (10%) 1.30 0.26 0.26 0.26 0.26 0.26 0 1.30Monitoring (1%) 0.13 0.03 0.03 0.03 0.03 0.03 0 0.13Evaluation (1%) 0.13 0.00 0.00 0.06 0.00 0.06 0 0.13EPA (4%) 0.46 0.00 0.46 0.00 0.00 0.00 0 0.46I & CB (5%) 0.65 0.26 0.13 0.13 0.13 0.00 0 0.65DPR (1%) 0.13 0.10 0.03 0 0.13
Total (A) 0 0 2.79 0 0.65 0 0.87 0 0.48 0 0.41 0 0.38 0 2.79
1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0 0.18072 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.1.2 Horticulture ha 0 0.87973 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.3 Agriculture ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.4 Pasture ha 0 0.55719 0.00 0 0.00 0 0.00 0 0.00 0 0.001.1.5 Others ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 0 0.09394 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.2 Countour Bunding ha 10 0.11168 1.12 5 0.56 5 0.56 0 0.00 10 1.121.2.3 Graded Bunding ha 10 0.12607 1.26 10 1.26 0 0.00 0 0.00 10 1.261.2.4 Bench Terracing ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.2.5 Others ha 10 0.04568
/0.19300 1.93 10 1.93 0 0 0 0 10 1.931.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.3.2 Brushwood Checks Rmt 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.3 Gully plugs Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.3.4 Loose bolder Cum 131 0.00651 0.85 131 0.85 0 0.00 0 0.00 131 0.851.3.5 Gabian structure Cum 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
2.2 1.3.6 Others nos 2 0.45/0.74 /1.01 1.19 0 0.00 2 1.19 0 0.00 2 1.19
1.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
1.4.2 Check dams nos 0 5.00 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.3 Nallah Bunds nos 1 0.459 / 1.045 0.90 0 0.00 1 0.90 0 0.00 1 0.901.4.4 Percolation tanks nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.5 Ground Water recharge structure nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.001.4.6 Others nos 1 0.58352 0.58 0 0.00 1 0.58 0 0.00 1 0.58
Total (B) 7.539 7.834 0.0 0.0 0.0 0.0 4.6 3.2 0 0.0 7.8
Annual Action Plan :
Total Unit Quantity
5th year
CHAPTER – V
(A) Preparatory phase activities capacity building trainings & EPA (22%)
(B) Natural resource management (60%)
Unit CostTotal cost
1st year 2nd year 3rd year 4th yearActivity
BANSWARA IWMP-I
Through Project Fund G.P.- VASOONI
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinTotal
Unit Quantity5th year
Unit CostTotal cost
1st year 2nd year 3rd year 4th yearActivity
( C ) Production System and micro enterprise(15%)8.Production system & micro-enterprises 8.1 Sericulture No. 0.00 0.00 0.00 0.00 0 0.00
8.2 Beekeeping No. 0.00 0.00 0.00 0.00 0 0.008.3 Poultry No. 0.39 0.12 0.16 0.12 0 0.398.4 Fisheries No. 0.00 0.00 0.00 0.00 0 0.008.5 Bio-fuel Plantation No. 0.00 0.00 0.00 0.00 0 0.008.6 Others No. 1.56 0.47 0.62 0.47 0 1.56
Total (C) 0 0.00 1.94 0.0 0.00 0.00 0.00 0.00 0.58 0.00 0.78 0.00 0.58 0.00 1.94(D) Consolidation (3%) 0.39 0.39 0 0.39
Grand Total 0 7.53936 12.95831 0 0.648 0 0.87 0 5.6646 0 4.4242 0 1.34784 12.96% Targets NA NA NA NA NA NA
BANSWARA IWMP-I
Through Project Fund Yearwise Total TOTAL OF BANSWARA IWMP -I
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. (10%) 41.76 0.00 8.35 0.00 8.35 0.00 8.35 0.00 8.35 0.00 8.35 0.00 41.76Monitoring (1%) 4.18 0.00 0.84 0.00 0.84 0.00 0.84 0.00 0.84 0.00 0.84 0.00 4.18Evaluation (1%) 4.18 0.00 0.00 0.00 0.00 0.00 2.09 0.00 0.13 0.00 1.96 0.00 4.18EPA (4%) 26.40 0.00 0.00 0.00 26.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.40I & CB (5%) 20.88 0.00 8.35 0.00 4.17 0.00 4.18 0.00 4.18 0.00 0.00 0.00 20.88DPR (1%) 4.18 0.00 3.01 0.00 0.00 0.00 0.21 0.00 0.00 0.00 0.95 0.00 4.18
Total (A) 0 0 101.57 0 20.55 0 39.8 0 15.67 0 13.50 0 12.09 0 101.57
1.1 Land Development (Productive use) 1.1.1 Afforestation ha 0 0.18072 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2 Horticulture ha 9 0.87973 7.92 0.00 0.00 9.00 7.92 0.00 0.00 9.00 7.921.1.3 Agriculture ha 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001.1.4 Pasture ha 25 0.55719 13.93 0.00 0.00 20.00 11.14 5.00 2.79 25.00 13.931.1.5 Others ha 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.2 Soil & Moisture Conservation 1.2.1 Straggred trecnching ha 140 0.09394 13.15 105.00 9.86 30.00 2.82 5.00 0.47 140.00 13.151.2.2 Countour Bunding ha 217 0.11168 24.23 107.00 11.95 80.00 8.93 30.00 3.35 217.00 24.231.2.3 Graded Bunding ha 150 0.12607 18.91 110.00 13.87 40.00 5.04 0.00 0.00 150.00 18.911.2.4 Bench Terracing ha 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001.2.5 Others ha 150 0.04568
/0.19300 23.05 95.00 13.18 35.00 6.02 20.00 3.86 150.00 23.051.3 Vegetative and Engineering Structure 1.3.1 Earthen Checks Cum 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.3.2 Brushwood Checks Rmt 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001.3.3 Gully plugs Cum 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001.3.4 Loose bolder Cum 10056 0.00651 65.46 7538.00 49.07 700.00 4.56 1818 12 10056 65.461.3.5 Gabian structure Cum 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.2 1.3.6 Others nos 43 0.45/0.74 /1.01 32.42 6.00 3.39 19.00 16.31 18.00 12.72 43.00 32.42
1.4 Water Harvesting Structure (New Created) 1.4.1 Farm ponds nos 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.4.2 Check dams nos 3 5.00 14.00 0.00 0.00 1.00 5.00 2.00 9.00 3.00 14.001.4.3 Nallah Bunds nos 20 0.459 / 1.045 16.18 0.00 0.00 6.00 5.29 14.00 10.89 20.00 16.181.4.4 Percolation tanks nos 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001.4.5 Ground Water recharge structure nos 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001.4.6 Others nos 20 0.58352 11.61 0.00 0.00 6.00 3.44 14.00 8.18 20.00 11.61
Total (B) 7.539 240.873 0.0 0.0 0.0 0.0 101.3 76.5 63.1 240.87
Annual Action Plan :
Total Unit Quantity
5th year
CHAPTER – V
(A) Preparatory phase activities capacity building trainings & EPA (22%)
(B) Natural resource management (60%)
Unit Cost Total cost1st year 2nd year 3rd year 4th year
Activity
BANSWARA IWMP-I
Through Project Fund Yearwise Total TOTAL OF BANSW ARA IW MP -I
Activity Unit
Quantity
Unit Cost
Total cost
1st year 2nd year 3rd year 4th year 5th year Total Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
( C ) Production System and micro enterprise(15%) 8.Production system & micro- enterprises 8.1 Sericulture
No. 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.2 Beekeeping No. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.3 Poultry No. 12.53 0.00 3.76 0.00 5.01 0.00 3.76 0.00 12.53 8.4 Fisheries No. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.5 Bio-fuel Plantation No. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.6 Others No. 50.11 0.00 15.03 0.00 20.04 0.00 15.03 0.00 50.11
Total (C) 0 0.00 62.64 0.0 0.00 0.00 0.00 0.00 18.79 0.00 25.06 0.00 18.79 0.00 62.64 (D) Consolidation (3%) 12.53 12.53 0 12.53
Grand Total 0 7.53936 417.61 0 20.553 0 39.8 0 135.78 0 115.02 0 106.5115 417.60 % Targets NA NA NA NA NA NA
BANSWARA IWMP-I
Name of work :- Plantation on Govt. Land / waste landConsideration :-1. Area of Pasture land 1 Ha1.Cross section of the pit, 0.45X0.45X0.45 = 0.09 cum2. Average lead ( from Nursery to Planting site). 20 Km3. No. of Plants : - 400 no.4.Gap filling :- 20 %
S. No. ITEM No. L B H Quantity Rate/ unit (rs) Amount (rs)
1Digging of pits for plants in Ordinary murrum 400 0.45 0.45 0.45 36.45 133.60 4869.72
3 Transportation of plants from nursery to camp site upto 20 Km (GKN,11item142) (389+24x20=839)per 1000 plants 400 400 0.839 335.60
4 treatments of pits by fertilizers labour rate 400 400 0.27 108.005 Cost of fertiliser & insecticides Incl. 400 400 1.50 600.006 treatments of pits by insecticides labour rate 400 400 0.54 216.00
7 Making of thawala 50 cm radius(patharili) (GKN,11 Item no.117(a) 400 400 2.40 960.00
8Planting of forest sapling including soaking in water, cutting & removal of polythene bags, mixing and treatment of soil , backfilling, planting and compaction of soil around the plants (GKN,11 item.113(a)
400 400 7.43 2972.00
9 Weeding and Hoeing two times (Twice in a year) (GKN,11, item 116) 1 400 400 1.20 480.00
10 Watering for plantation twice a year for two years (GKN,11, item 115) 4 400 1600 1.80 2880.00
14621.3211 Gapfilling 20% over ItemNo.1 to 10 14621.32 0.2 2924.26
Total 17545.58Contingency 3% 526.37
G. Total 180725 Fencing DCB 150 202 30300
total 48372Estimated Amount = Rs. Cost per Plant. = 121Cost per Ha. = 48372
48372
Plants saplings for plantation in Govt. pasture area,sapling not less than 30 cm. height 4002
MODEL ESTIMATE No. 1.1.1
400 3.00 1200.00
BANSWARA IWMP-I
Name of work :- Plantation of Horticulture PlantsConsideration :-1. Area of Pasture land 1 Ha1.Cross section of the pit, 0.9m0.91mX0.9m = 0.73 cum2. Average lead ( from Nursery to Planting site). 5 Km3.Plant spacing 5mX5m3. No. of Plants : - 400 no.4.Gap filling :- 20 %
S. No. ITEM No. L B H Quantity Rate/unit (rs) Amount(rs)
1 Digging of pits for plants in Ordinary murrum 400 0.9 0.9 0.9 291.60 91.00 26535.60
3 Transportation of plants from nursery to camp site upto 20 Km (GKN,11item142) (389+24x20=839)per 1000 plants 400 400 0.839 335.60
4 treatments of pits by fertilizers labour rate 400 400 0.27 108.005 Cost of fertiliser & insecticides Incl. as per market rate 400 400 3.50 1400.006 treatments of pits by insecticides labour rate 400 400 0.54 216.007 Making of thawala 50 cm radius(patharili) (GKN,11 Item no.117(a) 400 400 2.40 960.00
8Planting of forest sapling including soaking in water, cutting & removal of polythene bags, mixing and treatment of soil , backfilling, planting and compaction of soil around the plants (GKN,11 item.113(a)
400 400 7.43 2972.00
9 Weeding and Hoeing two times (Twice in a year) (GKN,11, item 116) 1 400 400 1.20 480.0010 Watering for plantation twice a year for two years (GKN,11, item 115) 4 400 1600 1.80 2880.00
51887.2011 Gapfilling 20% over ItemNo.1 to 10 51887.2 0.2 10377.44
Total 62264.64Contingency 3% 1867.94
64132.58Estimated Amount = Rs. Cost per Plant. = 160Cost per Ha. =
MODEL ESTIMATE No. 1.1.2
400 40.00 16000.00Plants saplings for plantation in Govt. pasture area,sapling not less than 30 cm. height
400
87973
2
64133
BANSWARA IWMP-I
ProductionName of Work :-Pasture DevelopmentConsideration :- 1. Area - 1 ha.
S. No. ITEM No. L B H Quantity Rate/unit (rs) Amount(rs)
VEGETATIVE WORK1 Supply of Seed Dhaman 5 40 200.00
Stylohemata 5 48 240.00Jetropha 5 30 150.00
2 Overseeding of grasses in between two furrows including seed treatment & pallet making etc. complete (GKN 11,item 126) 1 1 8 8 18.68 149.44
3 Sowing of Stylo / Dhaman seed on bunds in two rows (GKN,11 item no.114) 1 125 4 500 0.59 295.00
4 Plantation of Different Plants 200 121 24185.975765 Fencing DCB 150 202 30341.328
6 Construction of Staggered Trenches in Non arable area 1 9394 9394.007 Watch & ward for three year one chowkidar for at least 25 ha Area
(135X30X36/25) 1 5913 5913.00TOTAL 70868.74
Estimated Amount = Rs. Cost per Ha. =.
MODEL ESTIMATE No. 1.1.4
7086970869
BANSWARA IWMP-I
Name of Work :-Construction of Ditch cum bund fencing in Non arable areaConsideration :- 1. Area - 1 ha. 2. Cross section of trench- (0.9+1.50)/2X1.2 = 1.44 sq.m 3. Fencing length 150 per ha.
1
S. No. ITEM No. L B H Quantity Rate/unit (rs) Amount(rs)
(A) ADVANCE WORK1 Dag belling 5 to 7 cm. deep (GKN-11 Item No. 131) 2 150 2 600 1 600.002 E/W in excavation (GKN-11 Item N0.-2- page No.1)
Hard Soilordinary murrum Compacted murrum 1.00 150 1.2 1.2 216 133.6 28858
3 FencingTotal 29457.6
Contingency 3% 883.730341.330341
Estimated Amount = Rs. Cost per Ha. =.Cost per mtr. =.
MODEL ESTIMATE No. 1.1.4 A
3034130341
202
BANSWARA IWMP-I
SMCName of Work :-Construction of Staggered Trenches in Non arable area
Consideration :- 1. Area - 1 ha. 2. Cross section of trench- 0.45X0.45 = 0.2025 sq.m 3. No. of Trenches 100 Nos. 4. Length of Trenches 4 M
S. No. ITEM No. L B H Quantity Rate/unit (rs) Amount(rs)
(A) ADVANCE WORK
1Layout of contour lines (GKN 2011 item 130)
1 100 4 400 0.11 44.00
2 Dag belling 5 to 7 cm. deep (GKN-11 Item No. 131) 2 100 4 800 1 800.00
3 E/W in excavation (GKN-11 Item N0.-2- page No.1)
Hard Soil 0.10 400 0.45 0.45 8.1 75 607.50ordinary murrum 0.60 400 0.45 0.45 48.6 91 4422.60Compacted murrum 0.30 400 0.45 0.45 24.3 133.6 3246.48
Total 9120.6Contingency 3% 273.6
9394.29394
Estimated Amount = Rs. Cost per Ha. =.
MODEL ESTIMATE No. 1.2.1
93949394
BANSWARA IWMP-I
Name of Work :- Construction of Vegetative Contour Bund on Arable LandConsiderationsProposed Area :- 1 Ha. Length of V. C. B per Ha 180 mt.1.Total Length of V. C. B. 180 mt.
2. Cross section of the bund =(0.3+1.4)*0.75/2=0.64 Sqm. 0.64 0.643. Stylo Hemata / Dhaman is used as vegetative barrier4. Jetropha/Caster is used as vegetative barrier
S. No. ITEM No. L B H Quantity Unit Rate/unit (rs) Amount(rs)
(A) ADVANCE WORK 1 Dag belling 5 to 7 cm. deep (GKN-11 Item No. 131) 2 180 360 mt 1.0 3602
1 180 0.64 115.2 cum 85 9792
(B)VEGETATIVE WORK 3 Supply of seed
Dhaman 1.8 Kg 40 72Stylo 1.8 Kg 48 86.4Jetropha/ caster 3.6 Kg 30 108
4Sowing of Stylo / Dhaman seed on bunds in two rows (GKN,11 item no.114)
2 180 360 mt 0.59 212.4
5Sowing of Jetropha/ caster seed on bunds in two rows (GKN,11 item no.114)
2 180 360 mt 0.59 212.4
Total 10843.2Contingency 3% 325.30
11168.50Estimated AmountCost per Ha. =
MODEL ESTIMATE No. 1.2.2
Excavation in hard soil dry or moist including dressing & disposal of excavated materialwith initial leadof 30 mt. & lift of 1.50mt.(GKN-11 Item N0.-148 B)
1116811168
BANSWARA IWMP-I
Name of Work :- Construction of Vegetative Graded Bund on Arable LandConsiderationsProposed Area :- 1 Ha. Length of V. G. B per Ha 180 mt.1.Total Length of V. G. B. 180 mt.2. Cross section of the bund =(0.45+1.5)*0.75/2=0.73 Sqm. 0.733. Stylo Hemata / Dhaman is used as vegetative barrier4. Jetropha/Caster is used as vegetative barrier
S. No. ITEM No. L B H Quantity Unit Rate/unit (rs) Amount(rs)
(A) ADVANCE WORK 1 Dag belling 5 to 7 cm. deep (GKN-11 Item No. 131) 2 180 360 mt 1.0 3602
1 180 0.73 131.625 cum 85 11188.125
(B)VEGETATIVE WORK 3 Supply of seed
Dhaman 1.8 Kg 40 72Stylo 1.8 Kg 48 86.4Jetropha/ caster 3.6 Kg 30 108
4 Sowing of Stylo / Dhaman seed on bunds in two rows (GKN,11 item no.114)2 180 360 mt 0.59 212.4
5 Sowing of Jetropha/ caster seed on bunds in two rows (GKN,11 item no.114)2 180 360 mt 0.59 212.4
Total 12239.3Contingency 3% 367.18
12606.512607
Estimated AmountCost per Ha. =
MODEL ESTIMATE No. 1.2.3
Excavation in hard soil dry or moist including dressing & disposal of excavated materialwith initial leadof 30 mt. & lift of 1.50mt.(GKN-11 Item N0.-148 B)
1260712607
BANSWARA IWMP-I
Name of Work :- Construction of Vegetative Contour farrow R Considerations
Proposed Area :- 1 Ha. Length of V. C. F per Ha 250 mt.1.Total Length of V. C. F. 250 mt.
2. Cross section of the farrow =(0.6+0.0)*0.45/2=0.64 Sqm. 0.143. Stylo Hemata / Dhaman is used as vegetative barrier4. Jetropha/Caster is used as vegetative barrier
S. No. ITEM No. L B H Quantity Unit Rate/unit (rs) Amount(rs)
(A) ADVANCE WORK 1 Dag belling 5 to 7 cm. deep (GKN-11 Item No. 131) 2 250 500 mt 1.0 5002
1 250 0.14 35 cum 85 2975
(B)VEGETATIVE WORK 5 Supply of seed
Dhaman 2.5 Kg 40 100Stylo 2.5 Kg 48 120Jetropha/ caster 5 Kg 30 150
6 Sowing of Stylo / Dhaman seed on bunds in two rows (GKN,11 item no.114)2 250 500 mt 0.59 295
7 Sowing of Jetropha/ caster seed on bunds in two rows (GKN,11 item no.114)2 250 500 mt 0.59 295
Total 4435.00Contingency 3% 133.05
4568Estimated AmountCost per Ha. =
MODEL ESTIMATE No. 1.2.5
Excavation in hard soil dry or moist including dressing & disposal of excavated materialwith initial leadof 30 mt. & lift of 1.50mt.(GKN-11 Item N0.-148 B)
45684568
BANSWARA IWMP-I
Name of work :- Construction of pureto rico Terrace ( P . R . T . ) on sloping arable land
Area 1Length per Ha 150
Considerations(I) Length of PRTs 150 RM(ii) Cross section of PRT = 0.45x0.45 m. 0.2025
S. No. ITEM No. L B H Quantity Rate/unit
(rs) Amount(rs)
1 Dag belling 5 to 7 cm. deep (GKN-11 Item No. 131) 2 150 300 1 300.00
2 Dry stone masonary upto 3mheight .(GKN-11 Item N0.-146) 1 150 0.2025 30.375 607 18437.63
Total 18737.63Contingency 3% 562.13
1930019300
Labour = ####Material = 0Contingency 3% #### Total =Total #### Cost / RM 128.67
Cost /Ha 19300Cost /Cum 635
19300
MODEL ESTIMATE No. 1.2.5 A
BANSWARA IWMP-I
Name of work :- Construction of Gully control structures(LSCD)
Type of Str.
Dimension No. of str.
Lth./St
Total Lth.
Vol. Of Work
Vol. For
Foundation
Type -A 2/3X 5x(1.1+0.45)/2x0.6 1.55 Cum. 23 5 115 35.65 18.98
Type -B 2/3X 8x(1.4+0.50)/2x0.9 4.56 Cum. 22 8 176 100.32 36.96
Type -C 2/3x15x(1.8+0.6)/2x1.2 14.4 Cum. 11 15 165 158.4 44.55
Total 56 456 294.37 100.5
S. No. ITEM No. L B H Quantity Rate/unit (rs) Unit Amount(rs)
1 Dag belling 5 to 7 cm. deep (GKN-11 Item No. 131) 2 456 912 1 Rm 912
2
100.485 91 Cum 91443 Dry stone Masonary upto 3m height (GKN-11 Item N0.-146)
(a) For Foundation (as per -2) 100.485 607 Cum 60994(b) For Super structure 294.37 607 Cum 178683
249733Contingency 3% 7492
257225Total 257225
Estimated Amount = 395 651Cost per structure =total qtret per Cum
2572254593395651
MODEL ESTIMATE No. 1.3.4
Qty./ Str.
Excavation in hard soil dry or moist including dressing & disposal of excavated materialwith initial leadof 30 mt. & lift of 1.50mt.m.(GKN-11 Item N0.-2-B page No.1)
BANSWARA IWMP-I
Leangth of Structure :- 5
S. No. ITEM No. L B H Quantity Rate/unit (rs) Amount(rs)
1 E/W in excavtion in foundationHead wall 1 5.0 3.40 0.60 10.20Side wall 2 3.80 0.70 0.60 3.19Head wall extension left 1 2.50 1.00 0.60 1.50Head wall extension right 1 2.50 1.00 0.60 1.50wing wall 2 1.50 0.70 0.60 1.26hard stony staita 17.65 133.6 2358.3072
2 DRY STONE MASONARY 1 5.00 3.40 0.60 10.202 3.80 0.70 0.60 3.191 2.50 1.00 0.60 1.501 2.50 1.00 0.60 1.502 1.50 0.70 0.60 1.261 5.00 2.80 0.30 4.201 5.00 2.20 0.30 3.301 5.00 1.60 0.30 2.401 5.00 1.00 0.30 1.502 3.80 0.70 1.20 6.382 2.50 1.00 1.80 9.002 1.50 0.70 0.60 1.26
45.70 607 27737.4723 Cement concrete 1:2:4 1 5.00 3.40 0.10 1.7
2 3.80 0.70 0.10 0.5322 2.50 1.00 0.10 0.502 1.50 0.70 0.10 0.21
2.942 2529.4 7441.49484 Cement plaster 1:4,25mm thick 2 5.00 1.20 12
2 3.80 1.20 9.122 2.50 1.80 92 1.50 0.60 1.8
31.92 130 4149.65 ssr filling 2 1.80 3.80 1.00 13.68 37 506.166 23cm. Dry Stone pitching
2 1.80 3.80 0.23 3.1464 550 1730.52TOTAL 43923.554
ADD 3% CONT. 1318TOTAL 45000
cost per strecture
MODEL ESTIMATE No. 1.3.6W.H.S. TYPE- UR
Detailes of Estimate & Abstract of Cost
45000
BANSWARA IWMP-I
Leangth of Structure :- 10
S. No. ITEM No. L B H Quantity Rate/unit (rs) Amount(rs)
1 E/W in excavtion in foundationHead wall 1 10.0 3.40 0.60 20.40Side wall 2 3.80 0.70 0.60 3.19Head wall extension left 1 4.00 1.00 0.60 2.40Head wall extension right 1 4.00 1.00 0.60 2.40wing wall 2 1.50 0.70 0.60 1.26hard stony staita 29.65 133.6 3961.5
2 DRY STONE MASONARY 1 10.00 3.40 0.60 20.402 3.80 0.70 0.60 3.191 4.00 1.00 0.60 2.401 4.00 1.00 0.60 2.402 1.50 0.70 0.60 1.261 10.00 2.80 0.30 8.401 10.00 2.20 0.30 6.601 10.00 1.60 0.30 4.801 10.00 1.00 0.30 3.002 3.80 0.70 1.20 6.382 4.00 1.00 1.80 14.402 1.50 0.70 0.60 1.26
74.50 607 45219.0723 Cement concrete 1:2:4 1 10.00 3.40 0.10 3.4
2 3.80 0.70 0.10 0.5322 4.00 1.00 0.10 0.802 1.50 0.70 0.10 0.21
4.942 2529.4 12500.29484 Cement plaster 1:4,25mm thick 2 10.00 1.20 24
2 3.80 1.20 9.122 4.00 1.80 14.42 1.50 0.60 1.8
49.32 130 6411.65 ssr filling 2 3.30 3.80 1.00 25.08 37 927.966 23cm. Dry Stone pitching
2 3.30 3.80 0.23 5.7684 550 3172.62TOTAL 72193.054
ADD 3% CONT. 2166TOTAL 74000
cost per strecture
MODEL ESTIMATE No. 1.3.6 AW.H.S. TYPE- MR
Detailes of Estimate & Abstract of Cost
74000
BANSWARA IWMP-I
Leangth of Structure :- 15
S. No. ITEM No. L B H Quantity Rate/unit (rs) Amount(rs)
1 E/W in excavtion in foundationHead wall 1 15.0 3.40 0.60 30.60Side wall 2 3.80 0.70 0.60 3.19Head wall extension left 1 5.00 1.00 0.60 3.00Head wall extension right 1 5.00 1.00 0.60 3.00wing wall 2 1.50 0.70 0.60 1.26hard stony staita 41.05 133.6 5484.5
2 DRY STONE MASONARY 1 15.00 3.40 0.60 30.602 3.80 0.70 0.60 3.191 5.00 1.00 0.60 3.001 5.00 1.00 0.60 3.002 1.50 0.70 0.60 1.261 15.00 2.80 0.30 12.601 15.00 2.20 0.30 9.901 15.00 1.60 0.30 7.201 15.00 1.00 0.30 4.502 3.80 0.70 1.20 6.382 5.00 1.00 1.80 18.002 1.50 0.70 0.60 1.26
100.90 607 61243.8723 Cement concrete 1:2:4 1 15.00 3.40 0.10 5.1
2 3.80 0.70 0.10 0.5322 5.00 1.00 0.10 1.002 1.50 0.70 0.10 0.21
6.842 2529.4 17306.15484 Cement plaster 1:4,25mm thick 2 15.00 1.20 36
2 3.80 1.20 9.122 5.00 1.80 182 1.50 0.60 1.8
64.92 130 8439.65 ssr filling 2 4.30 3.80 1.00 32.68 37 1209.166 23cm. Dry Stone pitching
2 4.30 3.80 0.23 7.5164 550 4134.02TOTAL 97817.354
ADD 3% CONT. 2935TOTAL 101000
cost per strecture
MODEL ESTIMATE No. 1.3.6 BW.H.S. TYPE- LR
Detailes of Estimate & Abstract of Cost
101000
BANSWARA IWMP-I
S.No. Particulars No L B H Qty Unit
1 Excavation for foundation tranches or drains including loading unloading disposal and dressing of excavated material within initial lead of 50 M & lift of 1.5M.
a. Head wall 1 19 2.4 1.5 68.40 Cum b. Side wall 2 3.90 1.4 2.25 24.57 Cum c. Wing walls 2 1.9 1 2.25 8.55 Cum d. Head wall extention L 1 5 1.6 1.5 12.00 Cum
right 1 4.4 1.6 1.5 10.56 Cum e. Toe wall 1 19 0.75 0.95 13.54 Cum f. Apron 1 19 2.5 0.55 26.13 Cum
163.74 Cum1 In hard soil (%) 10 16.37 Cum2 Disintigrated or soft rock or compacted murrum (%) 20 32.75 Cum3 Hard rock requiring blasting (%) 70 114.62 Cum2 Cement concrece (1:3:6) well mixed & laid in position complete including curing and finishing
etc. Complete.
Head wall 1 19 2.4 0.15 6.84 CumSide wall 2 3.9 1.4 0.15 1.64 CumWing Wall 2 1.9 1 0.15 0.57 CumHead wall ext. L 1 5 1.6 0.15 1.20 cumR 1 4.4 1.6 0.15 1.06 cumToe Wall 1 19 0.75 0.15 2.14 Cum
13.44 Cum3 Stone kharanja 23cm thick
For Apron bed 1 19 2.5 47.50 sqm4 R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for
foundation.Head wall 1 19 2.4 1.2 54.72 Cum
1 19 1.7 1.80 58.14 CumSide Wall 2 3.9 1.4 2.65 28.94 Cum
2 2.5 1.18 3.15 18.59 Cum
Name of work : WHS construction MODEL ESTIMATE No. 1.4.2
BANSWARA IWMP-I
S.No. Particulars No L B H Qty Unit
Name of work : WHS construction
Wing wall 2 1.9 1 2.55 9.69 CumHead wall Extension 1 5 1.3 3.45 22.43 Cum
1 4.4 1.3 3.45 19.73 CumToe wall 1 19 1 0.35 6.65 Cum
1 19 0.75 0.4 5.70 Cum
224.58 Cum6 Cement concrete(1:2:4) well mixed and laid in position complete including curing and finishing.
On Head wall 1 19 1 0.1 1.90 Cum
1 19 0.15 3.7 10.55 CumSide wall 2 3.9 0.5 0.05 0.20 CumWing wall 2 1.9 0.5 0.05 0.10 CumHead wall ext. L 1 5 0.5 0.05 0.13 CumHead wall ext. R 1 4.4 0.5 0.05 0.11 CumToe Wall 1 19 0.5 0.1 0.95 CumApron 1 19 2.5 0.23 10.93 Cum
24.85 Cum7 25MM thick cement plaster in cement sand mortar (1:4) including racking of joints smooth
finishing and curing of etc. Complete Head wall 1 19 1.8 34.20 SqmOn side slop 1 19 2.3 43.70 SqmSide wall 2 0.85 2.7 4.59 Sqm
2 3.2 2 12.80 SqmOn slide slope 2 0.85 2.9 4.93 Sqm
2 3.2 2.2 14.08 SqmWing wall 2 1.9 1.3 4.94 Sqm
2 1.9 1.4 5.32 SqmHead wall extension L 1 5 2.70 13.50 Sqm
1 5 4.10 20.50 SqmHead wall extension R 1 4.4 3.8 16.72 Sqm
BANSWARA IWMP-I
S.No. Particulars No L B H Qty Unit
Name of work : WHS construction
1 4.4 4.1 18.04 SqmToe wall 2 19 0.45 17.10 Sqm
210.42 Sqm8 Earth backfill by murrum/black cotton soil I/c loading, unloading and lead of 3 Km
a. Head wall 1 19 0.6 1.5 17.10 Cum d. Head wall extention 2 5 0.6 1.5 9.00 Cum
26.10 Sqm9 Dewatering / approch road etc. LS
10 E\W for embankment including compaction , watering etc. complete2 5 2.6 1.3 33.8 Cum
11 Dry stone pitching to D\S of H.W.E. (L+R) 2 5 2.6 26 Sqm
BANSWARA IWMP-I
Rate Amount1 Excavation for foundation tranches or drains including loading unloading disposal and
dressing of excavated material within initial lead of 50 M & lift of 1.5M. Item 2I In hard soil
Cum 16.37 91 1490.06ii Hard rock not requiring blasting. Cum 32.75 133.6 4375.20iii H.R.B. Cum 114.62 177 20287.70
2 Cement concrece (1:3:6) well mixed & laid in position complete including curing and finishing etc. Complete. Item 151
Cum 13.44 1977.00 26573.853 Stone kharanja in cement mortar (1:6) including curing etc. complete. Item 99
Cum 47.50 238.00 11305.004 R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for
foundation & superstructure Item 150Cum 224 58 1390 00 312168 98
Total
Name of work : WHS construction
Qty.Unit ITEMS.No.
BANSWARA IWMP-I
Cum 224.58 1390.00 312168.986 Cement concrete(1:2:4) well mixed and laid in position complete including curing and
finishing. Item152
Cum 24.85 2529.00 62833.017 25MM thick cement plaster in cement sand mortar (1:4) including racking of joints smooth
finishing and curing of etc. item 65 Sqm 210.42 130.00 27354.608 Earth backfill by murrum/black cotton soil I/c loading, unloading item 83
Cum 26.10 260 6786.009 Dewatering \ approch road etc.
LS 5000.0010 E\W for embankment including compaction , watering etc. item 2 cum
33.8 75 2535.0011 Dry stone pitching to D\S of H.W.E. Item 99
26 180 4680.00SUB TOTAL 485389.40
Add 3% Contingencies Charges 14561.68GRAND TOTAL
499951.08
Say Rs. 5.00 Lacs
SWARA IWMP-I
Name of work :- Earthen ChecksConsideration :-Cross Section Top Width 1.00 m Slope 1:1
Base width 5.00 mHeight 2.00 mLength 15.00 m
NO. Length B H/B
1
1 15.00 12.50 187.50187.50 SQM 1.40 262.50
2
2 15.00 30.0030.00 SQM 1.10 33.00
3
1 12.00 1.20 1.65 23.76A 2.38 Cum 75.00 178.20B 9.50 Cum 91.00 864.86C 11.88 Cum 133.60 1587.174
1 5.00 7.00 0.30 10.50 Cum 91.00 955.501 5.00 7.00 1.20 42.00 Cum 133.60 5611.20
5
total 2/3 15 3 2.00 60didec. -12.88'ks"k 47.12 Cum 85.00 4005.54
6
9.42 Cum 11.00 103.677 23.56 Cum 33.75 795.228
2/3 15.00 3.00 0.23 6.90 Cum 542.00 3739.80
MODEL ESTIMATE No. 1.4.3
Amount (Rs)Rate/Unit (Rs)
E/W for By pass (GKN-11 Item No. 148)
lift more then 1.5 m
ADD. Lead more then 50 mpitching work
E/W for By pass (GKN-11 Item No. 2)
Earth work in Excavation (GKN-11 Item No. 2)
Site Clining (GKN 2011 item 80)
Dag belling 5 to 7 cm. deep (GKN-11 Item No. 131)
UnitS.N. ITEM Quantity
Hard SoilOrdinary MurrumCompacted Murrum
BANSWARA IWMP-I
18136.66part 1 total
BANSWARA IWMP-I
NO. Length B H/B1
2 7.00 0.90 1.05 13.23 Cum1 5.00 3.00 0.30 4.50 Cum1 5.00 1.20 1.05 6.30 Cum
24.03A 12.02 Cum 91.00 1093.37B 12.02 Cum 133.60 1605.202
2 7.00 0.90 0.15 1.891 5.00 1.20 0.15 0.901 5.00 3.00 0.15 2.25
5.04 Cum 1977.00 9964.083
2 7.00 0.75 0.90 9.451 5.00 1.05 0.90 4.732 7.00 0.63 1.50 13.131 5.00 0.90 0.90 4.05
31.35 Cum 312.15 9785.904
2 7.00 1.50 21.002 5.00 0.90 9.00
30.00 SQM 31.34 940.205
2 9.00 0.60 10.801 7.00 0.90 6.30
17.10 Sqm 179.00 3060.9026449.65
G TOTAL 44586Contingency 3% 1338
Cost per Stracture 45900 45924
By PassRate/Unit (Rs) Amount (Rs)S.N. ITEM Quantity Unit
PART B TOTAL
Earth work in Excavation (GKN-11 Item No. 2)
CC 1:3:6 in 20mm (GKN-11 Item No. 151)
S/M in 1:6 (GKN-11 Item No. 24 a)
50 mm Copping
Plaster 1:4 (GKN-11 Item No. 65 b)
Ordinary MurrumCompacted Murrum
BANSWARA IWMP-I
Name of work :- Earthen Checks with core wallConsideration :-Cross Section Top Width 1.00 m Slope 1:1
Base width 5.00 mHeight 2.00 mLength 15.00 m
NO. Length B H/B1
1 15.00 12.50 187.50187.50 SQM 1.40 262.50
2
2 15.00 30.0030.00 ehVj 1.10 33.00
3
1 12.00 1.20 1.65 23.76A 2.38 Cum 75.00 178.20B 9.50 Cum 91.00 864.86C 11.88 Cum 133.60 1587.174
1 12.00 1.20 0.15 2.16 Cum 1977.00 4270.325
1 12.00 0.90 1.50 16.201 12.00 0.75 2.10 18.90
35.10 Cum 1441.00 50579.106
1 12.00 2.10 25.20 SQM 79.00 1990.807
1 5.00 7.00 0.30 10.50 Cum 91.00 955.501 5.00 7.00 1.20 42.00 Cum 133.60 5611.20
S.N. ITEM Quantity Unit
Site Clining (GKN 2011 item 80)
Dag belling 5 to 7 cm. deep (GKN-11 Item No. 131)
Plaster 1:4 (GKN-11 Item No. 65 b)
E/W for By pass (GKN-11 Item No. 2)
Earth work in Excavation (GKN-11 Item No. 2)
Hard SoilOrdinary MurrumCompacted Murrum
MODEL ESTIMATE No. 1.4.3 A
Amount (Rs)Rate/Unit (Rs)
CC 1:3:6 in 20mm (GKN-11 Item No. 151)
S/M in 1:6 (GKN-11 Item No. 24 a)
BANSWARA IWMP-I
NO. Length B H/B8
total 2/3 15 3 2.00 60didec. -12.88'ks"k 47.12 Cum 85.00 4005.54
9
9.42 Cum 11.00 103.6710 23.56 Cum 33.75 795.2211
2/3 15.00 3.00 0.23 6.90 Cum 542.00 3739.80
74976.88
Rate/Unit (Rs) Amount (Rs)S.N. ITEM Quantity Unit
part 1 total
E/W for By pass (GKN-11 Item No. 148)
lift more then 1.5 m
ADD. Lead more then 50 mpitching work
BANSWARA IWMP-I
NO. Length B H/B1
2 7.00 0.90 1.05 13.23 Cum1 5.00 3.00 0.30 4.50 Cum1 5.00 1.20 1.05 6.30 Cum
24.03A 12.02 Cum 91.00 1093.37B 12.02 Cum 133.60 1605.202
2 7.00 0.90 0.15 1.891 5.00 1.20 0.15 0.901 5.00 3.00 0.15 2.25
5.04 Cum 1977.00 9964.083
2 7.00 0.75 0.90 9.451 5.00 1.05 0.90 4.732 7.00 0.63 1.50 13.131 5.00 0.90 0.90 4.05
31.35 Cum 312.15 9785.905
2 7.00 1.50 21.002 5.00 0.90 9.00
30.00 SQM 31.34 940.206
2 9.00 0.60 10.801 7.00 0.90 6.30
17.10 Sqm 179.00 3060.9026449.65
G TOTAL 101426.53Contingency 3% 3042.796014
Cost per Stracture 104500 104469
PART B TOTAL
Earth work in Excavation (GKN-11 Item No. 2)
CC 1:3:6 in 20mm (GKN-11 Item No. 151)
S/M in 1:6 (GKN-11 Item No. 24 a)
50 mm Copping
Plaster 1:4 (GKN-11 Item No. 65 b)
Ordinary MurrumCompacted Murrum
By PassRate/Unit (Rs) Amount (Rs)S.N. ITEM Quantity Unit
BANSWARA IWMP-I
MODEL ESTIMATE N 1 4 6
BANSWARA IWMP-I
Name of work :- Construction of Runoff management dugout structure Name of watershed :- micro watershed No. of structure 1Dimension of Structure
MODEL ESTIMATE No. 1.4.6
Dimension of StructureLength of structure 14.0 mt
LSCD Earthen Bund Pond LengthBreadth
top width 0.6 mt top width 0.60 mt Top Suface 10.0 10.0bottom width 2.6 mt bot. width 4.60 mt bot. width 7.0 7.0height 2.0 mt height 2.00 mt Height 1.0f d ti 0 3 0 30foundation 0.3 0.30
S. No
.ITEM No. L B H Quantity Rate/unit (rs) Unit Amount(rs)
1 Dag belling 5 to 7 cm deep (GKN-11 Item No 131)1 Dag belling 5 to 7 cm. deep (GKN-11 Item No. 131)For Lscd & Earthen Structure 2 14 28For Dugout pond 4 10 40
Total 68 1.0 mt 68.00
2
Excavation in Ordinary murrum dry or moist including dressing & disposal of excavated materialwith initial lead of 30 mt. & lift of 1.50mt.(GKN-11 Item N0.-2-B page No.1)2 1.50mt.(GKN 11 Item N0. 2 B page No.1) for foundation 1 14 7.20 0.30 30.24
For DOP 1 100 49 1 74.5Total 104.74 91 Cum 9531.34
3 Dry stone Masonary upto 3m height (GKN-11 Item N0.-146)(a) For Foundation (as per -2) 1 14 7.20 0.30 30.24(b) For Super structure 1 14 1.6 2.00 44.8( )
Total 75.04 607 Cum 45549.284
14 0.60 8.40 179 SQm 1503.60
Total 56652.22Contingency 3% 1699.57
Estimated Amount Total 58351.79Cost per structure = Say 58352
No. of StructureTotal cost
158352
50mm Copping 1:2:4 (GKN-11 Item N0.-56)
5835258352
BANSWARA IWMP-I
BANSWARA IWMP-I
Name of work :- Construction of Runoff management dugout structure
0.60 0.60
2.00
1.5:1
10.00
1.5:12.60 4.60
7 007.00
Prepared by Checked & submitted by J.En. A . En
W . D . & S . C .
BANSWARA IWMP-I