21
Auditing Association of Canada Onshore Pipeline Regulations Management Systems and Audits Ken Colosimo Technical Leader – Audits Operations National Energy Board
Transcript
Page 1: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

Auditing Association of Canada

Onshore Pipeline RegulationsManagement Systems

and AuditsKen Colosimo

Technical Leader – AuditsOperations

National Energy Board

Page 2: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

Presentation Overview

• NEB - Who We Are & What We Do• Onshore Pipeline Regulations Evolution Management & Management System Requirements

• NEB Audits• Company Audits and Third-Party Audits

Page 3: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

NEB - Who We Are & What We Do

Picture of processing plant

Page 4: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

NEB - Who We Are & What We DoWe regulate for the life of the project

Design and

ApprovalConstruction Operation Abandonment

Page 5: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

Onshore Pipeline Regulations Evolution

• Pre – 1999 Basically Prescriptive - Standard operational requirements:

design, construction, maintenance• 1999 Goal/Outcome Based - Management Programs guided by

non-mandatory guidance notes to encourage formal management systems

• 2013 Prescriptive Management Systems, Mandatory

Management Processes and Management Responsibility applicable to outcome based programs

Page 6: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

Onshore Pipeline Regulations Evolution

• 2013 (cont’d) Expanded Programs (EM and Security) Safety Culture Continual Improvement Demonstrate Human Resource Levels NO GRACE PERIOD for implementation

Page 7: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

Onshore Pipeline Regulations Management & Management Systems

• Management OPR now includes requirements for Company

management:• Accountable Officer Responsibilities MS and Programs Authority over human and financial resources Prepare policy statements and commitments Annual management review and report of

company performance in meeting section 6 obligations Reporting performance to the Board

Page 8: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

Onshore Pipeline Regulations Management & Management Systems

• Management Systems Section 6.1 requires companies to establish,

implement and maintain management systems with specific characteristic and management system processes.

Page 9: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

Onshore Pipeline Regulations Management & Management Systems

• Management Systems (cont’d) Systematic, explicit, comprehensive, proactive Integrated Applies to lifecycle of facilities Applies to management programs Ensures coordination between management

programs Right sized

Page 10: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

NEB Audits

• NEB conducts compliance audits which measure compliance to OPR MS, Program and prescriptive requirements.

• NEB has published generic protocols which it uses to provide clarity with respect to its expectations and to organize the Board’s audits and reports.

Page 11: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

NEB Protocol

11

PLAN

DOCHECK

ACT

Standard

MS

Cycle

Page 12: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

NEB Protocol

12

4.0

Cor

rect

ive

Act

ion

PLAN

DOCHECK

ACT

2.0 PlanningStandard

MS

Cycle

Page 13: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

NEB Protocol

13

NEB MS

Cycle

4.0

Cor

rect

ive

Act

ion

PLAN

DOCHECK

ACT

1.1Leadership

Accountability 1.2 Policy and

Commitment Statements

2.1Hazard

Identification, Risk Assessment

and Control

2.2 Legal

Requirements

2.3 Goals, Targets

and Objectives

2.4Organizational

Structure, Roles and

Responsibilities

3.1Operational

Control – Normal Operations

3.2Operational

Control – Upset or Abnormal Operating

Conditions3.3

Management of Change

3.4 Training,

Competence and Evaluation

3.5 Communication

3.6 Documentation and Document

Control

4.1 Inspection,

Measurement and Monitoring

4.2 Investigation of

Incidents, Near Misses and Non-compliances

4.3 Internal Audit

4.4 Records

Management

5.1 Management

Review

2.0 Planning

Page 14: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

NEB Audits

• Audits are chosen utilizing a risk-informed process

• Companies are required to demonstrate that they have established, implemented and maintained the specific MS processes and programs required by the OPR.

• NEB approves and issues audit reports.• Board reviews audit and determines next steps.

Page 15: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

NEB Audits

• The Board requires companies to develop and implement Corrective Action Plans to address all Non-Compliant findings.

• CAP implementation is verified by Board during scheduled Implementation Assessments.

Page 16: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

Company & Third Party Audits

• Company Internal Audits (OPR sections 6.5, 53 and 55) OPR Section 6.5 Management System

• Establishment, Implementation and Maintenance of MS; Required OPR MS Processes; QA; and < 3 year interval

• Documentation of Deficiencies, C&P actions planned and taken Section 55 Programs

• MS Application; Program Development, Implementation and Maintenance; Program Management Outcomes; Program Applicability; and < 3 year interval

• Documentation of Deficiencies, C&P actions planned and taken

Page 17: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

Company & Third Party Audits

• Company Internal Audits Section 53 Compliance

• Designed, Constructed, Operated and Abandoned in Compliance with Specified Requirements; OPR 6.5 (1)(h) List of Legal Requirements; Applicable Referenced Standards (OPR s. 4); and < 3 year Interval

• Documentation of Non-compliances, C&P Actions Planned and Taken

Section 4 Conformance (Compliance)• Ensure that the company is conforming to its designs, specs.,

programs, manuals, procedures, measures and plans

Page 18: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

Company & Third Party Audits

• To Demonstrate Compliant Audits Companies Must: Provide Quality Assurance Program Documentation Provide Audit Process Documentation Provide Audit Records

• Especially Protocols and Worksheets, as used

Provide Corrective & Preventative Action Process Documentation

Provide Records of Implementation Of C&P Process

Page 19: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

Company & Third Party Audits

• Board Directed Third-Party Audits Becoming more of a “common” compliance

assurance direction but is always considered a significant action

Used where deficiencies appear to be related to MS or where Board has ordered company to develop a MS or significant components of a MS and compliance needs to be verified.

Audits must meet Internal audit requirements

Page 20: Onshore Pipeline Regulations - · PDF fileDesign and Approval ... Onshore Pipeline Regulations Management & Management Systems • Management OPR now includes requirements for Company

Company & Third Party Audits

• Board Directed Third-Party Audits (cont’d) The Board’s direction usually contains:

• Imposed Schedule;• Demonstration of competence to conduct audit;• Protocol Approval;• Coincidental Submission of Reports (NEB and Company);• Company pays;• Company is required to develop and submit CAP for

approval;• Board will verify the implementation of CAPs by scheduling

inspections, implementation assessments or conducting another audit.