OPERATIONAL PERFORMANCE APRIL’14 Month Carried Tonnage Monthly Traffic projection based on ATP Variation % (Over 2013 – 14) 2014-15 2013- 14 For Apr’14 0.38 0.48 0.53 -20% Tonnage - MT
Transcript
Page 1: OPERATIONAL PERFORMANCE APRIL’14 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2013 – 14) 2014-152013-14 For Apr’14 0.380.480.53-20%

OPERATIONAL PERFORMANCE APRIL’14

Month Carried Tonnage Monthly Traffic projection based

on ATP

Variation % (Over 2013 – 14)2014-15 2013-14

For Apr’14

0.38 0.48 0.53 -20%

Tonnage - MT

Page 2: OPERATIONAL PERFORMANCE APRIL’14 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2013 – 14) 2014-152013-14 For Apr’14 0.380.480.53-20%

COMMODITY-WISE LOADS – FOR THE MONTH OF APRIL’14

Particulars Carried Tonnage 2014-15

Carried Tonnage 2013-14

Variation Over

Commodity Apr’14 Apr’13 Last Yr Apr’13

Iron Ore/ Export

Domestic

Total

0.00

0.00

0.00

0.00

0.00

0.00

0%

0%

0%

Cement 1.28 1.02 25%

Fertilizer 0.38 0.49 -22%

Food Grains 0.12 1.01 -88%

LPG/POL 0.15 0.19 -19%

Coal 1.72 1.68 3%

Gypsum 0.15 0.31 -50%

Iron/LSST 0.00 0.00 0%

Cont 0.00464 0.0773 -94%

Total 3.82 4.78 -20%

Tonnage in Lakhs

Page 3: OPERATIONAL PERFORMANCE APRIL’14 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2013 – 14) 2014-152013-14 For Apr’14 0.380.480.53-20%

COMMODITY-WISE REVENUE – FOR THE MONTH OF APRIL’14

Particulars Gross Revenue

2014-15

Gross Revenue

2013-14

Variation % Over

Commodity Apr’14 Apr’13 Last Yr Apr’13

Iron Ore/ Export

Domestic

Total

0.00

0.00

0.00

0.00

0.00

0.00

0%

0%

0%

Cement 3.91 3.00 30%

Fertilizer 1.00 1.14 -12%

Food Grains 0.31 1.84 -83%

LPG/POL 0.62 0.72 -14%

Coal 5.19 4.79 8%

Gypsum 0.48 0.92 -48%

Iron/LSST 0.00 0.00 0%

Cont 0.0248 0.07 -65%

Total 11.54 12.48 -8%

` - Crores

Page 4: OPERATIONAL PERFORMANCE APRIL’14 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2013 – 14) 2014-152013-14 For Apr’14 0.380.480.53-20%

Commodity wise Net Revenue Including OH

Particular April 2014 April 2013 Net Rev

Commodity Gross Reve

O&M Cost `. 166/T

* Net Reve

Gross Reve

O&M Cost `.145/T

Net Reve

Variation %

Iron Ore/ Export

Domestic0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0%

0%

Cement 3.91 2.12 1.79 3.00 1.48 1.52 18%

Fertilizer 1.00 0.63 0.37 1.14 0.71 0.43 -14%

Food Grains

0.31 0.21 0.10 1.84 1.46 0.38 -73%

LPG/POL 0.62 0.25 0.37 0.72 0.28 0.44 -16%

Coal 5.19 2.86 2.34 4.79 2.44 2.35 0%

Gypsum 0.48 0.26 0.22 0.92 0.45 0.47 -53%

Iron/LSST 0.00 0.00 0.00 0.00 0.00 0.00 0%

Cont 0.02 0.0077 0.02 0.0713 0.11 -0.04 -144%

TOTAL 11.54 6.34 5.21 12.48 6.93 5.55 -6%

` - Crores

•Apr’14 -Net Revenue Includes Def OH of ` 96 Lakhs ,O&M Cost Inclusive of Def OH-`191/T•Apr’13-Net Revenue Includes Def OH of `115 Lakhs, O&M Cost Inclusive of Def OH-`169/T

Page 5: OPERATIONAL PERFORMANCE APRIL’14 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2013 – 14) 2014-152013-14 For Apr’14 0.380.480.53-20%

Commodity wise Gross & Net Revenue Including OH (Per Tonne)

Particular April 2014 April 2013 Net Rev

Commodity Gross Rev

O&M Cost /T

Net Rev

Gross Rev

O&M Cost /T

Net Rev Variation %

Iron Ore

Export

Domestic

0

0

0

0

0

0

0

0

0

0

0

0

0%

0%

Cement 306 166 140 293 145 148 -5%

Fertilizer 263 166 97 233 145 88 10%

Food Grains 252 166 86 182 145 37 132%

LPG/POL 403 166 237 380 145 235 1%

Coal 301 166 135 285 145 140 -4%

Gypsum 311 166 145 297 145 152 -5%

Iron/LSST 0 0 0 0 0 0 0%

Cont 535 166 369 92 145 -53 -796%

Amt - `

•Apr’14 - Net Revenue Includes Def OH of ` 25/T , O&M Cost Inclusive of Def OH - ` 191/T•Apr’13 – Net Revenue Includes Def OH of ` 24/T, O&M Cost Inclusive of Def OH - ` 169/T

Page 6: OPERATIONAL PERFORMANCE APRIL’14 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2013 – 14) 2014-152013-14 For Apr’14 0.380.480.53-20%

Operating Ratio for the month of April 2014For April

2014To End of - April2014

Gross Revenue 11.54 11.54

Total Income 11.54 11.54

Operating Expenses

O&M Costs (Inc of Def. OH) 9.83 9.83

Administrative Expenses 0.07 0.07

Depreciation 2.90 2.90

Total Expenses (i) 12.80 12.80

Operating Ratio (%) 111% 111%

Cost of Maintenance works (ii) 0.62 0.62

Total Expenses (I) + (II) 13.42 13.42

Operating Ratio (Cumulative) 116% 116%

Surplus/Deficit -2 -2

Surplus % -16% -16%

` - Crores

NOTE : In O&M costs, cost of fuel is calculated as per service & direction wise

Page 7: OPERATIONAL PERFORMANCE APRIL’14 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2013 – 14) 2014-152013-14 For Apr’14 0.380.480.53-20%

COST OF FUEL (SERVICE WISE/ DIRECTION WISE) for APRIL’14Particulars No of Wagons Cost of Fuel

` - CroresTotal

` - Crores

Wagon Type UP DN UP DN UP + DN

BCN Load 648 1564 0.61 0.57 1.18

BOXN Load 2869 117 2.19 0.03 2.22

BTPG Load 366 0 0.33 0.00 0.33

BTPN Load 52 0 0.04 0.00 0.04

BLCA Load 0 45 0.00 0.01 0.01

BCNHL Load 116 464 0.07 0.12 0.19

BFKN Load 0 40 0.00 0.01 0.01

BOXN Empty 0 3869 0.00 0.42 0.42

BTPG Empty 0 400 0.00 0.13 0.13

BOBRN/ BRN Empty 93 0 0.02 0.00 0.02

BCNHL Empty 58 0 0.01 0.00 0.01

BTPN Empty 0 828 0.00 0.21 0.21

BCN Empty 482 0 0.14 0.00 0.14

Cost of Fuel of CLE + Other (UP+DN) 0.02

TOTAL 4.93

Cost of Lube Oil + Others 0.31

TOTAL 5.24

Page 8: OPERATIONAL PERFORMANCE APRIL’14 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2013 – 14) 2014-152013-14 For Apr’14 0.380.480.53-20%

Line Capacity Utilization for the month of April’14 :

Direction Loaded Empties Total No of Trains

*CLE *Others Total

UP Trains 79 15 94 42

(64)

7

(17) 287Down Trains 50 94 144

129 109 238 42 7 287

Permissible Capacity : 347

Utilized : 287

Percentage of Utilization : 83%

Percentage of Utilization Loaded : 37%

Engine Hour Cost : 79.38 Lakhs

NOTE:

* Moved between SKLR-SBHR-SKLR

Page 9: OPERATIONAL PERFORMANCE APRIL’14 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2013 – 14) 2014-152013-14 For Apr’14 0.380.480.53-20%

WAGON DAYS – APRIL 2014

No of Days

TotalUP Down

Actual 2380 3116 5496

Abnormal Detention

186 38 224

Rate per Day in terms of 8 wheeler : ` 1038.80

Wagon Hire Charges (Actual) : ` 57.09 Lakhs

Wagon Hire Charges for Abnormal : ` 2.33 Lakhs

Detention (Avoidable)

*Abnormal Detention : Time taken for completing the journey > 15 Hrs

Page 10: OPERATIONAL PERFORMANCE APRIL’14 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2013 – 14) 2014-152013-14 For Apr’14 0.380.480.53-20%

Details of Payments Received from Mysore Division after adjusting O&M Costs excluding work bills

Months Due Date Actual date of Receipt

Amount Rs - Cr

Prov. Pay Final Pay (Prov Pay)

April ’14 05.05.14 31.05.14 31.05.14 5.21

Page 11: OPERATIONAL PERFORMANCE APRIL’14 MonthCarried TonnageMonthly Traffic projection based on ATP Variation % (Over 2013 – 14) 2014-152013-14 For Apr’14 0.380.480.53-20%

Details of Payments made by HMRDC to SWR

Particulars For the month of April’14

To the End

(Crores)

Contractual payment for maintenance works (Provisional bill from 522-533)

0.62 0.62


Recommended