14
i OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN MODIFIED PARTICLE SWARM OPTIMIZATION (MPSO) PADA SISTEM KELISTRIKAN PABRIK INDARUNG VI PT. SEMEN PADANG SKRIPSI Diajukan Untuk Memenuhi Persyaratan Guna Meraih Gelar Sarjana Strata I Teknik Elektro Universitas Muhammadiyah Malang Disusun Oleh: DONY ZSAZSA YUDHISTIRA 201410130311117 JURUSAN TEKNIK ELEKTRO FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH MALANG 2018
Transcript
Page 1: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

i

OPTIMALISASI KOORDINASI RELE ARUS LEBIH

MENGGUNAKAN MODIFIED PARTICLE SWARM

OPTIMIZATION (MPSO) PADA SISTEM KELISTRIKAN

PABRIK INDARUNG VI PT. SEMEN PADANG

SKRIPSI

Diajukan Untuk Memenuhi

Persyaratan Guna Meraih Gelar Sarjana Strata I

Teknik Elektro Universitas Muhammadiyah Malang

Disusun Oleh:

DONY ZSAZSA YUDHISTIRA

201410130311117

JURUSAN TEKNIK ELEKTRO

FAKULTAS TEKNIK

UNIVERSITAS MUHAMMADIYAH MALANG

2018

Page 2: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

ii

LEMBAR PENGESAHAN

OPTIMALISASI KOORDINASI RELE ARUS LEBIH

MENGGUNAKAN MODIFIED PARTICLE

SWARM OPTIMIZATION (MPSO) PADA SISTEM KELISTRIKAN

PABRIK INDARUNG VI PT. SEMEN PADANG

Tugas Akhir ini Disusun Sebagai Salah Satu Syarat Memperoleh Gelar Sarjana

(S1) Teknik Elektro Universitas Muhammadiyah Malang

Oleh:

DONY ZSAZSA YUDHISTIRA

201410130311117

Tanggal Ujian : 13 Oktober 2018

Tanggal Wisuda : 24 November 2018

Disetujui Oleh:

1. Ir. Nur Alif Mardiyah, M.T.

NIDN. 0718036502

(Pembimbing I)

2. Ir. Diding Suhardi, M.T.

NIDN. 0706066501

(Pembimbing II)

3. Machmud Effendy, S.T., M.Eng.

NIDN. 0715067402

(Penguji I)

4. Dr. Zulfatman, S.T., M.Eng.

NIDN. 0709117804

(Penguji II)

Mengetahui,

Ketua Jurusan Teknik Elektro

Ir. Nur Alif Mardiyah, M.T.

NIDN. 0718036502

Page 3: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

iii

LEMBAR PERSETUJUAN

OPTIMALISASI KOORDINASI RELE ARUS LEBIH

MENGGUNAKAN MODIFIED PARTICLE SWARM

OPTIMIZATION (MPSO) PADA SISTEM KELISTRIKAN

PABRIK INDARUNG VI PT. SEMEN PADANG

Diajukan Sebagai Salah Satu Syarat Memperoleh Gelar Sarjana (S1)

Teknik Elektro Universitas Muhammadiyah Malang

Disusun Oleh:

DONY ZSAZSA YADHISTIRA

201410130311117

Diperiksa dan disetujui oleh:

Pembimbing I

Ir. Nur Alif Mardiyah, M.T.

NIDN. 0718036502

Pembimbing II

Ir. Diding Suhardi, M.T.

NIDN. 0706066501

Page 4: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

iv

LEMBAR PERNYATAAN

i. LEMBAR PERNYATAAN

Yang bertanda tangan dibawah ini :

Nama : DONY ZSAZSA YUDHISTIRA

Tempat/Tgl. Lahir : TRENGGALEK / 14 AGUSTUS 1994

NIM : 201410130311117

Fakultas/Jurusan : TEKNIK/TEKNIK ELEKTRO

Dengan ini saya menyatakan bahwa Tugas Akhir dengan judul “OPTIMALISASI

KOORDINASI RELE ARUS LEBIH MENGGUNAKAN MODIFIED PARTICLE

SWARM OPTIMIZATION (MPSO) PADA SISTEM KELISTRIKAN PABRIK

INDARUNG VI PT. SEMEN PADANG” beserta seluruh isinya adalah karya saya

sendiri dan bukan merupakan karya tulis orang lain, baik sebagian maupun

seluruhnya, kecuali dalam bentuk kutipan yang telah disebutkan sumbernya.

Demikian surat pernyataan ini saya buat dengan sebenar-benarnya. Apabila

kemudian ditemukan adanya pelanggaran terhadap etika keilmuan dalam karya

saya ini, atau ada klaim dari pihak lain terhadap keaslian karya saya ini maka saya

siap menanggung segala bentuk resiko/sanksi yang berlaku.

Malang, Oktober 2018

Yang Membuat Pernyataan

DONY ZSAZSA YUDHISTIRA

Mengetahui,

Pembimbing I

Ir. Nur Alif Mardiyah M.T.

NIDN. 0718036502

Pembimbing II

Ir. Diding Suhardi, M.T.

NIDN. 0706066501

Page 5: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

vii

KATA PENGANTAR

Puji syukur penulis panjatkan kehadirat Allah Subhanahu Wa Ta’ala atas

segala Nikmat-Nya, Rahmat-Nya, serta Hidayahnya-Nya. Sholawat serta salam

semoga senantiasa tercurah kepada Rasulullah Muhammad Shalallaahu 'Alayhi

Wasallam. Atas kehendak dan karunia Allah penulis mampu menyelesaikan tugas

akhir yang berjudul:

“OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN

MODIFIED PARTICLE SWARM OPTIMIZATION (MPSO) PADA SISTEM

KELISTRIKAN PABRIK INDARUNG VI PT. SEMEN PADANG”

Penulisan tugas akhir ini merupakan salah satu syarat untuk menyelesaikan

jenjang pendidikan S1 dan memperoleh gelar sarjana teknik di Jurusan Teknik

Elektro, Fakultas Teknik, Universitas Muhammadiyah Malang.

Dalam penulisan laporan tugas akhir ini, penulis telah berusaha maksimal

demi terciptanya kualitas penelitian yang baik. Namun besar harapan penulis untuk

menerima saran dan kritik guna perbaikan dan pengembangan tugas akhir ini.

Semoga tugas akhir ini dapat memberikan manfaat yang luas.

Malang, Oktober 2018

Penulis

Page 6: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

x

DAFTAR ISI

HALAMAN JUDUL ........................................................................................ i

LEMBAR PENGESAHAN ............................................................................. ii

LEMBAR PERSETUJUAN ............................................................................ iii

LEMBAR PERNYATAAN ............................................................................. iv

ABSTRAKS ....................................................................................................... v

ABSTRACT ........................................................................................................ vi

LEMBAR PERSEMBAHAN .......................................................................... vii

KATA PENGANTAR ...................................................................................... ix

DAFTAR ISI ..................................................................................................... x

DAFTAR GAMBAR ........................................................................................ xii

DAFTAR TABEL ............................................................................................ xv

BAB I PENDAHULUAN ............................................................................ 1

1.1 Latar Belakang ............................................................................ 1

1.2 Rumusan Masalah ...................................................................... 3

1.3 Batasan Masalah ......................................................................... 3

1.4 Tujuan .......................................................................................... 4

1.5 Manfaat ........................................................................................ 4

1.6 Sistematika Penulisan ................................................................. 4

BAB II TINJAUAN PUSTAKA .................................................................. 6

2.1 Gangguan Pada Sistem Kelistrikan.............................................. 6

2.1.1 Gangguan Beban Lebih ..................................................... 6

2.1.2 Gangguan Hubung Singkat ................................................ 6

2.2 Perhitungan Arus Hubung singkat ............................................. 8

2.3 Rele Pengaman ............................................................................ 9

2.4 Rele Arus Lebih Waktu .............................................................. 10

2.4.1 Rele Arus Lebih Waktu Inverse ......................................... 10

2.4.2 Setting Rele Overcurrent Inverse Time .............................. 11

2.5 Koordinasi Berdasarkan Arus dan Waktu ................................... 12

2.6 Particle Swarm Optimization ...................................................... 13

2.7 Modified Particle Swarm Optimization ....................................... 14

Page 7: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

xi

BAB III METODE PENELITIAN ................................................................ 16

3.1 Diagram Alir Perancangan Sistem .................................................. 16

3.2 Tahapan Penelitian .................................................................... 17

3.2.1 Pemodelan Sistem ........................................................... 17

3.2.2 Data Kelistrikan Pabrik Indarung VI ................................ 18

3.3 Perhitungan Arus Beban Penuh .................................................. 19

3.4 Perhitungan Gangguan Hubung Singkat .................................... 20

3.5 Perancangan Optimalisasi Dengan MPSO ................................. 21

BAB IV HASIL SIMULASI DAN ANALISIS ............................................. 23

4.1 Skema Koordinasi Proteksi ......................................................... 23

4.2 Sistem Distribusi Gardu Induk 1 ................................................. 24

4.3 Data Sistem Proteksi ................................................................... 24

4.3.1 Rangkuman Arus Hubung Singkat pada setiap Bus ......... 24

4.3.2 Rangkuman Sistem Proteksi .............................................. 25

4.4 Rangkuman Perhitungan Setting Koordinasi Rele ...................... 26

4.4.1 Setting Koordinasi Rele SS 158 ........................................ 26

4.4.2 Setting Koordinasi Rele SS 348.1 ..................................... 29

4.4.3 Setting Koordinasi Rele SS 348.2 ..................................... 33

4.5 Optimalisasi Koordinasi Rele menggunakan MPSO .................. 37

4.5.1 Perhitungan Koordinasi Rele Gardu Induk 1 .................... 38

4.5.2 Hasil Perhitungan Program Matlab ................................... 60

4.6 Simulasi Hasil Perhitungan Matlab pada ETAP ......................... 62

4.6.1 SS 158 ............................................................................... 62

4.6.2 SS 348.1 ............................................................................ 66

4.6.3 SS 348.2 ............................................................................ 69

BAB V PENUTUP ......................................................................................... 72

5.1 Kesimpulan ................................................................................. 72

5.2 Saran ........................................................................................... 72

DAFTAR PUSTAKA ....................................................................................... 73

LAMPIRAN ...................................................................................................... 76

Page 8: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

xii

DAFTAR GAMBAR

Gambar 2.1 Gangguan Tiga Fasa ............................................................ 8

Gambar 2.2 Gangguan Dua Fasa.............................................................. 8

Gambar 2.3 Gangguan Satu Fasa Terhubung Tanah ............................... 8

Gambar 2.4 Karakteristik kurva Invers .................................................... 10

Gambar 3.1 Diagram Blok Koordinasi Rele Proteksi .............................. 16

Gambar 3.2 Single Line Diagram Pabrik Indarung VI ............................ 17

Gambar 3.3 Single Line Diagram Gardu Induk 1 .................................... 18

Gambar 3.4 Flowchart cara berpikir program MPSO ............................. 22

Gambar 4.1 Koordinasi Proteksi pada Pabrik Indarung VI .................... 23

Gambar 4.2 SS 158 .................................................................................. 26

Gambar 4.3 SS 348.1 .............................................................................. 30

Gambar 4.4 SS 348.2 ............................................................................... 33

Gambar 4.5 Kurva Konvergensi MPSO dan PSO (1) .............................. 38

Gambar 4.6 Kurva Konvergensi MPSO & PSO (2) ................................ 38

Gambar 4.7 Sebaran Awal Partikel 158.1 ................................................ 39

Gambar 4.8 Sebaran Awal Partikel Incoming 158-1 ............................... 40

Gambar 4.9 Sebaran Akhir TDS 158.1 dan Incoming 158-1................... 40

Gambar 4.11 Sebaran Awal Partikel Outgoing 158 ................................... 41

Page 9: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

xiii

Gambar 4.12 Sebaran Akhir Partikel Outgoing 158 .................................. 42

Gambar 4.13 Kurva Konvergensi Fungsi Objektif SS 158.1 ..................... 42

Gambar 4.14 Sebaran Awal Partikel 158.2 ................................................ 43

Gambar 4.15 Sebaran Awal Partikel Incoming 158-1 (2) ......................... 44

Gambar 4.16 Sebaran Akhir Partikel 158.2 dan Incoming 158-1 .............. 44

Gambar 4.17 Sebaran Awal Partikel Outgoing 158 (2) ............................. 45

Gambar 4.18 Sebaran Akhir Partikel Outgoing 158 (2) ............................ 45

Gambar 4.19 Kurva Konvergensi Fungsi Objektif SS 158.2 ..................... 46

Gambar 4.20 Sebaran Awal Partikel 348.1.1 ........................................... 47

Gambar 4.21 Sebaran Awal Partikel Incoming 348.1 ............................... 47

Gambar 4.22 Sebaran Akhir Partikel 348.1.1 dan Incoming 348.1 ......... 48

Gambar 4.23 Sebaran Awal Partikel Outgoing 348.1 (2) ........................ 48

Gambar 4.24 Sebaran Akhir Partikel Outgoing 348.1 ............................. 49

Gambar 4.25 Kurva Konvergensi Fungsi Objektif SS 348.1.1 ................. 49

Gambar 4.26 Sebaran Awal Partikel 348.1.2 ............................................ 50

Gambar 4.27 Sebaran Awal Partikel Incoming 348.1(2) ......................... 51

Gambar 4.28 Sebaran Akhir Partikel 348.1.2 dan Incoming 348.1 ......... 51

Gambar 4.29 Sebaran Awal Partikel Outgoing 348.1 (2) ........................ 52

Gambar 4.30 Sebaran Akhir Partikel Outgoing 348.1 (2) ....................... 52

Gambar 4.31 Kurva Konvergensi Fungsi Objektif SS 348.1.2 ................. 53

Gambar 4.32 Sebaran Awal Partikel 348.2 .............................................. 54

Gambar 4.33 Sebaran Awal Partikel Incoming 348.2 .............................. 54

Gambar 4.34 Sebaran Akhir Partikel 348.2.1 dan Incoming 348.2 .......... 55

Page 10: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

xiv

Gambar 4.35 Sebaran Awal Partikel Outgoing 348.2 ............................... 55

Gambar 4.36 Sebaran Akhir Partikel Outgoing 348.2 .............................. 56

Gambar 4.37 Kurva Konvergensi Fungsi Objektif SS 348.2.1 ................. 56

Gambar 4.38 Sebaran Awal Partikel 348.2.2 ........................................... 57

Gambar 4.39 Sebaran Awal Partikel Incoming 348.2 (2) ......................... 53

Gambar 4.40 Sebaran Akhir Partikel 348.2.2 dan Incoming 348.2 .......... 58

Gambar 4.41 Sebaran Awal Partikel Outgoing 348.2 (2) ......................... 59

Gambar 4.42 Sebaran Akhir Partikel 348.2 (2) ....................................... 59

Gambar 4.43 Kurva Konvergensi Fungsi Objektif SS 348.2.2 ................. 60

Gambar 4.44 SS 158 diberi Gangguan Fasa ............................................. 63

Gambar 4.45 Kurva TCC SS 158.1 ......................................................... 64

Gambar 4.46 Kurva TCC SS 158.2 .......................................................... 65

Gambar 4.47 SS 348.1 diberi Gangguan Fasa .......................................... 66

Gambar 4.48 Kurva TCC SS 348.1 ......................................................... 67

Gambar 4.49 Kurva TCC SS 348.1.2 ...................................................... 68

Gambar 4.50 SS 348.2 diberi Gangguan Fasa .......................................... 69

Gambar 4.51 Kurva TCC SS 348.2.1 ....................................................... 70

Gambar 4.52 Kurva TCC SS 348.2.21 ..................................................... 71

Page 11: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

xv

DAFTAR TABEL

Tabel 2.1 Jenis Gangguan Hubung Singkat ............................................ 7

Tabel 2.2 Koef. Inverse menurut Standar IEC ......................................... 12

Tabel 2.3 CTI Minimum Rele ................................................................. 13

Tabel 3.1 Data Trafro Distribusi .............................................................. 18

Tabel 3.2 Tabulasi Pembebanan SS Pada Gardu Induk 150/6.3 kV ........ 19

Tabel 4.1 Rangkuman Rele Proteksi Gardu Induk 1 ............................... 24

Tabel 4.2 Rangkuman Nilai Arus Saat Terjadi Hubung Singkat Tiga

Phasa ....................................................................................... 24

Tabel 4.3 Rangkuman Hasil Simulasi Arus Hubung Singkat Maksimum.

................................................................................................. 25

Tabel 4.4 Rangkuman FLA dan CT masing-masing Rele ..................... 25

Tabel 4.5 Rangkuman Hasil Perhitungan Manual SS 158 ...................... 37

Tabel 4.6 Rangkuman Hasil Perhitungan Manual SS 348.1 .................... 37

Tabel 4.7 Rangkuman Hasil Perhitungan Manual SS 348.2 ................... 37

Tabel 4.8 Rangkuman Perhitungan Program Matlab .............................. 60

Tabel 4.9 Rangkuman Hasil Perhitungan CTI Menggunakan Cuckoo

Search Algorithm .................................................................... 61

Tabel 4.10 Rangkuman Hasil Perhitungan CTI Menggunakan MPSO ..... 61

Tabel 4.11 Rangkuman Hasil Perhitungan Matlab SS 158 ....................... 62

Tabel 4.12 Rangkuman Hasil Perhitungan Matlab SS 348.1 .................... 66

Tabel 4.13 Rangkuman Hasil Perhitungan Matlab SS 348.2 .................... 69

Page 12: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

73

DAFTAR PUSTAKA

[1] Situngkir, J., Pujiantara, M., & Priyadi, A. Analisa Arc fIash Pada Sistem

Tegangan Menengah di PT. Semen Padang Dengan Menggunakan Metode

Perhitungan Yang Dimodifikasi. JURNAL TEKNlK lTS. 5 (2) B-257. 2016

[2] Yahya, A. M., Pujiantara, M., & Anam, S. EvaIuasi Koordinasi Proteksi

Akibat Penambahan Pembangkit Dan Rekonfigurasi Jaringan Di Joint

Operation Body Pertamina-Petrochina East Java (Job P-Pej), Tuban.

JURNAL TEKNlK lTS. 4 (2) A-175. 2015

[3] Rahmania, Z. S., Zulfatman, Syafa’ah, L. 2018. Perhitungan Koordinasi

Rele Arus Lebih Menggunakan Cuckoo Search Algorithm Pada Sistem

Keiistrikan Lndarung Vi Pt Semen Padang. Universitas Muhammadiyah

Malang

[4] Kheshti, M., Tekpeti, B. S., Kang, X. The Optimal Coordination of Over-

current Relay Protection in Radial Network Based on Particle Swarm

Optimization. IEEE PES Asia-Pacific Power and Energy Conference. 2016

[5] Akhlagi, M., Fathi, A., Khesali, M. A., Modified Particle Swarm

Optimization with Semi-Active Congregation. IEEE. 2011

[6] Mahindhara, V. R., Pujiantara, M., Priyadi, A. Perhitungan Time DiaI

Setting (TDS) ReIe Arus Lebih Menggunakan Adaptive Modified FirefIy

AIgorithm Pada Sistem KeIistrikan PT. Pupuk KaIimantan Timur. JURNAL

TEKNlK lTS. 5 (2) B-53. 2015

[7] Faizin, A. K., Pujiantara, M., Priyadi, A. Adaptive Modified Firefly

Algorithm For OptimaI Coordination Of Overcurrent Relays. The lnstitute

of Engineering and TechnoIogy (IET). 2575-2585. 2017

[8] Sa’adah, S. K., Pujiantara, M., Fahmi, D., Priyadi, A. Studi Koordinasi

Proteksi Pabrik Ammurea ll Pt. Petrokimia Gresik. JURNAL TEKNlK lTS.

2017

Page 13: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

74

[9] Isfan, T. M. K., Pujiantara, M., Asfani, D. A. Studi Koordinasi Proteksi Pada

Pt. Petrokimia Gresik Akibat Penambahan Beban Pabrik Dan Generator 1

X 26.8 Mw. JURNAL TEKNlK lTS B-583. 2016

[10] Ukhti, V. A., . Pujiantara, M., Musthofa, A. Studi Koordinasi Proteksi

Dengan Mempertimbangkan Arc Flash Pada PItu Paiton Unit 3. JURNAL

TEKNlK lTS. 2017

[11] Nanda, A. A., Pujiantara, M., & Priyadi, Ardyono. Back-up Perlindungan

Relay Jarak Zona Kedua oleh Directional Overcurrent Relays dengan

Combined Curves. JURNAL TEKNlK lTS. 5 (2) B-443. 2016

[12] Hakimi, M. K., Pujiantara, M. Optimasi Koordinasi Proteksi Rele Arah Arus

Lebih Pada Sistem Distribusi Mesh Dengan Pembangkit Tersebar

Menggunakan Algoritma Genetika. JURNAL TEKNlK lTS. 2016

[13] Muhammad, N. Pujiantara, M., Negara, I. M. Y. Studi Koordinasi Proteksi

Pada Sistem KeIistrikan PT. Semen Tonasa. JURNAL TEKNlK lTS. 2014

[14] IEEE Std 242 2001™. “IEEE Recomended Practice For Protection And

Coordination Of Lndustriai And Commerciai Power System”. The

Lnstitution Of Electrical And Electronics Engineers. Lnc., New York.

Ch.15. 2001

[15] Rahmatullah, D. Pujiantara, M., Purnomo, M. H. Setting DOCR Adaptif

Pada Sistem Distribusi Dengan Pembangkit Tersebar Menggunakan

Algoritma Pso - NeuraI Network. JURNAL TEKNlK lTS. 2017

[16] Pramitasari, L., Hakim, E. A., Nurhadi. Analisis Perbandingan Metode

Optimasi Aliran Daya Menggunanakan Particle Swarm Optimization Dan

Artificial Bee Colony Berdasarkan Multi-Objective Function. Universitas

Muhammadiyah Malang. 2018

[17] Zhao, X. An Enhanced Particle Swarm Optimization Algorithm With

Passive Congregation. IEEE International Converence On Machine Vision

And Human-Machine Interface. 193. 2010

Page 14: OPTIMALISASI KOORDINASI RELE ARUS LEBIH MENGGUNAKAN ...

75

[18] Bambang, S. H., Fithriasari, K., Mashuri, M. Pendekatan Modified Particle

Swarm Optimization Dan Artificial Bee Colony Pada Fuzzy Geographically

Weighted Clustering. JURNAL TEKNlK lTS. 2017