ORNL ESPC Overview GovEnergy 2008
Transcript

ORNL ESPC Overview

GovEnergy 2008

ESPC Project Summary

$89M project funded by $8.2M in guaranteed annual savings

Energy Conservation Measures:1. Select Steam Decentralization of Remote Buildings

2. Super Boiler technology

3. Building Management System

4. Advanced Electric Metering

5. Comprehensive HVAC Upgrades

6. Energy Efficient Lighting

7. Water Conservation Measures

8. Compressed Air Cooling

Reduces fossil fuel consumption by over 80%!

Emissions reduction equal to:

removing 2.1 million cars from the road annually or

planting 32 million trees!

ESPC Project Summary (continued)

Addresses 6 of the Secretary’s TEAM goals

Reduces energy intensity in lab / office buildings by 30%

Meets long-term energy reduction goal of 30%

Reduces water usage by over 115M gallons/year

Meets long-term water reduction goal of 16%

Aligns with ORNL Ten Year Site Plan

Meeting the Primary TEAM Initiative Goals

No. ECM Description Energy

Red. Water Metering Renewable Sustainability M&V

12.1 Central Steam Plant Biomass Solution

1.2 Select Steam Decentralization of Remote Buildings (Super Boiler)

3.1 Building Management System Upgrade

3.2 Advanced Electric Metering

4.1 Comprehensive HVAC Upgrade

5.1 Energy-Efficient Lighting Upgrade

13.1 Water Conservation

13.2 Compressed Air Cooling Utility

Renewal Energy Showcase: Biomass Gasification System

Scope

Upgrades existing natural gas steam plant to a wood gasification biomass plant

Biomass plant integrated with existing plant for one integrated facility

Upgrades outdated infrastructure in existing plant

Upgrades existing steam distribution system

Woody biomass will be sourced within a 50 mile radius

Benefits

Reduces fossil fuel consumption by over 80%!

Major renewable energy utilization

Integrated with ORNL Biomass and Syngas research initiatives

Energy Conservation Showcase: EERE’s Super Boiler Technology

Scope

Elimination of over 1.5 miles of steam piping to Melton Valley

Johnson Controls and ORNL worked together to incorporate EERE’s Super Boiler Technology in the new Melton Valley Steam Plant

Benefits

Super Boiler operates at up to 94% efficiency

NOx and CO emissions < 5ppm, extremely “clean”

Integrated M&V approach provides on-going research information

Other Energy Conservation Measures

ECM 3.1 Building Management System Upgrades

ECM 3.2 Advanced Metering and Energy Awareness “Smart Meters” will integrate with ORNL’s energy management system

Incorporates lab-wide program for energy awareness and sustainability education

ECM 4.1 Building Mechanical Upgrades

ECM 5.1 Lighting Utilizes DOE scotopic and photopic research where applicable

ECM 13.1 Water Conservation Reduces domestic water consumption by over 50%

ECM 13.2 Compressed Air Cooling System Eliminates over 100 million gallons annually of once-through cooling water

Reduces site water consumption by 14%

It takes the entire “bundle” to meet the TEAM Initiative!

Summary of Project Benefits

Significant renewable energy showcase

Energy conservation

Renews outdated mission-critical support infrastructure

Attractive financial package given the level of infrastructure intensity

Integrated with the research mission of ORNL

Solid TEAM Initiative scorecard

Leveraged TEAM Initiative program to modernize the Laboratory


Recommended