ESPC Project Summary
$89M project funded by $8.2M in guaranteed annual savings
Energy Conservation Measures:1. Select Steam Decentralization of Remote Buildings
2. Super Boiler technology
3. Building Management System
4. Advanced Electric Metering
5. Comprehensive HVAC Upgrades
6. Energy Efficient Lighting
7. Water Conservation Measures
8. Compressed Air Cooling
Reduces fossil fuel consumption by over 80%!
Emissions reduction equal to:
removing 2.1 million cars from the road annually or
planting 32 million trees!
ESPC Project Summary (continued)
Addresses 6 of the Secretary’s TEAM goals
Reduces energy intensity in lab / office buildings by 30%
Meets long-term energy reduction goal of 30%
Reduces water usage by over 115M gallons/year
Meets long-term water reduction goal of 16%
Aligns with ORNL Ten Year Site Plan
Meeting the Primary TEAM Initiative Goals
No. ECM Description Energy
Red. Water Metering Renewable Sustainability M&V
12.1 Central Steam Plant Biomass Solution
1.2 Select Steam Decentralization of Remote Buildings (Super Boiler)
3.1 Building Management System Upgrade
3.2 Advanced Electric Metering
4.1 Comprehensive HVAC Upgrade
5.1 Energy-Efficient Lighting Upgrade
13.1 Water Conservation
13.2 Compressed Air Cooling Utility
Renewal Energy Showcase: Biomass Gasification System
Scope
Upgrades existing natural gas steam plant to a wood gasification biomass plant
Biomass plant integrated with existing plant for one integrated facility
Upgrades outdated infrastructure in existing plant
Upgrades existing steam distribution system
Woody biomass will be sourced within a 50 mile radius
Benefits
Reduces fossil fuel consumption by over 80%!
Major renewable energy utilization
Integrated with ORNL Biomass and Syngas research initiatives
Energy Conservation Showcase: EERE’s Super Boiler Technology
Scope
Elimination of over 1.5 miles of steam piping to Melton Valley
Johnson Controls and ORNL worked together to incorporate EERE’s Super Boiler Technology in the new Melton Valley Steam Plant
Benefits
Super Boiler operates at up to 94% efficiency
NOx and CO emissions < 5ppm, extremely “clean”
Integrated M&V approach provides on-going research information
Other Energy Conservation Measures
ECM 3.1 Building Management System Upgrades
ECM 3.2 Advanced Metering and Energy Awareness “Smart Meters” will integrate with ORNL’s energy management system
Incorporates lab-wide program for energy awareness and sustainability education
ECM 4.1 Building Mechanical Upgrades
ECM 5.1 Lighting Utilizes DOE scotopic and photopic research where applicable
ECM 13.1 Water Conservation Reduces domestic water consumption by over 50%
ECM 13.2 Compressed Air Cooling System Eliminates over 100 million gallons annually of once-through cooling water
Reduces site water consumption by 14%
It takes the entire “bundle” to meet the TEAM Initiative!
Summary of Project Benefits
Significant renewable energy showcase
Energy conservation
Renews outdated mission-critical support infrastructure
Attractive financial package given the level of infrastructure intensity
Integrated with the research mission of ORNL
Solid TEAM Initiative scorecard
Leveraged TEAM Initiative program to modernize the Laboratory