1 Air Side Regenerator Pre - Dismantling
Regenerator Plenum Area
www.ottosimon.co.uk [email protected]
Open Joint In the Gas Wall Allowing BFG into the Airside Regenerator Letting Combustion Take Place,
Thus Overheating The Plenum Area Surrounding Brickwork
1 Air Side Regenerator Gas Wall Condition
www.ottosimon.co.uk [email protected]
1 Air Side Regenerator Packing Condition
Fused and blocked Chequer Brick Packing
Extensive Gas Wall Damage
www.ottosimon.co.uk [email protected]
Blocked Gas Riser
Gas Wall Showing Exposed Coke Oven Gas Riser and Molten Brick Blockage
Gas Riser
Molten Brick
Coke Oven Gas Riser Completely
Blocked
www.ottosimon.co.uk [email protected]
Gas Wall Dismantling
Gas Wall showing partially dismantledcoke oven gas risers
www.ottosimon.co.uk [email protected]
Gas Wall Reconstruction
Gas Wall Reconstruction Showing Gas Riser Installation
Gas Wall
Gas Risers
www.ottosimon.co.uk [email protected]
New Gas Wall Installed
Gas Wall Repaired
Corbel reinstated and built tight to regenerator roof
Airports reinstated and Cleared
www.ottosimon.co.uk [email protected]
Otto Simon LimitedEngineering | Project Delivery | Operation & Maintenance