Introduction of Selection Criteria
P2M Bridge Study-Working Mtg 080708
Selection Criteria-Introduction
P2M Bridge Study-Working Mtg 080708
THIS STEPSelection/Screening- “All Types” to “Many Types”
Engineering- “Pass-Fail”Architectural- Opportunities and Challenges
NEXT STEP
Selection/Screening- “Many Types” to “Some Types”
Engineering-Performance of types against Engineering criteria
Architectural- Performance of types against Aesthetic criteria
Baseline Assumptions
P2M Bridge Study-Working Mtg 080708
Baseline Assumptions
P2M Bridge Study-Working Mtg 080708
Clearance Diagram
75’ V. for 150’ H.
65’ V. for 300’ H.
River User Survey and River Levels
P2M Bridge Study-Working Mtg 080708
Clearance Diagram
Baseline Assumptions
P2M Bridge Study-Working Mtg 080708
Grades
4.75% max. for all modes
4.75% 4.75%
ALTERNATIVES TESTED-stacked
P2M Bridge Study-Working Mtg 080708
Grades
4.75% 4.75%
ALTERNATIVES TESTED-Different Grades
P2M Bridge Study-Working Mtg 080708
Grades
ALTERNATIVES TESTED-Ramps and Landings
P2M Bridge Study-Working Mtg 080708
Grades
Baseline Assumptions
P2M Bridge Study-Working Mtg 080708
Grades-No Vertical Exaggeration
4.75% max. for all modes
4.75% 4.75%
Baseline Assumptions
P2M Bridge Study-Working Mtg 080708
Bridge High Point and Navigational Route
Not In Same Location
Navigational Route
High Point
1195’
Baseline Assumptions
P2M Bridge Study-Working Mtg 080708
Bridge High Point and Navigational Route
Not In Same Location
Hawthorn
P2M
Marquam
Ross Island
Assumed Nav. Route Existing Nav Route
Existing Nav Route
1392’
ALTERNATIVES TESTED-Same Point w/ Elevated SWF
P2M Bridge Study-Working Mtg 080708
Bridge High Point and Navigational Route
ALTERNATIVES TESTED-Same Point wo/ Elevated SWF
P2M Bridge Study-Working Mtg 080708
Bridge High Point and Navigational Route
Baseline Assumptions
P2M Bridge Study-Working Mtg 080708
Section Width
66’ (maximum)
SDEIS-Concrete Segmental SDEIS-Cable-Stayed
Transit Component Alternatives
P2M Bridge Study-Working Mtg 080708
Section Width
Baseline Assumptions
P2M Bridge Study-Working Mtg 080708
Number of In-Water Piers
4 (maximum)
SDEIS-Concrete Segmental SDEIS-Cable-Stayed
Issues- Shallow Water
P2M Bridge Study-Working Mtg 080708
Number of In-Water Piers