+ All Categories
Home > Documents > Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704...

Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704...

Date post: 19-Sep-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
151
KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - THRU 2016 2022 COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION 18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM SPRINGS CHURCH (12CCR) IMPROVEMENTS TO KY 100: CURVE, BRIDGE, AND INTERSECTION IMPROVEMENTS FROM NEAR THE STONY POINT ROAD INTERSECTION TO EAST OF THE ALONZO LONG HOLLOW ROAD INTERSECTION (12CCR) REPLACE BRIDGE OVER BAYS FORK ON MITCHELL WEAVER ROAD (CR 1328) 2.1 MI W OF KY 1332 (002C00063N)(SR=31.5)(16CCN) RECONSTRUCT KY-100 (OLD GALLATIN ROAD) FROM 0.2 MILES SOUTH OF KY- 2160 (MP 14.1) TO KY-980 (MP 14.41). (06CCN) CONDUCT A SCOPING STUDY ON THE EASTERN SCOTTSVILLE BYPASS. (08CCN) (10CCR)(16CCN) WIDENING OF KY 100 (FRANKLIN ROAD) TO 3 LANES WITH URBAN SECTION FROM OLIVER STREET TO US 31E TO INCREASE CAPACITY/SAFETY. MP 11.800- 12.700 (14CCN) IMPROVE ACCESS ROAD ON EACH END OF INDUSTRIAL ACCESS ROAD IN SCOTTSVILLE. (16CCN) 1.100 1.100 .020 .310 4.000 .900 ADAIR ALLEN ALLEN ALLEN ALLEN ALLEN ALLEN ALLEN KY-704 KY-98 KY-100 CR-1328 KY-100 KY-98 KY-100 - $950,000 $3,680,000 $1,400,000 $2,280,000 $2,580,000 $500,000 $5,330,000 $300,000 Total Total Total Total Total Total Total Total D R U C C R U D R U C R U C P D R U C C PHASE PHASE PHASE PHASE PHASE PHASE PHASE PHASE 2020 2021 2021 2022 2017 2018 2018 2020 2021 2021 2021 2016 2016 2017 2016 2017 2018 2019 2020 2017 YEAR YEAR YEAR YEAR YEAR YEAR YEAR YEAR BRX BRX BRX BRX SPP SPP SPP BRZ BRZ BRZ BRZ SPP SPP SPP SP SPP SP SP SP SPP FUNDING FUNDING FUNDING FUNDING FUNDING FUNDING FUNDING FUNDING $250,000 $150,000 $50,000 $500,000 $3,680,000 $500,000 $900,000 $400,000 $150,000 $75,000 $1,655,000 $370,000 $960,000 $1,250,000 $500,000 $480,000 $380,000 $670,000 $3,800,000 $300,000 AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT 08 03 03 03 03 03 03 03 1068.00 201.00 320.00 1088.00 8305.00 8400.00 8802.00 8901.00 - - - - - - - - Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: 08 03 03 03 03 03 03 03 1068.00 201.00 320.00 1088.00 8305.00 8400.00 8802.00 8901.00 - - - - - - - - Parent No.: Parent No.: Parent No.: Parent No.: Parent No.: Parent No.: Parent No.: Parent No.: 2016 2012 2012 2016 2006 2016 2014 2016 2016 2012 2012 2016 2006 2016 2014 2016 11.905 3.64 3.1 .35 14.1 11.8 11.913 4.74 4.2 .39 14.441 12.7 Milepoints: Milepoints: Milepoints: Milepoints: Milepoints: Milepoints: Milepoints: Milepoints: To: To: To: To: To: To: To: To: From: From: From: From: From: From: From: From: RELIABILITY / BRIDGE REPLACEMENT(P) SAFETY / SAFETY(P) RELIABILITY / RECONSTRUCTION(O) RELIABILITY / BRIDGE REPLACEMENT(P) RELIABILITY / RECONSTRUCTION(O) RELIABILITY / SCOPING STUDY(O) RELIABILITY / MAJOR WIDENING(O) RELIABILITY / SAFETY(P)
Transcript
Page 1: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 1

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5)(001B00078N)

IMPROVE THE SAFETY OF KY 98 NEAR DURHAM SPRINGS CHURCH (12CCR)

IMPROVEMENTS TO KY 100: CURVE, BRIDGE, AND INTERSECTIONIMPROVEMENTS FROM NEAR THE STONY POINT ROAD INTERSECTION TO EASTOF THE ALONZO LONG HOLLOW ROAD INTERSECTION (12CCR)

REPLACE BRIDGE OVER BAYS FORK ON MITCHELL WEAVER ROAD (CR 1328) 2.1MI W OF KY 1332 (002C00063N)(SR=31.5)(16CCN)

RECONSTRUCT KY-100 (OLD GALLATIN ROAD) FROM 0.2 MILES SOUTH OF KY-2160 (MP 14.1) TO KY-980 (MP 14.41). (06CCN)

CONDUCT A SCOPING STUDY ON THE EASTERN SCOTTSVILLE BYPASS. (08CCN)(10CCR)(16CCN)

WIDENING OF KY 100 (FRANKLIN ROAD) TO 3 LANES WITH URBAN SECTIONFROM OLIVER STREET TO US 31E TO INCREASE CAPACITY/SAFETY. MP 11.800-12.700 (14CCN)

IMPROVE ACCESS ROAD ON EACH END OF INDUSTRIAL ACCESS ROAD INSCOTTSVILLE. (16CCN)

1.100

1.100

.020

.310

4.000

.900

ADAIR

ALLEN

ALLEN

ALLEN

ALLEN

ALLEN

ALLEN

ALLEN

KY-704

KY-98

KY-100

CR-1328

KY-100

KY-98

KY-100

-

$950,000

$3,680,000

$1,400,000

$2,280,000

$2,580,000

$500,000

$5,330,000

$300,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

R

U

D

R

U

C

R

U

C

P

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2021

2021

2022

2017

2018

2018

2020

2021

2021

2021

2016

2016

2017

2016

2017

2018

2019

2020

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRX

BRX

BRX

BRX

SPP

SPP

SPP

BRZ

BRZ

BRZ

BRZ

SPP

SPP

SPP

SP

SPP

SP

SP

SP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$250,000

$150,000

$50,000

$500,000

$3,680,000

$500,000

$900,000

$400,000

$150,000

$75,000

$1,655,000

$370,000

$960,000

$1,250,000

$500,000

$480,000

$380,000

$670,000

$3,800,000

$300,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

03

03

03

03

03

03

03

1068.00

201.00

320.00

1088.00

8305.00

8400.00

8802.00

8901.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

03

03

03

03

03

03

03

1068.00

201.00

320.00

1088.00

8305.00

8400.00

8802.00

8901.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2012

2012

2016

2006

2016

2014

2016

2016

2012

2012

2016

2006

2016

2014

2016

11.905

3.64

3.1

.35

14.1

11.8

11.913

4.74

4.2

.39

14.441

12.7

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / SAFETY(P)

Page 2: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 2

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT 1.0 MILE EAST OF BRIDGE OVER BARREN RIVER LAKE TOCORRECT VERTICAL AND HORIZONTAL DEFICIENCIES.(16CCN)

RECONSTRUCT KY 151 FROM US 127 AT LAWRENCEBURG TO I-64 IN FRANKLINCOUNTY.

WIDENING AND IMPROVEMENTS ON US-62 FROM 0.103 MILE WEST OF THE NEWSCHOOL ENTRANCE/WESTWOOD ESTATES TO 0.095 MILE EAST OF US-127B(LAWRENCEBURG BYPASS). (02CCN)(04CCN)(08CCR)(12CCR)

PADUCAH-WICKLIFFE RD; 4-LANE US-60 FROM STAFFORD ROAD TO BETHELCHURCH ROAD (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1-115.10)(06CCR)(12CCR)(14CCR).

PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDEEXISTING LOCATION.

PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDEEXISTING LOCATION.

PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDEEXISTING LOCATION.

REPLACE BRIDGE ON KY 358 OVER CLAYTON CREEK APPR. 0.5 MILE NORTH OFKY 473 (SR 26.5) 004B00044N

6.700

.900

3.700

.970

.970

.040

ALLEN

ANDERSON

ANDERSON

BALLARD

BALLARD

BALLARD

BALLARD

BALLARD

KY-98

KY-151

US-62

US-60

US-51

US-51

US-51

KY-358

$2,400,000

$32,000,000

$7,450,000

$16,670,000

$3,000,000

$6,500,000

$6,500,000

$500,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

P

D

R

U

C

R

C

R

U

D

D

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2019

2020

2017

2017

2018

2020

2022

2016

2018

2017

2018

2019

2020

2021

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SP

SP

SPP

SPP

BRO

BRO

BRO

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$400,000

$400,000

$300,000

$1,300,000

$250,000

$1,750,000

$5,000,000

$5,000,000

$20,000,000

$3,800,000

$3,650,000

$10,480,000

$6,190,000

$3,000,000

$6,500,000

$6,500,000

$500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

05

07

01

01

01

01

01

8902.00

806.00

8100.00

115.00

1140.01

1140.02

1140.03

1143.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

FRANKLIN

MCCRACKEN

03

05

07

01

01

01

01

01

8902.00

806.00

8100.00

115.00

1140.00

1140.02

1140.03

1143.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2002

1998

2004

2016

2016

2012

2016

2016

2002

1998

2004

2016

2016

2012

10.1

17.251

7.327

7.327

7.327

14.034

10.2

18.371

8.297

8.297

8.297

14.074

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Milepoints:

Milepoints:

To:

To:

From:

From:

Page 3: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 3

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

STUDY IMPROVEMENTS TO HALLOWAY LANDING ROAD (CR1232) (16CCN).

PRIORITY SECTION 3: RECONSTRUCT KY-90 EAST OF GLASGOW FROM BRIDGEOVER FALLEN TIMBER CREEK TO THE METCALFE COUNTY LINE.(2002BOPC)(08CCR)(10CCR)(12CCR)

CONNECT US-31E (MP 12.6) TO OLD CALVARY DRIVE (CS 1196) AT THE EXISTINGINTERSECTION OF US-31E AND TROJAN TRAIL.(12CCN)

MAJOR WIDENING FROM SANDERS STREET IN CAVE CITY TO US 68 (GLASGOWOUTER LOOP) IN GLASGOW. (14CCN)(16CCR).

MAJOR WIDENING OR 2+1 FROM STATE PARK ROAD TO NUNN PARKWAY.(14CCN)

MAJOR WIDENING FROM DONNELLY DRIVE TO US-31E (ROGER WELLS) INGLASGOW AND WIDEN DONNELLY DRIVE. (14CCN) (16CCN)

WIDEN KY-70 AT THE CAVE CITY INDUSTRIAL PARK. (16CCN)

CONSTRUCT AN ACCESS DRIVE AT THE CAVE CITY INDUSTRIAL PARK.(16CCN)

CONSTRUCT AN INDUSTRIAL ACCESS ROAD TO CONNECT TO KY 70 NEAR MP 5.9,INCLUDING A LEFT TURNING LANE ON KY 70. (16CCN)

3.590

.300

8.414

11.074

1.721

BALLARD

BARREN

BARREN

BARREN

BARREN

BARREN

BARREN

BARREN

BARREN

CR-1232

KY-90

US-31E

KY-90

US-31E

KY-1297

KY-70

-

-

$200,000

$12,070,000

$550,000

$39,200,000

$3,500,000

$15,110,000

$220,000

$415,000

$600,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

P

C

C

D

R

U

C

D

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2016

2016

2016

2017

2017

2019

2017

2017

2019

2021

2018

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SPP

SPP

STP

STP

STP

SPP

SPP

STP

STP

STP

SP

SP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$200,000

$12,070,000

$550,000

$2,200,000

$6,000,000

$3,500,000

$27,500,000

$3,500,000

$3,860,000

$4,100,000

$7,150,000

$220,000

$415,000

$600,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

03

03

03

03

03

03

03

03

8953.00

108.50

8705.00

8819.00

8820.00

8821.00

8906.00

8907.00

8953.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

03

03

03

03

03

03

03

03

8953.00

108.00

8705.00

8819.00

8820.00

8821.00

8906.00

8907.00

8953.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2000

2012

2014

2014

2016

2016

2016

2016

2016

2000

2012

2014

2014

2016

2016

2016

2016

0

17.758

.16

1.222

11.078

5.878

5.762

22.022

8.574

12.296

12.799

6.016

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

Page 4: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 4

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT KY-111 IN THE VICINITY OF THE "S-CURVE" EAST OFOWINGSVILLE.(14CCR)

IMPROVE INTERSECTION OF KY 36 AND KENDALL SPRINGS ROAD TOACCOMODATE INDUSTRIAL TRUCK TRAFFIC. (14CCR)

RECONSTRUCTION FROM US-60 IN OWINGSVILLE NORTH TO PRICKLY ASHROAD. (SEE 9-193) (08CCN) (10CCN) (16CCN)

NEW CONSTRUCTION FROM KENDALL SPRINGS ROAD TO BATH COUNTY HIGHSCHOOL IN OWINGSVILLE. (08CCN)

RECONSTRUCT CURVE AT .8 MILE SOUTH OF KY-36. (08CCN)(12CCR)

INTERSECTION IMPROVEMENT AT KY 211 AND US 60 IN SALT LICK. (14CCN)

CORRECT HORIZONTAL AND WIDTH DEFICIENCIES ON KY 36 FROM "OLD KY 11"MP 1.004 TO KY 1325 (MP 6.97) TO IMPROVE SAFETY AND OPERATIONALEFFICIENCY OF ROADWAY. (14CCN)

.500

.100

1.900

.100

.200

5.966

BATH

BATH

BATH

BATH

BATH

BATH

BATH

KY-111

KY-36

KY-111

-

KY-965

US-60

KY-36

$8,140,000

$750,000

$8,100,000

$1,440,000

$800,000

$1,860,000

$6,400,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

R

U

C

P

D

U

C

R

U

C

P

D

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2018

2016

2016

2017

2018

2016

2017

2016

2016

2017

2017

2018

2016

2017

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SP

SP

SP

SP

SP

SPP

SPP

STP

STP

STP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,580,000

$1,040,000

$5,520,000

$750,000

$1,600,000

$1,000,000

$5,500,000

$240,000

$1,200,000

$50,000

$750,000

$560,000

$300,000

$1,000,000

$400,000

$2,100,000

$2,700,000

$1,200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

09

193.00

394.00

8402.00

8403.00

8404.00

8813.00

8814.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

09

09

193.00

394.00

8402.00

8403.00

8404.00

8813.00

8814.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2014

2016

2008

2008

2014

2014

2006

2014

2016

2008

2008

2014

2014

1

12.65

0

7.147

16.3

1.004

1.5

12.75

1.909

7.247

16.5

6.97

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

Page 5: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 5

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

CONSTRUCT NEW ROUTE FROM KY 441 TO US 25E IN MIDDLESBORO. (08CCR)

IMPROVE CONGESTION AND FREIGHT MOVEMENT BY CONSTRUCTING A TWOWAY LEFT TURN LANE. (LET W/ 11-8701)(12CCR)

RECONSTRUCT KY-66 FROM 500' S OF NCL PINEVILLE TO KY-221

REPLACE BRIDGE ON KY-2011 (MP 8.498) OVER RED BIRD CREEK; .55 MI SOUTHOF JCT KY 66; (SR=3.5) 007B00074N

PAGE SCHOOL TURN LANE. (LET W/ 11-189)(12CCN)

PROVIDE PASSING OPPORTUNITIES ON US 119 IN THE VICINITY OF MP 4.5 INBELL COUNTY. (12CCN)(14CCR)(16CCR)

CONSTRUCT LEFT AND RIGHT TURN LANES ONTO THE BELL COUNTYGARAGE/VETERANS PARK ENTRANCE FROM US 119. (14CCN)

.800

.800

.900

.100

.100

1.500

BELL

BELL

BELL

BELL

BELL

BELL

BELL

KY-441

US-119

KY-66

KY-2011

US-119

US-119

US-119

$7,910,000

$2,424,500

$11,030,000

$550,000

$980,000

$26,550,000

$1,275,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

R

U

C

C

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2017

2019

2016

2016

2016

2018

2016

2016

2017

2018

2019

2017

2018

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SPP

SP

SP

SP

BRX

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$400,000

$620,000

$490,000

$6,400,000

$2,424,500

$2,220,000

$830,000

$7,980,000

$550,000

$980,000

$1,450,000

$4,100,000

$21,000,000

$100,000

$25,000

$50,000

$1,100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

110.00

189.00

217.00

1079.00

8701.00

8702.00

8805.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

110.00

189.00

217.00

1079.00

8701.00

8702.00

8805.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2012

1996

2010

2012

2012

2014

2000

2012

1996

2010

2012

2012

2014

.37

.41

8.35

3.45

3.7

1.17

1.557

8.65

3.55

5.2

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY(P)

Page 6: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 6

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT TO CORRECT SAFETY ISSUES AND IMPROVE STABILIZATION OFROADWAY ON KY 188 AND YELLOW CREEK ON THE SOUTHSIDE OF ROADWAY.(16CCN)

RECONSTRUCT KY 1534 AND YELLOW CREEK ALONG THE EASTSIDE OFROADWAY FROM MP 1.3 TO MP 3.5 TO IMPROVE SAFETY. (16CCN)

IMPROVE SAFETY ALONG KY 221 WHILE PROVIDING SAFER TURNING LANESFOR SCHOOL TRAFFIC. (16CCN)

IMPROVE CURB AND GUTTER ON KY 74 FROM 10TH STREET TO 30TH STREET.(16CCN)

RECONSTRUCT THE KY-536 (MT. ZION ROAD) INTERCHANGE. (14CCR)(16CCR)

ADD AUXILIARY LANES ON I-71/75 FROM KY 536 TO US 42 (NB & SB) AS PER THEINTERCHANGE JUSTIFICATION STUDY (IJS).(10CCR)(12CCR)

RECONSTRUCT THE KY-338 (RICHWOOD ROAD) INTERCHANGE. (FUNDING FORIMR SHOWN UNDER 6-14.01) (10CCR)(12CCR)(14CCR)(16CCR)

.100

1.500

.100

BELL

BELL

BELL

BELL

BOONE

BOONE

BOONE

KY-188

KY-1534

KY-221

KY-74

I-75

I-75

I-75

$3,300,000

$3,050,000

$1,100,000

$450,000

$44,060,000

$20,600,000

$53,730,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

R

U

C

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2019

2020

2017

2018

2019

2020

2017

2018

2019

2020

2018

2019

2019

2020

2017

2019

2019

2018

2020

2019

2020

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SP

SP

SP

SP

SP

SP

SP

SP

IM

IM

IM

IM

IM

IM

IM

IM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$250,000

$200,000

$350,000

$2,500,000

$250,000

$300,000

$250,000

$2,250,000

$200,000

$200,000

$75,000

$625,000

$50,000

$75,000

$75,000

$250,000

$14,700,000

$7,280,000

$22,080,000

$800,000

$19,800,000

$26,250,000

$12,480,000

$15,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

06

06

06

8901.00

8902.00

8903.00

8904.00

14.00

14.50

18.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

06

06

06

8901.00

8902.00

8903.00

8904.00

14.00

14.01

18.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2016

2004

2008

2004

2016

2016

2016

2016

2004

2006

2004

0

1.3

15.19

177.659

178.039

175.217

2.55

3.5

16.753

178.345

180.106

175.622

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SAFETY(P)

RELIABILITY / SAFETY(P)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

RELIABILITY / MINOR WIDENING(O)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

Page 7: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 7

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT THE KY-338 (RICHWOOD ROAD) INTERCHANGE. (ADDITIONAL C-FUNDS FOR 6-18.00)

RECONSTRUCT THE KY-338 (RICHWOOD ROAD) INTERCHANGE. (ADDITIONAL C-FUNDS FOR 6-18.00)

RECONSTRUCT KY-536 TO A 5-LANE URBAN SECTION FROM 1500' WEST OF US-42TO I-75 (MP 10.3 TO MP 13.24). (DOES NOT INCLUDE INTERCHANGERECONSTRUCTION) (00CCR) (10CCR)(12CCR)(14CCR)(16CCR)

RECONSTRUCT KY-536 TO A 5-LANE URBAN SECTION FROM 1500' WEST OF US-42TO I-75 (MP 10.4 TO MP 13.4). (ADDITIONAL FUNDING FOR C PHASE) (16CCR)

DRY RIDGE-FLORENCE ROAD; 5-LANE US-25 FROM RICHWOOD ROAD TOWINNING COLORS DRIVE WITH GRADE SEPARATION OF KY-338 AT US-25 & RROVERPASS FOR KY-338. (2004BOPC)(2006BOPC)(12CCR)(NO BUILD)(14CCN)

DRY RIDGE-FLORENCE ROAD; 5-LANE US-25 FROM WINNING COLORS DRIVE TOBEESOM DRIVE. (2006BOPC) (10CCR)(NO BUILD)(14CCN)

DRY RIDGE-FLORENCE ROAD; 5-LANE US-25 FROM BEESOM DRIVE TOARISTOCRAT DRIVE WITH GRADE SEPARATION OF KY 536 AT US 25. (2006BOPC)(10CCR)(NO BUILD)(14CCN)

DRY RIDGE-FLORENCE ROAD; 5-LANE US-25 FROM ARISTOCRAT DRIVE TO RRSPUR CROSSING. (2004BOPC)(2006BOPC) (10CCR)(NO BUILD)(14CCN)

MINOR WIDENING AND CONSTRUCT A SOUTHBOUND LEFT TURN LANE ON DRYRIDGE-FLORENCE ROAD AT MUBEA.

.100

2.940

3.000

.636

2.346

.379

1.370

.200

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

I-75

I-75

KY-536

KY-536

US-25

US-25

US-25

US-25

US-25

$15,000,000

$27,000,000

$12,930,000

$17,700,000

$12,530,000

$1,710,000

$1,770,000

$950,000

$2,600,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

D

R

U

C

D

D

D

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2022

2017

2018

2016

2017

2017

2019

2016

2016

2016

2016

2017

2017

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

IM

IM

STP

STP

SP

SP

SP

SP

SP

SP

SP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$15,000,000

$27,000,000

$12,930,000

$17,700,000

$2,010,000

$3,640,000

$2,510,000

$4,370,000

$1,710,000

$1,770,000

$950,000

$100,000

$1,000,000

$500,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

06

18.10

18.11

158.00

158.01

351.10

351.20

351.30

351.40

351.45

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

06

18.00

18.11

158.00

158.00

8200.10

8200.10

8200.70

8200.70

351.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2000

2006

2006

2006

2006

2006

2016

2004

2016

2000

2000

2004

2004

2004

2004

1996

175.217

175.217

10.3

10.4

4.859

5.085

7.431

7.81

175.622

175.622

13.24

13.4

5.085

7.431

7.81

9.18

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

ECONOMIC DEVELOPMENT / PREFINANCD CONVRSN(O)

ECONOMIC DEVELOPMENT / PREFINANCD CONVRSN(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

Page 8: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 8

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

DRY RIDGE-FLORENCE ROAD; 3-LANE US-25 FRONTAGE ROAD FROM 0.11 MILESOUTH OF KY 338 TO WINNING COLORS. (2006BOPC) (10CCR)(NO BUILD)(14CCN)

CONSTRUCT ADDITIONAL TURN LANES AT THE INTERSECTION OF KY 842 ANDUS 42.(12CCR) (16CCN)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

.226

.263

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

US-25

US-42

-

-

-

-

-

-

$10,000

$4,400,000

$44,000

$44,000

$44,000

$44,000

$44,000

$44,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2017

2017

2016

2017

2018

2019

2020

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

CM

CM

CM

SNK

SNK

SNK

SNK

SNK

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$10,000

$1,750,000

$150,000

$2,500,000

$44,000

$44,000

$44,000

$44,000

$44,000

$44,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

351.50

367.00

400.11

400.12

400.13

400.14

400.15

400.16

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

06

06

06

06

06

06

06

06

8200.70

367.00

400.11

400.12

400.13

400.14

400.15

400.16

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2016

2012

2012

2012

2014

2014

2016

2004

2016

2012

2012

2012

2014

2014

2016

12.803 13.066

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

To:To:

To:To:

To:To:

To:To:

From:From:

From:From:

From:From:

From:From:

From:From:

From:From:

Page 9: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 9

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

-

-

-

-

-

-

-

-

$44,000

$56,000

$56,000

$56,000

$56,000

$56,000

$56,000

$56,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2022

2016

2017

2018

2019

2020

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$44,000

$56,000

$56,000

$56,000

$56,000

$56,000

$56,000

$56,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

400.17

401.11

401.12

401.13

401.14

401.15

401.16

401.17

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

06

06

06

06

06

06

06

06

400.17

401.11

401.12

401.13

401.14

401.15

401.16

401.17

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2012

2012

2012

2014

2014

2016

2016

2016

2012

2012

2012

2014

2014

2016

2016

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

To:To:

To:To:

To:To:

To:To:

To:To:

To:To:

From:From:

From:From:

From:From:

From:From:

From:From:

From:From:

From:From:

From:From:

Page 10: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 10

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

CONSTRUCT A RAMP FROM THE MALL ROAD INTERCHANGE TO SOUTHBOUND I-75.(12CCR)

INTERSECTION IMPROVEMENT PROJECT AT US 42 AND RICE PIKE/HICKS PIKE.US 42 MP 8.4 TO 8.6. TOLL CREDITS. (2012BOP)(AR/W)

PROVIDE ADDITIONAL LEFT TURN LANE ONTO WORLDWIDE BLVD FROM KY 237.ADD ADDITIONAL THROUGH LANES ON KY 237 NORTH OF KY 2846 (TANNERS LN).PROVIDE LANE EXTENSION ON WORLDWIDE BLVD FROM KY 237. (2012BOP)(ADM.BY KYTC)

EXTENSION OF WENDELL FORD BLVD TO AERO PKWY, 0.48 MILES. (2012BOP)

RECONSTRUCTION OF THE INTERSECTION OF CAMP ERNST ROAD ANDLONGBRANCH ROAD. WIDENING OF 1,900 FEET OF LONGBRANCH ROAD.(2012BOP)

CORRECT GEOMETRIC DEFICIENCIES AND ADD LEFT TURN LANES ONFROGTOWN ROAD AT TRIPLE CROWN BLVD AND CEDARWOOD.(2012BOP)(ADM.BY KYTC)

STUDY ALL MAJOR HIGHWAY CORRIDOR OPTIONS TO RELIEVE TRAFFIC IN THEBRENT SPENCE BRIDGE CORRIDOR, (INCLUDES IN-DEPTH LOOK AT EASTERNBYPASS OF GREATER CINCINNATI), AS WELL AS POSSIBLE TRAFFICMANAGEMENT IMPROVEMENTS AT THE EXISTING BRENT SPENCE CROSSING.

TWO-LANE EXTENSION OF EXISTING VETERANS WAY BETWEEN KY 18 AND KY237. LPA PROJECT (LET BY COUNTY)(2012BOP)

.083

.200

.450

.753

.558

.450

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

I-75

US-42

KY-237

PV-1011

CR-1002

KY-3060

-

CR-1057L

$1,500,000

$4,100,000

$4,500,000

$2,366,717

$686,640

$1,640,000

$2,000,000

$1,640,000

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

R

U

C

C

R

U

C

D

R

U

C

P

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2017

2016

2016

2017

2016

2016

2016

2017

2016

2017

2017

2018

2016

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

NH

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,500,000

$750,000

$600,000

$2,750,000

$1,000,000

$500,000

$3,000,000

$2,366,717

$50,000

$112,000

$524,640

$120,000

$200,000

$120,000

$1,200,000

$2,000,000

$1,640,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

409.00

412.00

415.00

417.00

422.00

423.00

431.00

700.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

06

06

06

06

06

06

06

06

409.00

966.00

966.02

966.02

966.02

966.02

431.00

966.01

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2002

2012

2012

2012

2012

2016

2012

2012

2002

2004

2004

2004

2004

2016

2002

180.3

8.4

10.9

.747

2.1

1.5

180.6

8.6

11.35

1.5

2.658

1.95

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / STRATGIC CORR STDY(O)

RELIABILITY / MATCHED FED FUNDS(O)

Milepoints:Milepoints:

To:To:

From:From:

Page 11: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 11

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2016. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2017 (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2018 (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2019 (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

-

-

-

-

-

-

-

$14,500,000

$8,800,000

$8,900,000

$9,100,000

$9,100,000

$9,100,000

$9,100,000

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2018

2019

2020

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SNK

SNK

SNK

SNK

SNK

SNK

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$14,500,000

$8,800,000

$8,900,000

$9,100,000

$9,100,000

$9,100,000

$9,100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

966.04

966.05

966.06

966.07

966.08

966.09

966.10

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

06

06

06

06

06

06

06

966.04

966.05

966.06

966.07

966.08

966.09

966.10

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2008

2008

2014

2014

2016

2016

2006

2008

2008

2014

2014

2016

2016

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

To:To:

To:To:

To:To:

To:To:

To:To:

From:From:

From:From:

From:From:

From:From:

From:From:

From:From:

From:From:

Page 12: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 12

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON KY 20 OVER WOOLPER CREEK SE OF STONE CREEK LANE(PR 1300)(SR 22.5) 008B00018N

REPLACE BRIDGE OVER NS (CNO&TP)RR ON RICHARDSON ROAD (KY 842) 0.14 MIE OF US 25 NEAR INDEPENDENCE (008B00092N)(SR=43)

I-275/KY-212 INTERCHANGE AND KY-20 RECONSTRUCTION NEAR GREATERCINCINNATI AIRPORT. (2004BOPC)(KYTC SHARE @ 46.6%)

RECONSTRUCT AND WIDEN KY 237 FROM VALLEY VIEW DRIVE TO ROGERSLANE. (14CCR)

RECONSTRUCT AND WIDEN KY 237 FROM VALLEY VIEW DRIVE TO ROGERSLANE.

CONSTRUCT A NEW LOOP ROAD AROUND THE CAMPUS OF GATEWAY COLLEGELOCATED OFF MOUNT ZION ROAD. (10CCN)

INCREASE SAFETY & OPERATIONS AT THE INTERSECTION OF KY 842(RICHARDSON RD.) AND US 25 (DIXIE HIGHWAY) FROM JUST W OF US 25 TOBOONE CO. LINE AND INCLUDES MULTI-MODES; (14CCN)

PHASE II - PEDESTRIAN SAFETY PROJECT TO RECONSTRUCT THE INTERSECTIONOF IDLEWILD ROAD AND INSTALL SIDEWALKS ALONG IDLEWILD ROAD ANDJEFFERSON STREET. (16CCN)

INTERCHANGE JUSTIFICATION STUDY AT I-275 AND GRAVES ROAD. BOONECOUNTY FISCAL COURT WILL PROVIDE A 50% MATCH ($375,000). (16CCN)

.074

.100

3.119

.048

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

KY-20

KY-842

I-275

KY-237

KY-237

-

KY-842

KY-338

I-275

$3,250,000

$3,000,000

$25,310,000

$14,340,000

$9,000,000

$500,000

$2,000,000

$715,000

$375,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

U

C

C

C

D

R

C

R

U

C

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2020

2021

2021

2022

2016

2018

2019

2016

2016

2017

2018

2017

2017

2017

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRX

BRX

BRX

STP

STP

STP

STP

SB2

SP

SP

SP

STP

STP

STP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,250,000

$500,000

$2,000,000

$500,000

$25,310,000

$1,160,000

$13,180,000

$9,000,000

$500,000

$200,000

$300,000

$1,500,000

$90,000

$125,000

$500,000

$375,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

06

1079.00

1087.00

8000.20

8001.21

8001.22

8630.00

8851.00

8952.00

8953.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

06

1079.00

1087.00

8000.11

8001.00

8001.22

8630.00

8851.00

8952.00

8953.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2004

2004

2016

2010

2014

2016

2016

2012

2014

2002

2000

2016

2010

2014

2016

2016

2.8

.094

4.842

2.251

2.251

0

2.86

.141

4.942

5.37

5.37

.34

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / SAFETY(P)

RELIABILITY / SAFETY(P)

RELIABILITY / SAFETY(P)

Page 13: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 13

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

STRUCTURE OVER SCOTTS CREEK ON KY 3364, 0.7 MILE NORTH OF US 460 ATNORTH MIDDLETOWN (BRIDGE IMPROVEMENTS). (03KYDN)(2012BOP) (16CCN)

REPLACE BRIDGE ON CR-1308 (MP 3.588) OVER TOWNSEND CREEK; .9 MI E OF JCTKY 353; (STRUCTURALLY DEFICIENT, SR=33.2) 009C00043N

RECONSTRUCT US 460 FROM RUSSELL CAVE ROAD TO US 27 BYPASS IN PARIS;MP 1.394 TO MP 7.696.(12CCN)(14CCR)(16CCR)

RECONSTRUCT US 460 FROM RUSSELL CAVE ROAD TO US 27 BYPASS IN PARIS;MP 1.394 TO MP 7.696. (ADDITIONAL FUNDING FOR C PHASE) (16CCR)

EXTEND FIFTH STREET IN MILLERSBURG TO THE MILLERSBURGBYPASS.(12CCN) (16CCR)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2016.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2017.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2018.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

.100

.100

6.302

6.302

.070

BOURBON

BOURBON

BOURBON

BOURBON

BOURBON

BOYD

BOYD

BOYD

KY-3364

CR-1308

US-460

US-460

CS-2016

-

-

-

$18,723

$930,000

$25,500,000

$7,700,000

$1,450,000

$1,150,000

$1,600,000

$1,600,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

C

D

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2017

2016

2017

2017

2018

2016

2017

2017

2017

2016

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

KYD

BRZ

BRZ

BRZ

STP

STP

STP

STP

SPP

SPP

SPP

SPP

SAH

SAH

SAH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$18,723

$90,000

$75,000

$765,000

$3,000,000

$2,500,000

$20,000,000

$7,700,000

$150,000

$300,000

$100,000

$900,000

$1,150,000

$1,600,000

$1,600,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

09

09

09

365.10

1124.00

8705.00

8705.01

8707.00

208.02

208.03

208.04

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

GREENUP

GREENUP

GREENUP

07

07

07

07

07

09

09

09

365.00

1124.00

8705.00

8705.01

8707.00

208.02

208.03

208.04

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2010

2012

2016

2012

2014

2014

2014

2002

2010

2012

2016

2012

2014

2014

2014

5.389

3.538

1.394

1.394

0

5.489

3.638

7.696

7.696

.07

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

From:

From:

From:

Page 14: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 14

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2019.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2020.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2021.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2022.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

US 60 FROM I-64 AT INTERCHANGE 181 (MP 0.2) EXTENDING NORTHERLY TO THEKY 180 (MP 4.02) INTERSECTION AT CANNONSBURG, INCLUDINGSUPERELEVATION CORRECTION ALONG KY 180 AT THE US 60 INTERSECTION.(08CCN) (10CCR)(12CCR)

SAFETY UPGRADES AND CONSTRUCT TURN LANES ON US-23 AT 12TH STREET -CATLETTSBURG. (14CCN)

REPLACE U.S. 68 AND U.S. 150 BRIDGE OVER CHAPLIN RIVER, PERRYVILLE.011B00042N (2005HPP-KY134)(EARMARK DOES NOT COVER TOTAL PROJECT COSTOF $1,790,000).

OPERATION OF AUGUSTA FERRY FOR FY 2017. (12CCR)(14CCR)

OPERATION OF AUGUSTA FERRY FOR FY 2018. (12CCR)(14CCR)

2.020

.100

BOYD

BOYD

BOYD

BOYD

BOYD

BOYD

BOYLE

BRACKEN

BRACKEN

-

-

-

-

US-60

US-23

US-68

KY-8

KY-8

$1,600,000

$1,600,000

$1,600,000

$1,600,000

$30,290,000

$500,000

$364,940

$180,000

$180,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2021

2022

2017

2016

2017

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SAH

SAH

SAH

SAH

SB2

SPP

HPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,600,000

$1,600,000

$1,600,000

$1,600,000

$30,290,000

$500,000

$364,940

$180,000

$180,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

07

06

06

208.05

208.06

208.07

208.08

8400.00

8801.00

242.01

355.19

355.20

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

GREENUP

GREENUP

GREENUP

09

09

09

09

09

09

07

06

06

208.05

208.06

208.07

208.08

8400.00

8801.00

242.01

355.19

355.20

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2016

2016

2008

2014

2010

2012

2012

2014

2014

2016

2016

2008

2014

2010

2012

2012

.2

14.458

6.4

13.1

13.1

4.02

14.558

6.418

13.2

13.2

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / CONGESTION MITIGTN(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

From:

From:

From:

Page 15: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 15

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

OPERATION OF AUGUSTA FERRY FOR FY 2019.(12CCR)(14CCR)

OPERATION OF AUGUSTA FERRY FOR FY 2020.(12CCR)(14CCR)

OPERATION OF AUGUSTA FERRY FOR FY 2021.

OPERATION OF AUGUSTA FERRY FOR FY 2022.

REPLACE BRIDGE ON KY-8 (MP 4.221) OVER SNAG CREEK; 1 MI W OF JCT KY 1109;(STRUCTURALLY DEFICIENT, SR=48.3) 012B00005N

SPOT IMPROVEMENTS FROM THE CITY OF BROOKSVILLE SOUTH TOPOWERSVILLE. (06CCN) (10CCR) (16CCR)

RECONSTRUCT KY-1159 FROM BROOKSVILLE TO KY-9/AA HIGHWAY. (06CCN)(10CCR)(12CCR) (16CCR)

IMPROVE SAFETY ALONG KY 2228 FROM KY 9 TO KY 8. (16CCN)

.100

3.579

2.650

BRACKEN

BRACKEN

BRACKEN

BRACKEN

BRACKEN

BRACKEN

BRACKEN

BRACKEN

KY-8

KY-8

KY-8

KY-8

KY-8

KY-10

KY-1159

KY-2228

$190,000

$190,000

$190,000

$190,000

$2,750,000

$37,040,000

$14,630,000

$675,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

R

C

D

R

U

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2021

2022

2016

2017

2016

2016

2019

2020

2017

2017

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

BRO

BRO

SB2

SB2

SPP

SPP

SPP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$190,000

$190,000

$190,000

$190,000

$150,000

$2,600,000

$3,120,000

$5,790,000

$2,820,000

$25,310,000

$14,630,000

$75,000

$50,000

$50,000

$500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

355.21

355.22

355.23

355.24

1074.00

8309.00

8311.00

8901.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

355.21

355.22

355.23

355.24

1074.00

8309.00

8311.00

8901.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2016

2016

2010

2006

2006

2016

2014

2014

2016

2016

2010

2006

2006

2016

13.1

13.1

13.1

13.1

4.171

10.38

.85

13.2

13.2

13.2

13.2

4.271

13.959

3.5

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SAFETY(P)

Page 16: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 16

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

ADD TURN LANES ON KY 9 AT KY 875 MT. ZION ROAD. (16CCN)

IMPROVEMENTS TO KY 19 FROM KY 165 TO KY 10 TO IMPROVE SIGHT DISTANCEAND CURVE ISSUES. (16CCN).

REPLACE BRIDGE ON KY 476 OVER CANEY CREEK BETWEEN HARDSHELLCANEY CREEK ROAD (CR 1117) AND NIX BRANCH ROAD (CR 1115)(SR 40.3)013B00014N

REPLACE BRIDGE ON MARIE ROBERTS ROAD (CR 1165) OVER TROUBLESOMECREEK 0.1 MILE SW OF KY 15(SR 27.1) 013C00011N

REPLACE BRIDGE OVER FROZEN CREEK ON KY 378 0.7 MI N OF KY 1812.(013B00050N)(SR=41)

REPLACE BRIDGE OVER SINKING CREEK ON DENTS BRIDGE ROAD (CR 1021) 1.4MI W OF KY 333 (014C00003N)(SR=26)

RECONSTRUCT KY 79 FROM KY 477 TO KY 428.(12CCN)(14CCR)

.040

.048

.028

.020

2.143

BRACKEN

BRACKEN

BREATHITT

BREATHITT

BREATHITT

BRECKINRIDGE

BRECKINRIDGE

KY-9

KY-19

KY-476

CR-1165

KY-378

CR-1021

KY-79

$4,000,000

$11,250,000

$840,000

$1,610,000

$1,350,000

$710,000

$19,380,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

C

C

D

R

U

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2019

2020

2017

2018

2019

2020

2016

2018

2019

2021

2021

2022

2017

2019

2019

2020

2016

2017

2017

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SP

SP

SP

SP

BRO

BRZ

BRX

BRX

BRX

BRX

BRZ

BRZ

BRZ

BRZ

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$250,000

$250,000

$3,000,000

$1,000,000

$750,000

$500,000

$9,000,000

$840,000

$1,610,000

$250,000

$50,000

$50,000

$1,000,000

$130,000

$30,000

$50,000

$500,000

$1,250,000

$3,710,000

$2,250,000

$12,170,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

10

10

10

04

04

8902.00

8903.00

1100.00

1105.00

1110.00

1090.00

8703.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MEADE

06

06

10

10

10

04

04

8902.00

8903.00

1100.00

1105.00

1110.00

1090.00

8703.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2012

2012

2014

2014

2012

2016

2016

2012

2012

2014

2014

2012

4.255

.092

.672

1.42

16.032

4.295

.14

.7

1.44

16.912

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)0 1.263Milepoints: To:From:

Page 17: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 17

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCTION STUDY ON KY 86 FROM MP 15.957 TO MP 26.137. (16CCN)

REPLACE LOW WATER STRUCTURE ON KY 261 AT MP 15.74. (16CCN)

REALIGN S-CURVE AND CULVERT WIDENING. (16CCN)

MINOR WIDENING OF KY 992 BETWEEN ROCK QUARRY AND US 60. (16CCN)

KY-61 BEGINS SOUTH OF KY-44 AND ENDS NORTH OF THE NEWLY CONSTRUCTEDCONESTOGA PARKWAY. (CSX RAILROAD)(CONSTRUCTION SEQUENCE 3)(10CCR)(12CCR)(LET W/ 117.20)

KY-61 BEGINS NORTH OF CONESTOGA PARKWAY AND ENDS AT EXISTING KY-61SOUTH OF BROOKS RUN CREEK. (CONSTRUCTION SEQUENCE 2)(10CCR)(12CCR)(LET W/ 117.10)

RECONSTRUCT KY-44 AT BOGARD/LLOYD LANE. (06CCN) (10CCR)(12CCR)(16CCR)

MT. WASHINGTON-TAYLORSVILLE RD; RECONSTRUCT KY 44 FROM MT.WASHINGTON BYPASS EAST 2.0 MILES (04CCN)(16CCR)

2.200

1.300

.500

2.300

BRECKINRIDGE

BRECKINRIDGE

BRECKINRIDGE

BRECKINRIDGE

BULLITT

BULLITT

BULLITT

BULLITT

KY-86

KY-261

KY-261

KY-992

KY-61

KY-61

KY-44

KY-44

$500,000

$550,000

$810,000

$580,000

$28,500,000

$19,700,000

$1,280,000

$6,660,000

Total

Total

Total

Total

Total

Total

Total

Total

P

D

R

U

C

D

R

U

C

C

C

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2017

2018

2019

2020

2017

2018

2019

2020

2018

2016

2016

2016

2016

2016

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

SP

SP

SP

SP

SP

SP

SP

SP

SPP

SPP

SPP

STP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$100,000

$25,000

$25,000

$400,000

$100,000

$60,000

$50,000

$600,000

$580,000

$28,500,000

$19,700,000

$1,280,000

$890,000

$1,090,000

$4,680,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

05

05

05

05

8901.00

8902.00

8903.00

8904.00

117.10

117.20

150.20

347.50

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

04

04

04

04

05

05

05

05

8901.00

8902.00

8903.00

8904.00

117.00

117.00

150.00

347.50

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2016

2000

2000

2004

1998

2016

2016

2016

2016

1996

1996

2000

1998

14.43

16.667

18.38

23.14

16.667

17.88

18.8

25.44

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SAFETY(P)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

Page 18: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 18

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

WIDEN CEDAR GROVE ROAD (KY 480) FROM CEDAR GROVE ELEMENTARYSCHOOL TO VALLEY VIEW DRIVE. (12CCR)(14CCR) (SEE 5-391.3 FORINTERCHANGE IMPROVEMENTS)

IMPROVEMENTS TO THE I-65/KY 480 INTERCHANGE INCLUDING RAMPIMPROVEMENTS AND TURNING LANES. (12CCR)(14CCR)(2014BOP)(16CCR)

ACCESS MANAGEMENT PROJECT TO RELOCATE LOVE'S ACCESS ROAD ON KY480 IN BULLITT COUNTY TO ADDRESS CONGESTION SAFETY PROBLEMS (2014BOPFROM 5-391.20).

CONSTRUCT NEW I-65 INTERCHANGE BETWEEN KY 480 AND KY 245.

REPLACE BRIDGE ON KY-61 (MP 7.609) OVER BARLEY CREEK; .10 MI NORTH OFJCT KY 251; (STRUCTURALLY DEFICIENT, SR=36.5) 015B00013N

WIDEN KY-245 FROM BERNHEIM FOREST TO THE COMMUNITY COLLEGE.(08CCN)(10CCR)(14CCR)(16CCR)

SOUND BARRIERS ON EAST SIDE OF I-65 BETWEEN MP 117.4 AND MP 117.8.(14CCN)(16CCR)

WIDEN TO 5 LANES BETWEEN MOUNT WASHINGTON AND SHEPHERDSVILLE.(14CCN)

CONSTRUCT A LEFT TURN LANE ON SOUTHBOUND KY 61 AT PLAZA PARK BLVD.AT MP 2.0 AND EXTEND EXISTING LEFT TURN LANE FOR NORTHBOUNDAPPROACH.(16CCN)

.830

.830

.100

1.990

.400

9.793

BULLITT

BULLITT

BULLITT

BULLITT

BULLITT

BULLITT

BULLITT

BULLITT

BULLITT

KY-480

KY-480

KY-480

I-65

KY-61

KY-245

I-65

KY-44

KY-61

$4,790,000

$7,900,000

$1,500,000

$28,500,000

$470,000

$10,510,000

$2,000,000

$3,000,000

$200,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

C

D

R

U

C

R

C

C

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2017

2018

2016

2016

2017

2017

2018

2016

2017

2016

2016

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

NH

NH

NH

NH

STP

NH

NH

NH

NH

BRO

BRO

STP

SP

SP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$4,790,000

$400,000

$1,800,000

$500,000

$5,200,000

$1,500,000

$2,500,000

$500,000

$500,000

$25,000,000

$20,000

$450,000

$10,510,000

$2,000,000

$3,000,000

$200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

391.20

391.30

534.00

538.00

1056.00

8509.00

8856.00

8857.00

8901.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

05

391.00

391.20

534.00

538.00

1056.00

8509.00

8856.00

8857.00

8901.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2014

2014

2016

2010

2008

2014

2014

2016

2006

2006

2014

2016

2010

2008

2014

2014

2016

2.01

1.1

7.559

4.425

117.4

13.072

2.84

1.11

7.659

6.415

117.8

22.865

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / NEW INTERCHANGE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

Page 19: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 19

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

PROVIDE A RELIABLE CONNECTION AND IMPROVE SAFETY ALONG KY 44 FROMMP 9.2 TO MP 10.3, INCLUDING RAISING THE ROADWAY, WIDENING ANDREPLACING BRIDGE 015B00020N. (16CCN)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2017.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2018.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2019.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2020.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2021.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2022.(12CCR)

REPLACE BRIDGE ON KY-340 (MP 7.120) OVER BR OF E PRONG INDIAN CAMPCREEK; 1.0 MI NORTH OF JCT KY 79; (STRUCTURALLY DEFICIENT, SR=44.3)016B00041N

UPGRADE THE NATCHER PARKWAY TO INTERSTATE STANDARDS IN ORDER TOESTABLISH "I-565"SPUR ROUTE BETWEEN BOWLING GREEN AND OWENSBORO.

.100

BULLITT

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

KY-44

KY-269

KY-269

KY-269

KY-269

KY-269

KY-269

KY-340

WN-9007

$8,100,000

$157,200

$157,200

$157,200

$157,200

$157,200

$157,200

$260,000

$10,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2021

2021

2022

2017

2018

2019

2020

2021

2022

2017

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SP

SPP

SPP

SPP

SPP

SPP

SPP

BRX

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$800,000

$1,710,000

$590,000

$5,000,000

$157,200

$157,200

$157,200

$157,200

$157,200

$157,200

$260,000

$10,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

03

03

03

03

03

03

03

03

8956.00

125.12

125.13

125.14

125.15

125.16

125.17

1072.00

2042.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

WARREN

05

03

03

03

03

03

03

03

03

8956.00

125.12

125.13

125.14

125.15

125.16

125.17

1072.00

2042.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2012

2012

2014

2014

2016

2016

2010

2016

2016

2012

2012

2014

2014

2016

2016

2010

2016

1.544

1.544

1.544

1.544

1.544

1.544

7.07

1.644

1.644

1.644

1.644

1.644

1.644

7.17

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)Milepoints: To:From:

Page 20: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 20

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

UPGRADE THE NATCHER PARKWAY TO INTERSTATE STANDARDS IN ORDER TOESTABLISH "I-565"SPUR ROUTE BETWEEN BOWLING GREEN AND OWENSBORO.

UPGRADE THE NATCHER PARKWAY TO INTERSTATE STANDARDS IN ORDER TOESTABLISH "I-565"SPUR ROUTE BETWEEN BOWLING GREEN AND OWENSBORO.

UPGRADE THE NATCHER PARKWAY TO INTERSTATE STANDARDS IN ORDER TOESTABLISH "I-565"SPUR ROUTE BETWEEN BOWLING GREEN AND OWENSBORO.

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2017.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2018.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2019.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2020.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2021.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2022.(12CCR)

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

WN-9007

WN-9007

WN-9007

KY-369

KY-369

KY-369

KY-369

KY-369

KY-369

$10,000,000

$10,000,000

$15,000,000

$157,200

$157,200

$157,200

$157,200

$157,200

$157,200

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2021

2022

2017

2018

2019

2020

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$10,000,000

$10,000,000

$15,000,000

$157,200

$157,200

$157,200

$157,200

$157,200

$157,200

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

03

03

03

2042.01

2042.02

2042.03

8504.07

8504.08

8504.09

8504.10

8504.11

8504.12

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

WARREN

WARREN

WARREN

OHIO

OHIO

OHIO

OHIO

OHIO

OHIO

03

03

03

03

03

03

03

03

03

2042.01

2042.02

2042.03

8504.07

8504.08

8504.09

8504.10

8504.11

8504.12

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2012

2012

2014

2014

2016

2016

2016

2016

2016

2012

2012

2014

2014

2016

2016

.526

.526

.526

.526

.526

.526

.626

.626

.626

.626

.626

.626

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

0

0

0

0

0

0

.067

.067

.067

.067

.067

.067

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

Page 21: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 21

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RELOCATION OF US 641 FROM US 62 NEAR EDDYVILLE TO JUST SOUTH OF THELYON/CALDWELL COUNTY LINE.

RECONSTRUCT SUBSTANDARD CURVES AT ROCK SPRINGS HILL(10CCR)

NEW CONNECTOR FROM HOPKINSVILLE ROAD (KY-91) TO WILSON WAREHOUSEROAD (KY-293) NORTHEAST OF PRINCETON.(06CCR)(10CCR)(12CCR)(14CCR)(16CCR)

REPLACE KY 276 DRAINAGE STRUCTURE. (FLOOD REPAIR PROJECT)

MURRAY FIVE-POINTS INTERSECTION ROUNDABOUT. (12CCR)(16CCR)

MAJOR WIDENING FROM TENN. STATE LINE TO MURRAY PRIORITY SECTION 1;FROM CLARKS RIVER BRIDGE, NORTH 1.0 MILE TO EXISTING 4-LANE.(SEE 1-8852.00)(12CCR)

REPLACE BRIDGE ON CARLTON RD (CR 1411) OVER W FORK ROCKHOUSE CREEK0.1 MILE W OF COLLINS RD (CR 1505)(SR 28.1)018C00110N (AR/W)

4.250

.600

2.400

.100

.100

1.000

.040

CALDWELL

CALDWELL

CALDWELL

CALDWELL

CALLOWAY

CALLOWAY

CALLOWAY

US-641

KY-139

-

KY-276

KY-1327

US-641

CR-1411

$26,000,000

$4,220,000

$18,490,000

$525,000

$5,750,000

$8,120,000

$470,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

R

U

C

R

U

C

R

U

C

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2017

2018

2016

2017

2017

2019

2016

2017

2019

2017

2017

2018

2017

2017

2019

2017

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SP

SP

SP

SP

SPP

SPP

SPP

BRX

BRX

BRX

SP

SP

SP

SPP

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,500,000

$3,500,000

$1,000,000

$20,000,000

$500,000

$610,000

$470,000

$2,640,000

$2,960,000

$2,060,000

$13,470,000

$50,000

$25,000

$450,000

$2,000,000

$1,670,000

$2,080,000

$8,120,000

$100,000

$370,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

02

02

02

01

01

01

187.50

141.00

153.00

1095.00

121.00

314.10

1149.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

02

02

02

01

01

01

187.50

141.00

153.00

1095.00

121.00

314.00

1149.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2000

2002

2016

2006

2000

2012

2006

2000

2002

2016

2006

1996

2012

7.573

1.49

5.666

1.027

8.173

1.51

6.666

1.067

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

SAFETY / SAFETY(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 22: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 22

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

CITY OF MURRAY BUSINESS LOOP FROM GLENDALE TO INDUSTRIAL ROAD. (SEE1-120 FOR D, R, & U FUNDING)(08CCN)(10CCR)(LET BY CITY)

CONSTRUCT A NEW IMPROVEMENT ALLOWING FOR AN OVERPASS FORPEDESTRIANS CROSSING 16TH STREET GOING TO THE OTHER SIDE OF CAMPUS.MURRAY STATE AND THE CITY ARE IN AGREEMENT WITH THE NEED OF THEIMPROVEMENT. (14CCN) (16CCR)

NEW CONSTRUCTION OF 4-LANE ON US-641 SOUTH OF MURRAY FROM END OFSECTION 1 TO TENNESSEE STATE LINE. (SEE 6-314.10 FOR PRIORITYSECTION)(14CCN)

IMPROVE N 16TH STREET FROM KY 1327 (5 POINTS) TO KY 121. (16CCN)

IMPROVE N 16TH STREET FROM KY 1327 (5 POINTS) TO KY 121. (16CCN)

STUDY AND REHABILITATE THE I-471 CORRIDOR, CAMPBELL COUNTY,KENTUCKY. (SEE ALSO 6-8104.00)(2005HPP-KY120)

EXTEND PROPOSED POND CREEK ROAD FROM US-27 TO AA HIGHWAY VIAPORTION OF KY 10/KY 1997 CORRIDOR (NEW KY-536)(04CCN)(12CCR)(14CCR)

.186

6.667

5.016

3.500

CALLOWAY

CALLOWAY

CALLOWAY

CALLOWAY

CALLOWAY

CAMPBELL

CAMPBELL

-

CS-1047

US-641

CS-1047

CS-1047

I-471

KY-536

$3,800,000

$8,500,000

$68,000,000

$6,900,000

$6,900,000

$1,439,840

$61,290,000

Total

Total

Total

Total

Total

Total

Total

C

U

C

D

R

U

C

D

R

U

C

D

R

U

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2018

2016

2018

2019

2021

2017

2018

2020

2022

2017

2018

2020

2022

2017

2021

2022

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SP

SP

SPP

SPP

SPP

SPP

STP

STP

STP

STP

STP

STP

STP

STP

HPP

STP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,800,000

$1,500,000

$7,000,000

$3,000,000

$7,500,000

$7,500,000

$50,000,000

$400,000

$2,000,000

$2,000,000

$2,500,000

$400,000

$2,000,000

$2,000,000

$2,500,000

$1,439,840

$10,940,000

$7,960,000

$42,390,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

01

06

06

8502.00

8851.00

8852.00

8952.00

8952.00

183.00

352.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

01

01

01

06

06

8502.00

8851.00

8852.00

8952.00

8952.00

183.00

352.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2014

2014

2016

2016

2004

1996

2008

2014

2014

2016

2016

2004

1996

1.312

0

0

1.498

6.666

5.016

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

Page 23: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 23

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

KY 9 EXTENSION, CAMPBELL COUNTY. (2006KYD). (KYD FUNDING MOVED FROM6-8101.02)

CONSTRUCT A SIDEWALK ON THE SOUTH SIDE OF KY 1120 (MEMORIALPARKWAY) FROM PAVILION PARKWAY TO WILSON ROAD OVER I-471 INNEWPORT. (2012BOP)

ROADWAY REHABILITATION ON CAROTHERS ROAD FROM MONMOUTH STREET(US 27) TO RIGHT TURN LANE INTO NEWPORT SHOPPING CENTER.

REPLACE BRIDGE ON KY-1996 (MP 0.259) OVER STEVENS BRANCH; .75 MI WESTOF JCT KY 10; (STRUCTURALLY DEFICIENT, SR=19.9) 019B00013N

REPLACE BRIDGE ON CS-1193 (MP 0.783) OVER TAYLOR CREEK; 1.0 MI N. JCT KY1120; (STRUCTURALLY DEFICIENT, SR=31.7) 019C00063N

REPLACE BRIDGE ON KY 10 OVER TWELVE MILE CREEK SE OF KY 1997 (SR 6.4)019B00006N

REPLACE BRIDGE ON KY 2921 OVER BR OF TWELVE MILE CREEK 0.2 MILE NW OFWASHINGTON TRACE ROAD (CR 1006)(SR 24.3) 019B00061N

REPLACE BRIDGE OVER TWELVEMILE CREEK ON KY 8 0.1 MI N OF NEISES ROAD(CR 1009). (019B00003N)(SR=46.1)

.150

.292

.173

.100

.100

.054

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

KY-9

KY-1120

KY-1892

KY-1996

CS-1193

KY-10

KY-2921

KY-8

$2,270,000

$552,000

$1,109,926

$300,000

$1,130,000

$1,910,000

$500,000

$3,960,000

Total

Total

Total

Total

Total

Total

Total

Total

R

C

U

C

D

C

C

C

R

U

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2017

2016

2017

2016

2017

2016

2016

2018

2016

2017

2019

2019

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

SNK

SNK

SNK

SNK

BRX

BRZ

BRX

BRX

BRX

BRX

BRX

BRX

BRX

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$100,000

$2,170,000

$25,000

$527,000

$104,874

$1,005,052

$300,000

$1,130,000

$150,000

$130,000

$1,630,000

$500,000

$280,000

$200,000

$190,000

$3,290,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

407.00

425.00

427.00

1072.00

1076.00

1077.00

1078.00

1085.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

407.00

966.02

427.00

1072.00

1076.00

1077.00

1078.00

1085.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2012

2014

2010

2010

2012

2012

2014

2010

2004

2014

2010

2010

2012

2012

2014

21.82

1.375

2.395

.209

.733

4.567

.4

18.017

21.97

1.667

2.568

.309

.833

4.607

.54

18.071

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 24: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 24

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON COVERT RUN PIKE (CR-1363) (0.048) OVER TRIBUTARY TOTAYLOR CREEK. (SR=11.9) 019C00069N

RECONSTRUCT KY 9 ALONG A NEW ROUTE FROM NORTH OF 10TH STREET TO5TH STREET. (2014BOP)

CONSTRUCT NEW I-471 SOUTHBOUND OFF-RAMP AT KY-8 (SEE ALSO 6-183.00).(02CCN)(06CCN)

TRANSPORTATION IMPROVEMENTS TO AA-I-275 CONNECTOR, CAMPBELLCOUNTY. (2005HPP-KY155)(SEE 6-8105.00 FOR "KYD" COMPONENT)(06CCR)(10CCR)

TRANSPORTATION IMPROVEMENTS TO AA-I-275 CONNECTOR, CAMPBELLCOUNTY. (2005HPP-KY166)(SEE 6-8105.00 FOR "KYD" COMPONENT)

CONSTRUCT NEW TECHNOLOGY TRIANGLE ACCESS ROAD, CAMPBELL COUNTY,KENTUCKY. (2005HPP-KY126)(2006BOPC).(10CCR)

REPAVING AND DRAINAGE IMPROVEMENTS ON LINCOLN ROAD BETWEENWARD AVENUE AND WOODLYN RIDGE (1/2 MILE) IN THE CITY OFBELLEVUE.(14CCN)

SPOT IMPROVEMENTS AND MINOR REPAIR WORK WITHIN THE CITY OFDAYTON. (14CCN)

SPOT IMPROVEMENTS AND MINOR REPAIR WORK WITHIN THE CITY OFHIGHLAND HEIGHTS. (14CCN)

SPOT IMPROVEMENTS AND MINOR REPAIR WORK WITHIN THE CITY OFNEWPORT. (16CCN)

.100

.459

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CR-1363

KY-9

I-471

I-275

I-275

-

CS-2079

-

-

-

$175,000

$4,000,000

$2,700,000

$940,402

$7,249,112

$1,439,839

$1,000,000

$500,000

$500,000

$1,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

R

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2016

2016

2017

2017

2016

2016

2017

2017

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

SPP

SP

HPP

HPP

HPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$175,000

$4,000,000

$2,700,000

$940,402

$7,249,112

$1,439,839

$1,000,000

$500,000

$500,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

06

06

1095.00

8101.25

8104.00

8105.01

8105.02

8105.03

8802.00

8804.00

8805.00

8904.00

-

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

06

06

1095.00

8101.20

8104.00

8105.01

8105.02

191.00

8802.00

8804.00

8805.00

8904.00

-

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2014

2002

2004

2004

2004

2014

2014

2014

2016

2016

2014

2002

2004

2004

2004

2014

2014

2014

2016

.045

4.722

0

.051

4.822

.459

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RESURFACING(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / SPOT IMPROVEMENTS(O)

SAFETY / SAFETY(P)

Page 25: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 25

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

SPOT IMPROVEMENTS AND MINOR REPAIR WORK WITHIN THE CITY OFSOUTHGATE. (16CCN)

DESIGN A ROUNDABOUT AT KY 8 AND O'FALLON AVENUE IN DAYTON.(16CCN)

CORRECT GEOMETRIC DEFICIENCIES AT INTERSECTION OF US-51/US-62/FRONTST/ELM ST IN BARDWELL TO ADDRESS FLOW, SAFETY, AND ACCESSISSUES.(12CCR)

REPLACE BRIDGE OVER KENTUCKY RIVER ON US 42 INPRESTONSVILLE/CARROLLTON 0.13 MI E OF KY 55. (021B00043N)(SR=27.8)

KY-7 (CAROL MALONE BLVD.) WIDENING FROM LITTLE SANDY RIVER BRIDGETO ACADEMIC PARKWAY. (08CCR)(12CCR)(16CCR)

REPLACE BRIDGE ON US-60 (MP 26.172) OVER UPPER STINSON CREEK; 1.5 MI E OFE-JCT KY 1; (STRUCTURALLY DEFICIENT, SR=29.6) 022B00064N (AR/W)

REPLACE BRIDGE ON US-60 (MP 4.111) OVER TYGARTS CREEK; .75 MI E OF JCT KY1662; (STRUCTURALLY DEFICIENT, SR=47) 022B00037N

REPLACE BRIDGE ON KY 474 OVER SMITH CREEK IN CARTER AT INTERSECTIONOF KY 474 AND NUNN ROAD(CR 1507)(SR 40.1) 022B00123N

SAFETY IMPROVEMENTS AT THE EAST CARTER HIGH SCHOOL.(06CCN)(08CCR)(12CCR)

.100

.250

.980

.100

.100

.100

CAMPBELL

CAMPBELL

CARLISLE

CARROLL

CARTER

CARTER

CARTER

CARTER

CARTER

-

KY-8

US-51

US-42

KY-7

US-60

US-60

KY-474

KY-1

$500,000

$1,500,000

$250,000

$4,500,000

$3,640,000

$1,100,000

$990,000

$930,000

$3,520,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

D

R

U

C

C

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2018

2016

2020

2021

2021

2019

2016

2016

2017

2016

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

BRX

BRX

BRX

SPP

BRO

BRO

BRX

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$1,500,000

$250,000

$2,080,000

$1,740,000

$680,000

$3,640,000

$1,100,000

$990,000

$930,000

$870,000

$570,000

$2,080,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

01

06

09

09

09

09

09

8907.00

8908.00

333.00

1084.00

144.00

1072.00

1075.00

1081.00

8311.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

01

06

09

09

09

09

09

8907.00

8908.00

333.00

1084.00

144.00

1072.00

1075.00

1081.00

8311.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2012

2014

1998

2010

2010

2012

2006

2016

2016

2012

2014

1998

2010

2010

2012

2006

7.8

5.697

10.318

26.072

4.061

5.062

10.08

7.9

5.947

10.865

26.172

4.161

5.102

10.18

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

Page 26: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 26

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

SAFETY IMPROVEMENTS TO KY-773 FROM KY-7 TO KY-1. (06CCN)(08CCR)

SAFETY IMPROVEMENTS TO KY-773 AT KY-7: ADD LEFT-TURN LANE ANDIMPROVE SIGHT DISTANCE ON KY-7. (06CCN)(2006BOPC)(08CCR)(10CCR)(12CCR)

DESIGN BRIDGES IN CONJUNCTION WITH PROJECT 9-8312. (08CCN)

REPLACE BRIDGE ON CR-1169 (0.059) OVER SOUTH FORK CREEK. (SR=23)023C00029N

NEW ALIGNMENT FROM MP 16.8 TO MP 17.4 (12CCN)

CORRECT VERTICAL ALIGNMENT ON US 127 AND KY 1552 NEARINTERSECTION.(12CCN)

RECONSTRUCT BELL HILL FROM MP 10.4 TO MP 11.9.(12CCN)(16CCR)

RECONSTRUCT BRUSHY CREEK HILL FROM MP 1.8 TO MP 2.8.(12CCN)(16CCR)

3.400

.100

.060

.300

1.500

1.000

CARTER

CARTER

CARTER

CASEY

CASEY

CASEY

CASEY

CASEY

KY-773

KY-773

KY-773

CR-1169

KY-70

US-127

KY-70

KY-49

$230,000

$600,000

$7,170,000

$250,000

$1,760,000

$1,570,000

$4,980,000

$3,610,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

R

U

C

R

U

C

D

D

R

U

D

R

U

D

R

D

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2016

2017

2017

2017

2018

2021

2016

2018

2018

2016

2018

2018

2019

2021

2019

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SP

SPP

SPP

SPP

BRZ

SP

SP

SP

SP

SP

SP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$120,000

$110,000

$50,000

$50,000

$500,000

$560,000

$370,000

$6,240,000

$250,000

$780,000

$480,000

$500,000

$780,000

$530,000

$260,000

$1,560,000

$3,420,000

$1,250,000

$1,320,000

$1,040,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

08

08

08

08

08

8312.00

8312.10

8506.00

1067.00

8701.00

8702.00

8703.00

8704.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

08

08

08

08

08

8312.00

8312.00

8506.00

1067.00

8701.00

8702.00

8703.00

8704.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2006

2008

2016

2012

2012

2012

2012

2006

2006

2008

2016

2012

2012

2012

2012

.1

0

1

.051

16.8

18.746

10.4

1.8

3.505

.1

1.3

.067

17.4

19.046

11.9

2.8

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / DESIGN ENGINEERING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

Page 27: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 27

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REALIGN KY 501 TO INTERSECT KY 70 EAST OF EXISTING LOCATION ANDCORRECT VERTICAL ALIGNMENT OF KY 70 NEAR EXISTINGINTERSECTION.(12CCN)

CONSTRUCT A NEW STORM DRAINING SYSTEM, CURB AND GUTTER FROMBELDON AVENUE EASTWARD AND CONSTRUCT A NEW LEFT TURN ONTOCOLLEGE STREET.(12CCN)

EXTEND KY-1682 FROM THE E.T. BREATHITT PARKWAY TO US-68/KY-80 EAST OFHOPKINSVILLE (HOPKINSVILLE NORTHEAST BYPASS). (16CCR)

WIDEN KY-911 FROM US-41A TO OAK GROVE.(12CCR)

RECONSTRUCT KY 1007 FROM US 68 TO SANDERSON ROAD INHOPKINSVILLE.(12CCR)(14CCR)(16CCR)

CONSTRUCT NEW CONNECTOR FROM US 41 NEAR THE INDUSTRIAL PARK TO KY115 SOUTH OF PEMBROKE. (16CCR)

RECONSTRUCT THE BREATHITT PARKWAY INTERCHANGE AT KY 1682 NORTHOF HOPKINSVILLE. (BREATHITT PARKWAY/FUTURE INTERSTATE SPURPROJECT) (16CCR)

.180

.368

4.000

1.800

1.724

2.500

CASEY

CASEY

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

KY-501

KY-70X

KY-1682

KY-911

KY-1007

US-41

EB-9004

$1,750,000

$3,530,000

$10,050,000

$8,800,000

$14,500,000

$14,000,000

$3,000,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

D

R

U

C

U

C

D

R

U

C

D

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2018

2018

2019

2016

2018

2018

2017

2020

2020

2016

2017

2018

2019

2020

2021

2022

2019

2020

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SP

SP

SP

STP

STP

STP

STP

SB2

SB2

SPP

SPP

SPP

SPP

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$520,000

$80,000

$250,000

$900,000

$780,000

$1,660,000

$1,090,000

$2,940,000

$4,700,000

$2,410,000

$8,800,000

$3,250,000

$11,250,000

$1,000,000

$300,000

$700,000

$12,000,000

$1,000,000

$1,000,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

02

02

02

02

02

8705.00

8706.00

136.00

180.00

227.00

381.00

898.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

08

02

02

02

02

02

8705.00

8706.00

136.00

180.00

227.00

381.00

898.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2000

2006

2012

2016

2016

2012

2012

2000

2006

2012

2016

2016

11

2.407

0

.785

11.18

2.775

1.835

2.509

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

Page 28: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 28

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

ADDRESS CONGESTION AND MOBILITY OF US 68 FROM KY 91 TO KY 1007 INHOPKINSVILLE.

REPLACE BRIDGE ON SUB STATION RD (CR 1116) OVER CSX RR 0.04 MILE E OF US41 (SR 34.4) 024C00034N

REPLACE BRIDGE OVER CSX RR ON WALNUT STREET (US 41A) IN HOPKINSVILLE475 FT NE OF EAST 21ST STREET (CS 1016) (024B00112N) (SR=30.3)

REPLACE BRIDGE OVER N FORK LITTLE RIVER ON MILBROOKE DRIVE (CS 1262)500 FT SW OF KAREN DRIVE (CS 1268) (SR 6) 024C00081N

WIDEN KY 107 TO THREE LANES FROM GREENWAY LANE TO KY380.(12CCN)(14CCR)

IMPROVE AND WIDEN KY 115 FROM ANDERSON ROAD (MP 6.87) TO JUST SOUTHOF PEMBROKE (MP 9.625)(16CCN)

IMPROVE AND WIDEN KY 115 FROM I-24 (MP 2.901) TO ANDERSON ROAD (MP6.87).(16CCN)

.900

.032

.038

.346

2.755

3.969

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

US-68

CR-1116

US-41A

CS-1262

KY-107

KY-115

KY-115

$9,950,000

$770,000

$3,410,000

$1,650,000

$4,720,000

$1,000,000

$1,300,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

D

R

U

C

D

R

U

C

R

U

C

D

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2021

2021

2022

2016

2016

2017

2019

2021

2021

2022

2017

2018

2018

2019

2016

2016

2017

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

BRZ

BRZ

BRZ

BRX

BRX

BRX

BRX

BRZ

BRZ

BRZ

BRZ

SPP

SPP

SPP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,200,000

$1,750,000

$1,500,000

$5,500,000

$150,000

$120,000

$500,000

$550,000

$120,000

$400,000

$2,340,000

$350,000

$150,000

$350,000

$800,000

$1,110,000

$1,360,000

$2,250,000

$1,000,000

$1,300,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

899.00

1085.00

1089.00

1094.00

8703.00

8953.00

8954.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

02

02

899.00

1085.00

1089.00

1094.00

8703.00

8953.00

8954.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2012

2014

2014

2012

2016

2016

2016

2012

2014

2014

2012

2016

2016

.019

15.386

.372

16.823

.059

15.418

.41

17.169

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / SAFETY(P)

SAFETY / SAFETY(P)

Page 29: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 29

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT EB REST AREA

REPLACE BRIDGE ON KY-974 (MP 10.924) OVER DRY FORK; .05 MI E-CR 1124@ALLNSVL; (STRUCTURALLY DEFICIENT, SR=23.1) 025B00090N

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION EIGHT FROM MILEPOST12.45 TO MILEPOST 14.32. (06CCN)(12CCR)(16CCR)

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION SEVEN FROM MILEPOST10.09 TO MILEPOST 10.88. (06CCN)(12CCR)

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION SIX FROM MILEPOST 9.30 TOMILEPOST 9.69. (06CCN)(12CCR)

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION FIVE FROM MILEPOST 7.02TO MILEPOST 7.51. (06CCN)(12CCR)

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION THREE FROM MILEPOST 3.06TO MILEPOST 4.28. (06CCN)(12CCR)

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION TWO FROM MILEPOST 1.96TO MILEPOST 2.93. (06CCN)(12CCR)

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION ONE FROM MILEPOST 0.96TO MILEPOST 1.96. (06CCN)(12CCR)

.100

1.870

.790

.400

.500

1.200

1.000

1.000

CLARK

CLARK

CLARK

CLARK

CLARK

CLARK

CLARK

CLARK

CLARK

I-64

KY-974

KY-89

KY-89

KY-89

KY-89

KY-89

KY-89

KY-89

$4,000,000

$570,000

$6,420,000

$440,000

$220,000

$220,000

$550,000

$400,000

$570,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

R

U

C

D

D

P

D

D

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2016

2016

2017

2016

2016

2018

2016

2016

2016

2016

2016

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

IM

BRX

BRX

BRX

SPP

SPP

SPP

SP

SP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$4,000,000

$100,000

$90,000

$380,000

$1,260,000

$1,560,000

$3,600,000

$440,000

$220,000

$220,000

$550,000

$400,000

$570,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

07

6.00

1121.00

8302.00

8307.00

8308.00

8309.00

8310.00

8311.00

8312.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

07

07

07

6.00

1121.00

8302.00

8307.00

8308.00

8309.00

8310.00

8311.00

8312.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

1996

2010

2006

2006

2006

2006

2006

2006

2006

1996

2010

2006

2006

2006

2006

2006

2006

2006

98.041

10.874

12.45

10.09

9.3

7.02

3.06

1.96

.96

98.541

10.974

14.32

10.88

9.69

7.51

4.28

2.93

1.96

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / REST AREA REHAB(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

Page 30: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 30

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

EXTEND THE WINCHESTER EAST BYPASS (KY 1958) FROM IRVINE ROAD (KY 89)TO KY 627 SOUTH OF WINCHESTER. (08CCN)(10CCR)

ERECT A FOUR-WAY TRAFFIC CONTROL SIGNAL AT THE INTERSECTION OF US-60 AND BREEZE HILL DRIVE. (08CCN)

RECONSTRUCT I-64/MOUNTAIN PARKWAY INTERCHANGE TO ADD NEW RAMPSTO AND FROM THE EAST.(12CCR)(14CCR)(16CCR)

EXTEND FULTON ROAD. (BY COUNTY)(10CCN)

RECONSTRUCT US 60 FOR SAFETY IMPROVEMENTS FROM I-64 IN CLARKCOUNTY (MP 14.210)) TO 500 FEET WEST OF SEWELL SHOP ROAD (MP17.032).(16CCN)

WEST BYPASS OF MANCHESTER (GRADE, DRAIN & INCIDENTAL SURFACING).(RU-04DEOB)(10CCR)

CORRECT STANDARDIZED ROADWAY GEOMETRICS AND ADDRESS SAFETYISSUES FROM SOUTH OF ENGINE BRANCH ROUTE TO US 421 (MP 7.2 TO MP 8.9).

REPLACE BRIDGE ON US 421 OVER ISLAND CREEK AT INTERSECTION OF US 421 &BOWLING BRANCH RD (CR 1346)(SR 27.8) 026B00001N

.030

2.575

3.600

CLARK

CLARK

CLARK

CLARK

CLARK

CLAY

CLAY

CLAY

KY-1958

US-60

I-64

-

US-60

US-421

KY-11

US-421

$37,510,000

$50,000

$14,220,000

$1,410,000

$55,000,000

$63,270,000

$3,100,000

$2,100,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

R

U

C

C

D

R

U

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2016

2018

2018

2019

2016

2017

2019

2021

2022

2020

2020

2022

2019

2021

2021

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SP

NH

NH

NH

SB2

SP

SP

SP

SP

SP

SP

SP

STP

STP

STP

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$37,510,000

$50,000

$1,700,000

$900,000

$11,620,000

$1,410,000

$2,000,000

$6,000,000

$10,500,000

$36,500,000

$6,180,000

$2,930,000

$54,160,000

$500,000

$2,000,000

$600,000

$2,100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

11

11

11

8401.00

8410.00

8506.01

8639.00

8952.00

273.01

364.00

1088.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

11

11

11

8401.00

8410.00

8506.00

8639.00

8952.00

273.01

364.00

1088.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2008

2012

2010

2016

1996

2016

2012

2008

2008

2008

2010

2016

1996

2016

2012

4.94

95.1

7.2

20.462

4.97

97.675

8.9

20.502

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BYPASS(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 31: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 31

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON BEECH CREEK RD (CR 1004) OVER GOOSE CREEK ATINTERSECTION WITH CHANDLER BRANCH RD (CR 1003)(SR 30.8) C00001N

REPLACE BRIDGE ON MILL CREEK ROAD (CR 1154) OVER GOOSE CREEK AT JCTWITH KY 1524 (SR 47) 026C00025N

REPLACE BRIDGE OVER OTTER CREEK ON OTTER CREEK ROAD (CR 1160) ATJUNCTION WITH MAY FORK ROAD (CR 1158)(026C00031N)(SR=2)

RECONSTRUCT KY-2432 FROM SECOND STREET IN EAST MANCHESTER NORTHTO THE LEFT FORK OF COAL HOLLOW ROAD (MP 2.10)(00CCN)(06CCR)(08CCR)(10CCR)

WIDEN US-421/KY-80 TO THREE LANES FROM KY 80 SOUTH TO KY-149(LOCKARTS CREEK ROAD). (00CCN)(10CCR)(12CCR)

CONSTRUCT A NEW ENTRANCE TO THE GREEN PARK FROM US-421 TO END NEARCEMETERY. (10CCN)(12CCR)

REPLACE BRIDGE OVER CURRY BRANCH ROAD IN CLAY COUNTY.(12CCN)

RECONSTRUCT EXISTING S-CURVE FROM MP 32.9 TO MP 33.5 TO IMPROVEGEOMETRICS.(14CCN)

IMPROVE SAFETY AND SIGHT DISTANCE ALONG KY 638 (MP 6.7 TO MP 7.1) ANDITS INTERSECTION WITH KY 3476. (14CCN)

.016

1.230

2.060

.040

.600

.400

CLAY

CLAY

CLAY

CLAY

CLAY

CLAY

CLAY

CLAY

CLAY

CR-1004

CR-1154

CR-1160

KY-2432

US-421

US-421

CR-1263

KY-66

KY-638

$2,000,000

$750,000

$570,000

$16,540,000

$25,700,000

$3,150,000

$960,000

$300,000

$1,840,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

R

U

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2018

2019

2020

2020

2022

2016

2016

2022

2016

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

SB2

SPP

SP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,000,000

$750,000

$150,000

$30,000

$50,000

$340,000

$16,540,000

$25,700,000

$3,150,000

$960,000

$300,000

$1,840,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

11

11

1091.00

1092.00

1099.00

8001.00

8003.00

8632.00

8711.00

8856.00

8861.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

11

11

1091.00

1092.00

1099.00

8001.00

8003.00

8632.00

8711.00

8856.00

8861.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2014

2000

2000

2010

2012

2014

2014

2012

2012

2014

2000

2000

2010

2012

2014

2014

.144

0

2.01

.351

13.692

.281

32.9

6.7

.184

.035

2.026

1.58

16.915

.321

33.5

7.1

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

Page 32: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 32

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

IMPROVE GEOMETRICS ALONG URBAN CREEK ROAD (CR 1286) AND, INCLUDINGINTERSECTIONS AT HAL ROGERS PARKWAY AND KY 687. (14CCN)

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM CLAY/LAUREL LINE TO MANCHESTER (JUST PAST EXIT 20 ATBRIDGE OVER KY 80/US 421), MP 10.593 TO MP 21.498 (SEGMENT 7). (16CCN)

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM MANCHESTER TO CLAY/LESLIE LINE; MP 21.498 TO MP 35.929(SEGMENT 8) (16CCN)

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM MANCHESTER TO CLAY/LESLIE LINE; MP 21.498 TO MP 35.929.(SEGMENT 8)(ADDITIONAL FUNDS FOR 11-8911.00 C PHASE) (16CCN)

RECONSTRUCT AND IMPROVE EXISTING ALIGNMENTS, WITH SHOULDERS, OFBARBOURVILLE - MANCHESTER ROAD (KY 11) FROM THE KNOX-CLAY COUNTYLINE (MP 0.0) TO US 421 IN CLAY COUNTY (MP 8.891). (16CCN)

REPLACE BRIDGE OVER CLEAR FORK CREEK ON KY 738 0.2 MI S OF US 127X.(027B00011N)(SR=31.5)

RELOCATION OF US 127 FROM APPROX 1.14 MI N OF INTERSECTION OF KY 3063 &OLD US 127, EXTENDING N TO KY 1730, LOCATED APPROX 0.36 MI E OF THEINTER. OF KY 1730 & MANNTOWN RD.(SEE 8-108 & 8-115 FORPE&ENV)(12CCR)(G&D)(SEE 8-8601.27 FOR SURFACING)(14CCR)

3.067

.010

21.300

CLAY

CLAY

CLAY

CLAY

CLAY

CLINTON

CLINTON

CR-1286

HR-9006

HR-9006

HR-9006

KY-11

KY-738

US-127

$6,100,000

$125,000,000

$131,000,000

$30,900,000

$3,000,000

$1,000,000

$28,960,000

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

D

R

U

C

C

D

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2016

2018

2019

2020

2016

2019

2020

2021

2021

2021

2019

2021

2021

2022

2016

2019

2019

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SP

SP

SP

SPP

SP

SP

SP

SP

SP

BRX

BRX

BRX

BRX

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$6,100,000

$1,000,000

$15,000,000

$11,000,000

$98,000,000

$1,000,000

$18,000,000

$13,000,000

$99,000,000

$30,900,000

$3,000,000

$250,000

$100,000

$10,000

$640,000

$2,300,000

$1,110,000

$550,000

$25,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

08

08

8864.00

8910.00

8911.00

8911.10

8957.00

1062.00

8601.26

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

RUSSELL

11

11

11

11

11

08

08

8864.00

8910.00

8911.00

8911.10

8957.00

1062.00

8601.26

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2016

2016

2016

2016

2014

2012

2014

2016

2016

2016

2016

2014

2012

0

21.498

21.498

6.478

11.017

3.067

35.929

35.929

6.488

20.967

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RELOCATION(O)0 11.4Milepoints: To:From:

Page 33: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 33

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RELOCATION OF US 127 FROM APPROX 0.18 MI E OF THE INTERSECTION OFAARON RIDGE RD AND OLD US 127, EXTENDING N TO APPROX 1.14 MI N OF THEINTERSECTION OF KY 3063 AND OLD US 127. (SEE 8-108 AND 8-115 FORPE&ENV)(12CCR)(G&D)(SEE 8-8601.31 FOR SURFACING)

RECONSTRUCTION OF US 127 FROM APPROX 0.18 MI E OF THE INTERSECTION OFAARON RIDGE RD AND OLD US 127, EXTENDING N TO APPROX 1.14 MI N OF THEINTERSECTION OF KY 3063 AND OLD US 127. (SEE 8-108 AND 8-115 FORPE&ENV)(12CCR)(SURFACING)(SEE 8-8601.30 FOR G&D)

RELOCATION OF US 127 FROM APPROX 1.14 MI N OF INTERSECTION OF KY 3063 &OLD US 127, EXTENDING N TO KY 1730, LOCATED APPROX 0.36 MI E OF THEINTER. OF KY 1730 & MANNTOWN RD.(SEE 8-108 & 8-115 FORPE&ENV)(ADDITIONAL C-FUNDS FOR 8-8601.26)

MARION TO FREDONIA; SURFACING AND INCIDENTAL GRADE ANDDRAIN.(12CCR)(14CCR)

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2017.(12CCR)

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2018.(12CCR)

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2019.(12CCR)

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2020.(12CCR)

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2021.

2.370

21.300

5.200

CLINTON

CLINTON

CLINTON

CRITTENDEN

CRITTENDEN

CRITTENDEN

CRITTENDEN

CRITTENDEN

CRITTENDEN

US-127

US-127

US-127

US-641

KY-91

KY-91

KY-91

KY-91

KY-91

$30,860,000

$4,000,000

$26,300,000

$13,000,000

$402,000

$402,000

$402,000

$402,000

$402,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2018

2018

2020

2020

2022

2016

2017

2018

2019

2020

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SP

NH

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,600,000

$1,680,000

$580,000

$27,000,000

$4,000,000

$26,300,000

$13,000,000

$402,000

$402,000

$402,000

$402,000

$402,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

08

01

01

01

01

01

01

8601.30

8601.31

8601.32

187.23

326.14

326.15

326.16

326.17

326.18

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

RUSSELL

CALDWELL

08

08

08

01

01

01

01

01

01

8601.30

8601.31

8601.26

187.20

326.14

326.15

326.16

326.17

326.18

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2016

2006

2012

2012

2014

2014

2016

2012

2014

2012

2000

2012

2012

2014

2014

2016

11.017

11.162

11.162

11.162

11.162

11.162

20.967

11.262

11.262

11.262

11.262

11.262

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

0 11.4Milepoints:

Milepoints:

To:

To:

From:

From:

Page 34: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 34

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2022.

REPLACE BRIDGE ON CR-1085 (0.048) OVER HUGHES BRANCH (SR=22.7) 028C00053N

SHOULDER TREATMENT ON KY 61 FROM JOE SCOTT RIDGE ROAD, SOUTH TOTHE TENNESSEE LINE.(2006BOPC)(10CCR)(12CCR)(14CCN)

REPLACE BRIDGE OVER CUMBERLAND RIVER ON KY 61 0.1 MI N OF COLDSPRINGS ROAD (CR 1204).(029B00012N)(SR=32)

REPLACE BRIDGE OVER CUMBERLAND RIVER ON KY 90 0.27 MI SE OF KY 61 ATTHE SCL OF BURKESVILLE. (029B00027N)(SR=35.4)

RECONSTRUCT KY-90 FROM NORRIS BRANCH WESTERLY TO KY-496 NEARMARROWBONE. (14CCN)

RECONSTRUCT INTERSECTION AT FAIRVIEW DRIVE (KY 3143) AND KY 298.(12CCR) (16CCR)

3.800

.140

.360

5.085

.100

CRITTENDEN

CRITTENDEN

CUMBERLAND

CUMBERLAND

CUMBERLAND

CUMBERLAND

DAVIESS

KY-91

CR-1085

KY-61

KY-61

KY-90

KY-90

KY-298

$402,000

$300,000

$930,000

$4,600,000

$6,100,000

$30,500,000

$5,100,000

Total

Total

Total

Total

Total

Total

Total

C

D

C

D

R

U

C

D

R

U

C

D

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2022

2021

2017

2016

2017

2017

2019

2016

2017

2017

2018

2017

2019

2019

2021

2016

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

BRZ

SPP

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

SP

SP

SP

SP

SB2

SB2

SB2

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$402,000

$300,000

$930,000

$500,000

$50,000

$50,000

$4,000,000

$500,000

$50,000

$50,000

$5,500,000

$3,500,000

$3,200,000

$1,800,000

$22,000,000

$600,000

$1,000,000

$3,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

08

08

08

08

02

326.19

1159.00

150.00

1060.00

1061.00

8852.00

229.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

99

08

08

08

02

326.19

1159.00

278.14

1060.00

1061.00

8852.00

229.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2006

2014

2014

2014

2012

2016

2016

2006

2014

2014

2014

2012

11.162

.044

0

9.945

14.127

5.347

7.7

11.262

.052

12.769

10.085

14.459

10.432

7.8

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PAVEMENT REHAB-PRI(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

Page 35: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 35

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT ON US 60 BETWEEN OAKFORD RD LOOP (CR 1370) TO ADDRESSFLOODING PROBLEM IN THE VICINITY OF THE KIMBERLY-CLARK PLANT(14CCR)

TRANSPORTATION IMPROVEMENTS TO US 60 OWENSBORO, DAVIESS COUNTY.(2005HPP-KY158)(2005HPP-KY167)(SEE 2-287.20 FOR "STP" COMPONENT)

REPLACE BRIDGE OVER BURNETT FORK ON FIELDS RD (CR 1014) 0.75 MI W OF KY142 030C00001N SR 39 (14CCR)

UPGRADE THE NATCHER PARKWAY TO INTERSTATE STANDARDS IN ORDER TOESTABLISH "I-565"SPUR ROUTE BETWEEN BOWLING GREEN AND OWENSBORO.

UPGRADE THE NATCHER PARKWAY TO INTERSTATE STANDARDS IN ORDER TOESTABLISH "I-565"SPUR ROUTE BETWEEN BOWLING GREEN AND OWENSBORO.

WIDENING KY-54 FROM THE US-60 BYPASS TOWARD WHITESVILLE FROMMILEPOST 4.51 TO MILEPOST 8.0. (06CCN)(10CCR)(12CCR)(14CCR)(16CCR)

ADDRESS SUBSTANDARD ROADWAY GEOMETRICS AND SAFETY CONCERNS ONKY 1456 FROM KY 54 TO HAYDEN ROAD. MP 2.778 TO 4.714 (SEE 2-8709.00)(14CCN)(16CCR)

GRAVES LANE BRIDGE REPLACEMENT-0.2 MI E JCT KY 405 (MM 1.005-1.009) OVERALLGOOD DITCH. (14CCN)(SR 47.5) 030C00016N

.592

2.200

.014

3.500

1.936

.004

DAVIESS

DAVIESS

DAVIESS

DAVIESS

DAVIESS

DAVIESS

DAVIESS

DAVIESS

US-60

US-60

CR-1014

WN-9007

WN-9007

KY-54

KY-1456

CR-1053

$3,000,000

$2,000,000

$500,000

$10,000,000

$11,000,000

$64,480,000

$14,250,000

$915,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

R

U

C

C

C

R

U

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2016

2016

2016

2017

2018

2020

2017

2018

2019

2016

2016

2018

2016

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

HPP

BRZ

BRZ

BRZ

NH

NH

SPP

SPP

SPP

SPP

SPP

SB2

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$500,000

$2,000,000

$2,000,000

$75,000

$75,000

$350,000

$10,000,000

$11,000,000

$13,000,000

$17,730,000

$33,750,000

$1,500,000

$1,500,000

$11,250,000

$75,000

$80,000

$760,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

02

237.00

287.52

1093.00

2092.00

2092.01

8300.00

8801.00

8813.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OHIO

OHIO

02

02

02

02

02

02

02

02

237.00

287.52

1093.00

2092.00

2092.01

8300.00

8801.00

8813.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2004

2014

2016

2016

2006

2014

2014

2014

2004

2014

2016

2016

2006

2014

2014

5.69

1.326

4.505

2.778

1

6.282

1.34

8.003

4.714

1.014

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Milepoints:

Milepoints:

To:

To:

From:

From:

Page 36: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 36

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

EXTEND THE CURRENT 4 LANES TO THE ROUNDABOUT AT KY-56/KY-81. (14CCN)

WIDEN KY 3143 TO 3 LANES WITH CURB AND GUTTER FROM KY 3335 TO KY 54.(14CCN)

WIDEN KY 331 LANE AND SHOULDERS FROM INTERSECTION WITH SECONDSTREET (MP 0.436) TO HARBOR ROAD (MP 1.991). (16CCN)

RECONSTRUCT KY-70/KY-259 FROM 0.36 MILE NORTH GREEN RIVER BRIDGE ATBROWNSVILLE TO 0.42 MILE NORTH OF THE KY-70/KY-259INTERSECTION.(06CCR)(2004BOPC)(12CCR)(14CCR)

RECONSTRUCT KY-259 FROM 0.42 MILE NORTH OF THE KY-70 INTERSECTION TONORTH OF THE KYROCK ELEMENTARY SCHOOL (PRIORITY SECTION).(2004BOPC)

RECONSTRUCT KY-32 FROM 0.408 MILES WEST OF STEGALL COLD SPRING ROADTO KY-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)(06CCR) (08CCR)(10CCR)(12CCR)(14CCR)(16CCR)

RECONSTRUCT KY-32 FROM 0.408 MILES WEST OF STEGALL COLD SPRING ROADTO KY-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)(16CCR)

.556

1.129

.900

3.400

6.656

6.656

DAVIESS

DAVIESS

DAVIESS

EDMONSON

EDMONSON

ELLIOTT

ELLIOTT

KY-81

KY-3143

KY-331

KY-259

KY-259

KY-32

KY-32

$3,800,000

$12,855,000

$800,000

$8,490,000

$25,610,000

$38,620,000

$20,000,000

Total

Total

Total

Total

Total

Total

Total

U

C

D

R

U

C

D

R

U

C

R

U

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2017

2016

2017

2017

2018

2022

2017

2017

2018

2016

2016

2018

2017

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SP

SPP

SPP

SPP

SP

SP

SP

STP

STP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$800,000

$3,000,000

$630,000

$2,475,000

$3,000,000

$6,750,000

$800,000

$1,540,000

$1,470,000

$5,480,000

$3,480,000

$1,690,000

$20,440,000

$7,720,000

$10,900,000

$20,000,000

$20,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

03

03

09

09

8851.00

8854.00

8952.00

7030.10

7030.50

192.01

192.02

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

03

03

09

09

8851.00

8854.00

8952.00

7030.00

7030.00

192.00

192.02

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2016

2004

2004

2006

2016

2014

2014

2016

1998

1998

2006

2016

11.13

1.829

11.676

12.096

2

2

11.686

2.958

12.096

16.204

8.656

8.656

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

Page 37: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 37

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT KY-32 FROM KY-504 NEAR ELLIOTTVILLE TO 0.408 MI WEST OFSTEGALL COLD SPRING ROAD IN ELLIOTT COUNTY. (10CCR)(16CCN)

RECONSTRUCT KY-32 FROM KY-504 NEAR ELLIOTTVILLE TO 0.408 MI WEST OFSTEGALL COLD SPRING ROAD IN ELLIOTT COUNTY. (16CCN)

RECONSTRUCT KY 7 FROM SOUTH CITY LIMITS OF SANDY HOOK TOWARDWRIGLEY. (12CCR)(16CCR)

RECONSTRUCT KY 7 FROM SOUTH CITY LIMITS OF SANDY HOOK TOWARDWRIGLEY. (12CCR)(16CCN).

RECONSTRUCT KY 7 FROM SOUTH CITY LIMITS OF SANDY HOOK TOWARDWRIGLEY. (12CCR) (16CCN).

KY-32 FROM 9.2 MILE MARKER TO 10.2 MILE MARKER WIDENING.(14CCN)(16CCR)

RECONSTRUCT KY-89 FROM 260' SOUTH OF RICE ST. IN IRVINE TO THE IRVINEBY-PASS.(10CCR)

NEW CIRCLE ROAD REHAB AND WIDENING FROM LEESTOWN ROAD TO NEARGEORGETOWN ROAD. (12CCR)(14CCR)

6.956

1.000

.900

3.400

ELLIOTT

ELLIOTT

ELLIOTT

ELLIOTT

ELLIOTT

ELLIOTT

ESTILL

FAYETTE

KY-32

KY-32

KY-7

KY-7

KY-7

KY-32

KY-89

KY-4

$55,000,000

$22,000,000

$41,380,000

$9,500,000

$9,500,000

$9,200,000

$6,200,000

$18,000,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

D

R

U

C

C

C

D

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2018

2020

2021

2018

2018

2019

2020

2021

2022

2017

2017

2017

2019

2016

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

SP

SP

SP

SP

STP

SP

SP

SP

SP

SP

STP

STP

STP

STP

SPP

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$5,000,000

$9,000,000

$6,000,000

$35,000,000

$22,000,000

$3,380,000

$12,000,000

$6,000,000

$20,000,000

$9,500,000

$9,500,000

$750,000

$850,000

$600,000

$7,000,000

$6,200,000

$18,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

10

07

192.03

192.04

228.00

228.10

228.20

8802.00

363.10

113.02

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MORGAN

09

09

09

09

09

09

10

07

192.03

192.04

228.00

228.10

228.20

8802.00

363.00

113.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2012

2016

2016

2014

2000

2014

2016

2016

2012

2016

2016

2014

1996

2006

0

0

9.2

11.851

7.26

2

6.956

10.2

12.811

8.26

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

7.887 11.121Milepoints: To:From:

Page 38: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 38

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT/WIDEN US-25 FROM SPURR ROAD SOUTH OF I-75 TO 1400 FEETSOUTH OF IRONWORKS ROAD. (06CCN)(08CCR)(10CCR)(12CCR)(16CCR)

RICHMOND ROAD MULTIUSE PATH IN LEXINGTON BETWEEN EAGLE CREEKDRIVE AND JACOBSON PARK. (LOCAL MATCH) (ALL WORK BY LFUCG)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

CLAYS MILL ROAD; WIDEN FROM HARRODSBURG ROAD TO NEW CIRCLE ROAD(SECTION 1) (LFUCG T.I.P.) (LOCAL MATCH) (ALL WORK BY LFUCG)(CONSTRUCTION SEQU. 2) (SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2017. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2019. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)

3.200

1.000

1.900

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

US-25

US-25

CS-4174

-

-

-

-

-

-

$34,970,000

$690,000

$13,415,000

$3,900,000

$4,600,000

$8,000,000

$8,200,000

$8,200,000

$8,200,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

R

U

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2018

2017

2016

2016

2017

2017

2018

2019

2020

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SLX

SLX

SLX

SLX

SLX

SLX

SLX

SLX

SLX

SLX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$12,170,000

$3,520,000

$19,280,000

$690,000

$1,400,000

$280,000

$11,735,000

$3,900,000

$4,600,000

$8,000,000

$8,200,000

$8,200,000

$8,200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

07

122.10

220.00

224.10

227.10

227.11

227.13

227.14

227.15

227.16

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

07

07

07

122.10

996.04

224.00

227.10

227.11

227.13

227.14

227.15

227.16

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2000

2000

2012

2012

2014

2014

2016

2016

2006

1996

2000

2012

2012

2014

2014

2016

2016

18.264

8.4

0

21.415

9.55

2.01

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

Page 39: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 39

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

SOUTH ELKHORN TRAIL IN LEXINGTON (PRIORITY SECTION 2); FROM JOSEPHBRYAN WAY THROUGH NS RAILROAD TUNNEL TO WAVELAND HISTORIC SITE(ALL WORK BY LFUCG). (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP).

SOUTH ELKHORN TRAIL(PRIORITY SECTION 3); FROM LOCHDALE TERRACE,EXTENDING NORTHERLY UNDER MAN O' WAR BOULEVARD TO SHILLITOPARK.(LOCAL MATCH)(DESIGN BY LFUCG)(ALL WORK BYLFUCG)(2004BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).

SIX-LANE NEWTOWN PIKE FROM KY-4 TO I-75. (16CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2017.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2018.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2019.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2020.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2021.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2022.(12CCR)

.300

.300

1.837

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

-

-

KY-922

KY-169

KY-169

KY-169

KY-169

KY-169

KY-169

$400,000

$625,000

$28,150,000

$330,000

$330,000

$330,000

$330,000

$330,000

$330,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

R

U

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2017

2016

2019

2019

2017

2018

2019

2020

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLX

SLX

STP

STP

STP

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$400,000

$625,000

$3,150,000

$5,000,000

$20,000,000

$330,000

$330,000

$330,000

$330,000

$330,000

$330,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

07

229.20

229.30

252.00

357.14

357.15

357.16

357.17

357.18

357.19

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MADISON

MADISON

MADISON

MADISON

MADISON

MADISON

07

07

07

07

07

07

07

07

07

229.00

229.00

252.00

357.14

357.15

357.16

357.17

357.18

357.19

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2002

2004

2000

2012

2012

2014

2014

2016

2012

2000

2000

2000

2012

2012

2014

2014

2016

2012

1.47

0

0

0

0

0

0

3.22

.1

.1

.1

.1

.1

.1

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

12.411

12.411

12.411

12.411

12.411

12.411

12.449

12.449

12.449

12.449

12.449

12.449

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

Page 40: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 40

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TOBOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION ATNEWTOWN PIKE.(2002BOPC)(2004BOPP)(10CCR)(12CCR)(14CCR)

WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TOBOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION ATNEWTOWN PIKE. (ADDITIONAL C-FUNDS FOR 7-366.00)

WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TOBOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION ATNEWTOWN PIKE. (ADDITIONAL C-FUNDS FOR 7-366.00)

STREAM RESTORATION ALONG CANE RUN AT THE KENTUCKY HORSE PARK FORGENERATION OF STREAM "CREDITS" DUE TO HIGHWAY PROJECT IMPACTS INTHE LOWER KENTUCKY RIVER WATERSHED. (2006BOPC)

REPLACE L&N RAILROAD BRIDGE OVERPASS (MP 8.378), IMPROVE DRAINAGEAND TYPICAL SECTION ON US 27 (NORTH BROADWAY)(12CCR)(14CCR)(16CCR)

CONSTRUCT AN ADDITIONAL LANE ON KY 922 (NEWTOWN PIKE) FROM PINTAILDR (MAIN ENTRANCE TO THE MARRIOTT GRIFFIN GATE) TO THE BEGINNING OFTHE SOUTHBOUND I-75 ENTRANCE RAMP.(12CCR)(14CCR)

IMPROVE ROADWAY TYPICAL SECTION AND PAVEMENT ON KY 2335 (WARE RD)FROM KY 57 (BRIAR HILL RD) TO NORTHERN ENTRANCE TO LEXINGTONBLUEGRASS ARMY DEPOT. (NOTE: DISTRICT IS ANTICIPATING EXPANSION OFLOCKHEED MARTIN FACILITY AT BLUEGRASS STATION)(12CCR)(16CCR)

CONSTRUCT TURN LANES AT THE INTERSECTION OF MAN O' WAR BLVD (CS-4524) AND PINK PIGEON PKWY (CS-2540).

1.300

1.300

1.300

.126

.330

2.100

.100

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

KY-4

KY-4

KY-4

-

US-27

KY-922

KY-2335

CS-4524

$12,000,000

$12,000,000

$10,930,000

$2,000,000

$16,030,000

$2,800,000

$10,600,000

$456,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

R

U

C

R

U

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2019

2016

2018

2019

2021

2016

2016

2017

2016

2017

2017

2018

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

SP

SPP

SPP

SPP

NH

NH

NH

SPP

SPP

SPP

SPP

SLX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$12,000,000

$12,000,000

$10,930,000

$2,000,000

$2,440,000

$1,550,000

$12,040,000

$1,500,000

$500,000

$800,000

$600,000

$4,000,000

$1,000,000

$5,000,000

$456,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

366.00

366.02

366.03

384.00

412.00

413.00

415.00

426.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

99

07

07

07

07

996.08

366.00

366.00

152.08

412.00

413.00

415.00

426.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2002

2016

2016

2006

2012

2012

2012

2014

1998

2002

2002

2006

2012

2012

2012

2014

8.731

8.731

8.731

8.324

2.72

0

14.722

10.015

10.015

10.015

8.45

3.05

2.1

14.822

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / ENVIRO MITIGATION(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

Page 41: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 41

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

CONSTRUCT TURN LANES AT THE INTERSECTION OF MAN O' WAR BLVD (CS4524) AND ALUMNI DRIVE (CS 3016).

CONSTRUCT TURN LANES AT THE INTERSECTION OF MAN O' WAR BLVD (CS-4524) AND RICHMOND ROAD (US-25).

INSTALL LIGHTING TO COMPLETE UPGRADE OF ALUMNI DR. BETWEENNICHOLASVILLE ROAD AND TATES CREEK ROAD. (16CCN)

NEWTOWN PIKE EXTENSION - PRIORITY 4: FROM EXISTING NEWTOWN PIKE &PATTERSON TO SOUTH LIMESTONE. (PHASE III - SCOTT STREETCONNECTOR)(14CCR)(16CCR)

REPLACE BRIDGE ON US 421 OVER FORK OF TOWN BRANCH AT INTERSECTIONOF US 421 AND BRACKTOWN RD (CS 4008)(SR 27.8) 034B00018N

REPLACE BRIDGE ON MALABU DRIVE (CS 3605) OVER BRANCH HICKMAN CREEKAT JCT WITH TATES CREEK ROAD (KY 1974)(SR 40) 034C00038N

REPLACE BRIDGE OVER BRANCH OF NORTH ELKHORN CREEK ON HUME ROAD(CR 1001) 0.7 MI NW OF US 60 (034C00001N)(SR=44.5)

SCOPING STUDY TO RECONSTRUCT/WIDEN US-60/WINCHESTER ROAD TO FOURLANES. (06CCN)(12CCR)

.100

.100

.040

.040

.900

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

CS-4524

CS-4524

-

-

US-421

CS-3605

CR-1001

US-60

$743,000

$590,000

$550,000

$22,879,700

$1,050,000

$700,000

$1,350,000

$280,000

Total

Total

Total

Total

Total

Total

Total

Total

R

C

R

C

C

R

U

C

R

U

C

R

U

C

D

R

U

C

P

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2016

2017

2016

2016

2018

2016

2016

2017

2016

2016

2018

2019

2021

2021

2022

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLX

SLX

SLX

SLX

SPP

SPP

SPP

SPP

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$18,000

$725,000

$40,000

$550,000

$550,000

$8,657,000

$3,467,500

$10,755,200

$125,000

$125,000

$800,000

$100,000

$100,000

$500,000

$300,000

$100,000

$200,000

$750,000

$280,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

427.00

428.00

429.10

593.30

1129.00

1132.00

1141.00

8340.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

07

07

427.00

428.00

429.10

593.02

1129.00

1132.00

1141.00

8340.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2016

2006

2012

2012

2014

2006

2014

2014

2016

2004

2012

2012

2014

2006

11.773

12.736

4.426

1.656

1.6

12.5

11.873

12.836

4.466

1.696

1.64

13.4

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SAFETY(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / SCOPING STUDY(O)

Page 42: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 42

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

SCOPING STUDY TO RECONSTRUCT/WIDEN US-60/WINCHESTER ROAD FROMMAN-O-WAR BOULEVARD TO THE CLARK COUNTY LINE. (06CCN)(12CCR)

SCOPING STUDY TO RECONSTRUCT/WIDEN KY-4/NEW CIRCLE ROAD FROMNEWTOWN PIKE TO WINCHESTER ROAD. (06CCN)(12CCR)

COMPLETE CONSTRUCTION ON POLO CLUB BOULEVARD AT DEERHAVEN LANEAND TODDS ROAD. (08CCN)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP)

SOUND BARRIERS ALONG OUTER LOOP OF NEW CIRCLE ROAD BETWEEN TATESCREEK ROAD AND NICHOLASVILLE ROAD. (14CCN)

SOUND BARRIERS ALONG INNER LOOP OF NEW CIRCLE ROAD BETWEEN TATESCREEK ROAD AND ALUMNI DRIVE. (14CCN) (16CCR)

SOUND BARRIERS ALONG INNER LOOP OF NEW CIRCLE ROAD BETWEEN TATESCREEK ROAD AND NICHOLASVILLE ROAD. (14CCN)

SOUND BARRIERS ALONG OUTER LOOP OF NEW CIRCLE ROAD BETWEEN TATESCREEK ROAD AND ALUMNI DRIVE. (14CCN)

SIDEWALK INSTALLATION ON BRYAN STATION ROAD FROM PREAKNESS DRIVETO HERMITAGE DRIVE. (14CCN)

EXTEND CITATION BLVD. (16CCN)

5.850

3.300

1.219

1.636

1.219

1.636

.380

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

US-60

KY-4

CS-2548

KY-4

KY-4

KY-4

KY-4

KY-57

-

$280,000

$340,000

$1,550,000

$4,600,000

$5,000,000

$5,000,000

$5,000,000

$250,000

$11,500,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

P

P

C

C

C

C

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2016

2017

2018

2019

2016

2017

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SLX

SPP

SPP

SP

SP

SPP

SPP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$280,000

$340,000

$1,550,000

$4,600,000

$5,000,000

$5,000,000

$5,000,000

$250,000

$1,000,000

$1,300,000

$1,100,000

$8,100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

07

8341.00

8342.00

8507.00

8801.00

8804.00

8805.00

8806.00

8812.00

8901.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

07

07

07

8341.00

8342.00

8507.00

8801.00

8804.00

8805.00

8806.00

8812.00

8901.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2006

2008

2014

2014

2014

2014

2014

2016

2006

2006

2008

2014

2014

2014

2014

2014

2016

13.4

9.4

17.778

16.142

17.778

16.142

.912

19.25

12.7

18.997

17.778

18.997

17.778

1.292

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

NEW ROUTES / NEW ROUTE(O)

Page 43: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 43

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

EXTEND THE EXISTING 4-LANE ON LIBERTY ROAD FROM GRAFTONS MILL LANE(MP 1.145) TO NEW CIRCLE ROAD (MP 0.0) AND IMPROVE INTERSECTION WITHNEW CIRCLE ROAD. (16CCN)

WIDEN I-64/I-75 TO 8 LANES FROM BRYAN STATION OVERPASS (MP 112.012) TONORTHERN SPLIT (MP 117.665) TO ALLEVIATE CONGESTION (SECTION 1). (16CCN)

WIDEN I-75 TO 8 LANES FROM C&O RAILROAD BRIDGE (MP 107.417) TO BRYANSTATION OVERPASS (MP 112.012) TO ALLEVIATE CONGESTION (SECTION 2).(16CCN).

REPLACE BRIDGE ON KY 32 OVER MUD LICK CREEK 0.2 MILES W OFCRAINTOWN RD (CR 1302)(SR 48.9) 035B00038N

REPLACE BRIDGE OVER ALLISON CREEK ON KY 111 1.2 MI N OF KY 156.(035B00016N)(SR=32.1)(EBRP)

REPLACE BRIDGE OVER FLEMING CREEK ON MCINTIRE ROAD (CR 1240) AT THEJCT WITH PIKE BLUFF (CR 1305)(035C00065N)(SR=24)

RESTORATION OF RINGO'S MILL COVERED BRIDGE LOCATED ON KY 158 ATRAWLINGS ROAD APPROX 7.274 MILES EAST OF HILLSBORO (FY2010 AND FY2011NHCB PROJECT) (2010 BOPC).

.040

.020

.024

FAYETTE

FAYETTE

FAYETTE

FLEMING

FLEMING

FLEMING

FLEMING

KY-1927

I-75

I-75

KY-32

KY-111

CR-1240

KY-158

$19,500,000

$43,500,000

$1,000,000

$800,000

$1,550,000

$1,075,000

$508,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2019

2020

2017

2017

2018

2019

2017

2016

2016

2017

2020

2021

2021

2022

2017

2019

2019

2020

2016

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SP

SP

SP

IM

IM

IM

IM

IM

BRO

BRO

BRO

BRX

BRX

BRX

BRX

BRZ

BRZ

BRZ

BRZ

KYD

KYD

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,600,000

$3,900,000

$4,000,000

$10,000,000

$500,000

$1,500,000

$1,500,000

$40,000,000

$1,000,000

$150,000

$250,000

$400,000

$500,000

$100,000

$200,000

$750,000

$350,000

$75,000

$50,000

$600,000

$5,000

$503,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

09

09

09

09

8902.00

8909.00

8910.00

1084.00

1091.00

1092.00

3021.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

09

09

09

09

8902.00

8909.00

8910.00

1084.00

1091.00

1092.00

3021.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2012

2014

2014

2010

2016

2016

2016

2012

2014

2014

2010

7.76

11.84

2.04

7.8

11.86

2.064

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

NEW ROUTES / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REHAB(P)

Page 44: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 44

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

SURFACE INDUSTRIAL PARK ROAD ON KY-11. (06CCN)(10CCR)

RECONSTRUCT/IMPROVE KY-57 FROM THE FLEMING COUNTY COURTHOUSE TOSLEEPY RUN CREEK. (06CCN)(10CCR)

RESTORATION OF GRANGE CITY COVERED BRIDGE LOCATED ON KY-111BETWEEN FLEMINGSBURG AND GRANGE CITY. (14CCN) (16CCR)

UPGRADE, WIDEN, AND PROVIDE SPOT IMPROVEMENTS ON KY-165 TO IMPROVESAFETY FROM KY-32 TO US-68. (14CCN)

CORRECT GEOMETRIC AND WIDTH DEFICIENCIES BEGINNING AT SLEEPY RUNBRIDGE EXTENDING TO 0.5 MILES SOUTH OF LEWIS COUNTY LINE TO IMPROVEOPERATIONAL EFFICIENCY, SIGHT DISTANCE RESTRICTIONS AND OVERALLFLOW OF TRAFFIC. (14CCN)

CONSTRUCT LEFT TURN LANES ON KY 11 AT ROSS DRIVE, TAYLOR MILL ANDTHE INDUSTRIAL PARK ROAD. (16CCN)

IMPROVE ACCESS AND RESPONSE TIMES FOR THE FLEMINGSBURG FIREDEPARTMENT TO THE BYPASS AT MP 11.574. (16CCN)

SAFETY IMPROVEMENTS AND PAVEMENT REHAB EAST OF FLEMINGSBURGBYPASS TO KY 156. (16CCN)

.200

2.008

6.239

6.704

FLEMING

FLEMING

FLEMING

FLEMING

FLEMING

FLEMING

FLEMING

FLEMING

KY-11

KY-57

KY-111

KY-165

KY-57

KY-11

KY-11

KY-32

$520,000

$300,000

$1,200,000

$6,400,000

$2,000,000

$1,750,000

$80,000

$14,500,000

Total

Total

Total

Total

Total

Total

Total

Total

C

D

C

D

R

U

C

D

D

R

U

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2017

2017

2018

2019

2016

2017

2018

2019

2020

2018

2018

2019

2020

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

TE

SPP

SPP

SPP

SPP

SP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$520,000

$300,000

$1,200,000

$900,000

$250,000

$250,000

$5,000,000

$2,000,000

$250,000

$400,000

$350,000

$750,000

$80,000

$750,000

$1,500,000

$1,500,000

$10,750,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

09

09

8300.00

8305.00

8804.00

8815.00

8817.00

8901.00

8902.00

8903.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

09

09

09

8300.00

8305.00

8804.00

8815.00

8817.00

8901.00

8902.00

8903.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2006

2014

2014

2014

2016

2016

2016

2006

2006

2014

2014

2014

2016

2016

2016

13.3

1.728

0

2.108

13.5

2.273

6.239

8.812

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ECONOMIC DEVELOPMENT / ECONOMIC DEVEL(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / DESIGN ENGINEERING(O)

RELIABILITY / SAFETY(P)

RELIABILITY / SAFETY(P)

SAFETY / SAFETY(P)

Page 45: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 45

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

MOUNTAIN PARKWAY CORRIDOR: EXTEND THE FOUR LANE MOUNTAINPARKWAY FROM THE MAGOFFIN/FLOYD COUNTY LINE TO THE HEAD OF LEFTFORK OF ABBOTT CREEK. (SEE 12-1.01 FOR PE & ENV)(14CCR)(16CCR)

MOUNTAIN PARKWAY CORRIDOR: EXTEND THE FOUR LANE MOUNTAINPARKWAY FROM THE HEAD OF LEFT FORK OF ABBOTT CREEK TO NEELEYBRANCH ROAD. (SEE 12-1.01 FOR PE & ENV)(14CCR)(16CCR)

MOUNTAIN PARKWAY CORRIDOR: EXTEND THE FOUR LANE MOUNTAINPARKWAY FROM NEELEY BRANCH ROAD TO COUNTY ROAD 1386 ATPRESTONSBURG ELEMENTARY SCHOOL. (SEE 12-1.01 FOR PE &ENV)(14CCR)(16CCR)

MITIGATE SAFETY HAZARDS DUE TO SPEED, POOR ACCESS CONTROL BETWEENKY 80 AND INTERSECTION WITH KY 3384.(12CCR)

SPOT IMPROVEMENTS FROM BRANHAM'S CREEK TO JOHN M. STUMBOSCHOOL.(12CCR)(16CCR)

MINNIE-HAROLD CONNECTOR; FROM LITTLE MUD CREEK RD TO MOUTH OFTACKETT CREEK (ALT.3B SEC.2). KYTC SHALL CONSIDER DESIGN-BUILDOPPORTUNITY.(08CCN)(10CCR)(12CCR)(14CCR)

UPGRADE EXISTING FLOYD COUNTY WEIGH STATION.

REPLACE BRIDGE AND APPROACHES ON KY-466 OVER LEFT FORK BEAVERCREEK (B30). (SR=37.5): (036B00030N)

3.500

3.900

1.800

1.000

1.179

2.800

.100

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

KY-114

KY-114

KY-114

US-23

KY-979

KY-680

US-23

KY-466

$82,120,000

$54,700,000

$55,800,000

$2,700,000

$11,500,000

$25,220,000

$1,000,000

$1,090,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

D

R

U

C

R

U

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2021

2021

2022

2019

2020

2020

2022

2018

2019

2019

2022

2016

2016

2018

2018

2016

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

SP

SP

SP

NH

SP

SP

SP

NH

SP

SP

SP

NH

NH

NH

SB2

SPP

NH

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,900,000

$6,020,000

$1,200,000

$72,000,000

$3,200,000

$4,000,000

$4,500,000

$43,000,000

$1,800,000

$3,000,000

$4,000,000

$47,000,000

$400,000

$500,000

$1,800,000

$11,500,000

$25,220,000

$1,000,000

$1,090,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

12

1.20

1.30

1.40

191.00

195.00

301.20

345.00

1084.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

12

1.01

1.01

1.01

191.00

195.00

301.00

345.00

1084.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2012

2012

1998

2016

2004

1996

1996

1996

2012

2012

1996

2016

2004

0

3.48

7.354

12.775

12.389

21.5

3.559

3.48

7.354

9.092

13.775

13.95

21.8

3.599

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / WEIGH STA REHAB(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 46: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 46

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON KY 1100 OVER LITTLE PAINT CREEK NEARFLOYD/JOHNSON COUNTY LINE (SR 47.1) 036B00002N

REPLACE BRIDGE OVER LEVISA FORK ON KY 2557 AT JCT US 23 IN JUSTELL.(036B00040N)(SR=19.9)

REPLACE BRIDGE OVER BRUSH CREEK ON KY 550 AT JCT WITH KY 850.(036B00015N)(SR=41.3)(EBRP)

CURVE REVISION TO INCLUDE IMPROVED SIGHT DISTANCE AND A LEFT TURNLANE ON KY-122 AT THE KY-680 INTERSECTION IN MCDOWELL. (02CCN)(12CCR)

IMPROVE ACCESS TO KY 80 AT GARRETT EASTBOUND AND ELIMINATENECESSITY FOR CROSSING WESTBOUND LANES TO MERGE INTO EASTBOUNDLANES. MP 1.527 TO MP 1.827 (12CCN)

BRIDGE OFF OF KY-1428 ACROSS LEVISA FORK TO SERVE BIG SANDYWASTEWATER TREATMENT PLANT. (14CCN)

MOUNTAIN PARKWAY EXPANSION FROM PRESTONSBURG TO WEST VIRGINIALINE. (16CCN)

WIDEN US 60 FROM JUST EAST OF THE EXISTING BRIDGE OVER SOUTH BENSONCREEK (B97) TO JUST WEST OF VICKY WAY, WEST OF FRANKFORT,KY.(04CCN)(10CCR)

.146

.040

.100

.300

1.400

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FRANKLIN

KY-1100

KY-2557

KY-550

KY-122

KY-80

KY-1428

-

US-60

$1,110,000

$5,050,000

$1,800,000

$3,950,000

$3,500,000

$2,840,000

$3,000,000

$12,390,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

R

U

C

D

R

U

C

C

R

C

C

P

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2018

2019

2020

2020

2022

2019

2020

2020

2022

2016

2016

2017

2016

2017

2017

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRX

BRX

BRX

BRX

BRX

BRX

BRX

BRX

BRX

BRX

BRX

SPP

SPP

SPP

SPP

NH

SPP

SPP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$75,000

$135,000

$900,000

$750,000

$300,000

$500,000

$3,500,000

$300,000

$200,000

$300,000

$1,000,000

$3,950,000

$500,000

$3,000,000

$2,840,000

$3,000,000

$4,640,000

$2,340,000

$5,410,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

05

1111.00

1119.00

1121.00

8100.00

8703.00

8806.00

8901.00

97.50

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

05

1111.00

1119.00

1121.00

8100.00

8703.00

8806.00

8901.00

97.50

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2014

2002

2012

2014

2016

1998

2012

2014

2014

2002

2012

2014

2016

1998

5.231

.152

2.03

18.5

1.527

2.78

5.271

.298

2.07

18.678

1.827

3.9

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / CONGESTION MITIGTN(O)

ECONOMIC DEVELOPMENT / ECONOMIC DEVEL(O)

RELIABILITY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

Page 47: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 47

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

FRANKFORT-NEWCASTLE; RECONSTRUCT US-421 FROM TOP OF BALD KNOBHILL AT END OF RECONSTRUCTED SECTION TO HARVIELAND ROAD.(10CCR)

ENHANCEMENT OF US 60 (EAST MAIN STREET) FROM MARTIN LUTHER KINGBLVD TO SCHENKEL LANE IN FRANKFORT. (PEDESTRIAN BRIDGE UNDER ITEMNO. 5-8714) (08CCR)(12CCR)

DEMOLITION OF THE CLOSED ROADWAY SECTION OF THE BROADWAY BRIDGEIN FRANKFORT, KENTUCKY.

REPLACE BRIDGE ON US-421 (MP 13.09) OVER FLAT CREEK; 2.0 MI NORTH OF JCTKY 12; (STRUCTURALLY DEFICIENT, SR=46.8) 037B00023N

REPLACE BRIDGE ON US-421 (MP 14.059) OVER HUDSON CREEK; 2.8 MI NORTH OFJCT KY 12; (STRUCTURALLY DEFICIENT, SR=48.9) 037B00024N

REPLACE BRIDGE ON US-421 (MP 15.091) OVER LITTLE FLAT CREEK; 3.8 MINORTH OF JCT KY 12; (STRUCTURALLY DEFICIENT, SR=48.7) 037B00025N

REPLACE BRIDGE ON US 460 OVER SOUTH ELKHORN CREEK AT INTERSECTIONOF US 460 AND N SCRUGGS LN(CR 1010)(SR 41.3) 037B00006N (PART-WIDTHCONSTRUCTION ON EXISTING LOCATION)

REPLACE BRIDGE OVER BENSON CREEK ON CRAB ORCHARD ROAD (CR 1230) 200FT NW OF KY 151 NEAR I-64 EXIT 48 (037C00010N)(SR=23.9) (EBRP)(16CCR)

1.500

.810

.100

.100

.100

.025

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

US-421

US-60

-

US-421

US-421

US-421

US-460

CR-1230

$4,470,000

$1,720,000

$300,000

$640,000

$310,000

$560,000

$1,000,000

$1,255,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

C

C

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2018

2018

2016

2017

2016

2016

2016

2017

2017

2018

2016

2017

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SPP

SPP

BRO

BRO

BRO

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$680,000

$2,440,000

$1,350,000

$1,720,000

$300,000

$640,000

$310,000

$560,000

$100,000

$200,000

$700,000

$350,000

$10,000

$20,000

$875,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

374.00

600.00

805.00

1057.00

1058.00

1059.00

1065.00

1078.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

374.00

600.00

805.00

1057.00

1058.00

1059.00

1065.00

1078.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2008

2016

2010

2010

2010

2012

2014

2004

2008

2016

2010

2010

2010

2012

2014

5.809

9.338

13.04

14.009

15.041

2.177

.04

7.309

10.148

13.14

14.109

15.141

2.217

.065

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

SAFETY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 48: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 48

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

PAVEMENT REHAB AND BRIDGE WIDENING ON I-64 FROM MP 47.70 TO MP 53.75.(2004BOPC)(DESIGN FUNDED UNDER 5-2035.40)(16CCN)

STUDY OF TRAFFIC FLOW THROUGH DOWNTOWN FRANKFORT. (12CCN)(14CCN)(16CCN)

CONSTRUCTION AND SIDEWALK IMPROVEMENTS TO THE INTERSECTION OFSECOND STREET AND BRIDGE STREET INCLUDING THE SIDEWALK ALONGSECOND STREET TO EWING STREET. (14CCN)(16CCN)

IMPROVE DRAINAGE ALONG SLICKWAY BRANCH BY EXPANDING WATER SHEDBASIN AT JIM BEAM DISTRIBUTION CENTER ON US 421S TO IMPROVE DRAINAGEISSUES ON COUNTRY LANE. (16CCN)

RECONSTRUCT AND IMPROVE I-69 AT THE KENTUCKY/TENNESSEE STATE LINETO US-51 INTERCHANGE AT FULTON. (I-69 CORRIDOR IMPROVEMENT)(2012BOP)

RECONSTRUCT ELEMENTS OF THE EXISTING PURCHASE PARKWAY BETWEENMP 1 AND MP 20 INCLUDING THE RECONSTRUCTION OF THE KY339INTERCHANGE IN WINGO, KY. (I-69 CORRIDOR IMPROVEMENT) (2012BOP)

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2017.(12CCR)

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2018.(12CCR)

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2019.(12CCR)

5.420

.098

1.660

19.000

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

FULTON

FULTON

FULTON

FULTON

FULTON

I-64

-

US-60

US-421S

JC-9003

JC-9003

KY-1354

KY-1354

KY-1354

$29,480,000

$43,000

$610,000

$2,100,000

$7,830,000

$15,750,000

$126,000

$126,000

$126,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

C

C

D

R

U

R

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2020

2017

2017

2018

2019

2021

2022

2019

2021

2017

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

IM

IM

IM

SPP

TE

SB2

NH

NH

NH

NH

NH

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$120,000

$110,000

$29,250,000

$43,000

$610,000

$2,100,000

$3,000,000

$3,830,000

$1,000,000

$750,000

$15,000,000

$126,000

$126,000

$126,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

01

01

01

01

01

2035.70

8711.00

8813.00

8902.00

25.00

26.00

320.14

320.15

320.16

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

HICKMANGRAVES

05

05

05

05

01

01

01

01

01

2035.00

8711.00

8813.00

8902.00

25.00

26.00

320.14

320.15

320.16

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2016

2012

2008

2012

2012

2014

2004

2016

2016

2016

2012

2008

2012

2012

2014

47.7

8.019

0

1

0

0

0

53.75

8.117

1.66

3.434

.1

.1

.1

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PAVEMENT REHAB-INT(P)

RELIABILITY / FEASIBILITY STUDY(O)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

3.4348.352

8.35220

Milepoints:Milepoints:

To:To:

From:From:

Page 49: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 49

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2020.(12CCR)

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2021.

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2022.

REPLACE BRIDGE ON HOLLAND LN (CR 1011) OVER BRANCH OF HARRIS FORKCREEK 0.26 MILE E OF KENTUCKY AVE (KY 307)(SR 31.9)038C00001N(12CCR)(AR/W)

SAFETY IMPROVEMENT AT INTERSECTION OF KY-1099 AND KY-125. (14CCN)

RECONSTRUCT US-42 ALONG THE OHIO RIVER TO CORRECT LANDSLIDEPROBLEMS BETWEEN MARKLAND DAM AND CRAIGS CREEK.(U-04DEOB)(10CCR)(14CCR)

REPLACE BRIDGE OVER LITTLE SUGAR CREEK ON LITTLE SUGAR CREEK ROAD(CR 1001) 1.1 MI S OF US 42 (039C00002N)(SR=46.7)(EBRP)

IMPROVE SAFETY, CONGESTION, AND PEDESTRIAN AND FREIGHT MOBILITY ONUS 42 IN WARSAW FROM DAVIS DRIVE TO 0.4 MILES EAST OF DORMAN DRIVE.MP 7.281-7.8. (16CCN)

.038

3.500

.008

FULTON

FULTON

FULTON

FULTON

FULTON

GALLATIN

GALLATIN

GALLATIN

KY-1354

KY-1354

KY-1354

CR-1011

KY-1099

US-42

CR-1001

US-42

$126,000

$126,000

$126,000

$470,000

$2,740,000

$17,310,000

$200,000

$9,750,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

U

C

R

U

C

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2021

2022

2016

2017

2016

2017

2018

2016

2016

2017

2018

2018

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

BRZ

BRZ

SPP

SPP

SPP

SPP

BRZ

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$126,000

$126,000

$126,000

$100,000

$370,000

$500,000

$780,000

$1,460,000

$17,310,000

$200,000

$1,000,000

$1,000,000

$750,000

$7,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

01

06

06

06

320.17

320.18

320.19

1148.00

8853.00

202.00

1089.00

8909.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

01

01

01

06

06

06

320.17

320.18

320.19

1148.00

8853.00

202.00

1089.00

8909.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2016

2016

2012

2014

1996

2014

2016

2014

2016

2016

2012

2014

1996

2014

2016

0

0

0

.247

2.25

3.325

1.13

.1

.1

.1

.287

2.288

4.636

1.138

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / LANDSLIDE REPAIR(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

Page 50: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 50

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT I-71 FROM US 127 FROM MP 62.8 TO MP 64 TO IMPROVEGEOMETRICS. (16CCN).

RECONSTRUCT US 27 FROM WEST LANCASTER BYPASS TO KY 34. (2006BOPC)(16CCN)

DEVELOP DESIGN FOR A TRAFFIC CIRCLE ON US-27 INLANCASTER.(12CCR)(14CCR)(16CCR)

REPLACE BRIDGE ON KY-1972 (MP 0.663) OVER BR OF TURKEY CREEK; .50 MIEAST OF JCT KY 39; (STRUCTURALLY DEFICIENT, SR=11.5) 040B00023N

REPLACE BRIDGE ON KY-563 (MP 3.89) OVER SUGAR CREEK; E-@ JCT KY 39;(STRUCTURALLY DEFICIENT, SR=21.7) 040B00034N

REPLACE BRIDGE OVER GILBERTS CREEK ON KY 1972 1.4 MI E OF CRABORCHARD ROAD (CR 1226) AT SECL OF LANCASTER. (040B00024N)(SR=35.5)(EBRP)

5.100

.053

.100

.100

.010

GALLATIN

GARRARD

GARRARD

GARRARD

GARRARD

GARRARD

I-71

US-27

US-27

KY-1972

KY-563

KY-1972

$35,200,000

$57,500,000

$710,000

$485,000

$580,000

$1,225,000

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

R

U

C

R

U

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2020

2021

2017

2018

2019

2020

2016

2016

2017

2016

2016

2017

2016

2016

2017

2020

2021

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

IM

IM

IM

IM

SPP

SPP

SPP

SPP

SPP

SPP

SPP

BRX

BRX

BRX

BRX

BRX

BRX

BRX

BRX

BRX

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,200,000

$1,500,000

$500,000

$31,000,000

$500,000

$10,000,000

$9,000,000

$38,000,000

$10,000

$150,000

$550,000

$75,000

$60,000

$350,000

$80,000

$70,000

$430,000

$300,000

$100,000

$75,000

$750,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

07

07

07

07

07

8910.00

196.30

285.00

1120.00

1122.00

1138.00

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

07

07

07

07

07

8910.00

196.01

285.00

1120.00

1122.00

1138.00

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2006

2010

2010

2014

2016

2004

2006

2010

2010

2014

5.199

3.009

.613

3.84

1.76

10.331

3.062

.713

3.915

1.77

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / DESIGN ENGINEERING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 51: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 51

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

CONSTRUCT AN INTERCHANGE ON I-75 AT SHERMAN. (06CCN)(08CCN)(10CCN)

ROADWAY IMPROVEMENTS TO KY-36 FROM US-25 AT WILLIAMSTOWN TOAPPROXIMATELY 1 MILE EAST OF HEEKIN CLARKS ROAD.(12CCR)(14CCR)

REPLACE BRIDGE ON SOUTH END OF BLANCHET ROAD 0.3 MILES NORTHEASTOF US 25. (SR=35.9) 041C00012N (12CCN)

REPLACE BRIDGE ON NORTH END OF BLANCHET ROAD 0.2 MILES SOUTHEASTOF THE JUNCTION WITH US 25. (SR=28.1) 041C00014N (12CCN)

REPLACE BRIDGE ON NORTH END OF DELANEY ROAD 0.1 MILE NORTH OF THEJUNCTION WITH US 25. (SR=21.5) 041C00016N (12CCN)

MURRAY-MAYFIELD RD; EXTEND MAYFIELD SOUTHERN BYPASS FROM KY 303SOUTH OF MAYFIELD, NORTHWEST TO JULIAN M. CARROLL PARKWAY(PURCHASE PARKWAY). (EXTENSION OF 1-181.30)(00CCR)(12CCR)(14CCR)

REPLACE BRIDGE ON RULE SHACK ROAD OVER IC RAILROAD 0.4 MILE E OF KY339(SR29.3)042C00146N

1.000

2.900

.050

.070

.050

2.800

GRANT

GRANT

GRANT

GRANT

GRANT

GRAVES

GRAVES

I-75

KY-36

CR-1138

CR-1138

CR-1142

KY-80

CR-1384

$49,070,000

$10,510,000

$2,380,000

$2,690,000

$2,720,000

$17,310,000

$1,600,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

R

U

C

R

U

C

R

U

C

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2017

2019

2016

2016

2017

2017

2017

2019

2017

2017

2020

2016

2016

2017

2018

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

STP

STP

STP

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRO

BRO

BRO

SPP

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,690,000

$1,350,000

$1,900,000

$44,130,000

$400,000

$1,010,000

$9,100,000

$270,000

$480,000

$1,630,000

$340,000

$100,000

$2,250,000

$180,000

$290,000

$2,250,000

$17,310,000

$350,000

$1,250,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

01

01

112.10

411.00

8714.00

8715.00

8716.00

181.50

1147.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

01

01

112.00

411.00

8714.00

8715.00

8716.00

181.30

1147.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2012

2012

2012

2012

2000

2012

2006

2012

2012

2012

2012

1998

2012

161.5

13.7

.28

1.95

.02

.403

162.5

14.761

.33

2.02

.07

.443

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW INTERCHANGE(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 52: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 52

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE OVER PANTHER CREEK ON MCKENDREE CHURCH RD (CR1088) 0.3 MI E OF KY 301 042C00010N SR 28.3

DESIGN FOR LEITCHFIELD BYPASS PRIORITY SECTION. (06CCN)(10CCR)

WIDEN PORTIONS OF US-62 FROM LEITCHFIELD TO CLARKSON.(08CCN)(10CCR)(14CCN)(16CCR)

PROVIDE A CONNECTION FROM EAST WHITE OAK STREET TO WEST CARROLLGIBSON BOULEVARD AT THE NEW JUDICIAL CENTER. (16CCN).

EXTEND THE WILLIAM THOMASON BYWAY (KY 3155) FROM THE SOUTHERNINTERSECTION AT KY 259 WESTERLY TO KY 54. (16CCN)

COLUMBIA TO GREENSBURG PRIORITY SECTION 1B: KY-61 FROM KY-487 ATGRESHAM, NW TO 5000' SE OF US-68 IN GREENSBURG. TO CONSTRUCTINTERSECTION IMPROVEMENT AT KY61-KY487; (SEE ITEM #8-128.12)(2005HPP-KY125)(2005HPP-KY161).

US 68 IMPROVEMENTS FROM T DAVIS RD TO CLOVER LICK CREEK (MP 6.425 TO11.744) AS PER 3-203 SCOPING STUDY (SPOT IMPROVEMENTS #11,12 & 13). (DESIGNUNDER 4-397)(2014BOP)(16CCN)

.100

4.000

5.319

GRAVES

GRAYSON

GRAYSON

GRAYSON

GRAYSON

GREEN

GREEN

CR-1088

-

US-62

CS-1145

KY-3155

KY-61

US-68

$1,070,000

$18,470,000

$12,520,000

$300,000

$7,000,000

$1,790,000

$24,800,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

R

U

C

D

D

R

U

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2021

2021

2022

2016

2018

2018

2016

2016

2019

2021

2018

2020

2020

2021

2016

2016

2017

2017

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

BRZ

SP

SP

SP

STP

STP

STP

SP

SPP

SPP

SPP

SPP

HPP

HPP

HPP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$280,000

$120,000

$120,000

$550,000

$2,710,000

$14,590,000

$1,170,000

$2,400,000

$1,000,000

$9,120,000

$300,000

$2,000,000

$1,800,000

$200,000

$3,000,000

$200,000

$100,000

$1,490,000

$2,500,000

$2,300,000

$20,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

04

04

04

04

04

04

1157.00

308.01

8502.00

8953.00

8954.00

158.10

397.10

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

04

04

04

04

08

04

1157.00

308.01

8502.00

8953.00

8954.00

128.12

397.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2006

2008

2016

2016

2010

2016

2014

2006

2008

2016

2016

2010

2012

.3

23

3.9

6.425

.4

25.5

4.25

11.744

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MINOR WIDENING(O)

NEW ROUTES / NEW ROUTE(O)

NEW ROUTES / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

Page 53: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 53

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

CONSTRUCT NEW CONNECTOR FROM VAUGHN CURVE ON US-68 BYPASS EASTOF GREENSBURG CROSSING KY-61 AND KY-417 AND CONNECTING WITH KY-3535NORTH OF GREENSBURG.(SEE ITEM #8-8711)(12CCN)(14CCR)(16CCR)

CORRECT GEOMETRIC DEFICIENCIES AND IMPROVE SAFETY CONCERN AT THEUS-68/KY-61 INTERSECTION. (10CCN)

CONSTRUCT A TRUCK CLIMBING LANE, SHOULDERS, AND TURN LANE AT KY-323.(12CCN)(PROJECT MOVED FROM DISTRICT 8 UNDER ITEM NO.8-8712)(14CCR)(16CCR)

SPOT IMPROVEMENTS & IMPROVE EXISTING ALIGNMENT ON KY 88 FROM 0.20MILES WEST OF AKIN NARROWS OF PITMAN RD (MP 8.996) TO KY 61 (MP 11.232).(14CCN)(16CCR)

ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ON KY 61 TO KY 1906. (16CCN)

MINOR SPOT IMPROVEMENTS ON GABE ROAD. (16CCN)

ADDRESS GEOMETRIC DEFICIENCIES ON KY 323 NEAR DIXIE CREEK ROAD FROMMP 7.3 TO MP 7.5 TO IMPROVE FLOW OF TRUCK TRAFFIC THROUGH A SHARPHORIZONTAL CURVE. (16CCN).

.045

.390

2.236

GREEN

GREEN

GREEN

GREEN

GREEN

GREEN

GREEN

-

US-68

KY-61

KY-88

KY-61

KY-323

KY-323

$25,500,000

$2,970,000

$15,100,000

$7,600,000

$6,650,000

$890,000

$965,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

R

U

C

R

U

C

D

R

U

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2018

2016

2016

2017

2019

2019

2020

2021

2017

2018

2019

2020

2018

2019

2020

2018

2018

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SB2

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SP

SP

SP

SP

SP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,500,000

$2,000,000

$20,000,000

$2,970,000

$2,310,000

$3,790,000

$9,000,000

$1,600,000

$900,000

$5,100,000

$450,000

$900,000

$1,000,000

$4,300,000

$325,000

$145,000

$420,000

$75,000

$325,000

$145,000

$420,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

04

04

04

398.00

8603.00

8712.00

8853.00

8905.00

8910.00

8955.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

04

08

04

04

04

04

8711.00

8603.00

8712.00

8853.00

8905.00

8910.00

8955.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2010

2012

2014

2016

2016

2016

2012

2010

2012

2014

2016

2016

2016

11.519

11.379

8.996

12.2

14.093

11.232

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / SAFETY(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

SAFETY / SAFETY(P)

Page 54: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 54

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT KY-2 FROM MP 13.2 TO US-23 (MP 17.2)(08CCN)(14CCR)(16CCR)

INSTALL TRAFFIC SIGNAL AT THE INTERSECTION OF US 23 AND KY 503(WURTLAND RIVERPORT). (2014BOP)

REPLACE BRIDGE ON KY-244 (MP 0.103) OVER CSX RAILROAD; .05 MI N.E. OF JCTUS 23; (STRUCTURALLY DEFICIENT, SR=47.9) 045B00039N (16CCR)

REPLACE BRIDGE ON KY-244 (MP 0.103) OVER CSX RAILROAD; .05 MI N.E. OF JCTUS 23; (STRUCTURALLY DEFICIENT, SR=47.9) 045B00039N (ADDITIONAL FUNDINGFOR C PHASE)(16CCR)

REPLACE BRIDGE ON KY-244 (MP 0.103) OVER CSX RAILROAD; .05 MI N.E. OF JCTUS 23;(STRUCTURALLY DEFICIENT SR=47.9) 045B00039N (ADDITIONAL FUNDINGFOR C PHASE)(16CCN)

"DEMOLISH" BRIDGE ON CS-1023 (MP 0.121) OVER TOWN BRANCH; 100' S. JCT KY2541; (STRUCTURALLY DEFICIENT, SR=16.5) 045C00051N

REPLACE BRIDGE OVER POND RUN ON WILLIAMS AVE (CS 4041) IN RACELAND250 FT NW OF POND RUN ROAD (CS 4001) (045C00119N) (SR=27.3)

CONSTRUCT A NEW CONNECTOR ROAD CONNECTING FLATWOODS AT KY-207AND KY-693 AND THE INDUSTRIAL PARKWAY CONNECTOR BETWEEN I-64 ANDUS-60. (08CCN)(16CCR)

4.000

.100

.100

.016

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

KY-2

US-23

KY-244

KY-244

KY-244

CS-1023

CS-4041

KY-207

$45,450,000

$143,704

$6,090,000

$4,740,000

$4,370,000

$1,085,000

$1,200,000

$41,150,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

U

C

C

C

R

U

C

D

R

U

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2020

2016

2017

2018

2018

2018

2016

2016

2017

2019

2021

2021

2017

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SAH

BRO

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

STP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$6,070,000

$3,380,000

$36,000,000

$143,704

$1,090,000

$5,000,000

$4,740,000

$4,370,000

$60,000

$25,000

$1,000,000

$350,000

$500,000

$350,000

$8,400,000

$6,750,000

$26,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

09

09

132.00

395.00

1073.00

1073.01

1073.02

1078.00

1094.00

8509.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

09

09

09

132.00

208.02

1073.00

1073.00

1073.00

1078.00

1094.00

8509.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

1998

2014

2010

2014

2016

2010

2014

2008

1998

2014

2010

2010

2010

2010

2014

2008

13.2

7.387

0

0

0

.071

.05

17.2

7.767

.207

.207

.207

.171

.066

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PE & ENVIRONMENTAL(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

Page 55: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 55

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

IMPROVE CONNECTION BETWEEN US-60 AND CANNELTON BRIDGE APPROACHAT HAWESVILLE. (06CCR) (08CCR) (10CCR)(12CCR)

MINOR WIDENING OF OLD TWO WESTBOUND LANES OF US 60.(12CCR)(14CCR)

BRIDGE PAINTING OF THE BOB CUMMINGS LINCOLN TRAIL BRIDGE OVER THEOHIO RIVER BETWEEN CANNELTON, INDIANA AND HAWESVILLE, KENTUCKY.INDOT IS THE LEAD STATE ON THE PROJECT. (2014BOP)

BRIDGE PAINTING OF THE BOB CUMMINGS LINCOLN TRAIL BRIDGE OVER THEOHIO RIVER BETWEEN CANNELTON, INDIANA AND HAWESVILLE, KENTUCKY.INDOT IS THE LEAD STATE ON THE PROJECT. (ADDITIONAL FUNDING FOR CPHASE)

REPLACE BRIDGE ON KY 2124 OVER SOUTH FORK OF PANTHER CREEK SW OFINTERSECTION WITH HICKORY RIDGE RD (CR 1127)(SR 33.5)046B00031N

IMPROVE THE SAFETY AND INCREASE THE CAPACITY OF THE I-65/KY-222INTERCHANGE BASED ON EXISTING AND FUTURE NEEDS OF THE AREA.(2006BOPC)(08CCR)(10CCR)(14CCR)

SAFETY AND SPOT IMPROVEMENTS TO KY 251 AND KY 434 AS RECOMMENDEDBY THE 2012 PLANNING STUDY.

KY 251: FROM KY-434 TO KY-313. (BRAC)(10CCR)(12CCR)

6.267

.040

.751

3.600

1.700

HANCOCK

HANCOCK

HANCOCK

HANCOCK

HANCOCK

HARDIN

HARDIN

HARDIN

KY-69

US-60

KY-69

KY-69

KY-2124

I-65

KY-251

KY-251

$5,850,000

$5,410,000

$3,025,000

$2,975,000

$375,000

$35,100,000

$25,000,000

$8,890,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

C

C

U

C

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2017

2016

2018

2019

2016

2016

2022

2016

2016

2018

2016

2017

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SB2

SPP

BRO

BRO

BRO

BRX

BRX

NH

BR2

BR2

BR2

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$5,850,000

$5,410,000

$25,000

$3,000,000

$2,975,000

$75,000

$300,000

$35,100,000

$6,800,000

$4,500,000

$13,700,000

$1,630,000

$1,740,000

$1,130,000

$4,390,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

04

04

04

197.00

226.00

316.10

316.11

1082.00

20.01

153.01

153.05

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

99

02

02

04

04

04

197.00

226.00

1073.04

316.11

1082.00

20.00

153.00

153.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2012

2014

2016

2012

2006

2008

2008

2006

2012

2008

2016

2012

2002

2008

2008

1.933

2.593

85.313

2.722

6.326

8.2

2.633

86.064

6.326

8.019

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / BRIDGE PAINTING(P)

RELIABILITY / PREFINANCD CONVRSN(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / PHASE I DESIGN(O)

RELIABILITY / PHASE I DESIGN(O)

Page 56: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 56

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

EXTEND RING ROAD FROM THE WESTERN KENTUCKY PARKWAY TO I-65.(12CCR)(14CCR)

REPLACE BRIDGE OVER P&L AND CSX RAILROADS (MP 36.4 TO 36.8 IN WESTPOINT) (047B00007N).(16CCR)

I-65 SOUTHBOUND PORT OF ENTRY FOR A COMMERCIAL VEHICLE MONITORINGSTATION.(10CCR)

REPLACE BRIDGE ON US 62 OVER UNNAMED STREAM 0.65 MILE SW OF KY 1375 (SLONG GROVE RD)(SR 48.5) 047B00052N

REPLACE BRIDGE ON US 62 OVER ROLLING FORK AT THE HARDIN-NELSON COLINE. (SR=49.3) 047B00023N

SOUTH WILSON ROAD CONNECTOR. (50/50 SPLIT WITH CITY OF RADCLIFF)(16CCN)

ADD TURN LANE ON KY 313 AT COLE RIDGE AVENUE. (16CCN)

.400

.100

.400

.139

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

KY-3005

US-31W

I-65

US-62

US-62

US-31W

KY-313

$30,890,000

$9,460,000

$17,840,000

$680,000

$5,617,000

$875,000

$425,000

Total

Total

Total

Total

Total

Total

Total

U

C

R

U

C

D

R

U

C

R

U

C

D

R

U

C

D

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2018

2016

2016

2019

2016

2019

2019

2022

2016

2016

2017

2019

2021

2021

2022

2017

2017

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

STP

STP

STP

IM

IM

IM

IM

BRO

BRO

BRO

BRX

BRX

BRX

BRX

SPP

SB2

SB2

SB2

SB2

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,190,000

$29,700,000

$120,000

$110,000

$9,230,000

$1,000,000

$110,000

$1,040,000

$15,690,000

$80,000

$110,000

$490,000

$800,000

$30,000

$25,000

$4,762,000

$875,000

$75,000

$50,000

$50,000

$250,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

04

04

04

198.00

199.00

286.10

1077.00

1093.00

8906.00

8907.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

NELSON

04

04

04

04

04

04

04

198.00

199.00

286.00

1077.00

1093.00

8906.00

8907.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2000

2012

2016

2016

2016

2012

2012

1996

2012

2016

2016

2016

36.4

81.95

8.894

28.157

36.8

82.05

8.934

28.193

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PE & ENVIRONMENTAL(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / WEIGH STA REHAB(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

NEW ROUTES / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

0 .103Milepoints: To:From:

Page 57: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 57

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

HARLAN-VIRGINIA STATE LINE; RESCOPE US-421 FROM BARN BRANCH TOVIRGINIA STATE LINE.(08CCR)(10CCR)(16CCR)

HARLAN-VIRGINIA STATE LINE; RESCOPE US-421 FROM BARN BRANCH TOVIRGINIA STATE LINE. (ADDITIONAL FUNDS FOR C PHASE. SEE 11-269.10) (16CCN)

HARLAN-VIRGINIA STATE LINE; RESCOPE US-421 FROM BARN BRANCH TOVIRGINIA STATE LINE. (ADDITIONAL FUNDS FOR C PHASE. SEE 11-269.1 AND 11-269.2)(16CCN)

REPLACE BRIDGE ON KY 72 OVER CATRON CREEK AT INTERSECTION OF KY 72AND SMITH LANE (CR 1226L)(SR 30) 048B00030N

REPLACE BRIDGE OVER WALLINS CREEK ON KY 219 3.0 MILE SOUTH OF SCL OFWALLINS CREEK. (048B00047N)(SR=43.8)

REPLACE BRIDGE ON US 119 OVER KY 160/MAIN ST IN HARLAN COUNTY, KY.(SR=32.3) 048B00126N

REPLACE BRIDGE ON SWEET BALL RD (CR-1328) (0.175) OVER AGES BRANCH.(SR=12.9) 048C00072N

PROVIDE A PASSING BAY ON US 119 FROM MP 1.2 TO MP 2.2 IN HARLANCOUNTY.(12CCN)(14CCR)(16CCR)

3.800

.040

.020

.118

1.000

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

US-421

US-421

US-421

KY-72

KY-219

US-119

CR-1328

US-119

$10,570,000

$10,000,000

$23,800,000

$1,300,000

$975,000

$8,600,000

$250,000

$4,000,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

C

C

C

D

R

U

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2019

2019

2017

2020

2021

2021

2022

2019

2021

2021

2022

2021

2016

2016

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

STP

STP

BRX

BRX

BRX

BRX

BRX

BRO

BRO

BRO

BRO

BRZ

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$570,000

$10,000,000

$10,000,000

$23,800,000

$1,300,000

$250,000

$100,000

$75,000

$550,000

$800,000

$200,000

$100,000

$7,500,000

$250,000

$500,000

$500,000

$3,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

11

269.10

269.20

269.30

1087.00

1097.00

1101.00

1107.00

8703.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

11

269.00

269.20

269.30

1087.00

1097.00

1101.00

1107.00

8703.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2016

2016

2012

2014

2016

2016

2012

1996

2016

2016

2012

2014

2016

2016

2012

0

6.539

1.033

34.787

.171

1.2

3.832

6.579

1.053

34.905

.179

2.2

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MINOR WIDENING(O)

Page 58: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 58

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

IMPROVE SAFETY ON DEAD MAN'S CURVE NEAR MP 10.1. (12CCN)

CONSTRUCT TURN LANES ONTO KY 840 FROM US 119. (14CCN) (16CCR)

CONSTRUCT A LEFT TURN LANE FROM S US 119 ONTO KY 3152. (14CCN) (16CCR)

CONSTRUCT A NEW TURN LANE ON US 119 BETWEEN KY 2007 AND KY 3467.(16CCN)

ADDRESS HORIZONTAL ALIGNMENT AND SAFETY ISSUES ON US 119 NEARHARLAN/BELL COUNTY LINE. (16CCN)

IMPROVE SAFETY ON KY-32 AT THE ENTRANCE TO HARRISON MEMORIALHOSPITAL IN CYNTHIANA.(12CCR)

REPLACE BRIDGE ON OLD LAIR RD (CR-1124) (0.071) OVER S. FORK LICKINGRIVER. (SR=14.2) 049C00035N (16CCR)

CONSTRUCT WEST US-27 CYNTHIANA BYPASS: SECTION THREE FROM US-27N TOUS-62 EAST. (06CCN)

.200

.200

.200

.200

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

HARRISON

HARRISON

HARRISON

KY-38

US-119

US-119

US-119

US-119

KY-32

CR-1124

US-27

$1,200,000

$1,500,000

$1,275,000

$1,325,000

$17,350,000

$2,290,000

$500,000

$7,300,000

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

D

R

U

C

D

R

U

C

C

C

D

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2017

2018

2018

2017

2017

2018

2018

2016

2017

2017

2018

2019

2016

2017

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

NH

NH

NH

NH

NH

NH

NH

NH

SPP

SPP

SPP

SPP

NH

SPP

BRZ

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,200,000

$100,000

$25,000

$75,000

$1,300,000

$100,000

$25,000

$50,000

$1,100,000

$100,000

$50,000

$75,000

$1,100,000

$17,350,000

$2,290,000

$500,000

$7,300,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

06

06

06

8704.00

8807.00

8808.00

8905.00

8906.00

908.00

1093.00

8302.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

06

06

06

8704.00

8807.00

8808.00

8905.00

8906.00

908.00

1093.00

8302.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2014

2016

2016

2010

2016

2006

2012

2014

2014

2016

2016

2010

2016

2006

10

10

9.8

10.074

.051

10.2

10.2

10

10.274

.091

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

Page 59: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 59

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT U2 62 FROM MP 11.9 TO MP 12.3.(12CCN)(14CCR)

RECONSTRUCT US 27 FROM MP 11.9 TO MP 12.4.(12CCN)(14CCR)

REPLACE UNION ROBINSON ROAD BRIDGE.(12CCN)

IMPROVE CONNECTIVITY AND SAFETY BY PROVIDING A ROUTE FOR TRUCKTRAFFIC WEST OF HORSE CAVE FROM KY 218 TO US 31W TO AVOID THERAILROAD CROSSING AND DOWNTOWN AREA. (16CCR)

PADUCAH-HENDERSON; RECONSTRUCT US-60 FROM THE CORYDON BYPASS(CORYDON-GENEVA ROAD) TO THE HENDERSON BYPASS (KY-425).(04CCR)

PADUCAH-HENDERSON; CONSTRUCT US-60 BYPASS OF CORYDON.(04CCR)(12CCR)

WIDEN AND IMPROVE US 60 FROM WEST OF HENDERSON COMMUNITY COLLEGE(MP 7.7) EXTENDING EAST TO KY 425 (MP 8.7). (BOP2012)

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2018. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

.400

.500

3.200

5.000

1.000

HARRISON

HARRISON

HARRISON

HART

HENDERSON

HENDERSON

HENDERSON

HENDERSON

US-62

US-27

CR-1062

KY-335

US-60

US-60

US-60

-

$2,920,000

$6,000,000

$1,150,000

$11,900,000

$38,320,000

$41,470,000

$5,500,000

$600,000

Total

Total

Total

Total

Total

Total

Total

Total

C

R

C

C

D

R

U

C

D

R

U

C

D

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2016

2017

2018

2019

2020

2016

2017

2017

2019

2016

2017

2017

2019

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SP

SP

SP

SP

SP

SP

SP

SP

STP

SHN

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,920,000

$500,000

$5,500,000

$1,150,000

$1,000,000

$1,500,000

$1,000,000

$8,400,000

$1,500,000

$5,760,000

$4,880,000

$26,180,000

$2,500,000

$3,840,000

$1,960,000

$33,170,000

$5,500,000

$600,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

04

02

02

02

02

8707.00

8708.00

8710.00

441.00

79.02

79.10

79.30

700.13

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

04

02

02

02

02

8707.00

8708.00

8710.00

441.00

79.00

79.00

79.00

700.13

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2012

2016

1998

1998

2012

2012

2012

2012

2012

2016

1996

1996

1996

2012

11.9

11.9

3.877

1.2

5.531

7.7

12.3

12.4

3.895

2.545

8.71

8.71

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

ECONOMIC DEVELOPMENT / ECONOMIC DEVEL(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MATCHED FED FUNDS(O)

Page 60: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 60

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2019. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2020. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2021. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2022. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

US 41/KY 812 INTERSECTION UPGRADE: ADD RIGHT TURN AND LEFT TURN LANESINCLUDING SIGNAL PHASING. KYTC PROJECT WITH KYTC PROVIDING 20%MATCH.(TOLL CREDITS)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP)

WATHEN BRIDGE REPLACEMENT: REPLACE EXISTING BRIDGE WITH 6FTPRECAST CONCRETE BOX CULVERT, PAVEMENT AND GUARDRAIL. LPAPROJECT. CITY TO PROVIDE MATCH.(FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)(051C00014)

KY 2183 / KY 1539 INTERSECTION AND UPGRADE: PROJECT WILL RECONSTRUCTTHE INTERSECTION AND MAKE IMPROVEMENTS TO THE SOUTHBOUNDAPPROACH. (2012BOP)

US 41/ WOLF HILLS ROAD INTERSECTION UPGRADE: PROJECT WILL ADDDEDICATED RIGHT TURN AND LEFT TURN LANES INCLUDING SIGNAL PHASINGTO BE MODIFIED OR ADDED TO EACH LEG OF THE INTERSECTION. (2012BOP)

.140

.100

.100

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

-

-

-

-

US-41

CS-1453

KY-2183

US-41

$700,000

$700,000

$700,000

$600,000

$700,000

$225,000

$1,400,000

$650,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

R

U

C

R

U

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2021

2022

2016

2016

2017

2016

2016

2017

2016

2016

2017

2016

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$700,000

$700,000

$700,000

$600,000

$50,000

$100,000

$550,000

$10,000

$15,000

$200,000

$400,000

$400,000

$600,000

$50,000

$100,000

$500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

02

700.14

700.15

700.16

700.17

711.00

713.00

714.00

715.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

02

02

02

700.14

700.15

700.16

700.17

700.07

700.07

700.08

700.08

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2016

2016

2006

2006

2012

2012

2014

2014

2016

2016

2006

2006

2008

2008

12.766

.72

1.693

18.488

12.906

.77

1.793

18.588

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

Page 61: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 61

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON US 60 OVER GREEN RIVER AT INTERSECTION WITH KY 1078(SR 39)051B00015N.(12CCR)

REPLACE BRIDGE ON US 60 OVER GREEN RIVER AT INTERSECTION WITH KY 1078(SR 39) 051B00015N (ADDITIONAL FUNDING FOR C PHASE)

REPLACE BRIDGE ON US 60 OVER GREEN RIVER AT INTERSECTION WITH KY 1078(SR 39) 051B00015N (ADDITIONAL FUNDING FOR C PHASE)

PE/ENVIRONMENTAL AND INITIAL FINANCING PLAN FOR FUTURE I-69 BRIDGEOVER THE OHIO RIVER BETWEEN HENDERSON AND EVANSVILLE NEAR US 41BRIDGES. (16CCR)

DEVELOP ALIGNMENT FOR INTERSTATE 69 HENDERSON/EVANSVILLE OHIORIVER CROSSING (TO BE DEVELOPED IN CONCERT WITH 2-1088.00).(16CCR)

REPLACE BRIDGE ON KY 55 OVER DAUGHERTY CREEK 0.17 MILE N OF JONES RD(CR 1331)(SR 38.6) 052B00003N

MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 ANDPENDLETON AT KY-153. SEGMENT 1: PENDLETON ROAD (KY 153) TO LOST CREEK(1/2 MILE EAST OF SAFETY KLEEN ENTRANCE). MILE POINT 2.1 TO MILE POINT6.8. (06CCN)(08CCR)(10CCR)(12CCR)(14CCR)

MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 ANDPENDLETON AT KY-153. SEGMENT 2:LOST CREEK (1/2 MILE EAST OF SAFETYKLEEN ENTRANCE) TO MAIN STREET (US 421/KY 55). MILE POINT 6.8 TO MILEPOINT 9.8.(12CCN)(14CCR)

.208

.208

.208

1.028

7.600

3.000

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENRY

HENRY

HENRY

US-60

US-60

US-60

I-69

I-69

KY-55

KY-146

KY-146

$14,250,000

$6,000,000

$5,000,000

$2,820,000

$41,000,000

$380,000

$13,630,000

$11,060,000

Total

Total

Total

Total

Total

Total

Total

Total

U

C

C

C

P

D

R

U

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2018

2019

2016

2017

2018

2019

2016

2016

2017

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

BRO

NH

NH

NH

NH

BRO

BRO

BRO

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$250,000

$14,000,000

$6,000,000

$5,000,000

$2,820,000

$6,000,000

$20,000,000

$15,000,000

$90,000

$60,000

$230,000

$13,630,000

$11,060,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

05

05

05

1080.00

1080.01

1080.02

1088.00

1088.10

1066.00

8300.00

8300.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

05

05

05

1080.00

1080.00

1080.02

1088.00

1088.10

1066.00

8300.00

8300.10

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2016

2016

2014

2016

2012

2006

2012

2012

2012

2016

2014

2016

2012

2006

2012

19.236

19.236

19.236

6.105

2.169

6.8

19.444

19.444

19.444

6.145

6.8

9.8

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

Page 62: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 62

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REHABILITATION-OVERLAY AND WIDENING EXISTING KY-55 FROM KY-22 TOCURVE AT MP 2.210 NORTH OF EMINENCE. INCLUDES REPLACING EXISTINGCURB AND GUTTER AND SIDEWALKS, AND RELOCATION OF IMPACT UTILITIES.(MP 1.408 TO 2.210)(14CCN)

IMPROVE DRAINAGE AND INSTALL SIDEWALK ALONG KY 241 INPLEASUREVILLE. (14CCN)

SCOPING/PLANNING STUDY FOR KY-389 IN HENRY COUNTY FROM KY-202(DRENNON ROAD) NORTH TO HENRY COUNTY/CARROLL COUNTY LINE. (14CCN)

REPLACE BRIDGE AND APPROACHES ON KY-1826 OVER TOWN CREEK (B79) INCLINTON. (SR=24.4): (053B00079N)

REPLACE BRIDGE OVER IC RR ON BALTIMORE RD (CR 1011) 0.3 MI NW OFHICKMAN/GRAVES CO LINE 053C00003N SR 24.5

REPLACE BRIDGE OVER HURRICANE BRANCH ON KY 1301, LOCATED 1.092 MI NWOF US 51 IN HICKMAN COUNTY, KY.(SR 21) (053B00083N) (2014BOP)

WIDEN US-41A TO 5 LANES FROM US-41 WEST TO KINGDOM HALL ROAD INMADISONVILLE. (2002BOPC)(04CCR)(SEE 2-137.02 FOR "HPP"COMPONENT)(08CCR)(10CCR)(12CCR)(16CCN)

US 41A PHASE II DESIGN AND RIGHT-OF-WAY. (2005HPP-KY135)(SEE 2-137.01 FOR"STP" COMPONENT)

.802

1.147

8.631

.100

.055

.057

3.600

3.600

HENRY

HENRY

HENRY

HICKMAN

HICKMAN

HICKMAN

HOPKINS

HOPKINS

KY-55

KY-241

KY-389

KY-1826

CR-1011

KY-1301

US-41A

US-41A

$5,260,000

$1,100,000

$500,000

$2,630,000

$2,610,000

$300,000

$27,000,000

$2,879,680

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

P

U

C

D

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2018

2016

2016

2017

2016

2016

2018

2019

2021

2021

2022

2017

2019

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

BRX

BRX

BRZ

BRZ

BRZ

BRZ

BRX

SPP

HPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,450,000

$1,160,000

$2,650,000

$550,000

$75,000

$475,000

$500,000

$630,000

$2,000,000

$380,000

$150,000

$250,000

$1,830,000

$300,000

$27,000,000

$2,879,680

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

01

01

01

02

02

8820.00

8821.00

8822.00

1062.00

1156.00

1158.00

137.01

137.02

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

01

01

99

02

02

8820.00

8821.00

8822.00

1062.00

1156.00

1074.05

137.00

137.02

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2008

2014

2014

2016

2004

2014

2014

2014

2008

2014

2008

2000

2004

1.408

0

13.16

4.888

.25

1.039

0

0

2.21

1.147

21.791

4.988

.305

1.096

3.426

3.426

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MINOR WIDENING(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / SCOPING STUDY(O)

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

Page 63: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 63

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

WIDEN US-41A FROM INDUSTRIAL DRIVE TO YORKWOOD PLACE. (SECTION 1)(2012BOP)(16CCR)

WIDEN US-41A FROM YORKWOOD PLACE TO US 41 / KY 281. (SECTION 2)(2012BOP)(16CCR)

STUDY POSSIBILITIES FOR IMPROVING RAILROAD CROSSING ON KY-1034 AT US-41A, MP 11.336.(10CCR)

RECONSTRUCT KY-85 FROM KY-70 EAST TO AIRPORT ROAD AT ANTON.(08CCR)(10CCR)(16CCR)

CENTER STREET/ISLAND FORD CONNECTOR ROAD IN MADISONVILLE FROMCENTER STREET NORTH TO CSX RAILROAD. (14CCN)

REPLACE BRIDGE ON KY-260 (MP 2.14) OVER OTTER CREEK; .20 MI EAST OFPENNYRILE PARKWAY; (FUNCTIONALLY OBSOLETE, SR=31.9) 054B00022N (14CCR)

REPLACE BRIDGE ON KY 262 OVER GREASEY CREEK 0.67 MILE E OF BEANCEMETERY RD (CR 1396)(SR 40.3)054B00107N

REPLACE BRIDGE ON KY 293 AT THE CALDWELL/HOPKINS COUNTY LINE(SR37.7)054B00115N

REPLACE BRIDGE ON KY 1069 OVER OTTER CREEK AT INTERSECTION OF J DBUCHANAN RD (CR 1093)(SR 43.9)054B00157N

2.030

1.246

.300

1.700

.100

.040

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

US-41A

US-41A

KY-1034

KY-85

-

KY-260

KY-262

KY-293

KY-1069

$11,000,000

$11,000,000

$200,000

$9,690,000

$2,600,000

$1,140,000

$500,000

$1,750,000

$770,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

R

U

C

C

R

U

C

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2019

2016

2016

2016

2017

2016

2016

2017

2018

2016

2016

2016

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SP

SP

SP

SP

SPP

BRX

BRX

BRX

BRO

BRO

BRO

BRO

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$11,000,000

$11,000,000

$200,000

$850,000

$840,000

$8,000,000

$2,600,000

$160,000

$300,000

$680,000

$500,000

$1,750,000

$150,000

$170,000

$450,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

02

02

137.10

137.20

161.00

176.00

804.10

1072.00

1079.00

1081.00

1084.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

CALDWELL

02

02

02

02

02

02

02

02

02

137.00

137.00

161.00

176.00

804.10

1072.00

1079.00

1081.00

1084.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2000

2004

2006

2014

2010

2012

2012

2012

2000

2000

2004

2006

2014

2010

2012

2012

2012

1.246

0

11.186

0

2.09

2.734

0

2.355

3.275

1.246

11.486

1.72

2.19

2.774

.044

2.395

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SCOPING STUDY(O)

ECONOMIC DEVELOPMENT / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

20.442 20.486Milepoints: To:From:

Page 64: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 64

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

WIDEN NORTH MAIN STREET FROM HOSPITAL DRIVE TO KY-281. (06CCN)(12CCR)

US-62; THREE LANES FROM BOARD OF EDUCATION TO CITY PARK IN DAWSONSPRINGS. (08CCN)(10CCR)(12CCR)(16CCN)

RECONSTRUCT KY 30 FROM US 421 TO THE OWSLEY COUNTY LINE. (14CCR)(SEE10-279.60 FOR PE & ENVIR)(16CCR)

REPLACE BRIDGE ON US 421 OVER PIGEON ROOST CREEK AT INTERSECTIONWITH WATER STREET E(CS 1006)(SR 43.9)(AR/W) 055B00157N

SNYDER FREEWAY; RECONSTRUCT 2 RAMPS AT I-265/I-64 INTERCHANGE EASTOF LOUISVILLE. (DESIGNED WITH 5-41.00)(2006BOPP)(12CCR)

SNYDER FREEWAY; RECONSTRUCT 2 RAMPS AT I-265/I-64 INTERCHANGE EASTOF LOUISVILLE. (DESIGNED WITH 5-41.00)(ADDITIONAL FUNDS FOR CPHASE)(12CCR)

COMPLETE I-265/I-64 INTERCHANGE IMPROVEMENTS.(ADDITIONAL FUNDS FOR CPHASE)

I-64 BRIDGE (SHERMAN MINTON) OVER OHIO RIVER @ LOUISVILLE (B279); JOINTPROJECT WITH INDIANA TO PERFORM IN-DEPTH INSPECTION. (056B00279N)

.600

.521

8.396

.040

.300

.300

.300

.300

HOPKINS

HOPKINS

JACKSON

JACKSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

US-41

US-62

KY-30

US-421

I-265

I-265

I-265

I-64

$11,330,000

$2,500,000

$65,000,000

$750,000

$31,590,000

$10,000,000

$19,600,000

$160,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

D

R

U

C

C

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2018

2017

2017

2018

2017

2018

2019

2020

2017

2017

2017

2019

2020

2021

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

BRO

IM

IM

IM

IM

IM

IM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$840,000

$1,020,000

$1,280,000

$8,190,000

$500,000

$500,000

$1,500,000

$4,700,000

$8,300,000

$5,000,000

$47,000,000

$750,000

$4,210,000

$3,380,000

$24,000,000

$10,000,000

$19,600,000

$160,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

11

11

05

05

05

05

8305.00

8501.00

278.30

1090.00

21.00

21.01

21.02

63.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

11

11

05

05

05

05

8305.00

8501.00

278.30

1090.00

21.00

21.00

21.00

63.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2016

2014

2012

2016

2016

2016

2000

2006

2016

2014

2012

2016

2016

2016

2000

16.989

.829

9.913

13.919

25.3

25.3

25.3

0

17.548

1.35

18.309

13.959

25.6

25.6

25.6

.316

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

ECONOMIC DEVELOPMENT / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

SAFETY / BRIDGE INSPECTION(P)

Page 65: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 65

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

I-64 BRIDGE (SHERMAN MINTON) OVER THE OHIO RIVER @ LOUISVILLE (B279);JOINT PROJECT WITH INDIANA TO PAINT THIS BRIDGE. (056B00279N)

WIDEN FROM 2 TO 4 LANES FROM BEARGRASS CREEK TO ZORN AVENUE. (LOUT.I.P.) (KYTC MATCH) (SEE 5-91.07 FOR ADDITIONAL 'KYD' FUNDING FOR RPHASE.) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

CLEAN AND PAINT THE GEORGE ROGERS CLARK MEMORIAL BRIDGECARRYING US-31 OVER THE OHIO RIVER BETWEEN LOUISVILLE, KENTUCKYAND JEFFERSONTOWN, INDIANA (THIS STRUCTURE IS 100% OWNED ANDMAINTAINED BY KENTUCKY) (B118): (056B00118N)(12CCR)

MAJOR REVISION OF THE INTERSECTION LOCATED AT THE OUTER LOOP,FEGENBUSH LANE, AND BEULAH CHURCH ROAD. TURN LANE TO BE COMPLETEDBY TRANSPORTATION CABINET PER AGREEMENT.(04CCN)(08CCR)(10CCR)(12CCR)

CLEAN AND PAINT ALL STEEL BRIDGES AND STEEL BEARINGS ON THE GENESNYDER FREEWAY(10CCR)

WIDEN I-64 WESTBOUND RAMP TO I-264 WESTBOUND FROM ONE TO TWO LANESFOR ENTIRE LENGTH AND OTHER NEEDED IMPROVEMENTS TO ADDRESSWEAVE ISSUES AT MERGE ON I-264. (2006BOPP)(12CCR)

SIGNAL SYSTEM IMPROVEMENTS IN JEFFERSON COUNTY.

RECONSTRUCT SECOND CURVE ONLY ON I-65 SOUTHBOUND RAMP AT KY-1065(OUTER LOOP).(SEE 5-205.01 FOR BREAKOUT IMPROVEMENTS)

WIDEN BLUE LICK ROAD FROM SNYDER FREEWAY NORTH TO KY-61 (LOU T.I.P.)(SECTION 2) (RU-04DEOB)(08CCR)(12CCR)(16CCR)

.300

1.500

1.100

.200

.500

.621

1.600

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

I-64

CS-1001B

US-31

KY-1065

I-265

I-64

-

I-65

KY-1450

$4,160,000

$11,500,000

$22,000,000

$5,570,000

$3,790,000

$21,460,000

$910,000

$1,820,000

$10,960,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2016

2018

2016

2016

2016

2016

2018

2016

2016

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

IM

SLO

SPP

SPP

SP

NH

NH

NH

SP

IM

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$4,160,000

$11,500,000

$22,000,000

$5,570,000

$3,790,000

$9,430,000

$2,350,000

$9,680,000

$910,000

$1,820,000

$10,960,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

64.00

91.02

110.00

122.00

136.00

159.00

183.01

205.00

247.10

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

05

64.00

91.02

110.00

122.00

136.00

159.00

183.01

205.00

247.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2000

2000

2000

2000

2000

2006

2006

2000

2000

2000

2000

2000

2000

2000

2006

2006

1996

0

1.6

0

9.944

.232

0

1.873

.316

2.925

1.089

10.009

.779

.621

3.542

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE PAINTING(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE PAINTING(P)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE PAINTING(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SIGNAL SYS IMPROVE(P)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

Page 66: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 66

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

WIDEN GREENWOOD ROAD FROM GREENBELT HWY TO DIXIE HWY (US-31W) (3-LANE IMPROVEMENT) FROM MP 0.54 TO MP 3.148. (98CCR)(R-04DEOB)(04CCR)(BOP2006P)(10CCR)(12CCR)

WIDEN SOUTHBOUND HURSTBOURNE LANE TO 3 LANES FROM LINN STATION RD(CS-1004H) TO EDEN AVE (CS-1660H). (06CCR)(03KYD)(2006BOPP)(SEE 5-344.02 FORKYD C PHASE)(14CCR)

ENGLISH STATION ROAD IN LOUISVILLE; WIDEN TO 3 LANES FROM AVOCAROAD TO WEST AIKEN ROAD.(FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

RECONSTRUCT KY-22 AT SPRINGCREST DRIVE. (06CCN)(2004BOPC)(14CCR)(EMERGENCY CULVERT REPLACEMENT AWARDED UNDER 5-371.12)

INTERSECTION SAFETY IMPROVEMENTS ON KY-22 AT TEN BROECK WAYINCLUDING PROVIDING LEFT TURN LANES. (2004BOPC) (DESIGN SHOWN UNDER371.01).

RECONSTRUCT KY-22 AT GOOSE CREEK ROAD. (06CCN) (2004BOPC)(14CCR)

RECONSTRUCT KY-22 AT BARBOUR LANE. (06CCN) (2004BOPC)

RECONSTRUCT KY-22 AT AVENUE OF THE WOODS AND CHATSWORTH. (06CCN)(2004BOPC)

2.600

1.600

.850

.400

.400

.400

.500

.400

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

KY-1931

KY-1747

CR-1006C

KY-22

KY-22

KY-22

KY-22

KY-22

$8,630,000

$12,950,000

$4,060,000

$1,000,000

$2,640,000

$1,320,000

$880,000

$6,620,000

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

C

C

R

U

C

C

R

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2017

2018

2016

2016

2016

2016

2017

2016

2016

2017

2016

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SLO

STP

SP

SP

SP

STP

SP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$8,630,000

$2,960,000

$3,140,000

$6,850,000

$4,060,000

$1,000,000

$640,000

$650,000

$1,350,000

$1,320,000

$310,000

$570,000

$1,290,000

$1,790,000

$3,540,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

323.01

344.01

353.00

371.10

371.11

371.13

371.14

371.15

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

323.01

344.00

965.08

371.12

371.00

371.00

371.00

371.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2000

2000

2014

2004

2004

2004

2004

2000

2000

1998

2004

1998

1998

1998

1998

.54

12.289

.457

1.432

3.2

2.537

1.919

1.03

3.148

13.632

1.232

1.789

3.48

2.937

2.419

1.43

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

Page 67: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 67

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

INTERSECTION IMPROVEMENT ON OLD KY-22 AT HERR LANE AND THEENTRANCE TO BALLARD HIGH SCHOOL. (06CCR)(2004BOPC)(12CCR)

EXTEND/RECONSTRUCT I-65 SB RAMP TO BROOK STREET (FUNDING SUBJECT TOFISCAL CONSTRAINT PENDING MPO TIP)

EXTEND COOPER CHAPEL ROAD FROM BEULAH CHURCH ROAD TO BARDSTOWNROAD (LOU T.I.P.) (ALL WORK BY LOUISVILLE METRO)(LOCALMATCH)(2004BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

ALIGN INTERSECTION OF BROADWAY AND 18TH STREET BY MOVING THESOUTH LEG OF 18TH STREET TO THE EAST (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

WIDEN SOUTHSIDE DRIVE (KY-907) TO 5 LANES FROM NEW CUT ROAD TONATIONAL TURNPIKE. (2004BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

REHABILITATION AND CONSTRUCTION OF VARIOUS SIDEWALK PROJECTS INLOUISVILLE METRO. (2006BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

REHABILITATION AND CONSTRUCTION OF VARIOUS SIDEWALK PROJECTS INLOUISVILLE METRO. (2006BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

REHABILITATION AND CONSTRUCTION OF VARIOUS SIDEWALK PROJECTS INLOUISVILLE METRO. (2006BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

.200

.100

2.700

.100

.700

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

KY-22

I-65

-

US-150

KY-907

-

-

-

$3,200,000

$2,110,000

$3,750,000

$850,000

$7,000,000

$100,000

$100,000

$100,000

Total

Total

Total

Total

Total

Total

Total

Total

R

C

C

R

U

C

D

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2016

2016

2016

2017

2016

2017

2017

2018

2016

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,370,000

$1,830,000

$2,110,000

$3,750,000

$90,000

$760,000

$1,000,000

$1,000,000

$1,000,000

$4,000,000

$100,000

$100,000

$100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

371.16

378.10

404.01

413.00

437.01

439.03

439.04

439.05

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OLDHAMBULLITT

OLDHAMBULLITT

OLDHAMBULLITT

05

05

05

05

05

05

05

05

371.00

378.00

404.00

413.00

437.00

439.02

439.03

439.03

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2000

2004

2004

2004

2006

2014

2014

1998

1998

2000

2004

2004

2004

2006

2006

.438

0

.9

6.31

.87

.155

1.18

7.036

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

To:To:

From:From:

From:From:

From:From:

Page 68: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 68

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

INSTALLATION OF SIDEWALKS TO FIX GAPS IN PEDESTRIAN NETWORK ONVARIOUS STATE MAINTAINED ROADS IN THE LOUISVILLE URBANIZED AREA.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

INSTALLATION OF SIDEWALKS TO FIX GAPS IN PEDESTRIAN NETWORK ONVARIOUS STATE MAINTAINED ROADS IN THE LOUISVILLE URBANIZED AREA.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

SENECA PARK LOOP EXTENSIONS (EAST AND WEST). (LOCAL MATCH)(ALLWORK BY LOUISVILLE METRO)(2004BOPC) (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP).

SENECA PARK LOOP EXTENSIONS (EAST AND WEST). (LOCAL MATCH)(ALLWORK BY LOUISVILLE METRO)(2004BOPC) (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP).

MT. WASHINGTON ROAD (KY-2053) SECTION 1; FROM PRESTON TO MAPLE WAY.(KYTC MATCH)(2004BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP)

MT. WASHINGTON ROAD (KY-2053) SECTION 2; FROM MAPLE WAY TO CEDARCREEK RD. (KYTC MATCH)(2004BOPC)(FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

CONVERSION OF ONE-WAY STREETS IN DOWNTOWN LOUISVILLE TO TWO-WAYTRAFFIC (8TH, 7TH, SHELBY, CAMPBELL STREETS). PHASE 2

REDUCE CONGESTION AND IMPROVE SAFETY AT THE KY 3084 (OLD HENRYROAD) INTERCHANGE. (12CCR)

.300

2.460

.820

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

-

-

-

-

KY-2053

KY-2053

CS-1049F

I-265

$40,000

$40,000

$320,000

$650,000

$930,000

$290,000

$748,000

$5,790,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

D

R

U

D

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2016

2016

2017

2017

2016

2016

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

NH

IM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$40,000

$40,000

$320,000

$650,000

$320,000

$490,000

$120,000

$290,000

$748,000

$700,000

$5,090,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

440.01

440.02

442.00

442.02

443.10

443.20

470.10

474.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OLDHAMBULLITT

OLDHAMBULLITT

05

05

05

05

05

05

05

05

440.01

440.02

965.09

442.00

443.00

443.00

965.12

474.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2004

2004

2004

2004

2004

2014

2012

2004

2004

2000

2004

2004

2004

2004

2012

0

.343

.047

28.28

.343

2.804

.58

29.1

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

From:From:

From:From:

Page 69: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 69

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

IMPROVE DIXIE HIGHWAY BETWEEN CRUMS LANE (KY 2049) AND ROCKFORDLANE (KY 2051)(12CCR)

IMPROVE DIXIE HIGHWAY BETWEEN ROCKFORD LANE (KY 2051) ANDGREENWOOD ROAD (KY 1931)

IMPROVE DIXIE HIGHWAY BETWEEN GREENWOOD ROAD (KY 1931) ANDSTONESTREET ROAD (CR 1003). (14CCN)

IMPROVE SAFETY ON DIXIE HIGHWAY BY PLACING BARRIER WALLS FOR 2MILES TO ELIMINATE CROSSOVER ACCIDENTS BETWEEN GREENWOOD ROAD(KY 1931) AND STONESTREET ROAD (CR 1003). (16CCN)

SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY 329.(16CCR)

CONSTRUCT A 2800' LONG, 10' WIDE MULTIUSE PATH THROUGH A.B. SAWYERPARK AND CONNECTING TO SURROUNDING NEIGHBORHOODS INCLUDES ANUNDERPASS, BRIDGE, AND SITE AMENITIES.

RE-CURB US 60A (EASTERN PARKWAY) FROM KY 1631 (CRITTENDEN DRIVE) TOUS 31E (BARDSTOWN ROAD).

GOOD SAMARITAN BICYCLE/PEDESTRIAN TRAIL CONNECTOR:CONSTRUCT AMULTI-USE BICYCLE & PEDESTRIAN TRAIL ALONG OLD TAYLORSVILLE ROAD &JEFFERSON ST IN DOWNTOWN JEFFERSONTOWN CONNECTING THEDOWNTOWN ST NETWORK TO THE GOOD SAMARITAN CENTER & BICYCLE/PEDTRAIL.

1.503

2.200

3.600

2.793

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

US-31W

US-31W

US-31W

US-31

I-71

-

US-60A

-

$4,330,000

$7,200,000

$4,800,000

$500,000

$49,000,000

$870,000

$4,400,000

$162,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

D

R

U

C

D

C

P

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2017

2016

2016

2018

2019

2020

2016

2016

2016

2016

2017

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SAF

NH

NH

NH

NH

SLO

SLO

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$4,330,000

$7,200,000

$4,800,000

$500,000

$2,500,000

$1,000,000

$500,000

$45,000,000

$170,000

$700,000

$200,000

$400,000

$3,800,000

$162,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

478.00

478.20

478.30

478.40

483.00

484.00

485.00

486.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OLDHAM

05

05

05

05

05

05

05

05

478.00

478.20

478.30

478.40

483.00

965.12

965.12

965.12

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2014

2016

2014

2014

2014

2014

2012

2014

2014

2016

2014

2004

2004

2004

13.837

11.65

9.749

9.749

9.1

4.038

15.34

13.837

11.65

11.69

11.315

6.831

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / PAVEMENT REHAB-PRI(P)

SAFETY / BIKE/PED FACIL(O)

11.315 14.1Milepoints: To:From:

Page 70: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 70

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

PRELIMINARY DESIGN & SCOPING STUDY TO DETERMINE LOCATION OF AMULTI-USE BICYCLE & PEDESTRIAN TRAIL PROJECT ALONG TAYLORSVILLEROAD FROM DOWNTOWN JEFFERSONTOWN TO 21ST CENTURY PARK.

DESIGN & CONSTRUCT SHARED USE PATH & LOUISVILLE LOOP TRAILHEADFACILITIES THRU JEFFERSON MEMORIAL FOREST FROM NORTH END OF SANDQUARRY TUNNEL AT GENE SNYDER FWY TO WEST TERMINUS OF EXISTING MSDTRAIL APPROX. 2.7 MI WHICH WILL INCLUDE BRIDGE OVER POND CR.

DESIGN & CONSTRUCT SHARED USE PATH & LOUISVILLE LOOP TRAILHEADFACILITIES THRU JEFFERSON MEMORIAL FOREST FROM BLEVINS GAP ROAD TONORTH END OF SAND QUARRY TUNNEL AT GENE SNYDER FWY(THE TUNNELWILL BE PART OF THIS SEGMENT) APPROX. 2.5 MILES.

DESIGN AND CONSTRUCT SHARED USE PATH AND LOUISVILLE LOOPTRAILHEAD FACILITIES THROUGH JEFFERSON MEMORIAL FOREST FROMPENDLETON RD AT MEDORA RD TO THE BEGINNING OF JEFFERSON MEMORIALFOREST PROPERTY ON BLEVINS GAP RD APPROX. 1.3 MILES.

MIDDLETOWN STREETSCAPE PHASE VI. ROADWAY AND STREETSCAPEIMPROVEMENTS ON OLD SHELBYVILLE RD FROM EVERGREEN RD TO US 60(SHELBYVILLE RD).

MISCELLANEOUS SIDEWALKS AND HANDICAP RAMPS: CONSTRUCT ANDREPLACE VARIOUS SIDEWALKS AND HANDICAP RAMPS THROUGHOUT THE CITYON A REOCCURRING ANNUAL BASIS.

OLMSTED PARKWAYS MULTI-USE PATH SYSTEM-SOUTHERN PKWY:CONSTRUCTION OF A 2.5 MILE SHARED USE PATH SYSTEM ALONG SOUTHERNPARKWAY BETWEEN SOUTH 3RD AND NEW CUT ROAD.

CONSTRUCTION OF A 0.5 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN WILSON AVENUE AND CYPRESS STREET.

CONSTRUCTION OF A 0.45 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN CYPRESS STREET AND DIXIE HWY.

2.500

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

-

-

-

-

CS-3596

-

KY-1020

KY-2054

KY-2054

$189,000

$333,600

$210,500

$144,240

$254,000

$37,800

$1,000,000

$1,000,000

$1,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

P

D

D

D

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2016

2016

2016

2016

2017

2016

2016

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$189,000

$333,600

$210,500

$144,240

$254,000

$37,800

$1,000,000

$1,000,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

487.00

489.00

490.00

491.00

492.00

493.00

495.00

496.00

497.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

05

965.12

965.12

965.12

965.12

965.12

965.12

965.12

965.12

965.12

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2014

2014

2014

2014

2014

2014

2004

2004

2004

2004

2004

2004

2004

2004

2004

.494

7.837

.72

1.22

1.005

9.15

1.22

1.64

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SCOPING STUDY(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

Page 71: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 71

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

CONSTRUCTION OF A 1.2 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN DIXIE HIGHWAY AND SHARP AVE.

RIVER ROAD BICYCLE AND PEDESTRIAN IMPROVEMENTS FROM DOWNTOWNLOUISVILLE TO THE CITY OF PROSPECT (US 42), 8.5 MILES. (SEE 5-3036.00)

CONSTRUCT SHARED USE PATH FROM NEIGHBORHOOD SIDEWALK TO REAR OFSCHOOL PROPERTY, AND PROVIDE OUTDOOR CLASSROOM AMENITIES ALONGSHARED USE PATH. PROJECT WILL INCLUDE WETLAND RESTORATION ONSCHOOL SITE.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

VARIOUS SAFETY PROJECTS IN THE LOUISVILLE URBANIZED AREA.

VARIOUS SAFETY PROJECTS IN THE LOUISVILLE URBANIZED AREA.

WIDEN WATTERSON TRAIL FROM 2 TO 3 LANES FROM RUCKRIEGEL PARKWAY(CS-2056H) TO MAPLE ROAD (CS-1132H) AND FROM OLD TAYLORSVILLE ROAD(CS-1119H) TO RUCKRIEGEL PARKWAY (KY 1819). PROJECT TO INCLUDESTREETSCAPE ENHANCEMENTS.

CONSTRUCT A MULTI-USE BICYCLE AND PEDESTRIAN TRAIL ALONGWATTERSON TRAIL FROM MULBERRY ROW WAY TO MANSFIELD ESTATESDRIVE.

REPAIR DRAINAGE SYSTEM ON THE I-64 BRIDGE OVER N.S. RAILROAD AND THELEVEE AND REPAIR THE LEVEE.(056B00284N)(2014BOP)

"SHARED USE PATH" LOUISVILLE LOOP TRAILHEAD FACILITIES THROUGHJEFFERSON MEMORIAL FOREST FROM NORTH END OF SAND QUARRY TUNNELAT GENE SNYDER FWY TO WEST TERMINUS OF THE EXISTING MSD TRAILAPPROX 2.7 MI WHICH WILL INCLUDE A BRIDGE OVER POND CREEK. 2012BOP

.151

.831

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

KY-2054

CR-1001B

-

-

-

CR-1004H

CR-1004H

I-64

-

$1,000,000

$2,243,030

$82,500

$1,000,000

$1,000,000

$703,957

$656,640

$400,000

$333,600

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

C

D

C

C

C

U

C

C

C

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2016

2017

2016

2017

2016

2017

2017

2016

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

IM

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,000,000

$200,000

$2,043,030

$12,500

$70,000

$1,000,000

$1,000,000

$194,169

$509,788

$656,640

$400,000

$333,600

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

498.00

499.00

513.00

516.02

516.03

518.00

519.00

521.00

522.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OLDHAMBULLITT

OLDHAMBULLITT

05

05

05

05

05

05

05

99

05

965.12

965.12

965.12

516.00

516.00

965.12

965.12

65.11

522.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2004

2014

2014

2014

2014

2014

2012

2004

2004

2004

2014

2014

2004

2004

2008

2012

1.64

0

3.179

1.857

1.387

2.717

6.761

3.33

2.688

1.891

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / MATCHED FED FUNDS(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / MINOR WIDENING(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / BRIDGE REHAB(P)

SAFETY / BIKE/PED FACIL(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

From:From:

From:From:

Page 72: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 72

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

IMPROVE THE SAFETY AND CONGESTION OF KY 1932 (CHENOWETH LANE) FROMUS 60 (SHELBYVILLE ROAD) TO US 42 (BROWNSBORO ROAD) APPROXIMATELY1.07 MILES (2014BOP).

WIDEN KY 1931 FROM 2 TO 3 LANES FROM US 31W (DIXIE HWY) TO DOSS HIGHSCHOOL. (2014BOP)

SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71.

PROVIDE COLLECTOR-DISTRIBUTOR LANE ON SOUTHBOUND I-71 TOFACILITATE RAMP MOVEMENTS TO AND FROM I-265.

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-265FROM MP 16.6 TO MP 17.2 APPROX 3100 FT.

LOUISVILLE BRIDGES; KENTUCKY TRADITIONAL NH FUNDING FOR FY 2017PLEDGED TO SUPPORT THE FINANCING OF THE LSIORB (CANNOT BEMOVED)(14CCR)

RECONSTRUCT/WIDEN I-264 (WATTERSON EXPRESSWAY) FROM WESTPORTROAD (KY 1447) TO I-71, INCLUDING THE US-42 INTERCHANGE AS ASPUI.(PROJECT INCLUDES 5-594) (12CCR)(14CCR)

RECONSTRUCT/WIDEN I-264 (WATTERSON EXPRESSWAY) FROM WESTPORTROAD (KY 1447) TO I-71, INCLUDING THE US-42 INTERCHANGE AS ASPUI.(PROJECT INCLUDES 5-594) (ADDITIONAL FUNDING FOR C PHASE)

3.000

1.700

1.700

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

KY-1932

KY-1931

I-265

I-71

I-265

-

I-264

I-264

$5,016,400

$3,000,000

$46,500,000

$5,000,000

$2,100,000

$50,000,000

$32,900,000

$23,000,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

R

D

R

U

C

C

C

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2018

2018

2016

2018

2020

2021

2017

2018

2017

2016

2019

2019

2020

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

NH

NH

NH

NH

IM

SP

NH

IM

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,250,000

$1,766,400

$2,000,000

$3,000,000

$2,500,000

$2,000,000

$2,000,000

$40,000,000

$5,000,000

$2,100,000

$50,000,000

$3,000,000

$5,020,000

$710,000

$24,170,000

$23,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

531.00

536.00

537.00

539.00

540.00

715.41

804.00

804.02

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

965.13

965.13

537.00

539.00

540.00

715.41

390.00

804.02

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2016

2016

2016

2008

2010

2016

2006

2006

2016

2016

2016

2008

2006

2016

5.523

3.148

23.409

16.6

20.9

20.9

6.59

4.887

34.727

17.2

22.6

22.6

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / RECONSTRUCTION(O)

ECONOMIC DEVELOPMENT / PREFINANCD CONVRSN(O)

Page 73: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 73

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2016 (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2017 (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018 (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2019. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

US 42 SAFETY IMPROVEMENTS FROM HARRODS CREEK BRIDGE TO RIVERROAD.(10CCR)

REPLACE BRIDGE ON CR-1038L OVER BEE LICK CREEK; (STRUCTURALLYDEFICIENT, SR=4) 056C00104N

1.000

.060

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

-

-

-

-

-

-

-

US-42

CR-1038L

$48,700,000

$5,800,000

$7,700,000

$23,000,000

$23,500,000

$23,500,000

$23,500,000

$12,000,000

$330,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2018

2019

2020

2021

2022

2016

2016

2018

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SP

SP

SP

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$48,700,000

$5,800,000

$7,700,000

$23,000,000

$23,500,000

$23,500,000

$23,500,000

$5,000,000

$3,000,000

$4,000,000

$330,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

965.14

965.15

965.16

965.17

965.18

965.19

965.20

972.00

1061.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

99

05

965.14

965.15

965.16

965.17

965.18

965.19

965.20

134.00

1061.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2008

2008

2014

2014

2016

2016

1998

2010

2006

2008

2008

2014

2014

2016

2016

1996

2010

9.628

0

10.548

.06

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 74: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 74

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

OLMSTED PARKS HISTORIC BRIDGES: REHABILITATE 11 BRIDGES THROUGHOLMSTED PARK: (056C00032N, 056C00031N, 056C00026N, 056C00027N, 056C00028N,056C00030N, 056C00029N, 056C00034N, 056C00033N, 056C00139N, 056C00138N)

REPLACE BRIDGE ON EASTERN PARKWAY (US 60A) OVER SOUTH FORKBEARGRASS CREEK 0.2 MILE NE OF POPLAR LEVEL RD (KY 864)(SR 9.5)056B00139N

REPLACE BRIDGE ON E BROADWAY (US 150) OVER SOUTH FORK BEARGRASSCREEK AT INTERSECTION WITH BRENT STREET (CS 1312G)(SR 38) 056B00348N

REPLACE BRIDGE ON FAIRMOUNT RD (CR 1004N) OVER CEDAR CREEK 0.2 MILEW OF FARMERS WAY (PR 1021N)(SR 41) 056C00054N

REPLACE BRIDGE ON E KENTUCKY ST (CS 1017G) OVER SOUTH FORKBEARGRASS CREEK 0.01 MILE E OF SCHILLER AVE (CS 1138G)(SR 48.8) 056C00083N

REPLACE I-264 EB BRIDGE OVER NORTHWESTERN PARKWAY (KY-3064) (SR=48.0)

REPLACE BRIDGE OVER NORTHERN DITCH ON GRADE LANE (CR 1001G) 0.34 MI SOF KY 1747 (FERN VALLEY ROAD) (056C00064N)(SR=25.4)

.040

.040

.040

.020

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

-

US-60A

US-150

CR-1004N

CS-1017G

I-264

CR-1001G

$600,000

$1,400,000

$1,190,000

$650,000

$710,000

$2,000,000

$1,270,000

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

R

U

C

R

U

C

R

U

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2018

2016

2016

2017

2016

2016

2017

2017

2017

2019

2016

2017

2019

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRO

BRO

BRO

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRO

BRZ

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$600,000

$100,000

$500,000

$800,000

$120,000

$220,000

$850,000

$100,000

$50,000

$500,000

$10,000

$100,000

$600,000

$2,000,000

$350,000

$20,000

$50,000

$850,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

1062.00

1064.00

1067.00

1068.00

1070.00

1073.00

1077.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

1062.00

1064.00

1067.00

1068.00

1070.00

1073.00

1077.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2012

2012

2012

2012

2014

2014

2010

2012

2012

2012

2012

2014

2014

5.698

3.6

.737

1.293

.15

2.48

5.738

3.64

.777

1.333

.19

2.5

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 75: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 75

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE OVER GOOSE CREEK ON RIVER ROAD (CR 1001B) 0.2 MI N OFLIME KILN ROAD (CR 1002B) (056C00130N)(SR=26.5)

WIDEN BUECHEL BANK ROAD TO 3 LANES FROM GE APPLIANCE PARK TOBUECHEL BY-PASS (00CCN) (FUNDING MOVED FROM 5-8105 IN 2010 ENACTEDHIGHWAY PLAN FOR R, U, AND C PHASES.)(12CCR)

RECONSTRUCT BILLTOWN ROAD FROM NORTH OF COLONNADES PLACE TOSOUTH OF EASUM ROAD. (04CCN)(06CCN)(08CCR)(10CCR)(12CCR)

IMPROVE AND WIDEN MT WASHINGTON ROAD FROM PRESTON HIGHWAY TOPENN RUN CREEK BRIDGE. (10CCN)(SAME AS 5-8611.00)

IMPROVE AND WIDEN MT. WASHINGTON ROAD FROM PENN RUN CREEK BRIDGETO CEDAR CREEK ROAD. (10CCN)(SAME AS 5-8612.00)

INSTALL SOUND BARRIER ON BOTH SIDES OF KY-841 AT WATSONVILLE ROAD.(08CCN)(12CCR)

INTERCHANGE AT MANSLICK ROAD (KY-1931) AND I-264.(08CCN)(10CCR)(12CCR)(14CCR)(16CCR)

RAILROAD SAFETY CROSSING. IMPROVE LIGHTING, ERECT SIGNALS UPGRADEAND ROADWAY CROSSINGS BETWEEN CARDINAL AND HILL STREETS.(08CCN)(12CCR)

.070

.900

2.500

1.501

1.187

.300

.100

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

CR-1001B

CR-1007G

KY-1819

KY-2053

KY-2053

KY-841

I-264

-

$1,760,000

$5,080,000

$2,400,000

$9,650,000

$3,800,000

$2,170,000

$5,800,000

$200,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

U

C

C

R

U

D

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2021

2021

2022

2016

2017

2016

2016

2016

2016

2018

2018

2016

2019

2020

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

BRZ

SPP

SPP

SPP

SP

SP

SP

SP

SP

SPB

NH

NH

SAF

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$450,000

$50,000

$10,000

$1,250,000

$750,000

$4,330,000

$2,400,000

$3,260,000

$6,390,000

$1,000,000

$1,500,000

$1,300,000

$2,170,000

$4,000,000

$1,800,000

$200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

1079.00

8001.00

8203.00

8205.10

8205.20

8403.00

8405.00

8412.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

1079.00

8001.00

8203.00

8205.10

8205.20

8403.00

8405.00

8412.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2000

2004

2010

2010

2008

2008

2008

2014

2000

2004

2010

2010

2008

2008

2008

3.8

.114

6.9

0

1.501

3.55

8.08

3.87

1.004

8.1

1.501

2.688

3.85

8.18

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / ENVIRO MITIGATION(P)

RELIABILITY / NEW INTERCHANGE(O)

SAFETY / SAFETY-RR PROTECTN(P)

Page 76: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 76

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

WIDEN KY-1020, NATIONAL TURNPIKE, FROM FAIRDALE ROAD TO SOUTH PARKROAD. MP .615 TO MP 2.669. (08CCN)

WIDEN KY-2055 (MT. HOLLY ROAD) FROM NATIONAL TURNPIKE TO FAIRDALEROAD. (08CCN)(16CCR)

MAKE BEAUTIFICATION AND IMPROVEMENTS ON DIXIE HIGHWAY AT THEWATTERSON EXPRESSWAY EXCHANGE. (08CCN)(12CCR)

EXTEND THE EXISTING SOUND BARRIER WALL ON THE WEST SIDE OF THEWESTPORT ROAD INTERCHANGE. THE WALL SHALL EXTEND APPROXIMATELY2900' AND BE 16' HIGH. (10CCN)(10CCR)

IMPROVE AND WIDEN MT. WASHINGTON ROAD FROM PRESTON HIGHWAY TOPENN RUN CREEK BRIDGE. (10CCN)(12CCR)(SAME AS 5-8205.10)

IMPROVE AND WIDEN MT. WASHINGTON ROAD FROM PENN RUN CREEK BRIDGETO CEDAR CREEK ROAD. (10CCN)(12CCR)(SAME AS 5-8205.20)

UPGRADE A 1-MILE SECTION OF SIDEWALKS, CURBING AND BEAUTIFICATIONTO BARDSTOWN ROAD IN BUECHEL.(12CCN)

RESURFACE, STREETSCAPE, PEDESTRIAN BUMP-OUTS AND OTHER TRAFFICIMPROVEMENTS ON EAST MARKET STREET FROM BAXTER TO BROOK STREET,BETWEEN NUCLEUS UL URBAN RESEARCH PARK AND HOME OF THEINNOCENTS.(12CCN)

2.054

1.360

.400

1.501

1.187

1.192

.932

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

KY-1020

KY-2055

US-31W

KY-1447

KY-2053

KY-2053

KY-2251

US-31E

$1,350,000

$17,070,000

$102,000

$1,392,000

$22,330,000

$12,380,000

$300,000

$8,500,000

Total

Total

Total

Total

Total

Total

Total

Total

D

D

R

U

C

C

C

D

R

U

C

D

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2018

2019

2020

2016

2016

2019

2020

2020

2022

2016

2017

2017

2019

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SP

SPP

SP

STP

SP

SP

SP

SP

SP

SP

SP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,350,000

$1,050,000

$1,050,000

$5,220,000

$9,750,000

$102,000

$1,392,000

$630,000

$3,500,000

$7,200,000

$11,000,000

$800,000

$2,020,000

$1,650,000

$7,910,000

$300,000

$8,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

8502.00

8503.00

8507.00

8601.00

8611.00

8612.00

8702.00

8703.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

8502.00

8503.00

8507.00

8601.00

8611.00

8612.00

8702.00

8703.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2008

2008

2010

2010

2010

2012

2012

2008

2008

2008

2010

2010

2010

2012

2012

.615

0

14.5

0

1.501

0

16.635

2.669

1.36

14.9

1.501

2.688

1.192

17.567

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / ENVIRO MITIGATION(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

Page 77: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 77

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

SOUND BARRIER ON I-264 FROM RAMP TO US 42 SOUTH TO EXISTINGBARRIERS.(12CCN)

SOUND BARRIER ON I-64 FROM WATTERSON RAMP TO EXISTING SOUNDBARRIER. (12CCN)

WIDEN RANGELAND ROAD TO 3 LANES FOR 1.23 MILES. (14CCN)

SAFETY IMPROVEMENTS TO PALATKA ROAD (KY-1142) MP 0.0 TO MP 1.73.(14CCN)

CONSTRUCT A SOUND WALL ON THE NORTH SIDE OF I-265 BETWEEN SMYRNAPARKWAY AND PENNSYLVANIA RUN ROAD. (14CCN)

NEW CONSTRUCTION - SOUNDWALL ALONG SOUTHWEST SIDE OF WATTERSONEXPRESSWAY FROM CRUMS LANE TO APPROXIMATELY 0.5 MILE WEST OF THEDIXIE HWY INTERCHANGE. (14CCN)

NEW CONSTRUCTION - CONSTRUCT SOUND WALL ALONG THE EAST SIDE OFGREENBELT HIGHWAY FROM APPROXIMATELY 0.5 MI SOUTH OF THEINTERSECTION WITH LOWER HUNTERS TRACE TO APPROXIMATELY 250 FEETSOUTH OF THE SAME INTERSECTION FOR NOISE ABATEMENT.(14CCN)

THREE LANE WIDENING ALONG KY-1931 FROM THE DOSS HIGH SCHOOLENTRANCE TO PALATKA ROAD, INCLUDING INTERSECTION IMPROVEMENTSWITH PALATKA ROAD AND TURN LANES. (14CCN)

ERECT SOUND WALL ON SOUTH SIDE OF GENE SNYDER FREEWAY FROM MP 18.0TO MP 18.5. (14CCN)

9.760

1.229

1.736

.730

1.040

.453

.599

.500

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

I-264

I-64

CR-1015G

KY-1142

I-265

I-264

KY-1934

KY-1931

I-265

$1,200,000

$1,200,000

$4,930,000

$220,000

$1,690,000

$2,850,000

$1,200,000

$11,090,000

$2,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

R

U

C

C

C

D

C

D

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2016

2017

2016

2016

2016

2017

2016

2016

2016

2016

2018

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

STP

STP

STP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,200,000

$1,200,000

$860,000

$990,000

$3,080,000

$220,000

$1,690,000

$250,000

$2,600,000

$240,000

$960,000

$3,130,000

$1,880,000

$6,080,000

$2,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

8716.00

8717.00

8801.00

8803.00

8806.00

8807.00

8808.00

8810.00

8854.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

05

8716.00

8717.00

8801.00

8803.00

8806.00

8807.00

8808.00

8810.00

8854.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2014

2014

2014

2014

2014

2014

2014

2012

2012

2014

2014

2014

2014

2014

2014

2014

12.05

0

0

13.6

5.96

5.701

4.887

18

21.81

1.229

1.736

14.33

7

6.154

5.486

18.5

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / TRANSP ENHANCEMENT(P)

Page 78: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 78

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

ERECT SOUND WALL ON NORTH SIDE OF GENE SNYDER FREEWAY FROM MP 15.3TO MP 16.1. (14CCN)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-71FROM MP 5.4 TO MP 6.3 FOR APPROX. 4700 FEET. (14CCN)(16CCR)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE SOUTH SIDE OF I-71FROM MP 7.5 TO MP 7.8. (14CCN)(16CCR)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-71FROM MP 7.5 TO MP 8.7 FOR APPROX. 6400 FEET. (14CCN)

HILLTOP PATHWAY FROM TYLER PARK TO A STREET CROSSWALK ATEDGELAND AVENUE. (16CCN)

EXTEND THE LEFT TURN LANE ON HURSTBOURNE LANE AT INTERSECTIONWITH SIX MILE LANE. (16CCN)

CONSTRUCT A NEW PEDESTRIAN BRIDGE AND IMPROVE DRAINAGE AT THEENGINEERING SPEED SCHOOL AT THE UNIVERSITY OF LOUISVILLE APPLIEDSCIENCE AND RESEARCH PARK. (16CCN)

4-LANE BLUE LICK RD FROM GENE SNYDER TO BULLITT COUNTY LINE. (16CCN)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON I-64 WESTBOUNDBETWEEN MILEPOINTS 13.7 AND 14.2. (16CCN)

.800

.900

.300

1.200

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

I-265

I-71

I-71

I-71

-

KY-1747

-

KY-1450

I-64

$3,000,000

$2,961,000

$1,152,000

$4,608,000

$77,000

$200,000

$11,000,000

$62,000,000

$1,850,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

P

C

U

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2017

2018

2017

2017

2017

2017

2018

2019

2020

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SPP

SPP

SPP

SP

SPP

SPP

SPP

SPP

SP

SP

SP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,000,000

$2,961,000

$1,152,000

$4,608,000

$77,000

$200,000

$3,500,000

$7,500,000

$2,500,000

$12,000,000

$10,000,000

$37,500,000

$1,850,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

8855.00

8858.00

8859.00

8860.00

8904.00

8905.00

8906.00

8907.00

8951.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

05

8855.00

8858.00

8859.00

8860.00

8904.00

8905.00

8906.00

8907.00

8951.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2014

2016

2016

2016

2016

2016

2014

2014

2014

2014

2016

2016

2016

2016

2016

15.3

5.4

7.5

7.5

0

13.7

16.1

6.3

7.8

8.7

1.88

14.2

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

NEW ROUTES / TRANSP ENHANCEMENT(P)

SAFETY / SAFETY(P)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / TRANSP ENHANCEMENT(P)

Page 79: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 79

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

WIDEN US 60 TO THREE LANES FROM EASTWOOD CUTOFF (MP 14.7) TOROCKCREST WAY (MP 15.1). (16CCN)

IMPROVE THE HURSTBOURNE PARKWAY (KY 1747) AT SHELBYVILLE ROAD (US60) INTERSECTION TO INCREASE CAPACITY, REDUCE DELAYS, AND IMPROVESAFETY. (16CCN)

DESIGN AND BUILD A NOISE BARRIER WALL ON THE NORTH SIDE OF I-265BETWEEN MP 15.3 AND MP 16.1 FOR APPROXIMATELY 4700 FEET. (16CCN)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE WESTBOUND SIDEOF I-64 FROM MP 10.3 TO MP 11.2 FOR APPROXIMATELY 4800 FEET. (16CCN)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-265FROM MP 16.6 TO MP 17.2 FOR APPROXIMATELY 3,100 FEET. (16CCN)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON I-71 NORTHBOUND FROMNEAR GLENVIEW AVENUE TO JUST NORTH OF THE LIME KILN OVERPASS FORAPPROXIMATELY 2,700 FEET. (16CCN)

EAST NICHOLASVILLE BYPASS SECTION IA FROM 50 FEET SOUTH OF KY 39 TO125 FEET NORTH OF KY 169.

EAST NICHOLASVILLE BYPASS SECTION IB FROM 125 FEET NORTH OF KY 169 TOEND OF PROJECT AT TIE-IN TO WEST BYPASS. THIS INCLUDES THEINTERCHANGE AT US 27 NORTH OF NICHOLASVILLE. (14CCR)

EAST NICHOLASVILLE BYPASS SECTION II; FROM KY-39, EXTENDINGSOUTHWESTERLY TO US-27 SOUTH OF NICHOLASVILLE. (SEE 7-8305.00 FOR DPHASE.)(2000BOP)(12CCR)(16CCR)

2.660

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JESSAMINE

JESSAMINE

JESSAMINE

US-60

KY-1747

I-265

I-64

I-265

I-71

-

-

-

$1,175,000

$4,338,000

$250,000

$250,000

$250,000

$1,730,000

$15,000,000

$38,000,000

$12,500,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

D

R

U

C

D

D

D

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2021

2022

2017

2018

2019

2020

2022

2021

2022

2019

2016

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SPP

SPP

SPP

SPP

SP

SP

SP

SPP

SP

SP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$325,000

$400,000

$450,000

$138,000

$700,000

$1,000,000

$2,500,000

$250,000

$250,000

$250,000

$1,730,000

$15,000,000

$38,000,000

$12,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

07

07

07

8952.00

8953.00

8957.00

8960.00

8961.00

8963.00

87.20

87.30

87.50

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

07

07

07

8952.00

8953.00

8957.00

8960.00

8961.00

8963.00

87.10

87.10

87.02

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2016

2016

2016

2014

2014

2000

2016

2016

2016

2016

2016

2016

2000

2000

1998

14.7

15.3

10.3

16.6

15.1

16.1

11.2

17.2

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

Page 80: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 80

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

EAST NICHOLASVILLE BYPASS SECTION II; FROM KY-39, EXTENDINGSOUTHWESTERLY TO US-27 SOUTH OF NICHOLASVILLE. (SEE 7-8305.00 FOR DPHASE.)(200BOP)(12CCR)(16CCN)

EXTEND EAST BRANNON ROAD FROM END OF EXISTING ROAD FROM EAST OFLAUDERDALE DRIVE (CS 1501) TO TATES CREEK ROAD (KY 1974) (2-LANEIMPROVEMENT)(12CCR)(16CCN)

IMPROVE ROADWAY GEOMETRICS, TYPICAL SECTION, AND ROADWAYHAZARDS ON KY 1980 (BRANNON RD) FROM US 68 (HARRODSBURG RD) TO US 27(NICHOLASVILLE RD)(12CCR)

RECONSTRUCT KY 169 JUST EAST OF KEENE TO ELIMINATE DROPOFFS.(12CCR)(14CCN)(16CCN)

ACCESS MANAGEMENT ON NICHOLASVILLE ROAD BETWEEN NICHOLASVILLEAND MAN-O-WAR BLVD. (14CCR)

RECONSTRUCT INTERSECTION OF KY 29 NORTH OF WILMORE.(16CCR)

REPLACE BRIDGE OVER HICKMAN CREEK AT BLACK BRIDGE ON KY 39 1.3 MI NOF KY 1268. (057B00002N)(SR=49.5)(EBRP)

3.205

.504

5.356

.700

.036

JESSAMINE

JESSAMINE

JESSAMINE

JESSAMINE

JESSAMINE

JESSAMINE

JESSAMINE

-

CS-1486A

KY-1980

KY-169

US-27

US-68

KY-39

$10,000,000

$22,380,000

$24,500,000

$4,400,000

$7,900,000

$6,230,000

$2,300,000

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

R

U

C

D

R

U

C

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2016

2017

2018

2019

2019

2021

2018

2019

2020

2021

2017

2017

2019

2021

2019

2020

2020

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

SPP

SPP

SPP

STP

STP

STP

SPP

SPP

SPP

SPP

SP

STP

STP

STP

BRX

BRX

BRX

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$10,000,000

$3,000,000

$4,980,000

$14,400,000

$7,500,000

$5,000,000

$12,000,000

$400,000

$1,000,000

$1,000,000

$2,000,000

$7,900,000

$2,630,000

$600,000

$3,000,000

$350,000

$100,000

$200,000

$1,650,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

87.51

376.00

414.00

419.00

430.00

915.00

1136.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

FAYETTE

07

07

07

07

07

07

07

87.51

376.00

414.00

419.00

430.00

915.00

1136.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2012

2016

2014

2010

2014

2016

2016

2012

2016

2014

2010

2014

0

16.555

10.867

4.1

3.74

3.205

17.059

15.278

4.8

3.776

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

0 .945Milepoints: To:From:

Page 81: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 81

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON CR-1238 (0.88) OVER NS SYSTEM. (SR=26.3) 057R00605N

CONSTRUCT A NEW 4 LANE CONNECTOR BETWEEN US-27 AND I-75.(08CCN)(12CCR)(16CCR)

REPLACE RAILROAD BRIDGE ON KY 169 (NORTH 3RD STREET) BETWEENMEADOWLARK LANE & ILHARDT AVENUE.(SR=28.9)057R00603(14CCN)(16CCR)

RECONSTRUCT KY 169 FROM US 68 TO 0.54 MILES NORTH OF CLEAR CREEK RD(MP 14.448 TO MP 19.00). (16CCN)

ADDRESS GEOMETRIC AND SAFETY ISSUES AND FUTURE CONGESTIONMITIGATION ON KY 40 FROM 0.10 MILE WEST OF TEAYS BR. ROAD TO 0.10 MILEEAST OF TEAYS BR. ROAD.(12CCR)

REPLACE BRIDGE ON KY 40 OVER BRANCH OF LITTLE PAINT CREEK 0.38 MILENE OF JOHNSON/MAGOFFIN COUNTY LINE (SR 12.5) 058B00012N

CORRECT ROCKFALL HAZARD @ MP 1.80 TO 3.05. (04CCR)(10CCR)(12CCR)

.046

.300

1.250

JESSAMINE

JESSAMINE

JESSAMINE

JESSAMINE

JOHNSON

JOHNSON

JOHNSON

CR-1238

US-27

KY-169

KY-169

KY-40

KY-40

KY-321

$675,000

$15,000,000

$2,000,000

$29,250,000

$1,506,000

$1,575,000

$12,600,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

D

R

U

D

C

D

R

U

C

D

R

U

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2022

2022

2017

2019

2020

2016

2018

2017

2018

2019

2020

2016

2017

2017

2016

2016

2017

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

STP

STP

STP

BRO

BRO

SP

SP

SP

SP

SPP

SPP

SPP

BRO

BRO

BRO

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$375,000

$150,000

$150,000

$2,000,000

$10,000,000

$3,000,000

$500,000

$1,500,000

$2,750,000

$4,000,000

$4,000,000

$18,500,000

$500,000

$496,000

$510,000

$400,000

$225,000

$950,000

$12,600,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

12

12

12

1144.00

8404.00

8851.00

8906.00

194.00

1114.00

5008.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MADISON

07

07

07

07

12

12

12

1144.00

8404.00

8851.00

8906.00

194.00

1114.00

5008.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2008

2014

2016

2012

2012

1998

2016

2008

2014

2016

2012

2012

1998

.868

10.807

14.448

9.375

.372

1.8

.892

10.853

19

9.575

.412

3.05

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / ROCKFALL MITIGTN(P)

Milepoints: To:From:

Page 82: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 82

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

IMPROVE SAFETY AND GEOMETRICS FROM KY 321 RAMP TO PAINTSVILLE, ATTHE BROADWAY INTERSECTION. (16CCN)

TRANSPORTATION IMPROVEMENTS TO BRENT SPENCE BRIDGE. (2005HPP-KY154): (059B00046N) (THESE FUNDS WILL BE USED BY KYTC FOR EXISTINGBRIDGE MAINTENANCE,REPAIR AND PAINTING.)

KY 143 HPP EARMARK "REPLACE BRENT SPENCE BRIDGE, KENTON COUNTY,KENTUCKY". (2005HPP-KY143)(SEE 6-17.04 FOR ADDITIONAL 2005HPP FUNDING)

BRENT SPENCE BRIDGE PROJECT (ADDITIONAL PROJECT FUNDS FORMAINTENANCE, REPAIR AND PAINTING)(10CCR)(14CCR)

BRENT SPENCE BRIDGE PROJECT (ADDITIONAL PROJECT FUNDS FORMAINTENANCE, REPAIR AND PAINTING).

RECONSTRUCT KY 1303 FROM KY 536 (MP 0.000) TO BEECHGROVE ELEMENTARY(MP 1.100) (PRIORITY SECTION 1). DESIGN PHASE UNDER PARENT NO. 6-162.01.(2012BOP)(16CCR)

RECONSTRUCT KY 536 FROM THE EAST END OF THE NS RAILROAD BRIDGE(B91)(MP 14.363 IN BOONE) TO KY 1303 (MP 1.061). (16CCN)

EXTEND THE SECOND EASTBOUND LANE OF THOMAS MORE PKWY FROMRENAISSANCE DR TO 0.1 SE OF CENTERVIEW BLVD. (2012BOP)

1.910

1.100

1.061

.510

JOHNSON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KY-1428

I-75

I-75

I-75

I-75

KY-1303

KY-536

CS-5555

$26,000,000

$16,800,000

$1,600,000

$6,520,000

$13,700,000

$14,000,000

$12,500,000

$568,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

C

C

C

R

U

C

R

U

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2020

2021

2017

2017

2018

2018

2019

2020

2022

2017

2019

2020

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

HPP

HPP

SB2

IM

STP

STP

STP

STP

STP

STP

SNK

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,500,000

$8,000,000

$1,500,000

$15,000,000

$16,800,000

$1,600,000

$6,520,000

$13,700,000

$3,000,000

$1,000,000

$10,000,000

$3,500,000

$1,000,000

$8,000,000

$40,000

$528,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

06

06

06

06

06

06

06

8903.00

17.04

17.05

17.09

17.10

162.10

162.20

416.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

BOONE

12

06

06

06

06

06

06

06

8903.00

17.04

17.05

17.09

17.10

162.01

162.01

966.02

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2004

2010

2010

2016

2012

2016

2012

2016

2004

2010

2010

2016

2000

2000

2004

.987

191.277

191.277

191.277

0

0

.29

2.897

191.777

191.777

191.777

1.1

1.061

.6

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MATCHED FED FUNDS(O)

14.363 14.746Milepoints: To:From:

Page 83: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 83

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

PAVEMENT AND SIDEWALK RESTORATION ALONG 6TH STREET FROM SCOTTSTREET TO RUSSELL STREET (1,400 FEET). ALSO SIDEWALK IMPROVEMENTS ONSCOTT STREET FROM 4TH STREET TO 6TH STREET (900 FEET). (2012BOP)

PHASE I MULTI-USE PATH ALONG BROMLEY CRESCENT SPRINGS RD FROMANDERSON ROAD TO AMSTERDAM ROAD. (2012BOP)

PEDESTRIAN/BICYCLE TRAIL THROUGH THE CITIES OF LUDLOW, COVINGTON,NEWPORT & BELLEVUE ALONG THE OHIO RIVER. (2012BOP)

RESURFACE & STABILIZE DUDLEY ROAD FROM WINDING TRAILS TO THOMASMORE PARKWAY (PHASE 1). (2014BOPC)(MOA WITH CITY OF EDGEWOOD).

RESURFACE & STABILIZE DUDLEY ROAD FROM THOMAS MORE PARKWAY TOCATHERINE DRIVE (PHASE 2). (2014BOPC)(MOA WITH CITY OF EDGEWOOD).

LATONIA AVENUE ROADWAY RECONSTRUCTION FROM SOUTHERN AVENUE TONEAR WEST 36TH STREET (2014BOP)(MOA WITH THE CITY OF COVINGTON).

WEST 15TH STREET; REPLACE BRIDGE AND APPROACHES OVER CSX RR INCOVINGTON. (SR=19.1): (059C00029N)(12CCR)

EVALUATE BRIDGE ON KY-1120 (MP 0.621) OVER CSX RAILROAD; 11TH ST E OFRUSSELL ST; (STRUCTURALLY DEFICIENT, SR=19.5) 059B00083N

RECONSTRUCT HANDS PIKE (KY 1501) FROM KY 17 TO CRYSTAL LAKEDRIVE.(12CCR)(14CCR)(16CCR)

.170

.275

3.462

.079

.100

1.032

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

CS-2215

CR-1316

KY-8

CS-4128

CS-4128

CS-2604

CS-2097

KY-1120

KY-1501

$1,280,508

$4,280,000

$481,600

$1,044,000

$924,000

$588,000

$3,490,000

$1,550,000

$5,800,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

C

C

C

C

R

U

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2017

2016

2017

2017

2017

2016

2016

2018

2016

2016

2017

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

BRZ

BRZ

BRZ

BRO

BRO

BRO

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,280,508

$400,000

$800,000

$3,080,000

$481,600

$1,044,000

$924,000

$588,000

$830,000

$550,000

$2,110,000

$250,000

$550,000

$750,000

$5,800,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

06

418.00

419.00

421.00

428.10

428.20

429.00

1070.00

1075.00

8307.10

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

CAMPBELL

06

06

06

06

06

06

06

06

06

966.02

966.02

966.02

428.00

428.00

966.03

1070.00

1075.00

8307.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2012

2014

2014

2014

2008

2010

2006

2004

2004

2004

2014

2014

2006

2008

2010

2006

0

0

4.2

2.19

1.46

.09

.144

.59

0

.17

.275

7.662

3.11

2.19

.36

.223

.65

1.032

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / RESURFACING(P)

RELIABILITY / RESURFACING(P)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

0 2.1Milepoints: To:From:

Page 84: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 84

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCTION OF PIKE AND MAIN STREETS IN CITY OF COVINGTON.(14CCN)

RECONSTRUCT KY 16 BETWEEN 38TH STREET AND HOWARD LITZLER DRIVE.(14CCN)

SIDEWALK AND CURB CONSTRUCTION ON DIXIE HIGHWAY FROM NORTHARLINGTON NORTH TO COVINGTON SIDEWALK SYSTEM. (14CCN)(16CCR)

IMPROVE MONTCLAIR AVE., INCLUDING CURB REPLACEMENT, PAVEMENTMILLING, AND ASPHALT REPLACEMENT. (16CCN)

IMPROVE ASH ST., INCLUDING CURB REPLACEMENT, PAVEMENT MILLING, ANDASPHALT REPLACEMENT. (16CCN)

IMPROVE ADELA AVE., INCLUDING TREE REMOVAL, SIDEWALK REPLACEMENT,CURB REPLACEMENT, PAVEMENT MILLING, AND ASPHALT REPLACEMENT.(16CCN)

EXTEND HANDS PIKE (KY 1501) TO KY 177. (16CCN)

CONSTRUCT A SOUND BARRIER WALL ON I-275 FROM DIXIE HIGHWAYWESTBOUND. (16CCN)

EXTEND HOUSTON ROAD TO CINEMA PROPERTY. (16CCN)

IMPROVE EXISTING ALIGNMENT WITH BUTTERMILK PIKE, ORPHANAGE ROAD,AND US 25. (16CCN)

.200

.682

.415

.337

.251

.680

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

US-25

KY-16

US-25

CS-1500

CS-5046

CS-1560

KY-1501

I-275

-

US-25

$1,700,000

$12,980,000

$1,130,000

$168,000

$98,000

$280,000

$500,000

$100,000

$250,000

$250,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

D

D

D

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2017

2017

2018

2018

2017

2018

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SAF

SPP

SPP

SPP

SP

STP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,700,000

$12,980,000

$1,130,000

$168,000

$98,000

$280,000

$500,000

$100,000

$250,000

$250,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

06

06

8813.00

8814.00

8815.00

8911.00

8912.00

8913.00

8914.00

8915.00

8916.00

8951.00

-

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

06

06

8813.00

8814.00

8815.00

8911.00

8912.00

8913.00

8914.00

8915.00

8916.00

8951.00

-

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2016

2016

2016

2016

2016

2016

2016

2014

2014

2014

2016

2016

2016

2016

2016

2016

2016

12.8

14.135

11.675

0

0

0

13

14.817

12.09

.337

.251

.68

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / RESURFACING(P)

RELIABILITY / RESURFACING(P)

RELIABILITY / RESURFACING(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / NEW ROUTE(O)

SAFETY / RECONSTRUCTION(O)

Page 85: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 85

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON ERNEST BRIDGE DR (CR 1021) OVER CSX RAILROAD.(16CCN)

IMPROVEMENTS TO KY-550 IN HINDMAN; CONSTRUCT NEW BRIDGE OVERTROUBLESOME CREEK AT THE NEW ARTS AND CRAFTS COLLEGE @ KY 160.(16CCR)

REPLACE BRIDGE ON ROCKLICK BRANCH (CR 1008) OVER RIGHT FORK BEAVERCREEK AT JCT WITH SOUTH HIGHWAY 7 (KY 7)(SR 43.9) 060C00006N

REPLACE BRIDGE OVER RIGHT FORK TROUBLESOME CREEK ON FIELDWOODDRIVE (CS1016) IN HINDMAN (060C00060N)(SR=21.9)

NEW CONSTRUCTION OF ONE MILE STRETCH OF KY-1231 BEGINNING AT BRIDGEAFTER LEAVING KY-550. (04CCN)(06CCR)(08CCR)(10CCR)(12CCR)

SPOT IMPROVEMENTS ON KY-1393 FROM KY-582 TO KY-899. (06CCN) (10CCR)

RECONSTRUCT CURVE ON KY 899 IN KNOTT COUNTY BETWEEN MP 3.6 AND MP3.7. (14CCN)(16CCN)

PEDESTRIAN BRIDGE OVER KY 899 FROM THE ENTRANCE OF ALICE LLOYDCOLLEGE TO THE PARKING LOTS. (14CCN)

INTERSECTION LIGHTS AT KY-160 AND KY-899. (14CCN)

.022

.061

.012

1.000

2.800

.100

.016

KENTON

KNOTT

KNOTT

KNOTT

KNOTT

KNOTT

KNOTT

KNOTT

KNOTT

CR-1021

CS-1012

CR-1008

CS-1016

KY-1231

KY-1393

KY-899

KY-899

KY-899

$600,000

$2,160,000

$1,000,000

$950,000

$4,660,000

$6,000,000

$125,000

$475,000

$75,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

R

C

R

U

C

D

R

U

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2016

2017

2016

2016

2017

2019

2021

2021

2022

2016

2017

2018

2016

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRX

BRO

BRO

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

SB2

SP

SAF

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$600,000

$530,000

$1,630,000

$75,000

$325,000

$600,000

$300,000

$150,000

$250,000

$250,000

$4,660,000

$6,000,000

$125,000

$475,000

$75,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

12

12

12

12

12

12

12

12

8954.00

283.40

1116.00

1124.00

8200.00

8301.00

8801.00

8802.00

8803.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

12

12

12

12

12

12

12

12

8954.00

283.00

1116.00

1124.00

8200.00

8301.00

8801.00

8802.00

8803.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2000

2012

2014

2004

2006

2016

2014

2014

2016

1998

2012

2014

2004

2006

2016

2014

2014

.027

0

0

.018

6.982

0

3.6

0

.65

.061

.04

.03

7.982

2.757

3.7

.016

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RESURFACING(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / SAFETY(P)

Page 86: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 86

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE OVER BALLS FORK ON KY 3209. (16CCN)

CONSTRUCT AN ACCESS POINT OFF KY-7 AT APPROXIMATELY MP 13.2 TOCONNECT WITH JUSTIN EMERY LN (CR-1657), INCLUDING NEW BRIDGE FOR ASAFE CROSSING OVER RAILROAD TRACKS. (16CCN)

MAJOR WIDENING - ADDRESS SAFETY AND CAPACITY ON US 25E FROM CORBINBYPASS TO KNOX/LAUREL COUNTY LINE. IMPROVE SAFETY ALONG CORRIDORBY PROVIDING IMPROVED ACCESS MANAGEMENT.(12CCR)

REPLACE BRIDGE ON OLD HWY 25 (CR 1325) JUST WEST OF US 25E. (SR=20.7)061C00063N

REPLACE STINKING CREEK ROAD BROWNS BRANCH BRIDGE.(12CCN)

RAISE KY-459 ABOVE FLOOD PLAIN FROM MP 3 TO MP 5, INCLUDING RAISINGTHE BULL RUN CREEK BRIDGE (INCLUDES 11-8712).(12CCN)

IMPROVE KY 3041 FROM MP 1.5 TO MP 2.0 TO INCREASE SAFETY AND PROVIDEACCESS TO THUNDER GAP HORSE RACING TRACK. (16CCN)

WIDEN ALLISON BOULEVARD (CS-1107) TO IMPROVE SAFETY AND PROVIDEACCESS TO THUNDER GAP HORSE RACING TRACK. (16CCN)

1.976

.004

.044

1.000

.500

.318

KNOTT

KNOTT

KNOX

KNOX

KNOX

KNOX

KNOX

KNOX

KY-3209

-

US-25E

CR-1325

KY-223

KY-459

KY-3041

CS-1107

$1,000,000

$100,000

$12,400,000

$725,000

$900,000

$4,120,000

$1,000,000

$2,025,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

R

U

C

D

R

U

C

C

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2017

2017

2017

2018

2019

2021

2021

2022

2016

2016

2017

2017

2017

2017

2017

2017

2017

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

RRS

NH

NH

NH

BRZ

BRZ

BRZ

BRZ

BRX

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,000,000

$100,000

$3,480,000

$1,920,000

$7,000,000

$250,000

$50,000

$25,000

$400,000

$900,000

$4,120,000

$200,000

$200,000

$100,000

$500,000

$150,000

$150,000

$75,000

$1,650,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

11

11

11

11

11

11

8904.00

8908.00

188.00

1102.00

8705.00

8713.00

8955.00

8956.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

11

11

11

11

11

11

8904.00

8908.00

188.00

1102.00

8705.00

8713.00

8955.00

8956.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2012

2016

2012

2012

2016

2016

2016

2016

2012

2016

2012

2012

2016

2016

24.221

.191

15.26

3

1.5

0

26.197

.195

15.304

5

2

.318

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

NEW ROUTES / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / MINOR WIDENING(O)

Page 87: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 87

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT AND IMPROVE EXISTING ALIGNMENTS, WITH SHOULDERS, OFBARBOURVILLE - MANCHESTER ROAD (KY 11) FROM US 25E (MP 10.1) TO THEKNOX-CLAY COUNTY LINE (MP 22.7). (16CCN)

REPLACE BRIDGE OVER SOUTH FORK BRANCH ON KY 61 0.5 MILE NORTH OF KY1906 (062B00010N) (SR=49.8)

RECONSTRUCT-REHABILITATION AND IMPROVEMENTS TO KY 222.(08CCN)(14CCR)

REPLACE BRIDGE OVER SOUTH FORK BRANCH. (16CCN)

CONNECTOR IMPROVEMENTS HODGENVILLE TO I-65. (16CCN)

SPOT IMPROVEMENTS ON KY 84 FROM HODGENVILLE TO I-65. (16CCN)

SCOPING STUDY TO IMPROVE KY 210 FROM CAMPBELLSVILLE TOHODGENVILLE. (16CCN)

WIDEN I-75 TO 6-LANES FROM US-25E TO THE LITTLE LAUREL RIVER (MP 28.9 TOMP 33.2)(16CCR)

12.600

.008

9.033

4.300

KNOX

LARUE

LARUE

LARUE

LARUE

LARUE

LARUE

LAUREL

KY-11

KY-61

KY-222

KY-61

KY-222

KY-84

KY-210

I-75

$4,500,000

$680,000

$1,000,000

$675,000

$675,000

$500,000

$600,000

$40,900,000

Total

Total

Total

Total

Total

Total

Total

Total

D

D

R

U

C

D

D

R

U

C

D

R

U

C

D

D

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2017

2019

2019

2020

2017

2017

2018

2019

2020

2017

2018

2019

2020

2018

2017

2020

2021

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

BRX

BRX

BRX

BRX

SPP

BRZ

BRZ

BRZ

BRZ

SPP

SP

SP

SP

SP

SPP

IM

IM

IM

IM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$4,500,000

$130,000

$50,000

$100,000

$400,000

$1,000,000

$125,000

$50,000

$100,000

$400,000

$125,000

$50,000

$100,000

$400,000

$500,000

$600,000

$500,000

$200,000

$200,000

$40,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

04

04

04

04

04

04

11

8958.00

1087.00

8505.00

8908.00

8909.00

8911.00

8912.00

9.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

04

04

04

04

04

04

11

8958.00

1087.00

8505.00

8908.00

8909.00

8911.00

8912.00

9.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2014

2016

2016

2016

2016

2016

2000

2016

2014

2016

2016

2016

2016

2016

1996

10.1

1.504

0

28.9

22.694

1.512

9.033

33.2

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SPOT IMPROVEMENTS(O)

SAFETY / SPOT IMPROVEMENTS(O)

SAFETY / SCOPING STUDY(O)

RELIABILITY / MAJOR WIDENING(O)

Page 88: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 88

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

US-25 CONGESTION RELIEF; WIDEN US-25 TO 5 LANES FROM KY-1006 TO KY-2069,CONSTRUCT A CONNECTOR FROM US-25 TO KY-229, IMPROVE KY-229 UP TO KY-192 AND CONSTRUCT A BACK ENTRANCE TO THE SCHOOL FROM KY-192 BYPASS.(06CCR)(10CCR)(12CCR)(14CCR)

ADDRESS SAFETY, CAPACITY, AND ACCESS MANAGEMENT ON KY 363 FROM KY1006 TO KY 192. (06CCR)(2006BOPC).(10CCR)(14CCR)

MAJOR WIDENING - ADDRESS SAFETY, CAPACITY, AND ACCESS MANAGEMENTON US 25E FROM KNOX/LAUREL COUNTY LINE TO KY 770(12CCR)(16CCR)

MAJOR WIDENING FROM KY 1006 TO US 25 IN LONDON. THE PROPOSEDWIDENING WILL INCREASE CAPACITY, IMPROVE FREIGHT MOVEMENT, SAFETYAND PROVIDE ACCESS MANAGEMENT. (12CCR)

REPLACE BRIDGE ON KY-578 (MP 5.154) OVER RACCOON CREEK; .10 MI W OF W-JCT KY 638; (STRUCTURALLY DEFICIENT, SR=24.9) 063B00069N

REPLACE BRIDGE ON DOG BRANCH SCHOOL RD (CR 1341) OVER SINKING CREEK0.56 MILE NW OF SINKING CREEK RD (FD 781)(SR 13.8) 063C00025N

REPLACE BRIDGE OVER CRAIG CREEK ON KY 312 1.8 MILE SE OF KY 192.(063B00053N)(SR=49.4)(14CCR)

REHAB BRIDGE ON I-75 AT MILEPOST 30.5 OVER LAUREL RIVER (SR 34.1) (B00043RAND B00043L)

.500

.500

2.024

1.565

.100

.020

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

US-25

KY-363

US-25E

KY-192

KY-578

CR-1341

KY-312

I-75

$25,310,000

$4,650,000

$14,730,000

$18,930,000

$1,530,000

$1,350,000

$1,350,000

$4,000,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

R

U

C

C

C

D

R

U

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2017

2016

2019

2020

2016

2017

2016

2017

2017

2019

2017

2017

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

NH

NH

NH

SPP

BRX

BRZ

BRZ

BRZ

BRZ

BRX

BRX

BRX

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$25,310,000

$4,650,000

$3,000,000

$2,480,000

$9,250,000

$18,930,000

$1,530,000

$250,000

$50,000

$50,000

$1,000,000

$100,000

$50,000

$1,200,000

$4,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

11

147.00

147.10

185.00

187.00

1080.00

1094.00

1096.00

1105.01

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

11

147.00

147.00

185.00

187.00

1080.00

1094.00

1096.00

1105.01

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2006

2012

2012

2010

2012

2014

2016

2006

2006

2012

2012

2010

2012

2014

2016

9.028

9.187

0

18.505

5.269

1.071

1.737

30.5

9.53

9.654

2.024

20.07

5.309

1.111

1.757

30.6

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REHAB(P)

Page 89: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 89

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

INCREASE CAPACITY OF THE ROBINSON CREEK BRIDGE ON US-25 AT MILEPOST3.28. (06CCN): (063B00024N)(10CCR)

CONSTRUCTION OF I-75 FRONTAGE ROAD FROM KY 3432 TO 5TH STREET (SEE 8-8514.10 AND 8-8514.00 FOR ADDITIONAL SECTIONS) (08CCN)

REPLACE BRIDGE LOCATED ON LILY ROAD (CR 1221) (MP 1.045) (AREA ADJACENTTO FARISTON INDUSTRIAL PARK WITH NEW ROADWAY ALIGNMENT). (14CCN)

PROVIDE FRONTAGE ROADS ON BOTH SIDES OF KY 80 JUST WEST OF I-75 EXIT 41(MP 9.9 TO MP 10.9) MAY INCLUDE RELOCATING EXISTING SIGNAL TO PROVIDEFOR ADEQUATE TURN LANE STORAGE AND IMPROVE CAPACITY.(14CCN)

PROVIDE LEFT AND RIGHT TURN LANES FOR KY 354 WHILE LOWERING THEEXISTING VERTICAL GRADE TO IMPROVE ALIGNMENT WITH KY 30. (14CCN)

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:EASTERN APPROACH TO THE ROCKCASTLE RIVER BRIDGE TO I-75 (SEGMENT 4)(16CCN)

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:EASTERN APPROACH TO THE ROCKCASTLE RIVER BRIDGE TO I-75 (SEGMENT 4).(ADDITIONAL FUNDING FOR C PHASE FOR 11-8907.00)(16CCN)

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:LONDON BYPASS, I-75 TO THE HAL ROGERS PARKWAY (SEGMENT 5). (16CCN)

.080

1.000

.087

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

US-25

KY-80

CR-1221

KY-80

KY-354

KY-80

KY-80

KY-80

$7,250,000

$3,130,000

$1,343,900

$2,000,000

$600,000

$160,400,000

$65,500,000

$143,500,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

C

C

C

D

R

U

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2018

2018

2016

2017

2016

2016

2019

2020

2021

2021

2017

2019

2020

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SB2

SPP

SPP

SPP

IM

SP

SP

SP

SP

IM

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,650,000

$170,000

$5,430,000

$3,130,000

$1,343,900

$2,000,000

$600,000

$1,000,000

$40,000,000

$20,400,000

$99,000,000

$65,500,000

$1,000,000

$25,000,000

$18,500,000

$99,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

11

8305.00

8514.20

8811.00

8851.00

8852.00

8907.00

8907.01

8908.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

11

8305.00

8514.00

8811.00

8851.00

8852.00

8907.00

8907.01

8908.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2008

2014

2014

2014

2016

2016

2016

2006

2008

2014

2014

2014

2016

2016

2016

3.299

1

9.9

1

3.326

1.08

10.9

1.087

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

Page 90: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 90

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:LONDON BYPASS, I-75 TO THE HAL ROGERS PARKWAY (SEGMENT 5)(ADDITIONAL FUNDS FOR C PHASE FOR 11-8908.00)(16CCN)

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:APPROXIMATELY 4 MILES EAST OF KY 192 TO CLAY/LAUREL LINE, MP 7.877 TOMP 10.593 (SEGMENT 6). (16CCN)

IMPROVE SAFETY ON KY 490 FROM MP 0.0 TO MP 3.8 BY REPAIRING SHOULDERBREAKOFFS AND PAVEMENT SETTLING, AS WELL AS RESURFACING ROADWAY.(16CCN)

REPLACE BRIDGE (063C00044N) ON MT ZION CHURCH ROAD (CR 1414). (16CCN)

CONSTRUCT A NEW ROADWAY TO CONNECT BETWEEN KY 3215 TO KY 1185 ATYATESVILLE LAKE. (12CCR)(14CCR)

IMPROVE SIGHT DISTANCE ON KY 2565 AND ELIMINATE DEAD MAN'S CURVE.(12CCR)

RECONSTRUCT CR 1529 (INDUSTRIAL PARK ROAD) FROM APPROX. 1000' EAST OFCOMMERCE DRIVE/CHLOES LANE INTERSECTION TO APPROX. 400' WEST OF CR1529/KY2565/KY2563 INTERSECTION (SECTION 1). (SECTION 2 INTERSECTION SYP12-196.10)

RECONSTRUCT KY 2565 FROM APPROX. 550' NW OF CR 1529/KY2565/KY2563INTERSECTION TO APPROX. 1150' SE OF THE INTERSECTION (SECTION 2).(2014BOP)

REPLACE BRIDGE ON MATTIE RD (CR 1202) OVER RIGHT FORK OF LITTLE BLAIN0.38 MILE W OF ASH BRANCH RD (CR 1161)(SR 47) 064C00011N

.100

.150

.520

.318

LAUREL

LAUREL

LAUREL

LAUREL

LAWRENCE

LAWRENCE

LAWRENCE

LAWRENCE

LAWRENCE

KY-80

HR-9006

KY-490

CR-1414

KY-3215

KY-2565

CR-1529

KY-2565

CR-1202

$32,700,000

$31,200,000

$500,000

$300,000

$20,400,000

$1,265,000

$1,670,000

$600,000

$500,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

C

D

U

C

C

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2016

2019

2021

2021

2022

2022

2016

2019

2016

2016

2016

2016

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

IM

SP

SP

SP

SP

SP

SPP

SPP

SPP

SPP

SPP

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$32,700,000

$1,000,000

$2,200,000

$1,000,000

$27,000,000

$500,000

$300,000

$500,000

$19,900,000

$1,265,000

$1,670,000

$600,000

$75,000

$75,000

$350,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

12

12

12

12

12

8908.01

8909.00

8952.00

8953.00

3.00

193.00

196.00

196.10

1118.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

12

12

12

12

12

8908.01

8909.00

8952.00

8953.00

3.00

193.00

196.00

196.00

1118.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2016

1996

2012

2012

2012

2012

2016

2016

2016

2016

1996

2012

2012

2012

2012

7.877

0

3.2

.2

1.916

.844

10.593

3.8

3.35

.72

2.234

.884

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 91: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 91

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

SIGHT DISTANCE IMPROVEMENTS ON KY-581 FROM KY-645, EXTENDING SOUTH2000' TOWARDS PAINTSVILLE. (02CCNFD04)

REPLACE THE GEORGES CREEK BRIDGE.(12CCN)

SPOT IMPROVEMENTS ON SPANKEM BRANCH ROAD (CR 1044).(16CCN)

I-75 TO MOUNTAIN PARKWAY; RECONSTRUCT KY-11 FROM KY-30 AT LEVI INOWSLEY COUNTY TO 0.5 MILE SOUTH OF KY-587 IN LEE COUNTY.(06CCR)(10CCR)(14CCR)

CONSTRUCT SIDEWALKS, CURB AND GUTTER ON KY 52 FROM DOWNTOWNBEATTYVILLE TOWARD IRVINE. (14CCN)(AR/W)(16CCR)

CONSTRUCT HYDEN BYPASS FROM LESLIE COUNTY HIGH SCHOOL TO HYDENSPUR (KY-118).(00CCR) (04CCN)(10CCR)

REPLACE BRIDGE AND APPROACHES ON CR-1214 OVER BEECH FORK (C24).(SR=6.0)(PROJECT FUNDING CONTINGENT UPON BRIDGE POSTING COMPLIANCE):(066C00024N)(AR/W)

REPLACE BRIDGE AND APPROACHES ON US-421 OVER STINNET CREEK (B08) 0.028MILE SOUTH OF KY-406 NEAR STINNETT.(SR=26.0) (10CCR)

REPLACE BRIDGE ON KY 80 OVER CUTSHIN CREEK AT INTERSECTION WITHBUSY HOLLOW DR (CR 1063)(SR 30) 066B00002N

.400

4.200

.678

2.100

.100

.100

LAWRENCE

LAWRENCE

LAWRENCE

LEE

LEE

LESLIE

LESLIE

LESLIE

LESLIE

KY-581

KY-581

CR-1044

KY-11

KY-52

US-421

CR-1214

US-421

KY-80

$640,000

$840,000

$500,000

$22,620,000

$3,000,000

$4,230,000

$630,000

$3,220,000

$1,681,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

C

C

C

C

R

U

C

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2016

2016

2019

2017

2016

2016

2016

2016

2017

2019

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SPP

SPP

SPP

SP

STP

SP

SP

BRZ

BRO

BRO

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$110,000

$60,000

$470,000

$40,000

$800,000

$500,000

$22,620,000

$3,000,000

$3,630,000

$600,000

$630,000

$180,000

$3,040,000

$1,681,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

10

10

11

11

11

11

8117.00

8701.00

8951.00

292.10

8852.00

12.00

1067.00

1078.00

1089.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OWSLEY

12

12

12

10

10

11

11

11

11

8117.00

8701.00

8951.00

292.00

8852.00

12.00

1067.00

1078.00

1089.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2002

2012

2016

2004

2014

1996

2004

2008

2012

2002

2012

2016

1996

2014

1996

2004

2008

2012

4.815

9.45

0

11.78

.024

15.137

5.142

5.194

9.55

1.082

12.26

.064

15.177

5.182

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

14.343 17.444Milepoints: To:From:

Page 92: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 92

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE OVER MUNCY CREEK ON US 421 0.5 MILE SOUTH OF TAYLORMORGAN ROAD (CR 1090).(066B00006N)(SR=31.5)

REPLACE BRIDGE OVER WOLF CREEK ON COON CREEK ROAD (CR 1528) AT JCTWITH KY 3427 (066C00039N) (SR=30.1) (EBRP)

REPLACE BRIDGE ON MILE BRANCH RD (CR 1219) (MP 0.022) OVER BEECH FORK.(SR=4.0) 066C00048N

REPLACE BRIDGE ON WILLIAMS BRANCH RD (CR-1207) (0.028) OVER MIDDLEFORK KENTUCKY RIVER. (SR=2) 066C00020N

CONSTRUCT A NEW APPROACH FROM KY-1482 ONTO THE HAL ROGERSPARKWAY AT MP 39. (08CCN)(10CCR)(2011BOPP)

CONSTRUCT A NEW APPROACH FROM KY-3424 ONTO THE HAL ROGERSPARKWAY AT MP 45.7. (08CCN)

CONSTRUCT A NEW APPROACH FROM KY-6272 ONTO THE HAL ROGERSPARKWAY AT MP 42.7. (08CCN)

.014

.012

.012

LESLIE

LESLIE

LESLIE

LESLIE

LESLIE

LESLIE

LESLIE

US-421

CR-1528

CR-1219

CR-1207

KY-1482

KY-3424

KY-6272

$1,225,000

$710,000

$1,225,000

$550,000

$3,340,000

$25,000

$638,300

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

D

R

U

C

D

R

U

R

U

C

R

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2019

2019

2020

2019

2021

2021

2022

2019

2021

2021

2022

2020

2022

2022

2016

2016

2017

2017

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRX

BRX

BRX

BRX

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

SB2

SB2

SB2

SPB

SPB

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$350,000

$100,000

$75,000

$700,000

$175,000

$60,000

$50,000

$425,000

$350,000

$150,000

$25,000

$700,000

$350,000

$100,000

$100,000

$920,000

$420,000

$2,000,000

$25,000

$638,300

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

1095.00

1100.00

1104.00

1106.00

8516.00

8517.00

8518.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

1095.00

1100.00

1104.00

1106.00

8516.00

8517.00

8518.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2016

2016

2008

2008

2008

2014

2014

2016

2016

2008

2008

2008

18.423

0

.016

.022

.09

2.521

0

18.437

.012

.028

.034

.19

3.121

.1

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

Page 93: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 93

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

WIDEN KY 118 TO PROVIDE LEFT AND RIGHT TURN LANES ONTO DENTONROAD.(12CCN)(14CCR)

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM CLAY/LESLIE LINE TO HYDEN SPUR, MP 35.929 TO MP 44.188(SEGMENT 9). (16CCN)

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM HYDEN SPUR TO LESLIE/PERRY LINE (SEGMENT 10). (16CCN)

CONSTRUCT RIGHT TURN LANE ON US 421 AT INTERSECTION WITH KY 80.(16CCN)

RECONSTRUCT US-119 BY WIDENING TO 4-LANES, BEGINNING 0.15 MILES NORTHOF KY-15 AT END OF BRIDGE TO THE EXISTING 4-LANE AT BRASS DRIVE(SOUTH).(16CCN)

RECONSTRUCT US-119 BY WIDENING TO 4-LANES, BEGINNING 0.15 MILES NORTHOF KY-15 AT END OF BRIDGE TO THE KY 2034/COUGAR DRIVEINTERSECTION.(16CCN)

RECONSTRUCT US-119 BY WIDENING TO 4-LANES FROM KY 2034/COUGAR DRIVETO THE EXISTING 4-LANE AT BRASS DRIVE (SOUTH).(16CCN)

.200LESLIE

LESLIE

LESLIE

LESLIE

LETCHER

LETCHER

LETCHER

KY-118

HR-9006

HR-9006

US-421

US-119

US-119

US-119

$1,420,000

$116,400,000

$79,600,000

$850,000

$6,800,000

$10,700,000

$17,100,000

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

D

R

U

C

D

R

U

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2019

2020

2020

2021

2019

2020

2020

2022

2021

2022

2022

2017

2017

2017

2018

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

NH

SP

SP

SP

NH

SP

SP

SP

SPP

SPP

SPP

NH

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,420,000

$1,000,000

$12,000,000

$9,000,000

$94,400,000

$1,000,000

$10,000,000

$7,000,000

$61,600,000

$500,000

$100,000

$250,000

$2,000,000

$2,400,000

$2,400,000

$10,700,000

$17,100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

12

12

12

8708.00

8912.00

8913.00

8951.00

199.10

199.11

199.15

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

12

12

12

8708.00

8912.00

8913.00

8951.00

199.10

199.11

199.15

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2016

2016

2016

2016

2016

2016

2012

2016

2016

2016

2016

2016

2016

2

35.929

2.2

44.188

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

Page 94: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 94

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT US-119 BY WIDENING TO 4-LANES FROM EXISTING 4-LANE AT KY-1862 TO PAST JUST NORTH OF THE MAYKING MALL.(16CCN)

RECONSTRUCT US-119 BY WIDENING TO 4-LANES FROM NORTH OF MAYKINGMALL TO JUST SOUTH OF THE TRUCK PASSING LANES AND KY-3406.(16CCN)

RECONSTRUCT US-119 BY WIDENING TO 4-LANES FROM KY-3406 AND THEBEGINNING OF THE NORTHBOUND TRUCK PASSING LANES TO JUST NORTH OFKY-805. (16CCN)

RECONSTRUCT US-119 BY WIDENING TO 4-LANES FROM NORTH OF KY-805 TOTHE EXISTING 4-LANE.(16CCN)

RECONSTRUCT US-119 BY WIDENING TO 4-LANES ALONG A NEW ALIGNMENT(ORANGE) THROUGH THE GATEWAY INDUSTRIAL PARK TO US-23, INCLUDINGUS-23 FLYOVER RAMP.(16CCN)

RECONSTRUCT US-119 BY WIDENING TO 4-LANES ALONG A NEW ALIGNMENT(ORANGE) THROUGH THE GATEWAY INDUSTRIAL PARK TO US-23.(16CCN)

RECONSTRUCT US-119 BY WIDENING TO 4-LANES ALONG A NEW ALIGNMENT(ORANGE) THROUGH THE GATEWAY INDUSTRIAL PARK TO US-23. (ADDITIONALFUNDS FOR C PHASE FOR 12-199.51)(16CCN)

HARLAN-WHITESBURG; PINE MOUNTAIN; PARTRIDGE TO OVEN FORK;BEGINNING 1.3 MILES EAST OF THE HARLAN COUNTY LINE TO 1.71 MILES EASTOF KY-3404 NEAR JOE DAY BRANCH. (R/W FOR SECTIONS 1A & 1B) (F16)(2000BOPP)

3.480

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

US-119

US-119

US-119

US-119

US-119

US-119

US-119

US-119

$14,050,000

$1,800,000

$3,900,000

$2,500,000

$9,600,000

$18,000,000

$10,000,000

$3,150,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

D

R

U

D

R

U

D

R

U

C

C

R

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2019

2021

2020

2022

2022

2020

2022

2022

2020

2022

2022

2017

2018

2018

2020

2021

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

NH

NH

NH

NH

NH

NH

NH

NH

NH

NH

NH

NH

NH

NH

APD

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,350,000

$1,350,000

$1,350,000

$10,000,000

$600,000

$750,000

$450,000

$1,300,000

$1,150,000

$1,450,000

$1,000,000

$750,000

$750,000

$3,500,000

$3,600,000

$2,500,000

$18,000,000

$10,000,000

$3,150,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

12

199.31

199.32

199.33

199.34

199.50

199.51

199.52

311.30

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

12

199.31

199.32

199.33

199.34

199.50

199.51

199.52

311.10

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2016

2016

2016

2016

2000

2016

2016

2016

2016

2016

2016

2016

1998

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RELOCATION(O)

Page 95: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 95

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

HARLAN-WHITESBURG; PINE MOUNTAIN; PARTRIDGE TO OVEN FORK;BEGINNING 1.71 MILES EAST OF KY-3404 NEAR JOE DAY BRANCH TO THECOMMUNITY OF OVEN FORK. (R/W FOR SECTIONS 3 & 4) (F16) (2000BOP)(16CCR)

HARLAN-WHITESBURG; PINE MOUNTAIN; PARTRIDGE TO OVEN FORK;SURFACING ON US-119 FROM 1000 FT WEST JCT. KY 3404 TO 0.15 MI WEST OF KY806 AT OVEN FORK INCLUDING APPROACH TO EXISTING US 119. (SURFACINGFOR CONSTRUCTION SECTIONS 2, 3A, 3B, AND 4).

RECONSTRUCTION OF US-119 FROM 0.15 MILE WEST OF KY-806 TO KY-932.2012BOP

RECONSTRUCTION OF US-119 FROM 0.15 MILE WEST OF KY-806 TO KY-932.(16CCN)

REPLACE BRIDGE AND APPROACHES ON KY-343 OVER WRIGHT FORK (B79) 50FEET NE OF HAYMOND HILL ROAD. (SR=3.0): (067B00079N)

REPLACE BRIDGE ON CS-2026 OVER (MP 0.032) ELKHORN CREEK; AT EASTJENKINS; (STRUCTURALLY DEFICIENT, SR=13) 067C00058N

REPLACE BRIDGE ON CR-1841 (MP 0.015) OVER NORTH FORK KY RIVER; 1 MI NJCT KY 1862; (STRUCTURALLY DEFICIENT, SR=15.7) 067C00063N (AR/W)

REPLACE BRIDGE ON KY 2034C OVER N FORK KY RIVER 0.02 E OF US 119(SR 42.7)067B00121N

REPLACE BRIDGE ON STEEL BRIDGE RD (CR 1359Q4) OVER NORTH FORK OFKENTUCKY RIVER AT JCT WITH HIGHWAY 7 (KY 7)(SR 24) C00080N

2.860

1.550

1.600

.100

.100

.100

.040

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

US-119

US-119

US-119

US-119

KY-343

CS-2026

CR-1841

KY-2034C

CR-1359Q4

$3,300,000

$5,000,000

$36,800,000

$9,000,000

$670,000

$270,000

$450,000

$1,895,000

$875,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

C

R

U

C

C

C

C

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2018

2018

2019

2020

2021

2016

2016

2016

2016

2016

2018

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

APD

APD

APD

APD

APD

APD

BRX

BRZ

BRZ

BRX

BRX

BRX

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,300,000

$5,000,000

$2,500,000

$300,000

$34,000,000

$9,000,000

$670,000

$270,000

$450,000

$420,000

$125,000

$1,350,000

$875,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

12

12

311.70

311.79

311.80

311.81

1094.00

1107.00

1108.00

1113.00

1117.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

12

12

311.10

311.77

311.77

311.81

1094.00

1107.00

1108.00

1113.00

1117.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2016

2014

2016

2008

2010

2010

2012

2012

1998

2004

2004

2016

2008

2010

2010

2012

2012

8.6

.622

0

0

.006

.002

10.2

.662

.1

.1

.046

.042

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

RELIABILITY / SURFACE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 96: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 96

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE OVER POOR FORK OF CUMBERLAND RIVER ON KY 3404 100 FTSOUTH OF US 119. (067B00114N)(SR=11.7)

REPLACE BRIDGE ON HAMPTON BRANCH (CR 1226) (MP 0.01) OVER COWANCREEK. (SR=7.0) 067C00021N

REPLACE BRIDGE ON CR-1225 (0.034) OVER COWAN CREEK. (SR=3.0) 067C00020N

IMPROVE THE EXISTING ROADWAY TO MEET CURRENT STANDARDS ANDIMPROVE CONGESTION INTO AND OUT OF JENKINS BETWEEN MP 8.741 AND MP9.247.(12CCN)

CONGESTION/SAFETY IMPROVEMENT AT THE JUNCTION OF MAIN STREET ANDEAST MAIN IN DOWNTOWN WHITESBURG. (14CCN)(16CCR)

UPGRADE KY-160 (ROXANA-VAN ROAD) WITH SHOULDER/BREAK REPAIRS,CULVERT EXTENSIONS, AND DRAINAGE UPGRADES. (16CCN)

CURVE CORRECTION AT MP 17.7 ALONG KY 160 NEAR INTERSECTION WITH KY588. (16CCN)

.012

.008

.506

.005

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

KY-3404

CR-1226

CR-1225

KY-805

KY-15X

KY-160

KY-160

$875,000

$750,000

$1,150,000

$6,060,000

$1,350,000

$3,300,000

$5,500,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

D

R

U

C

R

U

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2019

2019

2021

2017

2019

2019

2021

2020

2022

2022

2016

2016

2016

2017

2019

2019

2020

2019

2020

2020

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRX

BRX

BRX

BRX

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$275,000

$75,000

$75,000

$450,000

$200,000

$150,000

$100,000

$300,000

$600,000

$250,000

$300,000

$6,060,000

$150,000

$200,000

$1,000,000

$50,000

$100,000

$3,150,000

$300,000

$100,000

$100,000

$5,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

1120.00

1125.00

1126.00

8702.00

8804.00

8909.00

8910.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

1120.00

1125.00

1126.00

8702.00

8804.00

8909.00

8910.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2016

2016

2012

2014

2016

2016

2014

2016

2016

2012

2014

2016

2016

.782

.006

.03

8.741

1.8

.794

.014

.038

9.247

1.805

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / CONGESTION MITIGTN(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

Page 97: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 97

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RESURFACE KY-160 (ROXANA-VAN ROAD) FROM MP 15.376 TO MP 21.843.(16CCN)

RECONSTRUCT KY-59 FROM KY-9 (AA) IN VANCEBURG TO JUNCTION OF KY-344MP 18.1 TO MP 23.19.(16CCN)

RECONSTRUCT THE INTERSECTION OF KY 10 AND KY 1306.(16CCR)

REPLACE BRIDGE ON KY 8 OVER KINNICONNICK CREEK 0.094 MILE W OFDUDLEY AVE (CR-1031A) (SR 26.5) 068B00003N (14CCR)

REPLACE BRIDGE OVER LAUREL FORK ON KY 1068 30 FT S OF DEEP HOLEBRANCH ROAD (CR 1125).(068B00057N)(SR=60.1)(16CCR)

CONSTRUCT A NEW BRIDGE CROSSING THE NORTH FORK OF THE LICKINGRIVER AT THE LEWIS-FLEMING COUNTY LINE. (08CCN): (068B00027N)

RECONSTRUCT KY-8 FROM KY-8C IN GARRISON TO SCAFFOLD LICKROAD.(14CCN)(16CCR)

RECONSTRUCT KY-8 FROM KY-8C IN GARRISON TO SCAFFOLD LICK ROAD.(ADDITIONAL FUNDS FOR C PHASE. SEE 9-8806.00)(16CCN)

6.467

5.090

.160

.074

.020

4.387

LETCHER

LEWIS

LEWIS

LEWIS

LEWIS

LEWIS

LEWIS

LEWIS

KY-160

KY-59

KY-10

KY-8

KY-1068

KY-57

KY-8

KY-8

$1,200,000

$54,000,000

$550,000

$3,250,000

$1,550,000

$5,200,000

$31,500,000

$10,000,000

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

U

C

C

D

R

U

C

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2017

2019

2019

2020

2016

2016

2016

2017

2018

2018

2019

2016

2017

2019

2019

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

STP

STP

STP

STP

SPP

SPP

BRO

BRX

BRX

BRX

BRX

SPP

STP

STP

STP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,200,000

$6,000,000

$5,000,000

$3,000,000

$40,000,000

$50,000

$500,000

$3,250,000

$500,000

$75,000

$75,000

$900,000

$5,200,000

$3,000,000

$5,000,000

$3,500,000

$20,000,000

$10,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

09

09

09

09

09

09

09

8911.00

231.00

232.00

1082.00

1090.00

8507.00

8806.00

8806.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

ROWAN

FLEMING

GREENUP

12

09

09

09

09

09

09

09

8911.00

231.00

232.00

1082.00

1090.00

8507.00

8806.00

8806.10

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2014

2012

2014

2008

2014

2016

2016

2016

2014

2012

2014

2008

2014

2016

15.376

18.1

12

22.563

1.74

0

24.016

21.843

23.19

12.16

22.637

1.76

.031

28.95

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PAVEMENT REHAB-PRI(P)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

NEW ROUTES / NEW ROUTE(O)

RELIABILITY / PREFINANCD CONVRSN(O)

8.952

0

9.012

1.233

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

From:

From:

From:

Page 98: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 98

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT KY-57 FROM KY-9 TO FLEMING/LEWIS COUNTY LINE.(14CCN)(16CCR)

RECONSTRUCT KY-57 FROM KY-9 TO FLEMING/LEWIS COUNTY LINE.(ADDITIONAL FUNDS FOR C PHASE. SEE 9-8807.00)(16CCN)

RECONSTRUCT INTERSECTION AT KY-9 AND KY-2523. (14CCN)

RECONSTRUCT FROM KY 59 FROM KY 9 IN VANCEBURG TO JUNCTION OF KY 344.(16CCN)

PAVEMENT REHABILITATION ON THE AA HIGHWAY (KY 9) FROM THEINTERSECTION OF KY 59 (MP 11.205) TO 0.481 MILES NORTH OF CR 1303 (MP 15.800)IN LEWIS COUNTY. A TOTAL OF 4.595 MILES. (16CCN)

WIDEN US-27 FROM KY-590 TO BELL STREET IN STANFORD (MP 18.2 TO MP 18.9).(INCLUDES NEW GOSHEN CUT-OFF ROAD)(2005HPP-KY115)

RELOCATE A SHORT SECTION OF GOSHEN ROAD FROM ITS EXISTINGINTERSECTION WITH US 27 TO A NEW LOCATION OPPOSITE THE EXISTING WAL-MART SIGNAL.

REPLACE BRIDGE ON KY 1247 OVER ST. ASAPH CREEK 0.044 S OF KY 78(SR 45.4)069B00055N

4.557

.080

4.595

.700

.040

LEWIS

LEWIS

LEWIS

LEWIS

LEWIS

LINCOLN

LINCOLN

LINCOLN

KY-57

KY-57

KY-9

KY-59

KY-9

US-27

CR-1071

KY-1247

$30,700,000

$10,000,000

$1,325,000

$20,000,000

$1,280,000

$9,000,000

$850,000

$1,280,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

R

U

C

C

C

R

U

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2019

2021

2022

2016

2016

2017

2021

2019

2019

2019

2021

2016

2016

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

STP

STP

SPP

SPP

SPP

STP

NH

NH

NH

NH

SP

BRX

BRX

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,100,000

$5,200,000

$3,400,000

$20,000,000

$10,000,000

$200,000

$125,000

$1,000,000

$20,000,000

$1,280,000

$1,400,000

$1,100,000

$6,500,000

$850,000

$120,000

$350,000

$810,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

08

08

08

8807.00

8807.01

8808.00

8904.10

8917.00

196.00

395.00

1055.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

08

08

08

8807.00

8807.01

8808.00

8904.10

8917.00

196.00

395.00

1055.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2016

2014

2016

2016

2014

2012

2012

2014

2016

2014

2016

2016

2014

2012

2012

0

12.709

11.205

18.2

17.67

4.557

12.789

15.8

18.9

17.71

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PAVEMENT REHAB-PRI(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 99: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 99

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON CR-1043 (0.643) OVER LOGAN CREEK. (SR=20.2) 069C00008N

PADUCAH-HENDERSON; RELOCATION OF US-60 FROM APPROX. 0.8 MILE EAST OFTENN. RIVER BRIDGE TO 0.5 MILE EAST OF RUDD-SPEES ROAD(00CCR)(12CCR)(14CCR)

REPLACE BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70(SR 32.7) 070B00017N.

REPLACE BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70(SR 32.7) 070B00017N (ADDITIONAL FUNDING FOR C PHASE)

REPLACE BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70(SR 32.7) 070B00017N (ADDITIONAL FUNDING FOR C PHASE)

REPLACE BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70(SR 32.7) 070B00017N (ADDITIONAL FUNDING FOR C PHASE)

REPLACE BRIDGE ON KY 866 OVER FORK OF GUM CREEK 0.02 MILE N OF KY1664(SR 44.5)070B00050N

RUSSELLVILLE SOUTHERN BYPASS. (12CCR)

REPLACE BRIDGE ON KY-664 (MP 3.298) OVER PLEASANT RUN CREEK; 2.3 MI N.W.OF JCT KY 663; (STRUCTURALLY DEFICIENT, SR=29.8) 071B00040N

3.300

.344

.344

.040

4.000

.100

LINCOLN

LIVINGSTON

LIVINGSTON

LIVINGSTON

LIVINGSTON

LIVINGSTON

LIVINGSTON

LOGAN

LOGAN

CR-1043

US-60

US-60

US-60

US-60

US-60

KY-866

-

KY-664

$250,000

$22,360,000

$15,870,000

$15,000,000

$15,000,000

$5,650,000

$750,000

$19,300,000

$460,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

R

U

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2016

2016

2016

2018

2019

2020

2021

2016

2016

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

SP

BRO

BRO

BRO

BRO

BRO

BRO

BRX

SPP

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$250,000

$22,360,000

$500,000

$370,000

$15,000,000

$15,000,000

$15,000,000

$5,650,000

$750,000

$19,300,000

$460,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

01

01

01

01

01

01

03

03

1066.00

330.00

1142.00

1142.01

1142.02

1142.03

1145.00

311.10

1073.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

01

01

01

01

01

01

03

03

1066.00

330.00

1142.00

1142.00

1142.02

1142.03

1145.00

311.01

1073.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

1998

2012

2016

2016

2016

2012

2002

2010

2016

1998

2012

2012

2016

2016

2012

1998

2010

.635

12.524

12.524

12.524

12.524

.022

3.248

.651

12.868

12.868

12.868

12.868

.062

3.348

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RELOCATION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 100: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 100

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

IMPROVE SAFETY BY IMPROVING SIGHT LINES CROSSING RAILROAD BETWEENSTOCKYARDS AND INDUSTRIAL PARK. (16CCN)

RELOCATION OF US 641 FROM JUST SOUTH OF THE LYON/CALDWELL COUNTYLINE TO FREDONIA, 4.5 MILES.

UPGRADE KY 93/RIVERPORT ROAD INTERSECTION.

RECONSTRUCT INTERSECTION AT JUNCTION OF KY-93 AND KY-3305. (16CCN)

CONSTRUCT 4-LANE BEREA BYPASS SECTION 2; FROM 150' EAST OF US-25, SE TOKY-21. (2004BOPC)(08CCR)(12CCR)

RELOCATE AND/OR REALIGN KY-52 FROM WALLACE MILL ROAD TOINTERSTATE 75 AT THE DUNCANNON ROAD INTERCHANGE.(02CCR)(12CCN)(14CCR) (DESIGN/BUILD)(16CCR)

COMPREHENSIVE TRAFFIC STUDY FOR INTERSECTION OF MAIN STREET ANDBEREA COLLEGE CAMPUS, BEREA. (2005HPP-KY112)(MOA WITH BEREA). (16CCR)

WIDEN US-25 FROM US-421 NORTH TO KY-876. STATE TO PROVIDE DESIGN ANDPLANS, AND FUNDS FOR THIS PROJECT ARE REQUESTED TO BE PAID TO THEMADISON COUNTY FISCAL COURT, WHICH SHALL COORDINATE THE PROJECT.(2005HPP-KY110)(06CCR)

4.500

.200

3.600

6.000

3.500

LOGAN

LYON

LYON

LYON

MADISON

MADISON

MADISON

MADISON

KY-2349

US-641

KY-93

KY-93

-

KY-52

KY-595

US-25

$1,250,000

$28,000,000

$1,910,000

$1,450,000

$22,420,000

$49,710,000

$500,000

$719,921

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

U

C

C

C

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2019

2020

2016

2017

2017

2018

2016

2017

2017

2016

2017

2019

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

STP

SPP

SPP

SPP

HPP

HPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$150,000

$100,000

$150,000

$850,000

$2,500,000

$4,000,000

$1,500,000

$20,000,000

$350,000

$1,560,000

$1,450,000

$22,420,000

$15,840,000

$33,870,000

$500,000

$719,921

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

01

01

01

07

07

07

07

8908.00

187.60

801.00

8901.00

192.20

235.00

236.00

251.01

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

CALDWELL

03

01

01

01

07

07

07

07

8908.00

187.60

801.00

8901.00

192.00

235.00

236.00

251.01

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2014

2016

2004

2002

2004

2004

2016

2016

2014

2016

2000

2002

2004

2004

14.3

1.17

2.565

11.903

14.5

4.19

2.665

15.442

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / RELOCATION(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / MAJOR WIDENING(O)

Milepoints: To:From:

Page 101: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 101

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

PRIORITY SECTION III: WIDEN US 25 FROM US 421 TO 1500' SOUTH OFDUNCANNON LANE. (SEE 7-251.40 FOR R/W)(2006BOPC)

PRIORITY SECTION II & III: WIDEN US-25 FROM US 421 TO PUMPKIN RUN.(SEE 7-251.10 FOR SEC III UTIL & CONST) (2006BOPC)(08CCR)(10CCR)(12CCR)(14CCR)

REPLACE BRIDGE ON KY 3376 OVER HAYS FORK 0.048 SOUTH OF US 421 (SR 23.1)076B00086N.

REPLACE BRIDGE ON BATTLEFIELD MEMORIAL HWY (US 421) OVER COWBELLCREEK AT JCT WITH HIGHWAY 21 E (KY 21)(SR 45.5) 076B00021

REPLACE BRIDGE ON OLD HAYS FORK LN (CR 1158) OVER BRANCH OF HAYSFORK 0.2 MILE SE OF BATTLEFIELD MEMORIAL HWY (US 421)(SR 16.9) 076C00023N

REPLACE BRIDGE OVER TERRILL BRANCH ROAD ON KY 3376 IN BEREA 200 FT NOF PEACHTREE DRIVE (CS 2072).(076B00085N)(SR=46.5)

REPLACE BRIDGE ON CR-1017 (3.405) OVER MUDDY CREEK. (SR=27.5) 076C00004N

.700

2.980

.040

.040

.020

MADISON

MADISON

MADISON

MADISON

MADISON

MADISON

MADISON

US-25

US-25

KY-3376

US-421

CR-1158

KY-3376

CR-1017

$6,600,000

$10,880,000

$760,000

$805,000

$480,000

$1,450,000

$475,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

U

C

C

R

U

C

R

U

C

D

R

U

C

D

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2018

2017

2018

2016

2016

2016

2017

2016

2016

2017

2019

2021

2021

2022

2020

2022

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

NH

NH

BRX

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRX

BRX

BRX

BRX

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$570,000

$2,290,000

$3,740,000

$3,970,000

$6,910,000

$760,000

$90,000

$90,000

$625,000

$40,000

$40,000

$400,000

$300,000

$75,000

$325,000

$750,000

$275,000

$100,000

$100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

251.10

251.40

1126.00

1130.00

1131.00

1137.00

1142.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

07

251.50

251.50

1126.00

1130.00

1131.00

1137.00

1142.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2006

2012

2012

2012

2014

2016

2004

2004

2012

2012

2012

2014

2016

11.903

11.903

4.586

2.443

.252

.279

3.397

12.744

14.883

4.626

2.483

.292

.299

3.413

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 102: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 102

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON CR-1044 (0.007) OVER BR OF MUDDY CREEK. (SR=29.5)076C00066N

RECONSTRUCT AND WIDEN THE KY-627 BRIDGE OVER I-75 TO FIVE LANES TOIMPROVE TRAFFIC CONGESTION AND IMPROVE SAFETY. (INCLUDES 7-8400)(B40)(08CCN)(10CCR)(14CCR)(16CCR)

IMPROVE ROADWAY, SIDEWALKS, AND BIKE PATHS ON US-25 BETWEEN ELLIPSESTREET TO GLADES ROAD AND THEN CONTINUES ON TO THE BEREA BYPASS.(08CCN)(10CCR)(12CCR)(LET BY KYTC)

REHABILITATION FROM CLAY'S FERRY BRIDGE TO BARNES MILL ROAD. (14CCN)

PROPOSED ROADWAY IMPROVEMENTS FROM DUNCANNON RD TO THEMADISON CO AIRPORT TO INCLUDE CALEAST RD (KY 2881 MP.783-MP 2.780),JOHN BALLARD RD (KY 2877 MP0-MP.806 & CR 1236 MP0-MP.429) FROM MENELAUSTO AIRPORT RD, & A NEW BRIDGE OVER SILVER CR.(14CCN)(16CCR)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM APPROXIMATELY 0.4 MILES EAST OF KY 3050 OVERPASS (MP 71.0)TO 1.1 MI W OF BRIDGE OVER LICKING RIVER (MP 73.4). (2012BOP)(ADDITIONALFUNDING FOR C PHASE)(16CCN)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCR)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCN)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(14CCR)(16CCN)

.100

1.212

10.381

3.232

2.400

4.600

4.600

4.600

MADISON

MADISON

MADISON

MADISON

MADISON

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

CR-1044

KY-627

US-25

I-75

KY-2881

KY-9009

KY-9009

KY-9009

KY-9009

$500,000

$18,720,000

$6,220,000

$1,500,000

$13,200,000

$12,861,470

$40,850,000

$25,000,000

$22,870,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

D

D

R

U

C

C

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2022

2022

2017

2016

2016

2019

2020

2021

2022

2016

2017

2020

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

NH

SPP

IM

SPP

SPP

SP

SP

NH

NH

NH

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$300,000

$100,000

$100,000

$18,720,000

$6,220,000

$1,500,000

$1,000,000

$500,000

$2,700,000

$9,000,000

$12,861,470

$850,000

$40,000,000

$25,000,000

$22,870,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

10

10

10

10

1143.00

8403.00

8505.00

8820.00

8853.00

126.13

126.40

126.41

126.42

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

10

10

10

10

1143.00

8403.00

8505.00

8820.00

8853.00

126.12

126.03

126.40

126.40

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2008

2008

2014

2014

2016

1998

2016

2016

2016

2008

2008

2014

2014

2012

1996

1998

1998

.003

.073

4.644

87.16

.783

71

65

65

65

.011

.193

5.856

97.541

2.78

73.4

69.6

69.6

69.6

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / PAVEMENT REHAB-INT(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

Page 103: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 103

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.4 MI E OF THE KY-134 JOHNSON CREEK BR TO 0.3 MI W OF KY3047 - SECTION 5. (14CCR)(16CCR)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.4 MI E OF THE KY-134 JOHNSON CREEK BR TO 0.3 MI W OF KY3047 - SECTION 5.(ADDITIONAL FUNDING FOR C PHASE)(16CCR)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.4 MI E OF THE KY-134 JOHNSON CREEK BR TO 0.3 MI W OF KY3047 - SECTION 5.(ADDITIONAL FUNDING FOR C PHASE)(16CCR)

MOUNTAIN PARKWAY CORRIDOR: MOUNTAIN PARKWAY WIDENING ANDSAFETY IMPROVEMENTS FROM MP 73.4, 1.1 MI W OF LICKING RIVER BRIDGE, TOMP 75.3 BURNING FORK BRIDGE. (08CCR)(10CCR)(12CCR)(14CCR)(ADDITIONALFUNDING FOR 10-140.00)(16CCN)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAYEXTENSION (KY 114/US 460) THROUGH THE CONGESTED AREA AT SALYERSVILLEFROM BURNING FORK BRIDGE TO KY 114. (14CCR)(R & U PHASES UNDER 10-166.01)(2014TIGER $24M)

MOUNTAIN PARKWAY CORRIDOR: EXTEND THE FOUR LANE MOUNTAINPARKWAY FROM US 460 TO THE MAGOFFIN/FLOYD COUNTY LINE. (SEE 12-1.01FOR PE & ENV)(14CCR)(16CCR)

REPLACE BRIDGE ON KY 2019 OVER LICK CREEK 0.055 MILE S OF KY 3334 (SR31.9) 077B00062N

REPLACE BRIDGE ON KY 2019 OVER RACCOON CREEK 0.039 S OF KY 1081(SR33.2)(AR/W)077B00063N

2.400

2.400

2.400

1.900

2.400

5.000

.040

.040

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

KY-9009

KY-9009

KY-9009

KY-9009

US-460

KY-114

KY-2019

KY-2019

$15,630,000

$15,000,000

$7,700,000

$10,000,000

$24,000,000

$112,070,000

$780,000

$680,000

Total

Total

Total

Total

Total

Total

Total

Total

U

C

C

C

C

C

D

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2018

2019

2016

2016

2017

2018

2019

2021

2016

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

NH

KYD

NH

NH

NH

SP

BRO

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$630,000

$15,000,000

$15,000,000

$7,700,000

$10,000,000

$24,000,000

$3,000,000

$8,570,000

$2,500,000

$98,000,000

$780,000

$680,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

10

10

126.50

126.51

126.52

140.10

166.00

169.00

1098.00

1099.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MORGAN

MORGAN

MORGAN

10

10

10

10

10

12

10

10

126.01

126.50

126.50

140.00

166.00

1.01

1098.00

1099.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

1998

2016

2016

2016

2012

2014

2012

2012

1998

1998

1998

2006

2012

1996

2012

2012

63.123

63.123

63.123

73.4

12.486

0

2.898

5.497

65

65

65

75.331

14.566

5.026

2.938

5.537

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

62.588

62.588

62.588

63.123

63.123

63.123

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

From:

From:

From:

Page 104: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 104

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT KY-30 AT THE BREATHITT/MAGOFFIN COUNTY LINE BEGINNINGAT MILEPOST 37 IN BREATHITT COUNTY TO MILEPOST 0.75 IN MAGOFFINCOUNTY. (06CCN)(10CCR)

BRIDGE NEAR NEW MAGOFFIN COUNTY HIGH SCHOOL NEAR OLD BURNINGFORK ROAD. (14CCN)(16CCR)

RECONSTRUCT US 460 IN MAGOFFIN COUNTY AT IVY POINT HILL FROM MP 10.0TO 10.7. (16CCN)

REPLACE BRIDGE ON KY 49 OVER HAMILTON BRANCH 0.33 MILE E OF COWHERDLN (CR-1301) (SR 25) 078B00031N.

ROADWAY IMPROVEMENTS TO KY 49 FROM JUST SOUTH OF KY 84 EXTENDINGNORTH THROUGH LORETTO TO KY 52 (MP 18.63 TO MP 27.54). (2012BOP)

CONNECTOR FROM HENDRICKSON DRIVE TO CORPORATE DRIVE (12CCN)

KY 49 FROM RIVERSIDE BRIDGE (B76) TO KY 337 IN BRADFORDSVILLE (12CCN)

1.270

.700

.040

8.910

2.513

MAGOFFIN

MAGOFFIN

MAGOFFIN

MARION

MARION

MARION

MARION

KY-30

-

US-460

KY-49

KY-49

-

KY-49

$10,890,000

$256,370

$8,550,000

$570,000

$40,350,000

$8,200,000

$17,110,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

D

R

U

C

U

C

D

R

U

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2017

2018

2019

2020

2021

2016

2017

2016

2018

2018

2020

2016

2017

2017

2019

2016

2017

2017

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

BRO

STP

STP

STP

STP

BRO

BRO

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$310,000

$180,000

$10,400,000

$256,370

$850,000

$1,500,000

$200,000

$6,000,000

$90,000

$480,000

$3,000,000

$2,500,000

$3,000,000

$31,850,000

$700,000

$2,000,000

$500,000

$5,000,000

$1,770,000

$2,210,000

$1,130,000

$12,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

04

04

04

04

8308.00

8801.00

8901.00

1076.00

8707.01

8714.00

8715.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

BREATHITT 10

10

10

04

04

04

04

8308.00

8801.00

8901.00

1076.00

8707.00

8714.00

8715.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2014

2016

2012

2012

2012

2012

2006

2014

2016

2012

2012

2012

2012

0

10

20.553

18.63

7.987

.75

10.7

20.593

27.54

10.5

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

37 37.522Milepoints: To:From:

Page 105: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 105

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

SPOT IMPROVEMENTS ON KY-49 (MP 20.900 TO MP 21.830) AS PER THE KY-49PLANNING STUDY. (14CCN)

SPOT IMPROVEMENTS ON KY-49 (MP 23.350 TO 24.980) AS PER THE KY-49PLANNING STUDY. (14CCN)

IMPROVE CURVE/TURNING LANE AT WEST MARION ELEMENTARY. (14CCN)

NEW CONSTRUCTION - EXTEND MARTIN LUTHER KING AVENUE FROMDOWNTOWN LEBANON BYPASS (VETERANS MEMORIAL HIGHWAY). ESTIMATEDDISTANCE IS 1.5 MILES. (14CCN)

SAFETY IMPROVEMENTS TO KY-243 BETWEEN HWY 68 AND GRAVEL SWITCH(MP 1.751 TO MP 2.558). (14CCN)

IMPROVE INTERSECTION OF US 68 AND KY 2154.(16CCN)

REPLACE BRIDGE ON KY 84 OVER HARDINS CREEK. (16CCN)

.930

1.630

.100

.807

MARION

MARION

MARION

MARION

MARION

MARION

MARION

KY-49

KY-49

KY-49

-

KY-243

US-68

KY-84

$3,900,000

$5,900,000

$450,000

$14,450,000

$900,000

$2,750,000

$797,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

C

D

R

U

C

D

R

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2017

2018

2017

2017

2018

2016

2016

2017

2017

2019

2019

2020

2017

2019

2019

2020

2017

2019

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$800,000

$700,000

$2,400,000

$1,700,000

$900,000

$3,300,000

$450,000

$850,000

$3,000,000

$500,000

$10,100,000

$150,000

$750,000

$350,000

$550,000

$750,000

$1,100,000

$135,000

$30,000

$50,000

$582,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

04

04

04

8802.00

8803.00

8804.00

8805.00

8810.00

8913.00

8914.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

04

04

04

04

04

04

04

8802.00

8803.00

8804.00

8805.00

8810.00

8913.00

8914.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2014

2014

2016

2016

2014

2014

2014

2014

2014

2016

2016

20.9

23.35

25.65

1.751

21.83

24.98

25.75

2.558

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / SPOT IMPROVEMENTS(O)

SAFETY / SAFETY(P)

NEW ROUTES / NEW ROUTE(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 106: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 106

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

IMPROVE SAFETY ISSUES AND SIGHT DISTANCE SOUTH OF BRADFORDSVILLEFROM MP 16.90 TO MP 17.6. (16CCN)

HEARTLAND PARKWAY: LEBANON BYPASS TO MARION/WASHINGTON LINE.(16CCN)

HEARTLAND PARKWAY: MARION/TAYLOR LINE TO LEBANON BYPASS.(16CCN)

ADDRESS GEOMETRIC DEFICIENCIES AND SAFETY ALONG KY 49 SOUTH OFBRADFORDSVILLE FROM MP 6.9 TO MP 7.6. (16CCN)

WIDEN KY-348 TO 4 LANES BETWEEN PURCHASE PARKWAY AND US-641.(00CCN)(06CCR)(INCLUDES DESIGN FOR 1-8101.00)(RU-04DEOB)(12CCR)(16CCR)

INEZ TO WARFIELD (SECTION 2-1): FROM LITTLE BLACKLOG TO BOOTH FORK.[STA. 190+00 TO STA. 298+00 (ENGLISH)] (2002BOP)(12CCR)(AR/W)(16CCR)

INEZ TO WARFIELD (SECTION 2-1): FROM LITTLE BLACKLOG TO BOOTH FORK[STA. 190+00 TO STA. 298+00] (ADDITIONAL FUNDING FOR C PHASE)(16CCR)

INEZ TO WARFIELD (SECTION 2-2): FROM BOOTH FORK TO KY-2031 [STA. 298+00TO STA. 382+00 (ENGLISH)] (2002BOP)(16CCR)

1.750

2.000

2.000

1.600

MARION

MARION

MARION

MARION

MARSHALL

MARTIN

MARTIN

MARTIN

KY-49

KY-55

US-68

KY-49

KY-348

KY-40

KY-40

KY-40

$500,000

$5,500,000

$13,400,000

$500,000

$4,680,000

$18,000,000

$24,560,000

$48,140,000

Total

Total

Total

Total

Total

Total

Total

Total

D

D

R

U

C

D

R

U

C

D

C

U

C

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2017

2018

2018

2019

2017

2018

2018

2019

2022

2016

2018

2019

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

NH

NH

NH

NH

NH

NH

NH

NH

SP

SB2

SPP

SPP

SPP

SPP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$300,000

$350,000

$350,000

$4,500,000

$600,000

$900,000

$900,000

$11,000,000

$500,000

$4,680,000

$2,000,000

$16,000,000

$5,000,000

$19,560,000

$48,140,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

01

12

12

12

8915.00

8916.00

8917.00

8952.00

8002.00

154.11

154.12

154.16

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

04

04

04

04

01

12

12

12

8915.00

8916.00

8917.00

8952.00

8002.00

154.10

154.12

154.10

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2016

2000

2002

2016

2002

2016

2016

2016

2016

2000

1998

2016

1998

16.9

6.9

7.62

17.6

7.6

8.783

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RELOCATION(O)

Page 107: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 107

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

INEZ TO WARFIELD (SECTION 2-2): FROM BOOTH FORK TO KY-2031 [STA. 298+00TO STA. 382+00 (ENGLISH)](16CCR)

INEZ TO WARFIELD (SECTION 2-3): FROM KY-2031 TO KY-292 [STA. 382+00 TO STA.427+00 (ENGLISH)] (2002BOP)(16CCR)

INEZ TO WARFIELD; BRIDGE OVER TUG FORK (SECTION III) (R & U IDENTIFIEDIN SECTION II-ITEM NO. 154.10)(16CCR)

IMPROVE ALIGNMENT AND GEOMETRICS OF THE CURVE LOCATED JUSTBEFORE THE JUNCTION OF KY 2031 AND KY 40 TO .1 MILES BEFORE GORDONHOLLOW ROAD, AND IMPROVE THE CULVERT/SAFETY DESIGN TO INCREASEMOTORIST AND PEDESTRIAN SAFETY. (12CCR)

REPLACE BRIDGE AND APPROACHES ON PR-1015 OVER ROCKCASTLE CREEK(C26) 275 FEET WEST JCT. KY-3 JUST SOUTH OF CROOKED RUN ROAD. (SR=2.0):(080C00026N)

REPLACE BRIDGE ON KY 40 OVER BUCK CREEK AT THE KY 2031 INTERSECTION(SR 49.8) 080B00002N.(AR/W)

NEW FULLY CONTROLLED ACCESS ROUTE FROM US 68 NEAR WASHINGTONEAST TO KY 11 INCLUDING A NEW I-CHNG AT KY 11. (PRIORITYSECTION)(2004BOPC)(06CCR)

NEW FULLY CONTROLLED ACCESS ROUTE FROM KY 11 NORTHEAST TO KY 9 (AAHWY) INCLUDING NEW I-CHNG AT KY 9. (2004BOPC)(06CCR)

.900

.100

.200

.070

2.700

2.900

MARTIN

MARTIN

MARTIN

MARTIN

MARTIN

MARTIN

MASON

MASON

KY-40

KY-40

KY-40

KY-40

CR-1324

KY-40

US-68

US-68

$18,000,000

$18,000,000

$17,080,000

$1,150,000

$60,000

$675,000

$36,630,000

$37,930,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

U

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2022

2022

2017

2016

2016

2017

2016

2018

2018

2020

2016

2017

2017

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

SPP

BRZ

BRO

BRO

SP

SP

SP

SP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$18,000,000

$18,000,000

$17,080,000

$1,150,000

$60,000

$175,000

$500,000

$780,000

$1,580,000

$1,820,000

$32,450,000

$780,000

$1,580,000

$1,820,000

$33,750,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

09

09

154.17

154.21

154.30

192.00

1092.00

1112.00

147.20

147.60

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

09

09

154.17

154.10

154.10

192.00

1092.00

1112.00

147.11

147.11

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2002

1998

2012

2008

2012

2004

2004

2010

1998

1998

2012

2008

2012

1998

1998

18.2

0

19.63

18.4

.028

19.7

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

Page 108: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 108

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPAIR BRIDGE ON US 68 OVER LAWRENCE CREEK 0.13 MI SW OF KY 3056.(081B00067N)(16CCR)

ADDITION OF AN INTERCHANGE ON HEATHER FRENCH HENRY SOUTHERN LOOP(US 62 AND US 68). (14CCN)(16CCR)

RECONSTRUCT US 62 GOING TO SARDIS BETWEEN KY 324 AND SARDIS (BETWEENTWIN BRIDGES). (14CCN)

CONSTRUCT RIGHT TURN LANE (SB) INTO CLARKSON SHERMAN ROAD(LANDFILL, 4.740) TO PROVIDE SAFETY FOR MOTORISTS TRAVELING ALONG THEAA HIGHWAY. (MP 4.6 TO MP 4.9)(14CCN)

INSTALL DECORATIVE LIGHTING ON SIMON KENTON BRIDGE OVER OHIO RIVERIN MAYESVILLE.(16CCN)

REPLACE BRIDGE ON KY 3056 OVER SOUTH FORK LAWRENCE CREEK. (16CCN)

WIDEN KY 9/AA HIGHWAY TO 4 LANES FROM KY 435 TO KY 2370 IN BRACKEN CO.(16CCN)

.400

.150

2.828

.300

MASON

MASON

MASON

MASON

MASON

MASON

MASON

US-68

US-68

US-62

KY-9

US-62

KY-3056

KY-9

$2,550,000

$10,000,000

$300,000

$300,000

$300,000

$2,000,000

$57,000,000

Total

Total

Total

Total

Total

Total

Total

D

C

D

R

U

C

P

C

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2018

2019

2019

2020

2017

2017

2018

2017

2018

2019

2020

2017

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

STP

STP

STP

STP

SP

SPP

STP

BRO

BRO

BRO

BRO

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$550,000

$2,000,000

$750,000

$750,000

$500,000

$8,000,000

$300,000

$300,000

$300,000

$400,000

$175,000

$175,000

$1,250,000

$4,000,000

$3,000,000

$5,000,000

$45,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

09

1095.00

8809.00

8810.00

8816.00

8905.00

8906.00

8907.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

09

09

1095.00

8809.00

8810.00

8816.00

8905.00

8906.00

8907.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2014

2014

2014

2016

2016

2016

2016

2014

2014

2014

2016

2016

2016

16.8

11.75

.7

4.6

17.2

11.9

3.528

4.9

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REHAB(P)

NEW ROUTES / NEW INTERCHANGE(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

SAFETY / LIGHTING(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

Page 109: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 109

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

WIDEN THE AA HIGHWAY TO 4 LANES FROM KY 1449 TO KY 11. (16CCN)

IMPROVE SAFETY BY ADDING LEFT AND RIGHT TURN LANES FOR EXIT ALONGKY 11. (16CCN)

REPLACE THE BRIDGE ON DAVIS LANE. (16CCN)

REPLACE THE BRIDGE ON KENNEDY CREEK ROAD. (16CCN)

REPAIR BRIDGE (081C00018N) ON DIXIE PIKE. (16CCN)

I-24 BRIDGE OVER THE OHIO RIVER @ PADUCAH (B100); JOINT PROJECT WITHILLINOIS TO MITIGATE SCOUR (073B00100N)

PADUCAH-WICKLIFFE; 4-LANE US-60 FROM BETHEL CHURCH ROAD TO KY-1154(MARTIN MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).(10CCR)(12CCR)

1.000

1.600

MASON

MASON

MASON

MASON

MASON

MCCRACKEN

MCCRACKEN

KY-9

KY-11

CR-1124

CR-1019

CR-1122

I-24

US-60

$31,600,000

$5,450,000

$1,750,000

$1,100,000

$60,000

$260,000

$5,860,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

C

C

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2019

2020

2017

2018

2019

2020

2017

2018

2019

2020

2017

2018

2019

2020

2017

2016

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SP

SP

SP

SP

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

IM

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,500,000

$1,600,000

$3,500,000

$24,000,000

$550,000

$500,000

$400,000

$4,000,000

$500,000

$100,000

$150,000

$1,000,000

$300,000

$150,000

$100,000

$550,000

$60,000

$260,000

$3,150,000

$2,710,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

01

01

8908.00

8909.00

8910.00

8911.00

8916.00

2.00

115.10

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

01

01

8908.00

8909.00

8910.00

8911.00

8916.00

2.00

115.10

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2016

2016

2000

1998

2016

2016

2016

2016

2016

2000

1998

0

.4

1.067

1.968

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REHAB(P)

SAFETY / BRIDGE REHAB(P)

RELIABILITY / MAJOR WIDENING(O)

Page 110: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 110

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

MAJOR WIDENING OF US 62 FROM KY 998 TO PADUCAH INFORMATION AGEPARK. (12CCR)

UPGRADE KY 1286 (FRIENDSHIP ROAD) FROM MP 3.6 TO MP 6.4 IN PADUCAH.(PRELIMINARY ENGINEERING) (12CCR)(14CCR)(16CCN)

CONSTRUCT A DOUBLE-CROSSOVER DIAMOND INTERCHANGE ON US 60 AT THEI-24 INTERCHANGE NEAR KENTUCKY OAKS MALL.

PADUCAH OUTER LOOP (PRIORITY SECTION 1); FROM KY-1322 (LOVELACEVILLEROAD) TO US-62 (BLANDVILLE ROAD). (GRADE & DRAIN AND INC. SURFACE)(2002BOPC)(16CCR)

PADUCAH OUTER LOOP (PRIORITY SECTION 2); FROM US-45 (PADUCAH-MAYFIELD ROAD) TO KY-1322 (LOVELACEVILLE ROAD). (GRADE & DRAIN ANDINC. SURFACE) (2002BOPC)

PADUCAH OUTER LOOP (PRIORITY SECTION 3); FROM US-62 (BLANDVILLE ROAD)TO US-60 (PADUCAH-WICKLIFFE ROAD). (GRADE & DRAIN AND INC. SURFACE)(2002BOPC)

REPLACE BRIDGE AND APPROACHES ON US-62 OVER SUGG CREEK (B24) 0.2 MILENORTH OF WOBLE ROAD. (SR=29.5): (073B00024N)

RELOCATION AND MINOR WIDENING OF US-60 FROM CLARKS RIVER TO US-62JCT.(10CCR)(14CCR)(LET W/ 1-1115.20)(16CCR)

.957

2.800

1.500

2.000

2.500

.100

1.000

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

US-62

KY-1286

US-60

-

-

-

US-62

US-60

$10,100,000

$27,460,000

$4,320,000

$5,010,000

$7,420,000

$9,210,000

$750,000

$17,440,000

Total

Total

Total

Total

Total

Total

Total

Total

U

C

R

U

C

R

U

C

R

U

R

U

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2018

2019

2020

2016

2016

2017

2019

2020

2016

2016

2016

2016

2016

2016

2016

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

NH

NH

NH

SPP

SPP

SP

SP

SP

SP

BRO

NH

NH

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,500,000

$7,600,000

$4,870,000

$4,870,000

$17,720,000

$210,000

$320,000

$3,790,000

$2,520,000

$2,490,000

$5,040,000

$2,380,000

$5,040,000

$4,170,000

$750,000

$3,500,000

$3,120,000

$10,820,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

01

01

01

01

152.00

153.00

154.00

310.10

310.30

310.50

1055.00

1115.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

01

01

01

01

01

01

152.00

153.00

154.00

310.01

310.01

310.01

1055.00

1115.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2016

2014

2002

2002

2002

2008

2000

2012

2016

2014

1996

1996

1996

2008

1996

7.851

3.623

10.484

.852

18.65

8.808

6.423

10.891

.92

19.673

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / RELOCATION(O)

Page 111: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 111

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RELOCATION OF US-62 FROM US-60 DEPARTURE TO KY-1887 (PARKROAD).(10CCR)(12CCR)(LET W/ 1-1115.10)(16CCR)

REPLACE BRIDGE OVER BOTTOM DITCH ON KY 1954 0.7 MILE NORTH OF KY 348(073B00096N) (SR=8.3).

REPLACE BRIDGE OVER BRANCH OF BOTTOM DITCH ON KY 994 0.8 MI NW OF KY348 (073B00015N)(SR=35.3)(EBRP)

I-24; CONSTRUCT NEW INTERCHANGE AT KY-994 (OLD MAYFIELD ROAD) SE OFPADUCAH. (00CCN)(14CCN)

NEW ACCESS ROAD FROM KY-305 NEAR KY-998, EXTENDING WEST TO THE OHIORIVER MEGAPARK. (2-LANE INITIAL, 4-LANE ULTIMATE)(12CCN)(14CCR)

RECONSTRUCT KY-92 FROM 1450 FT WEST OF KY 592 TO 350 FT EAST OF THEWHITLEY/MCCREARY COUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)

BRIDGE OVER ROCK CREEK ON OLD FIDELITY-BELL FARM ROAD (CR 1239) 0.25MI W OF ROCK CREEK ROAD (CR 1236) (074C00008N)(SR=22)

1.500

.022

.038

.100

4.566

.040

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCREARY

MCCREARY

US-62

KY-1954

KY-994

I-24

KY-305

KY-92

CR-1239

$16,390,000

$1,080,000

$1,300,000

$42,550,000

$23,680,000

$33,300,000

$920,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

D

R

U

C

R

U

C

R

U

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2018

2019

2020

2017

2019

2019

2020

2020

2021

2021

2022

2016

2017

2019

2017

2017

2019

2016

2019

2020

2020

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

STP

BRX

BRX

BRX

BRX

BRX

BRX

BRX

BRX

SP

SP

SP

SPP

SPP

SPP

SPP

BRZ

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$520,000

$4,500,000

$2,710,000

$8,660,000

$260,000

$140,000

$120,000

$560,000

$240,000

$320,000

$310,000

$430,000

$7,170,000

$3,790,000

$31,590,000

$4,200,000

$3,250,000

$16,230,000

$33,300,000

$280,000

$50,000

$20,000

$570,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

01

08

08

1115.20

1152.00

1154.00

8003.00

8702.00

261.30

1065.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

WHITLEY

01

01

01

01

01

11

08

1115.00

1152.00

1154.00

8003.00

8702.00

184.20

1065.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2014

2014

2000

2012

2014

2014

1996

2014

2014

2000

2012

2014

2014

12.881

.768

2.27

8.56

20.335

.25

14.358

.79

2.308

8.66

24.835

.29

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW INTERCHANGE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

0 .066Milepoints: To:From:

Page 112: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 112

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE OVERFLOW STRUCTURE ON US-431 AT THE MUHLENBERG-MCLEAN COLINE (SR 39) B00056N.

REPLACE BRIDGE OVER BRANCH OF POND DRAIN CREEK ON KY 2385 0.9 MI SWOF KY 81 (075B00066N)(SR=43.6)

SPOT IMPROVEMENTS AT THE INTERSECTION OF US-431 AND KY-250.(08CCN)(12CCR)

RECONSTRUCT AND WIDEN FROM MCLEAN/MUHLENBURG COUNTY LINE) TOLIVERMORE. (08CCN)(10CCR)(16CCR)

CORRECT LINE OF SIGHT WITH INTERSECTION OF KY 56 & KY 1233. (14CCN)

REPLACE BRIDGE OVER UNNAMED STREAM ON KY 823 0.5 MILE WEST OF KY2734.(082B00008N) (SR=45.2)

RECONSTRUCT KY 79 FROM KY 428 TO KY 144.(12CCN)(14CCR)

.142

.080

.100

5.500

.120

.010

3.148

MCLEAN

MCLEAN

MCLEAN

MCLEAN

MCLEAN

MEADE

MEADE

US-431

KY-2385

US-431

US-431

KY-56

KY-823

KY-79

$2,700,000

$1,560,000

$880,000

$6,800,000

$450,000

$950,000

$17,470,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

R

U

C

R

U

C

R

U

C

R

U

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2019

2021

2021

2022

2016

2016

2017

2016

2016

2018

2016

2016

2017

2019

2021

2021

2022

2016

2017

2017

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

BRX

BRX

BRX

BRX

SPP

SPP

SB2

SB2

SB2

SPP

SPP

SPP

SPP

BRX

BRX

BRX

BRX

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$200,000

$100,000

$2,400,000

$440,000

$60,000

$120,000

$940,000

$200,000

$180,000

$500,000

$1,430,000

$1,210,000

$4,160,000

$50,000

$50,000

$350,000

$150,000

$50,000

$80,000

$670,000

$1,040,000

$3,250,000

$1,770,000

$11,410,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

04

04

1078.00

1090.00

8400.00

8401.00

8852.00

1088.00

8702.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MUHLENBERG 02

02

02

02

02

04

04

1078.00

1090.00

8400.00

8401.00

8852.00

1088.00

8702.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2008

2008

2014

2014

2012

2012

2014

2008

2008

2014

2014

2012

0

3.5

9.8

0

6.1

.54

1.263

.071

3.58

9.9

5.5

6.22

.55

4.411

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SPOT IMPROVEMENTS(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

28.273 28.344Milepoints: To:From:

Page 113: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 113

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT KY 79 FROM KY 144 TO KY 1051.(12CCN)(14CCR)

CONSTRUCT A SIDEWALK FROM 700 BLOCK OF HIGH STREET (KY 448) TO THEBYPASS IN BRANDENBURG ALONG THE NORTHWEST SIDE OF THE ROAD. (16CCN)

CONSTRUCT A ROUNDABOUT AT NORTHERN END OF MAIN STREET (CS 1004) INBRANDENBURG. (16CCN)

SPOT IMPROVEMENTS KY 36:(SECT A) FROM .20 MI N OF JCT W/ STONEQUARRYRD (MP 2.08) TO 0.16 MI S OF THE JCT W/ STONEQUARRY RD (MP 2.44). (SECT G)FROM .05 MI N OF THE JCT W/ SUITER BRCH RD (MP 3.90) TO .10 MI S OF THE JCTW/ SUITER BRCH RD (MP 4.05).(16CCR)

SPOT IMPROVEMENTS ON KY 36: (PRIORITY SECTION B-F) FROM 0.18 MILESSOUTH OF JUNCTION WITH STONEQUARRY RD (MP 2.463) TO 0.6 MILES NORTHOF JUNCTION WITH SUITER BRANCH RD (MP 3.90). (SEE 8001.10 FOR SECTION A &G)

IMPROVE SAFETY AND SUBSTANDARD GEOMETRICS FOR US 460 FROM MP 6.2 TOMP 8.5. RECONSTRUCTION FROM END OF ROTHWELL HILL RECONSTRUCTIONTO BRIDGE OVER BEAVER CREEK. (14CCN)(16CCR)

WIDEN EXISTING ROADWAY AND IMPROVE VERTICAL AND HORIZONTALCURVES. NEW CONSTRUCTION. COMPLETES US 460 UPGRADES IN MENIFEECOUNTY FROM MP 14.35 TO 19.39 AND IN MORGAN COUNTY FROM MP 0 TO MP0.8. (14CCN)(16CCR)

IMPROVE SAFETY ON US 68 AT KY 127 INTERSECTION IN HARRODSBURG.(12CCR)(14CCR)(16CCR)

3.826

.360

1.440

2.300

5.839

.300

MEADE

MEADE

MEADE

MENIFEE

MENIFEE

MENIFEE

MENIFEE

MERCER

KY-79

KY-448

CS-1004

KY-36

KY-36

US-460

US-460

US-68

$15,560,000

$76,000

$110,000

$2,800,000

$2,700,000

$14,500,000

$6,500,000

$3,500,000

Total

Total

Total

Total

Total

Total

Total

Total

U

C

C

C

C

D

R

U

C

R

U

C

D

R

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2018

2018

2018

2016

2017

2017

2018

2019

2020

2022

2019

2020

2016

2017

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SP

SP

SPP

SP

SP

SP

SP

SPP

SPP

SP

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,030,000

$13,530,000

$76,000

$110,000

$2,800,000

$200,000

$250,000

$250,000

$2,000,000

$3,000,000

$1,500,000

$10,000,000

$3,000,000

$3,500,000

$500,000

$1,000,000

$1,000,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

10

10

10

10

07

8705.00

8918.00

8919.00

8001.10

8001.20

8802.00

8805.00

416.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MORGAN

04

04

04

10

10

10

10

07

8705.00

8918.00

8919.00

8001.00

8001.00

8802.00

8805.00

416.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2016

2016

2000

2000

2014

2014

2012

2012

2016

2016

2000

2000

2014

2014

2012

4.411

2.08

2.463

6.2

14.347

7.3

8.237

2.44

3.9

8.5

19.386

7.6

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

0 .8Milepoints: To:From:

Page 114: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 114

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

IMPROVE SYSTEM MOBILITY ALONG MOBERLY ROAD FROM KY 390 TO KY 1989IN NORTHWEST HARRODSBURG. (12CCR)

REPLACE BRIDGE AND APPROACHES ON KY-152 OVER HERRINGTON LAKE ATTHE MERCER/GARRARD COUNTY LINE (B05). (SR=3.0); (084B00005N)

REPLACE BRIDGE AND APPROACHES ON KY-152 OVER HERRINGTON LAKE ATTHE MERCER/GARRARD COUNTY LINE (B05). (SR=3.0)(084B00005N)

REPLACE BRIDGE AND APPROACHES ON KY-152 OVER HERRINGTON LAKE ATTHE MERCER/GARRARD COUNTY LINE (B05). (SR=3.0)(084B00005N)(ADDITIONALFUNDING FOR C PHASE)

REPLACE BRIDGE ON US 68 OVER SHAKER CREEK 0.019 W OF CHATHAM RD(CR-1113)(SR 36.2) 084B00001N

SCOPING STUDY ON US-68 FROM HARRODSBURG TO WILMORE.(12CCN)

SAFETY IMPROVEMENTS ON US 127 IN SALVISA. (14CCN)

SUMMER SHADE BYPASS. (06CCR)(2006BOPC)(08CCR)(12CCR)(14CCR)

CONSTRUCT TWO-WAY LEFT TURN LANE AND INSTALL RAISED PAVEMENTMARKER ON US-68 FROM BRIDGE OVER ROGERS CREEK TO MAJESTIC DRIVE(CS-1024). (2004BOPC) (10CCR)

.341

.100

.400

13.837

2.434

.263

MERCER

MERCER

MERCER

MERCER

MERCER

MERCER

MERCER

METCALFE

METCALFE

CS-1237

KY-152

KY-152

KY-152

US-68

US-68

US-127

KY-90

US-68

$990,000

$8,000,000

$7,280,000

$5,000,000

$710,000

$500,000

$200,000

$19,390,000

$1,600,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

U

C

C

C

C

C

P

D

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2016

2017

2018

2016

2016

2016

2017

2018

2020

2016

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

BRO

BRO

BRO

BRO

SPP

SP

STP

STP

STP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$210,000

$780,000

$8,000,000

$7,280,000

$5,000,000

$710,000

$500,000

$200,000

$2,440,000

$1,760,000

$15,190,000

$190,000

$370,000

$1,040,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

03

03

417.00

1116.00

1116.01

1116.02

1128.00

8708.00

8858.00

112.10

900.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

GARRARD

GARRARD

JESSAMINE

07

07

07

07

07

07

07

08

99

417.00

1116.00

1116.00

1116.02

1128.00

8708.00

8858.00

136.00

354.07

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2008

2014

2016

2012

2012

2014

2006

2004

2012

2008

2008

2016

2012

2012

2014

2000

2004

0

18.818

18.818

18.818

12.5

8.391

14.469

0

7

.341

18.894

18.894

18.894

12.9

20.058

16.903

3.283

7.263

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PREFINANCD CONVRSN(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / SCOPING STUDY(O)

SAFETY / SAFETY(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

SAFETY / SAFETY(P)

0

0

0

.076

.076

2.17

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

From:

From:

From:

Page 115: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 115

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE OVER OIL WELL BRANCH ON KY 496 0.5 MILE SE OF KY533.(085B00025N) (SR=48.2)(EBRP)

REPLACE BRIDGE AND APPROACHES OVER ROGERS CREEK AT MP 7.307. (DESIGNHANDLED UNDER 3-8506.00)(STRUCTURALLY OBSOLETE, SR=79.8) 085B00010N(2014BOP)

REPLACE BRIDGE AND APPROACHES OVER BLACK ROCK CREEK AT MP 8.474(DESIGN HANDLED UNDER 3-8506.00)(STRUCTURALLY OBSOLETE,SR=73.0)085B00009N (2014BOP)

SPOT IMPROVEMENTS ON US-68 FROM THE CUMBERLAND PARKWAY TO THEGREEN/METCALFE COUNTY LINE.(12CCN)(16CCN)

RECONSTRUCT KY 163 AS A NEW ROUTE ON THE WEST SIDE OF EDMONTONFROM KY 163 AT GARY BELL RD (MP 10.0) S OF EDMONTON, CROSSING US 68(STOCKTON ST) 2000 FT WEST OF THE COURTHOUSE SQ, TO US 68 (GREENSBURGST) AT I-CHNG WITH NUNN PKWY (MP 9.8). (14CCN)(16CCR)

IMPROVE HIGHWAY SAFETY AND SYSTEMS MOBILITY IN THE KY 163 CORRIDORBETWEEN KY 90 (MP 2.907) AND THE PROPOSED WEST EDMONTON BYPASS (MP9.777). (16CCN)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2017. (12CCR)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2018. (12CCR)

.020

.616

.176

2.191

1.443

6.870

METCALFE

METCALFE

METCALFE

METCALFE

METCALFE

METCALFE

MONROE

MONROE

KY-496

KY-163

KY-163

US-68

KY-163

KY-163

KY-214

KY-214

$660,000

$3,133,000

$1,008,987

$9,750,000

$18,135,000

$2,500,000

$444,000

$444,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

C

R

U

C

D

R

U

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2020

2021

2016

2016

2018

2019

2021

2016

2017

2018

2019

2021

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRX

BRX

BRX

BRX

SPP

SPP

STP

STP

STP

SPP

SPP

SPP

SPP

SP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$250,000

$75,000

$100,000

$235,000

$3,133,000

$1,008,987

$1,550,000

$1,200,000

$7,000,000

$1,000,000

$3,000,000

$2,190,000

$11,945,000

$2,500,000

$444,000

$444,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

03

03

1087.00

8506.20

8506.30

8706.00

8859.00

8955.00

128.08

128.09

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

03

03

03

03

03

03

03

1087.00

8506.00

8506.00

8706.00

8859.00

8955.00

128.08

128.09

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2016

2014

2016

2012

2012

2014

2008

2008

2016

2014

2016

2012

2012

11.201

6.999

8.386

17.835

9.777

2.907

1.737

1.737

11.221

7.615

8.562

20.026

11.22

9.777

1.837

1.837

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SAFETY(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

Page 116: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 116

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2019.(12CCR)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2020.(12CCR)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2021.(12CCR)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2022.(12CCR)

REPLACE BRIDGE ON NEW SALEM RD (CR 1354) OVER PETER CREEK 0.2 MILE EOF BETHLEHAM CHURCH RD (CR 1335)(SR 20.4) 086C00015N

CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "GRADE &DRAIN ONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BESUPPLEMENTAL TO THE AUTHORIZED AMOUNT ALREADY EXPENDED ON THISPROJECT). (08CCR)(10CCR)

CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "SURFACINGONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BESUPPLEMENTAL TO THE AUTHORIZED AMOUNT ALREADY EXPENDED ON THISPROJECT). (08CCR)(10CCR)

RECONSTRUCT INTERSECTION OF KY 63 AND POPLAR LOG CHURCH ROAD.(16CCN)

MONTGOMERY COUNTY I-64 WEST BOUND REST AREA IMPROVEMENTS.

.040

MONROE

MONROE

MONROE

MONROE

MONROE

MONROE

MONROE

MONROE

MONTGOMERY

KY-214

KY-214

KY-214

KY-214

CR-1354

-

-

KY-63

I-64

$444,000

$444,000

$444,000

$444,000

$280,000

$6,930,000

$7,310,000

$1,600,000

$250,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2021

2022

2017

2017

2018

2017

2018

2018

2019

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

BRZ

STP

STP

SPP

SPP

SPP

SPP

IM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$444,000

$444,000

$444,000

$444,000

$280,000

$6,930,000

$7,310,000

$200,000

$300,000

$400,000

$700,000

$250,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

03

03

07

128.10

128.11

128.12

128.13

1084.00

7020.01

7020.17

8954.00

6.01

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

03

03

03

03

03

03

03

07

128.10

128.11

128.12

128.13

1084.00

7020.00

7020.01

8954.00

6.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2016

2016

2012

2002

2002

2016

1996

2014

2014

2016

2016

2012

1998

2002

2016

1996

1.737

1.737

1.737

1.737

1.954

10.5

107.652

1.837

1.837

1.837

1.837

1.994

10.6

107.702

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / REST AREA REHAB(P)

Page 117: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 117

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

WIDEN KY 1991 FROM MAYSVILLE ROAD TO MIDLAND TRAIL INDUSTRIAL PARK,MONTGOMERY COUNTY (SEE 7-8501.00 FOR "SPB" FUNDS)(2005HPP-KY129)

RECONSTRUCT US 460 AT LUCKY STOP HILL. (12CCR)

UPGRADE HINKSTON PIKE IN MT. STERLING FROM NEW MIDLAND TRAIL TOTHE NEW INDUSTRIAL PARK ENTRANCE (INCLUDES EXTENSION OF INDUSTRIALACCESS ROAD TO HINKSTON PIKE). (12CCR)

WIDEN KY-1991 FROM MAYSVILLE ROAD TO MIDLAND TRAIL INDUSTRIAL PARK.(2005HPP-KY129) TO BE DONE IN CONJUNCTION WITH 7-240.00. (08CCN)(12CCR)

WIDEN EXISTING PAVEMENT AND IMPROVE VERTICAL AND HORIZONTALCURVES FROM EXISTING MOUNT STERLING BYPASS (KY 686) TO 500' W OFBENTBROOK SUBDIVISION. ADD FULL WIDTH SHOULDERS & A CENTER TURNINGLANE IN CONGESTION AREAS FROM MP 2.2 TO 4.311.(14CCN)(16CCR)

WIDEN EXISTING PAVEMENT AND IMPROVE VERTICAL AND HORIZONTALCURVES FROM BOTTOM OF HILL TO US 460 IN JEFFERSONVILLE. ADD FULL-WIDTH SHOULDERS TO IMPROVE SAFETY. (14CCN)

WIDEN EXISTING BYPASS FROM 2 LANES TO 4 LANES FROM US 460 TO US 60.IMPROVE CAPACITY AND SAFETY IMPROVEMENTS ALONG KY-713INTERSECTION. ADD TURNING LANES WHERE APPROPRIATE. INCLUDE MULTI-USE TRAILWAY ALONG ROUTE. (14CCN)

WIDEN TO SIX LANES FROM MP 107.5 TO MP 113.7. (14CCN)

RECONSTRUCT US 60 FOR SAFETY IMPROVEMENTS FROM 500 FEET WEST OFSEWELL SHOP ROAD (MP 17.032) IN CLARK COUNTY TO 500 FEET WEST OFBENTBROOK (MP 2.007) IN MONTGOMERY COUNTY.(16CCN)

1.768

1.480

1.032

1.768

2.111

1.656

6.200

2.141

MONTGOMERY

MONTGOMERY

MONTGOMERY

MONTGOMERY

MONTGOMERY

MONTGOMERY

MONTGOMERY

MONTGOMERY

MONTGOMERY

KY-1991

US-460

KY-1991

KY-1991

US-60

KY-213

KY-686

I-64

US-60

$559,899

$12,980,000

$4,010,000

$1,600,000

$11,800,000

$1,000,000

$200,000

$1,500,000

$1,500,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

D

R

U

C

D

D

D

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2017

2016

2016

2016

2017

2018

2019

2016

2016

2016

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

HPP

STP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

IM

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$559,899

$12,980,000

$4,010,000

$1,600,000

$800,000

$1,500,000

$1,500,000

$8,000,000

$1,000,000

$200,000

$1,500,000

$1,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

07

240.01

250.10

411.00

8501.00

8810.00

8817.00

8818.00

8819.00

8953.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

CLARK

07

07

07

07

07

07

07

07

07

240.01

250.10

411.00

8501.00

8810.00

8817.00

8818.00

8819.00

8953.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2010

2012

2008

2014

2014

2014

2014

2016

2010

2010

2012

2008

2014

2014

2014

2014

2016

0

18.125

1.768

0

2.007

0

107.5

0

1.768

19.6

2.8

1.768

4.311

1.656

113.7

2.007

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)17.032 17.166Milepoints: To:From:

Page 118: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 118

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM CR 1226 PARKWAY ROAD TUNNEL (MP 59.3) TO 0.4 MI EAST OF THEKY-134 JOHNSON CREEK BRIDGE - SECTION 6.(12CCR)(14CCR)(16CCR)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM CR 1226 PARKWAY ROAD TUNNEL (MP 59.3) TO 0.4 MI EAST OF THEKY-134 JOHNSON CREEK BRIDGE - SECTION6.(12CCR)(14CCR)(16CCR)(ADDITIONAL FUNDING FOR C PHASE)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM CR 1226 PARKWAY ROAD TUNNEL (MP 59.3) TO 0.4 MI EAST OF THEKY-134 JOHNSON CREEK BRIDGE - SECTION6.(12CCR)(14CCR)(16CCR)(ADDITIONAL FUNDING FOR C PHASE)

IMPROVE SAFETY AND REDUCE ACCIDENTS ON KY-7 BY ELIMINATING ROCKOVERHANG AND ADDING SHOULDERS 1000 FEET SOUTH OF KY 1161 TO 1000 FEETNORTH OF KY 1161. (12CCR)(16CCR)

RECONSTRUCT/WIDENING OF MAIN ST (KY 7) IN WEST LIBERTY BEGINNING ATRIVERSIDE DR. (CS 1058) AND EXTENDING NORTH TO 0.159 MILES NORTH OFINTERSECTION WITH CEDAR RD (CS 1053). (2014BOP)(D,R,U COMPLETED UNDER10-293)(CONSTRUCTION SEQ 2)(16CCR)

REPLACE BRIDGE OVER WHITE OAK CREEK ON US 460 0.5 MILE NW OF KY 1000.(088B00021N)(SR=35)

RECONSTRUCT AND STRAIGHTEN CURVE IN US-460 FROM MILEPOST 0.8 TOMILEPOST 2.1. (06CCN)(12CCR)(16CCR)

RECONSTRUCT KY-7 FROM MILE POST 2.7 TO MILE POST 5.6 (JUNCTION 519 TOSOUTH SIDE OF WRIGLEY HILL). (08CCN)(12CCR)

3.300

3.300

3.300

.400

.366

.050

.500

2.950

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

KY-9009

KY-9009

KY-9009

KY-7

KY-7

US-460

US-460

KY-7

$8,900,000

$12,100,000

$15,000,000

$4,270,000

$3,800,000

$1,750,000

$4,370,000

$13,110,000

Total

Total

Total

Total

Total

Total

Total

Total

U

C

C

C

C

R

C

D

R

U

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2018

2019

2020

2016

2016

2017

2020

2021

2021

2022

2016

2016

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

SB2

SPP

SPP

BRX

BRX

BRX

BRX

STP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$900,000

$8,000,000

$12,100,000

$15,000,000

$4,270,000

$1,050,000

$2,750,000

$300,000

$150,000

$50,000

$1,250,000

$4,370,000

$2,320,000

$1,560,000

$9,230,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

10

10

126.60

126.61

126.62

160.00

293.10

1111.00

8302.00

8402.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

10

10

10

10

10

10

126.01

126.60

126.60

160.00

293.00

1111.00

8302.00

8402.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2016

2016

2012

2012

2014

2006

2008

1998

2000

2000

2012

2012

2014

2006

2008

59.3

59.3

59.3

3.45

.134

25.74

1.6

2.667

62.588

62.588

62.588

3.85

.5

25.79

2.1

5.592

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

Page 119: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 119

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

IMPROVEMENTS TO CORNER OF KY 2498 & US 460 EXTENDING ONE MILE TO THEARH HOSPITAL AT THE TOP OF THE HILL. (14CCN)(16CCN)

REPLACE BRIDGE ON KY 191 OVER CANEY CREEK .5 MILES WEST OF KY 1162.(16CCN)

IMPROVE RAILROAD CROSSING AT MP 15.674 BETWEEN CENTRAL CITY ANDDRAKESBORO. (04CCR)

WIDEN US-62 FROM WAL-MART TO US-431.(08CCN)(10CCR)(12CCR)(14CCR)(INCLUDES 2-8301)

WIDEN KY-181 BY FOUR FEET ON EACH SIDE FROM INTERSECTION 601 TOWENDELL FORD CENTER. (14CCN)

STRAIGHTEN DEAN ROAD INTERSECTION OF 189 BYPASS TO KY 181 NORTH NEARTHE INTERSECTION WITH THE WKY PARKWAY, WENDELL FORD NATIONALGUARD CENTER, AND JOB CORP. (14CCN)

LOWER THE ROAD AT THE INTERSECTION OF MERLE TRAVIS HIGHWAY (KY 246)AND KY 176 SO THAT THE INTERSECTION IS ON THE SAME LEVEL AS 176 ANDMERLE TRAVIS HIGHWAY. (14CCN)(16CCR)

1.000

.040

.300

1.500

2.467

MORGAN

MORGAN

MUHLENBERG

MUHLENBERG

MUHLENBERG

MUHLENBERG

MUHLENBERG

KY-2498

KY-191

US-431

US-62

KY-181

KY-2533

KY-246

$7,403,000

$1,200,000

$4,120,000

$9,740,000

$5,060,000

$6,600,000

$1,560,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

R

U

C

D

R

U

C

C

R

U

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2020

2017

2018

2019

2020

2016

2017

2017

2019

2016

2016

2017

2018

2016

2017

2018

2019

2017

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SP

SP

SP

SP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,200,000

$335,000

$5,868,000

$250,000

$100,000

$100,000

$750,000

$630,000

$450,000

$330,000

$2,710,000

$9,740,000

$530,000

$1,820,000

$2,710,000

$780,000

$500,000

$820,000

$4,500,000

$280,000

$120,000

$180,000

$980,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

02

02

02

02

02

8804.00

8902.00

160.00

8506.00

8802.00

8803.00

8804.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

02

02

02

02

02

8804.00

8902.00

160.00

8506.00

8802.00

8803.00

8804.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2004

2008

2014

2014

2014

2016

2016

2004

2008

2014

2014

2014

7.2

7.813

15.524

16.471

12.767

0

0

7.719

7.853

15.824

17.93

15.234

2.023

.04

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

Page 120: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 120

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

BARDSTOWN-LOUISVILLE; WIDENING AND ACCESS MANAGEMENTIMPROVEMENTS ON US-31E BETWEEN NAZARETH DRIVE AND KY-509. (2004BOPC)

REPLACE BRIDGES ON US 62 (HINKLE CREEK) AND KY 48 IN BLOOMFIELD090B00096N (SR 28.2) 090B00095N (SR 49.7)(12CCR)

REPLACE BRIDGE OVER FROMAN CREEK ON KY 509 0.9 MI W OF US 31E(090B00068N)(SR=38.7)

REPLACE BRIDGE OVER DAVIS RUN ON HIGDON LOOP (CR 1215) 0.1 MI S OF US31E NEAR SCL OF NEW HAVEN (090C00030N)(SR=27) (EBRP)

WIDEN KY-245 FROM FLAGET HOSPITAL (MP 7.722) THROUGH COUNTY LINE(MP12.261 NELSON/MP0.000 BULLITT) TO HAPPY HOLLOW RD (MP 4.425).

WIDEN US-150 FROM KY-49 TO NEAR KY-245/WAL-MART WIDENING. (06CCN)

3.700

.100

.018

.020

8.964

1.300

NELSON

NELSON

NELSON

NELSON

NELSON

NELSON

US-31E

US-62

KY-509

CR-1215

KY-245

US-150

$37,880,000

$2,090,000

$1,130,000

$428,000

$67,200,000

$16,880,000

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2018

2016

2016

2017

2020

2021

2021

2022

2019

2021

2021

2022

2017

2019

2019

2021

2016

2017

2017

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

BRO

BRO

BRO

BRX

BRX

BRX

BRX

BRZ

BRZ

BRZ

BRZ

SP

SP

SP

SP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$9,930,000

$2,440,000

$25,510,000

$170,000

$520,000

$1,400,000

$150,000

$100,000

$80,000

$800,000

$100,000

$30,000

$50,000

$248,000

$4,500,000

$10,000,000

$6,700,000

$46,000,000

$570,000

$2,440,000

$710,000

$13,160,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

04

04

287.10

1078.00

1089.00

1092.00

8307.20

8308.10

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

BULLITT

04

04

04

04

04

04

287.30

1078.00

1089.00

1092.00

8307.00

8308.00

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2012

2014

2014

2006

2006

2004

2012

2014

2014

2006

2006

16.835

27.278

3.61

.12

7.722

.44

20.536

27.318

3.628

.14

12.261

1.697

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

0 4.425Milepoints: To:From:

Page 121: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 121

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

WIDEN US-150 FROM NEAR KY-245 THROUGH THE BLUEGRASS PARKWAYINTERCHANGE TO JUST PAST LESLIE BALLARDROAD.(06CCN)(2006BOPC)(12CCR)(14CCR)(16CCR)

NEW ROUTE BETWEEN US 62 AND KY 245 WEST OF BARDSTOWN. (16CCR)

WIDEN TEMPLIN AVENUE BETWEEN CHAMBERS BLVD AND BEN IRVIN RD/KY2737. (14CCN)(16CCR)

PARIS-MAYSVILLE ROAD; RECONSTRUCT FROM MILLERSBURG TO KY-1455 ATCARLISLE (SECTION 3). (08CCR)(12CCR)(14CCR)(16CCR)

RECONSTRUCT KY 36-KY 32 NEAR THE NICHOLAS COUNTY SCHOOLS PROPERTY.MP 3.10 TO MP 3.283. (12CCR)(16CCR)

RECONSTRUCT KY 36/KY 928 INTERSECTION. (14CCN)(16CCR)

SAFETY IMPROVEMENTS ALONG KY 32 FROM LAKE ROAD (MP 9.5) TOSCRUBGRASS CREEK (MP 12.5) TO CORRECT HORIZONTAL, VERTICAL,PAVEMENT WITH DEFICIENCIES. (14CCN)

REPLACE BRIDGE ON ABNER'S MILL ROAD (CR 1010) 2.4 MILES NORTH OF KY 32.(16CCN)

.600

.642

4.400

.183

.230

3.000

NELSON

NELSON

NELSON

NICHOLAS

NICHOLAS

NICHOLAS

NICHOLAS

NICHOLAS

US-150

-

KY-1430

US-68

KY-36

KY-36

KY-32

CR-1010

$28,570,000

$500,000

$200,000

$16,870,000

$6,600,000

$1,750,000

$5,600,000

$100,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

D

C

R

U

C

R

U

C

P

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2020

2017

2016

2017

2016

2016

2017

2016

2016

2016

2016

2017

2017

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

NH

STP

STP

STP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,630,000

$940,000

$25,000,000

$500,000

$200,000

$16,870,000

$1,250,000

$850,000

$4,500,000

$200,000

$150,000

$1,400,000

$100,000

$2,000,000

$2,000,000

$1,500,000

$100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

07

09

09

09

09

8309.10

8809.00

8851.00

310.30

205.00

8811.00

8812.00

8951.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

04

04

04

07

09

09

09

09

8309.00

8809.00

8851.00

310.01

205.00

8811.00

8812.00

8951.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2014

2014

2000

2012

2014

2014

2016

2006

2014

2014

1996

2012

2014

2014

2016

1.697

.971

3.1

8

9.5

2.4

2.285

1.613

3.283

8.23

12.5

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 122: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 122

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT INTERSECTION AT KY 54 AND KY 2671. (12CCR)

REPLACE BRIDGE ON CR-1194 (MP 0.079) OVER THREELICK CREEK; .15 MI W JCTCR 5172; (STRUCTURALLY DEFICIENT, SR=2) 092C00128N (AR/W)

REPLACE BRIDGE ON US 62 OVER BRANCH OF THREE LICK FORK 0.23 MILE E OFGREEN MEADOWS DR (CS 6068)(SR 47.2)092B00032

REPLACE BRIDGE OVER THREELICK FORK ON US 62 0.4 MILE E OF GREENMEADOWS DRIVE (CS 6068) IN BEAVER DAM. (092B00033N)(SR=48)

ADDRESS LEFT TURN LANE ISSUES ON US-231 AT SOUTHERN ELEMENTARYSCHOOL, MP 5.15 TO 5.25.(12CCN)

WIDEN/RECONSTRUCT KY 69 FROM CENTERTOWN TO HARTFORD.(14CCN)(16CCR)

CONSTRUCT A CONNECTOR ROAD INTO BLUEGRASS CROSSINGS INDUSTRIALPARK TO IMPROVE ACCESS AND ELIMINATE SAFETY ISSUES. (14CCN)

.100

.100

.040

.074

.100

5.761

OHIO

OHIO

OHIO

OHIO

OHIO

OHIO

OHIO

KY-54

CR-1194

US-62

US-62

US-231

KY-69

-

$1,500,000

$490,000

$970,000

$1,910,000

$1,800,000

$25,690,000

$4,000,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

U

C

R

U

C

D

R

U

C

R

U

C

D

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2016

2017

2016

2016

2017

2020

2021

2021

2022

2016

2016

2017

2016

2018

2020

2021

2016

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

BRZ

BRZ

BRO

BRO

BRO

BRX

BRX

BRX

BRX

SPP

SPP

SPP

STP

STP

STP

STP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$200,000

$300,000

$1,000,000

$150,000

$340,000

$230,000

$90,000

$650,000

$440,000

$60,000

$120,000

$1,290,000

$400,000

$500,000

$900,000

$1,690,000

$2,500,000

$5,000,000

$16,500,000

$700,000

$300,000

$3,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

231.00

1077.00

1083.00

1091.00

8705.00

8810.00

8811.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

02

02

231.00

1077.00

1083.00

1091.00

8705.00

8810.00

8811.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2010

2012

2014

2012

2014

2014

2012

2010

2012

2014

2012

2014

2014

3.939

.029

11.892

12

5.15

7.556

4.039

.129

11.932

12.074

5.25

13.317

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY-HAZARD ELIM(P)

NEW ROUTES / NEW ROUTE(O)

Page 123: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 123

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE, IMPROVE ALIGNMENTS AND APPROACHES, AND ADDRESS SAFETYISSUES WITH BRIDGES ON KY 136 FROM MP 0.00 TO 22.618 IN MCLEAN COUNTYAND MP 0.00 TO 9.6 IN OHIO COUNTY. (14CCN)

UPGRADE KY 54 TO A 3 LANE AND PROVIDE NEW CURB AND GUTTER ANDADDRESS TWO DANGEROUS CURVES AT FORDSVILLE ON EAST SIDE OFROADWAY. (16CCN)

IMPROVE SAFETY ON KY 54 BY UPGRADING MP 7.0 TO MP 8.0 TO THREE LANESINCLUDING CURB AND GUTTER AND ADDRESSING TWO SHARP TURNS. (16CCN)

KY-393 RECONSTRUCT FROM 140FEET SOUTH OF RAILROAD CROSSING (CSX)EXTENDING NORTHWEST TOWARDS KY 146 ENDING AT STATION 12+00 (DESIGNUNDER 5-230.00). (CONSTRUCTION SEQ.#2)

RECONSTRUCT KY-22 FROM KY-329 TO ABBOTT LANE.(2004BOPC)(08CCR)(10CCR)(12CCR)

RECONSTRUCT KY-22 TO 5-LANES FROM ABBOTT LANE TO PROPOSED KY-393INTERSECTION AND CONTINUING WITH 3-LANES TO EXISTING KY-393.(2004BOPC)

CONSTRUCT NEW ROUTE FROM OLD HENRY INTERCHANGE AT I-265 TOCRESTWOOD BYPASS. (98CCR)(2004BOPP)(10CCN)(14CCR)

32.218

1.000

.959

2.100

2.200

5.000

OHIO

OHIO

OHIO

OLDHAM

OLDHAM

OLDHAM

OLDHAM

KY-136

KY-54

KY-54

KY-393

KY-22

KY-22

-

$9,500,000

$10,750,000

$10,750,000

$11,520,000

$17,440,000

$18,240,000

$16,000,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

R

U

C

D

R

U

C

C

R

U

C

D

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2017

2018

2019

2020

2017

2019

2020

2021

2016

2017

2017

2019

2016

2017

2017

2019

2016

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

STP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,000,000

$1,600,000

$6,900,000

$750,000

$1,000,000

$2,000,000

$7,000,000

$750,000

$1,000,000

$2,000,000

$7,000,000

$11,520,000

$2,560,000

$2,540,000

$12,340,000

$910,000

$3,840,000

$2,540,000

$10,950,000

$500,000

$500,000

$15,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

05

05

05

05

8812.00

8901.00

8951.00

234.00

304.10

304.20

367.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MCLEAN

SHELBYJEFFERSON

02

02

02

05

05

05

05

8812.00

8901.00

8951.00

230.00

304.01

304.01

367.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2016

2016

2000

2004

2004

1996

2014

2016

2016

1996

1996

1996

1996

0

7

5.13

3.25

5.32

9.6

8

5.868

5.32

7.5

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SAFETY(P)

RELIABILITY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / NEW ROUTE(O)

0 22.618Milepoints:

Milepoints:Milepoints:

To:

To:To:

From:

From:From:

Page 124: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 124

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

EXTENSION OF OLD HENRY ROAD EAST TO ASH AVENUE (KY362). (12CCR)

INTER-URBAN GREENWAY: CONSTRUCT A NON-MOTORIZED CORRIDOR FROMLAGRANGE TO JEFFERSON COUNTY LINE. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP). (14CCR)

CONSTRUCT AN UNINTERRUPTED RAIL UNDERPASS WEST OF LAGRANGE.(LOCAL MATCH)(ALL WORK BY OLDHAM COUNTY) (FUNDING SUBJECT TOFISCAL CONSTRAINT PENDING MPO TIP). (14CCR)

CONSTRUCT SIDEWALKS ON KY 1793 FROM RIDGEVIEW DRIVE TO SETTLERSPOINT TRAIL, AND A SIDEWALK CONNECTION FROM TIMOTHY WAY TO PEGGYBAKER PARK.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

RECONSTRUCT US-42 FROM THE JEFFERSON/OLDHAM COUNTY LINE TORIDGEMOOR DRIVE. (2004BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

INTERSECTION IMPROVEMENT AT KY 22 AND KY 329 IN CRESTWOOD. (ALLWORK BY KYTC)(2006BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP)

CONSTRUCTION OF A PARK AND RIDE FACILITY INCLUDING A PARKING LOT,SHELTER, PLAYGROUND, BIKE LOCKERS, WALKWAYS, AND A 1000' ACCESSROAD LOCATED ON APPLE PATCH WAY OFF OF KY-329 NEAR I-71 EXIT 14 INCRESTWOOD.(2010BOPC)(ADDITIONAL FUNDING)(14CCN)

WIDEN I-71 FROM FOUR TO SIX LANES FROM KY 329 (MP 14.1) TO KY 393 (MP 18.0).(16CCN)

2.200

.750

.286

.900

.200

.041

3.900

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

-

-

CR-1002

KY-1793

US-42

KY-22

CS-7000

I-71

$15,000,000

$2,610,000

$10,140,000

$80,000

$3,510,000

$870,000

$308,000

$41,100,000

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

C

R

U

C

C

C

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2017

2016

2016

2018

2016

2016

2016

2016

2019

2020

2021

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SB2

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$15,000,000

$180,000

$350,000

$2,080,000

$3,190,000

$1,350,000

$5,600,000

$80,000

$3,510,000

$870,000

$308,000

$3,500,000

$1,900,000

$1,700,000

$34,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

367.20

410.01

434.00

440.10

441.01

449.00

468.10

483.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

JEFFERSON 05

05

05

05

05

05

05

05

367.00

410.00

434.00

440.01

441.00

965.12

468.10

483.10

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2004

2004

2004

2004

2004

2014

2016

1996

2002

2004

2004

2004

2004

2014

2016

0

1.542

0

3.15

0

14.1

.747

1.828

.942

3.35

.041

18

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / MAJOR WIDENING(O)

Milepoints: To:From:

Page 125: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 125

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

WIDEN I-71 FROM FOUR TO SIX LANES FROM KY 393 (MP 18.0) TO KY 53 (MP 22.4),INCLUDING A NEW INTERCHANGE AT MP 20.6. (16CCN)

OLD FLOYDSBURG ROAD SAFETY IMPROVEMENTS: REPLACE NARROW ONE-LANE CULVERT CROSSING; CLEAR TREES AND VEGETATION OUT OF RIGHT-OF-WAY; ADD SHOULDER TO THE ROAD, AND ADD SIGNAGE FOR SAFETY.

CONSTRUCT VARIOUS SIDEWALKS IN OLDHAM COUNTY.

CONSTRUCT VARIOUS SIDEWALKS IN OLDHAM COUNTY.

IMPROVE DRAINAGE ON KY-362 (ASH AVENUE) IN PEWEE VALLEY.(14CCN)(16CCR)

DESIGN FOR IMPROVING KY-53 FROM ZHALE SMITH ROAD TO KY-22 (TOTAL 3.2MILES). (14CCN)

RECONSTRUCT KY-22 AT KY-227 AT END OF NEW CONSTRUCTION TO 0.4 MILEEAST OF KY 845 SOUTH. (06CCR)(08CCN)(12CCR)(14CCR)

REPLACE BRIDGE OVER CEDAR CREEK ON SAWDRIDGE CREEK W ROAD (CR1214) 0.2 MI N OF US 127 (094C00011N)(SR=20.3)

4.400

.571

2.617

4.700

.040

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OWEN

OWEN

I-71

CR-1209

-

-

KY-362

KY-53

KY-22

CR-1214

$7,800,000

$752,000

$100,000

$100,000

$500,000

$2,000,000

$26,490,000

$850,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

R

C

C

C

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2022

2016

2017

2016

2017

2016

2020

2017

2017

2019

2017

2019

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

SLO

SLO

SLO

SLO

SPP

STP

SPP

SPP

SPP

BRZ

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$5,500,000

$2,300,000

$230,000

$522,000

$100,000

$100,000

$500,000

$2,000,000

$1,840,000

$1,250,000

$23,400,000

$150,000

$100,000

$100,000

$500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

06

06

483.20

494.00

517.02

517.03

8851.00

8852.00

198.00

1088.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

06

06

483.20

965.12

517.00

517.00

8851.00

8852.00

198.00

1088.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2014

2014

2014

2014

2014

2006

2014

2016

2004

2014

2014

2014

2014

2006

2014

18

1.43

.975

3.068

11.315

.22

22.4

1.44

1.546

5.685

16.057

.26

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY-HAZARD ELIM(P)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / DRAINAGE IMPROVE(P)

RELIABILITY / DESIGN ENGINEERING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 126: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 126

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

WIDEN KY 22 FROM INTERSECTION WITH KY 845 TO THE OWEN/GRANT COUNTYLINE.(12CCN)(14CCR)(16CCR)

KY 30 (PRIORITY SECTION); FROM NORTH OF JCT. KY 847 AT TRAVELLERS RESTAT END OF NEW CONSTRUCTION TO KY 11 AT LEVI.(08CCN)(10CCR)(12CCR)(14CCR)

RECONSTRUCT KY 30 FROM KY 847 TO THE JACKSON COUNTY LINE.(14CCR)(SEE10-279.60 FOR PE & ENVIR) (AR/W)(16CCR)

RECONSTRUCT KY 30 FROM KY 847 TO THE JACKSON COUNTY LINE.(14CCR)(SEE10-279.60 FOR PE & ENVIR) (AR/W)(16CCR)

REPLACE BRIDGE ON KY-3185 (MP 1.535) OVER LICK CREEK; 1.6 MI NE - JCT KY17; (STRUCTURALLY DEFICIENT, SR=13.7) 096B00038N

REPLACE BRIDGE ON KY-159 (MP 3.639) OVER KINCAID CREEK; .2 MI. SOUTH OFJCT.KY 609; (STRUCTURALLY DEFICIENT, SR=42.4) 096B00004N

REPLACE BRIDGE ON KY 330 OVER SHORT CREEK 0.35 MILE N OF J H GODMANRD (CR 1238).(SR 2) 096B00012N (16CCR)

REPLACE BRIDGE ON HALE RD (CR 1020) 0.395MI N OF FLOUR CREEK RD.(SR=22.0) 096C00102N

2.500

6.200

3.378

.100

.100

.040

.006

OWEN

OWSLEY

OWSLEY

OWSLEY

PENDLETON

PENDLETON

PENDLETON

PENDLETON

KY-22

KY-30

KY-30

KY-30

KY-3185

KY-159

KY-330

CR-1020

$35,000,000

$28,080,000

$22,750,000

$16,510,000

$400,000

$2,525,000

$2,600,000

$290,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

D

R

U

C

C

C

R

U

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2019

2016

2016

2017

2017

2018

2019

2016

2016

2016

2018

2016

2017

2018

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

STP

STP

STP

STP

STP

BRX

BRX

BRX

BRX

BRX

BRZ

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,000,000

$1,000,000

$31,000,000

$28,080,000

$2,250,000

$2,000,000

$2,500,000

$16,000,000

$16,510,000

$400,000

$100,000

$75,000

$2,350,000

$2,600,000

$30,000

$50,000

$10,000

$200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

10

10

10

06

06

06

06

8702.00

279.51

279.61

279.62

1071.00

1073.00

1081.00

1092.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

10

10

10

06

06

06

06

8702.00

279.50

279.60

279.62

1071.00

1073.00

1081.00

1092.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

1996

2014

2016

2010

2010

2012

2016

2012

1996

2014

2016

2010

2010

2012

2016

16.057

0

1.485

3.589

8.638

.395

18.56

5.132

1.585

3.689

8.678

.401

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 127: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 127

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON EAST FAIRVIEW RD (CR-1207) (1.618) OVER S. FORK GRASSYCREEK. (SR=28) 096C00072N

RECONSTRUCT US-27 FROM BUTLER IN PENDLETON COUNTY TO SOUTH OF KY-154 IN CAMPBELL COUNTY (MP 17.9 PENDLETON COUNTY TO MP 1.9 CAMPBELLCOUNTY).(12CCN)(14CCR)

IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY 15 IN PERRY COUNTY FROM MORTON BOULEVARD TO KY 15 BYPASS

IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY 15 IN PERRY COUNTY FROM MORTON BOULEVARD TO KY 15BYPASS.(ADDITIONAL FUNDING FOR C PHASE)

IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY 15 IN PERRY COUNTY FROM MORTON BOULEVARD TO KY 15 BYPASS.(ADDITIONAL FUNDING FOR C PHASE)

RECONSTRUCTION OF KY 15 FROM BONNYMAN TO NEAR KY 28. (14CCN)

RECONSTRUCTION OF THREE (3) AT-GRADE RAILROAD CROSSING ON KY15 INPERRY COUNTY LOCATED BETWEEN MP 2.1 TO MP 3.7. (2012BOP)

REPLACE BRIDGE ON BULAN HINER RD (KY 1146) OVER TRACE FORK AT JCTWITH KENTUCKY HIGHWAY 476 (KY 476)(SR 25.5) 097B00103N

REPLACE BRIDGE ON BIG WILLARD RD (KY 2021) OVER WILLARD CREEK ATINTERSECTION WITH BEECH NUT LN (CR 1213)(SR 44.6) 097B00027N

3.340

1.243

1.243

1.243

3.300

1.600

.033

.040

PENDLETON

PENDLETON

PERRY

PERRY

PERRY

PERRY

PERRY

PERRY

PERRY

CR-1207

US-27

KY-15

KY-15

KY-15

KY-15

KY-15

KY-1146

KY-2021

$650,000

$67,790,000

$25,000,000

$15,000,000

$12,000,000

$66,600,000

$1,000,000

$600,000

$550,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

R

U

C

C

C

C

D

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2022

2022

2016

2016

2018

2017

2018

2019

2020

2020

2020

2020

2016

2017

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

SPP

SPP

SPP

NH

NH

NH

SP

SP

SP

SP

RRP

BRX

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$250,000

$200,000

$200,000

$20,000,000

$4,500,000

$43,290,000

$25,000,000

$15,000,000

$12,000,000

$1,510,000

$3,040,000

$2,050,000

$60,000,000

$1,000,000

$600,000

$550,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

10

10

10

10

10

10

10

1094.00

8706.00

158.00

158.01

158.02

269.20

294.00

1102.00

1103.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

CAMPBELL

06

06

10

10

10

10

99

10

10

1094.00

8706.00

158.00

158.00

158.00

269.01

352.10

1102.00

1103.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2012

2012

2016

2016

1996

2008

2012

2012

2016

2012

2012

2012

2012

1996

2008

2012

2012

1.612

17.9

13.269

13.269

13.269

16.847

2.1

2.679

1.075

1.624

19.34

14.512

14.512

14.512

20.135

3.7

2.712

1.115

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / SAFETY-RR PROTECTN(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

0 1.9Milepoints: To:From:

Page 128: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 128

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON BLACK HAWK RD (CR 1107) OVER CARR FORK AT JCTWITH RAPTOR LN (CR 1179)(SR 4.3) 097C00006N

REPLACE BRIDGE OVER CLOVER FORK ON ROAD TO LEATHERWOOD SCHOOL50 FT N OF KY 699 (097C00052N) (SR= 14.6)

REPLACE BRIDGE OVER NORTH FORK KENTUCKY RIVER ON KENMONT ROAD(CR 1114) 380 FT SE OF KY 7 (097C00005N)(SR=48.6)

REPLACE BRIDGE OVER STRAIGHT FORK ON LITTLE LEATHERWOOD CREEKROAD (CR 1140) AT JCT WITH KY 3348 (097C00013N)(SR=38)

MINOR WIDENING & RESURFACING OF KY 451 FROM MP 11.3 TO MP 11.65. (14CCN)

NEW INTERCHANGE OFF OF A NEW EXIT 57 HAL ROGERS PARKWAY. (16CCN)

IMPROVE SAFETY AND SUBSTANDARD GEOMETRICS FROM BAKER STREET TOKY 15 IN COMBS. (16CCN)

.010

.047

.009

.350

.504

PERRY

PERRY

PERRY

PERRY

PERRY

PERRY

PERRY

CR-1107

PR-1056

CR-1114

CR-1140

KY-451

HR-9006

KY-80

$940,000

$850,000

$2,000,000

$875,000

$360,000

$15,779,000

$2,105,000

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

D

R

U

C

D

R

U

C

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2019

2019

2020

2019

2021

2021

2022

2019

2020

2020

2022

2016

2017

2018

2019

2020

2017

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

SPP

STP

STP

STP

STP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$940,000

$250,000

$50,000

$50,000

$500,000

$300,000

$100,000

$100,000

$1,500,000

$250,000

$50,000

$75,000

$500,000

$360,000

$1,340,000

$530,000

$159,000

$13,750,000

$515,000

$318,000

$212,000

$1,060,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

10

1107.00

1112.00

1113.00

1114.00

8851.00

8903.00

8904.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

10

10

10

10

10

1107.00

1112.00

1113.00

1114.00

8851.00

8903.00

8904.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2014

2014

2014

2016

2016

2012

2014

2014

2014

2014

2016

2016

.062

.005

.07

0

11.3

57

7.406

.102

.011

.117

.009

11.65

7.91

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / NEW INTERCHANGE(O)

RELIABILITY / SAFETY(P)

Page 129: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 129

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REMOVE CONCRETE BARRIER ON KY-80 AND JUSTICE DRIVE IN HAZARD.(16CCN)

SAFETY IMPROVEMENTS ON KY 80 FROM LESLIE COUNTY LINE TO KY 451.(16CCN)

IMPROVE SAFETY AND DRAINAGE ALONG KY 478 NORTH OF AJAX HOLLOW TOJAKES BRANCH FIRE DEPARTMENT. (16CCN)

REPAIR SLIDE AREA TO CORRECT A CONTINUOUS MAINTENANCE ISSUE FROMMP 2.9 TO MP 3.1. (16CCN)

RECONSTRUCT FROM LOCUST STREET TO KY 15X IN HAZARD. (16CCN)

REPLACE BRIDGE ON KY-1166 OVER RT. FK. MACES CREEK. SR=26.8 (16CCN)

4.378

.200

1.579

.040

PERRY

PERRY

PERRY

PERRY

PERRY

PERRY

KY-80

KY-80

KY-80

KY-476

KY-451

KY-1166

$500,000

$6,036,000

$2,168,000

$1,166,000

$10,700,000

$1,653,000

Total

Total

Total

Total

Total

Total

C

D

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2017

2018

2019

2020

2017

2018

2019

2020

2017

2018

2019

2020

2017

2018

2019

2020

2017

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SAF

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

BRO

BRO

BRO

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$670,000

$309,000

$257,000

$4,800,000

$258,000

$265,000

$265,000

$1,380,000

$530,000

$53,000

$53,000

$530,000

$1,550,000

$1,590,000

$1,060,000

$6,500,000

$335,000

$155,000

$103,000

$1,060,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

8905.00

8906.00

8907.00

8908.00

8909.00

8910.00

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

10

10

10

10

8905.00

8906.00

8907.00

8908.00

8909.00

8910.00

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2016

2016

2016

2016

2016

2016

2016

2016

2016

0

2.9

1.891

.624

4.378

3.1

3.47

.664

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / SAFETY(P)

RELIABILITY / SAFETY(P)

RELIABILITY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 130: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 130

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT CURVE EAST OF HURT CEMETERY TO WEST OF HURT BR RD.(16CCN)

REPLACE BRIDGE ON KY 1168 OVER MACES CREEK. (16CCN)

NEW INTERCHANGE OFF OF HAL ROGERS PARKWAY AT MP 52.85. (16CCN)

REPLACE BRIDGE OVER LEATHERWOOD CREEK. SR=35(16CCN)

RESURFACE KY 699 FOR 2 MILES TO IMPROVE SAFETY AT OWEN'S BRANCHROAD. (16CCN)

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4LANE FROM LESLIE/PERRY LINE TO HAZARD, INCLUDING INTERCHANGE INHAZARD; MP 51.03 TO MP 59.09. (16CCN)

IMPROVE KY 194 FROM US 119 RAMP NEAR SMITH FARMS BOTTOM (CR 1458) TONEAR DESKINS BRANCH CULVERT

.050

2.000

8.060

2.049

PERRY

PERRY

PERRY

PERRY

PERRY

PERRY

PIKE

KY-1088

KY-1168

HR-9006

CR-1150

KY-699

HR-9006

KY-194

$2,460,000

$1,653,000

$12,500,000

$1,022,000

$260,000

$22,000,000

$16,000,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

C

D

R

U

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2019

2020

2017

2018

2019

2020

2017

2018

2019

2020

2017

2018

2019

2020

2017

2019

2021

2021

2017

2017

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

BRO

BRO

BRO

BRO

SP

SP

SP

SP

BRO

BRO

BRO

BRO

SPP

SP

SP

SP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$795,000

$212,000

$53,000

$1,400,000

$335,000

$155,000

$103,000

$1,060,000

$1,000,000

$250,000

$250,000

$11,000,000

$258,000

$103,000

$78,000

$583,000

$260,000

$1,000,000

$12,000,000

$9,000,000

$2,000,000

$1,500,000

$12,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

12

8912.00

8913.00

8914.00

8915.00

8916.00

8917.00

198.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

10

10

10

10

12

8912.00

8913.00

8914.00

8915.00

8916.00

8917.00

198.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2016

2016

2016

2014

2016

2016

2016

2016

2016

2016

2014

0

51.03

17.951

.05

59.09

21

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW INTERCHANGE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RESURFACING(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

Page 131: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 131

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

PIKEVILLE TO VA STATE LINE; US 460/KY 80; MAINLINE BRIDGES OVER KY 195 @MARROWBONE CREEK. (SECTION 5B) (2014BOP)

PIKEVILLE TO VA. STATE LINE; US460/KY80 FROM KY-195 TO EAST OF PONDCREEK - SECTION 6A-2 BRIDGE AT POND CREEK.(14CCR)

PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM DUNLEARY HOLLOW TO KY-80 AT BEAVER CREEK (SECTION 6C) BRIDGE ONLY.(14CCN)(16CCR)

PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM DUNLEARY HOLLOW TO KY-80 AT BEAVER CREEK (SECTION 6C) BRIDGE ONLY. (ADDITIONAL FUNDING FORC PHASE 12-263.67)(14CCN)(16CCN)

PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM KY-195 TO DUNLEARYHOLLOW. (SURFACING FOR SECTIONS 6A & 6B) (2000BOP)(14CCN)

PIKEVILLE TO VA. STATE LINE; US 460/KY 80 AT BEAVER CREEK NEAR BEAVERBOTTOM (SECTION 7A-2), RAMP 2, GRADE, DRAIN ANDSURFACING.(14CCR)(16CCR)

PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM KY-80 AT BEAVER CREEK TOVIRGINIA STATE LINE (SURFACING FOR SECTIONS 7A, 7B, 8 & 9V)(2000BOP)(14CCR)(16CCR)

CONSTRUCT BRIDGE AT POTTER FLATS NEAR ELKHORN CITY.(10CCR)(16CCR)

CURVE REVISION AND PASSING LANES ON KY-194 NEAR DESKINS BRANCH(08CCR)(12CCR)

KY-199 SPOT IMPROVEMENT (PRIORITY 2); IMPROVE INTERSECTION WITH KY-1056 AND RELOCATE PORTIONS OF KY-199 ALONG OLD NORFOLK SOUTHERNRAILROAD BED @ MCANDREWS. (2002BOPC) (08CCR)(10CCR)

.800

1.700

.400

.400

3.400

.600

4.500

.700

1.400

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

US-460

US-460

US-460

US-460

US-460

US-460

US-460

-

KY-194

KY-199

$15,000,000

$20,000,000

$43,000,000

$17,000,000

$17,550,000

$18,500,000

$17,000,000

$2,990,000

$8,300,000

$4,500,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2019

2019

2017

2018

2016

2016

2017

2016

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

APD

APD

APD

NH

APD

APD

APD

SPP

SPP

SPP

SPP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$15,000,000

$20,000,000

$43,000,000

$17,000,000

$17,550,000

$18,500,000

$17,000,000

$120,000

$60,000

$2,810,000

$8,300,000

$4,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

12

12

12

263.55

263.63

263.67

263.68

263.69

263.74

263.89

276.00

281.00

298.30

-

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

12

12

12

263.50

263.61

263.60

263.67

263.60

263.72

263.80

276.00

281.00

298.00

-

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2006

2006

2016

2000

2002

2000

2000

1998

2002

2000

2000

2000

2006

2000

2000

2000

2000

1998

1996

21.3

7.9

22

9.3

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / SURFACE(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / SURFACE(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY(P)

Page 132: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 132

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

KY-199 SPOT IMPROVEMENT; RELOCATE PORTIONS OF KY-199 ALONG OLDNORFOLK SOUTHERN RAILROAD BED @ STONE. (2002BOPC)(08CCR)

REPLACE BRIDGE ON KY-610 (MP 8.146) OVER LONG FORK; .1 MI S OF JCT KY-1469; (STRUCTURALLY DEFICIENT, SR=32) (AR/W)098B00069N

REPLACE BRIDGE ON KY-1469 (MP 5.243) OVER MARSHALL'S BRANCH; .72 MI E.JCT KY-3414; (STRUCTURALLY DEFICIENT, SR=7.5) 098B00242N

REPLACE BRIDGE ON FISHTRAP RD (KY 1441) OVER RACCOON CREEK ATINTERSECTION WITH COON CREEK (CR 1371)(SR 37.9) 098B00093N

REPLACE BRIDGE OVER LEVISA FORK ON SOUTH RIVER ROAD CONNECTOR (CR1181-70) AT JCT WITH US 460 NEAR VIRGINIA STATE LN (098C00088N)(SR=49)

REPLACE BRIDGE OVER BLACKBERRY CREEK ON BIG BLUE SPRINGS ROAD (CR1801) AT JCT WITH KY 1056 (098C00028N)(SR=15.2)

IMPROVEMENTS TO CASSIDY BLVD. AND THOMPSON RD TO ADDRESS SAFETYCONCERNS AND CONGESTION ISSUES.(12CCN)(14CCR)(16CCR)

CONSTRUCT NEW CONNECTION FROM THOMPSON ROAD TO US 23 ATSTONECOAL.(12CCN)(14CCR)(16CCR)

1.000

.100

.100

.040

.038

.265

.055

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

KY-199

KY-610

KY-1469

KY-1441

CR-1181

CR-1801

CS-1215

CS-1215

$5,300,000

$1,100,000

$500,000

$1,175,000

$1,800,000

$1,100,000

$9,933,000

$6,790,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

U

C

D

R

U

C

D

R

U

C

R

U

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2016

2018

2017

2019

2019

2021

2019

2021

2021

2022

2016

2016

2017

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

BRO

BRX

BRX

BRX

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$5,300,000

$1,100,000

$500,000

$225,000

$950,000

$400,000

$100,000

$100,000

$1,200,000

$300,000

$150,000

$150,000

$500,000

$1,233,000

$2,200,000

$6,500,000

$1,500,000

$5,290,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

12

298.40

1104.00

1105.00

1115.00

1122.00

1123.00

8704.00

8705.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

12

298.00

1104.00

1105.00

1115.00

1122.00

1123.00

8704.00

8705.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2002

2010

2010

2012

2014

2014

2012

2012

1996

2010

2010

2012

2014

2014

2012

2012

9.5

8.096

5.193

10.279

.04

.005

1.37

10.5

8.196

5.293

10.319

.078

.027

1.425

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

Page 133: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 133

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

EXTEND THE INDUSTRIAL PARK ACCESS ROAD ON CR-1268.(14CCN)(16CCN)

TRAFFIC SIGNAL AT THE ENTRANCE TO FOOD CITY AND US 119, SOUTHWILLIAMSON. (14CCN)

IMPROVE CONNECTIVITY BETWEEN KY 881 AND US 119. (16CCN)

IMPROVE CONNECTIVITY BETWEEN KY 292 AND US 119/US 52 MINGO. (16CCN)

REPLACE VIRGIE BRIDGE OVER SHELBY CREEK ON KY 610.(16CCN)

SPOT IMPROVEMENTS ON KY 194/KY 632 (META TO PHELPS) FROM MP 18.68 TOMP 20.98. (16CCN)

SPOT IMPROVEMENTS ON KY 194/KY 632 (META TO PHELPS) FROM MP 22.00 TOMP 27.00. (16CCN)

.100

2.300

5.000

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

-

US-119

KY-881

-

KY-610

KY-194

KY-194

$1,270,000

$75,000

$26,280,000

$3,450,000

$2,710,000

$19,639,000

$90,520,000

Total

Total

Total

Total

Total

Total

Total

C

C

D

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2016

2018

2019

2020

2021

2018

2019

2020

2021

2017

2018

2018

2019

2018

2019

2020

2021

2018

2019

2020

2021

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,270,000

$75,000

$1,750,000

$1,530,000

$1,500,000

$21,500,000

$450,000

$50,000

$100,000

$2,850,000

$400,000

$110,000

$600,000

$1,600,000

$2,000,000

$2,000,000

$1,500,000

$14,139,000

$5,700,000

$3,500,000

$2,600,000

$78,720,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

8805.00

8807.00

8905.00

8906.00

8912.00

8913.10

8913.20

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

8805.00

8807.00

8905.00

8906.00

8912.00

8913.10

8913.20

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2014

2016

2016

2016

2016

2016

2016

2014

2016

2016

2016

2016

2016

23.85

18.68

22

23.95

20.98

27

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

NEW ROUTES / NEW ROUTE(O)

RELIABILITY / SIGNAL SYS IMPROVE(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / SPOT IMPROVEMENTS(O)

Page 134: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 134

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

SPOT IMPROVEMENTS ON KY 194/KY 632 (META TO PHELPS) FROM MP 0.21 TO MP4.00. (16CCN)

SPOT IMPROVEMENTS ON KY 194/KY 632 (META TO PHELPS) FROM MP 4.20 TO MP10.50. (16CCN)

SPOT IMPROVEMENTS ON KY 194/KY 632 (META TO PHELPS) FROM MP 10.50 TOMP 14.00. (16CCN)

IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY 213 FROM KY 11 TO BOTTOM OF MOUNTAIN. (12CCR)(16CCR)

SOMERSET TO LONDON. (2006KYD)(10CCR)

HAL ROGERS PARKWAY NORTHEAST BYPASS AROUND SOMERSET. (2006KYD)

HORIZONTAL AND VERTICAL REALIGNMENT OF KY-196 AT WHITE OAK CREEKFROM 1.0 MILE E OF WARNER ROAD TO 0.3 MILE W OF SIEVERSROAD.(10CCR)(14CCR)

MEDIAN SAFETY IMPROVEMENTS WITH LEFT-TURN LANES ON US-27 FROM 0.05MILE NORTH OF LOST LODGE ROAD TO BOAT DOCK ROAD. (2006BOPC)(10CCR)

3.790

6.300

3.500

3.671

25.000

10.000

.500

.900

PIKE

PIKE

PIKE

POWELL

PULASKI

PULASKI

PULASKI

PULASKI

KY-632

KY-632

KY-632

KY-213

I-66

I-66

KY-196

US-27

$53,300,000

$2,300,000

$3,000,000

$17,280,000

$3,219,838

$1,470,000

$1,660,000

$510,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

D

R

U

C

C

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2021

2022

2020

2021

2019

2021

2022

2016

2016

2016

2016

2017

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SP

SP

SPP

SPP

SPP

KYD

KYD

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,200,000

$3,300,000

$2,500,000

$44,300,000

$2,300,000

$3,000,000

$6,060,000

$1,090,000

$10,130,000

$3,219,838

$1,470,000

$70,000

$180,000

$1,410,000

$510,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

10

08

08

08

08

8913.30

8913.40

8913.50

163.00

59.11

59.21

121.00

147.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

LAUREL

12

12

12

10

08

08

08

99

8913.30

8913.40

8913.50

163.00

59.11

59.21

121.00

376.01

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2012

2004

2004

2006

2006

2016

2016

2016

2012

2004

2004

2006

2006

.21

4.2

10.5

7.595

7.7

10.38

4

10.5

14

11.271

8.2

11.374

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / SPOT IMPROVEMENTS(O)

SAFETY / SAFETY(P)

RELIABILITY / PE & ENVIRONMENTAL(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY-HAZARD ELIM(P)

Milepoints: To:From:

Page 135: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 135

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDSINCLUDING ACCESS: SOMERSET NORTHERN BYPASS, LOUIE B. NUNN(CUMBERLAND) PARKWAY TO HAL ROGERS PARKWAY (KY 80) (SEGMENT1).(16CCN)

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:HAL ROGERS PARKWAY TO THE WESTERN APPROACHES OF THE ROCKCASTLERIVER BRIDGE (SEGMENT 2). (16CCN)

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS:HAL ROGERS PARKWAY TO THE WESTERN APPROACHES OF THE ROCKCASTLERIVER BRIDGE (SEGMENT 2). (ADDITIONAL FUNDS FOR C PHASE. SEE 8-8902.00)(16CCN)

UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDSROCKCASTLE RIVER BRIDGE AND APPROACHES. (SEGMENT 3)(16CCN)

IMPROVE CURVE ON KY 616 AND IMPROVE ROADWAY FROM THE NEWROBERTSON COUNTY SCHOOL TO MT OLIVET. (12CCN)(14CCR)

IMPROVE SAFETY BY RECONSTRUCTING THE CURVE ON KY 165 FROM MP 7.0 TOMP 7.2.(12CCN)(14CCN)(16CCR)

IMPROVE SAFETY BEGINNING AT ORCHARD AVENUE TO THE INTERSECTION ATKY 616. (12CCN)(14CCN)(16CCR)

.203

.200

1.268

PULASKI

PULASKI

PULASKI

PULASKI

ROBERTSON

ROBERTSON

ROBERTSON

-

KY-80

KY-80

KY-80

KY-616

KY-165

US-62

$100,000,000

$180,300,000

$64,000,000

$50,800,000

$3,280,000

$1,750,000

$14,670,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

C

D

R

U

C

R

U

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2019

2020

2018

2019

2020

2021

2021

2018

2019

2020

2021

2016

2016

2017

2016

2016

2017

2017

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$10,000,000

$10,000,000

$15,000,000

$65,000,000

$24,400,000

$30,000,000

$26,900,000

$99,000,000

$64,000,000

$5,100,000

$5,000,000

$4,900,000

$35,800,000

$250,000

$210,000

$2,820,000

$200,000

$50,000

$1,500,000

$1,250,000

$3,220,000

$10,200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

08

08

06

06

06

8901.00

8902.00

8902.01

8903.00

8711.00

8712.00

8713.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

08

08

08

06

06

06

8901.00

8902.00

8902.01

8903.00

8711.00

8712.00

8713.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2016

2012

2012

2012

2016

2016

2016

2016

2012

2012

2012

6.3

7

10.834

6.503

7.2

12.102

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

Page 136: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 136

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

SHOULDER IMPROVEMENTS ALONG KY 1504. (14CCN)

I-75 IN ROCKCASTLE COUNTY, KENTUCKY (MILEPOINT 64.5 TO MILEPOINT 69.0),4.5 MILES. (04KYD-KY070)

MAKE I-75 THREE LANES IN EACH DIRECTION FROM MP 64.5 TO MP 69.0.(12CCN)(DESIGN/BUILD)(16CCN)

MAKE I-75 THREE LANES IN EACH DIRECTION FROM MP 55.7 TO 60.1.(12CCN)(DESIGN/BUILD)(16CCN)

MAKE I-75 THREE LANES IN EACH DIRECTION FROM MP 60.1 TO MP64.5.(12CCN)(DESIGN/BUILD)(16CCN)

MAKE I-75 THREE LANES IN EACH DIRECTION FROM MP 60.1 TO MP64.5.(ADDITIONAL FUNDS FOR C PHASE. SEE 8-8718.10 AND 8-8718.12)(12CCN)(DESIGN/BUILD)(16CCN)

MAKE I-75 THREE LANES IN EACH DIRECTION FROM MP 60.1 TO MP64.5.(ADDITIONAL FUNDS FOR C PHASE. SEE 8-8718.10 AND 8-8718.11)(12CCN)(DESIGN/BUILD)(16CCN)

FOUR LANE US 461 FROM US 150 TO THE EXISTING FOUR LANEAPPROACH.(16CCN)

UPGRADE EXISTING ROWAN COUNTY WEIGH STATION.

6.857

4.500

4.500

4.400

4.400

4.400

ROBERTSON

ROCKCASTLE

ROCKCASTLE

ROCKCASTLE

ROCKCASTLE

ROCKCASTLE

ROCKCASTLE

ROCKCASTLE

ROWAN

KY-1504

I-75

I-75

I-75

I-75

I-75

I-75

US-461

I-64

$6,490,000

$855,000

$35,500,000

$47,500,000

$16,790,000

$15,000,000

$12,500,000

$1,200,000

$1,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

C

D

R

U

C

U

C

C

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2016

2016

2016

2016

2016

2016

2018

2016

2018

2019

2020

2022

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

KYD

IM

IM

IM

IM

IM

IM

IM

IM

IM

IM

SP

IM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$6,490,000

$855,000

$500,000

$35,000,000

$1,500,000

$750,000

$250,000

$45,000,000

$1,790,000

$15,000,000

$15,000,000

$12,500,000

$1,200,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

08

08

08

08

08

08

08

09

8810.00

6.02

8718.00

8718.02

8718.10

8718.11

8718.12

8952.00

61.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

08

08

08

08

08

08

08

09

8810.00

6.02

8718.00

8718.02

8718.10

8718.11

8718.12

8952.00

61.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2004

2016

2016

2016

2016

2016

2016

2016

2014

2004

2016

2016

2016

2016

2016

2016

2016

0

64.5

64.5

55.7

60.1

60.1

60.1

147.5

6.857

69

69

60.1

64.5

64.5

64.5

148

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

ECONOMIC DEVELOPMENT / WEIGH STA REHAB(P)

Page 137: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 137

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH. (12CCR)

CONSTRUCT TURN LANES INTO LAKESIDE CHRISTIAN ACADEMY TO IMPROVESAFETY.(12CCR)

NEW ROUTE FROM US-60/KY-32 EAST OF MOREHEAD TO I-64 INCLUDING A NEWINTERCHANGE. (98CCN)(08CCR)(14CCR)

REPLACE BRIDGE OVER BULL FORK ON HORSEMAN CEMETERY ROAD (CR 1140)AT JCT WITH BULLFORK ROAD (CR 1222) (103C00108N)(SR=32.5)(EBRP)

WIDEN KY-519 FROM THE INTERSECTION OF KY-801 AND EXTENDING 2.0 MILESNORTH. (98CCN) (08CCR)(12CCR)

RECONSTRUCT US-60 FROM WEST OF GLENWOOD HOLLOW ROAD TO EAST OFKY-3296. THE PROJECT SHALL INCLUDE 12' LANES, WIDE PAVED SHOULDERS,UNOBSTRUCTED CLEAR ZONES, FLATTER VERTICAL GRADES, AND GENTLYHORIZONTAL CURVES. (08CCN)(12CCR)(14CCR)

RECONSTRUCT KY 377 FROM KY 32 (MP 0.0) TO JUST NORTH OF KY 799 (MP 8.2+-)TO IMPROVE SAFETY, CAPACITY, EFFICIENCY AND HIGHWAY SYSTEMSCONNECTIVITY. (08CCN)(10CCR)(16CCR)

2.000

.300

3.200

.010

2.000

1.500

8.200

ROWAN

ROWAN

ROWAN

ROWAN

ROWAN

ROWAN

ROWAN

KY-32

US-60

-

CR-1140

KY-519

US-60

KY-377

$26,924,000

$250,000

$14,000,000

$850,000

$13,520,000

$7,030,000

$59,910,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

D

R

U

D

R

U

C

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2018

2016

2016

2018

2018

2019

2020

2020

2021

2016

2016

2016

2017

2017

2017

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SP

SP

BRZ

BRZ

BRZ

BRZ

SB2

SPP

SPP

SPP

SB2

SB2

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$5,000,000

$3,888,000

$18,036,000

$250,000

$3,000,000

$8,000,000

$3,000,000

$350,000

$50,000

$50,000

$400,000

$13,520,000

$830,000

$700,000

$5,500,000

$5,210,000

$13,100,000

$41,600,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

09

204.00

227.00

301.10

1093.00

7030.00

8401.00

8406.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

CARTER

09

09

09

09

09

09

09

204.00

227.00

301.00

1093.00

7030.00

8401.00

8406.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2000

2014

1998

2008

2008

2012

2012

1996

2014

1998

2008

2008

2.235

5.25

.01

2.464

16

0

4.157

5.55

.02

4.464

17.112

8.2

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

0 .4Milepoints: To:From:

Page 138: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 138

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE THE WEST BRIDGE ON US 60 AT SUNNYBROOK.(16CCN)

PROVIDE WEST TURN LANES ON US 60 AT SUNNYBROOK. (16CCN)

REPLACE BRIDGE ON LITTLE PERRY ROAD OVER TRIPLETT CREEK.(16CCN)

WIDEN KY 801 FROM NEAR MMRC REGIONAL PARK TO KY 158 IN FLEMING CO.(16CCN)

US-127 FROM NORTH BANK OF THE CUMBERLAND RIVER TO THE JAMESTOWNBYPASS. (00CCR) (08CCR)(10CCR)(12CCR)(G&D)(14CCR)

CONSTRUCT A NEW INTERCHANGE AT THE CUMBERLAND PARKWAYINTERSECTION WITH KY-910 AT WINDSOR. (08CCN)(10CCR)

3.444

ROWAN

ROWAN

ROWAN

ROWAN

RUSSELL

RUSSELL

US-60

US-60

CR-1025

KY-801

US-127

LN-9008

$1,475,000

$3,450,000

$1,575,000

$17,075,000

$43,200,000

$9,340,000

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

D

R

U

C

P

D

R

U

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2017

2018

2017

2018

2019

2020

2017

2018

2019

2020

2017

2017

2018

2019

2020

2016

2016

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

BRO

SPP

SPP

SPP

SPP

BRZ

BRZ

BRZ

BRZ

STP

STP

STP

STP

STP

SB2

SB2

SB2

SB2

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$600,000

$50,000

$75,000

$750,000

$300,000

$250,000

$400,000

$2,500,000

$400,000

$175,000

$100,000

$900,000

$75,000

$1,500,000

$2,000,000

$1,000,000

$12,500,000

$43,200,000

$1,840,000

$760,000

$6,740,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

08

08

8912.00

8913.00

8914.00

8915.00

108.00

8502.00

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

08

08

8912.00

8913.00

8914.00

8915.00

108.00

8502.00

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2016

2000

2008

2016

2016

2016

2016

2000

2008

8.129

70.5

11.573

70.9

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

ECONOMIC DEVELOPMENT / NEW INTERCHANGE(O)

Page 139: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 139

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RELOCATE US 127 FR APPROX .36 MI E OF INTERSECTION KY 1730 & MANNTOWNRD EXTEND N TO N BANK OF CUMBERLAND RIVER INCLUDING NEW BRIDGEOVER LAKE CUMBERLAND FR CLINTON CO TO RUSSELL CO(SEE 8-108&8-115 FORPE&ENV)(12CCR)(SEE 8-8601.22-SURFACING)(14CCR)

RECONSTRUCT US 127 FR APPROX .36 MI E OF INTERSECTION KY 1730 &MANNTOWN RD EXTEND N TO N BANK OF CUMBERLAND RIVER INCLUDE NEWBRIDGE OVER LAKE CUMBERLAND FR CLINTON CO TO RUSSELL CO(SEE 8-108&8-115 FOR PE&ENV) (ADDITIONAL C-FUNDS FOR 8-8601.21)(16CCR)

GEORGETOWN NORTHWEST BYPASS; FROM KY-32, EAST TO I-75.(04CCR)(2004BOPC)(SEE 7-102.01 FOR "HPP" COMPONENT)(10CCR)(12CCR)(16CCR)

REPLACE BRIDGE ON KY 1689 OVER LECOMPTES RUN 0.46 MILE W OF KY 227(SR9.4) 105B00038N

REPLACE BRIDGE OVER NS (CNO&TP)RR ON FIELDS ROAD (CR 1022) ATSCOTT/HARRISON CO LINE (105R00607N)(SR=28.8) (EBRP)

WIDEN/IMPROVE SHOULDERS ON KY-620. (06CCN) (08CCR)

RECONSTRUCT KY-227 FROM MP 2.98 TO MP 3.34 TO IMPROVE HORIZONTALCURVE. (16CCN)

2.520

2.520

4.700

.040

.020

1.370

RUSSELL

RUSSELL

SCOTT

SCOTT

SCOTT

SCOTT

SCOTT

US-127

US-127

-

KY-1689

CR-1022

KY-620

KY-227

$15,690,000

$15,000,000

$18,250,000

$720,000

$1,900,000

$2,500,000

$2,025,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

U

C

R

U

C

D

R

U

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2017

2018

2019

2017

2018

2016

2016

2018

2018

2019

2019

2020

2016

2017

2018

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

NH

STP

STP

BRX

BRX

BRX

BRZ

BRZ

BRZ

BRZ

SPB

STP

STP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,900,000

$2,100,000

$810,000

$10,880,000

$15,000,000

$3,540,000

$14,710,000

$60,000

$60,000

$600,000

$300,000

$100,000

$250,000

$1,250,000

$2,500,000

$225,000

$225,000

$325,000

$1,250,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

07

07

07

07

07

8601.21

8601.22

102.50

1127.00

1139.00

8306.00

8907.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

08

07

07

07

07

07

8601.21

8601.21

102.01

1127.00

1139.00

8306.00

8907.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2016

2004

2012

2014

2006

2016

2012

2012

1996

2012

2014

2006

2016

1.801

1.19

11.26

1.841

1.21

12.63

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / BYPASS(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

Page 140: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 140

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON KY-53 (MP 11.366) OVER FOX RUN CREEK; 3.0 MI NORTH OFJCT US-60W; (STRUCTURALLY DEFICIENT, SR=2) 106B00031N

REPLACE BRIDGE ON KY-55 OVER BULL SKIN CREEK 0.18 MILE N OF HERITAGELN (PR-1212)(SR 35.9) 106B00020N.

REPLACE BRIDGE ON SCRABBLE RD (CR 1036) OVER BACKBONE CREEK 0.47MILE E OF CEDARMORE RD (KY 1922)(SR 44.2) 106C00055N

WIDEN KY-53 TO FOUR LANES FROM I-64 TO US-60.(08CCN)(10CCN)(12CCR)(14CCR)(16CCR)

CONSTRUCT A THIRD LANE ON US-60 FROM THE MASONIC HOME TO ROCKETLANE. (12CCN)(14CCR)

WIDEN KY 55X FROM TWO TO FIVE LANES FROM US 60 (MP 0.0) NORTH TO KY 43(MP 1.354).(16CCN)

NEW NORTH-SOUTH ROUTE BETWEEN US 60 AND BENSON PIKE WEST OF ANDPARALLEL TO ROCKET LANE (KY 1871).(16CCN)

IMPROVEMENTS TO KY 100: RECONSTRUCT KY 100 FROM KY 622 TO EAST OFSULPHUR FORK CREEK. (12CCR)

RECONSTRUCTION AND WIDENING KY-100 FROM I-65 TO KY-622. (06CCN)(10CCR).(12CCR)(14CCR)

.100

.040

1.900

1.378

2.875

2.806

SHELBY

SHELBY

SHELBY

SHELBY

SHELBY

SHELBY

SHELBY

SIMPSON

SIMPSON

KY-53

KY-55

CR-1036

KY-53

US-60

KY-55X

-

KY-100

KY-100

$1,360,000

$2,580,000

$450,000

$11,290,000

$2,170,000

$13,101,000

$770,000

$15,260,000

$8,670,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

D

R

U

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2018

2019

2017

2020

2021

2021

2022

2022

2016

2016

2018

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRZ

STP

SPP

SP

SP

SP

SP

SP

SPP

SPP

SPP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,360,000

$2,580,000

$450,000

$11,290,000

$2,170,000

$1,420,000

$175,000

$786,000

$10,720,000

$770,000

$2,100,000

$2,750,000

$10,410,000

$8,670,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

03

03

1060.00

1063.00

1069.00

8511.00

8713.00

8958.00

8959.00

319.00

8306.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

ALLEN

05

05

05

08

05

05

05

03

03

1060.00

1063.00

1069.00

8511.00

8713.00

8958.00

8959.00

319.00

8306.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2012

2012

2008

2012

2016

2016

2012

2006

2010

2012

2012

2012

2016

2016

2012

2006

11.316

3.839

.462

6.064

11.5

0

16.34

13.534

11.416

3.879

.502

8.006

12.878

1.354

19.115

16.34

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

NEW ROUTES / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

0 .1Milepoints: To:From:

Page 141: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 141

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

GARVIN LANE EXTENSION TO HENDERSON INDUSTRIAL PARK. (14CCN)(16CCR)

MAJOR WIDENING TO 3-LANES WITH URBAN SECTION FROM KY-73 TO NORTHFRANKLIN STREET. (14CCN)

MAJOR WIDENING TO 5-LANES WITH URBAN SECTION FROM KY-1008 TO KY-621.(14CCN)(16CCR)

PLANNING STUDY FOR NEW ROUTE BETWEEN KY 100 WEST OF FRANKLIN OR US31W SOUTH OF FRANKLIN AND THE KENTUCKY/TENN LINE NEAR WITT ROAD INSIMPSON CO. (16CCN)

CONSTRUCT NEW ACCESS ROAD TO BROADY INDUSTRIAL PARK.(16CCN)

REPLACE BRIDGE OVER BUCK CREEK ON KY 1169 75 FT EAST OF YODER TIPTONROAD (CR 1142). (108B00022N)(SR=45.6)(EBRP)

REPLACE BRIDGE OVER SIMPSON CREEK ON KY 2885 (WEST RIVER ROAD) ATJCT WITH NETHERTON LANE (CR 1082) 3-TON WEIGHT LIMIT (SR=2)(108B00041N)

CONSTRUCT A 2+1 ROAD ON KY 55/155 (TAYLORSVILLE ROAD) IN SPENCERCOUNTY AND KY 155 (TAYLORSVILLE LAKE ROAD) IN JEFFERSON COUNTY BYADDING A CONTINUOUS THIRD LANE THAT SERVES AS AN ALTERNATINGPASSING LANE.(16CCN)

.645

2.322

SIMPSON

SIMPSON

SIMPSON

SIMPSON

SIMPSON

SPENCER

SPENCER

SPENCER

-

KY-1008

US-31W

KY-100

-

KY-1169

KY-2885

KY-155

$300,000

$6,800,000

$15,000,000

$300,000

$300,000

$1,060,000

$650,000

$4,750,000

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

D

R

U

C

P

C

D

R

U

C

R

U

C

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2017

2018

2016

2017

2017

2019

2017

2018

2020

2021

2021

2022

2016

2016

2017

2022

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

BRX

BRX

BRX

BRX

BRX

BRX

BRX

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$300,000

$1,700,000

$2,600,000

$2,500,000

$1,000,000

$2,000,000

$3,000,000

$9,000,000

$300,000

$300,000

$350,000

$10,000

$20,000

$680,000

$100,000

$50,000

$500,000

$4,750,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

05

05

05

8810.00

8855.00

8856.00

8903.00

8956.00

1076.00

1080.00

8954.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

03

03

03

03

05

05

05

8810.00

8855.00

8856.00

8903.00

8956.00

1076.00

1080.00

8954.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2016

2016

2014

2014

2016

2014

2014

2014

2016

2016

2014

2014

2016

3.688

8.477

8.53

2.629

4.333

10.799

8.552

2.635

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

NEW ROUTES / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / SCOPING STUDY DD (O)

NEW ROUTES / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

Page 142: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 142

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY 44 NEARDUTCHMAN CREEK ROAD. (16CCN)

HEARTLAND PARKWAY; CAMPBELLSVILLE BYPASS FROM KY-55 SOUTH TO KY-70. (2010BOP)(14CCR)(16CCR)

HEARTLAND PARKWAY; CAMPBELLSVILLE BYPASS FROM KY-70 TO US-68 EASTOF CAMPBELLSVILLE. (2010BOP)(16CCR)

CONSTRUCT 2 LANES WITH PASSING LANE TO CONTINUE ROUTE FROMADAIR/TAYLOR COUNTY LINE TO CAMPBELLSVILLE BYPASS. MP 0.00 TO MP8.003. (16CCN)

PLANNING STUDY FOR KY 210. (16CCN)

RECONSTRUCT KY-181 (ELKTON ROAD) FROM US-79 (MP 0.000) TO NORTH OFINTERSECTION WITH US-41 (MP 0.214) TO INCLUDE A NEW INTERSECTION WITHKY-294. (MP 0.000-0.400) (14CCN)

RESURFACE POND RIVER RD FROM NORTH MAIN ST TO THE 68/80 BYPASS INELKTON. (16CCN)

REPLACE BRIDGE ON KY-1585 (MP 4.87) OVER SINKING FORK; .3 MI. NORTH OFHWY. 272 JCT.; (STRUCTURALLY DEFICIENT, SR=19.7) 111B00054N (AR/W)

.400

.100

SPENCER

TAYLOR

TAYLOR

TAYLOR

TAYLOR

TODD

TODD

TRIGG

KY-44

KY-555

KY-555

KY-55

KY-210

KY-181

CS-1028

KY-1585

$1,560,000

$22,970,000

$16,190,000

$11,500,000

$250,000

$3,520,000

$65,000

$1,100,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

R

U

C

D

R

U

C

P

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2021

2021

2022

2017

2017

2019

2019

2019

2020

2018

2019

2020

2021

2019

2016

2017

2018

2018

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

NH

NH

NH

STP

STP

STP

NH

NH

NH

NH

SP

SPP

SPP

SPP

SPP

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$230,000

$170,000

$160,000

$1,000,000

$6,780,000

$1,000,000

$15,190,000

$4,920,000

$500,000

$10,770,000

$500,000

$1,000,000

$1,000,000

$9,000,000

$250,000

$250,000

$670,000

$2,600,000

$65,000

$1,100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

04

04

04

04

03

03

01

8955.00

142.20

142.30

8920.00

8951.00

8811.00

8909.00

1133.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

04

04

04

04

03

03

01

8955.00

142.10

142.10

8920.00

8951.00

8811.00

8909.00

1133.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2010

2010

2016

2016

2014

2016

2010

2016

2006

2006

2016

2016

2014

2016

2010

0

0

4.82

8.003

.4

4.92

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SCOPING STUDY DD (O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PAVEMENT REHAB-PRI(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 143: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 143

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

REPLACE BRIDGE ON CR-1380 (0.014) OVER DYERS CREEK (SR=17.8) 111C00027N

REALIGN KY 124 APPROACH TO KY 139 TO IMPROVE INTERSECTION ANGLE ANDSIGHT DISTANCE. (16CCN)

NEW MILTON-MADISON BRIDGE APPROACHES TO REALIGN US 421 AT BOTTOMOF HILL AT NEW BRIDGE LOCATION.

ADDRESS SAFETY ISSUES AND ACCESS AT THE INTERSECTION OF US-421/KY-1226AT MP 11.5. (12CCR)

REPLACE BRIDGE OVER LITTLE KENTUCKY RIVER ON KY 2871 150 FT NW OF KY1335. (112B00029N) (SR=46.2)(14CCR)(16CCR)

CONSTRUCT TURN LANES INTO TRIMBLE COUNTY HIGH SCHOOL. (12CCN)

PADUCAH-HENDERSON; RECONSTRUCT US-60 FROM WAVERLY BYPASS TOCORYDON BYPASS. (PRIORITY SECTION)(08CCR)(12CCR)(14CCR)

.600

.040

.040

.100

3.637

TRIGG

TRIGG

TRIMBLE

TRIMBLE

TRIMBLE

TRIMBLE

UNION

CR-1380

KY-139

US-421

US-421

KY-2871

US-421

US-60

$200,000

$1,100,000

$870,000

$1,410,000

$1,334,000

$2,200,000

$9,670,000

Total

Total

Total

Total

Total

Total

Total

D

D

R

U

C

C

R

U

C

R

U

C

R

U

C

D

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2021

2018

2019

2019

2019

2017

2016

2016

2017

2016

2016

2018

2016

2016

2017

2016

2017

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

SPP

SPP

SPP

SPP

BRO

STP

STP

STP

BRX

BRX

BRX

SPP

SPP

SPP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$200,000

$200,000

$150,000

$150,000

$600,000

$870,000

$320,000

$260,000

$830,000

$10,000

$24,000

$1,300,000

$100,000

$1,000,000

$1,100,000

$1,740,000

$5,680,000

$2,250,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

05

05

05

05

02

1160.00

8951.00

135.81

905.00

1075.00

8712.00

79.20

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

HENDERSON

01

01

05

05

05

05

02

1160.00

8951.00

135.80

905.00

1075.00

8712.00

79.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2004

2010

2014

2012

1998

2016

2016

2000

2010

2014

2012

1996

.011

18.776

11.278

.228

7.6

23.86

.017

19.198

11.678

.268

7.7

26.069

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)0 1.428Milepoints: To:From:

Page 144: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 144

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

PADUCAH-HENDERSON; MORGANFIELD BYPASS TO WAVERLY(08CCR)(12CCR)(14CCR)

PADUCAH-HENDERSON; WAVERLY BYPASS. (12CCR)(14CCR)

CONSTRUCT NEW US-60 BYPASS AT SULLIVAN. (04CCN)

ADDRESS SAFETY, CONDITION AND SERVICE CONCERN FROM KY 109 TO WESTOF KY 360 TO ESTABLISH TRUCK NETWORK CONNECTION TO SHAWNEETOWNBRIDGE.(14CCR) (SAME AS ITEM NO. 2-310.20 IN 2014 SYP)

REPLACE BRIDGE ON KY-359 (MP 0.971) OVER LOST CREEK; .95 MI N.E. OF JCT US-60; (FUNCTIONALLY OBSOLETE, SR=34.5) 113B00006N (LET W/ 2-1074)

REPLACE BRIDGE ON KY-359 (MP 1.193) OVER SINKING CREEK; 1.1 MI N.E. OF JCTUS-60; (FUNCTIONALLY OBSOLETE, SR=12.6) 113B00007N (LET W/ 2-1073)

RECONSTRUCT US 60 TO ALLEVIATE FLOODING ISSUES BETWEEN MP 23.8 ANDMP 25.2. (16CCN)

CONSTRUCTION OF NEW I-65 INTERCHANGE IN WARREN COUNTY.(SURFACINGONLY, SEE 16.03 FOR G&D) (SEE 3-16.00 FOR STP COMPONENT)

CONSTRUCTION OF NEW I-65 INTERCHANGE IN WARREN COUNTY. (SURFACINGONLY, SEE 16.03 FOR G&D) (SEE 3-16.00 FOR STP COMPONENT) (ADDITIONAL C-FUNDS FOR 3-16.04)

3.900

2.600

.300

4.460

.100

.100

UNION

UNION

UNION

UNION

UNION

UNION

UNION

WARREN

WARREN

US-60

US-60

US-60

KY-56

KY-359

KY-359

US-60

I-65

I-65

$33,310,000

$23,760,000

$970,000

$14,500,000

$570,000

$570,000

$2,700,000

$13,380,000

$6,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

D

C

C

C

D

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2018

2016

2017

2019

2016

2017

2016

2016

2018

2019

2019

2020

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SP

SP

SP

SP

BRO

BRO

SPP

SPP

SPP

SPP

IM

IM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,680,000

$2,610,000

$27,020,000

$1,730,000

$1,480,000

$20,550,000

$970,000

$14,500,000

$570,000

$570,000

$300,000

$150,000

$250,000

$2,000,000

$13,380,000

$6,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

03

03

122.01

123.01

139.00

310.21

1073.00

1074.00

8955.00

16.04

16.05

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

02

02

03

03

122.01

123.01

139.00

310.01

1073.00

1074.00

8955.00

16.04

16.05

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

1996

1996

2000

2000

2010

2010

2016

2004

2016

1996

1996

2000

2000

2010

2010

2016

2004

2016

17.6

1.398

2.723

.921

1.143

23.8

21.5

1.6

7.182

1.021

1.243

25.2

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BYPASS(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW INTERCHANGE(O)

RELIABILITY / PREFINANCD CONVRSN(O)

Page 145: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 145

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT KY-185 FROM NORTH OF THE JUNCTION WITH KY-263 NEARRICHARDSVILLE (MP 6.29) TO THE BUTLER COUNTY LINE (MP 11.913).(02CCR)(04CCR)(06CCR)(10CCR)(14CCR)

WIDEN TO 5 LANES FROM 1.0 MILE SOUTH OF KY 242 (MP 4.1) TO DILLARD ROAD(MP 6.7).(12CCR)

CONSTRUCT A PEDESTRIAN UNDERPASS UNDER US 31W CONNECTINGBUCHANON PARK TRAIL TO CHANEY'S DAIRY BARN.(16CCN)

RECONSTRUCT THE EXISTING NATCHER PARKWAY/US 231 INTERCHANGE ONWEST SIDE OF BOWLING GREEN. (12CCR)

REPLACE BRIDGE ON KY-234 OVER DRAKES CREEK 0.097 E OF SHAKER MILL RD(CR-1131) (SR 42.8) 114B00012N.

WIDEN AND EXPAND US 231 FROM PASCOE BLVD. TO NORTH OF CAVE MILLROAD. (12CCN)

CONSTRUCT A NEW INTERCHANGE ON THE NATCHER PARKWAY AT ELRODROAD IN BOWLING GREEN (MP 3.4 TO MP 4.0).(12CCN)

THREE SPRINGS ROAD EXTENSION FROM FLEALAND TO THE NATCHERPARKWAY INCLUDING BRIDGE OVER PARKWAY. (14CCN)

5.600

2.600

.200

.060

.346

.600

1.320

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

KY-185

US-31W

US-31W

WN-9007

KY-234

US-231

WN-9007

KY-884

$29,350,000

$9,610,000

$450,000

$13,810,000

$5,850,000

$5,500,000

$10,050,000

$15,730,000

Total

Total

Total

Total

Total

Total

Total

Total

U

C

C

D

C

D

R

U

C

C

R

U

C

D

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2018

2017

2017

2017

2017

2019

2019

2021

2018

2016

2017

2018

2019

2021

2021

2022

2016

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

NH

NH

NH

NH

BRO

SPP

SPP

SPP

NH

NH

NH

NH

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,540,000

$26,810,000

$9,610,000

$50,000

$400,000

$1,250,000

$1,740,000

$1,690,000

$9,130,000

$5,850,000

$840,000

$2,080,000

$2,580,000

$800,000

$2,000,000

$950,000

$6,300,000

$4,000,000

$2,800,000

$8,930,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

03

03

110.00

199.00

199.99

202.00

1077.00

8702.00

8707.00

8818.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

03

03

03

03

03

03

03

110.00

199.00

199.99

202.00

1077.00

8702.00

8707.00

8818.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2012

2016

2012

2012

2012

2012

2014

2000

2012

2016

2012

2012

2012

2012

2014

6.29

4.1

9.4

9.746

9.654

3.4

7.302

11.913

6.7

9.6

9.806

10

4

8.622

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / NEW INTERCHANGE(O)

NEW ROUTES / NEW ROUTE(O)

Page 146: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 146

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT KY-884 FROM LONG ROAD TO THE NATCHER PARKWAY (MP 5.516TO MP 7.438). (14CCN) (BRIDGE OVER NATCHER PKWY UNDER 3-8818).

MINOR WIDENING (2 + 1 CONCEPT) FROM WARREN/SIMPSON COUNTY LINE TOBUCHANON PARK.(14CCN)

MAJOR WIDENING/RECONSTRUCTION OF CEMETERY ROAD (KY-234) FROMFOUNTAIN TRACE TO ROGER PORTER ROAD (MP 7.878 TO MP9.625).(14CCN)(16CCR)

MAJOR WIDENING/RECONSTRUCTION FROM CAMPBELL LANE (US 231) TOUNIVERSITY BOULEVARD (US 231X). MP 10.561 TO MP 11.688 (14CCN)(16CCR)

EXTEND SHIVE LANE TO LOVERS LANE (KY 880) IN BOWLING GREEN.(14CCN)(16CCR)

MAJOR WIDENING WITH URBAN SECTION FROM CEMETERY ROAD TO US 68 INBOWLING GREEN, INCLUDING IMPROVING SAFETY AT THE INTERSECTION OFUS 31W BYPASS AND KY 234. (16CCN)

1.922

4.258

1.747

1.238

.400

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

KY-884

US-31W

KY-234

US-31W

CS-1540

US-31W

$12,150,000

$17,300,000

$10,750,000

$8,800,000

$3,820,000

$14,100,000

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2018

2019

2018

2019

2020

2017

2018

2019

2020

2017

2019

2020

2020

2017

2018

2018

2018

2017

2019

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,000,000

$2,000,000

$9,150,000

$1,800,000

$2,000,000

$13,500,000

$750,000

$2,000,000

$2,500,000

$5,500,000

$800,000

$1,750,000

$2,000,000

$4,250,000

$139,000

$324,000

$434,000

$2,923,000

$800,000

$2,500,000

$3,000,000

$7,800,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

8852.00

8853.00

8854.00

8857.00

8858.00

8904.00

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

03

03

03

03

03

8852.00

8853.00

8854.00

8857.00

8858.00

8904.00

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2014

2014

2016

2014

2014

2014

2014

2014

2016

5.516

0

7.878

10.561

7.438

4.258

9.625

11.688

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

Page 147: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 147

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

ACCOMMODATE INCREASED TRAFFIC FROM THE RESIDENTIAL ANDINDUSTRIAL DEVELOPMENT NORTH OF BOWLING GREEN ALONG THE SECTIONOF US 31W FROM US 68 (MP 21.148) TO MIZPAH. (16CCN)

IMPROVE CAPACITY AND SAFETY ON SCOTTSVILLE ROAD BY WIDENING TO SIXLANES FROM KY 884 (3 SPRINGS RD) TO WILKINSON TRACE/ASHLEY CIRCLE.(16CCN)

REPLACE BRIDGE ON KY 528 (MP 1.437) OVER ROAD RUN BRANCH.(SD,SR=46.6)(115B00043N)

REPLACE BRIDGE ON TEXAS-MACKVILLE ROAD (CR 1140) OVER PRATHERCREEK. (16CCN)

REPLACE BRIDGE ON TEXAS-MACKVILLE ROAD (CR 1140) AT MP 0.349 OVERLONG LICK CREEK. (16CCN)

ADDRESS SAFETY, MOBILITY, AND GEOMETRIC ISSUES ALONG US 150 INWASHINGTON COUNTY FROM 400 FEET WEST OF OLD FREDERICKTOWN-BARDSTOWN ROAD (KY 1872) TO 0.7 MILES EAST OF GRUNDY HOME ROAD (CR1337). (16CCN)

RECONSTRUCT KY-90 FROM OLD MILL SPRINGS ROAD TO BRIDGE AT MP 19.5.(12CCR)(16CCR)

1.800

WARREN

WARREN

WASHINGTON

WASHINGTON

WASHINGTON

WASHINGTON

WAYNE

US-31W

US-231

KY-528

CR-1140

CR-1140

US-150

KY-90

$4,900,000

$61,500,000

$630,200

$175,000

$175,000

$12,520,000

$8,440,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

D

R

U

C

C

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2017

2017

2018

2017

2019

2019

2021

2020

2021

2021

2022

2018

2017

2019

2020

2021

2022

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SPP

SPP

SPP

SPP

BRX

BRX

BRX

BRX

BRX

BRX

SPP

SPP

SP

SP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$800,000

$900,000

$400,000

$2,800,000

$2,000,000

$9,500,000

$19,900,000

$30,100,000

$150,000

$50,000

$50,000

$380,200

$175,000

$175,000

$700,000

$900,000

$1,100,000

$9,820,000

$8,440,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

04

04

04

04

08

8905.00

8951.00

1094.00

8956.00

8957.00

8958.00

109.10

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

03

04

04

04

04

08

8905.00

8951.00

1094.00

8956.00

8957.00

8958.00

109.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

2016

2016

2016

2016

2004

2016

2016

2016

2016

2016

2016

2000

1.433

17.691

1.441

19.5

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

Page 148: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 148

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RAISE GRADE TO PREVENT FLOODING FROM 0.5 MI EAST OF VALLEY VIEWDRIVE TO 0.7 MI W OF KY 1258. (12CCR)(14CCR)

REPLACE BRIDGE ON CR-1136 (MP 0.225) OVER LITTLE SOUTH FORK RIVER; 0.25MI SE OF JCT CR-5137; (STRUCTURALLY DEFICIENT, SR=16.6) 116C00007N

PLANNING STUDY FOR KY 92 EAST IN WAYNE AND RUSSELL COUNTIES. (16CCN)

RECONSTRUCT US-41A BETWEEN PROVIDENCE AND DIXON(04CCN)(08CCR)(10CCR)(12CCR)

RECONSTRUCT BETWEEN KY 120 AND RR BRIDGE AT SLAUGHTERS TOALLEVIATE FLOODING. (12CCR)

RECONSTRUCT KY-92 FROM 500 FT WEST OF THE WHITLEY/MCCREARY COUNTYLINE TO 1200 FT EAST OF OLD JELLICO CREEK ROAD. (SECTION 1)(14CCR)

MAJOR WIDENING, ADDRESSES CONGESTION, FREIGHT MOVEMENT, ANDACCESS ALONG 25W FROM KY 727 TO KY 3041. (12CCR)(16CCR)

REHAB BRIDGE ON I-75 AT MILEPOINT 27.9 OVER LYNN CAMP CREEK (SR 34.1)(B00063R AND B00063L)

2.061

.100

9.000

.281

4.172

2.225

WAYNE

WAYNE

WAYNE

WEBSTER

WEBSTER

WHITLEY

WHITLEY

WHITLEY

KY-92

CR-1136

KY-92

US-41A

KY-138

KY-92

US-25W

I-75

$12,830,000

$740,000

$250,000

$46,150,000

$1,550,000

$23,800,000

$14,170,000

$4,000,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

P

D

R

U

C

R

U

C

U

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2018

2016

2016

2017

2019

2016

2016

2016

2018

2016

2016

2017

2016

2017

2017

2017

2020

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

BRZ

BRZ

BRZ

SP

SPP

SP

SP

SP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,660,000

$2,170,000

$9,000,000

$90,000

$80,000

$570,000

$250,000

$1,700,000

$5,370,000

$4,430,000

$34,650,000

$100,000

$250,000

$1,200,000

$1,800,000

$22,000,000

$2,630,000

$2,540,000

$9,000,000

$4,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

08

02

02

11

11

11

394.00

1050.00

8951.00

143.00

228.00

184.10

186.00

1105.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MCCREARY

08

08

08

02

02

11

11

11

394.00

1050.00

8951.00

143.00

228.00

184.00

186.00

1105.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2010

2016

2000

2012

2014

2012

2016

2012

2010

2016

2000

2012

2010

2012

2016

10.62

.175

1.324

10.449

0

28.2

27.85

13.1

.275

10.01

10.73

4.172

30.425

27.95

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / SCOPING STUDY DD (O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REHAB(P)

24.74 24.835Milepoints: To:From:

Page 149: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 149

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

CONSTRUCT A NEW ENTRANCE TO THE UNIVERSITY OF THE CUMBERLANDSFROM SOUTH 2ND ST UP THE HILL TO TIE INTO HUTTON WAY. (16CCN)

WIDEN I-75 TO EIGHT LANES FROM MP 20.2 TO MP 27.943 IN WHITLEY COUNTYAND MP 27.943 TO MP 28.85 (US 25E) IN LAUREL COUNTY. (16CCN)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.45 MI W OF KY 205 (MP 56.8) TO CR 1226 PARKWAY ROAD TUNNEL(MP 59.30). (2012BOP)(14CCR)(16CCR)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.45 MI W OF KY 205 (MP 56.8) TO CR 1226 PARKWAY ROAD TUNNEL(MP 59.30). (ADDITIONAL C-FUNDS FOR 10-126.70)(16CCR)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.45 MI W OF KY 205 (MP 56.8) TO CR 1226 PARKWAY ROAD TUNNEL(MP 59.30). (ADDITIONAL C-FUNDS FOR 10-126.70)(16CCN)

RECONSTRUCT TO CURRENT STANDARDS THE CURVE FROM THE KY 15OVERPASS TO 2700 EAST OF KY 15 OVERPASS. (12CCR)(16CCR)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MTN PKY TO 4 LANES FROM 0.6MI W OF KY 191 OVERPASS TO 0.45 MI W OF KY 205 INTERCHANGE. (SEE 10-126.03FOR PE & ENVIR FUNDS)(2012BOP)(14CCR)(16CCR)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MTN PKY TO 4 LANES FROM 0.6MI W OF KY 191 OVERPASS TO 0.45 MI W OF KY 205 INTERCHANGE. (SEE 10-126.03FOR PE & ENVIR FUNDS)(2012BOP)(14CCN)(ADDITIONAL FUNDS FOR 10-168.00)(16CCR)

2.500

2.500

.600

11.000

11.000

WHITLEY

WHITLEY

WOLFE

WOLFE

WOLFE

WOLFE

WOLFE

WOLFE

-

I-75

KY-9009

KY-9009

KY-9009

KY-9000

KY-9009

KY-9009

$1,950,000

$2,000,000

$21,070,000

$8,000,000

$8,000,000

$3,410,000

$18,250,000

$10,200,000

Total

Total

Total

Total

Total

Total

Total

Total

D

U

C

D

U

C

C

C

C

R

U

C

D

R

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2017

2017

2022

2016

2018

2018

2018

2017

2017

2018

2019

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

NH

NH

NH

NH

NH

SB2

NH

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$300,000

$50,000

$1,600,000

$2,000,000

$2,400,000

$18,670,000

$8,000,000

$8,000,000

$3,410,000

$6,000,000

$2,250,000

$10,000,000

$5,200,000

$5,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

10

10

10

10

10

10

8954.00

8960.00

126.70

126.71

126.72

162.00

168.00

168.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

LAUREL

MORGAN

MORGAN

11

11

10

10

10

10

10

10

8954.00

8960.00

126.03

126.71

126.72

162.00

168.00

168.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2016

2016

1996

2016

2016

2012

1996

2014

2016

2016

1996

2016

2016

2012

1996

1996

20.2

56.8

56.8

56.8

38

45.8

45.8

27.943

57.72

57.72

59.3

38.6

56.8

56.8

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

27.943

57.72

57.72

28.85

59.3

59.3

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

From:

From:

From:

Page 150: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 150

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

RECONSTRUCT KY-205 FROM THE WOLFE/BREATHITT CO. LINE TO THEMOUNTAIN PARKWAY (PHASE 1). (02CCN)(06CCR)(08CCR)(10CCR)(12CCR)(16CCR)

HILL AND CURVE CORRECTION ON KY-191 BETWEEN HAZEL GREEN AND KY-205.(02CCN)(08CCR)(10CCR)

RECONSTRUCTION OF KY-715 & KY-2016 INTERSECTION MP 2.548 - MP 2.748.(14CCN)

REPLACE BRIDGE OVER GRIER CREEK ON GRIER CREEK ROAD (CR 1217) 0.8 MIW OF SCOTTS FERRY ROAD (CR 1215) (120C00017N)(SR=31.5)

REPLACE THE WEISENBURG MILL ROAD BRIDGE AT THE WOODFORD/SCOTTCOUNTY LINE. (10CCN)

STUDY IMPROVEMENTS TO TRAFFIC FLOW ISSUES IN DOWNTOWN VERSAILLES.(16CCN)

RECONSTRUCT KY 33 FROM 100 FEET NORTH OF KY 1267 TO 100 FEET NORTH OFKY 169. (MP 3.04 TO MP 10.65) (16CCN)

ACCESS MANAGEMENT IMPROVEMENTS ON US 60 FROM LEXINGTON ROAD ATWOODFORD FEED TO MARSAILLES DRIVE (MP 9.38 TO MP 9.70).(16CCN)

6.390

4.000

.200

.030

.023

WOLFE

WOLFE

WOLFE

WOODFORD

WOODFORD

WOODFORD

WOODFORD

WOODFORD

KY-205

KY-191

KY-715

CR-1217

CR-1015

-

KY-33

US-60

$16,500,000

$2,470,000

$280,000

$1,225,000

$1,380,000

$100,000

$40,200,000

$4,100,000

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

C

D

R

U

C

C

D

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2017

2017

2019

2020

2020

2022

2016

2017

2018

2019

2020

2021

2016

2016

2018

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SB2

SP

SP

SP

SPP

BRZ

BRZ

BRZ

BRZ

SB2

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$16,500,000

$250,000

$670,000

$1,550,000

$280,000

$325,000

$50,000

$100,000

$750,000

$1,380,000

$100,000

$3,000,000

$8,300,000

$6,400,000

$22,500,000

$400,000

$950,000

$750,000

$2,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

07

07

07

07

07

8101.00

8102.00

8803.00

1140.00

8642.00

8903.00

8904.00

8905.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

SCOTT

10

10

10

07

07

07

07

07

8101.00

8102.00

8803.00

1140.00

8642.00

8903.00

8904.00

8905.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2002

2002

2014

2014

2010

2016

2016

2016

2002

2002

2014

2014

2010

2016

2016

2016

0

10.256

2.548

1.15

2.499

3.04

9.38

6.394

14.298

2.748

1.18

2.522

10.65

9.7

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / SCOPING STUDY DD (O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

.536 .559Milepoints: To:From:

Page 151: Page: 1 FY - FY - 2016 2022 THRU REPLACE BRIDGE ON ......18 MAY 2016 REPLACE BRIDGE ON KY 704 (11.909) OVER UNNAMED STREAM (SR=53.5) (001B00078N) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 151

FY - FY - THRU2016 2022

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

18 MAY 2016

EXTEND FALLING SPRINGS BLVD FROM TYRONE PIKE (US-62) TO CLIFTON ROAD(KY-1964). (16CCN)

WOODFORD -

$15,150,000Total

D

R

U

C

PHASE

2019

2020

2021

2022

YEAR

SP

SP

SP

SP

FUNDING

$900,000

$2,750,000

$4,250,000

$7,250,000

AMOUNT 07 8908.00-

Purpose and Need: 07 8908.00-

Parent No.:2016

2016Milepoints: To:From:

RELIABILITY / NEW ROUTE(O)


Recommended