PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO 2013‐14 UP RAJYA VIDYUT UTPADAN NIGAM LTD 2009
Transcript
Page 1: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PANKI _MYT Petition for Determination of Tariff      

 

 

 

PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO 2013‐14 

                 

           

 

 

UP RAJYA VIDYUT UTPADAN NIGAM LTD 

 2009 

Page 2: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

FORM­1 (See Regulation 30) 

BEFORE THE HON’BLE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, KISAN MANDI BHAWAN, GOMITNAGAR, LUCKNOW 

 Receipt Register No.: _______________ 

 Petition No.: ______________ 

 IN THE MATTER OF  MULTI  YEAR  TARIFF  PETITION  FOR  APPROVAL  OF  ANNUAL  REVENUE  REQUIREMENT AND DETERMINATION OF TARIFF FOR FY 2009‐10 TO FY 2013‐14 IN RESPECT OF PANKI THERMAL  POWER  STATION  OF  UTTAR  PRADESH  RAJYA  VIDYUT  UTPADAN  NIGAM LIMITED (UPRVUNL), SHAKTI BHAWAN, 14‐ASHOK MARG LUCKNOW   AND  IN THE MATTER OF   PANKI THERMAL POWER STATION OF UTTAR PRADESH RAJYA VIDYUT UTPADAN NIGAM LIMITED (UPRVUNL),  SHAKTI BHAWAN, 14‐ASHOK MARG, LUCKNOW. 

APPLICANT V/s  UTTAR PRADESH POWER CORPORATION LIMITED (UPPCL), SHAKTI BHAWAN, 14‐ASHOK MARG, LUCKNOW.  MADHYANCHAL VIDYUT VITRAN NIGAM LTD. PN ROAD, LUCKNOW.  POORVANCHAL VIDYUT VITRAN NIGAM LTD. 132 KV S/S BHIKARI VIDYUT NAGAR, VARANASI PASCHIMANCHAL VIDYUT VITRAN NIGAM LTD. VICTORIA PARK, MEERUT  DAKSHINACHAL VIDYUT VITRAN NIGAM LTD. GALINA ROAD AGRA.  KANPUR ELECTRICITY SUPPLY CO. LTD. KESA HOUSE, KANPUR  NOIDA POWER CO. LTD. COMMERCIAL COMPLEX, H BLOCK, ALPHA‐II SECTOR GREATER NOIDA CITY 

RESPONDENTS

Page 3: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

The  applicant,  Panki  TPS  of  Uttar  Pradesh  Rajya  Vidyut  Utpadan  Nigam  Limited  ,  a 

Company  incorporated  under  the  provisions  of  the  Companies  Act,  1956  having  its 

registered  office  at  “Shakti  Bhawan,  14‐Ashok  Marg,  Lucknow‐226001’  is  making  this 

affidavit in the matter of application for Determination of Multi Year Tariff for the Control 

Period of FY 2009‐10 to FY 2013‐14  

 

1. Facts of the Case: 

The  Panki  TPS  of  Uttar  Pradesh  Rajya  Vidyut  Utpadan  Nigam  Limited  (Petitioner)  is 

submitting  this  Multi  Year  Tariff  Petition  for  Determination  of  Tariff  for  the  Five  Year 

Control Period of FY 2009‐10 to FY 2013‐14 for its Panki thermal power station as per Para 

5  of  the UPERC  (Terms  and Conditions  of  Generation Tariff)  Regulations,  2009 &  as  per 

Para 17 of UPRVUNL Tariff Order for FY 2008‐09.  

 

2. Submissions 

The Panki TPS of UPRVUNL is filing this Petition under the provisions of Section 61 & 62 of 

Electricity  Act,  2003  and  the  UPERC  (Terms  and  Conditions  of  Generation  Tariff) 

Regulations,  2009  and  its  Appendices  and  the  prescribed  tariff  filing  format  as  annexed 

with the petition. 

 

Page 4: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

EXECUTIVE SUMMARY 

The  performance  parameters  and  other  cost  elements  have  been  duly  elaborated  in  the 

enclosure to the Petition. Based on these, the cost of generation has been determined under 

three heads. 

Fixed Costs (Annual Capacity Charges)  

Energy charges 

Taxes and Govt Levies 

 The Cost for the control period as proposed in the tariff Petition is as under: 

Fixed Costs 

The  fixed charges are contracted capacity charges payable  to generating company by  the 

consumer  irrespective  of  actual  generation  from  the  plants.  However  as  the  tariff 

regulations provide for recovery of fixed costs based on achievement of target availability, 

the  fixed costs would be claimed based on achievement of  target availability. The overall 

fixed charges in respect of Panki thermal power station is elaborated in the table below 

Table: Total Annual Capacity (Fixed) Charges  

(All Figures in Rs Crs) 

Particulars (Rs Crs) FY 10 FY 11  FY 12  FY 13  FY 14 

Depreciation 6.25 6.25 15.94 26.05 26.05Interest on Loan 3.37 2.94 4.29 43.45 52.53Return on Equity 6.01 6.01 14.54 23.06 23.06Advance against Depreciation 0.00 0.00 0.00 0.00 18.81Interest on Working Capital 14.42 15.22 17.55 20.83 22.70O & M Expenses 79.55 84.33 94.73 106.06 112.40Compensation Allowance 1.37 1.37 1.46 1.56 1.56Total Fixed Cost 110.98 116.12 148.51 221.02 257.11

Energy Sent Out (MU) 982 1001 1092 1189 1233Fixed Cost per Unit (Rs/kwh) 1.13 1.16 1.36 1.86 2.09

SUMMARY OF ANNUAL CAPACITY (FIXED) CHARGES

 

The Petitioner would suitably approach the Hon’ble Commission for true‐up of fixed costs 

based on audited accounts 

 

 

 

 

Page 5: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

Variable Charges 

These are the expenses, taken place directly in proportion to the generation of power and 

primarily  consist  of  fuel  costs  of  generation.  These  are  dependent  on  the  quantity  of 

generation  and  hence  recovery  is  proposed  on  per  unit  or  net  generation.  The  cost  of 

energy charges for the Petitioner for the control period for Panki thermal power station is 

as under: 

Table: Summary of Energy (Variable) Charges  

Particulars FY 10 FY 11  FY 12  FY 13  FY 14 

Coal Cost  222.18 234.94 266.08 299.90 321.74Oil Cost 9.04 9.26 10.15 11.05 11.43Total Variable Cost 231.22 244.21 276.23 310.95 333.16

Energy Sent Out (MU) 982 1001 1092 1189 1233Variable Cost per Unit (Rs/kwh) 2.35 2.44 2.53 2.61 2.70

SUMMARY OF VARIABLE CHARGES

  

Taxes and Govt Levies 

These are the amounts recovered on behalf of the government and paid as taxes. In fact the 

amount  does  not  depend  upon  the  performance  of  the  company  but  are  determined  by 

government policies. The Petitioner has sought recovery of such expenses as separate pass 

through  basis.  Expenses  which  have  been  claimed  as  pass  through  are  Pollution  Cess 

liabilities, Water Cess, rates & taxes, regulatory fee payable to UPERC, etc. 

 

Other Significant Issues  

There are few issues which have been separately raised in this Petition which are: 

• Arrears  of  Pollution  Cess  Liabilities  –  Automatic  pass  through  approval  sought 

based on actual payments 

• Finance & Bank Charges – Sought as Separate pass through based on actual payment 

basis 

 

Page 6: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

Prayer 

The Petitioner respectfully prays that the Hon’ble Commission may  

Accept this Petition 

Accept the tariff rates as elaborated in the Petition 

Permit  recovery  of  expenses  understated/  not  considered  in  this  Petition  e.g. 

depreciation etc at a later stage, if required 

Allow  the Petitioner  to  apply  the  tariff  provided by  the Hon’ble Commission  from 

the beginning of FY 2009‐10 

Allow true‐up of uncontrollable expenses in the control period based on the audited 

accounts and normative parameters as applicable for various heads of expenditures. 

Condone  any  inadvertent  omissions  /  errors  /  short  comings  and  permit  the 

applicant to add /change /modify / alter this Petition and make further submissions 

as may be required at later stages 

Pass such orders as Hon’ble Commission may deem fit and proper and necessary in 

the facts and circumstances of the case, to grant relief to the petitioner. 

Page 7: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

FORM-2 (See Regulation 31)

BEFORE THE HON’BLE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, KISAN MANDI BHAWAN, GOMITNAGAR, LUCKNOW

Receipt Register No.: _______________

Petition No.: ______________

IN THE MATTER OF  MULTI  YEAR  TARIFF  PETITION  FOR  APPROVAL  OF  ANNUAL  REVENUE REQUIREMENT AND DETERMINATION OF TARIFF FOR FY 2009‐10 TO FY 2013‐14 IN  RESPECT  OF  PANKI  THERMAL  POWER  STATION  OF  UTTAR  PRADESH  RAJYA VIDYUT  UTPADAN  NIGAM  LIMITED  (UPRVUNL),  SHAKTI  BHAWAN,  14‐ASHOK MARG LUCKNOW   AND  IN THE MATTER OF  PANKI THERMAL POWER STATION OF UTTAR PRADESH RAJYA VIDYUT UTPADAN NIGAM LIMITED (UPRVUNL), SHAKTI BHAWAN, 14‐ASHOK MARG, LUCKNOW. 

APPLICANT VS 

Page 8: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

UTTAR PRADESH POWER CORPORATION LIMITED (UPPCL), SHAKTI BHAWAN, 14‐ASHOK MARG, LUCKNOW.  MADHYANCHAL VIDYUT VITRAN NIGAM LTD. PN ROAD, LUCKNOW.  POORVANCHAL VIDYUT VITRAN NIGAM LTD. 132 KV S/S BHIKARI VIDYUT NAGAR, VARANASI PASCHIMANCHAL VIDYUT VITRAN NIGAM LTD. VICTORIA PARK, MEERUT  DAKSHINACHAL VIDYUT VITRAN NIGAM LTD. GALINA ROAD AGRA.  KANPUR ELECTRICITY SUPPLY CO. LTD. KESA HOUSE, KANPUR  NOIDA POWER CO. LTD. COMMERCIAL COMPLEX, H BLOCK, ALPHA‐II SECTOR GREATER NOIDA CITY 

AFFIDAVIT

I, Mahendra Kumar , Son of Shri Parshu Ram aged about 45 years, resident of 80, Hydel officers

colony, Chandralok, Aliganj, Lucknow, do hereby solemnly affirm and state as under:

1. I say that I am Chief Engineer, Commercial UPRVUNL, the Applicant in the above

matter and am duly authorized by the said Applicant to swear the present affidavit.

2. I say that I have read the contents of the above Petition filed by the Petitioner (applicant)

and I have understood the contents of the same.

3. That the contents of the Petition filed by the Applicant are based on the information

available with the Applicant in the normal course of business and believed by me to be

true.

4. I say that the Text, Appendices and Annexure to the Petition are the true and correct

copies of their original.

DEPONENT

VERIFICATION

I, the deponent above named, do hereby verify the contents of the above affidavit to be true to the

best of my knowledge, no part of it is false and nothing material has been concealed therefrom.

Verified at Lucknow on the , 2010

DEPONENT

Page 9: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 8 

 

 

CONTENTS  

1.  INTRODUCTION .................................................................................................................... 10 

1.1  Rationale ................................................................................................................................................................ 10 

1.2  UPRVUNL ............................................................................................................................................................... 10 

1.3  Installed Capacity of the Petitioner ............................................................................................................ 11 

1.4  Capacity Addition Plans of UPRVUNL ........................................................................................................ 12 

1.5  R&M, Refurbishment & Up‐rating Programme ...................................................................................... 13 

1.5.1  Up‐rating of Panki U#3 & U#4 (2x105MW to 2x120MW) ...................................................... 15 

1.6  Arrears of Pollution Cess Liabilities ........................................................................................................... 16 

1.7  Annual Payment of Statutory Charges like Water Cess, Payment to Pollution Control Board, Regulatory Fee, etc ............................................................................................................................................ 17 

1.8  Finance & Bank Charges .................................................................................................................................. 18 

1.9  Payment of Service Tax on CISF Services ................................................................................................. 18 

1.10  Expenses towards implementation of ABT ............................................................................................. 20 

1.11  Imported Coal Usage ......................................................................................................................................... 20 

1.12  Incentive ................................................................................................................................................................ 22 

1.13  Taxes on Income ................................................................................................................................................. 22 

1.14  Milestones achieved in FY 2008‐09 ............................................................................................................ 22 

2.  ANNUAL REVENUE REQUIREMENT & MULTI-YEAR TARIFF PETITION OF ‘PANKI TPS’ ............................................................................................................................................. 23 

2.1.  Annual Capacity (Fixed Charges) Charges ................................................................................ 23 

2.1.1.  Gross Fixed Assets ................................................................................................................... 23 

2.1.2.  Interest on Loan Capital .......................................................................................................... 25 

2.1.3.  Depreciation including Advance Against Depreciation .................................................... 28 

2.1.3.1.  Depreciation .............................................................................................................................. 28 

2.1.3.2.  Advance against depreciation (AAD) ................................................................................... 30 

2.1.4.  Return on Equity ...................................................................................................................... 32 

2.1.5.  Operation & Maintenance Expenses ..................................................................................... 35 

2.1.5.1.  Base O&M Expenses ................................................................................................................ 35 

Page 10: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 9 

 

2.1.5.2.  Impact of Pay Revision ............................................................................................................ 35 

2.1.5.3.  Projected O&M Expenses ........................................................................................................ 37 

2.1.6.  Compensation Allowance ....................................................................................................... 38 

2.1.7.  Interest on Working Capital ................................................................................................... 39 

2.1.8.  Summary of Annual Capacity (Fixed) Charges ................................................................... 40 

2.2.  Energy Charges ........................................................................................................................ 41 

2.2.1.  Fuel Cost Adjustment .............................................................................................................. 43 

 

  

LIST OF EXHIBITS  

EXHIBIT A – Documentary evidence of SBI PLR 

EXHIBIT B – Audited Accounts for FY 2007‐08 

 

Page 11: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 10 

 

 

1. INTRODUCTION 

1.1 Rationale 

The Electricity Act, 2003 (Act 36 of 2003) came into force with effect from 10.6.2003 and 

the previous Acts governing the electricity supply in the country viz. The Indian Electricity 

Act, 1910 (9 of 1910),  the Electricity (Supply) Act, 1948 (54 of 1948), and the Electricity 

Regulatory Commissions Act, 1998 have been repealed. The provisions of the UP Electricity 

Reform Act, 1999  (Uttar Pradesh Act 24 of 1999)  to  the extent not  inconsistent with  the 

provisions of the Electricity Act, 2003, however, continue to apply to Uttar Pradesh. 

As  per  Section  10  (2)  of  the  Electricity  Act,  2003  (hereinafter  referred  to  as  the  Act), 

UPRVUNL shall supply electricity to the Licensees (UPPCL or its successors). Section 61 of 

the Electricity Act, 2003 deals with Tariff Regulations 

Section 62  (1)  of  the Act  provides  that  the Appropriate  Commission  shall  determine  the 

tariff  in accordance with the provisions of the Act,  inter‐alia,  for supply of electricity by a 

generating company to a distribution licensee. Further,  in accordance with Section 86 (1) 

(a) of the Act, UPERC shall determine the tariff of generation of power at stations owned by 

the UPRVUNL. Section 86 (1) (b) further mandates UPERC to regulate electricity purchase 

and procurement process of distribution  licensees  including the price at which electricity 

shall be procured from the generating companies or licensees. Accordingly this petition is 

being submitted by the state generating utility’s ‘Panki TPS’ for determination of tariff. 

1.2 UPRVUNL 

Uttar  Pradesh  Rajya  Vidyut  Utpadan  Nigam  Limited  (UPRVUNL),  is  a  company 

incorporated  on  25th  August  1980  with  the  principal  object  of  generating  electricity. 

Petitioner implemented commissioning of 2x210 MW thermal power stations at Unchahar. 

In February 1992 this power station was transferred to NTPC. 

Consequent  to  the  implementation  of  power  sector  reforms  in  the  State  where  under, 

amongst others, the activities of generation, transmission, distribution and retail supply of 

electricity  carried out by UPSEB have been  restructured  and UPSEB was unbundled  into 

Uttar Pradesh Power Corporation Limited (UPPCL), Uttar Pradesh Jal Vidyut Nigam Limited 

Page 12: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 11 

 

(UPJVNL) and UP Rajya Vidyut Utpadan Nigam Limited vide  the Uttar Pradesh Electricity 

Reforms Transfer Scheme, 2000 notification No 149/P‐1/2000‐24, Lucknow dated January 

14th, 2000. As part of the scheme all thermal generating stations as set out in Schedule A to 

the transfer scheme were transferred to and vested in the Petitioner 

The Transfer Scheme assigned a value of Rs. 6009.63 crs (Prov) to gross fixed assets as on 

March 31, 1999. The Scheme determined the equity capital as Rs. 1053.71 crs. As part of 

the Scheme certain liabilities (listed in Schedule ‘D’ to the Scheme) were retained by GoUP 

The  provisional  Scheme  was  modified  by  GoUP  vide  notification  no.  348/P‐1/2001‐24 

dated 25 January 2001, which made the Transfer Scheme of the year 2000 effective from 

14  January  2000.  The modified  Scheme  provided  that  value  of  gross  fixed  assets  as  Rs. 

6270.60 crs and increased the equity amount to Rs. 1511.44 crs.  

In  pursuance  of  GOUP  notification  no.,  2740/P‐1/2003‐24‐14P/2003  dated  12th  August 

2003, UPPCL was  further  divided  into  five  successor  companies, with UPPCL  as  Transco 

and  four  successor distribution companies  (hereinafter  referred  to as  “licensees”), which 

are as follows: 

• Paschhimanchal Vidyut Vitran Nigam Limited, Meerut ‐ (Meerut DisCom)  

• Dakshinanchal Vidyut Vitran Nigam Limited, Agra ‐ (Agra DisCom)  

• Madhyanchal Vidyut Vitran Nigam Limited, Lucknow ‐ (Lucknow DisCom)  

• Poorvanchal Vidyut Vitran Nigam Limited, Varanasi ‐ (Varanasi DisCom) 

1.3 Installed Capacity of the Petitioner 

The details of Installed Capacity of the generating station Panki is listed in table below: 

Table: Generation Capacities of the UPRVUNL 

S No Thermal Power Station 

Unit No. Installed Capacity 

Derated Capacity 

Date of Commercial Operation 

Panki 

1  32 MW  Nil*    2  2  32 MW  Nil*    3  3  110 MW  105 MW  29‐Jan‐77 4  4  110 MW  105 MW  29‐May‐77    Total  4  284 MW  210 MW    

*These Units have been deleted from the installed capacity 

Page 13: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 12 

 

1.4 Capacity Addition Plans of UPRVUNL 

The demand for electricity is increasing continuously. Due to increasing gap in the demand 

and availability of electricity, the productivity of agricultural, industrial and other fields is 

adversely  affected.  For  improvement  in  the  availability  of  power,  the  Petitioner  has 

undertaken  several  capacity  addition  schemes  which  are  under  various  stages  of 

development. 

The  following  table  lists  the Power Stations with  the expected dates of commissioning of 

their units. 

Table: Generation Capacity Addition Plan of UPRVUNL 

Name of ProjectCapacity (MW)

Likely Commissioning Dates

Parichha Extn (2x250 MW) 500 MW U#5 in April 2010U#6 in June 2010

Harduaganj Extn (2x250 MW) 500 MW U#5 in April 2010U#6 in June 2010

Anpara D (2x500 MW) 1000 MW 2011‐12

Obra C (2x660 MW) 1320 MW 12th Plan

Meja (2x660 MW) (In JV with NTPC) 1320 MW 12th Plan

Anpara E (2x660 MW) 1320 MW 12th Plan

Fatehpur(In JV with Neyvile Lignite) 2000 MW 12th Plan

 

 

 

 

 

 

 

 

Page 14: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 13 

 

1.5 R&M, Refurbishment & Up­rating Programme  

Normal life of any thermal power station is around 25 years. During this life span also, the 

performance  of  the  plants  gradually  goes  down  until  unless  required  maintenance  is 

carried out regularly. After completion of normal life, the plants are either to be retired or 

major Renovation and Modernization  is  to be done  to bring  their performance back  to  a 

reasonable level. The graph below elaborates the average age of thermal generating units 

of UPRVUNL plants as on 1st April 2009. 

Table 2: Average Age of Power Stations 

21

15

36

29

33 32

24

2

0

5

10

15

20

25

30

35

40

Anpara A Anpara B Obra A Obra B Harduaganj Panki Parichha Parichha Extn 

Average Age of TPS 

It may  be  seen  that  the  average  age  of  the  thermal  generating  units  of  the  Petitioner  is 

around 27 years (excluding Parichha Extn). 

The  creeping  effect  of  vintage  coupled  with  irregular  maintenance  on  account  of  the 

persistent  power  deficit  in  the  state  (which  resulted  in  the  deferment  of  planned 

maintenance of  the units  for a number of  times), has  further affected  the performance of 

the generating units. 

However, UPRVUNL has planned a Comprehensive R&M, Refurbishment & Up‐rating plans 

for its power stations which are under various stages of implementation 

Page 15: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 14 

 

A  snapshot  is  presented  below  of  the  various  Completed  /  Ongoing  &  Proposed  R&M  / 

Refurbishment & Up‐rating Schemes:‐ 

Table 3: Snapshot of R&M / Refurbishment & Up­rating Schemes 

Name of the schemeNature of Scheme

Capacity AgencyProject Cost (Rs 

Benefits from the scheme

 ­ Increase in PLF

 ­ LE by 15 yrs

 ­ Increase in Gen Capacity 1x10+1x50

Obra U#6  R&M 94 MW BHEL 52.47  ­ Increase in PLF

Harduaganj U#7 & U#5

R&M 165 MW BHEL 55.34  ­ Increase in PLF

Name of the schemeNature of Scheme

Capacity AgencyProject Cost (Rs 

Benefits from the scheme

 ­ Increase in PLF

­ LE by 15 years 

 ­ Increase in Gen Capacity 5x16 MW

Anpara A (3x210) Refurbish­ment 630 MW BHEL 787.50  ­ To keep PLF stable

Harduaganj U#7  Up­rating 120 MW BHEL 392.00Improve PLF, LE by 15 years, Increase in capacity by 1x10MW 

Obra A U#7 & U#8 R&M 188 MW BHEL 178.00  ­ Increase in PLF

Name of the schemeNature of Scheme

Capacity AgencyProject Cost (Rs 

Benefits from the scheme

Parichha U#1 & U#2 Refurbish­ment 220 MW BHEL 275.00Increase in PLF, LE by 15 years 

Panki U#3 & U#4 Up­rating 240 MW BHEL 550.00

Increase in PLF, LE by 15 years, Increase in capacity by 2x10MW 

Anpara B (2x500MW)  R&M 1000 MW BHEL 691.97 Stabilise PLF

Completed R&M / Refurbishment & Up­rating Schemes 

Obra A(U#1 & U#2)

Refurbish­ment 100 MW

 M/s Techno Prome Exports (TPE) Russia & 

others

189.39

Proposed  R&M / Refurbishment & Up­rating Schemes 

Ongoing R&M / Refurbishment & Up­rating Schemes 

Obra B (5x200 MW) Refurbish­ment 1000 MW BHEL 1635.00

 

The  Petitioner,  Panki  TPS  is  in  the  process  of  implementing  a  up‐rating  scheme,  whose 

broad features has been discussed in the following chapter: 

Page 16: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 15 

 

1.5.1 Up­rating of Panki U#3 & U#4 (2x105MW to 2x120MW)  

The units of Panki TPS are 32 years old. The Petitioner has planned a comprehensive Up‐

rating of the units in the control period. The Proposed Scheme is of Rs 550 crs.  

A snapshot of the scheme along with the shut‐down period is as per table below 

Table 4: Details of Up­rating Scheme of Panki TPS 

Name of the scheme

Nature of Scheme

Capacity AgencyProject Cost (Rs Cr)

Benefits from the scheme

U# 3 10/11 to 3/12

U# 4 4/12 to 9/12

Shut­down period

Panki U#3 & U#4

Up­rating 240 MW BHEL 550.00

80% PLF, LE by 15 years, 

Increase in capacity by 2x10MW 

 

The scheme would be funded in the ratio of 80:20 Debt to Equity ratio. GoUP support in the 

form equity would be to the tune of Rs 110 crs. GoUP has made a Budgetary Allocation of 

Rs 100 crs  in FY 2009‐10 for the same. The Debt  funding of Rs 440 crs would be tied up 

with PFC 

The following table lists the proposed loan drawls and equity support under the scheme 

Table 5: Investment Plan for Up­rating Scheme of Panki TPS 

Particulars FY 10 FY 11 FY 12 FY 13 FY 14

Equity Drawl 100.00            10.00              ‐                   ‐                   ‐                  

Loan Drawl ‐                   176.00            176.00            88.00              ‐                  

Total 100.00           186.00           176.00           88.00              ­                   

Page 17: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 16 

 

 

Based  on  the  proposed  expenditure  pattern  and  the  unit‐wise  Commissioning  dates  the 

proposed  capitalization,  Interest  on  Loan,  Return  on  equity,  Depreciation  &  Advance 

against depreciation is calculated in the table below 

Table 6: Capitalization details of Panki Up­rating Scheme 

Particulars FY 10 FY 11 FY 12 FY 13 FY 14

Opening Loan ‐                   ‐                   176.00            352.00            429.00           Drawl ‐                   176.00            176.00            88.00              ‐                  Repayment ‐                   ‐                   ‐                   11.00              44.00             Closing Loan ‐                   176.00            352.00            429.00            385.00           Intt on loan (Revenue)

­                  ­                  1.68                41.20              50.54             

Capitalisation ­                  ­                  269.15           280.85           ­                 

Loan incl IDC ­                  ­                  214.15            225.85            ­                 

Equity ­                  ­                  55.00              55.00              ­                 

Return on Equity ­                  ­                  8.53                17.05              17.05             

Depreciation ­                  ­                  0.81                15.59              19.80             

AAD ­                  ­                  ­                  ­                  18.81                

 

 

 

1.6 Arrears of Pollution Cess Liabilities 

The Petitioner  in  the  tariff  petition  for  FY 2008‐09 had  sought  recovery  of  ‘duties,  taxes 

payable  to Government or  local authorities (like Pollution Cess,  rates and taxes  including 

Fringe Benefit  Tax,  Forest  Cess)  and  fees  payable  to UPERC  as  separate  pass  through  in 

tariff as these are payments being statutory in nature and imposed by law. 

The Hon’ble  Commission  had  allowed  “recovery of Pollution Cess  liabilities,  rates and 

fees payable to the Commission on actual basis” 

Page 18: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 17 

 

The  basis  of  charge  of  the  Pollution  Cess  is  a  provision  in  Section  3  of  the  Water 

(Prevention  and  Control  of  Pollution)  Cess  Act,  1977  through which  thermal  generating 

stations across the country have to pay such cess at the prescribed rates. The Petitioner’s 

principal liabilities of such cess is shown in table below: 

Table: Principal Liabilities of Pollution Cess towards UP Pollution Control Board 

Power Station  Cess Amount  (Rs Crs)  

 Payment  (Rs Crs)  

 Balance  (Rs Crs)  

Panki  5.12  4.77  0.35 

Total UPRVUNL  185.64  49.96  135.68 

 

Note:  The  Petitioner  submits  that  the  above  charges  are  towards  cess  charges  and  not  in 

violation of any environmental norms. Such liabilities do not include any interest or penalty. 

Based on the submissions of the Petitioner in Pet No/228/2205 the Hon’ble Commission in 

an order dated August 20, 2007 had allowed a recovery of Rs. 32 crs to the Petitioner. The 

Petitioner has in all paid Rs. 49.96 crs towards Pollution Cess as on FY 2008‐09 

The Petitioner requests the Hon’ble Commission to allow the additional 17.96 crs (49.96‐

32.00) to be recovered as pass through. 

The Petitioner  is also planning  to repay  its arrears of cess dues  in a phased manner. The 

Petitioner  humbly  requests  the  Hon’ble  Commission  to  grant  automatic  approval  of 

recovery of such charges as these are pass through in nature. 

 

 

1.7 Annual  Payment  of  Statutory  Charges  like  Water  Cess,  Payment  to 

Pollution Control Board, Regulatory Fee, etc 

In  the  tariff  Petition  for  FY 2008‐09,  the Petitioner  had  sought  recovery  of  ‘duties,  taxes 

payable  to Government or  local authorities (like Pollution Cess,  rates and taxes  including 

Page 19: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 18 

 

Fringe Benefit  Tax,  Forest  Cess)  and  fees  payable  to UPERC  as  separate  pass  through  in 

tariff as these are payments being statutory in nature and imposed by law” 

The Hon’ble Commission in Para 6.2.2 of FY 2008‐09 Tariff Order had allowed such items –  

“The Commission allows recovery of Pollution Cess liabilities, rates and taxes and fees 

payable to the Commission on actual basis and same shall be recovered as additional 

O&M” 

Also the Hon’ble Commission in Para 21 (iv) (d)  of  UPERC  (Terms  &  Conditions  of 

Generation Tariff) Regulations 2009 has allowed such items –  

“The expenses on regulatory fee, payment to pollution control board, fringe benefit tax, 

impact  of  pay  revision,  cost  of water  and water  cess  shall  be  paid  additionally  at 

actuals” 

Thus  the  Petitioner  seeks  recovery  of  such  items  as  separate  pass  through  basis  as  and 

when they are incurred and paid. 

 

1.8 Finance & Bank Charges 

The  Finance  charges,  guarantee  fees  and  bank  charges  remain  un‐recovered  as  the 

regulations  do  not  provide  for  them  explicitly.  These  costs  are  incidental with  raising  of 

debt. The Hon’ble Commission had allowed such expenses in the Tariff Order for FY 2008‐

09. The Petitioner cannot project such expenses as the likely impact & incidence of charges 

varies from situation to situation. For example,  in the past the GoUP has levied guarantee 

fees on some loans guaranteed by it, however in other cases it has also given a waiver on 

guarantee fees 

The  Petitioner  requests  the Hon’ble  Commission  to  allow  such  charges  as  separate  pass 

through in tariff based on actual payment. 

1.9 Payment of Service Tax on CISF Services 

The power stations of  the Petitioner are  important assets which need  to be manned and 

protected.  The  responsibility  of  such  safety  and  security  has  been  entrusted  to  premier 

Page 20: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 19 

 

defence organization CISF. The  annual  liability  of  the Petitioner  for  the  last  four  years  is 

shown in table below: 

Table – Annual Liabilities towards CISF 

Power Station FY 2005­

06 (Audited) 

FY 2006­07 

(Audited) 

FY 2007­08 

(Audited) 

FY 2008­09 

(Prov) Total 

Panki  4.69  5.39  5.74  6.74  22.57  

Consequent  upon  replacement  of  “Commercial  Concern”  in  definition  of  various  taxable 

services by a  “Person”  through  the  changes made  in  the Finance Bill  2006, CISF  services 

provided against consideration have been covered under the category of “Security Agency 

Service” as defined under Section 65(94) read with Section 65 (105) (w) of the Finance Act, 

1994 for payment of Service Tax w.e.f 01.05.2006. 

However since CISF provides its services to PSUs and other client organizations under the 

directions of Ministry of Home Affairs and cost of deployment  is also recovered  from the 

user PSUs/client organizations in such a manner as the Central Government may from time 

to  time  specify,  in  accordance with  the provisions  contained  in Rule  73  of  the CISF Rule 

2001 

In this regard CISF and Ministry of Home Affairs had moved an application with Ministry of 

Finance for Exemption from Service tax on the security services provided by it.  

After examination in consultation with Ministry of Finance, Department of Revenue it has 

now been decided by Ministry of Home Affairs  that  Service Tax  is payable by CISF w.e.f. 

from 1st April 2009. 

Service tax is to be paid by the service provider (CISF) who in turn would bill the service 

receiver (Petitioner in this case) for the service tax amount. 

The  current  service  tax  rate  is  10.3%  and  the  annual  impact  of  service  tax  would  be 

considerable.  The  Petitioner  requests  the Hon’ble  Commission  to  allow  recovery  of  such 

service tax (additionally other than from O&M) as separate pass through as service tax is a 

statutory liability.  

Page 21: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 20 

 

1.10 Expenses towards implementation of ABT 

The Hon’ble Commission has recommended for implementation of Availability Based Tariff 

(ABT) regime in the state. Accordingly UPRVUNL has geared up to prepare the necessary 

requisite infrastructure for its adoption and its smooth running. In this regard it has made 

significant investments are given in table below: 

 

Table: Capital Expenditure on ABT Implementation 

 

Power Station Material supply 

Installation & AMC 

Total  (Rs Crs) 

Panki  0.36  0.22  0.59  

The Hon’ble Commission in Para 18 (6) of the UPERC (Terms & Conditions of Generation 

Tariff) Regulations 2009 has stated: 

“Cost on  implementation of ABT shall be allowed as additional capital expenditure  in 

tariff” 

Accordingly  the  Petitioner’s  requests  the  Hon’ble  Commission  to  allow  capitalization  of 

such expenditure in FY 2009‐10 

1.11 Imported Coal Usage 

The Petitioner submits that as per the correspondence received from the Ministry of Power 

which submits that the complete coal requirement of the Petitioner cannot be materialized 

from Coal India Limited. Also the quality of indigenous coal received by the Petitioner has 

been  declining  over  the  years.  As  a  consequence  the  Petitioner  has  entered  into  an 

agreement with MMTC Ltd (a Government of India Enterprise) for the supply of imported 

coal to the tune of 3.36 lac MT.  

The scope of such agreement with MMTC Ltd includes import coal to Mundra/other west 

coast  Indian  port,  arranging  vessels,  stevedoring,  handling,  and  storage,  port  clearances, 

arranging Railway rakes, loading, transportation and delivery at UPRVUNL power stations. 

All other activities for clearing and forwarding of the consignments like customs clearance, 

coordination  with  Port,  Railways  and  any  statutory  authorities  shall  also  be  the 

Page 22: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 21 

 

responsibility of MMTC Ltd. Unloading of coal at Power Stations end from Railway Wagons 

shall be arranged by the Petitioner.  

The price of Coal to be supplied shall comprise Coal price arrived at based on the concept 

and formulae for re‐fixation of price for supply of  imported coal to UPRVUNL,  linking the 

FOB prices and Ocean freight with CERCs methodology of indexation, fixed component and 

Actual cost as given below: 

A. Coal Price – C&F price of US$ 179.00 (firm US Dollar rate per Metric Tonne (PMT) 

converted into Indian Rupees on the basis of applicable exchange rate. 

B. Fixed Component – Stevedoring, Handling, Clearing & Forwarding charges & MMTC 

Ltd’s Service Charges @ Rs 35/‐ per Metric Tonne 

C. As per Actuals – Customs Duty, Railway Freight,  Insurance Charges, Sales  tax/VAT 

and other statutory duties & Port charges 

The technical specifications of imported coal as per agreement are given below: 

Table: Technical Specifications of Imported Coal 

Parameter Unit Acceptable RangeTotal Moisture % 10‐20 max

Ash % 8‐20'Fixed Carbon % 30‐50 typicalVolatile Matter % 25‐45

Sulphur % 0.70 ‐ 0.90 MaxGross Calorific Value kcal/kg 5800 ‐ 6500

HGI ‐ 45‐60Size mm 0‐50  

The price basis of imported coal is as follows 

• Gross Calorific Value – 6300 kcal/kg • Total Moisture – 16% • Ash – 10% • Sulphur – 0.8% 

It may  be  appreciated  that  imported  coal  although  has  a  better  GCV  than  domestic  coal, 

however,  the price of  imported  coal  and  its  calorific  value vis‐à‐vis  the price  and GCV of 

domestic  coal  are  not  linearly  proportional.  The  same  effectively  means  that  usage  of 

Page 23: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 22 

 

imported  coal  will  essentially  lead  to  increase  in  cost  of  generation  of  the  plant.  The 

decision for usage of imported coal is not based on the cost‐benefit analysis but is rather an 

outcome of the limitations of choice which is purely beyond the control of the Petitioner 

1.12 Incentive 

The Petitioner would be raising bills for recovery of incentive for which it is entitled to in 

terms of the Tariff regulations of the Commission for the control period of FY 2009‐10 to 

FY 2013‐14. Accordingly, for the same the Petitioner is not making any specific submission 

1.13 Taxes on Income 

The tariff regulations issued by the Commission provides that tax on the income streams of 

the generating company from its core business shall be computed as an expense and shall 

be permitted to be recovered. The income tax shall be recovered through the mechanism of 

tax escrow account. 

1.14 Milestones achieved in FY 2008­09 

The Petitioner has tried to  improve its performance with overall concerted efforts. There 

have  been  some  significant milestones  achieved  in  FY  2008‐09 which  the  Petitioner  has 

presented in the table below: 

S. No.   Particulars  Milestone Achieved  

Date  

1 Highest ever generation on a single day   76.545 MU   21st Feb 2009  

2 Highest ever PLF on a single day   79.10% 21st Feb 2009 

3 Highest ever peak Load   3257 MW   22nd Feb 2009 03.00 hrs  

4 Highest ever monthly generation   2189.068 MU   Jan‐095 Highest ever monthly  PLF   73.16% Jan‐09

6 Highest ever monthly generation achieved by 3X210 MW Anpara ‘A’ TPS   464.129 MU   Jan‐09

7 Highest ever monthly PLF achieved by 3X210 MW Anpara ‘A’ TPS   99.02% Jan‐09

Page 24: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 23 

 

 

2. ANNUAL REVENUE REQUIREMENT & MULTI­YEAR TARIFF PETITION 

OF ‘PANKI TPS’ 

The  following  sections  detail  the  Annual  Revenue  Requirement  and  Tariff  Petition  of 

PankiTPS for the five year control period of FY 2009‐10 to FY 2013‐14 

2.1. Annual Capacity (Fixed Charges) Charges  

As per tariff regulations the annual capacity (fixed) charges consist of  

a.  Interest on Loan Capital 

b.  Depreciation including Advance against Depreciation 

c.  Return on Equity 

d.  Operation and maintenance expenses including insurance and 

e.  Interest on Working Capital 

f.  Compensation Allowance 

 

2.1.1. Gross Fixed Assets 

In the Tariff Petition for FY 2008‐09, the Petitioner had submitted detailed asset wise list of 

its fixed assets upto FY 2006‐07. Further in the course of finalization of tariff order for FY 

2008‐09, additional submissions were made by the Petitioner whereby it had provided the 

Provisional Gross fixed assets value for FY 2007‐08. 

The  statutory  audit  of  the  financial  statements  of  the  Petitioner  for  FY  2007‐08  was 

completed on July 21, 2009. Based on such audited financial statements upto FY 2007‐08 & 

the provisional financial statements for FY 2008‐09, the summary of year wise Gross Fixed 

Asset values is as per table below 

Page 25: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 24 

 

 Table: Gross Fixed Assets Summary ­ FY 2004­FY2009 (Rs in Crs) 

(All figures in Rs Crs) 

Power StationFY 04 Audited

FY 05 Audited

FY 06 Audited

FY 07 Audited

FY 08 Audited

FY 09 Provisional

Anpara 'A' 778 780 791 797 808 813

Anpara 'B' 4706 4708 4712 4713 4725 4730

Obra 'A' 113 113 113 113 155 262

Obra 'B' 478 484 485 485 485 485

Harduaganj 250 250 271 274 274 274

Panki 153 161 161 172 173 174

Parichha  209 211 223 225 222 222

Parichha Extn. 0 0 0 832 1705 1710

Total 6687 6706 6755 7610 8547 8669  

For the purpose of this MYT Petition, the Petitioner has considered the opening Gross Fixed 

Assets  for  FY  2009‐10  on  the  basis  of  Provisional  Accounts  of  FY  2008‐09  and  Audited 

Accounts  for  FY  2007‐08.  Further,  Gross  Fixed Assets  for  each  of  the  plants  is  projected 

based on the capitalization plan for  the control period of FY 2009‐10 to FY 2013‐14. The 

details  of  such  capitalization  have  been  shown  in  the  specific  formats  annexed  to  this 

petition.  The  R&M/Refurbishment  &  Up‐rating  schemes  have  been  discussed  in  the 

foregoing sections.  

Table: Panki TPS ­ Gross Fixed Assets Summary ­ FY 2009­10 to FY 2013­14 

 (All figures in Rs Crs) 

Power Station FY 10 FY 11 FY 12 FY 13 FY 14

Opening GFA 174.18            174.77            174.77            443.92            724.77           

Captalisation during the Year 0.59                 ‐                   269.15            280.85            ‐                  

Closing GFA 174.77           174.77           443.92           724.77           724.77            

Page 26: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 25 

 

 

2.1.2. Interest on Loan Capital 

GoUP  vide  transfer  scheme  notification  dated  25th  January  2001  had  transferred  the 

following loans to the Petitioner 

Table: Loans Received in Transfer Scheme 

Generic Loans Rs Crs

Public Bonds 470.27

IDBI ‐ Deferred Credit 60.77

LIC Loan 453.75

PFC Loans 74.83

CEA ‐ GoI Loan 20.33

Foreign Currency Loan 218.12

Total 1298.07  

(Note: Out of the above Bonds and one PFC Loan of Obra Crash are still due) 

In the month of March 2008, the Petitioner has settled its LIC loan liability. In a One‐time 

Settlement,  LIC  has  accepted  Rs  500  crores  to  liquidate  its  long  standing  debt.  PFC  has 

provided  financing  of  this  amount  at  monthly  repayment  of  Rs  4.167  crore  over  120 

installments. This has substantially optimized the interest cost of the Petitioner. Further a 

Hudco Loan (Generic) totalling Rs 100 crs was also added in FY 2004‐05 & FY 2005‐06 

The Opening Balance of Generic Loans as on April 1, 2009 is as per table below: 

Table : Station wise Opening Balances of Generic Loans as on April 1, 2009 

(All figures in Rs Crs) Financial Institution

Anpara A Anpara B Obra A Obra BHardua­ganj

Panki Parichha Total

Public Bonds           17.99         105.17              3.45            10.79              6.10              3.84              4.95        152.28 

HUDCO             1.57              9.20              0.30              0.94              0.53              0.34              0.43           13.32 

PFC‐LIC OTS           53.18         310.78            10.19            31.87            18.01            11.35            14.62        450.00 

UP Govt. Loan           25.89         151.31              4.96            15.52              8.77              5.52              7.12        219.09 

Total          98.63        576.46           18.91           59.12           33.41           21.05           27.11        834.69   

Page 27: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 26 

 

 The Petitioner reiterates that it had inherited a portfolio of loans from erstwhile UPSEB and 

station/project  wise  allocation  of  loans  was  not  provided  in  the  transfer  scheme. 

Considering  the  above,  the  loans have been allocated  to various projects  considering  the 

following principles 

• The loans which are clearly identifiable with the project have been assigned to the 

project only 

• The  loans which  are not  identifiable directly with  the project have been  allocated 

among plants in the ratio of their GFA balance 

All  loans except  the  loans  from PFC are  corporate  loans and are not associated with any 

plant.  Loan  balances  along  with  interest  cost  of  these  loans  have  been  allocated  among 

existing plants in the ratio of their GFA balances. There is one PFC loan No 08104005 (Obra 

Crash) which was received in transfer scheme. The same has been allocated among Obra A 

and Obra B based on their GFA balances. None of the corporate loans have been allocated to 

Parichha Extn (2x210 MW). The PFC loan of Rs 500 cr (LIC‐OTS) and its interest cost has 

been allocated among all existing plants except Parichha Extn in the ratio of GFA balances, 

as this loan has been taken to extinguish a prior debt. 

The petitioner has continued with this approach for allocation of interest expenses for such 

common loans for the control period. 

The Petitioner takes Project Loans  from PFC to fund its capacity addition & R&M scheme 

loans.  Loans  from  PFC  are  project  specific  and  these  loans  have  been  added  to  the 

allocation of the corporate loans to arrive at the total loans as well as interest cost for each 

plant.  Actuals  loan drawls  upto  June 2009 have been  taken  into  account  for  the  Interest 

calculations. For computation of  interest charges the Petitioner has considered the actual 

interest rate wherever the rate of interest is fixed as per loan agreement & in cases where 

the interest rate is flexible the SBI PLR as on 01.04.2009 of 12.25% has been considered 

The plant wise details of all the existing and new scheme loans are provided in the relevant 

forms  prescribed  by  the  Commission. However  a  summary  of  the  generic  and  corporate 

loan  balances,  drawls  and  repayments  along  with  Interest  cost  is  summarized  in  Table 

below 

Page 28: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 27 

 

Table: Panki TPS ­ Summary of Interest on Loan for the Control Period  (All figures in Rs Crs) 

Particulars FY 09 FY 10 FY 11 FY 12 FY 13 FY 14Generic LoansHUDCOOpening Balance 1.01             0.34             ‐               ‐               ‐               ‐              Less: Repayment 0.67             0.34             ‐               ‐               ‐               ‐              Closing Balance 0.34            ­              ­              ­              ­              ­             Interest  0.09             0.03             ‐               ‐               ‐               ‐              Public BondsOpening Balance 5.46             3.84             2.10             1.05             ‐               ‐              Less: Repayment 1.62             1.74             1.05             1.05             ‐               ‐              Closing Balance 3.84            2.10            1.05            ­              ­              ­             Interest  0.52             0.33             0.18             0.10             ‐               ‐              UP Govt. LoanLoan Balance 5.52            5.52            5.52            5.52            5.52            5.52           Interest  0.89             0.96             0.96             0.96             0.96             0.96            PFC ­ LIC OTSOpening Balance 12.61           11.35           10.09           8.83             7.56             6.30            Less: Repayment 1.26             1.26             1.26             1.26             1.26             1.26            Closing Balance 11.35          10.09          8.83            7.56            6.30            5.04           Interest  1.39             1.27             1.12             0.98             0.82             0.67            Project SpecficPFC

Loan No. 8304010 (R&M)

Opening Loan 12.21           10.77           9.34             7.90             6.46             5.03            Less: Repayment 1.44             1.44             1.44             1.44             1.44             1.44            Closing Balance 10.77          9.34            7.90            6.46            5.03            3.59           Interest 0.83             0.79             0.68             0.58             0.48             0.37            Proposed Up­rating for U#3 & 4 (2x105MW)

Opening Loan ‐               ‐               ‐               176.00        352.00        429.00       Add: Drawal ‐               ‐               176.00        176.00        88.00           ‐              Less: Repayment ‐               ‐               ‐               ‐               11.00           44.00          Closing Balance ­              ­              176.00       352.00       429.00       385.00      Interest ‐               ‐               ‐               1.68             41.20           50.54          SummaryTotal LoansOpening Loan 36.81           31.82           27.05           199.30        371.55        445.86       Add: Drawals ‐               ‐               176.00        176.00        88.00           ‐              Less: Repayment 4.99             4.77             3.75             3.75             13.70           46.70          

Closing Balance 31.82          27.05          199.30       371.55       445.86       399.16      

Interest 3.72             3.37             2.94             4.29             43.45           52.53            

Page 29: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 28 

 

2.1.3. Depreciation including Advance Against Depreciation 

2.1.3.1. Depreciation  

It is noteworthy to mention that the Hon’ble Commission had considered Average Rate of 

Depreciation  @  3.54%  for  Obra  A,  Obra  B,  Harduaganj  &  Panki  and  3.56%  for  Panki, 

Anpara B & Parichha Extn in the MYT order for 2005‐06 to 2007‐08. At that time the asset 

wise break up of gross fixed assets was not provided by the Petitioner. 

However  in  the  tariff  petition  for  FY 2008‐09  the Petitioner  had provided detailed  asset 

wise  list  of  Gross  Fixed  Asset  for  each  plant.  Even  though  such  list  was  submitted,  the 

Hon’ble  Commission  considered  average  rate  of  depreciation  at  3.54%  &  3.56%  in  the 

Tariff order for the Petitioner of FY 2008‐09. 

The Petitioner reiterates that the detailed asset wise list is now available with the Hon’ble 

Commission.  Such  values  are  in  accordance with  the  audited  financial  statements  of  the 

Petitioner. The rates of depreciation prescribed by the Hon’ble Commission in Appendix 2 

of  the  Generation  Tariff  Regulations  prescribe  different  depreciation  rates  for  different 

assets.  In  such  circumstances  it  would  only  be  fit  to  consider  station  wise  depreciation 

calculated at  the rates prescribed  in Appendix 2  for different asset classes and not at  the 

average rate. 

The value of Gross Fixed Assets has been discussed  in  foregoing  sections. The Petitioner 

has  calculated  station wise  depreciation,  on  the Gross  Fixed Asset  (GFA)  value  of  all  the 

plants owned by it, at the rates specified in the Appendix 2 of Generation Tariff Regulations 

2009. 

 

Page 30: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 29 

 

Table: Panki TPS ­ Depreciation Summary for the Control Period   (All figures in Rs Crs) 

GFA Dep GFA Dep GFA Dep GFA Dep GFA DepLand & Land Rights 0.00%       1.5          ‐          1.5          ‐          1.5          ‐          1.5          ‐          1.5         ‐   Land Owned Under Full Title 0.00%       0.1          ‐          0.1          ‐          0.1          ‐          0.1          ‐          0.1         ‐   Land Heled Under Lease 0.00%         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           ‐   Buldings 3.60%    74.6        2.7     74.6        2.7     74.6        2.7     74.6        2.7     74.6        2.7 Bldgs‐Thermao‐Elect.Gene.Plant 3.60%         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           ‐   

Office Buldings 3.60%         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           ‐   

Residential Coloney For Staff 3.60%         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           ‐   

Other Building 3.60%         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           ‐   Hydraulic Workes 3.60%       3.4        0.1        3.4        0.1        3.4        0.1        3.4        0.1        3.4        0.1 Other Civil Work 3.60%       7.6        0.3        7.6        0.3        7.6        0.3        7.6        0.3        7.6        0.3 Plant & Machinery 3.60%    49.8        1.8     49.8        1.8   210.3        7.6   377.8     13.6   377.8     13.6 Boiler Plant & Equipment 3.60%    22.1        0.8     22.1        0.8     93.3        3.4   167.6        6.0   167.6        6.0 

Turbine Gen. Steam Pwr Gene. 3.60%       3.0        0.1        3.0        0.1     12.7        0.5     22.8        0.8     22.8        0.8 

Auxilaries In Steam Pwr Plant 3.60%       3.4        0.1        3.4        0.1     14.2        0.5     25.4        0.9     25.4        0.9 Coal Handling Plant & Handlg Eqpt 3.60%       4.5        0.2        4.5        0.2     18.9        0.7     33.9        1.2     33.9        1.2 

Plt‐Foundtn Hydel Pwr‐Gene‐Plt 3.60%         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           ‐   

Trans Plt Tranfs Rating 100Kva 3.60%         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           ‐   

Materials Handlg Eqpt‐Earth Hover 3.60%         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           ‐   

Switch Gear Incdg Cable Connts 3.60%         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           ‐   

Batteries Inclu. Charg Eqpt 3.60%         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           ‐   Commu. Eqpt Teleph. & Tele 3.60%       0.0        0.0        0.0        0.0        0.1        0.0        0.2        0.0        0.2        0.0 Tools & Tackles 3.60%       0.2        0.0        0.2        0.0        0.6        0.0        1.2        0.0        1.2        0.0 Other Misc. Eqpt. 3.60%       0.6        0.0        0.6        0.0        2.6        0.1        4.6        0.2        4.6        0.2 Lines Cable Network Etc. 3.60%       2.8        0.1        2.8        0.1        2.8        0.1        2.8        0.1        2.8        0.1 Vehicles  0.00%       0.3          ‐          0.3          ‐          0.3          ‐          0.3          ‐          0.3         ‐   Vehicles 18.00%       0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0 Heavy Vehicles  18.00%         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           ‐   Jeeps & Moter Cars 18.00%       0.1        0.0        0.1        0.0        0.1        0.0        0.1        0.0        0.1        0.0 Others Vehicles 18.00%       0.2        0.0        0.2        0.0        0.2        0.0        0.2        0.0        0.2        0.0 Furnitures & Fixtures 0.00%       0.1          ‐          0.1          ‐          0.1          ‐          0.1          ‐          0.1         ‐   Furnitures & Fixtures 6.00%       0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0 

Furnitures &  Fixtures Used In Hotel Restrnt. Bording House , Scol., Coll., Lib. & Meeting Hall

6.00%       0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0 

Office Eqpt 0.00%       0.2          ‐          0.2          ‐          0.2          ‐          0.2          ‐          0.2         ‐   Office Eqpt. 6.00%       0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0 Photostat Mach. 6.00%       0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0        0.0 Computer 6.00%       0.1        0.0        0.1        0.0        0.1        0.0        0.1        0.0        0.1        0.0 Other 6.00%       0.1        0.0        0.1        0.0        0.1        0.0        0.1        0.0        0.1        0.0 Capital Spares Genrating Stations (95%) 3.60%       0.2        0.0        0.2        0.0        0.2        0.0        0.2        0.0        0.2        0.0 

 Total      175           6      175           6      444        16      725        26      725        26 

FY 10Particulars

Dep. Rate

FY 11 FY 12 FY 13 FY 14

 

Page 31: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 30 

 

2.1.3.2. Advance against depreciation (AAD) 

Depreciation  is  provided  as  replacement  cost  of  assets.  Advance  against  Depreciation  is 

provided  to  generator  to  ensure  that  he  has  enough  cash  resources  to  meet  the  loan 

repayment liability. 

CERC in  its CERC (Terms and Conditions of Tariff) Regulations 2009 have withdrawn the 

concept of Advance Against Depreciation and have increased the depreciation rates as per 

Appendix III to the notified regulations. The rates of depreciation for the first 12 years of a 

plant  from  the  date  of  commercial  operation  would  be  5.28%  and  the  remaining 

depreciable value as on 31st March of the year closing after a period of 12 years from date 

of commercial operation shall be spread over the balance useful life of the assets. 

UPERC  in  the Draft  generation  regulations have retained  the  concept of Advance Against 

Depreciation.  Para  21  (ii)  (b)  of  the  Generation  Tariff  Regulations  2009  provide  for 

Advance Against Depreciation –  

“In  addition  to  allowable  depreciation,  the  generating  company  shall  be  entitled  to 

Advance Against Depreciation, computed in the manner given hereunder: 

AAD = Loan repayment amount as per regulation 21  (i) subject  to a ceiling of 

1/10th of loan amount as per regulation 20 minus depreciation as per schedule 

Provided that Advance Against Depreciation shall be permitted only if the cumulative 

repayment up to a particular year exceeds the cumulative depreciation up to that year; 

Provided further that Advance Against Depreciation in a year shall be restricted to the 

extent of difference between cumulative repayment and cumulative depreciation up to 

that year” 

Advance Against Depreciation makes available funds to meet loan repayment in the years 

where normative  depreciation  is  lower  than  loan  repayment.  The  funding pattern  of  the 

Petitioner’s  loans for capacity additions & R&M schemes is 70:30 debt to equity (in some 

cases  it  varies  upto  80:20  also) which  is  in  line with  the  prescribed  debt  equity  ratio  in 

tariff regulations. However, the tenure of loan which the Petitioner has tied up, ranges from 

10 to 12 years. As against  this,  the depreciation allowed  is at an amortization rate which 

Page 32: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 31 

 

assumes a  life cycle of a plant of 25 years. This brings consequential matching difference 

between loan repayment liability & depreciation allowed in the initial years. 

The following table highlights the matching difference between the allowable depreciation 

and repayment schedule 

Particulars Value to be amortized No of years Annual Value

Depreciation 90% (balance 10% residual value)

25 years (useful life) 90%/25 = 3.60%

Loan 70% (Normative Debt)

10 years (loan repayment  70%/10 = 7.00%

 

The First Generation Tariff Regulations were  implemented  from FY 2005‐06. As such the 

cumulative depreciation claimed in tariff before FY 2005‐06 could not be determined. The 

Petitioner  has  inherited  many  generic  loans  from  the  erstwhile  UPSEB  and  hence  the 

cumulative repayments also cannot be determined. Hence Advance Against Depreciation is 

not being claimed by the Petitioner against any old loans. 

The  Petitioner  has many  new  capacity  addition  plans  and  implementing  various  R&M  / 

Refurbishment & Up‐rating schemes for its power stations which are under various stages 

of development. For such schemes it has contracted loans from PFC to fund such schemes. 

The  loan  repayment  tenure  of  such  loans  varies  from 10‐12  years whereas  depreciation 

available against such capitalizations in only around 3.60%.  

In  the  following  table  the  Petitioner  has  provided  the  calculation  of  advance  against 

depreciation  for  the  power  station.  AAD  has  been  calculated  as  per  the  prescription  of 

generation  tariff  regulations  w.r.t.  to  the  depreciation  related  to  capitalization  of  new 

project loans/ additional capitalization of R&M scheme and repayment related to such new 

project loan/ R&M scheme loan only  

Page 33: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI_MYT Petition for Determination of Tariff  Page 32 

 

 Table: Panki TPS ­ Advance Against Depreciation for the Control Period 

(All figures in Rs Crs) 

Particulars FY 10 FY 11 FY 12 FY 13 FY 14

Capital Cost ‐                 ‐                 269.15           550.00           550.00          

Gross Loan Amount ‐                 ‐                 440.00           440.00           440.00          

1/10th of Loan ‐                 ‐                 44.00             44.00             44.00            

Repayment ‐                 ‐                 ‐                 11.00             44.00            

Dep. Charged ‐                 ‐                 0.81                15.59             19.80            

Cum. Repayment ‐                 ‐                 ‐                 11.00             55.00            

Cum. Depreciation ‐                 ‐                 0.81                16.39             36.19            

AAD ­                 ­                 ­                 ­                 18.81            

2.1.4. Return on Equity 

At  the  time of  transfer  scheme  the equity which  stood  in  the books of UPRVUNL was Rs 

252.805  crores.  GoUP  vide  transfer  scheme  notification  dated  25th  January  2001  had 

provided equity of Rs 1,511.44 crores to the Petitioner.  

The  equity  received  in  transfer  scheme  of  Rs  1,511.44  and  Rs  252.805  crores  equity 

pertaining to UPRVUNL equity as on 14.01.2000 has been allocated among existing plants 

except Parichha Extn in the ratio of their GFA balances. 

Table: Allocation of Common Equity 

                                                                   (All figures in Rs Crs) 

Power Station FY 00 FY 01

Anpara 'A' 29.48 176.26

Anpara 'B' 178.35 1066.29

Obra 'A' 4.28 25.60

Obra 'B' 17.90 106.99

Harduaganj 9.48 56.66

Panki 5.56 33.24

Parichha  7.76 46.40Total 252.81 1511.44  

Page 34: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PANKI _MYT Petition for Determination of Tariff                  Page 33 

 

 

The year wise plant wise total equity employed is given in the table below:  Table – Year­wise Equity Employed 

(All figures in Rs. Crores) Heads FY 00 FY 01 FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14

UPRVUNL Own Equity 253        253        253        253        253        253        253        253        253        253        253        253        253        253        253       Equity received in Transfer Scheme 1,511    1,511    1,511    1,511    1,511    1,511    1,511    1,511    1,511    1,511    1,511    1,511    1,511    1,511   

Anpara 'A' ‐         ‐         ‐         ‐         ‐         ‐         3             14          14          14          70          155        171        171        171       

Anpara 'B' ‐         ‐         ‐         33          33          34          34          34          34          34          87          173        173        173        173       

Obra 'A' ‐         ‐         ‐         ‐         ‐         ‐         81          110        110        110        110        146        146        146        146       

Obra 'B' ‐         ‐         ‐         ‐         ‐         ‐         ‐         95          245        317        327        327        327        327        327       

Harduaganj ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         16          76          106        106        106        106        106       Panki ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         100        110        110        110        110       Parichha  ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         23          55          55          55          55         Parichha Extn (2x210 MW) ‐         ‐         ‐         ‐         ‐         ‐         277        343        343        343        365        365        365        365        365       Parichha Extn (2x250MW) ‐         ‐         ‐         ‐         ‐         ‐         ‐         107        307        505        570        707        707        707        707       Harduaganj Extn (2x250MW) ‐         ‐         ‐         ‐         ‐         ‐         ‐         100        300        442        517        782        782        782        782       Anpara D ‐         ‐         ‐         ‐         ‐         ‐         ‐         18          418        611        1,020    1,020    1,020    1,020    1,020   ESP Installation (CREP works) ‐         ‐         ‐         ‐         ‐         ‐         ‐         10          50          93          123        123        123        123        123       Obra C ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         345        345        345        345        345       Panki Extn ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         85          85          85          85          85         Harduaganj Extn 2 ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         170        170        170        170        170       Fatehpur ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         50          50          50          50          50         Anpara C ‐         ‐         ‐         ‐         ‐         ‐         1             1             1             1             1             1             1             1             1            Equity for Coal Dues ‐         ‐         ‐         ‐         ‐         334        334        334        334        334        334        334        334        334        334       

Total 253       1,764   1,764   1,797   1,797   2,133   2,495   2,931   3,937   4,645   6,167   6,817   6,833   6,833   6,833    (Note: The equity additions in control period for plants under development stage like Anpara D, Obra C, Fatehpur, Panki Extn, Harduaganj Extn etc have not been projected for the purpose of above table. However upto FY 2008‐09 the actual equity employed has been taken into account)

Page 35: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI _MYT Petition for Determination of Tariff  Page 34 

 

Further, the year‐wise equity employed along with the nature of scheme under which it has 

been received is given in table below: 

Table – Unit wise Equity Employed  (All figures in Rs Crs) 

Particulars FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14

Allocation of UPRVUNL own Equity 6             6             6             6             6             6             6             6             6            

Allocation of Transfer Scheme Equity 33          33          33          33          33          33          33          33          33         

Up‐Rating of U#3 & 4 ‐         ‐         ‐         ‐         100        110        110        110        110       

Total 39          39          39          39          139       149       149       149       149        

As per the Generation Tariff Regulations, equity would be eligible for return when the asset 

is commissioned. Based on the commissioning & capitalization programme which has been 

discussed  in  foregoing  sections,  the  table  below  provides  the  summary  of  equity  base 

eligible  for  return  and  the  Return  on  Equity  claimed  by  the  petitioner  for  the  control 

period: 

Table: Return on Equity for the Control Period (FY 2009­10 to FY 2013­14) 

(All figures in Rs Crs) 

Particulars FY 10 FY 11 FY 12 FY 13 FY 14

Equity Base 39                    39                    94                    149                  149                 

ROE (%) 15.5% 15.5% 15.5% 15.5% 15.5%

Return on Equity (Rs. Cr.) 6.01                6.01                14.54              23.06              23.06               

Page 36: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI _MYT Petition for Determination of Tariff  Page 35 

 

 

2.1.5  Operation & Maintenance Expenses 

2.1.5.1 Base O&M Expenses  

Para 21 (iv) of UPERC (Terms & Conditions of Generation Tariff) Regulations 2009 deals 

with  the  allowance  of  O&M  expenses.  The  Hon’ble  Commission  in  the  generation  tariff 

regulations  –  Para  21  (iv)  (b)  have  prescribed  the  O&M  expenses  based  on  the  levels 

approved  in  FY  2008‐09  escalated  at  5.72%  annually  for  the  control  period  for  Obra  A, 

Obra B, Panki, Harduaganj & Parichha TPS.  Para 21 (iv) (a) prescribes norms for all other 

stations. Based on prescription of Para 21 (iv) (b) the O&M expenses allowed for the power 

station is as per table below: 

Table: Base O&M expense for the Control Period 

Financial YearCapacity (MW)

Rate (Rs lakh / MW)

Amount (Rs Crs)

FY 2010 210 31.8 66.8FY 2011 210 33.7 70.7FY 2012 225 35.6 80.0FY 2013 240 37.6 90.3FY 2014 240 39.8 95.4  

2.1.5.2 Impact of Pay Revision 

The Hon’ble Commission has prescribed the mechanism for factoring in, the impact of Pay 

Revision in Para 21 (iv) (d) of Generation Tariff Regulations–  

“The expenses on regulatory fee, payment to pollution control board, fringe benefit tax, 

impact  of  pay  revision,  cost  of water  and water  cess  shall  be  paid  additionally  at 

actuals” 

Pay Revision Arrears from 1st Jan 2006 upto FY 2008­09 

The Petitioner has finalized the Pay Revision for its employees during the last quarter of FY 

2008‐09. Such pay revision is implementable from 1st January 2006. However the payment 

structure is spread across a number of financial years.  

Page 37: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI _MYT Petition for Determination of Tariff  Page 36 

 

Financial  prudence  requires  the  Petitioner  to  recognize  the  pay  revision  liabilities  in  its 

financial statements even though the payment is structured in future years.  

Para  17  (a)  of  Accounting  Standards‐1  Disclosure  of  Accounting  Policies,  issued  by  the 

Accounting Standards Board of the Institute of Chartered Accountants of India lay –  

“Prudence  ­  In  view  of  the  uncertainty  attached  to  future  events,  profits  are  not 

anticipated  but  recognised  only  when  realised  though  not  necessarily  in  cash. 

Provision is made for all known liabilities and  losses even though the amount cannot 

be  determined  with  certainty  and  represents  only  a  best  estimate  in  the  light  of 

available information” 

The Petitioner has calculated the power station wise impact of provision for arrears of pay 

revision for the years 2005‐06, 2006‐07, 2007‐08 & 2008‐09. In compliance with AS‐1, the 

Petitioner  has  recognized  the  liabilities  of  arrears  of  pay  revision  from  01.01.2006  to 

31.03.2009 in the financial statements of FY 2008‐09. Accordingly the Petitioner has made 

a provision of Rs 261.71 crs in the financial statements of FY 2008‐09. The year wise and 

power station‐wise liabilities due to pay revision arrears are given in table below: 

Table: Liabilities of Arrears due to Pay Revision  (All figures in Rs Crs) 

Particulars FY 2006 FY 2007 FY 2008 FY 2009 Total

Salaries (before15.01.2000) 1.63 6.57 7.06 8.94 24.20

Salaries (after15.01.2000) 0.15 0.61 0.61 0.85 2.22

Pension & Gratuity (@19.08%) 0.31 1.25 1.35 1.71 4.62

CPF (@10%) 0.02 0.06 0.06 0.08 0.22

Salary of CISF Personnel 0.15 0.60 0.60 0.25 1.61

Total 2.26 9.10 9.69 11.82 32.88  

Note:  The  liabilities  of  arrears  of  pay  revision,  of  employees  at  Headquarter  have  been 

allocated to the power stations.  

The Petitioner requests the Hon’ble Commission to allow the Petitioner to raise such bills 

of  arrears  of  pay  revision  to  UPPCL.  It  would  entail  matching  of  revenue  with  the 

expenditure in the financial statements.  

Page 38: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI _MYT Petition for Determination of Tariff  Page 37 

 

Yearly Pay Revision Impact The hike in salary bill due to pay revision is being paid regularly from April 1, 2009. Only 

the payment of Arrear of Pay revision from 01.01.2006 to 31.03.2009 has been structured 

for payment in the future years.  

The Petitioner has calculated the power station wise impact of provision for arrears of pay 

revision  for  the  years 2005‐06,  2006‐07,  2007‐08 & 2008‐09. Accordingly  the Petitioner 

requests the Hon’ble Commission to allow the additional  impact  in  future years based on 

the provision of FY 2008‐09 escalated at 7.5% per year to account for the semi‐annual hike 

in D.A . Any further adjustment would be sought by the Petitioner in compliance with Para 

21 (iv) (b) ‐  

“Provided  that Obra A, Obra B, Panki, Parichha and Harduaganj may approach  the 

Commission  for  adjustment  in  O&M  expenses  only  on  account  of  establishment 

expenses,  insurance  charges  and  repair  and maintenance  based  on  annual  audited 

financial statements and prudence check.” 

2.1.5.3  Projected O&M Expenses 

The  overall  projection  of  O&M  expenses  for  the  years  2009‐10  to  2013‐14  is  provided 

below 

Table: Total Projected O&M Expenses for the Control Period  (All figures in Rs Crs) 

Particulars FY 09 FY 10 FY 11 FY 12 FY 13 FY 14

Impact of Pay Revision Arrears from FY 2005‐06 to FY 2008‐09 32.88

Normal O&M 66.84 70.67 80.04 90.26 95.43

Yearly Pay revision impact 12.71 13.66 14.69 15.79 16.98

Total 32.88 79.55 84.33 94.73 106.06 112.40  

Page 39: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI _MYT Petition for Determination of Tariff  Page 38 

 

 

2.1.6  Compensation Allowance 

Para  21  (iv)  (e)  of  the  Generation  Tariff  Regulations  2009  prescribe  a  separate 

compensation  allowance  unit‐wise  to meet  expenses  in  nature  of  capital  expenditure  on 

replacement of minor assets based on the life of the station. 

The following table summarizes the Petitioner’s entitlement for Compensation allowance: 

Table: Unit­wise Compensation Allowance for the Control Period (All figures in Rs Crs) 

Unit No.Derated Capacity  (in MW)

Date of Commercial Operation

Age of Plant as on 

31.03.2009  (In Yrs)

FY 10 FY 11 FY 12 FY 13 FY 14

3 29‐Jan‐77 32.19 0.68 0.68 0.78 0.78 0.78

4 29‐May‐77 31.86 0.68 0.68 0.68 0.78 0.78

1.37 1.37 1.46 1.56 1.56  

Page 40: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI _MYT Petition for Determination of Tariff  Page 39 

 

 

2.1.7 Interest on Working Capital 

The Petitioner  has worked  out  the working  capital  requirement  based  on  the  normative 

parameters prescribed in Para 21 (v) of the Generation Tariff Regulations 2009. The rate of 

interest has been taken at 12.25% being the Prime Lending Rate of the State Bank of India 

on  April  1,  2009.  (A  copy  of  the  documentary  proof  to  this  effect  in  the  form  of 

communication from State Bank if India is attached as Exhibit B) 

The  Hon’ble  Commission  in  Note  to  Para  6.2.3  of  the  FY  2008‐09  Tariff  Order  for  the 

Petitioner had  stated  that  the  amount  recoverable under Finance & Bank  charges, water 

cess,  payment  to  Pollution  Control  Board,  Regulatory  fee  etc  and  impact  of  pay  revision 

would not be accounted for the purpose of interest on working capital. 

In this reference, the Petitioner would like to state that the annual impact starting from FY 

2009‐10 (and not the impact of arrear from 01.01.2006 to 31.03.2009) of pay hike should 

be accounted for in the calculation of working capital requirement. 

Based  on  the  above  premise  &  taking  into  account  the  annual  impact  of  pay  hike,  the 

computation  of  interest  on working  capital  for  the  control  period  for  kind  consideration 

and approval of the Hon’ble Commission are as per table below: 

Table: Interest on Working Capital for the Control Period (All figures in Rs Crs) 

Particulars FY 10 FY 11 FY 12 FY 13 FY 14

Working Capital 117.74 124.26 143.25 170.08 185.28

Rate of Interest 12.25% 12.25% 12.25% 12.25% 12.25%

Interest on Working Capital 14.42 15.22 17.55 20.83 22.70 

Page 41: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI _MYT Petition for Determination of Tariff  Page 40 

 

 

2.1.8 Summary of Annual Capacity (Fixed) Charges 

In view of the above submissions, the fixed cost of the Petitioner’s Panki TPS for the control 

period under consideration works out at as under: 

Table: Summary of Annual Capacity (Fixed) Charges for the Control Period (All figures in Rs Crs) 

Particulars FY 10 FY 11 FY 12 FY 13 FY 14

Interest on Loan 3.37 2.94 4.29 43.45 52.53

Depreciation 6.25 6.25 15.94 26.05 26.05

Advance against Depreciation 0.00 0.00 0.00 0.00 18.81

Return on Equity 6.01 6.01 14.54 23.06 23.06

O&M Expenses 79.55 84.33 94.73 106.06 112.40

Compensation Allowance 1.37 1.37 1.46 1.56 1.56

IOWC 14.42 15.22 17.55 20.83 22.70

Total 110.98 116.12 148.51 221.02 257.11

Ex‐bus Energy Sent Out 982 1,001 1,092 1,189 1,233

Fixed Cost/Unit 1.13 1.16 1.36 1.86 2.09 

Graph: Fixed Cost per unit in the Control Period

   

Page 42: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI _MYT Petition for Determination of Tariff  Page 41 

 

2.2  Energy Charges 

The following table highlights the normative parameters which the Hon’ble Commission 

has prescribed for the control period of FY 2009‐10 to FY 2013‐14: 

Table Normative Operating Parameters for the Control Period 

Particulars Unit FY 10 FY 11 FY 12 FY 13 FY 14

Target Availability  %65.00% 66.00% 67.00% 68.00% 70.00%

Target PLF %60.00% 61.00% 62.00% 63.00% 65.00%

Aux Energy Consumption   %11.00% 10.80% 10.60% 10.20% 9.80%

Gross Station Heat Rate  kCal/kWh3100 3070 3040 3010 2980

Specific Fuel Oil Cons ml/kWh2.50 2.40 2.30 2.20 2.10

NORMATIVE PARAMETERSAs Per Tariff Generation Regulations 

for MYT FY10  to FY14

 

For the purpose of calculations of energy charges for FY 2009‐10, the average of the actual 

GCV of coal and oil and actual cost thereof of the preceding three months (January to March 

2009) has been taken for the purpose of calculations of energy charges. The Petitioner has 

assumed an annual Escalation Rate of 5%  in  the price of  fuels over  the  five year  control 

period starting from the financial year 2010‐11 upto FY 2013‐14 

Energy  charges  for  the  control  period  have  been  projected  based  on  the  operating 

parameters  prescribed  in  the  Generation  Tariff  Regulations.  A  summarized  position  of 

energy  charges proposed  for  the  control period  is  given  in Table below:  (The details  are 

available in tariff filing formats prescribed by the Hon’ble Commission) 

Page 43: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI _MYT Petition for Determination of Tariff  Page 42 

 

 

Table: Calculation of Energy Charges for the Control Period 

Description  Unit  2009­10 2010­11 2011­12 2012­13 2013­14

Capacity  MW  210 210 225 240 240

PLF  % 60% 61% 62% 63% 65%

Gross Station Heat Rate Kcal/kWh  3100 3070 3040 3010 2980

Auxiliary Energy Consumption  % 11.0% 10.8% 10.6% 10.2% 9.8%

Energy Generation ‐ Gross MU 1104 1122 1222 1325 1367

Auxiliary Energy Consumption  MU 121 121 130 135 134

Ex‐bus Energy Sent Out MU 982 1001 1092 1189 1233

Specific Oil Consumption ml/kWh 2.50 2.40 2.30 2.20 2.10

Wt. Avg. GCV of Oil  KCal/Lt 9440 9440 9440 9440 9440

Price of Oil  Rs./KL 32761 34399 36119 37925 39822

Wt. Avg. GCV of Coal  kCal/kg 3444 3444 3444 3444 3444

Price of Coal  Rs./MT  2253 2366 2484 2608 2739

Heat Contribution from SFO Kcal/kWh  24 23 22 21 20

Oil Consumption KL 2759 2693 2811 2914 2870

Heat Contribution from Coal Kcal/kWh  3076 3047 3018 2989 2960

Specific Coal Consumption kg/kWh 0.89 0.88 0.88 0.87 0.86

Coal Consumption MMT 0.99 0.99 1.07 1.15 1.17

Total Cost of Oil Rs Cr 9.04 9.26 10.15 11.05 11.43

Total Cost of Coal Rs Cr 222.18 234.94 266.08 299.90 321.74

Total Fuel Cost Rs Cr 231.22 244.21 276.23 310.95 333.16

Rate of Energy Charge from Secondary Fuel Oil ex‐bus Paise/kWh  9.20 9.26 9.29 9.29 9.27

Rate of Energy Charge from Coal ex‐bus Paise/kWh  226.18 234.72 243.56 252.14 261.01

Rate of Energy Charge ex‐bus per kWh   Paise/kWh  235.38 243.97 252.85 261.43 270.29

 

Page 44: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

PANKI _MYT Petition for Determination of Tariff  Page 43 

 

 Graph: Variable Cost per unit in the Control Period 

 

2.2.1 Fuel Cost Adjustment 

Regulation  22  (i)  (ii)  &  (iii)  of  the  Generation  Tariff  Regulations  2009,  provide  the mechanism for claiming the adjustment of rate of energy charges on account of variation in price and heat values of fuels.  

“Initially, Gross Calorific Value of coal or gas or liquid fuel shall be taken as per actual of  the  preceding  three months.  Any  variation  shall  be  adjusted  on month  to month basis on  the basis of Gross Calorific Value of  coal or gas or  liquid  fuel  received and burnt and  landed cost  incurred by  the generating company  for procurement of coal, oil, or gas or liquid fuel, as the case may be. No separate petition need to be filed with the  Commission  for  fuel  price  adjustment.  In  case  of  any  dispute,  an  appropriate application  in  accordance  with  Uttar  Pradesh  Electricity  Regulatory  Commission (Conduct  of  Business)  Regulations  2004,  as  amended  from  time  to  time  or  any statutory re­enactment thereof, shall be made before the Commission” 

Accordingly the Petitioner would raise bills for recovery of Fuel Cost Adjustment.  

Page 45: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

TARIFF FILING FORMS (THERMAL

PANKI

Appendix­I

Page 46: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­I

Form No. Title of Tariff Filing Forms (Thermal) Tick

FORM­ 1 Summary Sheet

FORM­1A Calculation of Return on Equity

FORM­2 Plant Characteristics

FORM­3 Normative parameters considered for tariff computations

FORM­ 4 Details of Foreign  loans 

FORM­5 Abstract of Admitted Capital Cost for the existing Projects 

FORM­5AAbstract of Capital Cost Estimates and Schedule of Commissioningfor the New projects

FORM­5B Break‐up of Capital Cost for Coal based projects  

FORM­5C Break‐up of Capital Cost for Gas/Liquid fuel based Projects

FORM­5D Break‐up of Construction/Supply/Service packages

FORM­ 6 Financial Package upto COD

FORM­ 7 Details of Project Specific Loans

FORM­ 8 Details of Allocation  of  corporate loans to various projects 

FORM­9 Statement of Additional Capitalisation after COD

FORM­ 10 Financing of Additional Capitalisation 

FORM­ 11 Statement  of Depreciation

FORM­ 12 Calculation of Depreciation Rate  

FORM­ 13 Calculation of Weighted Average Rate of Interest on Actual Loans1

FORM­ 13A Calculation of  Interest on Loans

FORM­ 14 Calculation of Advance Against Depreciation (AAD)

FORM­ 15 Calculation of Interest on Working Capital 

FORM­ 16 Draw Down Schedule for Calculation of IDC & Financing Charges

FORM­17 CALCULATION OF OPERATION AND MAINTENANCE EXPENSES

FORM­18 DETAILS OF OPERATION AND MAINTENANCE EXPENSES

FORM­19 ­ IDetails/Information to be Submitted in respect of Fuel forComputation of Energy Charges

FORM­19 ­IIDetails/Information to be Submitted in respect of Fuel forComputation of Energy Charges

FORM 20 Computation of Energy ChargesOther Information/ Doc ments

Sl. No. Information/Document  Tick

1

Certificate of incorporation, Certificate for Commencment ofBusiness, Memorandum of Association, & Articles of Association (For New Station setup by a company making tariff application for thefirst time to UPERC)

2Stationwise and Corporate audited Balance Sheet and Profit & LossAccounts with all the Schedules & annexures on COD of the Stationfor the new station &  for the relevant years.

3 Copies of relevant loan Agreements

4Copies of the approval of Competent Authority for the Capital Costand Financial package.

5Copies of the Equity participation agreements and necessaryapproval for the foreign equity.

7 Copies of the BPSA/PPA with the beneficiaries, if any

8 Detailed note giving reasons of time and cost over run, if applicable.

9 Any other relevant information, (Please specify)

Checklist of Forms and other information/ documents for tariff filing for Thermal Stations

Page 47: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

Name of the CompanyName of the Power Station :Region State: UTTAR PRADESH District: KANPUR

(Rs. Cr)S. No.

ParticularsExisting    2008­09

2009­10 2010­11 2011­12 2012­13 2013­14

1 2 3 4 5 6 7 8

1.1 Depreciation FORM‐ 11 6.23            6.25            6.25            15.94         26.05         26.05        

1.2 Interest on Loan FORM‐ 13A 3.72            3.37            2.94            4.29            43.45         52.53        

1.3 Return on Equity FORM 1A 5.43            6.01            6.01            14.54         23.06         23.06        

1.4 Advance against Depreciation FORM‐ 14 ‐              ‐              ‐              ‐              ‐              18.81        

1.5 Interest on Working Capital FORM‐ 15 16.90         14.42         15.22         17.55         20.83         22.70        

1.6 O & M Expenses FORM‐18 85.81         79.55         84.33         94.73         106.06       112.40      

1.7 Compensation Allowance * 1.37 1.37 1.46 1.56 1.56

Total 118.10      110.98      116.12      148.51      221.02      257.11     

2.Calculation of Rate of  Energy Charge(Rs./kWh)1

 

2.1Rate of Energy Charge from Primary Fuel (REC)p2

Paise/KWh 226.18 234.72 243.56 252.14 261.01

2.2 Rate of Energy Charge from Secondary Fuel (REC) Paise/KWh 9.20 9.26 9.29 9.29 9.27

2.3 Rate of Energy Charge ex‐bus(REC)3A,3B,3C Paise/KWh 235.38 243.97 252.85 261.43 270.29

* The detailed calculation of Compensation Allowance has been provided in the Text of the Petition as no separate form was prescribed for it.

Petitioner

PART­IFORM­ 1

1 Details of calculations, considering equity as per regulation, to be furnished.2 If  multifuel is used simultaneously, give 2.1 in respect of every fuel individually.3A The rate of energy charge shall be computed for open cycle operation and combined cycle operation separatly in case of gas/liquid fuel fired plants.3B The total energy charge shall be worked out based on ex‐bus energy scheduled to be sent out in case of plants covered by ABT, and ex‐bus energy sent out in case of plants not covered by ABT, as the case may be.

Summary Sheet

After Stablisation

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

3C Any escalation in fuel cost to be considered for subsequent years or FPA to take care of the escalation. 

Page 48: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­ 1A

Calculation of Return on Equity

Name of the CompanyName of the Power Station :

(Rs. Cr)

S.No. Particulars 2005­06 2006­07 2007­08 2008­09 2009­10 2010­11 2011­12 2012­13 2013­14

1 2 3 4 5 6 7 8 9 10 111.1 Capital Cost 161.30           172.45           172.52           174.18           174.77           174.77           443.92           724.77           724.77          

1.2 Notional Equity 38.80              38.80              38.80              38.80              38.80              38.80              93.80              148.80           148.80          

1.3 Return on Equity (%) 14.00% 14.00% 14.00% 14.00% 15.50% 15.50% 15.50% 15.50% 15.50%

1.4 Return on Equity  5.43               5.43               5.43               5.43               6.01               6.01               14.54             23.06             23.06            

Petitioner

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

Page 49: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

Name of the Company

Name of the Power Station

Basic characteristics of the plant1

Special Features of the Plant

Site Specific Features2

Special Technological Features3

Environmental Regulation relatedfeatures4

Any other special features

Fuel Details5

Details(1) (2) (3) (4) (5) (6) (7) & so on

U‐1 U‐2 U‐3 U‐4 U‐5 U‐6 U‐7Installed Capacity (IC) 32 32 110 110Derated Capacity (MW) Deleted Deleted 105 105Date of  Commercial Operation (COD) Oct‐67 Jul‐68 Jan‐77 May‐77Type of cooling system6

Type of Boiler Feed Pump7

3  Any Special Technological feature like Advanced class FA technology in Gas Turbines, etc.4  Environmental regulation related  features like FGD, ESP etc.5 Coal or natural gas . 6 Closed circuit cooling, once through cooling, ie with/without cooling tower.7 Motor driven, Steam turbine driven etc. 

Plant Characteristics

PART­IFORM­2

Petitioner

UP RAJYA VIDYUT UTPADAN NIGAM LIMITED

PANKI

ELECTROSTATIC PRECIPITATORS IN BOTH 105 MW UNITS

NONE

ELECTRICAL DRIVEN

2 Any site specific feature such as Merry‐Go‐Round, , Intake /makeup water systems etc. scrubbers etc.Specify all such features.

COAL FO+ HSD

1 Describe the basic characteristics of the plant e.g. in the case of a coal based plant whehter it is aconventional steam generator or circulating fludized bed combustion generator or sub‐critical oncethrough steam generator etc. 

Module number or Unit number

OIL COOLING SYSTEM

COAL BASED CONVENTIONAL STEAM GENERATOR

Primary Fuel Secondary Fuel Alternate Fuels

ONCE THROUGH CONDENSER COOLING SYSTEM

NONE

Page 50: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­I

FORM­3

Name of the Company

Name of the Power Station

2009­10 2010­11 2011­12 2012­13 2013­14

(1) (2) (3) (4) (5) (6) (7)

Rate of Return on Equity   % 15.50% 15.50% 15.50% 15.50% 16%Target Availability  % 65.00% 66.00% 67.00% 68.00% 70.00%Target PLF % 60.00% 61.00% 62.00% 63.00% 65.00%Auxiliary Energy Consumption   % 11.00% 10.80% 10.60% 10.20% 9.80%Gross Station Heat Rate  kCal/kWh 3100 3070 3040 3010 2980Specific Fuel Oil Consumption  ml/kWh 2.50 2.40 2.30 2.20 2.10O&M Cost  Rs.Lakh/MW 31.83 33.65 35.58 37.61 39.76Cost of Coal for WC1 in Months 2 Months 2 Months 2 Months 2 Months 2 MonthsCost of Secondary Fuel Oil forWC1

in Months 2 Months 2 Months 2 Months 2 Months 2 Months

Fuel Cost for WC2 in Months NA NA NA NA NALiquid Fuel Stock for WC2 in Months NA NA NA NA NAO & M Expenses  for WC in Months 1 month 1 month 1 month 1 month 1 monthMaintenance Spares for WC %  20 % of O&M 20 % of O&M 20 % of O&M 20 % of O&M 20 % of O&MRecievables for WC in Months 2 months 2 months 2 months 2 months 2 monthsPrime lending Rate of SBI as on01.04.2009 %  12.25% 12.25% 12.25% 12.25% 12.25%

Incentive Rate Paise / kWhAs per 

Regulation 23(1) & 23(2)

As per Regulation 

23(1) & 23(2)

As per Regulation 

23(1) & 23(2)

As per Regulation 

23(1) & 23(2)

As per Regulation 

23(1) & 23(2)

1For Coal based generating stations

Petitioner

Normative parameters considered for tariff computations

Particulars

Year Ending March

2For Gas Turbine/Combined Cycle generating stations duly taking into account the mode of operation on gas fuel and liquid fuel

UP RAJYA VIDYUT UTPADAN NIGAM LIMITED

PANKI

Unit          As Notified by UPERC

Page 51: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

Name of the CompanyName of the Power StationExchange Rate at CODExchange Rate as on 31.03.2009

(Rs. Cr)Financial Year (Starting from COD)

1 2 3 4 5 6 7 8 9

DateAmount (Foreign Currency)

Exchange Rate

Amount (Rs.) Date

Amount (Foreign Currency)

Exchange Rate

Amount (Rs.)

Currency11

At the date of Drawl2Scheduled repayment date of principalScheduled payment date of interestAt the end of Financial year

Currency21

At the date of Drawl2

principalScheduled payment date of interestAt the end of Financial year

Currency31 & so on

At the date of Drawl2

principalScheduled payment date of interestAt the end of Financial year

1 Name of the currency to be mentioned e.g. US $, DM, etc. etc.2 In case of more than one drawl during the year, Exchange rate at  the date of each drawl to be given.

Petitioner

NIL

PART­IFORM­ 4

Details of Foreign  loans 

2009­10 2010­11 to 2013­14

(Details only in respect of loans applicable to the project under petition)

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

Page 52: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­5

Name of the Company :Name of the Power Station :

Capital Cost as admitted by UPERC

Capital cost admitted as on________(Give reference of the relevant UPERCOrder with  Petition No. & Date)

Foreign Component, if any (In Million US $or the relevant Currency)

Domestic Component (Rs. Cr.)

Foreign Exchange rate considered for theadmitted Capital cost

Total Capital cost admitted (Rs. Cr)

Petitioner

Abstract of Admitted Capital Cost for the existing Projects 

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

NA

PETITION NO.

Page 53: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­5A

Name of the Company :Name of the Power Station :

New ProjectsCapital Cost Estimates

Board of Director/ Agency approving the Capitalcost estimates:Date of approval of the Capital cost estimates:

Price level of approved estimates

Foreign Exchange rate considered for theCapitalcost estimates

Capital Cost excluding IDC & FC

Foreign Component, if any (In Million US $ or therelevant Currency)

Domestic Component (Rs. Cr.)

Capital cost excluding IDC & FC (Rs. Cr)

IDC & FC

Foreign Component, if any (In Million US $ or therelevant Currency)

Domestic Component (Rs. Cr.)

Total IDC & FC (Rs.Cr.)

Rate of taxes & duties considered

Capital cost Including IDC & FC  

Foreign Component, if any (In Million US $ or therelevant Currency)

Domestic Component (Rs. Cr.)

Capital cost Including IDC & FC (Rs. Cr)

Schedule of Commissioning

COD of Unit‐I/Block‐I 

COD of Unit‐II/Block‐II

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

COD of last Unit/Block

Petitioner

Abstract of  Capital Cost Estimates and Schedule of Commissioning for the New projects

Present Day Cost   Completed Cost 

As of End of ______Qtr. Ofthe year _________

As on Scheduled COD of theStation

NIL

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

NIL

Page 54: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­5B

Name of the Company :Name of the Power Station :

As per original Estimates

As  on COD

(1) (2) (3) (4) (5) (6) (7)1.0 Cost of Land & Site Development  1.1 Land 1.2 Rehabitation  & Resettlement  (R&R)1.3 Preliminary Investigation & Site development

Total cost ( Land & Site Development) 2.0 Plant & Equipment

2.1 Steam Generator Island2.2 Turbine Generator Island2.3 BOP Mechanical2.3.1 External water supply system2.3.2 CW system2.3.3 DM water Plant 2.3.4 Clarification plant2.3.5 Chlorination Plant2.3.6 Fuel  Handiling & Storage system2.3.7 Ash Handling System 2.3.8 Coal Handling Plant2.3.9 Rolling Stock and Locomotives2.3.10 MGR 2.3.11 Air Compressor System2.3.12 Air Condition & Ventilation System2.3.13 Fire fighting System2.3.14 HP/LP Piping

Total BOP Mechanical2.4 BOP Electrical2.4.1 Switch Yard   Package2.4.2 Transformers  Package2.4.3 Switch gear  Package2.4.4 Cables , Cable facilities & grounding2.4.5 Lighting2.4.6 Emergency  D.G. set

Total BOP Electrical

2.5 C & I   PackageTotal Plant & Equipment excluding taxes &Duties

2.60 Taxes and Duties2.6.1 Custom Duty2.6.2 Other Taxes & Duties

Total Taxes & Duties

Total Plant & Equipment  With Taxes &Duties3.0 Initial spares4.0 Civil Works4.1 Main plant/Adm. Building

Variation (Rs. Cr.)

Reasons for 

Variation

Break­up of Capital Cost for Coal based projects  

Admitted Cost    (Rs. 

Cr.) 

Break Down  Cost in Rs. Crores Sl.No.

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

NIL

Page 55: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

As per original Estimates

As  on COD

(1) (2) (3) (4) (5) (6) (7)

Variation (Rs. Cr.)

Reasons for 

Variation

Admitted Cost    (Rs. 

Cr.) 

Break Down  Cost in Rs. Crores Sl.No.

4.2 CW system4.3 Cooling Towers4.4 DM water Plant 4.5 Clarification plant4.6 chlorination plant4.7 Fuel  Handiling & Storage system4.8 Coal Handling Plant4.9 MGR & Marshalling Yard4.10 Ash Handling System 4.11 Ash disposal area development4.12 Fire fighting System4.13 Township & Colony4.14 Temp. construction & enabling works4.15  Road & Drainage

Total Civil works 

5.0 Construction & Pre­ Commissioning Expences

5.1 Erection Testing and commissioning5.2 Site supervision5.3 Operator's Training5.4 Construction Insurance5.5 Tools & Plant5.6 Start up fuel

Total Construction & Pre­ CommissioningExpences

6.0 Overheads6.1 Establishment6.2 Design & Engineering6.3 Audit & Accounts6.4 Contingency

Total Overheads

7.0 Capital cost excluding IDC & FC7.1 Interest During Construction (IDC)7.2 Financing Charges (FC)8.0 Capital cost including IDC & FC

Petitioner

Page 56: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­5C

Name of the Company :Name of the Power Station :

As per original Estimates

As  on COD

(1) (2) (3) (4) (5) (6) (7)1.0 Cost of Land & Site Development  1.1 Land 1.2 Rehabilitation & Resettlement (R&R)1.3 Preliminary Investigation & Site development

Total  Land & Site Development  2.0 Plant & Equipment

2.1 Steam Turbine generator Island2.2 Turbine Generator Island2.3 WHRB Island2.4 BOP Mechanical2.4.1 Fuel Handling & Storage system2.4.2 External water supply system2.4.3 CW system2.4.4 Cooling Towers2.4.5 DM water Plant 2.4.6 Clarification plant2.4.7 Chlorination Plant2.4.8 Air condition & Ventilation System2.4.9 Fire Fighting system2.4.10 HP/LP Piping  Total BOP Mechanical2.5 BOP Electrical2.5.1 Switch Yard   Package2.5.2 Transformers package2.5.3 Switch gear  Package2.5.4 Cable , Cable Facilities & grounding2.5.5 Lighting2.5.6 Emergency  D.G. set

Total BOP Electrical2.6 C & I  Package

Total Plant & Equipment excluding taxes &Duties

2.7 Taxes and Duties2.7.1 Custom Duty2.7.2 Other Taxes & Duties

Total Taxes & DutiesTotal Plant & Equipment(with taxes & Duties)

3.0 Initial spares4.0 Civil Works4.1 Main plant/Adm. Building4.2 External water supply system4.3 CW system4.4 Cooling Towers4.5 DM water Plant 4.6 Clarification plant4.7 Fuel Handling & Storage system4.8 Township & Colony

NIL

UP RAJYA VIDYUT UTPADAN NIGAM LIMITED

Break­up of Capital Cost for Gas/Liquid fuel based Projects

Sl.No. Break Down  Cost in Rs. Crores  Variation( Rs. Cr.)

Reasons for Variation

Admitted Cost    (Rs. 

Cr.) 

PANKI

Page 57: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

As per original Estimates

As  on COD

(1) (2) (3) (4) (5) (6) (7)

Sl.No. Break Down  Cost in Rs. Crores  Variation( Rs. Cr.)

Reasons for Variation

Admitted Cost    (Rs. 

Cr.) 

4.9 Temp. construction & enabling works4.10 Road & Drainage4.11 Fire Fighting system

Total Civil works  

5.0 Construction & Pre­ Commissioning Expences

5.1 Erection Testing and commissioning5.2 Site supervision5.3 Operator's Training5.4 Construction Insurance5.5 Tools & Plant5.6 Start up fuel

Total Construction & Pre­ CommissioningExpences

6.0 Overheads6.1 Establishment6.2 Design & Engineering6.3 Audit & Accounts6.4 Contingency

Total Overheads

7.0 Capital cost excluding IDC & FC7.1 Interest During Construction (IDC)7.2 Financing Charges (FC)8.0 Capital cost including IDC & FC

Note:

Petitioner

1. In case of time & Cost over run, a detailed note giving reasons of such time and cost over run should be submittedclearly bring out the agency responsible and whether such time & cost over run was beyond the control of thegenerating company.

Page 58: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­I

FORM­5DName of the Company :Name of the Power Stati

Sl.No.

Name/No. of Construction / Supply / Service 

Package 

Scope of works1 

(in line with head of cost break­ups as applicable)

Whether awarded through ICB/DCB/ Depatmentally/ Deposit Work 

No. of bids 

received

Date of Award

Date of Start of work

Date of Completion of Work

Value of Award2 in (Rs. 

Cr.)

Firm or With 

Escalation in prices

Actual expenditure till the completion 

or up to COD whichever is earlier(Rs.Cr.)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

Petitioner

2 If there is any package, which need to be shown in Indian Rupee and foreign currency(ies), the same should be shown separatly alongwith the currency, the exchangerate and the date e.g. Rs.80 Cr+US$50m=Rs.280Cr at US$=Rs40 as on say 4.1.1999.

1 The scope of work in any package should be indicated in conformity of Capital cost break‐up for the coal based plants in the FORM‐5B to the extent possible. In caseof Gas/Liquid fuel based projects, cost break up in the similar manner in the relevent 

NIL

Break­up of Construction/Supply/Service packages

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

Page 59: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­ 6

Name of the CompanyName of the Power StationProject Cost as on CODDate of Commercial Operation of the Station

(Rs. Cr)

1 2 3 4 5 6 7

Loan‐I US $  200mLoan‐IILoan‐III

and so on Loan‐                                           Foreign                          DomesticTotal loan(Rs)Equity‐

ForeignDomestic

Total Equity( Rs)Debt : Equity Ratio 

2 Date of Commercial Operation means Commercial Operation of the last unit3 For example : US $, 200M etc.etc

Petitioner

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

NA

Currency and Amount

1 Say US $ 200m + Rs.400 Cr or Rs.1200 Cr including US $200m at an exchange rate of  1US $=Rs.40/‐ 

Financial Package upto COD

Financial Package as Approved Financial Package as on COD As Admitted on CODCurrency and Amount Currency and Amount

Page 60: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

Name of the CompanyName of the Power Station

(Rs Cr)

Particulars Package1 Package2 Package3 Package4 Package5 Package6

1 2 3 4 5 6 7

Loan No. 8304010Proposed Up­rating Scheme

Source of Loan PFC PFC

Currency INR INR

Amount of Loan sanctioned 15.71 440.00Amount of Gross Loan drawn upto 31.03.2008/COD 14.02 0.00

Interest Type Fixed Fixed

Fixed Interest Rate, if applicable

Base Rate, if Floating Interest

Margin, if Floating Interest No No

Are there any Caps/Floor No No

If above is yes,specify caps/floor ‐                   ‐                  

Moratorium Period ‐                   ‐                  

Moratorium effective from ‐                   ‐                  

Repayment Period 10 Years 10 Years

Repayment effective from

Repayment Frequency Quarterly Quarterly

Repayment Instalment 40 40

Base Exchange Rate

Petitioner

PART­IFORM­ 7

Details of Project Specific Loans

1 Source of loan means the agency from whom the loan has been taken such as WB, ADB, WMB, PNB, SBI, ICICI, IFC, PFC etc.2 Currency refers to currency of loan such as US$, DM, Yen,Indian Rupee etc.

UP RAJYA VIDYUT UTPADAN NIGAM LIMITED

15 In case of Foreign loan,date of each  drawal & repayment alongwith exchange rate at that date may be given.

5 If the Tariff in the petition is claimed seperately for various units, details in the Form is to be given seperately for all the units in the same form.6 Interest type means whether the interest is fixed or floating.7 Base rate means the base as PLR, LIBOR etc. over which the margin is to be added. Applicable base rate on different dates from the date of drawl may also be enclosed.

9 At times caps/floor are put at which the floating rates are frozen. If such a condition exists, specify the limits.

8 Margin means the points over and above the floating rate.

PANKI

3 Details are to be submitted as on 31.03.2004 for existing assets and as on COD for the remaining assets.

16 Base exchange rate means the exchange rate prevailing as on 31.03.2004 for existing assets and as on COD for the remaining assets.

14 If the repayment  instalment amount and repayment date  can not be worked out from the data furnished above, the repayment schedule to be  furnished seperately.

13 Where there is more than one drawal/repayment for a loan, the date & amount of each drawal/repayement may also be given seperately

4 Where the loan has been refinanced, details in the Form is to be given for the loan refinaced. However, the details of the original loan is to be given seperately in the same form.

10 Moratorium period refers to the period during which loan servicing liability is not required.11 Repayment period means the repayment of loan such as 7 years, 10 years, 25 years etc.12 Repayment frequency means the interval at which the debt servicing is to be done such as monthly, quarterly, half yearly, annual, etc.

Page 61: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

 

Name of the CompanyName of the Power Station

(Rs. Cr.)Particulars Package1 Package2 Package3 Package4 Package5 Package6 Package7 Total

1 2 3 4 5 6 7 8 9

Source of Loan IDBI HUDCOPUBLIC BONDS

CEA LIC UP Govt.  PFC

Currency INR INR INR INR INR INR INRAmount of Loan sanctionedAmount of Gross Loan drawn upto 31.03.2009/COD ‐              13.32         152.28      0.00           0.00           219.09      450.00      834.69   

Interest Type Fixed Fixed Fixed Fixed Fixed Fixed FixedFixed Interest Rate, if applicableBase Rate, if Floating InterestMargin, if Floating Interest

Are there any Caps/Floor Not applicable

Not applicable

Not applicable

Not applicable

Not applicable

Not applicable

Not applicable

If above is yes,specify caps/floor ‐              ‐              ‐              ‐              ‐              ‐              ‐             Moratorium Period ‐              ‐              ‐              ‐              ‐              ‐              ‐             Moratorium effective from ‐              ‐              ‐              ‐              ‐              ‐              ‐             Repayment Period ‐              ‐              ‐              ‐              ‐              ‐              ‐             Repayment effective from ‐              ‐              ‐              ‐              ‐              ‐              ‐             Repayment Frequency ‐              ‐              ‐              ‐              ‐              ‐              ‐             Repayment Instalment ‐              ‐              ‐              ‐              ‐              ‐              ‐             Base Exchange Rate ‐              ‐              ‐              ‐              ‐              ‐              ‐             

Distribution of loan packages to various projectsName of the Projects TotalAnpara A ‐              1.57           17.99         ‐              ‐              25.89         53.18         98.63      Anpara B ‐              9.20           105.17      0.00           ‐              151.31      310.78      576.46    Obra A ‐              0.30           3.45           0.00           0.00           4.96           10.19         18.91      Obra B ‐              0.94           10.79         0.00           ‐              15.52         31.87         59.12      Harduaganj ‐              0.53           6.10           ‐              ‐              8.77           18.01         33.41      Panki ‐              0.34           3.84           0.00           ‐              5.52           11.35         21.05      Parichha ‐              0.43           4.95           0.00           0.00           7.12           14.62         27.11      Parichha Ext. ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐            

Total ­              13.32        152.28     0.00          0.00          219.09     450.00     834.69   

Petitioner

11 Repayment period means the repayment of loan such as 7 years, 10 years, 25 years etc.

5 If the Tariff in the petition is claimed seperately for various units, details in the Form is to be given seperately for all the units in the same form.6 Interest type means whether the interest is fixed or floating.

2 Currency refers to currency of loan such as US$, DM, Yen,Indian Rupee etc.

7 Base rate means the base as PLR, LIBOR etc. over which the margin is to be added. Applicable base rate on different dates from the date of drawl may also be enclosed.

PART­IFORM­ 8

9 At times caps/floor are put at which the floating rates are frozen. If such a condition exists, specify the limits.10 Moratorium period refers to the period during which loan servicing liability is not required.

1 Source of loan means the agency from whom the loan has been taken such as WB, ADB, WMB, PNB, SBI, ICICI, IFC, PFC etc.

13 Where there is more than one drawal/repayment for a loan, the date & amount of each drawal/repayement and its allocation may also be given seperately14 If the repayment  instalment amount and repayment date  can not be worked out from the data furnished above, the repayment schedule to be  furnished seperately.15 In case of Foreign loan,date of each  drawal & repayment alongwith exchange rate at that date may be given.16 Base exchange rate means the exchange rate prevailing as on 31.03.2004 for existing assets and as on COD for the remaining assets.

12 Repayment frequency means the interval at which the debt servicing is to be done such as monthly, quarterly, half yearly, annual, etc.

8 Margin means the points over and above the floating rate.

3 Details are to be submitted as on 31.03.2004 for existing assets and as on COD for the remaining assets.4 Where the loan has been refinanced, details in the Form is to be given for the loan refinaced. However, the details of the original loan is to be given seperately in the same form.

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

Details of Allocation  of  corporate loans to various projects 

Page 62: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­I

FORM­9

Name of the Company

Name of the Power Station

(Rs Cr)

Sl.No. Year

Work/Equipment added after COD up to Cut off Date / 

Beyond Cut off Date

Amount Capitalised / Proposed to be capitalised

Justification Admitted Cost

(1) (2) (3) (4) (5) (6)

1 2009‐10 ABT EXPENSES 0.59Allowed As Per Parra 

18 (6) Of Tariff Regulations

2 2010‐11 0.00

3 2011‐12 Uprating Scheme for U#3 & 4 269.15

Increase in Gen Capacity by 2x10 MW, Life Extension by 15 Years, Improvement 

in PLF

4 2012‐13 Uprating Scheme for U#3 & 4 280.85

Increase in Gen Capacity by 2x10 MW, Life Extension by 15 Years, Improvement 

in PLF

5 2013‐14 0.00

TOTAL 0.00 550.59 0.00 0.00

 Note:

   

Statement of Additional Capitalisation after COD

UP RAJYA VIDYUT UTPADAN NIGAM LIMITED

PANKI

1 Fill the form in chronological order year wise along with detailed justification clearly bring out the necessity and the benefitsaccruing to the beneficiaries.2 In case initial spares are purchased alongwith any equipment, then the cost of such spares should be indicated separately.e.g. Rotor ‐ 50 Crs. Initial spares‐ 5 Crs.

Petitioner

Page 63: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

Name of the CompanyName of the Power Station

(Rs. Cr.)

Financial Year (Starting from COD)

2009­10 2010­11 2011­12 2012­13 2013­14 2009­10 2010­11 2011­12 2012­13 2013­14

1 2 3 4 5 6 7 8 9 10 11

Amount Captalized in Work/Equipment

0.59 269.15 280.85

Financing Details

PFC 214.15 225.85

Total Loan 214.15 225.85

Equity 55.00 55.00

Internal Resources 0.59

Others 0.00 0.00

Total 0.59 269.15 280.85

1 Year 1 refers to Financial Year of COD and Year 2, Year 3 etc. are the subsequent financial years respectively.2 Loan details for meeting the additional capitalisation requirement should be given as per FORM‐7 or 8 whichever is relevent.

Petitioner

PART­IFORM­ 10

Financing of Additional Capitalisation 

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

Actual Admitted

Page 64: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­ 11

Name of the CompanyName of the Power Station

(Rs Cr)Financial Year FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14

1 2 3 4 5 6 7 8 9 10

Depreciation on Capital Cost 5.73         5.74        6.13       6.15       6.23       6.25        6.25         15.94     26.05    

Depreciation on Additional CapitalisationAmount of Additional Capitalisation 0.14         11.16      0.07       1.66       0.59       ‐          269.15     280.85   ‐        Depreciation Amount 0.00         0.05        0.01       0.08       0.02       ‐          9.69         10.11     ‐        

Detail of FERVAmount of FERV on which depreciation charged ‐           ‐           ‐           ‐           ‐           ‐           ‐           ‐           ‐          Depreciation amount ‐           ‐          ‐         ‐         ‐         ‐          ‐           ‐         ‐        

‐           ‐          ‐         ‐         ‐         ‐          ‐           ‐         ‐        Depreciation Recoverered During the Year 5.73           5.79           6.13           6.23           6.25           6.25           15.94        26.05        26.05       

Advance against Depreciation recovered during the Year ‐           ‐           ‐           ‐           ‐           18.81      

Depreciation & Advance against Depreciation recovered during the year

5.73         5.79         6.13         6.23         6.25         6.25         15.94       26.05       44.85      

Cumulative Depreciation & Advance against Depreciation recovered upto the year

5.73        11.53      17.66      23.89      30.14      36.39      52.33      78.38      123.23  

Petitioner

Statement  of Depreciation

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

Page 65: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­ 12

Name of the CompanyName of the Power Station

(Rs Cr.)

Sl. No.

Name of the Assets

Dep Rates as per UPERC's Dep Rate Schedule 

Op. BalAdd­itions

Cl. Bal Dep. Op. BalAdd­itions

Cl. Bal Dep. Op. BalAdd­itions

Cl. Bal Dep. Op. BalAdd­itions

Cl. Bal Dep. Op. BalAdd­itions

Cl. Bal Dep. Op. BalAdd­itions

Cl. Bal Dep.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 251 LAND & LAND RIGHTS 0.00% 1.5         ‐     1.5                 ‐    1.5         1.5         ‐     1.5         1.5         ‐     1.5         1.5         ‐     1.5         1.5         ‐     1.5         1.5         ‐    2 LAND OWNED UNDER FULL TITLE 0.00% 0.1         ‐     0.1                 ‐    0.1         0.1         ‐     0.1         0.1         ‐     0.1         0.1         ‐     0.1         0.1         ‐     0.1         0.1         ‐    3 LAND HELD UNDER LEASE 0.00% ‐        ‐     ‐                ‐    ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐    4 BUILDINGS 3.60% 74.6      ‐     74.6            2.7  74.6      74.6      2.7      74.6      74.6      2.7      74.6      74.6      2.7      74.6      74.6      2.7      74.6      74.6      2.7     5 BLDGS‐THERMO‐ELECT.GENE.PLANT 3.60% ‐        ‐     ‐                ‐    ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐    6 OFFICE BUILDINGS 3.60% ‐        ‐     ‐                ‐    ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐    7 RESIDENTIAL COLONY FOR STAFF 3.60% ‐        ‐     ‐                ‐    ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐    8 OTHER BUILDING 3.60% ‐        ‐     ‐                ‐    ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐    9 HYDRAULIC WORKS 3.60% 3.4         ‐     3.4               0.1  3.4         3.4         0.1      3.4         3.4         0.1      3.4         3.4         0.1      3.4         3.4         0.1      3.4         3.4         0.1     10 OTHER CIVIL WORK 3.60% 7.0         ‐     7.0               0.3  7.0         0.6      7.6         0.3      7.6         7.6         0.3      7.6         7.6         0.3      7.6         7.6         0.3      7.6         7.6         0.3     11 PLANT & MACHINERY 3.60% 49.8      ‐     49.8            1.8  49.8      49.8      1.8      49.8      49.8      1.8      49.8      160.5   210.3    7.6      210.3    167.5     377.8    13.6   377.8    377.8    13.6  12 BOILER PLANT & EQUIPMENT 3.60% 22.1      ‐     22.1            0.8  22.1      22.1      0.8      22.1      22.1      0.8      22.1      71.2      93.3      3.4      93.3      74.3       167.6    6.0      167.6    167.6    6.0     13 TURBINE GEN. STEAM PWR GENE. 3.60% 3.0         ‐     3.0               0.1  3.0         3.0         0.1      3.0         3.0         0.1      3.0         9.7        12.7      0.5      12.7      10.1       22.8      0.8      22.8      22.8      0.8     14 AUXILIARIES IN STEAM PWR PLANT 3.60% 3.4         ‐     3.4               0.1  3.4         3.4         0.1      3.4         3.4         0.1      3.4         10.8      14.2      0.5      14.2      11.3       25.4      0.9      25.4      25.4      0.9     15 COAL HANDLING PLANT & HANDLG EQPT 3.60% 3.0         1.5      4.5               0.2  4.5         4.5         0.2      4.5         4.5         0.2      4.5         14.4      18.9      0.7      18.9      15.0       33.9      1.2      33.9      33.9      1.2     16 PLT‐FOUNDTN HYDEL PWR‐GENE‐PLT 3.60% ‐        ‐     ‐                ‐    ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐        ‐     ‐        ‐         ‐        ‐     ‐        ‐        ‐    17 TRANS PLT TRANFS RATING 100KVA 3.60% ‐        ‐     ‐                ‐    ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐        ‐     ‐        ‐         ‐        ‐     ‐        ‐        ‐    18 MATERIALS HANDLG EQPT‐EARTH HOVER 3.60% ‐        ‐     ‐                ‐    ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐        ‐     ‐        ‐         ‐        ‐     ‐        ‐        ‐    

Calculation of Depreciation Rate  

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

FY 2013­14Particulars FY 2008­09 FY 2009­10 FY 2010­11 FY 2011­12 FY 2012­13

19 SWITCH GEAR INCDG CABLE CONNTS 3.60% ‐        ‐     ‐                ‐    ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐        ‐     ‐        ‐         ‐        ‐     ‐        ‐        ‐    20 BATTERIES INCLU. CHARG EQPT 3.60% ‐        ‐     ‐                ‐    ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐        ‐     ‐        ‐         ‐        ‐     ‐        ‐        ‐    21 COMMU. EQPT TELEPH. & TELE 3.60% 0.0         0.0      0.0               0.0  0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.1        0.1         0.0      0.1         0.1          0.2         0.0      0.2         0.2         0.0     22 TOOLS & TACKLES 3.60% 0.2         0.0      0.2               0.0  0.2         0.2         0.0      0.2         0.2         0.0      0.2         0.5        0.6         0.0      0.6         0.5          1.2         0.0      1.2         1.2         0.0     23 OTHER MISC. EQPT. 3.60% 0.6         ‐     0.6               0.0  0.6         0.6         0.0      0.6         0.6         0.0      0.6         2.0        2.6         0.1      2.6         2.1          4.6         0.2      4.6         4.6         0.2     24 LINES CABLE NETWORK ETC. 3.60% 2.8         ‐     2.8               0.1  2.8         2.8         0.1      2.8         2.8         0.1      2.8         2.8         0.1      2.8         2.8         0.1      2.8         2.8         0.1     25 VEHICLES  0.00% 0.3         ‐     0.3                 ‐    0.3         0.3         ‐     0.3         0.3         ‐     0.3         0.3         ‐     0.3         0.3         ‐     0.3         0.3         ‐    26 VEHICLES 18.00% 0.0         ‐     0.0               0.0  0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0     27 HEAVY VEHICLES  18.00% ‐        ‐     ‐                ‐    ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐     ‐        ‐        ‐    28 JEEPS & MOTER CARS 18.00% 0.1         ‐     0.1               0.0  0.1         0.1         0.0      0.1         0.1         0.0      0.1         0.1         0.0      0.1         0.1         0.0      0.1         0.1         0.0     29 OTHERS VEHICLES 18.00% 0.0         0.2      0.2               0.0  0.2         0.2         0.0      0.2         0.2         0.0      0.2         0.2         0.0      0.2         0.2         0.0      0.2         0.2         0.0     30 FURNITURES & FIXTURES 0.00% 0.1         ‐     0.1                 ‐    0.1         0.1         ‐     0.1         0.1         ‐     0.1         0.1         ‐     0.1         0.1         ‐     0.1         0.1         ‐    31 FURNITURES & FIXTURES 6.00% 0.0         ‐     0.0               0.0  0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0     

32FURNITURES &  FIXTURES USED IN HOTEL RESTRNT. BORDING HOUSE , SCOL., COLL., LIB. & MEETING HALL

6.00% 0.0         ‐     0.0               0.0  0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0     

33 OFFICE EQPT 0.00% 0.2         ‐     0.2                 ‐    0.2         0.2         ‐     0.2         0.2         ‐     0.2         0.2         ‐     0.2         0.2         ‐     0.2         0.2         ‐    34 OFFICE EQPT. 6.00% 0.0         ‐     0.0               0.0  0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0     35 PHOTOSTAT MACH. 6.00% 0.0         ‐     0.0               0.0  0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0      0.0         0.0         0.0     36 COMPUTER 6.00% 0.1         0.0      0.1               0.0  0.1         0.1         0.0      0.1         0.1         0.0      0.1         0.1         0.0      0.1         0.1         0.0      0.1         0.1         0.0     37 OTHER 6.00% 0.0         0.0      0.1               0.0  0.1         0.1         0.0      0.1         0.1         0.0      0.1         0.1         0.0      0.1         0.1         0.0      0.1         0.1         0.0     

38 CAPITAL SPARES GENRATING STATIONS (95%) 3.60% 0.2         ‐     0.2               0.0  0.2         0.2         0.0      0.2         0.2         0.0      0.2         0.2         0.0      0.2         0.2         0.0      0.2         0.2         0.0     

TOTAL 172.5  1.7     174.2  6.2     174.2  0.6     174.8  6.2     174.8  ­    174.8  6.2     174.8  269.2  443.9  15.9  443.9  280.8   724.8  26.0  724.8  ­    724.8  26.0 

PETITIONER

Page 66: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­ 13

Name of the CompanyName of Power Station

(Rs Cr)

S. No Particulars  FY04   FY05   FY06   FY07   FY08   FY09   FY10   FY11   FY12   FY13   FY14 

1 2 3 3 4 5 6 7 8 9 10 11 121 Loan 1­ IDBI

Gross Loan Opening ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Cumlative repayments of loans upto previous year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Net Loan Opening 0.39         0.27         0.19         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Add:‐ Drawls during the year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Less:‐ Repayments during the year 0.12         0.08         0.19         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Net Loan Closing 0.27         0.19         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Average Net Loan 0.33         0.23         0.09         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Rate of Interest on Loan ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Interest on Loan 0.14         0.10         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

2 Loan 2­ HUDCO

Gross Loan Opening ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Cumlative repayments of loans upto previous year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Net Loan Opening ‐            ‐            1.29         2.35         1.68         1.01         0.34         ‐            ‐            ‐            ‐           

Add:‐ Drawls during the year ‐            1.29         1.24         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Less:‐ Repayments during the year ‐            ‐            0.17         0.67         0.67         0.67         0.34         ‐            ‐            ‐            ‐           

Net Loan Closing ‐            1.29         2.35         1.68         1.01         0.34         ‐            ‐            ‐            ‐            ‐           

Average Net Loan ‐            0.64         1.82         2.02         1.34         0.67         0.17         ‐            ‐            ‐            ‐           

Rate of Interest on Loan ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Interest on Loan ‐            0.02         0.13         0.20         0.15         0.09         0.03         ‐            ‐            ‐            ‐           

3 Loan 3­ PUBLIC BONDS

Gross Loan Opening ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Cumlative repayments of loans upto previous year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Net Loan Opening 7.58         6.52         6.52         6.52         6.51         5.46         3.84         2.10         1.05         ‐            ‐           

Add:‐ Drawls during the year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Less:‐ Repayments during the year 1.05         ‐            ‐            0.01         1.05         1.62         1.74         1.05         1.05         ‐            ‐           

Net Loan Closing 6.52         6.52         6.52         6.51         5.46         3.84         2.10         1.05         ‐            ‐            ‐           

Average Net Loan 7.05         6.52         6.52         6.52         5.98         4.65         2.97         1.58         0.53         ‐            ‐           

Rate of Interest on Loan ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Interest on Loan 0.85         0.77         0.77         0.77         0.71         0.52         0.33         0.18         0.10         ‐            ‐           

4 Loan 4­ CEA

Gross Loan Opening ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Cumlative repayments of loans upto previous year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Net Loan Opening 0.25         0.17         0.06         0.01         0.00         0.00         0.00         0.00         0.00         0.00         0.00        

Add:‐ Drawls during the year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Less:‐ Repayments during the year 0.08         0.08         0.05         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Less:‐ Tranfer to restructuring account ‐            0.03         ‐            0.01         ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Net Loan Closing 0.17         0.06         0.01         0.00         0.00         0.00         0.00         0.00         0.00         0.00         0.00        

Average Net Loan 0.09         0.03         0.01         0.00         0.00         0.00         0.00         0.00         0.00         0.00         0.00        

Rate of Interest on Loan ‐            ‐            ‐            0.00E+00 ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Interest on Loan 0.17         0.18         0.18         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

Calculation of Weighted Average Rate of Interest on Actual Loans

Page 67: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­ 13

Name of the CompanyName of Power Station

(Rs Cr)

S. No Particulars  FY04   FY05   FY06   FY07   FY08   FY09   FY10   FY11   FY12   FY13   FY14 

1 2 3 3 4 5 6 7 8 9 10 11 12

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

Calculation of Weighted Average Rate of Interest on Actual Loans

5 Loan 5­ LIC

Gross Loan Opening ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Cumlative repayments of loans upto previous year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Net Loan Opening 6.48         5.32         3.32         2.34         1.99         ‐            ‐            ‐            ‐            ‐            ‐           

Add:‐ Drawls during the year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Less:‐ Repayments during the year 1.17         1.99         0.99         0.87         1.99         ‐            ‐            ‐            ‐            ‐            ‐           

Less:‐ Tranfer to restructuring account ‐            ‐            ‐            (0.53)        ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Net Loan Closing 5.32         3.32         2.34         1.99         ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Average Net Loan 2.66         1.66         1.17         1.00         ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Rate of Interest on Loan ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Interest on Loan 6.10         7.03         8.08         9.31         0.24         ‐            ‐            ‐            ‐            ‐            ‐           

6 Loan 6­ UP Govt.

Gross Loan Opening ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Cumlative repayments of loans upto previous year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Net Loan Opening 9.12         11.96       13.96       5.52         5.52         5.52         5.52         5.52         5.52         5.52         5.52        

Add:‐ Drawls during the year 2.84         2.00         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Less Repayments during the year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Less:‐ Converted into Equity ‐            ‐            8.44         ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Net Loan Closing 11.96       13.96       5.52         5.52         5.52         5.52         5.52         5.52         5.52         5.52         5.52        

Average Net Loan 7.40         7.98         2.76         2.76         2.76         2.76         2.76         2.76         2.76         2.76         2.76        

Rate of Interest on Loan ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Interest on Loan 0.84         0.94         0.95         0.98         1.00         0.89         0.96         0.96         0.96         0.96         0.96        

7 Loan 7­ PFC(Project Specific)

Gross Loan Opening ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Cumlative repayments of loans upto previous year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Net Loan Opening ‐            0.68         1.50         8.51         13.65       12.21       10.77       9.34         183.90    358.46    434.03   

Add:‐ Drawls during the year ‐            0.83         7.01         5.50         ‐            ‐            ‐            176.00    176.00    88.00       ‐           

Less Repayments during the year ‐            0.02         ‐            0.36         1.44         1.44         1.44         1.44         1.44         12.44       45.44      

Net Loan Closing ‐            1.50         8.51         13.65       12.21       10.77       9.34         183.90    358.46    434.03    388.59   

Average Net Loan ‐            1.09         5.00         11.08       12.93       11.49       10.06       96.62       271.18    396.25    411.31   

Rate of Interest on Loan ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Interest on Loan ‐            0.05         0.35         0.95         0.93         0.83         0.79         0.68         2.26         41.67       50.90      

8 Loan 7­ PFC(Allocation)

Gross Loan Opening ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Cumlative repayments of loans upto previous year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Net Loan Opening ‐            ‐            ‐            ‐            ‐            12.61       11.35       10.09       8.83         7.56         6.30        

Add:‐ Drawls during the year ‐            ‐            ‐            ‐            12.61       ‐            ‐            ‐            ‐            ‐            ‐           

Less Repayments during the year ‐            ‐            ‐            ‐            ‐            1.26         1.26         1.26         1.26         1.26         1.26        

Net Loan Closing ‐            ‐            ‐            ‐            12.61       11.35       10.09       8.83         7.56         6.30         5.04        

Average Net Loan ‐            ‐            ‐            ‐            6.30         11.98       10.72       9.46         8.20         6.93         5.67        

Rate of Interest on Loan ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Interest on Loan ‐            ‐            ‐            ‐            0.03         1.39         1.27         1.12         0.98         0.82         0.67        

Page 68: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­ 13

Name of the CompanyName of Power Station

(Rs Cr)

S. No Particulars  FY04   FY05   FY06   FY07   FY08   FY09   FY10   FY11   FY12   FY13   FY14 

1 2 3 3 4 5 6 7 8 9 10 11 12

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

Calculation of Weighted Average Rate of Interest on Actual Loans

Page 69: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­ 13

Name of the CompanyName of Power Station

(Rs Cr)

S. No Particulars  FY04   FY05   FY06   FY07   FY08   FY09   FY10   FY11   FY12   FY13   FY14 

1 2 3 3 4 5 6 7 8 9 10 11 12

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

Calculation of Weighted Average Rate of Interest on Actual Loans

9 Total Loan to this Project

Gross Loan Opening ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Cumlative repayments of loans upto previous year ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Net Loan Opening 23.82       24.92       26.84       25.26       29.36       36.81       31.82       27.05       199.30    371.55    445.86   

Add:‐ Drawls during the year 2.84         4.12         8.24         5.50         12.61       ‐            ‐            176.00    176.00    88.00       ‐           

Less Repayments during the year 2.42         2.17         1.39         1.92         5.16         4.99         4.77         3.75         3.75         13.70       46.70      

Less:‐ Converted into Equity/Tranfer to Restructuring ‐            0.03         8.44         (0.51)        ‐            ‐            ‐            ‐            ‐            ‐            ‐           

Net Loan Closing 24.24       26.84       25.26       29.36       36.81       31.82       27.05       199.30    371.55    445.86    399.16   

Average Net Loan 24.03       25.88       26.05       27.31       33.08       34.31       29.44       113.18    285.43    408.70    422.51   

Rate of Interest on Loan

Interest on Loan 8.10         9.08         10.46       12.21       3.07         3.72         3.37         2.94         4.29         43.45       52.53      

Petitioner

Page 70: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

Calculation of  Interest on Loans

Name of the CompanyName of the Power Station

(Rs Cr)Particulars 2003­04 2004­05 2005­06 2006­07 2007­08 2008­09 2009­10 2010­11 2011­12 2012­13 2013­14

1 2 3 4 5 6 7 8 9 10 11 12

1.Gross loan ‐ Opening ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            2.Cumulative repayments of Loans upto previous  ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            3.Net loan ‐ Opening ( 1 ‐ 2 ) 23.82        24.92        26.84        25.26        29.36        36.81        31.82        27.05        199.30      371.55      445.86     4.Increase/Decrease due to ACE during the Year 2.84           4.12           8.24           5.50           12.61        ‐             ‐             176.00      176.00      88.00        ‐            5.Repayments of Loans during the year 2.42           2.17           1.39           1.92           5.16           4.99           4.77           3.75           3.75           13.70        46.70       6.Converted into Equity/Tranfer to Restructuring ‐             0.03           8.44           (0.51)         ‐             ‐             ‐             ‐             ‐             ‐             ‐            7.Net loan ‐ Closing ( 3+ 4 ‐ 5‐6) 24.24        26.84        25.26        29.36        36.81        31.82        27.05        199.30      371.55      445.86      399.16     8.Average Net Loan ( (3 + 7 ) * 0.5 ) 24.03        25.88        26.05        27.31        33.08        34.31        29.44        113.18      285.43      408.70      422.51     9.Weighted average Rate of Interest on Loans 10.Interest on loan 8.10           9.08           10.46        12.21        3.07           3.72           3.37           2.94           4.29           43.45        52.53       

Petitioner

PART­IFORM­ 13A

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

Page 71: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­ 14

Name of the CompanyName of the Power Station

(Rs Cr)

Particulars 2009­10 2010­11 2011­12 2012­13 2013­14

1 3 4 5 6 7

1/10th of the Loan(s) 44.00        44.00        44.00        44.00        44.00       Repayment of the Loan(s) asconsidered for working out Intereston Loan

‐             ‐             ‐             11.00        44.00       

Minimum  of the Above ‐             ‐             ‐             11.00        44.00       Less:Depreciation during the year ­            ­            0.81          15.59       19.80      (A1) ­            ­            ­            ­            24.20      

Cumulative Repayment of theLoan(s) as considered for workingout Interest on Loan

‐             ‐             ‐             11.00        55.00       

Less: Cumulative Depreciation  ‐             ‐             0.81           16.39        36.19       (B1)  ­            ­            ­            ­            18.81      Advance Against Depreciation(Minimum of A & B) ­            ­            ­            ­            18.81      

1 If the amount is negative, it will be shown as zero.

Petitioner

Calculation of Advance Against Depreciation (AAD)

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

For the purpose of Calculating AAD,  Annual Depreciation has been pro‐rated accordingly with respect to the proposed dates of Commissioning of the Units being under schemes of R&M/Refurbishment/Up‐rating. For this thermal power station a Up‐Rating scheme of RS. 550 Cr. has been proposed for U#3 & 4 (110 MW each). Of the above mentioned Units: U#3 is to be Commissioned in Mar‐12 & U#4 is to be Commissioned in Sep‐12

Page 72: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­ 15

Name of the Company

Name of the Power Station

(Rs Cr)Sl. No.

ParticularsExisting 2008­09

2009­10 2010­11 2011­12 2012­13 2013­14

1 2 3 4 5 6 7 8

1 Cost of Coal 35.39            37.03            39.16            44.35            49.98            53.62           

2 Cost of Secondary Fuel Oil 1.33               1.13               1.16               1.27               1.38               1.43              

3 Fuel Cost ‐                ‐                ‐                ‐                ‐                ‐               

4 Liquid Fuel Stock ‐                ‐                ‐                ‐                ‐                ‐               

5 O & M expenses  9.89               6.63               7.03               7.89               8.84               9.37              

6 Maintenance Spares  23.74            15.91            16.87            18.95            21.21            22.48           

7 Recievables 62.21            57.03            60.05            70.79            88.66            98.38           

Total Working Capital 132.55 117.74 124.26 143.25 170.08 185.28

Rate of Interest  12.75% 12.25% 12.25% 12.25% 12.25% 12.25%

Interest on Working Capital  16.90 14.42 15.22 17.55 20.83 22.70

1For Coal bsaed generating stations

3 submit documentary evidence

Petitioner

Calculation of Interest on Working Capital 

2For Gas Turbine/Combined Cycle generating stations duly taking into account the mode of operation on gas fuel and liquid fuel

PANKI

UP RAJYA VIDYUT UTPADAN NIGAM LIMITED

Page 73: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­ 16

Name of the CompanyName of the Power Station

(Rs. Cr.)Draw Down

Particulars

Quantum in Foreign currency

Exchange Rate on draw down date

Amount in Indian Rupee

Quantum in Foreign currency

Exchange Rate on draw down date

Amount in Indian Rupee

Quantum in Foreign currency

Exchange Rate on draw down date

Amount in Indian Rupee

1 Loans1 Foreign Loans

1.1.1 Foreign Loan 1Draw down Amount IDCFinancing charges

1.1.2 Foreign Loan 2Draw down Amount IDCFinancing charges

1.1.3 ‐ ‐

1.1.4 ‐ ‐

1 Total Foreign LoansDraw down Amount IDCFinancing charges

1 Indian Loans

1.2.1 Indian Loan 1Draw down Amount ‐‐IDC ‐‐Financing charges ‐‐

1.2.2 Indian Loan 2Draw down Amount ‐‐IDC ‐‐Financing charges ‐‐

1.2.3 Indian Loan 3Draw down Amount ‐‐IDC ‐‐Financing charges ‐‐

1.2.4 ‐ ‐ ‐‐

1 Total Indian LoansDraw down Amount ‐‐IDC ‐‐Financing charges ‐‐

1 Total of Loans drawn IDCFinancing charges

2 Equity

2 Foreign equity drawn

2 Indian equity draw ‐‐ ‐‐ ‐‐ ‐‐ ‐‐ ‐‐

Total equity deployed

UP RAJYA VIDYUT UTPADAN NIGAM LIMITED

PETITIONER

PANKI

Note: Drawal of debt and equity shall be on paripassu basis to meet the commissioning schedule.  Drawal of higher equity in the beginning is permissible.

Draw Down Schedule for Calculation of IDC & Financing Charges

Sl. No.

Quarter 1 Quarter 2 Quarter n (COD)

NIL

Page 74: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

Name of the Company

Name of the Power Station

( Rs. Cr)

Particulars 2003­04 2004­05 2005­06 2006­07 2007­08   2008­09 2009­10 2010­11 2011­12 2012­13 2013­14

Audited Audited Audited Audited Audited Average Base

1 2 3 4 5 6 7 8 9 10 11 12 13

O&M data 

(Base O&M on the basis of actual data)A) Total O&M Expenses 53.49         55.30         59.30         60.65         98.44         65.43         85.81         66.84         70.67         80.04         90.26         95.43        

Repair & Maintenance Expenses 10.37          13.94          15.40          13.85          47.99          20.31          27.53          21.45          22.67          25.68          28.96          30.62         Administration & General Expenses 5.01            5.50            5.98            6.06            7.32            5.97            8.71            6.78            7.17            8.12            9.16            9.69           Employee Cost 33.92          31.43          32.51          35.52          36.41          33.96          39.35          30.65          32.40          36.70          41.39          43.76         Other Fuel Related Cost 3.79            4.14            5.07            4.68            6.17            4.77            9.48            7.39            7.81            8.85            9.98            10.55         Corporate office expenses allocation 0.40            0.29            0.34            0.53            0.55            0.42            0.74            0.57            0.61            0.69            0.78            0.82           

B) Abnormal O&M expenses*C) Arrears of Pay Revision 32.88         D) Yearly  Pay Revision Impact 12.71          13.66          14.69          15.79          16.98         E) Calculation of Base O&M (A­B+C+D)

53.49         55.30         59.30         60.65         98.44         65.43         118.69      79.55         84.33         94.73         106.06      112.40     

Petitioner

Tariff Period

PANKI

PART­I

FORM­17

Calculation of Operation & Maintenece Expenses

UP RAJYA VIDYUT UTPADAN NIGAM LIMITED

Page 75: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

Name of the CompanyName of the Power Station

( Rs. Cr)ITEMS FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14

1 2 3 4 5 6 7 8 9 10 11 12(A) Breakup of O&M expenses1 Consumption of Stores and Spares

Fuel Related Cost 2.0             2.4             3.4             2.7             2.9             5.3             4.1             4.4             5.0             5.6             5.9            Freight Variance on Coal Receipts ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Stock Shortages on Fuel Stock ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Cost of Water 0.6             0.6             0.6             0.7             0.6             0.8             0.6             0.6             0.7             0.8             0.8            Lubricants & Consumables 0.7             0.6             0.4             0.6             1.7             2.2             1.7             1.8             2.0             2.3             2.4            Station Supplies 0.5             0.5             0.7             0.8             0.9             1.3             1.0             1.0             1.2             1.3             1.4            Sub­Total (Consumption of Stores & Spares)

3.8            4.1            5.1            4.7            6.2            9.5            7.4            7.8            8.8            10.0         10.5        

2 Repair and MaintenancePlant and Machinery 9.0             12.3          13.3          12.0          45.9          24.7          19.3          20.4          23.1          26.0          27.5         Buildings 1.3             1.6             2.1             1.8             2.1             2.7             2.1             2.2             2.5             2.9             3.0            Civil Works 0.0             0.0             ‐            ‐            ‐            0.0             0.0             0.0             0.0             0.0             0.0            Hydaulic Works ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Lines, Cables, networks etc 0.0             0.0             0.0             0.0             0.0             0.0             0.0             0.0             0.0             0.0             0.0            Vehicles ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Furniture and Fixtures 0.0             0.0             0.0             0.0             0.0             0.0             0.0             0.0             0.0             0.0             0.0            Office Equipments ‐            0.0             ‐            ‐            0.0             0.0             0.0             0.0             0.0             0.0             0.0            R&M Charged to Capital Account ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Sub­Total (R & M Expenses) 10.4         13.9         15.4         13.9         48.0         27.5         21.4         22.7         25.7         29.0         30.6        

3 Administrarive ExpensesRent ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Rates and Taxes 0.2             0.2             0.2             0.2             0.2             0.2             0.1             0.2             0.2             0.2             0.2            Insurance 0.0             0.0             0.1             0.1             0.0             0.0             0.0             0.0             0.0             0.0             0.0            Telephone, Telex and Postage 0.0             0.1             0.1             0.1             0.1             0.2             0.1             0.1             0.1             0.2             0.2            Professional Charges 0.0             0.0             0.0             0.2             0.2             0.2             0.2             0.2             0.2             0.2             0.2            Conveyance and Travelling 0.2             0.2             0.1             0.3             0.3             0.2             0.2             0.2             0.2             0.2             0.2            Printing and Stationery 0.1             0.1             0.1             0.1             0.1             0.1             0.1             0.1             0.1             0.1             0.1            Advertisement Expenses ‐            ‐            ‐            ‐            0.1             0.2             0.1             0.1             0.2             0.2             0.2            Electricity Charges 0.7             0.6             0.6             0.2             0.8             0.9             0.7             0.7             0.8             0.9             1.0            Water Charges 0.1             ‐            0.2             0.2             0.1             0.2             0.1             0.1             0.1             0.2             0.2            Entertainment ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Security (CISF Payments) 3.6             4.2             4.5             4.8             5.1             6.5             5.1             5.3             6.1             6.8             7.2            Other Expenses 0.1             0.1             0.1             0.1             ‐            ‐            ‐            ‐            ‐            ‐            ‐           Miscellaneous Expenses ‐            ‐            ‐            ‐            0.1             0.1             0.1             0.1             0.1             0.1             0.1            Vehicle Suspense Account ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Expenses charged to Capital ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Sub­Total (Administrative Expenses) 5.0            5.5            6.0            6.1            7.3            8.7            6.8            7.2            8.1            9.2            9.7           

4 Employee CostSalaries 14.5          13.7          13.1          18.1          17.4          17.6          13.7          14.5          16.4          18.5          19.6         Overtime 1.8             2.0             1.7             1.2             1.1             1.2             0.9             1.0             1.1             1.3             1.3            DA 8.4             8.5             8.2             6.3             7.3             9.5             7.4             7.8             8.9             10.0          10.6         Other Allowances 1.9             1.7             1.6             1.6             1.7             2.5             2.0             2.1             2.4             2.7             2.8            Bonus ‐            0.3             0.3             0.3             0.3             0.3             0.3             0.3             0.3             0.3             0.4            Other Staff Costs 2.9             0.9             3.5             3.4             3.6             2.6             2.0             2.1             2.4             2.7             2.9            Staff Welfare 0.1             0.1             0.1             0.1             0.3             0.3             0.2             0.3             0.3             0.3             0.3            Terminal Benefits 4.4             4.2             4.0             4.6             4.6             5.3             4.1             4.3             4.9             5.5             5.9            Employee Costs Charged to Capital ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           Sub­Total (Employees Cost) 33.9         31.4         32.5         35.5         36.4         39.3         30.6         32.4         36.7         41.4         43.8        

5 Corporate office expenses allocation 0.4             0.3             0.3             0.5             0.5             0.7             0.6             0.6             0.7             0.8             0.8            6 Total (1 to 7) 53.5         55.3         59.3         60.6         98.4         85.8         66.8         70.7         80.0         90.3         95.4        

LESS: Recovered ,  if anyA) Net Expenses 53.5         55.3         59.3         60.6         98.4         85.8         66.8         70.7         80.0         90.3         95.4        

Salaries (before15.01.2000) 1.6             6.6             7.1             8.9             9.6             10.3          11.1          11.9          12.8         Salaries (after15.01.2000) 0.2             0.6             0.6             0.8             0.9             1.0             1.1             1.1             1.2            Pension & Gratuity (@19.08%) 0.3             1.3             1.3             1.7             1.8             2.0             2.1             2.3             2.4            CPF (@10%) 0.0             0.1             0.1             0.1             0.1             0.1             0.1             0.1             0.1            Salary of CISF Personnel 0.2             0.6             0.6             0.3             0.3             0.3             0.3             0.3             0.4            

B) Total 2.3            9.1            9.7            11.8         12.7         13.7         14.7         15.8         17.0        

Grand Total  ­ O&M Expenses 53.49      55.30      61.56      69.75      108.13    97.64      79.55      84.33      94.73      106.06    112.40   Total Petitioned O&M Expenses in MYT Petition

32.9         79.6         84.3         94.7         106.1      112.4     

Note: Corporate Expenses have been allocated among generating stations based on GFA balances

PETITIONER

PART­IFORM­18 Details of Operation & Maintenance Expenses

UP RAJYA VIDYUT UTPADAN NIGAM LIMITEDPANKI

Yearly Impact due to Pay RevisionArrears of Pay Revision

Page 76: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IFORM­19

COAL

Name of the CompanyName of the Power Station 

Sl. No.

Month Unit Jan­09 Feb­09 Mar­09

1 Quantity of Coal/ supplied by Coal Company (MT)              117,500                 89,083               111,624 

2 Adjustment (+/‐) in quantity supplied made byCoal Company (MT)                   2,717                 17,577                 12,683 

3 Coal supplied  by Coal  Company (1+2) (MT)              120,217               106,660               124,307 

4 Normative Transit & Handling Losses (For coalbased Projects) (MT)                      962                       853                       994 

5 Net coal /  Supplied (3‐4) (MT)              119,256               105,806               123,312 6 Amount charged by the Coal Company (Rs.)     158,961,462      129,173,607      153,102,867 

7 Adjustment (+/‐) in amount charged made by Coal/Company (Rs.)          5,200,192         23,211,177         18,529,558 

8 Total amount Charged (6+7) (Rs.)     164,161,654      152,384,785      171,632,426 

9 Transportation charges by rail/ship/road transport ( Rs.)        68,671,064         73,183,787         84,663,492 

10 Adjustment (+/‐) in amount charged made byRailways/Transport Company ( Rs.)        30,344,231         19,996,514         26,082,394 

11 Demurrage Charges, if any ( Rs.)          1,472,800           2,002,500           2,675,500 

12 Cost of diesel in transporting coal through MGRsystem, if applicable ( Rs.)                         ‐   

13 Total Transportation Charges (9+/‐10‐11+12) ( Rs.)        97,542,495         91,177,800      108,070,387 

14 Total amount Charged for coal/ supplied includingTransportation (8+13) ( Rs.)     261,704,149      243,562,585      279,702,813 

15 Average Landed Cost of Coal Rs/MT                   2,194                    2,302                    2,268 16 Weighted average GCV of coal/  as fired (kCal/Kg                   3,471                    3,418                    3,439 

Petitioner

Details/Information to be Submitted in respect of Fuel for Computation of Energy Charges

PANKIUP RAJYA VIDYUT UTPADAN NIGAM LIMITED

Page 77: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

PART­IIFORM­19

OIL

Name of the Company

Name of the Power Station 

Sl. No.

Month Unit Jan­09 Feb­09 Mar­09

1 Quantity of Oil supplied by  Oil Company ( KL )                   120                    192                    336 

2 Adjustment(+/‐) in quantity supplied made by OilCompany ( KL )                      ‐   

3 Oil supplied by Oil Company (1+2) ( KL )                   120                    192                    336 

4 Normative Transit & Handling Losses (ForCoal/Lignite based Projects) ( KL )                      ‐   

5 Net Oil Supplied (3‐4) ( KL )                   120                    192                    336 

6 Amount charged by the Oil Company ( Rs.)       4,216,190        6,738,212      11,007,832 

7 Adjustment(+/‐) in amount charged made by OilCompany ( Rs.)                      ‐   

8 Total amount Charged (6+7) ( Rs.)       4,216,190        6,738,212      11,007,832 

9 Transportation charges by rail / ship /roadtransport ( Rs.)                      ‐   

10 Adjustment (+/‐) in amount charged made byRailways/Transport Company ( Rs.)                      ‐   

11 Demurrage Charges, If any ( Rs.)                      ‐   

12 Cost of diesel in transporting Oil through MGRsystem, if applicable ( Rs.)                      ‐   

13 Total Transportation Charges (9+/‐10‐11+12) ( Rs.)                       ‐                          ‐                         ‐   Others

14 Railway Siding Charges ( Rs.)                      ‐   

15 Total amount Charged for Oil supplied includingTransportation  (8+13) ( Rs.)       4,216,190        6,738,212      11,007,832 

16 Weighted average GCV of Oil as fired (kCal/Ltr)

               8,863                 8,860                 9,440 17 Weighted average cost of Oil Rs./KL             35,135              35,095              32,761 

Petitioner

Details/Information to be Submitted in respect of Fuel for Computation of Energy Charges

UP RAJYA VIDYUT UTPADAN NIGAM LIMITED

PANKI

Page 78: PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF … · PANKI _MYT Petition for Determination of Tariff PANKI TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009‐10 TO

FORM­20

 Name of the Company  Name of the Power Station 

Description  Unit  2009­10 2010­11 2011­12 2012­13 2013­14Capacity  MW  210 210 225 240 240PLF  % 60% 61% 62% 63% 65%Gross Station Heat Rate Kcal/kWh  3100 3070 3040 3010 2980Auxiliary Energy Consumption  % 11.0% 10.8% 10.6% 10.2% 9.8%Energy Generation ‐ Gross MU 1,104            1,122            1,222            1,325            1,367           Auxiliary Energy Consumption  MU 121                121                130                135                134               Ex‐bus Energy Sent Out MU 982                1,001            1,092            1,189            1,233           Specific Oil Consumption ml/kWh 2.5                 2.4                 2.3                 2.2                 2.1                Wt. Avg. GCV of Oil  KCal/Lt 9,440            9,440            9,440            9,440            9,440           Price of Oil  Rs./KL 32,761          34,399          36,119          37,925          39,822         Wt. Avg. GCV of Coal  kCal/kg 3444 3444 3444 3444 3444Price of Coal  Rs./MT  2253 2366 2484 2608 2739Heat Contribution from SFO Kcal/kWh  24 23 22 21 20Oil Consumption KL 2759 2693 2811 2914 2870Heat Contribution from Coal Kcal/kWh  3076 3047 3018 2989 2960Specific Coal Consumption kg/kWh 0.89 0.88 0.88 0.87 0.86Coal Consumption MMT 0.99               0.99               1.07               1.15               1.17              Total Cost of Oil Rs Cr 9.04               9.26               10.15            11.05            11.43           Total Cost of Coal Rs Cr 222.18          234.94          266.08          299.90          321.74         Total Fuel Cost Rs Cr 231.22          244.21          276.23          310.95          333.16         Rate of Energy Charge from Secondary Fuel Oil ex‐bus Paise/kWh  9.20 9.26 9.29 9.29 9.27

Rate of Energy Charge from Coal ex‐bus Paise/kWh  226.18 234.72 243.56 252.14 261.01Rate of Energy Charge ex‐bus per kWh   Paise/kWh  235.38 243.97 252.85 261.43 270.29

Petitioner

Computation of Energy Charges(Additional form)

UPRVUNLPanki


Recommended