CHAMPAIGN PARK DISTRICT Champaign Park District 706 Kenwood Road Champaign, IL 61821 (217) 819-3821 www.champaiRnparkdistrict.com REQUEST FOR PROPOSALS Construction Manager The Champaign Park District is seeking a construction manager to coordinate and supervise the renovation of the The Bicentennial Center. The Bicentennial Center is located at 2112 Sangamon Drive Champaign, IL 61821. The recreation center has approximately 12,500 square feet of usable space. Page 1 of 9
Transcript
Page 1: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

CHAMPAIGNPARK DISTRICT

Champaign Park District

706 Kenwood Road

Champaign, IL 61821

(217) 819-3821www.champaiRnparkdistrict.com

REQUEST FOR PROPOSALS

Construction Manager

The Champaign Park District is seeking a construction manager to coordinate and supervise the

renovation of the The Bicentennial Center. The Bicentennial Center is located at 2112 Sangamon Drive

Champaign, IL 61821. The recreation center has approximately 12,500 square feet of usable space.

Page 1 of 9

Page 2: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

CHAMPAIGNPARK DISTRICT Request for Proposal: Construction Manager

1. General Scope of Project

The Champaign Park District is accepting proposals for construction manager to coordinate and

supervise the renovation of the Champaign Park District's Bicentennial Center.

The Bicentennial Center is currently being utilized as a batting cage facility but a need has arisen to

covert the facility into a recreation center for Champaign-Urbana Special Recreation and other

recreation programs offered by the Champaign Park District.

2. Project Description

The Champaign Park District is seeking a construction manager for the renovation of the Bicentennial

Recreation Center. The Bicentennial Center is located at 2112 Sangamon Drive Champaign, IL 61821. The

recreation center has approximately 12,500 square feet of usable space.

The Bicentennial Center has 12,500 square feet of space which includes one full-size gym, office space,

one small activity room, restrooms and storage space. The Bicentennial Center shares parking space

with the Sholem Aquatic Center, the Leonhard Recreation Center and the Champaign School District's

Jefferson Middle School.

Pre-construction Bidding and Negotiations

Results and Deliverables

• Assist in development of design documents program with respect to requirements of

governmental agencies having jurisdiction and utilities and advise on cost impact of these

requirements

• Assist the selected architect in the preparation of the "front end" bid documents including

General and Special Conditions, contract formats, and scope definitions

• Assist the architect on drawings and permits needed for the selected Design Program

• Assist in developing bid packages to cover complete scope of project, including unit pricing

requests and alternate pricing

• Develop a recommended trade contractor bidders list for each component of work and submit

to the project team for review and approval. Pre-qualify four trade contract bidders according to

work capacity and quality• Solicit, receive and analyze trade bids

• Report bids in tabulation form to the project team, along with recommendation for award

• Assist the project team with subcontracts and other required procurement processes

• Award work upon receipt of project team approval

• Compare and adjust line items of project budget to reflect firm pricing received and bidpackages awarded, and to maintain adherence to overall project budget

• Prepare cost estimates at 50%CD, 95%CD, and 100%CD

Page 2 of 9

Page 3: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

CHAMPAIGNPARK DISTRICT Request for Proposal: Construction Manager

Construction Phase: Construction Management Service

Results and Deliverables

® Develop project specific safety and site logistics programs.

« Provide a Project Management team to oversee all aspects of the construction on site and the

administration required.

® Provide planning, scheduling and coordination of all activities to facilitate the completion of thework in accordance with the contract documents and the project team occupancy requirements.

a Provide for the distribution of the project documents and for the receipt, review, logging, and

distribution of shop drawings, catalogs, samples, and other pertinent documents. Maintain

necessary coordination with the architect, consultants, and the trade contractors in order to

procure or expedite approvals.

8 Continuously review work in place for adherence to the quality standards set forth by the

project documents.

a Record and monitor costs in order to provide for proper disbursements and cost accounting in

accordance with the project team requirements. Review the progress reports provided by each

trade contractor, and applications for progress payments and final payments. Certify to the

project team that the progress of the work is as stated in the reports for purposes of payment

under the terms of each trade contractor.

• Expedite the issuance of Building Permits, Certificate of Substantial Completion, and Certificate

of Occupancy.

• Assist in coordinating state and local agency review as necessary for occupancy.

• Prepare a punch list with the Project Team and supervise completion of same.

• Assist the Project Team in coordinating the move-in and occupancy.

• Coordinate all 0/M manuals, warranties, and close out documents.

Project Timeline1. Contract with AE and CM2. Design and submit for permit

3. Bid, contract, and receive permit

4. Construction

5. Occupancy

6. Move in

7. CD Special Recreation Programming

December 2019February 2020April 2020May 15, 2020 to November 15,2020November 15, 2020

November 15 to December 1, 2020

December 2020

3. Selection & Award Process

Champaign Park District staff will review all the proposals and rank the companies or individualsaccordingly based on the award criteria, which are detailed below. Award criteria includes, but is not

limited to:

• Qualifications of company, organization, and individual as a construction manager company or

individual. (50%)• Listing of previous successes as a construction manager of similar projects. (40%)

• References (minimum of three letters of reference detailing previous experience as a

construction manager company or individual. (10%)

Page 3 of 9

Page 4: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

CHAMPAIGNPARK DISTRICT Request for Proposal: Construction Manager

4. Submission Process, Due Date & Required Documents

A total of four copies (one original and three copies) of the response, including all required forms andsupporting documentation, must be addressed and delivered to the address listed below, which is the

address to be used for all communication in connection with this project:

Cindy Harvey, Assistant to the Executive Director

Champaign Park District706 Kenwood RoadChampaign, IL 61821

Proposals must be received no later than 2 p.m. on Monday, November 11, 2019. Responses received

later than the stated date and time above will be rejected and returned unopened.

Inquiries:

Questions and comments regarding this solicitation should be directed to Joe DeLuce, Executive Director, by

calling 217-398-2550 xl21 or email: [email protected]. Written answers to questions of a

general nature or which would affect the solicitation will be provided to all eligible bidders. Only written

answers to the questions shall be binding.

5. Schedule for Selection Process

The following is the schedule for the selection process:a. Responses are due no later than 2 p.m. on Monday, November 11, 2019.

b. Board approval is expected on November 13, 2019.

c. Contract is expected to be executed by November 20, 2019.

d. Facility is expected to be available for occupation on November 15, 2020.

6. Insurance Requirements & Quality Assurance

At the time an agreement is signed, successful proposer must provide proof of insurance as listed below.

Please note that all limits of liability for insurance shall be not less than the following amounts, and mustbe greater where required by other laws or regulations and must be insured on an "occurrence" basis

and not on a "claims made" basis:

a. Workmen's Compensation:

• State Statutory

• Applicable Federal Statutory

b. Comprehensive General Liability:

• Bodily Injury (including completed operation and products liability) and PropertyDamage: $2,000,000 Each Occurrence $2,000,000 Annual Aggregate or a combined

single limit of $2,000,000• Property damage liability insurance will provide Explosion, Collapse and Underground

coverages where applicable.

Page 4 of 9

Page 5: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

CHAMPAIGNPARK DISTRICT Request for Proposal: Construction Manager

» Contractual Liability (Hold Harmless Coverage): Bodily Injury: $2,000,000• Each Occurrence Property Damage: $2,000,000

® Each Occurrence $2,000,000 Annual Aggregate

c. Comprehensive Automobile Liability:

« Bodily Injury: $2,000,000 Each Person $2,000,000 Each Occurrence

o Property Damage: $500,000 Each Occurrence or combined single limit of $500,000.

d. Umbrella Liability:• $5,000,000 each occurrence

7. Outline for Response

1. Company or Organization Background

a. Name of company or Individual

b. Contact Name and Email Address

c. Company Address, City, State, Zip Code

d. Company Telephone and Facsimile Numbers

2. Company or Organization Profile

a. History of Company or Organization, and years in business

b. Type of Ownershipc. Type of Organization

d. Size of Company

e. Professional Affiliations

f. Letters of Reference (minimum of 3)

3. Personnel

a. Identify owner and/or manager

b. Provide information on all key personnel who will be assigned to this project

4. Qualifications of the Company or Individual

5. Background of experience and successful as a construction manager on similar size and type of

projects

6. Company or Individual Understanding of the Projecta. A complete description of the firms or organization's role, methodology and approach to the

scope of the projectb. Project Timelinec. Insurance requirements

7. A summary of any expected services from the Champaign Park District

8. Based on a construction cost of $800,000 to $1,200,000 what is the CM FEE % of the cost of work?

Page 5 of 9

Page 6: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

CHAMPAIGNPARK DISTRICT Request for Proposal: Construction Manager

8. Request for Additional Information

The Champaign Park District reserves the right to request any further additional information that itdeems necessary for the review and award process.

9. Cancellation of Request for Proposals

The Champaign Park District reserves the right to cancel this request for services at any time, to elect not

to award the work listed, to award a portion of the work listed, to reject any or all of the responses, and

to waive any informality or irregularity in any response received. The Champaign Park District shall be the

sole judge of the merits of the proposals received.

10. Attachments

Several attachments are included with this RFP. Attachments include:

1) Description of Champaign Park District - Attachment A2) Description of the Bicentennial Center-Attachment B

3) Reports by Broeren Russo Company on The Bicentennial Center-Attachment C

SUBMITTED BY: ACCEPTED BY:

Company Champaign Park District

Address Date

Phone

Authorized Agent (print or type)

Signature of Authorized Agent

Date

Page 6 of 9

Page 7: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

CHAMPAIGNPARK DISTRICT Request for Proposal: Construction Manager

Attachment A

1. Champaign Park District

The City of Champaign is home to approximately 89,000 residents and is located nearly equidistant fromChicago, Indianapolis, Indiana, and St. Louis, Missouri. Though surrounded by farm communities,

Champaign is notable for sharing the campus of the University of Illinois at Urbana-Champaign with itssister city of Urbana. Champaign is also the home of Parkland College which serves about 20,000

students during the academic year. Champaign is an integral part of what is known as the "Silicon

Prairie." Champaign is also home to offices for Abbott, Archer Daniels Midland (ADM), Caterpillar, Deere

& Company, Dow Chemical Company, IBM, State Farm, Science Applications International Corporation

(SAIC), Sony, and Yahoo!, all Fortune 500 companies. Champaign is the eleventh-most populous city in

Illinois, and the fourth-most populous city in the state outside of the Chicago Metropolitan Area. In

2013, Champaign was rated fifth best place in the United States for a healthy work-life balance. Thearea's top employers are The University of Illinois, Champaign Unit 4 School District, Kraft Foods,

Parkland College, and PlastiPak.

Organized in 1911, the award-winning Champaign Park District ("Park District") has an annual operating

budget of $18 million. The Park District manages and maintains more than 700 acres of community

parks, playgrounds, and facilities, and provides recreational services and educational opportunities to

more than one million visitors annually.

The Park District's recreational facilities include (1) outdoor pool, (3) waterslides, (2) recreation centerswith gymnasiums, (2) senior centers, (1) cultural arts center, the Virginia Theatre (a renovated historic

theater featuring a 1,500 seat auditorium), (6) court indoor tennis facility, (23) outdoor tennis courts,(19) softball and baseball fields, (21) soccer fields, (32) playgrounds, (1) children's petting zoo, (5) picnicshelters, (1) skate park, (1) dog park, and (1) small lake for fishing.

The Park District schedules more than 1,500 recreational and leisure programs and events each year

targeting families and residents of all ages. A few of the Park District's hallmark events include Taste of

Champaign-Urbana, seasonal Concerts in the Park, and Halloween Funfest. The Park District also is

integral in providing support for well-attended community events like Street Fests in downtown

Champaign, art exhibits at the Springer Cultural Center, EbertFest at the Virginia Theater, and various

fitness events.

The Park District has received several state and national awards such as the Distinguished Agency

distinction from the Illinois Association of Park Districts (IAPD), The National Gold Medal Award forExcellence in Parks and Recreation in 1979,1990 and 1998, and numerous International Platinum and

Gold Aquatic Safety Awards.

Page 7 of 9

Page 8: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

CHAMPAIGNPARK DISTRICT Request for Proposal: Construction Manager

Attachment B

2. The Bicentennial Center

Bicentennial Center: Existing Conditions

The Bicentennial Center is located at 2212 West Sangamon Drive. The facility is equipped with (1) full-

size gymnasium, restrooms, (1) small activity room, a reception area, storage, two small office spaces,

and storage areas. The Bicentennial Center has a capacity of 512 people. There are 134 parking spaces

and four accessible parking spaces in the lot across Sangamon Drive, south of the building. The

Bicentennial Center was dedicated on November 6,1976. Now nearly 43 years old, the facility is no

longer able to meet the needs of today's residents or the Champaign Park District's programming and

services. The following is a list of the current conditions of The Bicentennial Center:

Gymnasium: Space does not function as a true full size gym. The main court basketball

supports/hoops are non- operable and the half-court hoops do not adjust. The space

lacks adequate storage and spectator seating and the gym noise is disruptive to adjacent

office and reception areas. The gymnasium floor is painted concrete. Floors made of

wood or a synthetic multi-purpose material. The gym is not air conditioned and the roof

is not rated to handle more than a slight hanging load.

Program space: There is one small activity room located next to the offices.

Locker rooms and bathrooms: Bathrooms lack privacy and are visually exposed to the

hallway. The locations of the bathrooms do not allow the gymnasium to be secured

from public usage. The locker rooms are used for storage, and the showers are not

used.

Storage: There is not enough storage for all programs of the facility. The staging area

and distribution areas are not adequate. Storage needs for seasonal usage, daily usage,

fixed storage and movable storage are not functional or programmatic.

Building Exterior: Gymnasium roof leaks will need to be replaced. The existing masonry

is in good condition.

MEP and Fire Suppression Systems: The gym and storage areas are not air conditioned.

A new HVAC system is proposed for shared spaces and the multipurpose room.

Increased electrical service is proposed.

Page 8 of 9

Page 9: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

CHAMPAIGNPARK DISTRICT Request for Proposal: Construction Manager

Attachment C

Page 9 of 9

Page 10: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

CHAMPAIGNPARK DISTRICT

B R 0 ERE NR U S SOBUILDERS, INC.

TABLE OF CONTENTS

1 Cover Letter & Executive Summary

Remediation Budgets & Schedule

Building Investigation Report

Exhibits

Page 11: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

CHAMPAIGNPARK DISTRICT

Pl-l] B R 0 ERE NRU S S 0BUILDERS. INC.

September 26, 2019

Mr. Joe DeLuce

Champaign Park District706 Kenwood RoadChampaign, IL 61821

RE: CHAMPAIGN PARK DISTRICT BICENTENNIAL CENTERPHASE 1 PRE-CONSTRUCTION REPORT

Dear Joe:

In partnership with the Champaign Park District (CPD), Broeren Russo Builders, Inc. (BRBI) is pleased toprovide this Report as per our Phase 1 Pre-Construction Agreement.

After your review of the Phase 1 Pre-Construction Report, BRBI is ready to continue the partnership into

Final Programming with the CPD selected AE & BRBI Phase 2 Pre-Construction Services.

If the CPD elects to continue our service into the next phase, we are confident our endeavors to create a

vital space for the CD Special Recreation will be a success by alignment of the program & budgets.

Sincerely,

BROEREN RU$SO BUILDERS, INC.

Jim LopezPresident

Page 12: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

EXECUTIVE SUMMARY

PROJECT GOAL:

Develop a BUDGET MENU to allow the PROCESS to yield a building USE by the SCHEDULE TARGET.

DEFINITIONS:

USE - CPD along with the CD Special Recreation short term and long options

PROCESS - Current Tenant has a 90 day lease clause for notification to terminate. CPD would like to

work the schedule to include a date for this notification based on need for construction to begin in

the building.

BUDGET MENU -The concept is to present a budget menu that allows for minimal cost to protect

the building asset and ranges up to costs for complete renovation to create a competitive space for

comparable building services.

SCHEDULE TARGET- June of 2020 completion ready for CU Special Recreation with the

understanding that a scope may be selected to extend the work timeline thus phasing may need to

be considered.

PRIMARY DELIVERABLES;

Evaluation of:

• Existing conditions of the building

o Field Inspections

o Consulting Subcontractors

o KAP Architecture

• Original Construction Drawings

o ISAKSEN AND MATZDORFF DRAWINGSo EXISTING CONDITIONS REPORT

• CPD provided Professional Services Reports

o STRUCTURAL REPORT FROM FRAEUNHOFFERo REIFSTECK REID REPORT

Final Report on:

• Remediation costs & recommendations to align with the BUDGET MENU, PROCESS, USE and

SCHEDULE TARGET from a contractor's perspective. Consider the end user view that has the

potential of 4 different forms of the USE.

Page 13: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

4 USES DEFINED:

ASSET PROTECTION - Stabilize the building from further deferred maintenance damage with least

amount of work & cost needed. Some of the work is required to meet code compliance.

CU SPECIAL RECREATION -All work associated with ASSET PROTECTION and minimal code

preparation for CU Special Recreation programming.

EXTENDED UPGRADES-All work associated with CU SPECIAL RECREATION along with work needed

to enhance the CU SPECIAL RECREATION use.

COMPETITIVE SPACE - All work associated with EXTENDED UPGRADES and work needed to create a

space the more closely competes with newer facilities without a complete demolition & rebuild.

4 USES MAJOR SCOPE:

ASSET PROTECTION - Structure stabilization, Roof repair/repaint and HVAC maintenance

CU SPECIAL RECREATION -Add on HVAC Gym and ADA compliance

EXTENDED UPGRADES - All on new roof in lieu of repairs and interior upgrades

COMPETITIVE SPACE -All on additional space and extended finish upgrades

4 USES BUDGET:

ASSET PROTECTION - $366,021

CU SPECIAL RECREATION - $964,745

EXTENDED UPGRADES-$1,996,279

COMPETITIVE SPACE - $2,501,809

Page 14: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

9/26/2019

B R 0 ERENR US S 0

Remediation Budget

ASSET PROTECTION

Division

Division 0- General Requirementsl

Division 2 - Testing Servicesl

Division 2a - Landscaping]

Division 3 - Foundation and Settlementl

Division 4 - Masonry|

Division 7 - Roofing]

Descriptiontubbish dumspters - 20CY

'emporary fencing - 6' tall panel temp fencing

ieneral cleaning

Msting storm sewer line camera inspection

Msting drainage system inspection for acth/e leaks

Srading and seeding North side where sidewalk is demo'd. Replace any damaged landscaping

;rading and seeding East side where alien blakc wall is repaired. Replace any damaged landscaping

Srading and seeding Westside wherelpundatiqn is repaired. Replace any damaged landscaping

ioil boring test

Stabilize settlement using push piers on East side of bldg

nject ground with PolyLeyel to supportj:he slab after it has been stabilized and lifted on east side of bldg

Stabilize settlement using push piers on West side of bldg

:ix leaning Alien Block wall at exterior on West end

replace cracked CMU and mortar joints

'atch seams at ridge cap locations causing leaks

\dd new gutters and downspouts to carry wate^awayfrombuilding

Mew flashing at roof penetrations

Budget Pricing

$1,200$6,400$5,500

$2,500$2,500

$1,500$1,000

$3,000

$2,500$30,000$12,000

$8,000

$10,000

$17,000

$29,000

Division 9c - Painting|prep, prime and paint existing roof _|_$34,142

Division 23 - HVAC|

Service and Maintenance on existing HVAC followed by suggested repair costs TBD

iervice and Maintenance on existing HVACTBD Allowance

ien/ice and Maintenance on existing HVAC Boiler/Condensing Unit/Cooling DX Coil

$15,000$25,000$70,000

Cost of Work TOTAL) _$276,242

AE Fees (10%)|Plan Review/Permit (0.5%)|

General Conditions (6%)|

CM Fee (6%)|Contingency (10%)

PROJECT TOTALl

$27,624$1,381

$16,575$16,575$27.624

$366,021

Page 15: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

9/26/2019

BR OER E NR U SS 0

Remediation Budget

CU Special Recreation

Division

Division 0 - General Requirements

Division 1 - ADA & Life Safety Uprade"

Division 2 - Testing Service;

Division 2a - Landscapjng

Dh/ision 3 - Foundation and Settlemenl

Division 4 - Masonr^

Division 7 - Roofing

Division 7b - Building Insulatior

Division 9a - Gypsum Partition'

Division 9b - Floorinf

Division Sc-Paintinj

Division 22 -Plumblnf

Division 23 - HVAC

Division 26-Electrica

Description

iubbish dumspters - 20C/

'emporary facilities - Toilets'empqrary fencing-6' tail panel temp fencingSeneral deanlng

:reate a lined crosswalk where pedestrian pathway crosses through vehicular traffic on Sangamon Ave.(eplace door hardware and doors where applicable to be compliant with ADA

Jpdate accesible stalls In both Men's and Women's multi user restroom to be compliant with ADAModify Men's and Women's single user restroom sizes to be compliant with ADAtelocate bath accessories and replace hand dryer to meet ADA, Install missing accessories

?emo existing sidewalk on the North side of the building and fix sidewalk outside the building to be

compliant with ADA

existing storm sewer line camera inspection

Existing drainage system Inspection for active leaks

grading and seeding North side where sidewalk is demo'd. Replace any damaged landscapingSrading and seeding East side where alien blakc wall is repaired. Replace any damaged landscaping

3rading and seeding West side where foundation is repaired. Replace any damaged landscaping

ioll boring test

Stabilize settlement using push piers on East side of bldg

nject ground with PolyLevel to support the slab after it has been stabilized and lifted on east side of bldg

Stabilize settlement using push piers on West side of bldg

:lx leaning Alien Block wall at exterior on West end

ieolace cracked CMU and mortar ioints

'atch seams at ridge cap locations causing leaks

\dd new gutters and downspouts to carry water away from building

Mew flashing at roof penetrations

nsulate multipurpose room ceiling

\nf patching, minor framing where restroom plumbing is relocated. New gypsum partition for accesiblestall'atch floors where walls/partitions will be moved in restrooms/locker rooms.

Allowance Is for rolled vinyl product

3ean residual due underneath existing turf in multlpurpose room and minor patches

'rep, prime and paint existing roof

Misc. orep, orime and paint CMU, drvwall patches and overall repaint

3emo, rough in and upgrade all plumbing fixtures in multi user restrooms to be^iDA compliant3emo, rough In and upgrade all plumbing fixtures In single user restrooms to be ADA compliant

Demo and upRrade water fountain to be ADA compliant

iervlce and Maintenance on existing HVAC followed by suggested repair costs TBD

Mew HVAC system - Shared Spaces

few HVAC system - Multiouroose room

Increase electrical service to building to accommodate new RTU

Cost of Work TOTAI

AE Fees (S%

Plan Review/Permft (0.5%General Conditions (5.5%

CM Fee (5%Contingency (8%)

PROJECT TOTAI

Budget Pricing

$2,400

$1,200$6,400

$10,000

$1,000

$30,000

Included in 9aIncluded in 9a

$5,000

$10,000

$2,500

$2,500

$1,500$1,000

53.000

$2,500

$30,000

$12,000

$8,000

$10,000

$17,000

$29,000

S44.000

$10,000

$5,000

$15,000

$34,142

$50,000

$53,000

$9,000S6.SOO

$15,000

$117,000

$175,000

$40,000

$759,642$60,771

$3.798$41,780

$37,982

$60.771

$964,745

Page 16: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

9/26/2019

Remediation Budget

EXTENDED UPGRADES

Division

Division 0 - General Requirements

Division 1 - ADA & Life Safety Uprade-

Division 2 - Testing Service;

Division 2a - LandscapinE

Division 3 - Foundation and Settlemen

Division 4-Masonn

Division 7 - Roofmf

Division 7b - BuildinR Insulatior

Division 8a - Interior Doon

Division 9a - Gypsum Partition:

Division 9b - Floorini

Division 9c- Paintini

Division 22 - Plumbini

Description;ubblsh dumspters - 20CY

emporary facilities - Toilets

emporary fencing - 6' tall panel temp fencing

ieneral cleaning

:reate a lined crosswalk where pedestrian pathway crosses through vehicular traffic on Sangamon Ave.

;eplace door hardware and doors where applicable to be compliant with ADA

Ipdate accesible stalls in both Men's and Women's multi user restroom to be compliant with ADA

/lodify Men's and Women's single user reslroom sizes to be compliant with ADA

lelocate bath accessories and replace hand dryer to meet ADA, install missing accessories

)ema existing sidewalk on the North side of the building and fix sidewalk outside the building to be

:ompliant with ADA

listing storm sewer line camera inspection

'xisting drainage system inspection for active leaks

irading and seeding North side where sidewalk is demo'd. Replace any damaged landscaping

irading and seeding East side where alien blakc wall is repaired. Replace any damaged landscaping

irading and seeding West side where foundation is repaired. Replace any damaged landscaping

:ull exterior Building Landscape and Small Playground

,oil boring test

itabilize settlement using push piers on East side of bldg

niect Rround with PolvLevel to suDport the slab after it has been stabilized and lifted on east side of bldg

.tabilize settlement using push piers on West side of bldg

Vest side of building new topping to level the floor

:ix leaning Alien Block wall at exterior on West end

ieolace cracked CMU and mortar joints

:xterior - Remove and replace damaged control and mortar joints and broken/spalled brick

tew Roof, Wall Panels, and Windows

nsulate multipuroose room ceilinR

nsulate multipurpose room walls

teolace all interior doors, frames and hardware

^ny patching, minor framing where restroom plumbing is relocated. New gypsum partition for accesible

stall

:eiling and Wall finish upgrades

>atch floors where walls/partitions will be moved in restrooms/locker rooms.

Allowance is for rolled vinyl product

:tean residual Blue underneath existinRturfln multipurpose room and minor patches

tesinous/rubber/svnthetic sports floor in multi purpose, gym and LVP/tile/carpet in remaining areas

'rep, prime and paint existing roof

Wise. prep, prime and paint CMU, drywall patches and overall repaint

Demo, rough in and upgrade all plumbing fixtures in multi user restrooms to be ADA compliant

3emo, rough in and upgrade all plumbing fixtures in single user restrooms to be ADA compHant^

lemo and uoerade water fountain to be ADA compliant

Budget Pricing

$4,800$1,200$6,400

$15,000

$1,000,

$30,000Included in 9a

Included in 9a

$5,000

S 10,000

$2,500$2,500

$1,500$1,000$3,000

$30,000$2,500

$30,000$12,000

$8,000

$20,000

$10,000$17,000

$15,000

$450,000

$44,000

$40,000

$48,000

$10,000

$80,000

$5,000

$16.000

$90,000

534,142

$50,000$53,000$9,000$6,500

Page 17: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

Division 23 - HVACl

Division 26- Electricall

Foilet Room Accessories and Finishes

Service and Maintenance on existing HVAC followed by suggested repair costs TBD

Mew HVAC system -Shared Spaces

New HVAC system - Multipurpose room

$18,000

$15,000$117,000$175,000

Increase electrical service to building to accommodate new RTU _|_$40,000Multipurpose room LED lighting upgrades

testroom and locker room LED lighting upgrades

Fire alarm system replacement

$35,000

$25,000

$30,000

I __ __ ! , . , . Cost of Work TOTALl $1,619,042

AE Fees (6%1Plan Review/Permit (0.5%)General Conditions (5.3%:

CM Fee (4%;Contingency (7.5%)

PROJECT TOTAl

$97,143

$8,095$85,809$64,762

$121,428

$1,996,279

Page 18: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

9/26/2019

BRO E R ER U S SDUILDCR3.1W Remediation Budget

COMPETITIVE SPACE

Division

Division 0 - Genera] Requirements]

Division 1 - ADA & Life Safety Uprades|

Division 2 - Testing Servicesl

Division 2a - Landscapingl

Division 3 - Foundation and Settlement!

Division 4- Masonryl

Description

tubbish dumspters - 20CY

'emporary facilities - Toilets

'emporary fencing - 6' tail panel temp fencing

ieneral cleaning

'.reate a lined crosswalk where pedestrian pathway crosses through vehicular traffic on Sangamon Ave.

ieplace door hardware and doors where applicable to be compliant with ADA

Jpdate accesible stalls in both Men's and Women's multi user restroom to be compliant with ADA

i/lodify Men's and Women's single user restroom sizes to be compliant with ADA

telocate bath accessories and replace hand dryerto meet ADA, install missing accessories

temo existing sidewalk on the North side of the building and fix sidewalk outside the building to be

compliant with ADA

existing storm sewer line camera inspection

listing drainage system inspection for active leaks

irading and seeding North side where sidewalk is demo'd. Replace any damaged landscaping

trading and seeding East side where alien blakc wall is repaired. Replace any damaged landscaping

trading and seeding West side where foundation is repaired. Replace any damaged landscaping

:ull exterior Building Landscape and Small Playground

ioil boring test

itabilize settlement using push piers on East side of bldg

niect ground with PolvLevel to support the slab after it has been stabilized and lifted on east side of bldg

Stabilize settlement using push piers on West side of bldg

(Vest side of building new topping to level the floor

:ix leaning Alien Block wall at exterior on West end

teolace cracked CMU and mortar Joints

Budget Pricing$4,800$1,200$6,400

$15,000

$1,000$30,000

Included in 9a

Included in 9a

$5,000

$10,000

$2,500

,$2,500

$1,500$1,000$3,000

$30,000

$2,500$30,000$12,000

$8,000

$20,000

$10,000$17,000

:xterior - Remove and replace damaged control and mortar joints and broken/spalled brick I $15,000

Division 7 - Roofing|New Roof, Wall Panels, and Windows _|_$450,000Division 7b-Building lnsulation|lnsulatemultipurpose room ceiling I $44,000

[Insulate multipurpose room walls __| $40,000Division 8a - Interior Doors|Replace all interior doors, frames and hardware I $48,000

Division 9a - Gypsum Partjtionsl

Division 9b - Flooring]

Division 9c-Painting]

Division 22 - Plumbing]

\ny patching, minor framing where restroom plumbing is relocated. New gypsum partition for accesible

stall

:eilingand Wall finish upgrades

'atch floors where walls/partitions will be moved in restrooms/locker rooms.

Allowance is for rolled vinyl product

:lean residual Blue underneath existine turf in multipurpose room and minor patches

toinous/rubber/svnthetic sports floor in multi purpose, gym and LVP/tile/carpet in remaining areas

Prep, prime and paint existing roof

Vlisc. oreD. Drime and oaint CMU. drvwall patches and overall repaint

3emo, rough in and upgrade alt plumbing fixtures in multi user restrooms to be ADA compljant

Demo, rough in and upgrade all plumbing fixtures in single user restrooms to be ADA compliant

Oemo and uoerade water fountain to be ADA compliant

$10,000

$80,000

$5,000

$16,000

$90,000

534,142

$50,000553,000

$9,OOG$6,500

Page 19: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

|Toilet Room Accessories and Finishes $18,000

Division 23 - HVACI.ervice and Maintenance on existing HVAC followed by suggested repair costs TBD

tew HVAC system - Shared Spaces

tew HVAC system - Multipurpose room

Division 26 - Electrical|lncrease electrical service to building to accommodate new RTU

Division 27 - Allowancesl

t/lultipurpose room LED lighting upgrades

?estroom and locker room LED lighting upgrades

'•ire alarm system replacement

;ntry lobby / check in / Reception spaceexterior Metal panel modern colors and textures of materials

nteriorcasework/millwork/range/hood

ileachers/Seating and Auditorium AV

Storage and Office Space

:!re protection Sprinkler system

$15,000$117,000$175,000

$40,000

$35,000

$25,000

$30,000

$100,000

$50,000

$40,000

$75,000

$100,000

$45,000

I ____Cost of Work TOTAL) $2,029,042AE Fees (6%

Plan Review/Permit (0.5%

General Conditions (5.3%

CM Fee (4%Contingency (7.5%)

PROJECT TOTAI

$121,743

$10,145$107,539

$81,162$152,178

$2,501,809

Page 20: PARK DISTRICT CHAMPAIGN Construction Manager · General Scope of Project The Champaign Park District is accepting proposals for construction manager to coordinate and supervise the

0

I

234567s9101112131415161718192021

22232425

2627282930

31323334353637

383110

41

G R 0 ERENR US S 0

ask Name

ICENTENNIAL CENTERPRECONSTRUCnON

CPD authorize phase 1 - Design Review and Cost Esimation

BR submit phase 1 report

CPO - Tenant Notice to Vacate

CPD authorize phase 2 - Bidding & Negotiations

BR complete phase 2

CPD authorize phase 3 - Construction

Subcontractor Awards

PERMITSFoundation Permit

Building PermitCONSTRUCTION

Exterior

Foundation fixes

Early Tareet - Demo igl Exterior Sidewalk

Roofing

Gutters & Downspouts

Roofing painl

Pour pad for HVAC 30 ton unit

Exterior sidewalk fixes

Exterior alien block Hues

Landscaping fill @ alien block, grading and seeding

ADA striping and sicnage

Interior

Demo at restrooms

Plumbing Rough In @ resirooms and water fountain

KVAC rough in for gymnasium AC

Electric Rough-ln

Building insulation

Mason ry work

Gypsum work

Painting

Flooring

Doors & Hardware

Toilet Accessories

MEP TrimPunchlist

Final Clean

Short term remedlatlon work - Final Occupancy

Lone term Remcdiatlon Work - Final Occupancy

Duration

289 days

152 days

I day20 days90 days

1 day60 days1 day20 days

20 days

20 days

20 daysMS days

74 days

IS days

5 days

10 days5 days

6 days5 days10 days

10 days5 days

3 days

77 days5 daysIS days16 days16 days5 days

15 days5 days

10 days

10 days3 days

3 days

3 days

5 days2 days

1 day1 day

Start

Wed 8/28/19

Wed 8/28/19Wed 8/28/19Fhu 8/29/19Thu 10/24/19Thu 10/24/19Ffl10/25/19Thu 2/27/20Frl2/28/20Thu 2/27/20Thu 2/27/20Thu 2/27/20Thu 3/12/20Thu 3/12/20Thu 3/26/20Thu 3/12/2BThu 4/16/20Thu 4/30/20Thu 5/7/20Fri 5/15/20

Fri 5/15/2BFri S/29/20Fri6/12/20Fri 6/19/20Thu 4/16/20Thu 4/16/20

Thu 1/23/20Fri 5/22/20Thu 4/23/20Men 6/15/20Thu 4/23/20Men 6/15/20Mon 6/22/20Men 7/6/20

Men 7/20/20Men 7/20/20Men 7/20/20

Thu 7/23/20Tliu 7/30/20

Man 8/3/20Man 10/5/20

Finish

Mon 10/5/20

Fhu 3/26/20Wed 8/28/19Wed 9/25/1SWed 2/26/20Fhu 10/24/19rhu 1/16/20rhu 2/27/20Thu 3/26/20Wed 3/25/20Wed 3/25/20Wed 3/25/20Man 10/5/20Tue 6/23/20Wed 4/15/20Wed 3/18/20Wed 4/29/20WedS/6/20Thu 5/14/20Thu 5/21/20Thu 5/28/20Thu 6/11/20Thu 6/18/20Tue 6/23/20Fri 7/31/20

Wed 4/22/20ThU 5/14/20Frl6/12/20Thu 5/14/20Fri 6/19/20Wed 5/13/20Fri 6/19/20Fri 7/3/20Frl7/17/20Wed 7/22/20Wed 7/22/20Wed 7/22/20Wed 7/29/20Fri 7/31/20

Man 8/3/UMan 10/5/20

CPDBicentennial Center

Predecessors

34F5+20 days<FS+20days67FS+20 days.5

a

8SS8SS

11SSStlO days151717,18

19192)21,22

23

152626,20

2627,28,29

26

27,28,29

32,31

3334343435.36,37

38

3910F5<-44daV5

21 I Seotembeil Nouemberl December I February 1] April I I May 21 |jy!!Al^^l5LlO^Ihyiil2/8t2/_2.fe/U|^3/lEA2ra

^

11 ^Se^tembei October 2^ DecemberlFebry arYjMaj•/26!s/i6l wWjS/iSif&T/iS/iSinSi/sS/iSS'

. PRECONSTOUCTIONluthoriie phase 1 - Design Review and Cost Eslmatlon

imlt phase 1 report

,CPD - Tenant Notice to Vacate

,CPD aulhorhe phase 2 • Bidding & Neeotlatlons

^.n—"m~rr—-->-BB^o?pjletc phase 2

rCPD authorize phase 3 - Construction

Subcontractor Awards

PERMffS.Foundation Permit

I Building Permit

Exterior

.Foundation fixes

1—»0 Early] irget-Demo @ Exterior Sideaualk

tooflng

^Gutters & Downspouts

^Roofing paint

Q^Oamyjat re

W"T

Pour pad for HVAC 30 ton ur

l^Eiftcrior sidewalk fixes

f-LExterlor alien block flxe:

^landscaping fill S> alley ADA striping and stgr

< Interior

at restrooms

umif

I 'V=i\101

IVAC roi

Rough-li

t In @ restrooi

igh tn for eymr

n

Building Insulation

work

,Gypsumwork

SiPaintine

, Flooring

irs & narav

Toilet Acccssoi

MEP Trim.PunchIIst

t^Flnal Clean

iPs h oPt-tflFm i

B1CENTENNIAL CENTER

CONSTRUCTION

block, grading and seeding

ie

> and water fountain

slum AC

reis

mediation work" Final Occupancy

Long term Remediation Work - Final Occ

Project: Bfcentennial CenterDate: Mon 9/23/19

Schematic Short Term Remediation Schedule

Page 1


Recommended