It is a violation of Copyright law to make and distribute copies of electronic designs or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
Note: Some designs in this collection may have been created using unique special stitches and/or techniques. To preserve design integrity when rescaling or rotating designs in your software, always rescale or rotate designs using the handles directly on-screen.
Patchwork Zipper Pouches#12623 / 12 Designs
12623-01 Pouch 1 Front5.35 X 6.35 in.
135.89 X 161.29 mm3,591 St.
12623-02 Pouch 1 Back5.35 X 5.84 in.
135.89 X 148.34 mm1,894 St.
12623-03 Pouch 2 Front5.35 X 6.33 in.
135.89 X 160.78 mm6,381 St.
12623-04 Pouch 2 Back5.35 X 5.86 in.
135.89 X 148.84 mm5,436 St.
12623-05 Pouch 3 Front5.5 X 5.87 in.
139.7 X 149.1 mm5,390 St.
12623-06 Pouch 3 Back5.5 X 5.37 in.
139.7 X 136.4 mm4,154 St.
12623-07 Pouch 4 Front5.37 X 6.33 in.
118.62 X 160.78 mm5,883 St.
12623-08 Pouch 4 Back5.64 X 5.96 in.
78.74 X 151.38 mm4,315 St.
12623-09 Pouch 5 Front5.5 X 5.87 in.
139.7 X 149.1 mm4,017 St.
12623-10 Pouch 5 Back5.5 X 5.08 in.
139.7 X 129.03 mm2,740 St.
12623-11 Pouch 6 Front5.5 X 5.87 in.
139.7 X 149.1 mm5,902 St.
12623-12 Pouch 6 Back5.5 X 5.37 in.
139.7 X 136.4 mm5,460 St.
It is a violation of Copyright law to make and distribute copies of electronic designs or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
Listings below indicate color sample, stitching order and suggested thread color number. Most numbers indicate Isacord thread. Colors beginning with 20501 refer to YLI Fine Metallics, 7 refer to Yenmet Metallic, 8 refer to YLI Variations Variegated Thread and 9 refer to Isacord Multicolor Variegated.
Patchwork Zipper Pouches#12623 / 12 Designs
12623-01 Pouch 1 Frontn 1. Zipper Placement Stitch ........................................... 0020n 2. Zipper Tackdown ...................................................... 0020n 3. Tackdown 1 .............................................................. 0020n 4. Placement Stitch 2 ................................................... 0020n 5. Tackdown 2 .............................................................. 0020n 6. Tackdown 3 .............................................................. 0020n 7. Placement Stitch 4 ................................................... 0020n 8. Tackdown 4 .............................................................. 0020n 9. Basting Stitch ........................................................... 0020n 10.Stipple ...................................................................... 0020n 11. Seam Stitch .............................................................. 0020
12623-02 Pouch 1 Backn 1. Placement Stitch ...................................................... 0020n 2. Tackdown ................................................................. 0020n 3. Stipple ...................................................................... 0020
12623-03 Pouch 2 Frontn 1. Zipper Placement Stitch ........................................... 0020n 2. Zipper Tackdown ...................................................... 0020n 3. Tackdown 1 .............................................................. 0020n 4. Placement Stitch 2 ................................................... 0020n 5. Tackdown 2 .............................................................. 0020n 6. Placement Stitch 3 ................................................... 0020n 7. Tackdown 3 .............................................................. 0020n 8. Tackdown 4 .............................................................. 0020n 9. Placement Stitch 5 ................................................... 0020n 10.Tackdown 5 .............................................................. 0020n 11. Placement Stitch 6.................................................... 0020n 12. Tackdown 6 .............................................................. 0020n 13. Basting Stitch ........................................................... 0020n 14. Quilting ..................................................................... 0020n 15. Seam Stitch .............................................................. 0020
12623-04 Pouch 2 Backn 1. Background Placement Stitch .................................. 0020n 2. Background Tackdown ............................................. 0020n 3. Placement Stitch 2 ................................................... 0020n 4. Tackdown 2 .............................................................. 0020n 5. Placement Stitch 3 ................................................... 0020n 6. Tackdown 3 .............................................................. 0020n 7. Basting Stitch ........................................................... 0020n 8. Quilting ..................................................................... 0020
12623-05 Pouch 3 Frontn 1. Zipper Placement Stitch ........................................... 0020n 2. Zipper Tackdown ...................................................... 0020n 3. Tackdown 1 .............................................................. 0020n 4. Placement Stitch 2 ................................................... 0020n 5. Tackdown 2 .............................................................. 0020n 6. Placement Stitch 3 ................................................... 0020n 7. Tackdown 3 .............................................................. 0020n 8. Tackdown 4 .............................................................. 0020n 9. Placement Stitch 5 ................................................... 0020n 10.Tackdown 5 .............................................................. 0020n 11. Placement Stitch 6.................................................... 0020n 12. Tackdown 6 .............................................................. 0020n 13. Basting Stitch ........................................................... 0020n 14. Quilting ..................................................................... 0020n 15. Seam Stitch .............................................................. 0020
12623-06 Pouch 3 Backn 1. Placement Stitch 1 ................................................... 0020n 2. Tackdown 1 .............................................................. 0020n 3. Placement Stitch 2 ................................................... 0020n 4. Tackdown 2 .............................................................. 0020n 5. Basting Stitch ........................................................... 0020n 6. Quilting ..................................................................... 0020
12623-07 Pouch 4 Frontn 1. Zipper Placement Stitch ........................................... 0020n 2. Zipper Tackdown ...................................................... 0020n 3. Tackdown 1 .............................................................. 0020n 4. Placement Stitch 2 ................................................... 0020n 5. Tackdown 2 .............................................................. 0020n 6. Placement Stitch 3 ................................................... 0020n 7. Tackdown 3 .............................................................. 0020n 8. Tackdown 4 .............................................................. 0020n 9. Placement Stitch 5 ................................................... 0020n 10.Tackdown 5 .............................................................. 0020n 11. Placement Stitch 6.................................................... 0020n 12. Tackdown 6 .............................................................. 0020n 13. Basting Stitch ........................................................... 0020n 14. Quilting ..................................................................... 0020n 15. Seam Stitch .............................................................. 0020
12623-08 Pouch 4 Backn 1. Placement Stitch 1 ................................................... 0020n 2. Tackdown 1 .............................................................. 0020n 3. Placement Stitch 2 ................................................... 0020n 4. Tackdown 2 .............................................................. 0020n 5. Placement Stitch 3 ................................................... 0020n 6. Tackdown 3 .............................................................. 0020n 7. Basting Stitch ........................................................... 0020n 8. Quilting ..................................................................... 0020
12623-09 Pouch 5 Frontn 1. Zipper Placement Stitch ........................................... 0020n 2. Zipper Tackdown ...................................................... 0020n 3. Tackdown 1 .............................................................. 0020n 4. Placement Stitch 2 ................................................... 0020n 5. Tackdown 2 .............................................................. 0020n 6. Tackdown 3 .............................................................. 0020n 7. Placement Stitch 4 ................................................... 0020n 8. Tackdown 4 .............................................................. 0020n 9. Basting Stitch ........................................................... 0020n 10.Quilting ..................................................................... 0020n 11. Seam Stitch .............................................................. 0020
12623-10 Pouch 5 Backn 1. Placement Stitch ...................................................... 0020n 2. Tackdown ................................................................. 0020n 3. Quilting ..................................................................... 0020
12623-11 Pouch 6 Frontn 1. Zipper Placement Stitch ........................................... 0020n 2. Zipper Tackdown ...................................................... 0020n 3. Tackdown 1 .............................................................. 0020n 4. Placement Stitch 2 ................................................... 0020n 5. Tackdown 2 .............................................................. 0020n 6. Tackdown 3 .............................................................. 0020n 7. Placement Stitch 4 ................................................... 0020n 8. Tackdown 4 .............................................................. 0020n 9. Basting Stitch ........................................................... 0020n 10.Quilting ..................................................................... 0020n 11. Seam Stitch ................................................................ 002
12623-12 Pouch 6 Backn 1. Background Placement Stitch .................................. 0020n 2. Background Tackdown ............................................. 0020n 3. Placement Stitch 2 ................................................... 0020n 4. Tackdown 2 .............................................................. 0020n 5. Placement Stitch 3 ................................................... 0020n 6. Tackdown 3 .............................................................. 0020n 7. Basting Stitch ........................................................... 0020n 8. Quilting ..................................................................... 0020
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
Supplies• Fabrics (See individual instructions for fabric sizes)• OESD Fuse & Fleece• OESD Bobbin Thread• Nylon Coil Zipper (minimum 7”)• Small appliqué iron• Isacord thread
General Instructions
Eachzipperpouchismadefromtwofiles.The“back”filequilts(andpieces,insomecases)thebackof thepouch.The“front”fileinstallsthezipper,piecestheproject,quiltsit,andthensewsthebacktothefrontwithaseamstitch.
There is a piecing guide for each design. This guide will tell you the Position of each fabric piece and allow you to choose fabrics. Also usethepiecingguidetohelpdetermineorientationof eachflip-and-sewfabricpiece.Followtheinstructionsbelowtostitcheachpouch.
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
Pouch 1:
Step One: Create the Pouch Back
Fabrics:• Fabric1-6”x6½”
1. Thread the embroidery machine with OESD Bobbin thread in the bobbin and desired Isacord thread in the needle.2. Selectdesign12623-02–Pouch1Back3. Hoop a piece of OESD Fuse & Fleece with the fusible side up.4. StitchColorChange1–PlacementStitch5. Remove the hoop from the machine, but do not remove the project from the hoop.6. Place Fabric 1 right side up onto the OESD Fuse & Fleece, centering it over the placement line.7. Usinganappliquéiron,pressthefabrictotheFuseandFleece,beingcarefulnottotouchtheappliquéirontotheexposed
fusibleareasof theFuse&Fleece.YoucanalsouseaTeflonpressingsheetovertheprojecttopreventtouchingtheirontothe fusible coating.
8. ReturnthehooptothemachineandstitchColorChange2–Tackdown.9. StitchColorChange3–Stipple.10. Remove the project from the hoop.11. Usingarotarycutterorscissors,trimtheprojectbackto¼”fromtheTackdownline.
Step Two: Create the Pouch Front
Fabrics:• Fabric1–6½”x5½”• Fabric2–6½”x2 ½”• Fabric3–6½”x5½”• Fabric4–6½”x2 ½”
1. Press fabrics 1 and 3 in half, WRONG sides together, lengthwise.2. Thread the embroidery machine with OESD Bobbin thread in the bobbin and desired Isacord thread in the needle.3. Selectdesign12623-01–Pouch1front.4. Hoop a piece of OESD Fuse & Fleece with the fusible side up.5. StitchColorChange1–ZipperPlacementStitch.6. Place the zipper onto the hoop within the placement lines. The zipper stops should be OUTSIDE the placement line. The
zipper pull should be at the top position. Use removable tape on either side of the zipper to hold in place temporarily.7. StitchColorChange2–ZipperTackdown.Thiswillbastethezipperinplace.8. Remove the hoop from the machine but do not remove the project from the hoop. Place the folded Fabric 1 onto the project
in Position 1 (see piecing guide), aligning the folded edge with the zipper teeth. The top and bottom raw edges of the fabrics should align with or just past the zipper placement line.
9. Usingasmallappliquéiron,pressthefabrictotheFuse&Fleece,beingcarefulnottotouchtheappliquéirontotheexposed fusibleareasof theFuse&Fleece.YoucanalsouseaTeflonpressingsheetovertheprojecttopreventtouchingtheironto the fusible coating.
10. ReturntheprojecttothemachineandstitchColorChange3–Tackdown1.Thiswillstitchtheedgestitchingnexttothezip-perwhiletackingFabric1inplace.
11. StitchColorChange4–PlacementStitch2.ThisistheplacementguideforFabric2.12. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric1toa¼”seamallowanceto
the outside of the placement line.13. Place Fabric 2 RIGHT sides together with Fabric 1, aligning the long edge with the seam allowance created in the previous
step.14. ReplacethehooponthemachineandstitchColorChange5–Tackdown2.ThiswillstitchaseamforFabric2.15. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
16. Place the folded Fabric 3 along onto the project in Position 3 (see piecing guide), aligning the folded edge with the zipperteeth. The top and bottom raw edges of the fabrics should align with or just past the zipper placement line. Using a small ap-pliquéiron,pressthefabrictotheFuse&Fleece,beingcarefulnottotouchtheappliquéirontotheexposedfusibleareasofthe Fuse & Fleece.
17. ReturnthehooptothemachineandstitchColorChange6–Tackdown3.Thiswillstitchtheedgestitchingnexttothezip-perwhiletackingFabric3inplace.
18. StitchColorChange7–PlacementStitch4.ThisistheplacementguideforFabric4.19. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric3toa¼”seamallowanceto
the outside of the placement line.20. Place Fabric 4 RIGHT sides together with Fabric 3, aligning the long raw edge with the seam allowance created in the previ-
ous step.21. ReplacethehooponthemachineandstitchColorChange8–Tackdown4.ThiswillstitchaseamforFabric4.22. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.23. ReplacethehooponthemachineandstitchColorChange9–BastingStitch.24. StitchColorChange10–Stipple.25. UNZIP the zipper halfway so the zipper stop is within the pouch front.26. Placethefinishedprojectbackrightsidestogetherwiththeprojectfront,aligningtheTackdownlineontheprojectbackwith
thebastinglineontheprojectfront.Useremovabletapetoholdtheprojectbackinplace.27. StitchColorChange11–SeamStitch.28. Removetheprojectfromthehoopandtrimalllayersto¼”fromtheseamstitchline.Clipcorners.29. Cut away the OESD Fuse & Fleece from behind the zipper (in between the zipper placement lines).30. Turn the project right side out through the zipper opening. Use a point turner to push out corners and press the project.
12623-01 12623-02
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
Pouch 2:
Step One: Create the Pouch Back
Fabrics:• Fabric1–6½”x6½”• Fabric2–5”x3”• Fabric3–5”x3”
1. Thread the embroidery machine with OESD Bobbin thread in the bobbin and desired Isacord thread in the needle.2. Selectdesign12623-04–Pouch2Back3. Hoop a piece of OESD Fuse & Fleece with the fusible side up.4. StitchColorChange1–BackgroundPlacementStitch5. Remove the hoop from the machine, but do not remove the project from the hoop.6. Place Fabric 1 right side up onto the OESD Fuse & Fleece over the placement line.7. Usinganappliquéiron,pressthefabrictotheFuseandFleece,beingcarefulnottotouchtheappliquéirontotheexposed
fusibleareasof theFuse&Fleece.YoucanalsouseaTeflonpressingsheetovertheprojecttopreventtouchingtheirontothe fusible coating.
8. ReturnthehooptothemachineandstitchColorChange2–BackgroundTackdown9. Trimexcessfabricto¼”totheoutsideof theTackdown.10. StitchColorChange3–PlacementStitch2.11. PlaceFabric2overPlacementStitch2,rightsidestogetherwithFabric1,aligningtheedgeof thefabric¼”withthe¼”
seam allowance trimmed in step 9.12. StitchColorChange4–Tackdown2.13. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.14. StitchColorChange5–PlacementStitch3.15. PlaceFabric3overPlacementStitch3,rightsidestogetherwithFabric1,aligningtheedgeof thefabricwiththe¼”seam
allowance trimmed in step 9.16. StitchColorChange6–Tackdown317. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.18. StitchColorChange7–BastingStitch19. StitchColorChange8-Quilting20. Removetheprojectfromthehoop.Usingarotarycutterorscissors,trimtheprojectbackto¼”fromtheBastingline.
Step Two: Create the Pouch Front
Fabrics:• Fabric1–6½”x6”• Fabric2–4½”x2½”• Fabric3–4½”x2½”• Fabric4–6½”x6”• Fabric5–4½”x2½”• Fabric6–4½”x2½”
1. Press the Fabric 1 and Fabric 4 in half, WRONG sides together, lengthwise.2. Thread the embroidery machine with OESD Bobbin thread in the bobbin and desired Isacord thread in the needle.3. Selectdesign12623-03–Pouch2front.4. Hoop a piece of OESD Fuse & Fleece with the fusible side up.5. StitchColorChange1–ZipperPlacementStitch.6. Place the zipper onto the hoop within the placement lines. The zipper stops should be OUTSIDE the placement line. The
zipper pull should be at the top position. Use removable tape on either side of the zipper to hold in place temporarily.
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
7. StitchColorChange2–ZipperTackdown.Thiswillbastethezipperinplace.8. Remove the hoop from the machine but do not remove the project from the hoop. Place the folded Fabric 1 onto the project
in Position 1 (see piecing guide), aligning the folded edge with the zipper teeth. The top and bottom raw edges of the fabricsshould align with or just past the zipper placement line.
9. Usingasmallappliquéiron,pressthefabrictotheFuse&Fleece,beingcarefulnottotouchtheappliquéirontotheexposedfusibleareasof theFuse&Fleece.YoucanalsouseaTeflonpressingsheetovertheprojecttopreventtouchingtheirontothe fusible coating.
10. ReturntheprojecttothemachineandstitchColorChange3–Tackdown1.Thiswillstitchtheedgestitchingnexttothezip-perwhiletackingFabric1inplace.
11. StitchColorChange4–PlacementStitch2.ThisistheplacementguideforFabric2.12. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric1toa¼”seamallowanceto
the outside of the placement line.13. Place Fabric 2 RIGHT sides together with Fabric 1, aligning the long raw edge with the seam allowance created in the previ-
ous step.14. ReplacethehooponthemachineandstitchColorChange5–Tackdown2.ThiswillstitchaseamforFabric2.15. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.16. ReplacethehooponthemachineandstitchColorChange6–PlacementStitch3.17. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric1toa¼”seamallowance
beyond the placement line.18. Place Fabric 3 RIGHT sides together with Fabric 1, aligning the raw edge with the seam allowance you just trimmed.19. ReplacethehooponthemachineandstitchColorChange7–Tackdown3.ThiswillstitchaseamforFabric3.20. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.21. Place the folded Fabric 4 onto the project in Position 4 (see piecing guide), aligning the folded edge with the zipper teeth. The
top and bottom raw edges of the fabrics should align with or just past the zipper placement line. Using a small appliqué iron,pressthefabrictotheFuse&Fleece,beingcarefulnottotouchtheappliquéirontotheexposedfusibleareasof theFuse&Fleece.
22. ReturnthehooptothemachineandstitchColorChange8–Tackdown4.Thiswillstitchtheedgestitchingnexttothezip-perwhiletackingFabric4inplace.
23. StitchColorChange9–PlacementStitch5.ThisistheplacementguideforFabric5.24. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric4toa¼”seamallowanceto
the outside of the placement line.25. Place Fabric 5 RIGHT sides together with Fabric 4, aligning the long raw edge with the seam allowance trimmed in the previ-
ous step.26. ReplacethehooponthemachineandstitchColorChange10–Tackdown5.ThiswillstitchaseamforFabric5.27. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.28. ReplacethehooponthemachineandstitchColorChange11–PlacementStitch629. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric4toa¼”seamallowance
beyond the placement line.30. Place Fabric 6 RIGHT sides together with Fabric 4, aligning the raw edge with the seam allowance you just trimmed.31. ReplacethehooponthemachineandstitchColorChange12–Tackdown6.ThiswillstitchaseamforFabric6.32. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.33. ReplacethehooponthemachineandstitchColorChange13–BastingStitch.34. StitchColorChange14–Quilting35. UNZIP the zipper halfway so the zipper stop is within the pouch front.36. Placethefinishedprojectbackrightsidestogetherwiththeprojectfront,aligningtheTackdownlineontheprojectbackwith
thebastinglineontheprojectfront.Useremovabletapetoholdtheprojectbackinplace.37. StitchColorChange15–SeamStitch.38. Removetheprojectfromthehoopandtrimalllayersto¼”fromtheseamstitchline.Clipcorners39. Cut away the OESD Fuse & Fleece from behind the zipper (in between the zipper placement lines).
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
40. Turn the project right side out through the zipper opening. Use a point turner to push out corners and pressthe project.
12623-03 12623-04
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
Pouch 3:
Step One: Create the Pouch Back
Fabrics:• Fabric1–6”x3½”• Fabric2–6”x3½”
1. Thread the embroidery machine with OESD Bobbin thread in the bobbin and desired Isacord thread in the needle.2. Selectdesign12623-06–Pouch3Back.3. Hoop a piece of OESD Fuse & Fleece with the fusible side up.4. StitchColorChange1–PlacementStitch15. Remove the hoop from the machine, but do not remove the project from the hoop.6. Place Fabric 1 right side up onto the OESD Fuse & Fleece over the placement line.7. Using an appliqué iron, press the fabric to the Fuse and Fleece. (Keep the project in the hoop)8. ReturnthehooptothemachineandstitchColorChange2–BackgroundTackdown9. Trimtheexcessfabrictoa¼”seamallowancearoundtheoutsideof theTackdownline.10. StitchColorChange3–PlacementStitch211. Place Fabric 2 right sides together with Fabric 1, aligning the edge of the fabric with the seam allowance just trimmed.12. StitchColorChange4–Tackdown2.13. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.14. StitchColorChange5–BastingStitch15. StitchColorChange6-Quilting16. Removetheprojectfromthehoop.Usingarotarycutterorscissors,trimtheprojectbackto¼”fromtheBastingline.
Step Two: Create the Pouch Front
Fabrics:• Fabric1–6“x5”• Fabric2–5”x2”• Fabric3–5”x2”• Fabric4–6“x5”• Fabric5–5”x2”• Fabric6–5”x2”
1. Press Fabric 1 and Fabric 4 in half, WRONG sides together, lengthwise.2. Thread the embroidery machine with OESD Bobbin thread in the bobbin and desired Isacord thread in the needle.3. Selectdesign12623-05–Pouch3front4. Hoop a piece of OESD Fuse & Fleece with the fusible side up.5. StitchColorChange1–ZipperPlacementStitch6. Place the zipper onto the hoop within the placement lines. The zipper stops should be OUTSIDE the placement line. The
zipper pull should be at the top position. Use removable tape on either side of the zipper to hold in place temporarily.7. StitchColorChange2–ZipperTackdown.Thiswillbastethezipperinplace.8. Remove the hoop from the machine but do not remove the project from the hoop. Place the folded Fabric 1 onto the project
in Position 1 (see piecing guide), aligning the folded edge with the zipper teeth. The top and bottom raw edges of the fabrics should align with or just past the zipper placement line.
9. Usingasmallappliquéiron,pressthefabrictotheFuse&Fleece,beingcarefulnottotouchtheappliquéirontotheexposed fusibleareasof theFuse&Fleece.YoucanalsouseaTeflonpressingsheetovertheprojecttopreventtouchingtheironto the fusible coating.
10. ReturntheprojecttothemachineandstitchColorChange3–Tackdown1.Thiswillstitchtheedgestitchingnexttothezip-perwhiletackingFabric1inplace.
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
11. StitchColorChange4–PlacementStitch2.ThisistheplacementguideforFabric2.12. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric1toa¼”seamallowanceto
the outside of the placement line.13. Place Fabric 2 RIGHT sides together with Fabric 1, aligning the raw edge with the seam allowance trimmed in the previous
step.14. ReplacethehooponthemachineandstitchColorChange5–Tackdown2.ThiswillstitchaseamforFabric2.15. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.16. ReplacethehooponthemachineandstitchColorChange6–PlacementStitch3.17. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.Trimfabrics1&2toa¼”seamallow-
ance outside the placement line.18. Place Fabric 3 RIGHT sides together with fabrics 1 & 2, aligning the raw edge with the seam allowance you just trimmed.19. ReplacethehooponthemachineandstitchColorChange7–Tackdown3.ThiswillstitchaseamforFabric3.20. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.21. Place the folded Fabric 4 along onto the project in Position 4 (see piecing guide), aligning the folded edge with the zipper
teeth. The top and bottom raw edges of the fabrics should align with or just past the zipper placement line. Using a small ap-pliquéiron,pressthefabrictotheFuse&Fleece,beingcarefulnottotouchtheappliquéirontotheexposedfusibleareasofthe Fuse & Fleece.
22. ReturnthehooptothemachineandstitchColorChange8–Tackdown4.Thiswillstitchtheedgestitchingnexttothezip-perandtackFabric4inplace.
23. StitchColorChange9–PlacementStitch5.ThisistheplacementguideforFabric5.24. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric4toa¼”seamallowanceto
the outside of the placement line.25. Place Fabric 5 RIGHT sides together with Fabric 4, aligning the long edge with the seam allowance you just trimmed.26. ReplacethehooponthemachineandstitchColorChange10–Tackdown5.ThiswillstitchaseamforFabric5.27. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.28. ReplacethehooponthemachineandstitchColorChange11–PlacementStitch6.29. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.Trimfabrics4&5toa¼”seamallow-
ance beyond the placement line.30. Place Fabric 6 RIGHT sides together with fabrics 4 & 5, aligning the raw edge with the seam allowance you just trimmed.31. ReplacethehooponthemachineandstitchColorChange12–Tackdown6.ThiswillstitchaseamforFabric6.32. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.33. ReplacethehooponthemachineandstitchColorChange13–BastingStitch.34. StitchColorChange14–Quilting35. UNZIP the zipper halfway so the zipper stop is within the pouch front.36. PlacethefinishedPouchBackrightsidestogetherwiththePouchFront,aligningtheTackdownlineonthePouchBackwith
thebastinglineonthePouchFront.Useremovabletapetoholdtheprojectbackinplace.37. StitchColorChange15–SeamStitch.38. Removetheprojectfromthehoopandtrimalllayersto¼”fromtheseamstitchline.Clipcorners39. Cut away the OESD Fuse & Fleece from behind the zipper (in between the zipper placement lines).40. Turn the project right side out through the zipper opening. Use a point turner to push out corners and press the project.
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
12623-05 12623-06
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
Pouch 4:
Step One: Create the Pouch Back
Fabrics:• Fabric1–4½”x3½”• Fabric2–4½”x3½”• Fabric3–6”x3”
1. Thread the embroidery machine with OESD Bobbin thread in the bobbin and desired Isacord thread in the needle.2. Selectdesign12623-08–Pouch4Back3. Hoop a piece of OESD Fuse & Fleece with the fusible side up.4. StitchColorChange1–PlacementStitch15. Remove the hoop from the machine, but do not remove the project from the hoop.6. Place Fabric 1 right side up onto the OESD Fuse & Fleece over the placement line.7. Using an appliqué iron, press the fabric to the Fuse and Fleece. (Keep the project in the hoop)8. ReturnthehooptothemachineandstitchColorChange2–Tackdown19. Trimtheexcessfabrictoa¼”seamallowancearoundtheoutsideof theTackdown.10. StitchColorChange3–PlacementStitch2.11. Place Fabric 2 over placement stitch 2, right sides together with Fabric 1, aligning the edge of the fabric with the seam allow-
ance trimmed in step 9.12. StitchColorChange4–Tackdown2.13. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.14. StitchColorChange5–PlacementStitch3.15. Trimtheexcessfabric1&2toa¼”seamallowancebeyondtheplacementstitch.16. Place Fabric 3 over Placement Stitch 3, right sides together with fabrics 1 & 2, aligning the edge of the fabric with the seam
allowance trimmed in the previous step.17. StitchColorChange6–Tackdown318. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.19. StitchColorChange7–BastingStitch20. StitchColorChange8-Quilting21. Removetheprojectfromthehoop.Usingarotarycutterorscissors,trimtheprojectbackto¼”fromtheTackdownline.
Step Two: Create the Pouch Front
Fabrics:• Fabric1–6½”x4• Fabric2–5”x2”• Fabric3–5”x3”• Fabric4–6½”x4• Fabric5–5”x2”• Fabric6–5”x3”
1. Press the Fabric 1 and Fabric 4 in half, WRONG sides together, lengthwise.2. Thread the embroidery machine with OESD Bobbin thread in the bobbin and desired Isacord thread in the needle.3. Selectdesign12623-07–Pouch4front4. Hoop a piece of OESD Fuse & Fleece with the fusible side up.5. StitchColorChange1–ZipperPlacementStitch6. Place the zipper onto the hoop within the placement lines. The zipper stops should be OUTSIDE the placement line. The
zipper pull should be at the top position. Use removable tape on either side of the zipper to hold in place temporarily.
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
7. StitchColorChange2–ZipperTackdown.Thiswillbastethezipperinplace.8. Remove the hoop from the machine but do not remove the project from the hoop. Place the folded Fabric 1 onto the project
in Position 1 (see piecing guide), aligning the folded edge with the zipper teeth. The top and bottom raw edges of the fabricsshould align with or just past the zipper placement line.
9. Usingasmallappliquéiron,pressthefabrictotheFuse&Fleece,beingcarefulnottotouchtheappliquéirontotheexposedfusibleareasof theFuse&Fleece.YoucanalsouseaTeflonpressingsheetovertheprojecttopreventtouchingtheirontothe fusible coating.
10. ReturntheprojecttothemachineandstitchColorChange3–Tackdown1.Thiswillstitchtheedgestitchingnexttothezip-perwhiletackingfabric1inplace.
11. StitchColorChange4–PlacementStitch2.ThisistheplacementguideforFabric2.12. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric1toa¼”seamallowanceto
the outside of the placement line.13. Place Fabric 2 RIGHT sides together with Fabric 1, aligning the raw edge with the seam allowance trimmed in the previous
step.14. ReplacethehooponthemachineandstitchColorChange5–Tackdown2.ThiswillstitchaseamforFabric2.15. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.16. ReplacethehooponthemachineandstitchColorChange6–PlacementStitch317. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.Trimfabrics1&2toa¼”seamallow-
ance beyond the placement line.18. Place Fabric 3 RIGHT sides together with fabrics 1 & 2, aligning the raw edge with the seam allowance you just trimmed.19. ReplacethehooponthemachineandstitchColorChange7–Tackdown3.ThiswillstitchaseamforFabric3.20. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.21. Place the folded Fabric 4 along onto the project in Position 4 (see piecing guide), aligning the folded edge with the zipper
teeth. The top and bottom raw edges of the fabrics should align with or just past the zipper placement line. Using a small ap-pliquéiron,pressthefabrictotheFuse&Fleece,beingcarefulnottotouchtheappliquéirontotheexposedfusibleareasofthe Fuse & Fleece.
22. ReturnthehooptothemachineandstitchColorChange8–Tackdown4.Thiswillstitchtheedgestitchingnexttothezip-perwhiletackingFabric4inplace.
23. StitchColorChange9–PlacementStitch5.ThisistheplacementguideforFabric5.24. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric4toa¼”seamallowanceto
the outside of the placement line.25. Place Fabric 5 RIGHT sides together with Fabric 4, aligning the long raw edge with the seam allowance trimmed in the previ-
ous step.26. ReplacethehooponthemachineandstitchColorChange10–Tackdown5.ThiswillstitchaseamforFabric5.27. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.28. ReplacethehooponthemachineandstitchColorChange11–PlacementStitch629. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.Trimfabrics4&5toa¼”seamallow-
ance beyond the placement line.30. Place Fabric 6 RIGHT sides together with fabrics 4 & 5, aligning the raw edge with the seam allowance you just trimmed.31. ReplacethehooponthemachineandstitchColorChange12–Tackdown6.ThiswillstitchaseamforFabric6.32. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.33. ReplacethehooponthemachineandstitchColorChange13–BastingStitch.34. StitchColorChange14–Quilting35. UNZIP the zipper halfway so the zipper stop is within the pouch front.36. PlacethefinishedPouchBackrightsidestogetherwiththePouchFront,aligningtheTackdownlineonthePouchBackwith
thebastinglineonthePouchFront.Useremovabletapetoholdtheprojectbackinplace.37. StitchColorChange15–SeamStitch.38. Removetheprojectfromthehoopandtrimalllayersto¼”fromtheseamstitchline.Clipcorners
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
39. Cut away the OESD Fuse & Fleece from behind the zipper (in between the zipper placement lines).40. Turn the project right side out through the zipper opening. Use a point turner to push out corners and press the project.
12623-07 12623-08
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
Pouch 5:
Step One: Create the Pouch Back
Fabrics:• Fabric1–7”x7”
1. Thread the embroidery machine with OESD Bobbin thread in the bobbin and desired Isacord thread in the needle.2. Selectdesign12623-10–Pouch5back3. Hoop a piece of OESD Fuse & Fleece with the fusible side up.4. StitchColorChange1–PlacementStitch5. Remove the hoop from the machine, but do not remove the project from the hoop.6. Place Fabric 1 right side up onto the OESD Fuse & Fleece, centering the fabric over the placement line.7. Using an appliqué iron, press the fabric to the Fuse and Fleece. (Keep the project in the hoop).8. ReturnthehooptothemachineandstitchColorChange2–Tackdown.9. StitchColorChange3–Quilting.10. Remove the project from the hoop.11. Usingarotarycutterorscissors,trimtheprojectbackto¼”fromtheTackdownline.
Step Two: Create the Pouch Front
Fabrics:• Fabric1–6”x4”• Fabric2–6”x2½”• Fabric3–6”x4”• Fabric4–6”x2½”
1. Press fabrics 1 and 3 in half, WRONG sides together, lengthwise.2. Thread the embroidery machine with OESD Bobbin thread in the bobbin and desired Isacord thread in the needle.3. Selectdesign12623-09–Pouch5front4. Hoop a piece of OESD Fuse & Fleece with the fusible side up.5. StitchColorChange1–ZipperPlacementStitch6. Place the zipper onto the hoop within the placement lines. The zipper stops should be OUTSIDE the placement line. The
zipper pull should be at the top position. Use removable tape on either side of the zipper to hold in place temporarily.7. StitchColorChange2–ZipperTackdown.Thiswillbastethezipperinplace.8. Remove the hoop from the machine but do not remove the project from the hoop. Place the folded Fabric 1 onto the project
in Position 1 (see piecing guide), aligning the folded edge with the zipper teeth. The top and bottom raw edges of the fabrics should align with or just past the zipper placement line.
9. Usingasmallappliquéiron,pressthefabrictotheFuse&Fleece,beingcarefulnottotouchtheappliquéirontotheexposed fusibleareasof theFuse&Fleece.YoucanalsouseaTeflonpressingsheetovertheprojecttopreventtouchingtheironto the fusible coating.
10. ReturntheprojecttothemachineandstitchColorChange3–Tackdown1.Thiswillstitchtheedgestitchingnexttothezip-perwhiletackingFabric1inplace.
11. StitchColorChange4–PlacementStitch2.ThisistheplacementguideforFabric2.12. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric1toa¼”seamallowanceto
the outside of the placement line.13. Place Fabric 2 RIGHT sides together with Fabric 1, aligning the long raw edge with the seam allowance you just trimmed.14. ReplacethehooponthemachineandstitchColorChange5–Tackdown2.ThiswillstitchaseamforFabric2.15. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.16. Place the folded Fabric 3 along onto the project in Position 3 (see piecing guide), aligning the folded edge with the zipper
teeth. The top and bottom raw edges of the fabrics should align with or just past the zipper placement line. Using a small ap-
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
pliquéiron,pressthefabrictotheFuse&Fleece,beingcarefulnottotouchtheappliquéirontotheexposedfusibleareasof the Fuse & Fleece.
17. ReturnthehooptothemachineandstitchColorChange6–Tackdown3.Thiswillstitchtheedgestitchingnexttothezip-perwhiletackingFabric3inplace.
18. StitchColorChange7–PlacementStitch4.ThisistheplacementguideforFabric4.19. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric3toa¼”seamallowanceto
the outside of the placement line.20. Place Fabric 4 RIGHT sides together with Fabric 3, aligning the raw edge with the seam allowance you just trimmed.21. ReplacethehooponthemachineandstitchColorChange8–Tackdown4.ThiswillstitchaseamforFabric4.22. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.23. ReplacethehooponthemachineandstitchColorChange9–BastingStitch.24. StitchColorChange10–Quilting.25. UNZIP the zipper halfway so the zipper stop is within the pouch front.26. Placethefinishedprojectbackrightsidestogetherwiththeprojectfront,aligningtheTackdownlineontheprojectbackwith
thebastinglineontheprojectfront.Useremovabletapetoholdtheprojectbackinplace.27. StitchColorChange11–SeamStitch.28. Removetheprojectfromthehoopandtrimalllayersto¼”fromtheseamstitchline.Clipcorners29. Cut away the OESD Fuse & Fleece from behind the zipper (in between the zipper placement lines).30. Turn the project right side out through the zipper opening. Use a point turner to push out corners and press the project.
12623-09 12623-10
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
Pouch 6:
Step One: Create the Pouch Back
Fabrics:• Fabric1–6”x4”• Fabric2–5½”x2½”• Fabric3–6”x2½”
1. Thread the embroidery machine with OESD Bobbin thread in the bobbin and desired Isacord thread in the needle.2. Selectdesign12623-12–Pouch6back3. Hoop a piece of OESD Fuse & Fleece with the fusible side up.4. StitchColorChange1–BackgroundPlacementStitch5. Remove the hoop from the machine, but do not remove the project from the hoop.6. Place Fabric 1 right side up onto the OESD Fuse & Fleece over the placement line.7. Using an appliqué iron, press the fabric to the Fuse and Fleece. (Keep the project in the hoop)8. ReturnthehooptothemachineandstitchColorChange2–BackgroundTackdown9. StitchColorChange3–PlacementStitch2.10. Trimtheexcessfabrictoa¼”seamallowancearoundtheoutsideof theplacementline.11. Place Fabric 2 right sides together with Fabric 1, aligning the edge of the fabric with the seam allowance you just trimmed.12. StitchColorChange4–Tackdown213. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.14. StitchColorChange5–PlacementStitch3.15. PlaceFabric3rightsidestogetherwithFabric1,aligningtheedgeof thefabric¼”withtheseamallowanceyoutrimmedin
step 10.16. StitchColorChange6–Tackdown317. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.18. StitchColorChange7–BastingStitch19. StitchColorChange8-Quilting20. Removetheprojectfromthehoop.Usingarotarycutterorscissors,trimtheprojectbackto¼”fromtheBastingline.
Step Two: Create the Pouch Front
Fabrics:• Fabric1–6”x5”• Fabric2–5½”x2½”• Fabric3–6”x5”• Fabric4–5½”x2½”
1. Press fabrics 1 and 3 in half, WRONG sides together, lengthwise.2. Thread the embroidery machine with OESD Bobbin thread in the bobbin and desired Isacord thread in the needle.3. Selectdesign12623-11–Pouch6front4. Hoop a piece of OESD Fuse & Fleece with the fusible side up.5. StitchColorChange1–ZipperPlacementStitch6. Place the zipper onto the hoop within the placement lines. The zipper stops should be OUTSIDE the placement line. The
zipper pull should be at the top position. Use removable tape on either side of the zipper to hold in place temporarily.7. StitchColorChange2–ZipperTackdown.Thiswillbastethezipperinplace.8. Remove the hoop from the machine but do not remove the project from the hoop. Place the folded Fabric 1 onto the project
in Position 1 (see piecing guide), aligning the folded edge with the zipper teeth. The top and bottom raw edges of the fabrics should align with or just past the zipper placement line.
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
9. Usingasmallappliquéiron,pressthefabrictotheFuse&Fleece,beingcarefulnottotouchtheappliquéirontotheexposedfusibleareasof theFuse&Fleece.YoucanalsouseaTeflonpressingsheetovertheprojecttopreventtouchingtheirontothe fusible coating.
10. ReturntheprojecttothemachineandstitchColorChange3–Tackdown1.ThiswillstitchtheedgestitchingnexttothewhiletackingFabric1inplace.
11. StitchColorChange4–PlacementStitch2.ThisistheplacementguideforFabric2.12. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric1toa¼”seamallowanceto
the outside of the placement line.13. Place Fabric 2 RIGHT sides together with Fabric 1, aligning the long raw edge with the seam allowance trimmed in the previ-
ous step.14. ReplacethehooponthemachineandstitchColorChange5–Tackdown2.ThiswillstitchaseamforFabric2.15. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.16. Place the folded Fabric 3 along onto the project in Position 3 (see piecing guide), aligning the folded edge with the zipper
teeth. The top and bottom raw edges of the fabrics should align with or just past the zipper placement line. Using a small ap-pliquéiron,pressthefabrictotheFuse&Fleece,beingcarefulnottotouchtheappliquéirontotheexposedfusibleareasofthe Fuse & Fleece.
17. ReturnthehooptothemachineandstitchColorChange6–Tackdown3.Thiswillstitchtheedgestitchingnexttothezip-perwhiletackingFabric3inplace.
18. StitchColorChange7–PlacementStitch4.ThisistheplacementguideforFabric4.19. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.TrimFabric3toa¼”seamallowanceto
the outside of the placement line.20. Place Fabric 4 RIGHT sides together with Fabric 3, aligning the long raw edge with the seam allowance trimmed in the previ-
ous step.21. ReplacethehooponthemachineandstitchColorChange8–Tackdown4.ThiswillstitchaseamforFabric4.22. Removethehoopfromthemachinebutdonotremovetheprojectfromthehoop.FlipthefabricpiecebackontotheFuse&
Fleece. Using the appliqué iron, press the fabric to the OESD Fuse and Fleece.23. ReplacethehooponthemachineandstitchColorChange9–BastingStitch.24. StitchColorChange10–Quilting25. UNZIP the zipper halfway so the zipper stop is within the pouch front.26. Placethefinishedprojectbackrightsidestogetherwiththeprojectfront,aligningtheTackdownlineontheprojectbackwith
thebastinglineontheprojectfront.Useremovabletapetoholdtheprojectbackinplace.27. StitchColorChange11–SeamStitch.28. Removetheprojectfromthehoopandtrimalllayersto¼”fromtheseamstitchline.Clipcorners29. Cut away the OESD Fuse & Fleece from behind the zipper (in between the zipper placement lines).30. Turn the project right side out through the zipper opening. Use a point turner to push out corners and press the project.
It is a violation of Copyright law to make and distribute copies of instructions or artwork. Electronic designs are licensed to the original purchaser for use at one location. ©2016 OESD, LLC. All rights reserved.
InstructionsPatchwork Zipper Pouches
12623-11 12623-12