CDM Strategy brief
The first stage in developing a clear plan for managing the significant risk issues
associated with successful project delivery:
• Scope
• Client H&S brief
• Project timescales
• Pre-construction information ie. Site and Design Concept
• Project leadership
• Procurement strategy
• Communication strategy
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Identify - Site Issues
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Develop the Concept and hold Design Review
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Proposed Ground Floor Plan – Site analysis & design response
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
CDM Review- Short and Sharp eg. Flipchart at a DTM
Briefly record the foreseeable risks and issue to team
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Capture the identified significant risks on CDM Visual Risk Analysis Drawings
Capture the other consultants significant risks
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Cross reference with a simple Risk Register
CDM - Intelligent Drawing Annotation
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
ALLFORD HALL MONAGHAN MORRIS
CDM - Intelligent Drawing Annotation
Legend to Identify Risk’s by what’s annotated on each Revit Sheet
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Significant Risks identified on Sections & Elevations
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Complex risk analysis issues need more detail to include all other factors
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Use CGI’s and concept design drawings or sketches to explore the detail
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Use project drawings to analyse and explore difficult issues
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Develop a visual risk analysis, storyboard or pathway, with tracking
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Hold a collaborative buildability review with
the full team. Develop sketches on flipcharts
or whiteboards collaboratively
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Capture the collaborative design sketch outputs in CDM analysis sheets
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Analysis sheets distributed to whole team with actions noted & dialogue
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Process is applicable to smaller projects proportionately
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Existing and proposed plans annotated and RAG’d
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Everything can be shown on one drawing
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Paul Bussey RIBA , RMaPS 2015, MIFireE,
Technical Consultant, AHMM Architects.
CDM 2015:
A Practical
Guide for
Architects
and
Designers
and
RIBA
PD Course in
2015-17
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Create Better & Safer Architecture CDM 2015
AHMM Architects, RIBA, IIRSM
Demystifying the Principal Designer Role
Collaboration and teamwork is key………
As Judith Hackett ( Past HSE Chair) said:-
“From now on ,if we all work together with a clear vision
and purpose we can recommence improvement and bring
about a change for the better”
HSE Strategy - Acting together
Promoting broader ownership of health and safety in
Great Britain