© Holcim Ltd 2010 Holcim Canada – an overview Paul Ostrander – CEO Holcim Canada Mississauga Cement Plant February 15, 2011
Transcript
Page 1: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

© Holcim Ltd 2010

Holcim Canada – an overview

Paul Ostrander – CEO Holcim Canada

Mississauga Cement Plant

February 15, 2011

Page 2: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

2

© Holcim Canada (Ltd) Mississauga Cement Plant February 15, 2011

Holcim Canada will soon celebrate 60 years of operations in Canada with a history dotted with strategic acquisitions and growth

Atlas Realities (later St. Lawrence

Cement) is incorporated by

Holderbank (later Holcim)

Cement production begins in Quebec (1954) & Ontario

(1956)

St. Lawrence Cement is listed on Montreal & Toronto Stock

Exchanges

Acquisition of Dufferin assets

Acquisition of 50% share in Quebec Ready-Mix & De-

Mix

Acquisition of Joliette Cement Plant & Ontario

concrete operators

(Boehmers & Peninsula)

Acquisition of cement plants in Catskill New York and Hagerstown

Maryland

Creation of strategy waste

recycling committee

(AFR at Joliette in

1994)

Acquisition of NorthStar Cement (Nfld) and Gormley

Aggregates

Acquisition of TCG, Acton and

Mosport.

Launch of Shared

Services

Installation of Vertical Roller Mill & Clinker

Cooler

Acquisition of Ontario Red-Mix & Beton Grilli

& Lunick

St. Lawrence Cement becomes Holcim Canada

1951 1954-56 1961 1965 1973-76 1984-85 1990 1997 2001 2007 2009

Holcim Ltd. buyout of St.

Lawrence Cement minority

shareholders

Matured vertical integration strategy to concentrate on areas surrounding cement

plants

Page 3: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

3

© Holcim Canada (Ltd) Mississauga Cement Plant February 15, 2011

Fully Integrated Cement & ConstructionConstruction Only

Holcim Canada is a fully integrated player in the highly populated Greater Toronto (GTA) and Greater Montreal (GMA) markets

GTA

GMA

GMA

GTA

Cement Plant

Aggregate (8)

Ready-Mix (20)

Cement Plant

Aggregate (5)

Ready-Mix (9)

Page 4: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

4

© Holcim Canada (Ltd) Mississauga Cement Plant February 15, 2011

The Canadian economy is closely linked to that of the United States. As such there has been an economic impact but this impact has thus far been mitigated and there was a strong rebound in late 2009 and early 2010

GDP (% Change)

-4

-2

0

2

4

2005 2006 2007 2008 2009 2010 2011

CAD US

Total Construction (% Change)

-20

-10

0

10

20

2005 2006 2007 2008 2009 2010 2011

CAD US

Cement Consumption (% Change)

-30

-20

-10

0

10

20

2005 2006 2007 2008 2009 2010 2011

CAD US (incl. imports)

Housing Starts (% Change)

-50

-25

0

25

2005 2006 2007 2008 2009 2010 2011

CAD US

Source: PCA 2010 Summer Forecasts for the US and Canada, August 2010

Page 5: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

5

© Holcim Canada (Ltd) Mississauga Cement Plant February 15, 2011

Holcim Canada has a commitment to Sustainable Development with Corporate Objectives for OH&S, Environment and Social initiatives

3.22.2 2.3

0.6

4.2

1.1

7.1

5.6

3.9

2.7< 2.0

0

2

4

6

8

2005 2006 2007 2008 2009 2010

LTIFR Target

850 652 610 6070

100

200

300

400

500

600

700

800

900

1990A 2007A 2008A 2009A

CO

2 ne

t / t

cem

Annual CO2

25% Reduction Target from 1990 LevelsO

H&

S -

LTIF

R

EN

VIR

ON

ME

NT

–C

O2

CO

RP

OR

ATE

SO

CIA

L R

ES

PO

NS

IBIL

ITY

Holcim Canada maintains Community Advisory Panels (CAPS) at all operating sites (proportional to site size)

CO

MM

UN

ITY

SP

ON

SO

RS

HIP

LTIFR: Lost Time Incident Frequency Rate

Page 6: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

6

© Holcim Canada (Ltd) Mississauga Cement Plant February 15, 2011

Holcim Canada is well integrated into the Value Chain with a broad customer base ranging from product supply of cement to solutions providing construction services

Page 7: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

7

© Holcim Canada (Ltd) Mississauga Cement Plant February 15, 2011

Holcim Canada optimizes Vertical Integration in the value chain while improving delivery mechanisms for new product introduction & optimization of existing products

35% of cementitious volumes and 39% of aggregate volume flowed through our vertically integrated channels in 2009.

Transactional

Mortars

Ready-mixConcrete

Asphalt

Concrete Products

Direct Sales

Direct Sales

Traders

Wholesalers

Retailers

Traders

Wholesalers

Retailers

End-users

General Contractors

Civil Engineering

ChannelsTransformational

MasonsSelf - builders

CementitiousMaterials

(cement,mineral

components)

SupplyBasic Materials Processing

Aggregates

(sand, gravel, stone, recycled

aggregates) Infrastructure

Commercial / IndustrialBuilding

Housing

Demand

Appl icat ions

Applications andConstruction Fields

Page 8: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

8

© Holcim Canada (Ltd) Mississauga Cement Plant February 15, 2011

Pervious concrete is a special type of high porosity concrete used where applications require water from precipitation and other sources to pass directly through.

It helps reduce stormwater runoff, replenishes aquifers, protects streams and lakes and allows water and oxygen to reach tree roots.

Ready-Mix is the optimal Business Unit in the Holcim Value Chain for solutions delivery. Innovations in products and services have made the Ready-Mix Business Units into market leaders

PE

RV

IOU

S

CO

NC

RE

TES

PE

CIA

LTY

CO

NC

RE

TE

Specialty concretes were almost 10% of Demix Beton’s volumes in 2009.

Flex concrete is a bending application used with City of Montreal as well as Montreal airport and ports.

Self-Placing is fluid and homogeneous with minimal segregation and bleeding; used primarily for vertical applications.

Anti-Corrosion concrete inhibits the corrosion of steel reinforcement.

EN

VIR

OG

UA

RD

In 2009, Dufferin Concrete won multiple awards for a system that ensures no chute wash water is released into the environment by returning the water used to clean the chute back into the truck’s drum.

The benefits are in cost savings and also a stronger job site environment scorecard which aids in LEEDS points.

LEEDS: Leadership in Energy & Environmental Design

Page 9: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

9

© Holcim Canada (Ltd) Mississauga Cement Plant February 15, 2011

Dufferin Construction, one of the leading highway contractors for the province of Ontario, has been low bidder on 3 RBRs in Ottawa and Hamilton. RBRs are the replacement of a highway bridge overpass over the course of a weekend where the entire bridge is removed and replaced with sectionals built in a nearby staging area. RBR is not only more economical but also offers solutions to the Municipalities in terms of less traffic congestion, a shorter construction cycle and benefits to the public.

Since 1975, Dufferin Construction has been responsible for ‘air-side’ snow removal at Pearson airport – a 24hrs/day, 6months/year contract. 250 DCC personnel have Government of Canada security clearance and are available on 1 hour notice.

The activity not only provides cash flow and operations during traditionally slow construction months but also ensure equipment utilization over the period.

Material recycling has been critical in allowing waste materials deposit sales and also in construction cost reduction.

In 2009, Demix Aggregates sold 230kt of recycled aggregates primarily to Demix Construction’s A-25 PPP project. Additional opportunities for asphalt recycling are being investigated to lower operating costs for construction and provide a potential revenue stream for aggregates.

RA

PID

BR

IDG

E

RE

PLA

CE

ME

NT

AG

GR

EG

ATE

S

RE

CY

CLI

NG

SN

OW

R

EM

OVA

L

Construction, in addition to Ready-Mix, is highly competitive in Greater Toronto and Montreal markets. Providing solutions is how Dufferin and Demix Construction distinguish themselves from other market players

Page 10: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

10

© Holcim Canada (Ltd) Mississauga Cement Plant February 15, 2011

Vertical Integration has also given Holcim Canada the opportunity to move into Solutions Provider roles in large scale projects. This allows the company the ability to optimize its product/service offerings

COMMODITY SOLUTIONS

SUPPLIER

ALLIANCE

BUILD

PARTNERDESIGN &

BUILDMunro Concrete

Products

Ministry of Transportation

A-25 & SAB

407 ETR

Page 11: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

11

© Holcim Canada (Ltd) Mississauga Cement Plant February 15, 2011

A key area of growth for Holcim Canada is participation in Public-Private Partnerships in projects across Canada

• Public Private Partnerships (PPP) are an alternative method for governments to meet the public’s infrastructure needs

• Through long-term PPP contracts that have design, build, finance and operate components, governments can access private sector expertise, technology and capital

407 ETR

Proposed Montreal Hospital

Government

Equity provider

Special Purpose Vehicle (SPV)

Construction contract

Loan agreement

Shareholders agreement

Service agreement

Concession (30 years)

Service agreement

Technical advisers/

consultants

Maintenance Operator

Debt provider

Design Build Joint Venture

Sub-contractors/ suppliers

Serviceagreements

Engineers/consultants

Construction/supply contracts

Engineers/ consultants

Serviceagreements

Page 12: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

12

© Holcim Canada (Ltd) Mississauga Cement Plant February 15, 2011

Legend:Fully Integrated Cement & ConstructionConstruction Only

Focusing on core strategies in Greater Toronto and Montreal markets as well as building HCA as a solutions provider will allow the company to gain full advantage from upcoming large scale projects

GTA

GMA

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

M

X

X

X

X

X

X

X

X

X

X

X

X

S

Completed

2012 - 20172,500Turcott

2011 - 20172,000Windsor Essex Parkway

Pending

Ongoing350MTQ Highways (A-25)

Ongoing300MTO Highways

2007 - 20125,000James Bay (Sarcelle & Rupert)

2005 - 20131,600Sir Adam Beck Tunnel

Current

2012 – 20218,000Churchill Falls

Future

2012 - 20151,000407 ETR East

2010 - 2015400Calgary Airport

2010 - 20209,500MetroLinx(York BRT, Sheppard LRT, Scar RT, Finch LRT, Eglington LRT)

2012 – 20156,000Hebron Platform

2009 - 20152,400PanAm Games

2005 - 20254,200Vancouver Airport

1991 – 19976,000Hibernia Platform

2002 - 20072,000James Bay (Eastmain 1)

2011 - 20132,200Inco Smelter (Nfld)

1998 – 20104,500Toronto Airport (GTAA)

1995 - 19981,000Highway 407 ETR

Est. Project Value ($M CAD) TimelineProject

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

M

X

X

X

X

X

X

X

X

X

X

X

X

S

Completed

2012 - 20172,500Turcott

2011 - 20172,000Windsor Essex Parkway

Pending

Ongoing350MTQ Highways (A-25)

Ongoing300MTO Highways

2007 - 20125,000James Bay (Sarcelle & Rupert)

2005 - 20131,600Sir Adam Beck Tunnel

Current

2012 – 20218,000Churchill Falls

Future

2012 - 20151,000407 ETR East

2010 - 2015400Calgary Airport

2010 - 20209,500MetroLinx(York BRT, Sheppard LRT, Scar RT, Finch LRT, Eglington LRT)

2012 – 20156,000Hebron Platform

2009 - 20152,400PanAm Games

2005 - 20254,200Vancouver Airport

1991 – 19976,000Hibernia Platform

2002 - 20072,000James Bay (Eastmain 1)

2011 - 20132,200Inco Smelter (Nfld)

1998 – 20104,500Toronto Airport (GTAA)

1995 - 19981,000Highway 407 ETR

Est. Project Value ($M CAD) TimelineProject

Page 13: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

13

© Holcim Canada (Ltd) Mississauga Cement Plant February 15, 2011

Holcim Canada is a strong vertically integrated player. Optimizing opportunities in customer loyalty, sustainable development and product and service solutions will ensure full advantage of upcoming opportunities

SUSTAINABLE DEVELOPMENT

Operating by the Triple Bottom Line. Providing the right products

& services for a balanced approach to growth economically,

in our communities and respecting the environment.

STAKEHOLDER LOYALTY

Responding to stakeholder (customer, community, regulator) needs with products & services (ready-mix designs, rapid bridge

replacement) and changing procurement practices (PPP)

HOLCIM SOLUTIONS

Moving forward on innovative solutions (products / services) that fulfill our commitment to

Sustainable Development and enhance our Customer

Relationships

SUSTAINABLE DEVELOPMENT

Capturing opportunities for developing a sustainable

competitive advantage, improving relationships with stakeholders

and capturing cost savings through efficiency gains

VERTICAL INTEGRATION

Utilizing a city-based strategy to optimize material flow through channels to market, primarily in

core Toronto and Montreal markets

EMPLOYEE DEVELOPMENT

Continue to develop employees for the needs of the future with

increasingly challenging opportunities (PPPs) as well as opportunities for development

abroad

Holcim Canada’s Commitment to it’s Community & Markets

Holcim Canada’s Strategic Positioning In Holcim Ltd.

Page 14: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

14

© Holcim Canada (Ltd)

Holcim Canada is committed to sustainability and this commitment is embedded in the company’s business strategies and day-to-day management.

• One of the largest and most environmentally responsible suppliers of cement in Canada.

• Ongoing technological advancements designed to meet the increasing marketplace needs, improved environmental performance, enhanced employee safety and mitigate potential impacts on the local community.

• Corporate Social Responsibility and Sustainable Environmental Performance are mindsets that are firmly embedded throughout HCA.

• Over the past 10 years, more than $100 million have been invested at the Mississauga Plant, in support of our particulate matter (PM 2.5 and 10), Nitrogen Oxides (NOx) and Sulfur Dioxide (SO2) and Carbon Dioxide (CO2) emission reduction efforts.

Mississauga Cement Plant February 15, 2011

Page 15: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

15

© Holcim Canada (Ltd)

CO2 EmissionsWe are making constant, measurable progress. Since 1990, we have reduced the net production of CO2 per tonne of cement by more than 30%.

• Approximately 60% of CO2 emissions from the cement sector result from the chemical process that converts the calcium carbonate in limestone to calcium oxide during the production of clinker.

• By using suitable industrial by-products, such as slag from the steel industry, as Supplementary Cementitious Materials (SCM) – either directly in manufacturing or in cement mixes – we minimize this chemical reaction and the related greenhouse gas emissions.

• To this end the Plant spent $88 million on a Vertical Roller Mill to produce GranCem®, a high quality slag cement. HCA investments in GranCem® production have contributed to a reduction in our clinker factor, resulting in a significant permanent decrease in our net specific CO2 emissions.

• The Plant also continues to optimize its use of other SCMs (such as limestone additions) to reduce its overall CO2 emissions intensity.

Mississauga Cement Plant February 15, 2011

Page 16: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

16

© Holcim Canada (Ltd)

Particulate Matter (PM10, PM2.5)Holcim Canada recognizes concern that the emission of fine particulates are a concern in the Clarkson airshed. • The Mississauga Cement Plant has made investments to control these emissions, in both “filterable” and

secondary (condensable) fractions, from all our stacks, as well as from other fugitive sources.

Installation of Opacity monitors

Installation of Teflon bags in system baghouse

Reduction of precursor chemical compounds (NOx, SO2 and Ammonia)

These state-of-the-art bags are rated to achieve control of PM1 (ultrafine particulates). This led to a 79%

reduction in PM, PM10, and PM2.5 from 2006 to 2009 due to phased in installation of new bags. Represents

“Best Available Control Technology” for the cement sector.

Mississauga Cement Plant February 15, 2011

• Recent emission reduction initiatives include:

• Fugitive Dust Control (Plant and boat loading)

• Road paving

• Installation of water sprinklers

• Use of water, vacuum and sweeper trucks

• Dry fog water spraying

• Installation of a wet dust suppression system

• Dust spray on off-loading stone

• Greening of the Plant through tree plantings, among other initiatives

• Spillage reduction through housekeeping improvement initiatives

• Replacement of Particulate Controls on all stacks

• State-of-the-art C730 system baghouse replacing Electrostatic Precipitator (ESP)

• F280 cooler baghouse replacing Gravel Bed Filter

• Installation of bypass stack baghouse

• Slag grinding and drying system

• CM#7 separator baghouse

• Installation of AFM baghouse replacing ESP

• Installation of Vertical Roller Mill de-dusting system1

Page 17: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

17

© Holcim Canada (Ltd)

As a member of the Southwest GTA Task Force, Holcim took the commitment one step further by working together with key influencers and groups within the community to make recommendations to improve the quality of the Clarkson Airshed.

• Holcim continues to promote that the Ontario GHG policy should incorporate the following: A uniform CO2 intensity standard should be adopted. This standard should be expressed in a

form (e.g. kg CO2 per tonne of cement) which recognizes and incents the important role that supplementary cement substitutes can play in reducing GHG emissions from cement manufacturing;

The use of alternative energies from biomass, engineered fuels, residual materials and other combustible by-products should be encouraged in GHG regulations and policy, and

Aggressive adoption of the new National and Ontario building code standards (release in Q1, 2011) that allow for the increased use of SCMs. Ontario should be progressive in encouraging the maximum use of less carbon intensive cementitious materials that will be allowable under the new code in government projects and procurement. Ontario should initiate the development of the next level of building code changes which would allow for a more aggressive use of SCMs, to align with leading jurisdictions.

• We intend to remain a leader in sustainable performance through further innovation and work with the community and local government and health agencies to implement measures to improve air quality in the Clarkson Airshed.

Mississauga Cement Plant February 15, 2011

Page 18: Paul Ostrander – CEO Holcim Canada Mississauga Cement ...whiteoakslornepark.com/wp-content/uploads/2011/04/Meet-CEO-CAP... · ... CEO Holcim Canada Mississauga Cement Plant ...

18

© Holcim Canada (Ltd) Milton Quarry CAP Presentation September 27th, 2010

Strength. Performance. Passion.


Recommended