www.incose.org/IW2017 PDES Requirements Traceability Project Update
Transcript
Page 1: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

www.incose.org/IW2017

PDES Requirements Traceability Project Update

Page 2: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

TracingManagement

Tracing from Requirements to Ph Elements MCADModel

ECADModel

Requirements Management

STEP AP239/233/242, OSLC, ReqIF, QIF, EDX, PDF

STEPAP239/233/242/AP203, QIF, PRC PDF

STEP AP239/233/242/AP203, QIF, IDX, PRC PDF

Requirements Traceability Test Case

MBSEEnvironment

OSLC, ReqIF, XMI, PDF

OSLC, STEP AP239/233/242,

PDFEDX

DBOM & EBOM

DBOM & EBOM

OSLC,XMI

Page 3: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

Testing Environment• Share-A-space 7.8 Test Instance up and supporting: AP233/AP239, ReqIF

(Eurostep)• Eurostep Nova In-Reach – loading with requirements and tracing relationships,

setting up for review – artifacts transmitted to Eurostep; more samples generated

• DOORS 9.6 ReqIF – loaded with updates from SME feedback• DOORS NextGen – loading requirements; OLSC enabled but incomplete on

trust relationships – ReqIF import from DOORS 9.6 successful• Enterprise Architect 12 – requirements imported through CSV; exported as

XMI and transmitted to Eurostep – research shows EA12 can only act as provider; Oauth support looks questionable; next step is to work with Sparx

• References of ModelSIM wrappers to provide OSLC interoperability• Feedback from others regarding difficulties with this version of application

• Mentor Graphics Vx 1.2 update installed; both cards and flex tape converted. Conversion to Vx 2.1 in process and access to better STEP, ODB++, EDX translators. Have 3D library available but haven’t converted entire design yet.

• In discussion with Mentor about a Context SDM test instance with OSLC• Creo 2 – Have parts modeled with PMI; incomplete conversion to fully public

models; PTC willing to convert to STEP AP242 in Creo 4 preliminary version –Pursuing conversion to Creo 4; seeking version with AP242 translator

• NX – models not as well done as Creo (particularly for PBA’s); available in NX 11; have access to preliminary STEP AP242 translator

Requirements Traceability Status

Page 4: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

• ARAS OSLC – IBM releasing OSLC connector for ARAS (paid model) in 2017.• Would prefer native support within Aras for OSLC, but not committed

• PRO-R – updated to ReqIF Studio, new ReqIF import generated from DOORS.• Downloaded Eclipse – Lyo; working through setup.

• Includes interactive and command line validator for ReqIF syntax• DoorScope – installed and testing; did well with DOORS ReqIF but not

reference files• Papyrus – installed and testing; developing requirements diagram.

• Unsuccessful (to date) on getting XMI import / export working• Tc 10 – EBOM structure loaded; product structure loaded with both a Creo 2

version and NX 8.5 version. Reference documents and PDF visualizations produced and linked to EBOM structure. PLM/XML output successfully exported and imported to other test instances

• Should be able to produce ASME BOM reports shortly – first ones available but need to make generic

• More test parts and public documents loaded• Clear Case – access enabled for use of test instance with OSLC function;

delayed on build software example• ANARK – Working with latest versions and comment extraction function.

• 1ST iteration of merged requirements, external attributes, and CAD data went well.

• Need feedback on next steps

Requirements Traceability Status - 2

Page 5: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

Test DataRefresh Mechanical Product Structure – completed for Creo 2 & NX

8.5 Verify with NX 11 – open

Ported Mentor Expedition examples to Mentor Vx 1.2 Add additional trace links to requirements in tools – completed Investigate GUID links to requirements Migrate to Vx 2.1 and xDM 2 – 60% complete

PLM (DBOM) & PDM (EBOM) product structures – completed Exchange XMI versions with Enterprise Architect and Eurostep tools – in

progress Build out software example – complete in PLM/PDM environment but need re-

verification• Build out Clear Case test cases – not started• Update mechanical models for feature set use cases – not started• Enter requirements into new version of Share-A-space – 25% complete• Generic version of mechanical design – 3rd party made progress – 50%

complete Updating requirements/traces for better configuration management tracing –

complete, but concluding that including GUID’s early in the process would help most exchange scenarios

• Obtain more analysis artifact examples – progress with Open Modelica and Visio timing diagram module

Requirements Traceability Status - 3

Page 6: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

Eclipse Resources: ReqIF & OSLC

Eclipse

Bugzilla Lyo

OSLC SDK

OSLC Test Suite

Reference Implementations

- CM Excel- CM Bugzilla- OAuth consumer/provider

ProR

ReqIF Reference

CSV

ReqIF Studio

ProR Essentials

Consequent Validation

Requirements –Traceability Template

ISO/IEC/IEEE 29148:2011

SRS Template

Papyrus

UML, SysML, MARTE, ADL

ReqIF

Page 7: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

ReqIF – 12/6/16

DOORS9.6

Works: 1) may require higher privs 2) make sure to export all views from source

DOORSNext Gen

DoorScope

Works: 1) easy, but only basics don’t require user input 2) need to use mapper to see all columns

ProR

ReqIFStudio

Papyrus

Didn’t Work OOTB

Didn’t Work OOTB

Didn’t Work OOTB

Standard ReqIF export with view and all columns included

Page 8: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

ReqIF – 12/6/16

ProR

Likely to fail; will test with update

DOORSNext Gen

DoorScopeFailed: no output in tool

DOORS9.6

ReqIFStudio

Papyrus

Didn’t Work OOTB

Didn’t Work OOTB

Standard ReqIF export with view and all columns included

Failed: no output in tool; syntax errors

Page 9: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

Examples of information coming from the level 1 requirements file: -Identifier: Unique identifier for the object filled automatically by DOORS RMF -Requirement Version: Version number of the requirement that enables to manage requirements into configuration. -Requirement Statement: States an expected behavior or global performance of the product under consideration. -Working Status: Current version of the requirement/activity. -Rationale: Provides the justification and/or the reason for the activity/requirement. The rationale is particularly useful for orphan requirement (i.e. requirement that are not traced to an upper level requirement).

Manually generated with XML tools• 10-15 requirements• No V&V elements• Some differences in tracing relationships with AP239/233

Public release accomplished• Downloaded and planning to incorporate• Exploring possibilities for creating physical artifacts to go with AP242 example

Contact: Claude Reyterou (Airbus)

Airbus STEP AP242e1 Requirements Test Case

Page 10: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

MCAD Model Considerations

• MBE Offers Major Advantages Over Drawing Based For Tracing – Drawings and models don’t need to match in traditional approaches– Models are normally parametric, drawings are not– Assemblies and derivative designs often contain mixed modes

• Use Case Requirements– GUID / UUID for features and feature groups (surfaces, dimensions,

parameter-driven elements, notes, holes, etc.)– Pull from model: linked references to features and collections of

features that are stable throughout the life of the model– Push to model: requirements, CTQ’s, and constraints from MBSE

into MBE models that can be exchanged• Challenges

– Inconsistent MBE modelling practices – many part model and especially assemblies not going through adequate V&V processes

– Mix of MBE and legacy drawing approaches in large assemblies– Translation functions for textual requirements to usefully relate to

features in MBE model – implementations not supporting all necessary features yet

12

Page 11: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

ECAD Model Considerations

• Modern and Legacy Designs Support Logical Component Tracing– Tools tend to support hierarchy well over last 25 years but

translations don’t always handle well– Common reporting functions down to component pin level or even

gate and internal package – easy to pull during baselines– Rules engines enforce design, producibility, and consistency checks

• Use Case Requirements– GUID / UUID for component.pin structure, signal names, (surfaces,

dimensions, parameter-driven elements, notes, holes, etc.)– Pull from model: linked references to features and collections of

features that are stable throughout the life of the model– Push to model: requirements, CTQ’s, and constraints from MBSE

into MBE models that can be exchanged• Challenges

– Mechanical features that are not components or in the ECAD library will be treated differently

– Navigating hierarchy could be complex – particularly with programmed devices, ASICS, FPGA’s and other components developed through external toolkits.

13

Page 12: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

Schematic Diagram Considerations• Many Different Types

– Tools tend to be domain centric (e.g. ECAD, computer logical, mechanical, etc.)

– Basic graphics exchanges work well, but logic content exchange is poor or non-existent.

– Hierarchy often not handled well • Use Case Requirements

– GUID / UUID for component.port structure, signal names, flows, etc. – Pull from model: linked references to features and collections of

features that are stable throughout the life of the model– Push to model: requirements, CTQ’s, and constraints from MBSE

into MBE models that can be exchanged• Challenges

– features that are not components or in the library may be treated differently

– Navigating hierarchy sometimes complex – particularly with components integrated through 3rd party toolkits and vendor libraries.

– Representing bus, bundle, and manifold structures– Schematic tools for mechanical and electrical systems are not often

the same14

Page 13: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

MCAD vs. ECAD Model Representations

15

MCADModel

ECADModel/s

ECAD design operates as multiple tools integrated with a local database while MCAD design models are often self contained models

ECAD design for a single part number can incorporate tools from different vendors to create a native model. The designs are normally dependent on a central library for physical, logical, and analysis models.

ECAD Designers are often tasked with maintaining configuration files to successfully manage their designs. Collaboration needs to be concerned about synchronization of a lot of files in many formats.

Schematic

PBA Layout

Mechanical

BOM Mgmt

Drafting

Page 14: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

MCAD vs. ECAD Collaboration Differences

16

MCAD• Modeling done in single tool;

supply chain has common view throughout process

• Components are less of the content and have small amount of alternates.

• Piece part activities – even in assemblies – are focus of design and supply chain collaboration. On-drawing partslists still popular.

ECAD• Design process can be

partitioned many ways among different tools but end result must reside in central PLM or library-connected repository

• Alternate parts, altered parts, and Source Control Documents are common. BOM primarily based on commodity items.

• Almost everything is an assembly – on drawing partslists don’t work well

PLM Systems Traditionally Oriented Towards MCAD –That’s Changing

Page 15: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

Major Mechanical and Electrical CAx Standards

STEPAP214

STEPAP239

STEPAP203

STEPAP242

RS 274(multiples)Gerber

ODB++IDF & IDX

EDIF

VHDL

ELOG

FAB

Custom XML & TXT

STEPAP210 IPC

D-350

ANSI/IPC NC-349

PDF

IPC(multiples)D-356/A

FIRE9000

Verilog

Mechanical Design1 Primary Standards Organization Converging

on STEP AP242 & AP239

Electrical DesignMultiple OrganizationsMajor Vendor Influence

EDX

EDMD

OSLC

GenCAMIPC-2511

Page 16: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

Document & Spreadsheet Considerations

• Lack of Consistency– Project-developed macros and structures – some linked to other

custom artifacts and databases that may not have documented schemas.

• Use Case Requirements– GUID / UUID for component.port structure, signal names,

preliminary partslists and alternates, costs– Common for early development and reuse of existing designs

• Challenges– Maintaining consistency through lifecycle so every update doesn’t

turn into a new translation and mapping project– Lack of defined, basic common templates that could be shipped with

major tools• These could be out there, but not commonly recognized – is this a

potential activity?

18

Page 17: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

PLM System Considerations

• Role of the PLM system in providing traceability– Primary objects: xBOM structures, reports, CAD models, schematics,

change management objects, metadata status of objects– In an active environment that supports OSLC, what functionality

does the PLM system offer when interacting with the models, artifacts, and metadata objects in the repository?

– Should each artifact type (e.g. document, spreadsheet, MCAD model, schematic, ECAD model, etc.) be treated like a software language class so it could be addressed either by PLM or independently? This may entail a standards based API approach: AP239/233 representation of element relationships

– Provides IP control, status, and one-stop shopping for hardware and product structure information

• Challenges– There is tremendous potential for PLM workflows, translators, and

services to coordinate controlled access to CAD and cost relationships, but inconsistencies can thwart automation

– During development, it is critical to classify CAx artifacts that may be in progress

19

Page 18: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

Visualization Findings

• Visualization Useful for Physical Products– Can be static, manipulated, or animations– Best if reviewers and stakeholders can capture comments in viewing

environment and have it compiled automatically.– Growing number of tools can do basic operations OOTB– Limited use for software; particularly with interactive animations

• Associating Multiple Requirements to 1 Object Not Always Supported– Many systems oriented towards display of block of text and part

attributes vs. accessing individual requirements in a controlled fashion– Can be done, but requires some interface planning to be useful

• HTML-based Approach Preferred Internally– Easily integrated with PLM, ALM, ERP resources– Security an issue for people outside the organization: handling links to IP

sensitive resources, account management, partitioning interactions and feedback of competitors, etc.

• File-based Artifact Exchange Approach Preferred Externally– Current systems find this easier to distribute and manage– Can be distributed to downstream suppliers – both good and bad with

that that.

20

Page 19: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

Visualization of Tracing Relationships POC

Requirements &TracesDOORS

PBAMentor

Graphics

Flex TapeMentor

Graphics

Core MCADModels – NIST

Creo 2

Supplier Derivative Models

Creo 2

Tier 2 Supplier

Design withPMI

Power Supply &

Cable Model

STEP AP203

PRC PDFWith PMI

ECAD -> MCAD

ConversionIDX

DatabaseOf Part

NumberInformation

Consolidated Metadata

Excel

MCAD Top LevelAssembly

Creo 2

Component Requirements

ExplorerPRC PDF

Also in: Excel, Share-A-space, Enterprise Architect, ReqIF Studio

Simulates ERP and supply chain information sources

Page 20: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

Scenarios Considered

xCAD Tool

xCAD Tool

MBSE Tool

xCAD Tool

xCAD Tool

MBSE Tool

MBSE Tool

MBSE Tool

PLMSystem

PLMSystem

ALMSystem

ALMSystem

• Scenarios Change During Lifecycle• Tool-only Scenarios Are Difficult to Track and do IP Control

– Domain differences and common references need to be understood for meaningful results

– Improvements in exchange standards requires better alignment with high priority use cases

• System-based Scenarios Are Difficult To Configure And Maintain– May not happen as often as they should– Standards are more complex but more complete

Page 21: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

Use Cases – ALM View

• Status Reporting & Queries– Links between ALM and PLM environments to enable real-time

reporting on PLM objects that implement requirements– Real time access to program status– Ad-hoc rollups for Systems Engineering on PLM, ERP, and historical

performance related to product structure • Impact Analysis and Validation

– Program risk accurately assessed with more automation– I/O validation and tracing– Workflows include ALM and PLM objects with increased granularity

• Reuse– Search for current and historical elements linked to product or

platform structure– Expert identification– Functional block reuse and history on trade studies

• Updates to PLM and hardware toolsuites improving reuse

23

Page 22: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

Use Cases – PLM View

• Status Reporting & Queries– Links between ALM and PLM environments to enable real-time and

historical reporting on ALM objects that drive design constraints– Identification of analysis results not in PLM; eliminate investigations

that were already rejected in trade studies• Reuse and Impact Analysis

– Program risk accurately assessed with more automation– Workflows can included ALM and PLM objects with more granularity– Access to studies to aid in cost reduction – Analysis date to improve test and inspection processes

24

Page 23: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

ALM-PLM System Interoperability

• ALM – PLM Exchanges– Metadata is easy; artifact features are difficult once we go past basic

access to individual files– Building multiple views of linked data– Baseline and archival at project level– Exposure of MBSE activities and status to PLM users.

• Challenges– There are a huge amount of relationships that can be established

that would need to be maintained:• Prioritizing use cases for business and product impact• IP controls – easy to accidently expose information to customers and

suppliers that is inappropriate• Persistence and archival of relationships, artifacts• Legal ramifications of object relationship archival

25

Page 24: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

Project Summary

• ALM – PLM Exchanges– Metadata is easy; artifact features are difficult once we go past basic

access to individual files• MCAD and ECAD Tracing to PMI or Model Features Possible …. If

Model Based Design Practices Are Followed– Drawings Are NOT Models

• Publicly Available Test Cases Were Critical to Project – Need work on high priority use cases and test elements for software– Control of test artifacts by central organization preferred

• Maintaining Detailed Tracing Throughout Lifecycle Requires ALM and PLM Disciplne– Scenarios critical to business and process must be identified and

supported for PMI traces – doesn’t happen automatically (yet)– ALM <-> PLM likely to work more reliably than tool to tool situations

26

Page 25: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

Discussion Topics

• How relevant is this project to your Systems Engineering practices or needs?– What would improve it?

• What examples would people like access to?• Are there projects this activity should align with?

– How could we pull this together into perhaps an MBSE community of practice?

– Could INCOSE, NIST or some other entity host and inventory / control the artifacts?

• For useful software example, what could/should we build?– Is anyone willing to help with that? - LOTAR and MoSSEC efforts

could benefit from that– Are there standards for user interface prototyping or system

interaction applications we should consider looking into / supporting?• SAVI did some excellent work. Is there some way, we could

build out / replicate a public version of the SAVI examples?

27

Page 26: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

PDES, Inc.

Discussion Topics II

• What scenarios are people interested in and how do we trace down to potential artifacts that support them?– Then what derivative requirements are there on the artifacts and

relationships so they support the scenarios?• Missing in this are details around some standard, basic office

automation tool templates commonly used in Systems Engineering, Requirements Management, and inter-company exchanges on large programs. Would it be of value to put out some pseudo-standard templates with filled out examples for:– Requirements– Tracing Matrix– EBOM’s– Interconnect Tables / Wiring Lists

28

Page 27: PDES Requirements Traceability Project Update - … Tracing Management. Tracing from Requirements to Ph Elements . MCAD. Model. ECAD. Model. Requirements Management. STEP …

www.incose.org/IW2017