+ All Categories
Home > Documents > PDF C20 - 00135€¦ ·  · 2015-03-25•Reduced shipyard installation •30º visibility...

PDF C20 - 00135€¦ ·  · 2015-03-25•Reduced shipyard installation •30º visibility...

Date post: 20-Apr-2018
Category:
Upload: truongdung
View: 217 times
Download: 3 times
Share this document with a friend
1
Reduced shipyard installation 30º visibility Optional individually lengh arrangements Antireflecting lenses Reinforced ABS Low weight
Transcript
Page 1: PDF C20 - 00135€¦ ·  · 2015-03-25•Reduced shipyard installation •30º visibility •Optional individually lengh arrangements ... •Reinforced ABS •Low weight . RINA 150

• Reduced shipyard

installation • 30º visibility • Optional individually

lengh arrangements • Antireflecting lenses • Reinforced ABS • Low weight

Recommended