TED Dangelmayer President & CEO www.dangelmayer.com Perfect ESD Storm! CDM & Class 0 Converge in Backend
Transcript

TED DangelmayerPresident & CEO

www.dangelmayer.com

Perfect ESD Storm!CDM & Class 0 Converge in Backend

Copyright © 2007 Dangelmayer Associates 2

Outline

• Introduction• CDM Overview• Lessons from the recent past• Industry Class 0 Trend

– It is Real This Time!

• Backend CDM Issues• CDM & Class 0 Countermeasures• Conclusions

Copyright © 2007 Dangelmayer Associates 3

CDM + Class 0 Trend =

!”The Perfect ESD Storm“

Class 0 – Rapidly Growing TrendCDM Technology not Understood by Most Co’s

CDM = 95% of ESD Failures

Copyright © 2007 Dangelmayer Associates 4

CDM Overview

Copyright © 2007 Dangelmayer Associates 5

Human Body Model Charged Device Model

CDM and related metal-metal discharge events cause 95% of current ESD problems. This will continue to be the underlying driver for ESD control.

Emergence of CDM ESD (90% to 95% of ESD Failures Today)

Tweezer VideoCDM Video

Copyright © 2007 Dangelmayer Associates 6

HBM

CDM

Copyright © 2007 Dangelmayer Associates 7

HBM and CDM Waveforms (500v)

Copyright © 2007 Dangelmayer Associates 8

Lessons from the Recent Past

Copyright © 2007 Dangelmayer Associates 9

Wafer ESD Model Schematic

Field plate at V

Arc model, I(t)- Includes inductance

Small features Large bus

Bulk resistance

V(t)

surface resistance

small cap large cap

neglected

neglected

Wafers Will Experience ESD Damage with Technology Trend!

Copyright © 2007 Dangelmayer Associates 10

Wafer Saw Example

• CDM Threshold – 35 Volts• 92.2% Defective at Wafer Saw• Failure Analysis

– CDM Damage

Copyright © 2007 Dangelmayer Associates 11

Class 0 Case StudyCorresponding Yield Improvements

O v erall E S D Y ield Loss Im prov em ents

0

5

10

15

20

25

1 5 9 13 17 21 25 29 33 37 41 45 49 1 5 9 13 17 21 25 29

W e e k

ESD

Yie

ld L

oss

(%)

Sy c orax

Caliban

Cordelia

T10000A

Consultant Hired

80% EPM Performance Scale™

22% Yield Loss

Out of Control

Copyright © 2007 Dangelmayer Associates 12

Class 0 CDM Failure Induced by Tape & Reel Packaging

Copyright © 2007 Dangelmayer Associates 13

Industry TrendsIt is real this time!

Copyright © 2007 Dangelmayer Associates 14

Typical IC With Protection Circuitry

Functional Circuitry

Protection CircuitsProtection Circuits Constrained or Omitted By:

•Technology Node Feature Sizes

•Circuit Functionality

•I/O Density

•Speed

Copyright © 2007 Dangelmayer Associates 15

2003 ITRSA recent SEMATECH benchmarking study of integrated

circuit suppliers indicated that ESD will be one of the top three reliability concerns within the next 5 years and already is with

certain products!

Copyright © 2007 Dangelmayer Associates 16

ESD Threshold Populations including high speed applications

ESD Populations including high speed applications

00.00010.00020.0003

0.00040.00050.00060.0007

0 1000 2000 3000 4000 5000 6000

ESD Threshold (volts)

Rel

ativ

e Fr

eque

ncy 1996

20022008HS 1996HS 2002HS 2008

Distribution becoming bimodal

Copyright © 2007 Dangelmayer Associates 17

Class 0 Devices per Factory

Class 0 Devices per Factory

0

0.10.2

0.3

0.4

0.50.6

0.7

1980 1985 1990 1995 2000 2005 2010

Year

#Cla

ss0/

Fact

ory

Class 0:

Virtually all Factories by 2010

Copyright © 2007 Dangelmayer Associates 18

0

500

1000

1500

2000

2500

1980 1985 1990 1995 2000 2005 2010

H B MC D MM M

ESDA Technology Roadmap

(IC Chip Design Experts: “With Our Best Effort”)

Volts

HBM

CDM

MM

IBM; TI; Intel – Ph.D. Chip Design Experts

400 chip design patents

Copyright © 2007 Dangelmayer Associates 19

Sources of Trend Confirmation• ESD Association Roadmap

• SEMETECH – ITRI Roadmap

• DA Customer Reports / Literature Analysis

• ESD Stress Test Labs

• Stress Test Equipment Manufacturers

• IC Mfg/Design: Intel; TI; IBM; AMD etc.– Lowering 2000 volts HBM to 1000 volts

• FA Labs

• Subcontractors – Foxconn; Jabil; Solectron etc.

• OEM’s – Cisco, Nokia, etc.

Copyright © 2003 Dangelmayer Associates 20

Backend CDM Issues

Copyright © 2007 Dangelmayer Associates 21

Copyright © 2007 Dangelmayer Associates 22

Copyright © 2007 Dangelmayer Associates 23

Copyright © 2007 Dangelmayer Associates 24

No ESD Events Detected!

ESD Events Detected!Bonding Tip Not Grounded!

Bonding Tip Properly Grounded!

Event Video

Copyright © 2007 Dangelmayer Associates 25

Surface Resistance Test

Pick-up Nozzle

Too Conductive!

Copyright © 2007 Dangelmayer Associates 26

Copyright © 2007 Dangelmayer Associates 27

CDM video

CDM & Class 0 Countermeasures

Copyright © 2007 Dangelmayer Associates 29

ESDA S20.20 Scope: HBM >100V

Note:Tailoring is Essential for Class 0 & CDM

Best Industry

Standard

Copyright © 2003 Dangelmayer Associates 30

MR Head Lessons Learned• Conventional ESD Methods Did Not Work!

– Below 100 Volts– Ionization Too Slow– Incomplete Coverage with Ionization

• Expect a Paradigm Shift @ 100 volts– Assume Device Still Charged!

• New Control Methods– Eliminate Metal-to-Metal Contact– Substitute “Soft Landings” with Dissipative Materials

Copyright © 2003 Dangelmayer Associates 31

Pogo Video

Semitron Video

Copyright © 2007 Dangelmayer Associates 32

ConclusionsCDM + Class 0 Trend = Perfect ESD Storm!

Trend Drivers:• Class 0:

– Virtually All Factories By 2010!– It Takes Two Year To Prepare

• Trends Driven By – Exploding Consumer Markets – High Volume Production

• Designed-in Protection Circuits Limited– By Speed Of Application And I/O Density

Impact On Control Procedures:• Standard Control Procedures

– Insufficient But Necessary• Paradigm Shift In Control Techniques

– Occurs At 100 Volts– Must Assume Product Is Still Charged– Ionization Often Not Sufficient

• Metal-to-metal Contact Must Be Eliminated• EMI/ESD Event Testing Is Essential

Copyright © 2007 Dangelmayer Associates 33

Class 0 - Are You Ready?It Takes 2 Years!

ConsultOr developExpertise

IdentifyChampionAnd Team Detailed

TechnicalAssessment

SchedulingSurvey, Report

By Site

LocateOr DevelopSuppliers

Initiate -> Assess -> Design -> Develop -> Implement

6 months 2-4 months 4-12 months Total time up to 2 years

Develop andDocumentProcedures

TrainEngineers

TrainWorkers

TrainManagers

Purchase Cycle Time

ImplementAnd

Sustain

Purchase Cycle Time

TrainTeam

4-8 weeks per item

By Tool

Tool

Solutions

By Product

Product

Solutions

HS1203


Recommended