Ian Knowles Technical Officer, PBN
Performance-based Navigation Products and Services
PBN Promotional Video
Outline • Why implement PBN?
• Global status of PBN Implementation
• Why PBN Products and Services?
• Products and Services Overview
• Summary
3
PBN BENEFITS
REDUCES
ENVIRONMENTAL
IMPACT
IMPROVES
SAFETY
IMPROVES
OPERATIONAL
EFFICIENCY
INCREASES
AIRSPACE
CAPACITY
REDUCES
INFRASTRUCTURE
Air Navigation Priority
4
Approach procedures with vertical guidance -
APV (Baro-VNAV) including LNAV-only minima
for all instrument runway ends by 2016
Assembly Resolution A37-11
5
Time is running out to meet the
Performance-based Navigation (PBN) objectives of A37-11
GANP Highlights • ICAO focus is on development and implementation of:
– PBN
– CCO and CDO
– ATFM (including runway sequencing capabilities (AMAN/DMAN)
• “PBN is air navigation’s highest priority. Implementation of PBN in terminal airspace is seen as key enabler for advanced terminal operations . . .”
6
GASP Highlights • The GASP has identified Runway Safety
and Controlled Flight into Terrain (CFIT) as priorities
• “Many safety benefits can be gained from PBN implementation” – PBN instrument approaches with vertical
guidance (APV) can help reduce probability of runway excursions and CFIT
7
Global Traffic Forecast • Air traffic is predicted to double in the
next 15 years
• Our collective responsibility is to allow
the aviation system to safely and
efficiently, realize this growth
• PBN enables this growth
3 October 2016 8
Current Situation
• PBN Implementation plans
• PBN Approaches
Global Status of PBN Implementation Plans
PBN PLAN
YES
NO
109 States
10
Implementation of PBN
Approaches
3 October 2016 11
Total instrument runway ends: 3454
PBN runway ends: 2138 61.9%
As at July 2016
Why ICAO Products and Services?
12
To provide States the necessary
assistance to implement PBN
PBN Tailored Products & Services • Flight Procedures Programme (FPP)
• PBN Start
• PBN Training
• PBN Publications and Bundles
• PBN Symposia/Workshops
• PBN Implementation Assistance
• PBN Business Planning
• PBN Financial Aid
• PBN Recognitions Provided through ICAO HQ, Regional Offices,
FPPs, ICAO Authorized Training Centers, On-
line ICAO Store
13
Flight Procedures Programme (FPP) • Assists participating States with PBN flight
procedures, ops approvals, airspace designs
• Asia-Pacific FPP
– Beijing, China
– Phase III approved
– Extended another 3 years to 2020
• African FPP
– Dakar, Senegal
– FPP Office established 2014 (covers all African States)
14
Flight Procedures Programme (FPP)
15
Mid FPP – To be
established January
2017
PBN Start • PBN assessment of State requirements
• 2-week intensive collaboration with all Stakeholders
• Analyzes and evaluates all aspects - needs, issues and concerns
• Delivers an achievable strategic plan aligned with local/regional PBN goals
3 October 2016 16
PBN Training • Computer Based Training Courses (CBTs)
• PBN Classroom Courses
PBN Overview
PBN Ops Approval
PBN Airspace Design
PBN for Pilots
PBN for ATCOs
(Coming Soon)
PBN Ops Approval
PBN Airspace Design
IFP Design Courses
(PBN and Conventional)
17
PBN Publications and Bundles • PBN Manual (Doc 9613) 4th Edition
• PBN Ops Approval Manual (Doc 9997)
• Manual on PBN Use in Airspace Design (Doc
9992)
• RNP AR Procedure Design Manual (Doc
9905)
• PANS Ops Volume I & II
• CDO Manual (Doc 9931)
• CCO Manual (Doc 9993)
• Procedure QA Manual (Vol 1 to Vol 6)
(Doc 9906)
18
PBN Symposia and Workshops • Organization/provision of a ICAO HQ global event to
help all States and Stakeholders with implementation
• Assistance in organizing local and regional events
that promote PBN Implementation and education
• Provision of subject matter experts to address
specific State/Regional issues
3 October 2016 19
PBN Implementation Assistance
• Needs vary from State to State
• Tailored assistance to meet a State’s specific needs.
• Provision of necessary tools to assist with implementation and understanding of PBN
3 October 2016 20
PBN Related Tools to assist with implementation
• PBN related Publications and Annexes
– Bundled specifically for Stakeholders
– Hard and soft copies
• CBT Training (iLearn)
Available through ICAO e-store: www.store1.icao.int
21
PBN Funding Coordination
• Assistance in obtaining funding to meet a
State’s implementation needs
• Coordination with International bodies
such as the World Bank, Industry partners
and other financial institutions
3 October 2016 22
• Recognition of Compliance of Instrument
Procedure Design organizations
• To assist States with PBN
Implementation
• 11 Organizations recognized by ICAO
– From 8 different States across all ICAO regions
PBN Recognition of Compliance – IFP Organizations
23
SUMMARY • PBN implementation is the #1 Air Navigation Priority
• GANP and GASP highlight the importance of PBN
• PBN enables many of the ASBUs
• Increasing air traffic will continue to make PBN implementation even more important – Capacity and Efficiency
• Many States have not developed a PBN implementation plan nor met the objectives of A37-11
• ICAO Products and Services were developed to specifically help all States with implementation
3 October 2016 24
For more information
Contact us at :
3 October 2016 25
Or visit us at:
http://www.icao.int/pbn
For more information
Download the App
3 October 2016 26
Follow us
#icaoPBN
Questions?
Ian Knowles Technical Officer, PBN
Performance-based Navigation Products and Services
THANK YOU