+ All Categories
Home > Documents > Petroleum & Geothermal Energy Act 2000 -...

Petroleum & Geothermal Energy Act 2000 -...

Date post: 19-Aug-2018
Category:
Upload: vohanh
View: 213 times
Download: 0 times
Share this document with a friend
49
Petroleum & Geothermal Energy Act 2000 Regulatory Requirements Regulatory Requirements Michael Malavazos Chief Engineer Petroleum and Geothermal Group
Transcript
Page 1: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Petroleum & Geothermal Energy Act 2000

Regulatory RequirementsRegulatory Requirements

Michael MalavazosChief Engineer

Petroleum and Geothermal Group

Page 2: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Aim of PresentationAim of Presentation• Objectives/Intent of Petroleum & OHS Legislation• Serious vs less serious incidents

L i l di i di t• Lagging vs leading indicators • Reporting requirements• Role of the regulatorRole of the regulator• Discussion

Page 3: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Petroleum and Geothermal Energy Act 2000 Petroleum and Geothermal Energy Act 2000 Obj tiObj tiObjectivesObjectivesLetter of the LawLetter of the Law

Minimise environmental and Safety risks from activities involved in:

• Exploration for, and recovery and processing… of petroleum and other resources to which this act applies; and

• The construction or operation of transmission pipelines for transportingThe construction or operation of transmission pipelines for transporting petroleum and other substances to which this act applies

Prudent supply of Natural Gas

Page 4: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

OH&S Act ObjectivesOH&S Act ObjectivesLetter of the LawLetter of the LawLetter of the LawLetter of the Law

• To secure the health, safety and welfare of persons at work;

• To eliminate risks to the health, safety and welfare of persons at work;

• To protect the public against risks to health or safety arising out of:• To protect the public against risks to health or safety arising out of:(i) the activities of persons at work; or(ii) the use or operation of various types of plant

Page 5: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Spectrum of IncidentsSpectrum of IncidentsGulf of MexicoVaranus Island

ntSupp

ly

viro

nmen

of G

as S

Env

Secu

rity

oS

From Tweedale 2003 Small leakSmall Gas ReleaseRelease

Page 6: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Ultimate AimUltimate AimIntent of the lawIntent of the lawIntent of the lawIntent of the law

No serious/high severity incidents

Page 7: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Safety/Reliability Stop the bangSafety/Reliability Stop the bang

Page 8: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Stop the environmental disasterStop the environmental disaster

Page 9: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Ultimate AimUltimate Aim

Delivered through Objective/Risk-based legislation:g j g

• Major focus –• outcomes to be achieved (“what” to achieve)• risk-based approvals/surveillance “case by case” basis• licensees/permit holders demonstrate can/do achieve outcomes• licensees/permit holders demonstrate can/do achieve outcomes• prevention (achieve outcomes) rather than cure

• Less focus –• “how” to achieve• prescriptive regulatory requirements or “one-size-fits all”prescriptive regulatory requirements or one size fits all

Page 10: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Reporting Provisions under Petroleum & Reporting Provisions under Petroleum & p gp gGeothermal Energy Act 2000Geothermal Energy Act 2000

Page 11: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Objective of ReportingObjective of Reporting

Provide evidence that we are meeting this ultimate aim through:

• Demonstrating all relevant risks in particular MAEs are managed to ALARP• Equipment facilities and management systems are fit for purpose• Equipment, facilities and management systems are fit for purpose• Incidents are detected, responded to and preventative measures implemented• Demonstrate continuous improvement/learning

Page 12: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

The Concept of ALARPThe Concept of ALARP

Regard must be had to the following matters in determining what is reasonably practicable in relation to ensuring effective EHS Management:EHS Management:

a) the likelihood of the hazard or risk concerned eventuating; b) the degree of harm that would result if the hazard or risk

eventuated; c) what the person concerned knows, or ought reasonably to

know, about the hazard or risk and any ways of eliminating , y y gor reducing the hazard or risk;

d) the availability and suitability of ways to eliminate or reduce the hazard or risk; educe e a a d o s ;

e) the cost of eliminating or reducing the hazard or risk.

Page 13: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Measuring avoidance of high severity incidentsMeasuring avoidance of high severity incidentsg g yg g y

Page 14: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Preventative vs Mitigation Preventative vs Mitigation

Hazards Outcomes

Incident

PreventativeControls

MitigationControls

Threats Loss Potential

Page 15: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Swiss Cheese Model of Defence

Hazard

RealityIdeal

IncidentIncident

Page 16: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Two Categories of MeasuresTwo Categories of Measures

• Lagging KPI (mitigative - reactive)gg g ( g )• Leading KPI (preventative - proactive)

Page 17: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Lagging KPIs (too late)Lagging KPIs (too late)

Examples

3721%

116% 8

4%

42%

53%

2313%

9251%

Oil Spill Other Spill Other Pipeline Encroach Gas Release Security of Supply OHS&W

Page 18: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Lagging KPIs OK if you are at the low severity incident endLagging KPIs OK if you are at the low severity incident end

Page 19: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Leading IndicatorsLeading Indicators

More about being proactive to ensure we avoid the big g gbang rather than react to it

Page 20: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Swiss Cheese Hazard ModelSwiss Cheese Hazard Model

C t S tCourtesy Santos

Page 21: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Regulatory preference for leading indicatorsRegulatory preference for leading indicatorsg y p gg y p g

Page 22: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Leading KPIsLeading KPIs

Indicators of effectiveness of Safety Management System:y g y

• Maintenance of mechanical Integrity• Action items follow-up• Management of Change• Training and competency• Near misses (incident and procedural)

AIM: Early detection of deterioration of key barriers beforeAIM: Early detection of deterioration of key barriers before loss of containment incident occurs

Page 23: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Leading KPIsLeading KPIs

Mechanical Integrity:g y

• Focus on safety critical items • Include pressure vessels, relief and vent devises, control systems,

interlocks and emergency shutdown systems• Number of inspections of critical items of plant and equipment• Number of inspections of critical items of plant and equipment

completed on time• Length of time plant operating with safety critical items in failed

state

Page 24: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Leading KPIsLeading KPIs

Action Items Follow Up:

• Focus on due or extended PSM action items:• Audit action items• JHA/PHA action items

I id t i ti ti ti it• Incident investigation action items• Regulatory compliance action items

Page 25: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Leading KPIsLeading KPIs

• Management of Change:g g• Extent to which site’s MOC procedure is being followed• How well site recognises changes that require MOC procedure

• Training and Competency:• Competency assessment indicator qualifications vs experience• Competency assessment indicator, qualifications vs experience• Deviation of critical tasks to PSM work procedures/instructions

Page 26: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Leading KPIsLeading KPIs

• Incident Near Misses without major eventj• Creation of demand with successful Pressure Relief Device

(PRD)/Safety Instrumented System (SIS)Creation of demand with failure of Pressure Relief Device• Creation of demand with failure of Pressure Relief Device (PRD)/Safety Instrumented System (SIS)

• Excursion of parameters such as P, T, corrosion and Flow limits• Operating outside equipment design parameters• Detected cracks or pin holes or corrosion with/without releases

f• Utility failures eg power, steam, water and air

Page 27: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Leading KPIsLeading KPIs

• Procedural Near Misses without major incidentj• PTW breaches• Inadequate critical drawing availability and up to date• Inadequate critical procedure dossier• MOC and maintenance procedure breaches• Deactivation of safety equipment eg gas detectors• Deactivation of safety equipment eg gas detectors• Incorrect installation of equipment

Page 28: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Key Risk Management ProvisionsKey Risk Management Provisions

• Risk Assessment• Demonstration of ALARP• Ongoing review of risks and controls (preventative and mitigative)

• Management System• Operating procedures and controls (Incl JHA PTW etc)• Operating procedures and controls (Incl JHA, PTW etc)• Training and induction• Change managementg g• Incident management• Audit and Review

Page 29: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Risk Assessment (EIR)Risk Assessment (EIR)

For regulated activities licensee must address:g

• Potential and actual hazardous events• Frequency and likelihood of such events• Potential and actual consequences of these events

Mi i i / l• Mitigation/control measures• Level of risk – in light of control measures adopted

• Establishes whether risk is ALARP or not• Establishes whether risk is ALARP or not• Stakeholder consultation

Page 30: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Risk Assessment What Type?Risk Assessment What Type?

Page 31: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Risk AssessmentRisk Assessment

Ongoing review of risks and controls:g g

• Fitness for Purpose Assessment for all facilities at least every 5 years p y y(Regulation 30)

• See PIRSA environmental register for copies of all FFP reports submitted

Page 32: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Risk AssessmentRisk Assessment

Fitness-for-Purpose (FFP) Assessment must address:( )

•Facility physical condition•Effectiveness of Management Systems•Revise potential risks•Ensure new and existing risks are ALARP•Adequacy and reliability of utilitiesLi it ti f il bl i f ti d iti it f•Limitations of available information and sensitivity of

assumptions

Page 33: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Management SystemManagement System

Licensees must demonstrate appropriate management gsystems are in place (Regulation 16):

•Policies, procedures & work practices with respect to achieving SEO compliance•Training/induction/supervision practices and proceduresTraining/induction/supervision practices and procedures•Risk management (eg JHA, PTW systems)•Monitoring, auditing, reviewing and improving performance (eg incident and change management)•High/Low Regulatory supervision

Page 34: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

HSE MS AssessmentHSE MS Assessment

www.pir.sa.gov.au/petroleum/legislation/activity_approval_process/hse_management_systems

Page 35: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy
Page 36: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy
Page 37: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy
Page 38: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Summary of Results 2009 Summary of Results 2009 (Leading KPI) (Leading KPI) Results published every year in PIRSA Annual Compliance ReportResults published every year in PIRSA Annual Compliance ReportResults published every year in PIRSA Annual Compliance ReportResults published every year in PIRSA Annual Compliance Report

Page 39: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Summary of Results 2009 Summary of Results 2009 (Leading KPI) (Leading KPI) Results published every year in PIRSA Annual Compliance ReportResults published every year in PIRSA Annual Compliance ReportResults published every year in PIRSA Annual Compliance ReportResults published every year in PIRSA Annual Compliance Report

Page 40: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

PIRSA Response to Self Assessment ResultsPIRSA Response to Self Assessment Results

Regulatory scrutiny on 5 HSEMS components in 2010:

• Audits & Reviews• Training and Competence• Management of Change• Contractor Management

A t I t it• Asset Integrity

Page 41: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Lagging & Leading Incident ReportingLagging & Leading Incident Reportinggg g g p ggg g g p g

Page 42: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Incident DefinitionsIncident Definitions

Regulation 32:

• Serious incidents (defined in SEO)• Reportable incidents less serious incidents (defined in SEO)• Reportable incidents, less serious incidents (defined in SEO)

Mixture of lagging and leading:gg g g

www.pir.sa.gov.au/petroleum/legislation/guidelines/incident_reporting/

Page 43: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Incident InvestigationsIncident Investigations

•Incident Investigations must detail:• Cause (Root Cause)• Consequences• Mitigation and remedial actions of consequences• Mitigation and remedial actions of consequences• Preventative mitigation measures

Page 44: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Incident Statistics Incident Statistics (Lagging KPIs)(Lagging KPIs)Published every year in PIRSA Annual Compliance ReportPublished every year in PIRSA Annual Compliance ReportPublished every year in PIRSA Annual Compliance ReportPublished every year in PIRSA Annual Compliance Report

3721%

11 86% 84%

42%

553%

2313%

9251%

Oil Spill Other Spill Other Pipeline Encroach Gas Release Security of Supply OHS&W

Page 45: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Root Cause Analysis ResultsRoot Cause Analysis ResultsPublished every year in PIRSA Annual Compliance ReportPublished every year in PIRSA Annual Compliance ReportPublished every year in PIRSA Annual Compliance ReportPublished every year in PIRSA Annual Compliance Report

Root Cause Summary 2008Root Cause Summary - 2008

28

81

2817%

Monitoring/MaintenanceDesign

49%

4125%

gWork PracticesCommunicationSupervisionInduction/Training

106%

42%

21%

Page 46: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

If all things fail then Emergency ResponseIf all things fail then Emergency Response

Final Mitigative Control Regulation 31 Requires:g g

• Licensees must have ERP to address:• Environment impact• Public health and Safety

S it f l• Security of gas supply

• ERP must include:ERP must include:• Measures which mitigate consequences in emergency

• Eg Evacuation, safe shut down, supply contingencies, containment• Measures to rehabilitate environment affected by emergency

Page 47: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Management System FrameworkManagement System Framework

Vision/Mission

Policy

GeneralAssessment General StandardsFactors

Reg. 16

Procedures

Work Instructions

Performance Review & Reporting

Leading andLagging Indicators

Reporting

Page 48: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Role of PIRSARole of PIRSA

M it tMonitor to ensure:• Integrity of company reporting and audits by assessing:

• Available resources (technical competency of people systems)• Available resources (technical, competency of people, systems)

• Companies meet the regulatory conditions

Enforce compliance where necessary

Page 49: Petroleum & Geothermal Energy Act 2000 - Mineralsminerals.statedevelopment.sa.gov.au/__data/assets/pdf_file/0007/... · Reppgorting Provisions under Petroleum & Geothermal Energy

Enforcement PyramidEnforcement PyramidyyReport Step 1 to 4 measures in annual compliance reportReport Step 1 to 4 measures in annual compliance report

See 2009 annual compliance report for examples of such measures


Recommended