PURDUE UNIVERSITY BASEBALL FACILITY
Phase 1 : Conceptual Design and Alternatives Analysis
CE 498 -Senior Design - 2009
Team 5
ENGINEERING TEAM
PROJECT MANAGER: Alice Madjani
TRANSPORTATION ENGINEER: Eric Hulme
STRUCTURAL ENGINEER: Matt Murray
ENVIRONMENTAL ENGINEER: Mike Broyles
STRUCTURAL ENGINEER: Ryan Laughlin
2
3
Presentation OverviewSite LayoutBaseball FacilitySoccer FacilitySite master planSite AccessWater management
Engineering considerations
Environmental considerations
LEED AccreditationConstructionCost EstimateProject Schedule
4
Time for a New FacilityOther Big Ten Facilities
Current Purdue Facility
5
Site Layout
6
Baseball Facility
Unique FeaturesSeatingGreen SpacesPress BoxHD LightingBerme SeatingOutfield Wall
LayoutGround LevelConcourse LevelPress Box
7
Soccer FacilityContinue using the eastern
field for competitionOption of using the west
field for a future men’s teamExpanded SeatingSupport Facilities
Concessions StandRestroomsLocker Room
H.D. LightingOpportunities to share
facilities
Opportunities to share facilities
8
Site Master Plan
9
Existing Access
10
Construction Access
Construction Route from S.R. 26
Construction Route from S.R. 126
Construction Route to US 231
Construction Route to S.R. 26
Construction Exit Route from S.R. 526 to S.R. 126
Construction Route into Site
Construction Route from Site
Construction Route from US 231
11
Vehicle Access Intersection Improvements
Intersection Improvements
New Parking Field
New Parking Field
New Parking Field
Perimeter Parkway
12
Pedestrian AccessUpper Pedestrian
Corridor
Lower Pedestrian Corridor
Central Pathway
Eastern Pathway
Western Pathway
Bike Path Extension
13
Water ManagementStream through the middle of the site
Central Drainage Channel through siteRiparian zone = Storm water pollution prevention
BMP to remove fertilizers and suspended solidsCentral detention basin
Control release rate to Jordan CreekHarvest rain water from basin
Flushing toilets Site irrigation Electronic controls (Supervisory Controls and Data
Acquisition)
14
Water Management
15
Environmental Considerations
Wetlands U.S. Fish and Wildlife
ServicePEMA: temporary wetland
ContaminationUS-231 Relocation StudyPreviously undeveloped
siteNot classified as a historic
site by DNRNo formal study
16
Engineering ConsiderationsFoundation System
Shallow spread footing and continuous wall foundations
Structural SystemSteel frameReinforced concrete slabs and seating structureSteel columns for Press Box supportAwning covering half the seatsCable suspension system for awning and
backstop
17
L.E.E.D.LEED Certification and Benefits
Anticipated Certification: Silver (20 points)Sustainable Site Credits: 9Water Efficiency Credits: 3Materials and Resources Credits: 6Innovation & Design Process Credits: 2
Gold Certification Potential
18
ConstructionSite management
ZEAL as the constructionmanager
Construction equipment1. Rollers 7. Bobcats
2. Lifts 8. Grader
3. Concrete
pumps9. Excavator
4. Cranes 10. Pavers
5. Front-end
loader
11.
Compactor
6. Dump Trucks 12. Fort lift
19
Construction cont’dMaterial
Building Steel framing Reinforced concrete
Parking lot Pervious concrete
20
Cost EstimateConceptual cost estimate
Soccer addition
Facility CostBaseball field $1,894,089Building Construction $4,929,922
Site work $5,471,713
Total (89.2% cost reduction) $10,967,786
Administrative $4,240,563
Total project cost $15,208,349
Facility Cost
Soccer addition $592,330
Administrative cost $191,915
Total $784,245
21
Construction Scheduling
22
SummaryThe FacilitySite LayoutEngineering ConsiderationEnvironmental ConsiderationL.E.E.D. Accreditation Cost EstimateProject Schedule
23
References Ashley, Erin. "Using Pervious Concrete to achieve LEED credits." 2008.
Pervious Concrete Pavement. 02 February 2009 <http://www.perviouspavement.org/benefits_LEEDcredit.htm>.
B4UBUILD. A Sample Residential Construction Schedule. 1998 - 2008. 19 February 2009 <http://www.b4ubuild.com/resources/schedule/6kproj.shtml>.
CE 498 - CE Design Project. January 2009. 02 February 2009 <https://engineering.purdue.edu/Courses/CE498>.
Corporation, The Schneider. "Storm Water Analysis." 2007. Google. Google Earth. West Lafayette, February 2009. HNTB. Purdue University - Athletic Facilities Master Plan. Conceptual
master plan. Indianapolis: HNTB, 2007. J&M Equipment Specialist & Salvage Recovery. 2008. 2 February 2009
<jmequipmentspecialist.com/id7.html>. Michigan, University of. Michigan Go Blue. February 2009. February 2009
<http://www.mgoblue.com/facilities/article.aspx?id=28646#>.
24
References cont’d Microsoft. Live Search Maps. February 2009. February 2009
<http://maps.live.com/>. Office of the University Architect. "Consultant's Handbook." 2006. Office of
University Architect. 20 January 2009 <http://www.purdue.edu/architect/resources/handbook/index.html>.
Qualite. Design Soccer. 2008. 12 February 2009 <http://www.qualite.com/DesignSoccer.html>.
RS Means. Builiding Construction Cost Data. Kingston, MA: R.S. Means Company, 2009.
The Schneider Corporation. "Report of Geotechnical Engineering Study." 2008.
The Schneider Corporation. "Storm Water Analysis." 2007. U.S. Fish and Wildlife Service. "Viewing Wetland with Google Earth (Plug-in for
Google Earth)." July 2008. U.S. Green Building Council. New Construction Version 2.2 Reference Guide.
Washington, DC: U.S. Green Building Council, 2006. US Green Building Council. 2009. 20 January 2009 <http://www.usgbc.org/>.
25
Questions!