STAVROS PORT Located west coastline of Strymonikos Gulf Lat: 40’’ 40 ’07.29’’B & Long: 23 42 ’01.66’’E . Piers for Dischargi ng & Loading. Various Information. Harbour Equipment:. •Un – fixed Crane 40 •Un – fixed Crane 40 . - PowerPoint PPT Presentation
Popular Tags:
4
STAVROS PORT Located west coastline of Strymonikos Gulf Lat: 40’’40’07.29’’B & Long: 2342’01.66’’E
Transcript
Page 1: Piers for Dischargi ng & Loading

STAVROS PORTLocated west coastline of Strymonikos GulfLat: 40’’40’07.29’’B & Long: 2342’01.66’’E

Page 2: Piers for Dischargi ng & Loading

Piers for Discharging & Loading

The piers for discharging / loading are as follows: Berth “A” (North 2): Depth 8m Length 108 m. Berth “B” (South 1): Depth 5m Length 107 m.

Max LOA: 140.0 m – Basic Draft: 9.0 m. There are no restriction concerning Air Draft. Entrance:

2 nautical miles NorthEast from port Lighthouse - Bounded by four corners: A: E023-44' N40-42' B: E023-45' N40-42' C: E023-45' N40-41' D: E023-44 N40-41' Max Draft: 40 m

Pilot boarding position: EE023-43' N 40-41' Hours to Port: 8 hrs

The area of approach to the port is covered on the map 321/4 of the Ministry of Mercantile Marine.

Master should watch on VHF Channel 08 for pilot communication and Channel 12 for Port Authority.

Pilotage compulsory. No Tugs – Only boat for ropes.

Page 3: Piers for Dischargi ng & Loading

Various Information

The loading / discharging procedure is always a result of a close cooperation between Master / Ch. Mate and piers foreman.

Bunker’s ops at port is allowed – pre ordered from Thessaloniki.

Fresh water is available. Delivery of waste/ sludge-slops contact with Agent. Working days / hours in the piers Mon – Sat 08:00 – 17:00

hrs l.t.- Lunch break 13:00-14:00 l.t.

Embarkation/disembarkation of crew members is not allowed. Minor repairs only after permission of the port authority.

Page 4: Piers for Dischargi ng & Loading

Harbour Equipment:

• Un – fixed Crane 40• Un – fixed Crane 40


Recommended