    Scope Management

    Chapter 5

  • 8/17/2019 Pinto 05

    2/17

    Project Scope

    Project scope is everything about a project  –work content as well as expected outcomes.

    Scope management  is the function of

    controlling a project  in terms of its goals

    and objectives and consists of:

    1) Conceptual development 4) Scope reporting

    2) Scope statement 5) Control systems

    3) Wor authori!ation ") Project closeout

  • 8/17/2019 Pinto 05

    3/17

    Conceptual #evelopment

    The process that addresses project objectives by finding the best ways to meet them.

    $ey steps in in%ormation development&' Pro(lemneed statement' *n%ormation gathering

    ' Constraints'  +lternative analysis' Project o(jectives

  • 8/17/2019 Pinto 05

    4/17

    Pro(lem Statements

    Success%ul conceptual development re,uires&

    'Reduction o% overall project complexity

    ' -oals and o(jects are clearly stated

     ./e%erence points are provided

    ' Complete understanding o% the pro(lem

  • 8/17/2019 Pinto 05

    5/17

    Statement o% Wor 0SW)

     A S! is a detailed narrative description of

    the work re"uired for a project.

    %%ective SWs contain

    1 *ntroduction and (acground

    2 echnical description

    3 imeline and milestones

    4 Client epectations

  • 8/17/2019 Pinto 05

    6/17

    he Scope Statement Process

    1 sta(lish the project goal criteria

    a) cost

    () schedule

    c) per%ormanced) delivera(les

    e) revie6 gates

    2 #evelop the management plan %or the project

    3 sta(lish a work breakdown structure

    4 Create a scope baseline

  • 8/17/2019 Pinto 05

    7/17

    Wor 7reado6n Structure

    a process that sets a project8s scope (y breaking down its overall mission into a cohesive set o% synchronous9increasingly specific tasks

    What does WBS accomplish?

    choes project o(jectives

    %%ers a logical structure

    sta(lishes a method o% control

    Communicates project status

    *mproved communication

    #emonstrates control structure

  • 8/17/2019 Pinto 05

    8/17

    Wor 7reado6n Structure and Codes

    Wor Pacages are

    individual project activities

    1:

    12 13 14

    121

    122

    123

    131

    132

    1231

    1232

    #elivera(les are

    major projectcomponents

    Su(delivera(les are

    supporting delivera(les

    he project is theoverall project underdevelopment

  • 8/17/2019 Pinto 05

    9/17

    Sample W7S in MS Project

  • 8/17/2019 Pinto 05

    10/17

    Wor Pacages

    #owest level in !$S

    %eliverable result 

    ne owner 

    &iniature projects

    &ilestones

    'its organi(ation

    Trackable

  • 8/17/2019 Pinto 05

    11/17

    rgani!ational 7reado6n Structure

    rgani!ational 7reado6n Structure 07S) allo6s

    ' Wor de%inition

    ' 6ner assignment o% 6or pacages

    ' 7udget assignment to departments

    $S links cost) activity * responsibility 

  • 8/17/2019 Pinto 05

    12/17

    /esponsi(ility +ssignment Matri

    ;oti%ication /esponsi(le Support +pproval

    /

     +nn/?#

    =im/?#

    as? Code#elivera(le *S

    Match * torg ass

    proposalPrepare

    13

    11

    *denti%y *Suser needs

    12

    Pro(lem +nalysis

    #evelop

    in%o*ntervie6

    users

    sho6#evelop

    -ain user@(uy inA

    Bind cost(ene%it in%o

    111

    112

    121

    122

    123

    131

  • 8/17/2019 Pinto 05

    13/17

    Wor +uthori!ation

    he %ormal “go ahead” to (egin 6or

    Bollo6s the scope management steps o%&

    1 scope de%inition

    2 planning documents

    3 management plans

    4 contractual documents

  • 8/17/2019 Pinto 05

    14/17

    Contractual #ocumentation

    Most contracts contain&

    Requirements

    Valid consideration

    Contracted terms

    Contracts range %rom&

  • 8/17/2019 Pinto 05

    15/17

    Scope /eporting

    determines what  types of information reported)

    who receives copies) when) and how  

    information is ac"uired and disseminated.

    ypical project reports contain

    1 Cost status

    2 Schedule status3 echnical per%ormance

  • 8/17/2019 Pinto 05

    16/17

    ypes o% Control Systems

    o Con%iguration

    o #esign

    o rend monitoring

    o #ocument

    o  +c,uisition

    o Speci%ication

  • 8/17/2019 Pinto 05

    17/17

    Project Closeout

    The job is not over until the paperwork is done+

    Closeout documentation is used to&

    /esolve disputes

    rain project managers

    Bacilitate auditing

    Closeout documentation includes&>istorical records

    Post project analysis

    Binancial closeout