+ All Categories
Home > Documents > Piping Estimate & Summary Form

Piping Estimate & Summary Form

Date post: 18-Feb-2018
Category:
Upload: karuna
View: 218 times
Download: 0 times
Share this document with a friend
21
7/23/2019 Piping Estimate & Summary Form http://slidepdf.com/reader/full/piping-estimate-summary-form 1/21 Piping Group Time Charge Codes Activity Grouping Piping Sub-Group Operation Number & Name (* !"# !"$ !"! !"% P' P P)G PC Supervision  A Proect )esign +asis B Pre,iminary )esign C )etai,ed )esign D Model Reviews )e,iverab,es E Line List    A   c    i    t    i   v    i    t   y    C   o    d   e Work Assignment, Planning, Status Report Meetings w Department, Pro!e"t # Client, Emp$$ Per%orm$ Reviews, &e"'ni"al Dire"tion, P#(D Reviews Work Assignment, Work review, Meetings, Status Reports, Emp$$ Per%orm$ Review, P#(D Reviews Work Assignment, Work review, Meetings, Status Reports, Emp$$ Per%orm$ Review, P#(D Reviews Work Assignment, Work review, Meetings, Status Reports, Emp$$ Per%orm$ Review, P#(D Reviews S)W, La*or +our Estimate, Control Level S"'edule, Colle"t, Review and Disseminate Client Criteria, Coordinate endor S- C., Field &rips Spe"i%i"ations, Standards, Develop CCC, endor Data S- C. Spe"i%i"ations, Standards, Plot Plan Developm/t, endor Data S- C., +eat &ra"ing Criteria, Field &rips Esta*lis' Mat/l &ake0)%% Data Base, De%ine Material 1Bump1 Criteria, &ranspositions, essel )rientations, Model (nde2, Drawing (nde2, La3out Studies, Preliminar3 M&) # RF- SP (tem A"tivities, Model Reviews, 4D CADD, 5D CADD, Manual Drawings, Revise E2ist$ Dwgs$,Model Reviews, (ntermediate M&) and P)R, Model Reviews Constru"tion Work Pa"kages 6CWP7 Manual (sometri"s, CADD (sometri"s, Piping Plans, Piping Se"tions, (sometri" (nde2, &ie0(n (nde2, &ie0(n List, &ie0(n (sos$, +eat &ra"ing (sometri"s, +eat &ra"ing (nde2, Demo Dwg/s, Final M&), P) Supplements, S'ortage Reports, )verage Reports,
Transcript
Page 1: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 1/21

Piping Group Time Charge Codes

Activity Grouping

Piping Sub-Group Operation Number & Name (*

!"# !"$ !"! !"%

P' P P)G PC

Supervision  A

Proect )esign +asis B

Pre,iminary )esign C

)etai,ed )esign D

Model Reviews

)e,iverab,es E

Line List

   A  c   i   t   i  v   i

   t  y

   C  o   d  e

Work Assignment,Planning, Status ReportMeetings wDepartment, Pro!e"t #Client, Emp$$ Per%orm$Reviews, &e"'ni"alDire"tion, P#(DReviews

Work Assignment, Workreview, Meetings,Status Reports, Emp$$Per%orm$ Review, P#(DReviews

Work Assignment, Workreview, Meetings,Status Reports, Emp$$Per%orm$ Review, P#(DReviews

Work Assignment, Workreview, Meetings,Status Reports, Emp$$Per%orm$ Review, P#(DReviews

S)W, La*or +ourEstimate, Control LevelS"'edule, Colle"t,Review andDisseminate ClientCriteria, Coordinateendor S- C., Field&rips

Spe"i%i"ations,Standards, DevelopCCC, endor Data S-C.

Spe"i%i"ations,Standards, Plot PlanDevelopm/t, endorData S- C., +eat&ra"ing Criteria, Field&rips

Esta*lis' Mat/l &ake0)%%Data Base, De%ineMaterial 1Bump1Criteria,

&ranspositions, essel)rientations, Model(nde2, Drawing (nde2,La3out Studies,

Preliminar3 M&) #RF-

SP (tem A"tivities,Model Reviews,

4D CADD, 5D CADD,Manual Drawings,Revise E2ist$

Dwgs$,Model Reviews,

(ntermediate M&) andP)R, Model Reviews

Constru"tion WorkPa"kages 6CWP7

Manual (sometri"s,CADD (sometri"s,Piping Plans, PipingSe"tions, (sometri"(nde2, &ie0(n (nde2,&ie0(n List, &ie0(n (sos$,

+eat &ra"ing(sometri"s, +eat&ra"ing (nde2, DemoDwg/s,

Final M&), P)Supplements, S'ortageReports, )verageReports,

Page 2: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 2/21

 

!"

PS

Work Assignment, Workreview, Meetings,Status Reports, Emp$$Per%orm$ Review, P#(DReviews

Spe"i%i"ations,Standards, De%ine PipeStress Anal3sis Criteria,Pre0Eng$ Pipe Supportsendor Data S- C.

Model Reviews, PipeStress Anal3sis, +angerData S'eets, 8oint Data

S'eets, Review # Sign(sometri"s

Page 3: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 3/21

PIPING ENGINEERING AND DESIGN __ SUMMARY OF HOME OFFICE LABOR AND COST ESTIMATE & FINAL REPORT

P+,%E# N.'E/ P+,%E# '.N.GE+/

#EN/ P+EP.+ED (PE)/ ES3 NE #,4N/ 9

,#.,N/ .PP+,ED / E643 S,3 #,4N/

P+,%E# N,3/ # 7N. +EP,+ / ES3 #/ (8'')

P.N PE/ +E3/ 0 1

#,N+.# PE / (EP#9 EP#'9 et3) D.E/ 7N. S, #,4N / 9

PPNG ENGNEE+NG DS#PNE ES'.E .PP:D 4DGE 7N. +EP,+

,PE+3 No3 G+,4P ; ,7 ,. ; ,7 ,.

251 PPE '.E+. ENG+3 :AL;E< <.4E= 9  

252 PPNG DESGN :AL;E< <.4E= 9  

25 PPE '.E+. #,N+, :AL;E< <.4E= 9  

25 PPE S+ESS ENG+3 :AL;E< <.4E= 9  

S4 ,. E#>N#. .,+ >+S ! <.4E= 80300 80300 0 0

250 PE9 DEP3 & S.77 :AL;E< <.4E= 9  

. ,. .,+ >,4+S <.4E= 100 ; 0 100 ; 0 100 ;

+E'.+?S/ >+S@S,! <.4E= >+S@S,! <.4E= >+S@S, ! <.4E=

ES'.ED.,+ >,4+S

ES'.ED#,'P4E+

EAPENSES 8

ES'.ED +.E &,DGNG

EAPENSES 8

4DGE.,+>,4+S

; ,7 ,.

.#4..,+>,4+S

Page 4: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 4/21

P.P.NG NG.N/.NG & )S.GN 0O O11.C 'A+O/2 3PNS ST.AT )TA.'

P'AS NOT On,y the ye,,o4 bo5es are 6or data entryPR)8EC& =)$

!"$7 7 7 7 P . P . N G A T / . A ' N G . N / . N G ST.AT

SPEC(F(CA&()=S SPEC =)$ -;A=&(&> +);RS DE7.4 LAB)R +RS

B P(P(=? MA&/L L(=E CLASS =)&ES # DA&A 20 9

B (=D((D;AL L(=E CLASS SPECS 20 9

B P;RC+ASE 6P(PE, ALES, F(&&(=?S, E&C$7 5 9

B &ES&(=?, CLEA=(=?, PASS(A&(=? 20 9

B SP (&EM 0 SPEC, L(S&, # DA&AS+EE&S B 9

B (S;LA&(=?,PA(=&(=?,C)A&(=?,L(=(=? 20 9

B WELD(=? =DE 20 9

&)&AL =;MBER )F SPEC(F(CA&()=S A=D +);RS 9

 AC&((&(ES LAB)R +RS

B PR)8EC& C)MM)D(&> CA&LA)?

E L(=E L(S& (=DE@ 0 DEEL)P # MA(=&A(= ES&$ L(=E C);=& 9$

S;B0&)&AL AC&((&> MA= +);RS:AL;E<

 A S;PER(S()= 9 :AL;E<  A8;S&ME=& :AL;E<

!"!--P.P.NG AT/.A' NG.N/.NG TOTA'S - 0/S :AL;E<

TOTA' 'A+O/0/S

Page 5: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 5/21

9

 !"! 7 7 7 7 P . P . N G ) S . G N ST.AT

 AC&((&> =;MBER +);RS

DRAW(=?SD)C;ME=&S SCALE S(E )F PER DEFA;L&

6 DW?$ S(E A 0 B 0 C 0 D 0 E 7 6)P&()=AL7 6)P&()=AL7 (&EMS (&EM +RS LAB)R +RS

C &RA=SP)S(&()= LA>);&S 6=)= CAD7 99 9

C LA>);&S, S&;D(ES, ESSEL )R(E=&A&()=S 9 9

C L)CA&()= C)=&R)L PLA=S 6LCP7 49 9

C PL)& PLA=S 6S(&E A=D)R ;=(&7 99 9

C P(P(=? (=DE@ 6 PLA=S, M)DEL, &(E0(= 7 49 9

B DRAW(=? E=D)R PR(=& S-$ C.$ AR();S AR();S 9

D P(P(=? PLA= DRAW(=?S 6 4DMA=;AL7 9

D 5D M)DEL(=? 0 E-;(PME=& G 9

D 5D M)DEL(=? 0 P(PE L(=ES 9

B P(P(=? S&A=DARD # DE&A(L DRAW(=?S 9 9

E +EA& &RACE DRAW(=?S 6P(P(=? )=L>7 $4 9

E DEM)L(&()= DRAW(=?S 6 =)=0CAD7 9

E (S)ME&R(CS 6=EW L(=ES # &(E0(=S7 =A H$4 9

E P(P(=? PLA= DRAW(=?S 6RE E@(S&/?7 9 9

E P(P(=? PLA= 0 AS0B;(L&S I 49 9

E E@&RAC& PLA= DRAW(=?S 0 5D 49 9

E E@&RAC& (S)ME&R(CS 0 5D 9

S;B0&)&AL DRAW(=? -;A=&(&(ES A=D LAB)R +);RS 9 9

TOTA' 'A+O/0/S

Page 6: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 6/21

SPEC(F(CA&()=S SPEC =)$ -;A=&(&> +RS$ PER$ DEFA;L& +RS

B DES(?=, LA>);& # DRAW(=? 9 9

B S+)P FABR(CA&()= 9 9

B F(ELD FABR(CA&()= 9 9

B &(E (=S 9 9

B ?E)?RAP+(C C)L)R C)DE 9 9

B +EA& &RAC(=? 9 9

S;B0&)&AL =;MBER )F SPEC(F(CA&()=S A=D LAB)R +);RS 9

 AC&((&> -;A=&(&> +RS$ PER$ DEFA;L& +RS

B DES(?=ER F(ELD &R(PS DA>S +);RS H 9

E &(E (= L(S& =o &(E0(=S +RS PER 9

F CAD C))RD(=A&)R WEE.S +);RS 9 9

E (S)ME&R(C DRAW(=? L(S&(=DE@  = 9

S;B0&)&AL AC&((&> LAB)R +);RS 9

 A S;PER(S()= 9 :AL;E<  A8;S&ME=& :AL;E<

!"$ - P.P.NG )S.GN TOTA'S - )8GS2 SPCS2 'A+O/ 0O9/S :AL;E<

(S)ME&R(CC);=&

Page 7: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 7/21

9

 !"% 7 7 7 7 P . P . N G A T / . A ' C O N T / O ' ST.AT

 AC&((&(ES -;A=&(&> +RS$ PER$ DEFA;L& +RS

B MA&ER(AL MA=A?EME=& CR(&ER(A, P#(D RE(EW 5 9

C MA&/L &A.E)FF 6PREL(M7 # RF- PER E-($ (S) 9$ 9

D MA&/L &A.E)FF 6(=&ERMED(A&E7 # P) PER E-($ (S) 9

E MA&/L &A.E)FF 6F(=AL,MA=;AL7 # S;PPL$ PER (S) 9

E MA&/L &A.E)FF 6F(=AL, D)W=L)AD7 # S;PPL$ PER (S) 9$ 9

E MA&ER(AL )ERA?EJS+)R&A?E REP)R&S$ H9 9

S;B0&)&AL AC&((&> MA= +);RS 9

 A S;PER(S()= 9 :AL;E<  A8;S&ME=& :AL;E<

!"% - P.P.NG AT/.A' CONT/O'S TOTA' - 'A+O/ 0/S :AL;E<

TOTA' 'A+O/0/S

PER RF-P),E&C

Page 8: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 8/21

9

 !"7 7 7 7 P . P S T / S S N G . N / . N G ST.AT

SPEC(F(CA&()=S SPEC =)$ -;A=&(&> +);RS DE7.4 LAB)R +RS

B A=AL>S(S 20 9

B PRE E=? # E=? S;PP&S 20 9

B C)MP)=E=&S 6E@P 8&S, S&R;&S, E&C7 10 9

B )&+ER 20 9

&)&AL =;MBER )F SPEC(F(CA&()=S A=D MA= +);RS 9

 AC&((&(ES -;A=&(&> +);RS DE7.4 LAB)R +RS

D S&RESS A=AL>S(S AC&((&(ES 10 9

S;B0&)&AL AC&((&> LAB)R +);RS

 A S;PER(S()= 9 :AL;E<  A8;S&ME=& :AL;E<

 !" - P.P ST/SS NG.N/.NG TOTA' -'A+O/ 0/S   :AL;E<

TOTA' 'A+O/0/S

+RS$ PER L(=E AC&;AL

Page 9: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 9/21

&EC+$ &)&AL :AL;E<

9

 !"# 7 7 7 7 ' A ) P . P . N G N G . N / ST.AT

 AC&((&(ES =;MBER +);RS DE7.4 LAB)R +RS

B LPE F(ELD &R(PS 0 PREL(M$ 8)B S(&E S;RE> DA>S B 9

E C)=S&R;C&()= W)R. PAC.A?E PREP EAC+ 20 9

@ &R(PS 0 C)=S&R;C&()= S;PP)R& PE)PLE 0 9

@ &R(PS 0 P(PE FAB S+)P S;RE> 6 (=SPEC&$-;AL(F>7 D.S B 9

 A DEPAR&ME=& MA=A?EME=& RE(EWS DA>S B 9

 A &EC+=(CAL S;PP)R& AC&((&(ES DA>S B 9

 A &EC+=(CAL A(DE WEE.S 0 9

B FR)=& E=D PLA==(=? 6SC)PE, ES&, E&C7

 A S;PER(S()= C))RD(=A&()= MEE&(=?S 9 :AL;E<  A8;S&ME=&   :AL;E<

!"# - 'A) P.P.NG NG.N/ & STA11 -TOTA' 'A+O/ 0/S FLWB   :AL;E<

1@1 A"tivit3 t'at is reKuired *ut will *e 'andled under a di%%erent *udget$ PR)8EC& )R 8)B &)&AL :AL;E<

TOTA' 'A+O/0/S

 

WEE.S 2 9

-$A$ A;D(& AC&((&(ES

WEE.S 2 9

Page 10: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 10/21

=)&ES

:AL;E<

Page 11: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 11/21

Page 12: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 12/21

=)&ES

:AL;E<

Page 13: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 13/21

=)&ES

:AL;E<

Page 14: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 14/21

=)&ES

:AL;E<

Page 15: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 15/21

=)&ES

:AL;E<

99

Page 16: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 16/21

PIPING ENGINEERING & DESIGN FINAL REPORT DETAIL

9

1.NA'

-;A=&(&> LAB)R +RS

9

LAB)R +RS

 AC&;AL$

L(=E =o$

9

The area be,o4 is to be used on,y at

the end o6 the proect to record thehistorica, actua, data7

TOTA''A+O/ 0/S

Page 17: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 17/21

9

1.NA'

SCALE =;MBER A?$ +);RS

S(E )F )F PER LAB)R

DRAW(=?S DRAW(=?S DRAW(=? +RS

:D(9<

:D(9<

:D(9<

:D(9<

:D(9<

:D(9<

:D(9<

:D(9<

:D(9<

 

9 :D(9< 9

TOTA''A+O/ 0/S

Page 18: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 18/21

-;A=&(&> +RS

 

9 9

-;A=&(&> +RS

 

9

9

Page 19: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 19/21

9

1.NA'

-;A=&(&> LAB)R +RS

 

9

9

TOTA''A+O/ 0/S

Page 20: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 20/21

9

1.NA'

-;A=&(&> +RS

 

9 9

+RS

 

9

TOTA''A+O/ 0/S

Page 21: Piping Estimate & Summary Form

7/23/2019 Piping Estimate & Summary Form

http://slidepdf.com/reader/full/piping-estimate-summary-form 21/21

9

9

1.NA'

LAB)R +RS

 

9

9 99

TOTA''A+O/ 0/S


Recommended