+ All Categories
Home > Documents > Plan - gov.uk...railway realignment Indicative extent of AR MM Client's Comments Addressed 2017...

Plan - gov.uk...railway realignment Indicative extent of AR MM Client's Comments Addressed 2017...

Date post: 23-Sep-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
1
0 10 20 30 40 50 60 70 80 -10 -20 -30 0 10 20 30 40 50 60 70 80 -10 -20 -30 Chainage 28 + 430 28 + 500 28 + 600 28 + 700 28 + 800 28 + 900 29 + 000 29 + 100 29 + 200 29 + 300 29 + 400 29 + 500 29 + 600 29 + 700 29 + 800 29 + 900 30 + 000 30 + 100 30 + 200 30 + 300 30 + 400 30 + 500 30 + 600 30 + 700 30 + 800 30 + 900 31 + 000 31 + 100 31 + 200 31 + 300 31 + 400 31 + 500 31 + 600 31 + 700 31 + 800 31 + 900 32 + 000 32 + 100 32 + 200 32 + 300 32 + 400 32 + 500 32 + 600 32 + 700 32 + 800 32 + 900 33 + 000 33 + 100 33 + 200 33 + 300 33 + 400 33 + 500 33 + 600 33 + 700 33 + 800 33 + 900 34 + 000 34 + 100 34 + 137 28793 . 4 29068 . 4 29635 . 2 29910 . 2 30467 . 1 30742 . 1 32396 . 0 32671 . 0 33360 . 6 33635 . 6 34137 . 2 Horizontal Alignment L=1462.6 R=-2700.0 L = 275 . 0 L=566.8 L = 275 . 0 L=556.9 R=-2700.0 L = 275 . 0 L=1653.9 L = 275 . 0 L=689.6 R=-2700.0 L = 275 . 0 L=501.7 Vertical Alignment G = - 1 . 253 % L = 2624 . 1 R=-56000.0 L=639.9 G = - 0 . 110 % L = 591 . 2 R=-45000.0 L=183.6 G = 0 . 298 % L = 1992 . 1 R=16000.0 L=312.2 G = - 1 . 654 % L = 392 . 2 R=-12900.0 L=221.3 G = 0 . 062 % L = 224 . 0 Existing Level 23 . 1 26 . 2 30 . 6 28 . 6 27 . 9 25 . 2 21 . 5 17 . 0 15 . 3 12 . 2 9 . 6 9 . 4 9 . 1 8 . 7 8 . 3 9 . 0 8 . 6 8 . 6 8 . 6 8 . 9 9 . 0 8 . 7 8 . 9 Proposed Level 32 . 5 31 . 7 30 . 4 29 . 2 27 . 9 26 . 6 25 . 4 24 . 1 22 . 9 21 . 6 20 . 4 19 . 1 17 . 9 16 . 8 15 . 8 15 . 0 14 . 4 14 . 0 13 . 8 13 . 7 13 . 6 13 . 4 13 . 3 13 . 2 13 . 1 13 . 1 13 . 3 13 . 6 13 . 9 14 . 2 14 . 5 14 . 8 15 . 1 15 . 4 15 . 7 16 . 0 16 . 3 16 . 6 16 . 9 17 . 2 17 . 5 17 . 8 18 . 1 18 . 4 18 . 7 19 . 0 19 . 2 19 . 2 18 . 4 17 . 1 15 . 4 13 . 8 12 . 1 10 . 5 9 . 3 8 . 8 8 . 9 9 . 0 9 . 0 + 9 . 4 + 5 . 5 + 0 . 6 + 1 . 4 + 3 . 9 + 7 . 1 + 7 . 6 + 9 . 4 + 10 . 8 + 9 . 7 + 8 . 8 + 8 . 1 + 7 . 5 + 6 . 0 + 5 . 8 + 5 . 4 + 5 . 2 + 4 . 8 + 4 . 6 + 4 . 7 + 4 . 4 Cut and Fill - 0 . 2 Design Speed 230km/h 8 . 6 8 . 3 8 . 2 7 . 9 8 . 5 8 . 8 8 . 1 8 . 0 8 . 1 7 . 9 7 . 2 7 . 2 8 . 2 7 . 7 7 . 5 6 . 9 7 . 5 7 . 7 7 . 1 6 . 3 7 . 2 7 . 0 6 . 3 7 . 8 8 . 6 7 . 4 6 . 6 6 . 6 7 . 0 7 . 0 6 . 7 6 . 7 7 . 3 7 . 8 8 . 6 8 . 6 + 4 . 6 + 4 . 8 + 4 . 9 + 5 . 4 + 5 . 1 + 5 . 1 + 6 . 1 + 6 . 5 + 6 . 7 + 7 . 2 + 8 . 2 + 8 . 5 + 7 . 8 + 8 . 6 + 9 . 1 + 10 . 0 + 9 . 7 + 9 . 8 + 10 . 7 + 11 . 8 + 11 . 2 + 11 . 7 + 12 . 7 + 11 . 4 + 10 . 6 + 11 . 0 + 10 . 5 + 8 . 8 + 6 . 8 + 5 . 1 + 3 . 8 + 2 . 6 + 1 . 5 + 1 . 1 + 0 . 4 + 0 . 4 0 . 0 CH. 29580 . 7 T P. 18 . 1 CH. 30220 . 6 T P. 13 . 8 CH. 30811 . 9 T P. 13 . 1 CH. 30995 . 5 T P. 13 . 3 CH. 32987 . 6 T P. 19 . 2 CH. 33299 . 8 T P. 17 . 1 CH. 33691 . 9 T P. 10 . 6 CH. 33913 . 2 T P. 8 . 9 90 100 110 120 90 100 110 120 20 . 0 m 20 . 0 m 20 . 0 m 20 . 0 m 20 . 0 m 20 . 0 m 20 . 0 m 40 . 0 m 4 0 . 0 m 40 . 0 m 40 . 0 m 28 + 000 29 + 000 30 + 000 31 + 000 32 + 000 33 + 0 0 0 34 + 000 34 + 137 A1 07/06/2017 JV Railway Track JV C321-MMD-RT-DPP-130-591706 Post-Consultation Mott MacDonald West Midlands to Leeds Route Profile Scale H:1:10,000 V:1:1000 @ A1 Scale 1:10,000 @ A1 Plan F o r Con t i n u a t i on Re f e r t o Dr a wi n g C32 1 - M M D- RT - DPP- 1 30 - 591705 Leeds Leg North 1:10000 Common Lane Sandwath Lane Existing railway V A162 Saw Wells Lane over A162 HS2 crossing HS2 viaduct over Common Lane, Dort's Dike floodplain, Sandwath Lane and existing railway - 2170m floodplain, Sandwath Lane and existing railway HS2 viaduct over Common Lane, Dort's Dike Sheet 5 of 5 HSL17B HSL17B East Coast Main Line HS2 connection to East Coast Main Line East Coast Main Line HS2 connection to railway realignment Indicative extent of MM AR Client's Comments Addressed 2017 Preferred Route 28/06/17 28/06/17 28/06/17 AR JV MM P01 First Issue 11/07/17 11/07/17 AR MM 11/07/17 P02 P02 10 Key Environmental Features Legend Legend Major Contour Minor Contour Node Engineering Earthworks Viaduct Tunnel Railway Cutting Railway Embankment Track Centrelines Flood Zones Historical Landfill Active and/or Authorised Landfill Historical Battlefields Registered Parks and Gardens Scheduled Monuments Track Profile Ground Profile Fully Retained Cutting/Fill Operational Boundary HS2 Depot/Station National Park Beauty Area of Outstanding Natural National Nature Reserves SSSI Special Protection Areas Special Areas of Conservation Ramsar World Heritage Site Listed Building Grade I Listed Building Grade II* Listed Building Grade II Major Development Sites Existing Railway Connection HS2 Connection Additional Development Sites Drawn Checked Approved Drawing No. Date Scale Size Rev. Drawn Rev Description Project/Contract Discipline/Function Zone Creator/Originator Legends/Notes: Drawing Title Design Stage HS2 App Con App Checked Scale with caution as distortion can occur. or if it is issued in part or issued incompletely in any way. the reproduction of this document after alteration, amendment or abbreviation HS2 accepts no responsibility for any circumstances which arise from Ordnance Survey Licence number 100049190 © Crown Copyright and database right 2017. All rights reserved. Registry under delegated authority from the Controller of HMSO. © Crown Copyright material is reproduced with the permission of Land may be used for legal or other official purposes. Only an official copy of a title plan or register obtained from the Land Registry sold or published without the formal permission of Land Registry. This material was last updated on 2017 and may not be copied, distributed, Birmingham, B4 6GA Queensway, 2 Snow Hill, Registered office: Registration No. 06791686 Registered in England 0 500 200 100 1000 @ 1:10000 METRES 0 100 50 20 10 @ 1:1000 METRES
Transcript
Page 1: Plan - gov.uk...railway realignment Indicative extent of AR MM Client's Comments Addressed 2017 Preferred Route 28/06/17 JV AR MM P01 First Issue 11/07/17 11/07/17 AR MM 11/07/17 P02

0

10

20

30

40

50

60

70

80

-10

-20

-30

0

10

20

30

40

50

60

70

80

-10

-20

-30

Chainage

28+430

28+500

28+600

28+700

28+800

28+900

29+000

29+100

29+200

29+300

29+400

29+500

29+600

29+700

29+800

29+900

30+000

30+100

30+200

30+300

30+400

30+500

30+600

30+700

30+800

30+900

31+000

31+100

31+200

31+300

31+400

31+500

31+600

31+700

31+800

31+900

32+000

32+100

32+200

32+300

32+400

32+500

32+600

32+700

32+800

32+900

33+000

33+100

33+200

33+300

33+400

33+500

33+600

33+700

33+800

33+900

34+000

34+100

34+137

28793.4

29068.4

29635.2

29910.2

30467.1

30742.1

32396.0

32671.0

33360.6

33635.6

34137.2

Horizontal Alignment

L=1462.6

R=-2700.0 L=275.0L=566.8

L=275.0 L=556.9

R=-2700.0 L=275.0L=1653.9

L=275.0 L=689.6

R=-2700.0 L=275.0L=501.7

Vertical Alignment G=-1.253%

L=2624.1

R=-56000.0

L=639.9G=-0.110%

L=591.2R=-45000.0

L=183.6

G=0.298%

L=1992.1

R=16000.0

L=312.2G=-1.654%

L=392.2R=-12900.0

L=221.3

G=0.06

2%L=22

4.0

Existing Level 23.1

26.2

30.6

28.6

27.9

25.2

21.5

17.0

15.3

12.2

9.6

9.4

9.1

8.7

8.3

9.0

8.6

8.6

8.6

8.9

9.0

8.7

8.9

Proposed Level 32.5

31.7

30.4

29.2

27.9

26.6

25.4

24.1

22.9

21.6

20.4

19.1

17.9

16.8

15.8

15.0

14.4

14.0

13.8

13.7

13.6

13.4

13.3

13.2

13.1

13.1

13.3

13.6

13.9

14.2

14.5

14.8

15.1

15.4

15.7

16.0

16.3

16.6

16.9

17.2

17.5

17.8

18.1

18.4

18.7

19.0

19.2

19.2

18.4

17.1

15.4

13.8

12.1

10.5

9.3

8.8

8.9

9.0

9.0

+9.4

+5.5

+0.6

+1.4

+3.9

+7.1

+7.6

+9.4

+10.8

+9.7

+8.8

+8.1

+7.5

+6.0

+5.8

+5.4

+5.2

+4.8

+4.6

+4.7

+4.4

Cut and Fill -0.2

Design Speed 230km/h

8.6

8.3

8.2

7.9

8.5

8.8

8.1

8.0

8.1

7.9

7.2

7.2

8.2

7.7

7.5

6.9

7.5

7.7

7.1

6.3

7.2

7.0

6.3

7.8

8.6

7.4

6.6

6.6

7.0

7.0

6.7

6.7

7.3

7.8

8.6

8.6

+4.6

+4.8

+4.9

+5.4

+5.1

+5.1

+6.1

+6.5

+6.7

+7.2

+8.2

+8.5

+7.8

+8.6

+9.1

+10.0

+9.7

+9.8

+10.7

+11.8

+11.2

+11.7

+12.7

+11.4

+10.6

+11.0

+10.5

+8.8

+6.8

+5.1

+3.8

+2.6

+1.5

+1.1

+0.4

+0.4

0.0

CH.2

9580.7

TP. 18.1

CH.3

0220.6

TP. 13.8

CH.3

0811.9

TP. 13.1

CH.3

0995.5

TP. 13.3

CH.3

2987.6

TP. 19.2

CH.3

3299.8

TP. 17.1

CH.3

3691.9

TP. 10.6

CH.3

3913.2

TP. 8.9

90

100

110

120

90

100

110

120

20.0

m

20.0

m

20.0

m

20.0

m

20.0m

20.0

m

20.0

m

40.0

m

40.0m

40.0

m

40.0m

28+000

29+000

30+000

31+000

32+000

33+000

34+000

34+137

A107/06/2017

JV

Railway Track

JV

C321-MMD-RT-DPP-130-591706

Post-Consultation

Mott MacDonald

West Midlands to Leeds Route

ProfileScale H:1:10,000 V:1:1000 @ A1

Scale 1:10,000 @ A1

Plan

For

Continuation R

efer to Dra

wing C

321-M

MD-R

T-D

PP-1

30-5

91705

Leeds Leg North

1:10000

Common Lane Sandwath Lane Existing railway

V

A162 Saw Wells Lane

over A162

HS2 crossing

HS2 viaduct over Common Lane, Dort's Dike floodplain, Sandwath Lane and existing railway - 2170m

floodplain, Sandwath Lane and existing railway

HS2 viaduct over Common Lane, Dort's Dike

Sheet 5 of 5

HSL17B

HSL17B

East Coast Main Line

HS2 connection to

East Coast Main Line

East Coast Main LineHS2 connection to

railway realignment

Indicative extent of

MMAR

Client's Comments Addressed

2017 Preferred Route

28/06/17 28/06/1728/06/17

ARJV MMP01

First Issue

11/07/17 11/07/17

AR MM

11/07/17

P02

P02

10

Key Environmental Features Legend Legend

Major Contour

Minor Contour

Node

Engineering Earthworks

Viaduct

Tunnel

Railway Cutting

Railway Embankment

Track Centrelines

Flood Zones

Historical Landfill

Active and/or Authorised Landfill

Historical Battlefields

Registered Parks and Gardens

Scheduled Monuments

Track Profile

Ground Profile

Fully Retained Cutting/Fill

Operational Boundary

HS2 Depot/Station

National Park

Beauty

Area of Outstanding Natural

National Nature Reserves

SSSI

Special Protection Areas

Special Areas of Conservation

Ramsar

World Heritage Site

Listed Building Grade I

Listed Building Grade II*

Listed Building Grade IIMajor Development Sites

Existing Railway Connection

HS2 Connection

Additional Development Sites

Drawn Checked Approved

Drawing No.

Date Scale Size

Rev.

DrawnRev Description

Project/Contract

Discipline/Function

Zone

Creator/Originator

Legends/Notes:

Drawing Title

Design Stage

HS2 AppCon AppChecked

Scale with caution as distortion can occur.

or if it is issued in part or issued incompletely in any way.

the reproduction of this document after alteration, amendment or abbreviation

HS2 accepts no responsibility for any circumstances which arise from

Ordnance Survey Licence number 100049190

© Crown Copyright and database right 2017. All rights reserved.

Registry under delegated authority from the Controller of HMSO.

© Crown Copyright material is reproduced with the permission of Land

may be used for legal or other official purposes.

Only an official copy of a title plan or register obtained from the Land Registry

sold or published without the formal permission of Land Registry.

This material was last updated on 2017 and may not be copied, distributed,

Birmingham, B4 6GA

Queensway,

2 Snow Hill,

Registered office:

Registration No. 06791686

Registered in England

0 500200100 1000

@ 1:10000METRES

0 100502010

@ 1:1000METRES

Recommended