Enabling a Microelectronic World ® PLM Best Practice Conference PLM Best Practice Conference 20 th. May ’09, DPARK, Director, Corporate R&D, Amkor Technology Korea
Transcript
Page 1: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

Enabling a

Microelectronic

World®

PLM Best Practice Conference PLM Best Practice Conference

20th. May ’09, DPARK,

Director, Corporate R&D,

Amkor Technology Korea

Page 2: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

What is Package?

• Connecting Silicon to Real World

Page 3: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

Package Assembly & Test Process flow

WB FC

0. Wafer Fab 1. Solder Bumping 3. Wafer Thinning 4. Sawing

5. Die Attach6. Wire Bonding7. Die Stacking8. Molding9. Solder Ball Attach

0. Package Design

2. Wafer Test

FC CSP 단면도단면도단면도단면도Multi Chip CSP10. Final Test

Page 4: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

Enabling a

Microelectronic

World®

System for Amkor’s Operation StructureSystem for Amkor’s Operation Structure

Page 5: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

Business Organization and Location

• Major Sales Office and Manufacturing Sites

� Customer

� Head Quarter

� Sales/ Marketing

� Customer

� Sales

� Customer

� Sales

� R&D

� Factory

� Supplier

Page 6: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

PLM

NPI

Volume Production

APQP- Strategic

Product Development

Volume

Customer

Proto

Simplified Amkor Biz Flow …

Manufacturing Platform

Factory

Template

Sales

APD

BU

BU

R&D

Page 7: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

What is PLM ( Product Lifecycle Management)?

Prod Reqt

Planning

Product-

concept

Product-

Definition

Product-

Development

Product-

Introduction

Concept to market entry

Volume

Production

Product-

Support

Dispatch

Selling

Marketing

Logistics

Physical Asset

Order to

Delivery

PLM

ERP =SAP

CRM

SCM

PLM : Product Lifecycle Management

CRM : Customer Relationship Management

ERP : Enterprise Resource Planning

SCM : Supply Chain Management

Money

Product Information

Page 8: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

ACL (Security) DMZ

MCAD(AutoCAD)

ECAD(Allegro, APD)

Document

Viewing

Amkor Global PLM

Tool Environment CPC

Legacy

Sales/Marketing R&D Center Engineering QA Service SuppliersPlanningORG

PLM

Configuring & ECM

ESI (S

AP I/F

)

Migration

CPC

Customer Portal

Supplier Portal

CPC PortalInternet

Intranet

Customer

Product

Design &

Develop

Feedback,

Assessment &

Correction

Process

Design &

Develop

Idea

Management

Product

Definition &

Planning

Product &

Process

Validation

Phase 1 Phase II Phase III Phase IV Phase VPhase 0

APQP

Process

Project & Portfolio Mgmt Report

EDM

Drawing Mgmt

Service Request

CAD I/F

Quality Mgmt

SCAR

RRS

eSmart

Agile

APQP

ATDOCSTIMS

ADA

Data Migration

ERP =SAP

ePM

Amkor Global ERP

MM

PP FI

SD PM

QM

CO

MESOthers

Not Integrated in Ph.1

SID#PO#, PR#, BOM, EC SAP ERP Integration

기존의기존의기존의기존의 연구연구연구연구 개발개발개발개발 및및및및 기술기술기술기술 관련관련관련관련 DB를를를를 통합하고통합하고통합하고통합하고 SAP 및및및및 MES와와와와 연계함연계함연계함연계함

PLM ( Product Life Cycle Management) 구축구축구축구축

Page 9: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

Major system categories for Amkor operation

ERP(SAP)

for Resource

MES(AMS)

For Manufacturing

PLM

For Technologies

PIN#, Schedule

Project Info

Product Info, PV

( BOM, Process, Equipment )

PR( For Material, Tooling)

Billing Info

QML trigger

CAM Data,

PIN#,

Manufacturing Status

Utilization data

FG, PIN, PDL

SID#

Process Code

PO Info

Equipment Info , Code

Page 10: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

System for Idea & Development

Phase0 Phase1 Phase 2 Phase3 Phase4

Path Finding Marketing Engineering Product Production

Ideas Planning Development Verification Validation

Idea 1

Idea 2

Idea 3

Idea 4

Idea 5

Planning 3 Development 3 Qualification 3

Planning 2

Planning 4

Idea

Screen

Planning Project &

Drop

Engineering

Feasibility

& Hold

Advanced Biz

Support

Capacity Plan &

Investment

Transfer 3

Gate

Review

Gate

Review

Gate

Review

Gate

Review

Page 11: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

Enabling a

Microelectronic

World®

PLM Scope OverviewPLM Scope Overview

Page 12: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

Amkor PLM Architecture

WAN

PTC Topology Rev 1.vsdWANDMZ LAN

Internal LANPTC Topology

External Firewal

DMZ Network

External Firewal

Internal Network

SunFire T2000

SunSunFire T1000

Sun

DEV

Zone

QA

ZoneSunFire T1000

Sun

SunFire T1000

Sun

QA

Zone

External

User

SunFire T1000

Sun

DEV

Zone

SunFire T1000

Sun

Database Server

Application Servers

PRD FO

Zone

Zone

Failover

Production

Oracle

Database

QA

Database

DEV

Database

File

VaultATT

ATP

ATK

Internal

User

Web Servers

Production Servers

Web Servers

2 X Sun T2000 (4 Cores)

16GB Memory

Application Server

2 X Sun T5120 (8 Cores)

32GB Memory

Database Server

1 X Sun T5120 (8 Cores)

32GB Memory

DEV/QA Servers

Web Servers

QA Zone on Production Web

Server

Application Server

1 X Sun T5120 (8 cores)

32GB Memory

Database Server

1 X Sun T5120 (8 Cores)

32GB Memory

SunFire T2000

Sun

QA

Zone

Page 13: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

Activity

Monitoring

Enterprise SOA Framework

ESB

DB

Logic

UI

MDM

Composite Apps SupplyDemandProduct Internal

User Interaction

Tools

Security and Management

Governance

Office Web 2.0

EDW ERPSCM CRM

BI PortalEnterprise

Content

Service

Registry

Enrich Manage

Service Enablement Layer

PLMODS MES

Activity

MonitoringBPM

Transact

Page 14: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

Overall BOM Process

Template

BOM

M-BOM

Page 15: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

SAPSAP

Various

Report

Test

요청서

Team, Roles, Work Flows and Deliverables are

linking with BOM

ADA

Drawing

Distribution

OR

Order

Request

Customer Sales BU PurchEngineer QAManufact

uring

CPO

Customer PO

FAI

Qualification

BR

Build

Request

신뢰성 실험

요청서Simulation

요청서DE

Design

Request

Design

BOM

Templat

e BOM

Supplier

CAD/ CAM

M- BOM

Sales OrderPR

(order release)PO FGMM PP

Process

STDTKEY

Part Material

SID #

D- BOM

Report

Page 16: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

New Product (Device) Introduction

New Product

(Device) Input

Requirements

Analysis

(with Forecast)

Cost Analysis

& Schedule

Risk

Assessment

Schedule fixing

(Sales)

Build & Analysis

& Shipping

Build Schedule

Feasibility

Qualified Product

List

BOM confirm &

Process Review

Approve &

Agreement

Design &

Simulation

Tooling/ Material

Preparation

Risk Agreement

(Sales)

Approve &

Agreement

Approve &

Agreement

BOM & Design

Rule/ Spec

FAI & QML

Ramp up

Readiness

Customer BU/Sales R&D PE/ PC

Customer’s Qual

Testing

1 2

345

NPI Request

With PO

6

eSmart

PLM

Process

Factory

Process

Deliver

able

7 8

910

12

DFMEA

(BU)

11

13

14 15 16

17

SPD,

OPD,CPF

18

19 20 21

Changes

Request For

Proposal form

required

Page 17: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

Amkor PLM UI

Page 18: PLM Best Practice Conference · 2009-05-25 · Customer Sales BU Engineer Purch QA Manufact uring CPO Customer PO FAI Qualification BR Build Request 신뢰성 실험 Simulation요청서

© 2009 Amkor Technology, Inc. Amkor Confidential / Proprietary Business Information May, 2009 DPARK.

EPM Drawing View