PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved democratic governance and sustainable economic growth in the Americas Intermediate Outcomes 1000 Strengthened implementation of elections, focusing on gender equality considerations in targeted countries 2000 Increased progress towards implemen- tation of policies and regulatory frameworks and instruments that stimulate sustainable economic growth, particularly in areas of competitiveness, innovation and MSMEs, in targeted countries 3000 Increased opportunities provided by member states to businesses to access na- tional, regional and global markets 4000 Strengthened application of human rights instruments related to gender equality, i.e. CEDAW and Belem do Para by member states 5000 Improved effectiveness of the OAS in fulfilling its mandate to support democ- ratic governance and sustainable eco- nomic growth 1100 Strengthened abilities of Management Bodies (EMBs) in countries benefiting from OAS EOMs, to organize and administer elec- tions, incorporating a gender perspective into their activities and processes 2100 Strengthened ability of member states to design and adopt public policies, legislation and regulatory frameworks, in the areas of inclusive sustainable economic growth, competitiveness, innovation and MSMEs, with a particular emphasis on women, youth and vulnerable groups 3100 Increased access by MSMEs to national institutions that provide services to increase regional/ sub-regional competitiveness, pro- ductivity and access to expanded markets 4100 Improved capacity of member states to identify and analyze women's rights and gen- der equality concerns and integrate them in public policies 5100 Strengthened performance man- agement capacity of the OAS, through RBM and the integration of gender equal- ity in programs and projects 2200 Increased awareness of the importance of responsible business practices among key stakeholders (governments, parliamentarians, academia, and private sector) at regional and national levels 3200 Strengthened capacity of government officials for negotiation and implementation of trade agreements 4200 Enhanced capacity of member states to implement Belem Do Para and CEDAW (Gen. rec. 18) 5200 Strengthened systems within the OAS to integrate, monitor and evaluate gender equality as a cross-cutting theme in policies, mandates, projects and institu- tional level results 2300 Increased capacity of ministries/ execut- ing agencies and legislative committees to promote sound management practices re- lated to domestic and international business development 3300 Increased knowledge by SMEs, working mainly in the extractive sector, of CSR and re- sponsible business practices which enhance productivity, competitiveness and market ac- cess 5300 Strengthened OAS capacity to effec- tively respond to emerging priorities (in- cluding crises) in the region 2400 Improved capacity of member states to implement secured transactions reform, in- cluding the promotion of equitable access to credit, based on the OAS Model Law 3400 Increased knowledge by commercial judges and other public officials to enforce in- ternational commercial dispute settlement and arbitration decisions related to trade 5400 Strengthened OAS technical capacity to observe electoral processes in the re- gion with a focus on equal participation Immediate Outcomes 2500 Improved capacity of member states to increase transparency and equitable access to public information 5500 Improved consultation with stake- holders regarding OAS programs, activi- ties and policy making processes. Title CIDA-OAS Cooperation Plan No. Team Leader Country/Region Latin America and the Caribbean Budget $19,500,000 CDN Duration 3 Years
Transcript
Page 1: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

PM

P /

OA

S C

oo

pe

rati

on

Pla

n 2

01

2-2

01

3

LOG

IC M

OD

EL

(LM

) JU

LY 3

1,

20

12

An

ne

x 1

-Lo

gic

Mo

de

l

Ult

ima

te

Ou

tco

me

Imp

rove

d d

em

ocr

ati

c g

ove

rna

nce

an

d s

ust

ain

ab

le e

con

om

ic g

row

th in

th

e A

me

rica

s

Inte

rme

dia

te

Ou

tco

me

s

10

00

St

ren

gth

en

ed

im

ple

me

nta

tio

n

of

ele

ctio

ns,

fo

cusi

ng

o

n

ge

nd

er

eq

ua

lity

con

sid

era

tio

ns

in t

arg

ete

d c

ou

ntr

ies

20

00

In

cre

ase

d p

rog

ress

to

wa

rds

imp

lem

en

-

tati

on

of

po

licie

s a

nd

re

gu

lato

ry f

ram

ew

ork

s

an

d

inst

rum

en

ts

tha

t st

imu

late

su

sta

ina

ble

eco

no

mic

g

row

th,

pa

rtic

ula

rly

in

are

as

of

com

pe

titi

ven

ess

, in

no

vati

on

a

nd

M

SME

s,

in

targ

ete

d c

ou

ntr

ies

30

00

In

cre

ase

d

op

po

rtu

nit

ies

pro

vid

ed

b

y

me

mb

er

sta

tes

to

bu

sin

ess

es

to

acc

ess

n

a-

tio

na

l, r

eg

ion

al a

nd

glo

ba

l ma

rke

ts

40

00

St

ren

gth

en

ed

a

pp

lica

tio

n

of

hu

ma

n

rig

hts

in

stru

me

nts

re

late

d t

o g

en

de

r e

qu

alit

y,

i.e

. C

ED

AW

an

d B

ele

m d

o P

ara

by

me

mb

er

sta

tes

50

00

Im

pro

ved

eff

ect

ive

ne

ss o

f th

e O

AS

in

fulf

illin

g

its

ma

nd

ate

to

su

pp

ort

d

em

oc-

rati

c g

ove

rna

nce

a

nd

su

sta

ina

ble

e

co-

no

mic

gro

wth

11

00

Str

en

gth

en

ed

ab

iliti

es

of

Ma

na

ge

me

nt

Bo

die

s (E

MB

s) i

n c

ou

ntr

ies

be

ne

fiti

ng

fro

m

OA

S E

OM

s, t

o o

rga

niz

e a

nd

ad

min

iste

r e

lec-

tio

ns,

in

corp

ora

tin

g

a

ge

nd

er

pe

rsp

ect

ive

into

th

eir

act

ivit

ies

an

d p

roce

sse

s

21

00

St

ren

gth

en

ed

a

bili

ty

of

me

mb

er

sta

tes

to d

esi

gn

an

d a

do

pt

pu

blic

po

licie

s,

leg

isla

tio

n

an

d

reg

ula

tory

fr

am

ew

ork

s,

in

the

are

as

of

incl

usi

ve s

ust

ain

ab

le e

con

om

ic

gro

wth

, co

mp

eti

tive

ne

ss,

inn

ova

tio

n

an

d

MSM

Es,

w

ith

a

p

art

icu

lar

em

ph

asi

s o

n

wo

me

n,

you

th a

nd

vu

lne

rab

le g

rou

ps

31

00

In

cre

ase

d a

cce

ss b

y M

SME

s to

na

tio

na

l

inst

itu

tio

ns

tha

t p

rovi

de

se

rvic

es

to i

ncr

ea

se

reg

ion

al/

su

b-r

eg

ion

al

com

pe

titi

ven

ess

, p

ro-

du

ctiv

ity

an

d a

cce

ss t

o e

xpa

nd

ed

ma

rke

ts

41

00

Im

pro

ved

ca

pa

city

of

me

mb

er

sta

tes

to

ide

nti

fy a

nd

an

aly

ze w

om

en

's r

igh

ts a

nd

ge

n-

de

r e

qu

alit

y co

nce

rns

an

d i

nte

gra

te t

he

m i

n

pu

blic

po

licie

s

51

00

St

ren

gth

en

ed

p

erf

orm

an

ce

ma

n-

ag

em

en

t ca

pa

city

o

f th

e

OA

S,

thro

ug

h

RB

M a

nd

th

e i

nte

gra

tio

n o

f g

en

de

r e

qu

al-

ity

in p

rog

ram

s a

nd

pro

ject

s

2

20

0 I

ncr

ea

sed

aw

are

ne

ss o

f th

e i

mp

ort

an

ce

of

resp

on

sib

le b

usi

ne

ss p

ract

ice

s a

mo

ng

ke

y

sta

keh

old

ers

(g

ove

rnm

en

ts,

pa

rlia

me

nta

ria

ns,

aca

de

mia

, a

nd

pri

vate

se

cto

r) a

t re

gio

na

l a

nd

na

tio

na

l le

vels

32

00

St

ren

gth

en

ed

ca

pa

city

o

f g

ove

rnm

en

t

off

icia

ls f

or

ne

go

tia

tio

n a

nd

im

ple

me

nta

tio

n

of

tra

de

ag

ree

me

nts

42

00

En

ha

nce

d c

ap

aci

ty o

f m

em

be

r st

ate

s to

imp

lem

en

t B

ele

m D

o P

ara

an

d C

ED

AW

(G

en

.

rec.

18

)

52

00

St

ren

gth

en

ed

sy

ste

ms

wit

hin

th

e

OA

S to

in

teg

rate

, m

on

ito

r a

nd

e

valu

ate

ge

nd

er

eq

ua

lity

as

a c

ross

-cu

ttin

g t

he

me

in p

olic

ies,

ma

nd

ate

s, p

roje

cts

an

d i

nst

itu

-

tio

na

l le

vel r

esu

lts

2

30

0 I

ncr

ea

sed

ca

pa

city

of

min

istr

ies/

exe

cut-

ing

a

ge

nci

es

an

d

leg

isla

tive

co

mm

itte

es

to

pro

mo

te

sou

nd

m

an

ag

em

en

t p

ract

ice

s re

-

late

d t

o d

om

est

ic a

nd

in

tern

ati

on

al

bu

sin

ess

de

velo

pm

en

t

33

00

In

cre

ase

d k

no

wle

dg

e b

y SM

Es,

wo

rkin

g

ma

inly

in

th

e e

xtra

ctiv

e s

ect

or,

of

CSR

an

d r

e-

spo

nsi

ble

b

usi

ne

ss

pra

ctic

es

wh

ich

e

nh

an

ce

pro

du

ctiv

ity,

co

mp

eti

tive

ne

ss a

nd

ma

rke

t a

c-

cess

5

30

0 S

tre

ng

the

ne

d O

AS

cap

aci

ty t

o e

ffe

c-

tive

ly r

esp

on

d t

o e

me

rgin

g p

rio

riti

es

(in

-

clu

din

g c

rise

s) in

th

e r

eg

ion

2

40

0 I

mp

rove

d c

ap

aci

ty o

f m

em

be

r st

ate

s to

imp

lem

en

t se

cure

d

tra

nsa

ctio

ns

refo

rm,

in-

clu

din

g t

he

pro

mo

tio

n o

f e

qu

ita

ble

acc

ess

to

cre

dit

, b

ase

d o

n t

he

OA

S M

od

el L

aw

34

00

In

cre

ase

d

kno

wle

dg

e

by

com

me

rcia

l

jud

ge

s a

nd

oth

er

pu

blic

off

icia

ls t

o e

nfo

rce

in

-

tern

ati

on

al

com

me

rcia

l d

isp

ute

se

ttle

me

nt

an

d a

rbit

rati

on

de

cisi

on

s re

late

d t

o t

rad

e

5

40

0 S

tre

ng

the

ne

d O

AS

tech

nic

al

cap

aci

ty

to o

bse

rve

ele

cto

ral

pro

cess

es

in t

he

re

-

gio

n w

ith

a f

ocu

s o

n e

qu

al p

art

icip

ati

on

Imm

ed

iate

Ou

tco

me

s

2

50

0 I

mp

rove

d c

ap

aci

ty o

f m

em

be

r st

ate

s to

incr

ea

se t

ran

spa

ren

cy a

nd

eq

uit

ab

le a

cce

ss t

o

pu

blic

info

rma

tio

n

55

00

Im

pro

ved

co

nsu

lta

tio

n w

ith

sta

ke-

ho

lde

rs r

eg

ard

ing

OA

S p

rog

ram

s, a

ctiv

i-

tie

s a

nd

po

licy

ma

kin

g p

roce

sse

s.

Tit

le

CID

A-O

AS

Co

op

era

tio

n P

lan

N

o.

T

ea

m L

ea

de

r

Co

un

try

/Re

gio

n

Lati

n A

me

rica

an

d t

he

Ca

rib

be

an

B

ud

ge

t $

19

,50

0,0

00

CD

N

Du

rati

on

3

Ye

ars

Page 2: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

PM

P /

OA

S C

oo

pe

rati

on

Pla

n 2

01

2-2

01

3

LOG

IC M

OD

EL

(LM

) JU

LY 3

1,

20

12

An

ne

x 1

-Lo

gic

Mo

de

l

Ou

tpu

ts

11

10

Ca

pa

city

-bu

ildin

g a

nd

pro

fess

ion

al

de

-

velo

pm

en

t su

pp

ort

pro

vid

ed

to

all

EM

Bs

in

po

litic

al-

ele

cto

ral

fin

an

cin

g

an

d

ge

nd

er

ma

inst

rea

min

g

21

10

OA

S D

ialo

gu

e o

f M

SME

Hig

h-L

eve

l A

u-

tho

riti

es

inst

itu

tio

na

lize

d

as

an

h

em

isp

he

ric

foru

m

for

pu

blic

p

olic

ies

an

d

stra

teg

ies

for

MSM

E d

eve

lop

me

nt

31

10

T

rain

-th

e-T

rain

ers

P

rog

ram

e

xecu

ted

,

taki

ng

in

to a

cco

un

t th

e n

ee

ds

of

wo

me

n e

n-

tre

pre

ne

urs

41

10

M

on

ito

rin

g

imp

lem

en

tati

on

o

f a

gre

ed

com

mit

me

nts

on

wo

me

n’s

rig

hts

un

de

rta

ken

51

10

To

ols

en

ha

nce

d t

o m

an

ag

e d

ata

on

ma

nd

ate

s,

exe

cute

d

reso

urc

es,

a

nd

ach

ieve

d r

esu

lts

incl

ud

ing

ge

nd

er-

spe

cifi

c

resu

lts,

an

d s

up

po

rt p

rovi

de

d t

o f

aci

lita

te

resu

lts-

ba

sed

ma

na

ge

me

nt

by

OA

S/G

S

11

20

Tra

inin

g/s

em

ina

rs/

exc

ha

ng

es

he

ld t

o

sha

re

less

on

s le

arn

ed

re

late

d

to

ele

ctio

ns,

incl

ud

ing

le

sso

ns

pro

mo

tin

g

wo

me

n’s

p

ar-

tici

pa

tio

n in

ele

cto

ral b

od

ies

21

20

Su

pp

ort

p

rovi

de

d

to

hig

h-i

mp

act

MSM

Es,

in

clu

din

g

wo

me

n-l

ed

M

SME

s,

pu

b-

lic/p

riva

te

un

ive

rsit

ies

an

d

R&

D

cen

ters

(wh

ich

in

clu

de

g

ove

rnm

en

t-sp

on

sore

d

R&

D

cen

ters

an

d o

the

rs c

rea

ted

by

ass

oci

ati

on

s o

f

MSM

Es)

in s

tra

teg

ic e

con

om

ic s

ect

ors

32

10

T

rad

e-r

ela

ted

te

chn

ica

l a

ssis

tan

ce

(TR

TA

) p

rog

ram

fo

r g

ove

rnm

en

t o

ffic

ials

re

-

spo

nsi

ble

fo

r n

eg

oti

ati

ng

a

nd

im

ple

me

nti

ng

tra

de

ag

ree

me

nts

de

sig

ne

d a

nd

exe

cute

d

41

20

R

eg

ion

al

ass

ess

me

nt

of

Na

tio

na

l M

a-

chin

eri

es

for

Th

e

Ad

van

cem

en

t o

f W

om

en

un

de

rta

ken

a

nd

re

com

me

nd

ati

on

s d

isse

mi-

na

ted

51

20

T

oo

ls

an

d

sup

po

rt

pro

vid

ed

to

OA

S/SG

St

aff

to

fa

cilit

ate

re

sult

s-b

ase

d

pro

ject

fo

rmu

lati

on

, in

clu

din

g t

he

in

cor-

po

rati

on

of

ge

nd

er

eq

ua

lity

resu

lts

in t

he

pro

ject

cyc

le

11

30

Stu

die

s d

isse

min

ate

d t

o a

ll E

MB

S o

n

ho

w t

o s

tre

ng

the

n t

he

ir w

ork

to

ma

ke e

lec-

tio

ns

mo

re in

clu

sive

21

30

Su

pp

ort

pro

vid

ed

to

me

mb

er

sta

tes

to

faci

lita

te

the

d

eve

lop

me

nt

of

the

p

olic

y

fra

me

wo

rk

en

ab

ling

p

ub

lic-p

riva

te

pa

rtn

er-

ship

s fo

r in

no

vati

on

in

th

e b

usi

ne

ss e

nvi

ron

-

me

nt,

in

clu

din

g l

ice

nsi

ng

an

d t

ran

sfe

r o

f te

ch-

no

log

y

32

20

Ca

pa

city

bu

ildin

g p

rog

ram

of

cou

ntr

y o

f-

fici

als

fo

r th

e s

ust

ain

ab

le u

se o

f n

atu

ral

re-

sou

rce

s (w

ate

r, s

oil,

la

nd

, re

ne

wa

ble

en

erg

y,

bio

div

ers

ity)

d

eve

lop

ed

in

tr

ad

e

go

od

s a

nd

serv

ice

s e

xecu

ted

, ta

kin

g i

nto

acc

ou

nt

the

dif

-

fere

nt

ne

ed

s, o

wn

ers

hip

an

d u

ses

of

tho

se r

e-

sou

rce

s w

ith

a

n

inte

gra

ted

g

en

de

r b

ala

nce

pe

rsp

ect

ive

42

10

Mo

nit

ori

ng

th

e i

mp

lem

en

tati

on

of

the

Be

lem

do

Pa

ra C

on

ven

tio

n u

nd

ert

ake

n

51

30

SIS

CA

en

ha

nce

d t

o i

nte

gra

te I

nte

r-

Am

eri

can

m

inis

teri

al

ma

nd

ate

s,

ge

nd

er

eq

ua

lity

rela

ted

ma

nd

ate

s, a

nd

to

allo

w

sex

dis

ag

gre

ga

ted

d

ata

a

nd

im

pro

ve-

me

nts

in

R

BM

re

po

rtin

g

for

me

mb

er

sta

tes

11

40

Q

ua

lity

Ma

na

ge

me

nt

Syst

em

s (Q

MS)

imp

lem

en

ted

an

d E

lect

ora

l M

an

ag

em

en

t A

s-

sura

nce

(E

MA

) d

eve

lop

ed

to

ce

rtif

y e

lect

ora

l

au

tho

riti

es

21

40

Su

pp

ort

pro

vid

ed

to

th

e I

nte

r-A

me

rica

n

Ne

two

rks

(RIA

C,

STE

N,

Inte

r-A

me

rica

n E

-SM

E

an

d I

nn

ova

tio

n N

etw

ork

an

d C

on

sum

er

Safe

ty

Ne

two

rk)

to u

nd

ert

ake

th

eir

ma

nd

ate

s

33

10

Tra

inin

g p

rovi

de

d t

o S

ME

s to

ad

op

t so

-

cia

lly

an

d

en

viro

nm

en

tally

re

spo

nsi

ble

b

usi

-

ne

ss p

ract

ice

s a

nd

esp

eci

ally

ge

nd

er

sen

siti

ve

pra

ctic

es

42

20

T

rain

ing

p

rovi

de

d

to

go

vern

me

nt

off

i-

cia

ls o

n t

he

imp

lem

en

tati

on

of

Be

lem

do

Pa

ra

52

10

M

an

da

tes

Ma

na

ge

me

nt

Da

tab

ase

an

d P

lan

nin

g a

nd

Co

ntr

ol S

yste

m u

pd

ate

d

to

faci

lita

te

the

fo

llow

-up

o

f g

en

de

r

eq

ua

lity

ma

nd

ate

s

11

50

N

ew

te

chn

olo

gie

s

wh

ich

ta

ke

into

con

sid

era

tio

n

ge

nd

er

eq

ua

lity

(wh

ere

ap

-

pro

pri

ate

) id

en

tifi

ed

an

d i

mp

lem

en

tati

on

fa

-

cilit

ate

d

(in

clu

din

g

e-v

oti

ng

) in

e

lect

ora

l

pro

cess

es

in m

em

be

r st

ate

s

22

10

Me

cha

nis

ms

cre

ate

d t

o r

ais

e a

wa

ren

ess

of

CSR

pri

nci

ple

s a

mo

ng

pa

rlia

me

nta

ria

ns

in

the

re

gio

n

33

20

CSR

co

mm

un

ity

of

pra

ctic

e c

rea

ted

to

faci

lita

te k

no

wle

dg

e e

xch

an

ge

52

20

Pro

ced

ure

s d

eve

lop

ed

an

d s

up

po

rt

pro

vid

ed

to

fa

cilit

ate

th

e

inte

gra

tio

n

of

ge

nd

er

eq

ua

lity

con

sid

era

tio

ns

in O

AS/

SG

pro

gra

ms/

pro

ject

s

11

60

T

ech

nic

al

coo

pe

rati

on

p

rovi

de

d

to

EM

Bs

on

se

vera

l e

lect

ora

l to

pic

s, i

ncl

ud

ing

:

leg

al

refo

rm,

ge

o-r

efe

ren

ce

syst

em

s,

ele

c-

tora

l re

gis

try

au

dit

ing

, e

lect

ora

l ju

rid

ica

l ru

l-

ing

s, d

ece

ntr

aliz

ati

on

of

the

vo

te a

nd

pro

-

mo

tio

n o

f th

e e

qu

al

pa

rtic

ipa

tio

n o

f w

om

en

an

d m

en

at

all

leve

ls o

f th

e e

lect

ora

l pro

cess

22

20

C

ap

aci

ty

bu

ildin

g

too

ls

de

velo

pe

d

to

pro

mo

te

resp

on

sib

le

pra

ctic

es

am

on

g

key

sta

keh

old

ers

of

the

In

ter-

Am

eri

can

Co

op

era

-

tio

n N

etw

ork

(C

oo

pe

raN

et)

34

10

Tra

inin

g p

rovi

de

d t

o t

he

ju

dic

iary

an

d

oth

er

pu

blic

off

icia

ls i

n t

he

ap

plic

ati

on

of

in-

tern

ati

on

al

com

me

rcia

l a

rbit

rati

on

an

d t

he

lo

-

cal

en

forc

em

en

t o

f fo

reig

n j

ud

gm

en

ts a

nd

ar-

bit

ral a

wa

rds

5

31

0 Q

ua

lita

tive

an

d q

ua

nti

tati

ve t

oo

ls,

info

rma

tio

n,

an

d

an

aly

sis

ge

ne

rate

d

an

d a

pp

lied

to

imp

rove

SA

PE

M

2

31

0

Est

ab

lish

a

kn

ow

led

ge

e

x-

cha

ng

e/d

ialo

gu

e

me

cha

nis

m

to

pro

mo

te

sou

nd

m

an

ag

em

en

t p

ract

ice

s in

m

em

be

r

sta

tes/

in t

he

re

gio

n i

.e.

Inte

r-A

me

rica

n C

oo

p-

era

tio

n M

ech

an

ism

fo

r E

ffe

ctiv

e P

ub

lic M

an

-

ag

em

en

t (M

EC

IGE

P)

53

20

Re

com

me

nd

ati

on

s fr

om

pre

vio

us

cri-

sis

ma

na

ge

me

nt

an

d r

eso

luti

on

ca

ses

con

-

sid

ere

d

by

OA

S/G

S d

eci

sio

n

ma

kers

a

nd

en

voys

du

rin

g n

ew

cri

sis

situ

ati

on

s in

th

e

LAC

re

gio

n

Page 3: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

PM

P /

OA

S C

oo

pe

rati

on

Pla

n 2

01

2-2

01

3

LOG

IC M

OD

EL

(LM

) JU

LY 3

1,

20

12

An

ne

x 1

-Lo

gic

Mo

de

l

2

32

0

Te

chn

ica

l a

ssis

tan

ce

pro

vid

ed

fo

r th

e

imp

lem

en

tati

on

o

f se

lect

ed

p

roje

cts

re-

qu

est

ed

by

OA

S m

em

be

r st

ate

s in

ke

y a

rea

s o

f

pu

blic

ma

na

ge

me

nt

54

10

Tra

inin

g,

ob

serv

ati

on

of

un

de

rre

pre

-

sen

ted

g

rou

ps

me

tho

do

log

y,

an

d

da

ta-

ba

ses

de

sig

ne

d a

nd

im

ple

me

nte

d f

or

OA

S

Ele

cto

ral O

bse

rva

tio

n t

ea

ms

2

41

0 T

ech

nic

al

sup

po

rt p

rovi

de

d t

o m

em

be

r

sta

tes

for

imp

lem

en

tati

on

of

the

OA

S M

od

el

Law

on

se

cure

d t

ran

sact

ion

s, w

ith

th

e p

art

ici-

pa

tio

n o

f in

tern

ati

on

al

org

an

iza

tio

ns,

pri

vate

sect

or,

tra

de

ass

oci

ati

on

s a

nd

ta

kin

g i

nto

ac-

cou

nt

the

fi

na

nci

al

incl

usi

on

o

f w

om

en

-

ow

ne

d S

ME

s

55

10

Re

com

me

nd

ati

on

s fr

om

vir

tua

l a

nd

face

-to

-fa

ce

con

sult

ati

on

s p

rese

nte

d

to

OA

S m

em

be

r st

ate

s in

th

e p

olic

y-m

aki

ng

pro

cess

(i.

e.

Sum

mit

Im

ple

me

nta

tio

n R

e-

vie

w G

rou

p-S

IRG

)

2

51

0 A

sse

ssm

en

t o

f th

e c

om

plia

nce

of

the

In

-

ter-

Am

eri

can

C

on

ven

tio

n

ag

ain

st

Co

rru

pti

on

con

du

cte

d t

hro

ug

h i

ts F

ollo

w-u

p M

ech

an

ism

(ME

SIC

IC)

55

20

Co

nsu

lta

tio

ns

wit

h a

ba

lan

ced

re

-

gio

na

l re

pre

sen

tati

on

o

f st

ake

ho

lde

rs

faci

lita

ted

, a

nd

g

en

de

r se

nsi

tive

re

c-

om

me

nd

ati

on

s p

rese

nte

d t

o O

AS

me

m-

be

r st

ate

s a

nd

G

en

era

l Se

cre

tari

at

in

pre

pa

rati

on

of

Ge

ne

ral

Ass

em

blie

s a

nd

min

iste

ria

l me

eti

ng

s

2

52

0 T

ech

nic

al

sup

po

rt p

rov

ide

d f

or

the

im

-

ple

me

nta

tio

n

of

the

M

od

el

Inte

r-A

me

rica

n

Law

on

Acc

ess

to

Pu

bli

c In

form

ati

on

an

d i

ts

Gu

ide

lin

es

wit

h t

he

pa

rtic

ipa

tio

n o

f g

ov

ern

-

me

nt

off

icia

ls,

po

licy

ma

ke

rs a

nd

th

e p

riv

ate

sect

or

an

d

civ

il

soci

ety

, in

clu

din

g

wo

me

n’s

org

an

iza

tio

ns

No

tes:

1.

Th

e b

oxe

s in

th

e t

em

pla

te a

re t

he

re f

or

illu

stra

tio

n p

urp

ose

s o

nly

. Y

ou

ca

n a

dju

st t

he

nu

mb

er

of

bo

xes

by

usi

ng

th

e “

split

ce

ll” a

nd

“m

erg

e c

ell”

fu

nct

ion

s to

su

it t

he

ne

ed

s o

f yo

ur

inve

stm

en

ts/p

rog

ram

. It

is n

ot

the

nu

mb

er

of

bo

xes

tha

t is

im-

po

rta

nt,

bu

t ra

the

r th

e lo

gic

al l

ink

be

twe

en

re

sult

leve

ls.

2.

Imm

ed

iate

Ou

tco

me

s =

10

0 s

eri

es

(10

0,2

00

,30

0 e

tc)

Act

ivit

ies/

Ou

tpu

ts =

10

se

rie

s (1

10

,12

0,1

30

etc

)

Sub

-act

ivit

ies

(no

t in

clu

de

d in

LM

) =

1 s

eri

es

(11

1,1

12

,11

3 e

tc)

3.

Wh

en

pre

pa

rin

g a

log

ic m

od

el f

or

an

inve

stm

en

t, m

ake

su

re t

ha

t th

e p

rog

ram

leve

l lo

gic

mo

de

l is

con

sid

ere

d.

Th

is is

be

cau

se t

he

inve

stm

en

t fa

lls u

nd

er

a p

art

icu

lar

sect

or

of

the

pro

gra

m a

nd

th

e p

rog

ram

LM

sh

ou

ld in

form

th

e d

eve

lop

me

nt

of

the

inve

stm

en

t le

vel l

og

ic m

od

el.

De

velo

pin

g a

n in

vest

me

nt

leve

l lo

gic

mo

de

l in

th

is w

ay

will

en

sure

a c

lea

r lin

kag

e b

etw

ee

n t

he

inve

stm

en

t a

nd

th

e p

rog

ram

leve

l re

sult

s a

nd

ass

ist

in t

he

ro

ll u

p o

f re

sult

s fo

r la

rge

r m

on

ito

rin

g a

nd

re

po

rtin

g r

e-

qu

ire

me

nts

.

Yo

u c

an

acc

ess

dte

rms

an

d d

efi

nit

ion

s to

he

lp y

ou

fill

ou

t th

is d

ocu

me

nt.

Page 4: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

1

Re

vis

ed

Ap

ril

15

, 2

01

5

Tit

le

OA

S C

oo

pe

rati

on

Pla

n Y

ea

r II

I 2

01

4-2

01

5

No

. A

-03

50

32

T

ea

m L

ea

de

r

Co

un

try

/Re

gio

n/

Inst

itu

tio

n

Org

an

iza

tio

n o

f A

me

rica

n S

tate

s (O

AS)

B

ud

ge

t C

DN

$2

0M

D

ura

tio

n

3 Y

ea

rs

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

Ult

ima

te O

utc

om

e

Imp

rov

ed

de

mo

cra

tic

go

ve

rna

nce

an

d s

ust

ain

ab

le e

con

om

ic g

row

th i

n

the

Am

eri

cas

� ��� Le

vel o

f sa

tisf

act

ion

of

de

mo

cra

cy b

y ci

tize

ns

in

Lati

n A

me

rica

� ��� P

erc

ep

tio

n o

f th

e s

tate

of

the

e

con

om

y in

th

e

Am

eri

cas

44

% V

ery

/Ra

the

r S

ati

s-fi

ed

51

% N

ot

Ve

ry/N

ot

at

all

S

ati

sfie

d

5%

Do

n’t

Kn

ow

/No

An

-sw

er/

Re

fuse

d

(Da

ta 2

00

9)

16

% V

ery

Go

od

/Go

od

43

% A

bo

ut

Av

era

ge

40

% V

ery

Ba

d /

Ba

d

1%

No

An

swe

r/R

efu

sed

(Da

ta 2

00

9)

45

% V

ery

/Ra

the

r S

ati

sfie

d1

30

%V

ery

G

oo

d/G

oo

d2

� ��� La

tin

o-

ba

rom

etr

o

da

ta A

nn

ua

l

Re

po

rts

20

09

-20

14

� ��� A

na

lysi

s o

f

Lati

no

-

ba

rom

etr

o

da

ta

� ��� R

evi

ew

of

Re

po

rts

20

09

-20

14

An

nu

ally

Ge

ne

ral S

ecr

e-

tari

at

(GS)

of

the

O

AS

12

01

3 D

ata

sh

ow

s: 3

9%

Ve

ry/R

ath

er

Sa

tisf

ied

,57

% N

ot

Ve

ry/N

ot

Sa

tisf

ied

,4%

Do

n’t

’ K

no

w /

No

An

swe

r/R

efu

sed

2 2

01

3 D

ata

sh

ow

s: 2

5%

Ve

ry G

oo

d/G

oo

d,

46

% A

bo

ut

Ave

rag

e,2

8.5

% V

ery

Ba

d /

Ba

d,0

.5 %

No

An

swe

r/R

efu

sed

Page 5: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

2

Re

vis

ed

Ap

ril

15

, 2

01

5

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

Page 6: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

3

Re

vis

ed

Ap

ril

15

, 2

01

5

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

Inte

rme

dia

te O

utc

om

es

10

00

Str

en

gth

en

ed

im

ple

me

nta

tio

n

of

ele

ctio

ns,

fo

cusi

ng

on

ge

nd

er

eq

ua

lity

co

nsi

de

rati

on

s in

ta

rge

ted

cou

ntr

ies

� ��� #

/ %

of

wo

me

n r

un

nin

g f

or

off

ice

in m

un

icip

al e

lec-

tio

ns

in t

he

DR

, E

S, a

nd

ME∗

� ��� #

/ %

of

wo

me

n r

un

nin

g f

or

off

ice

in le

gis

lati

ve e

lec-

tio

ns

in t

he

DR

, E

S, a

nd

M

E*

� ��� P

erc

ep

tio

n b

y ci

tize

ns

of

the

cre

dib

ilit

y o

f th

e E

MB

in

co

un

trie

s w

he

re t

he

OA

S co

nd

uct

s E

OM

s a

nd

me

as-

ure

s ci

tize

n o

pin

ion

s (H

N,

CR

, E

S, G

T,

NI,

PA

, D

R,

EC

, P

Y)

� ��� #

Of

OA

S re

com

me

nd

ati

on

s

ad

op

ted

by

EM

Bs

in c

ou

n-

trie

s b

en

efi

tin

g

fro

m

OA

S

EO

Ms.

� ��� #

o

f g

en

de

r se

nsi

tiv

e

OA

S

reco

mm

en

da

tio

ns

ad

op

ted

by

EM

Bs

in c

ou

ntr

ies

be

ne

-

fiti

ng

fro

m O

AS

EO

Ms

DR

: 7

0 (

11

%)3

1

2(7

.8%

)4

ES

: 2

7(9

.8%

) 5

ME

: 1

22

(5

%)6

DR

: 9

4 (

24

%)7

/34

%

8/2

0.8

%9

ES

: 2

0 (

36

%)1

0

ME

: 1

39

7 (

38

.9%

)11/

46

%1

2/3

6.8

%1

3

HN

: 5

.5%

hig

hly

tr

ust

wo

rth

y (

20

12

)

CR

: 2

6%

hig

hly

tru

st-

wo

rth

y (

20

06

)

ES

: 9

.4 h

igh

ly t

rust

-w

ort

hy

(2

01

2)

GT

: 1

1.7

% h

igh

ly

tru

stw

ort

hy

(2

01

3)

NI:

18

.4%

hig

hly

tr

ust

wo

rth

y (

20

12

)

PA

: 1

4%

hig

hly

tru

st-

wo

rth

y (

20

13

)

DR

: 3

2.7

% h

igh

ly

tru

stw

ort

hy

(2

01

2)

EC

: 2

6.8

% h

igh

ly

tru

stw

ort

hy

(2

01

2)

PY

: 3

.5%

hig

hly

tr

ust

wo

rth

y (

20

12

)14

0 0

An

est

ima

ted

20

%

incr

ea

se p

er

cou

n-

try

by

20

14

An

est

ima

ted

20

%

incr

ea

se p

er

cou

n-

try

by

20

14

An

est

ima

ted

5%

in

cre

ase

fo

r h

igh

ly-

tru

stw

ort

hy

pe

r co

un

try

by

20

14

2 1

� ��� La

tin

o-

ba

rom

etr

o

� ��� C

ID G

allu

p

da

ta

� ��� O

AS

EO

Ms

rep

ort

s

� ��� E

MB

s re

po

rts

� ��� M

eth

od

olo

gy

(Ma

trix

of

in-

dic

ato

rs)

to

inco

rpo

rate

a

Ge

nd

er

Pe

r-

spe

ctiv

e i

nto

OA

S E

OM

s

� ��� O

AS

EO

Ms

� ��� T

rain

ing

s

Te

chn

ica

l co

-

op

era

tio

n

pro

ject

s

� ���

� ��� A

na

lysi

s o

f

Lati

no

-

ba

rom

etr

o

da

ta

� ��� A

na

lysi

s o

f

EO

M R

ep

ort

s

� ��� R

esu

lts

an

aly

sis

of

the

Me

tho

d-

olo

gy

(Ma

trix

of

ind

ica

tors

)

to I

nco

rpo

-

rate

a G

en

-

de

r P

ers

pe

c-

tive

into

OA

S

EO

Ms

� ��� A

na

lysi

s o

f

EO

Ms

da

ta

� ��� A

na

lysi

s o

f

do

cum

en

ts

fro

m t

rain

-

ing

s a

nd

tech

nic

al c

o-

op

era

tio

n

pro

ject

s

An

nu

ally

D

ep

art

me

nt

of

Ele

cto

ral C

oo

p-

era

tio

n a

nd

Ob

-se

rva

tio

n (

DE

CO

)

∗ M

idte

rm:

ind

ica

tors

we

re m

ov

ed

fro

m t

he

leve

l o

f o

utp

uts

Page 7: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

4

Re

vis

ed

Ap

ril

15

, 2

01

5

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

20

00

In

cre

ase

d

pro

gre

ss

tow

ard

s

imp

lem

en

tati

on

o

f p

oli

cie

s a

nd

reg

ula

tory

fr

am

ew

ork

s a

nd

in

stru

-

me

nts

th

at

stim

ula

te

sust

ain

ab

le

eco

no

mic

gro

wth

, p

art

icu

larl

y i

n a

r-

ea

s o

f co

mp

eti

tiv

en

ess

, in

no

va

tio

n

an

d M

SM

Es,

in

ta

rge

ted

co

un

trie

s

� ��� #

of

cou

ntr

ies

tha

t a

re m

ak-

ing

pro

gre

ss t

ow

ard

s im

-

ple

me

nta

tio

n o

f p

olic

ies

an

d r

eg

ula

tory

fra

me

wo

rks

an

d u

se o

f in

stru

me

nts

thro

ug

h i

nit

iati

ves

such

as

sta

keh

old

ers

’ a

gre

e-

me

nts

/pla

ns

of

act

ion

, n

ew

inst

itu

tio

na

l se

t-u

ps

or

pro

-

gra

ms

or

leg

al r

efo

rm

� ��� #

of

law

s a

nd

re

gu

lati

on

s

i.e

. o

n s

ecu

red

tra

nsa

c-

tio

ns,

ta

x in

cen

tive

, p

ub

lic

pri

vate

all

ian

ces,

dra

fte

d

tha

t st

imu

late

su

sta

ina

ble

eco

no

mic

gro

wth

� ��� P

erc

ep

tio

n o

f M

SME

Su

p-

po

rt I

nst

itu

tio

ns

wit

hin

th

e

targ

ete

d c

ou

ntr

ies

of

pro

-

gre

ss m

ad

e t

ow

ard

s th

e

imp

lem

en

tati

on

of

po

licie

s

an

d r

eg

ula

tory

fra

me

wo

rks

an

d in

stru

me

nts∗

0 5

80

% A

gre

e

10

7

85

% A

gre

e 1

5

� ��� A

nn

ua

l OA

S

Pro

gra

m R

e-

po

rts

� ��� G

A R

ep

ort

s

� ��� M

inis

teri

al

Re

po

rts

� ��� R

eg

ion

al

Fra

me

wo

rks

� ��� Su

mm

its/

SISC

A

� ��� In

tern

ati

on

al

ind

exe

s (i

.e.

Wo

rld

Ba

nk’

s

Do

ing

Bu

si-

ne

ss,

Wo

rld

Eco

no

mic

Fo

-

rum

’s G

lob

al

Co

mp

eti

tive

-

ne

ss R

ep

ort

)

� ��� M

ESI

CIC

He

mis

ph

eri

c

an

d A

nn

ua

l

Pro

gre

ss R

e-

po

rts

� ��� A

na

lysi

s o

f

OA

S R

ep

ort

s

� ��� Su

rve

ys

� ��� Q

ue

stio

n-

na

ire

s

An

nu

ally

D

ep

art

me

nt

of

Eff

ect

ive

Pu

blic

M

an

ag

em

en

t (D

EP

M)

De

pa

rtm

en

t o

f In

tern

ati

on

al L

aw

(D

IL)

De

pa

rtm

en

t o

f Le

ga

l Co

op

era

-ti

on

(D

LC)

De

pa

rtm

en

t o

f E

con

om

ic a

nd

So

cia

l De

velo

p-

me

nt

(DE

SD)

3 C

an

did

ate

s ru

nn

ing

fo

r M

ayo

r in

20

10

in

th

e D

R w

ere

wo

me

n

4 C

an

did

ate

s e

lect

ed

Ma

yor

in 2

01

0 i

n t

he

DR

we

re w

om

en

5 C

an

did

ate

s e

lect

ed

Ma

yor

in 2

00

9 i

n E

S w

ere

wo

me

n

6 C

an

did

ate

s e

lect

ed

as

“ P

resi

de

nte

s M

un

icip

ale

s” i

n 2

00

9 i

n M

E w

ere

wo

me

n

7 C

an

did

ate

s ru

nn

ing

fo

r le

gis

latu

re i

n 2

01

0 i

n t

he

DR

we

re w

om

en

8 C

an

did

ate

s ru

nn

ing

in

th

e D

om

inic

an

Re

pu

blic

in

th

e 2

01

2 e

lect

ion

s (l

ow

er

ho

use

)

9 W

om

en

ele

cte

d f

or

the

lo

we

r h

ou

se o

f co

ng

ress

in

th

e 2

01

2 e

lect

ion

in

Do

min

ica

n R

ep

ub

lic

10 C

an

did

ate

s ru

nn

ing

fo

r le

gis

latu

re i

n 2

00

9 i

n E

S w

ere

wo

me

n

11 C

an

did

ate

s ru

nn

ing

fo

r le

gis

latu

re i

n 2

00

9 i

n M

EX

we

re w

om

en

12 C

an

did

ate

s ru

nn

ing

in

th

e 2

01

2 e

lect

ion

s in

Me

xico

(lo

we

r h

ou

se)

13 W

om

en

ele

cte

d f

or

the

lo

we

r h

ou

se o

f th

e c

on

gre

ss i

n t

he

20

12

ele

ctio

n i

n M

exi

co

14 M

idte

rm D

ata

fo

r C

R,

GT

, P

A,

DR

, E

C,

PY

∗ M

idte

rm;

Ne

w I

nd

ica

tor

15 *

*M

idte

rm;

Sca

le:

5=

Ag

ree

; 4

=P

art

iall

y A

gre

e;

3=

Pa

rtia

lly

Dis

ag

ree

; 2

=D

isa

gre

e;

1=

N/A

. R

esu

lts

an

d d

ata

(b

ase

lin

e/t

arg

et)

are

exp

ect

ed

fo

r e

arl

y M

ay

20

14

to

allo

w f

or

a m

ea

nin

gfu

l co

mp

ari

son

at

the

en

d o

f th

e e

xecu

tio

n o

f th

e P

roje

ct i

n 2

01

5.

Page 8: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

5

Re

vis

ed

Ap

ril

15

, 2

01

5

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

30

00

In

cre

ase

d

op

po

rtu

nit

ies

pro

-

vid

ed

b

y

me

mb

er

sta

tes

to

bu

si-

ne

sse

s to

a

cce

ss

na

tio

na

l,

reg

ion

al

an

d g

lob

al

ma

rke

ts

� ��� #

o

f n

ew

p

ub

lic

init

iati

ves

(i.e

. le

gis

lati

on

, re

gu

lati

on

s,

pro

ced

ure

s,

ag

ree

me

nts

,

pro

gra

ms)

u

nd

ert

ak

en

in

targ

ete

d

cou

ntr

ies

to

im-

pro

ve m

ark

et

acc

ess

� ��� P

erc

ep

tio

n

of

a

sam

ple

o

f

bu

sin

ess

es

tha

t p

erc

eiv

e

the

y h

ave

a

n

incr

ea

sed

ma

rke

t a

cce

ss

0

78

% A

gre

e

41

6

85

% A

gre

e1

7

� ��� P

ub

lic d

ocu

-

me

nts

� ��� B

usi

ne

ss A

s-

soci

ati

on

re

-

po

rts

� ��� Sp

eci

aliz

ed

org

an

iza

tio

ns

rep

ort

s

� A

na

lysi

s o

f re

po

rts

an

d

surv

eys

An

nu

ally

D

ep

art

me

nt

of

Eco

no

mic

an

d

Soci

al D

eve

lop

-m

en

t (D

ESD

)

De

pa

rtm

en

t o

f In

tern

ati

on

al

Law

(D

IL)

De

pa

rtm

en

t o

f Su

sta

ina

ble

De

-ve

lop

me

nt

(DS

D)

40

00

Str

en

gth

en

ed

ap

pli

cati

on

of

hu

ma

n r

igh

ts i

nst

rum

en

ts r

ela

ted

to

ge

nd

er

eq

ua

lity

, i.

e.

CE

DA

W a

nd

Be

lem

do

Pa

ra b

y m

em

be

r st

ate

s

� ��� #

o

f n

ati

on

al

act

ion

p

lan

s

de

velo

pe

d

to

imp

lem

en

t

CE

DA

W a

nd

th

e B

ele

m d

o

Pa

ra C

on

ven

tio

n

� ��� D

eg

ree

to

w

hic

h

na

tio

na

l

act

ion

p

lan

s co

mm

it

to

mo

nit

ori

ng

a

nd

e

valu

ati

ng

the

su

bst

an

tive

exe

rcis

e o

f

wo

me

n’s

hu

ma

n r

igh

ts

0

0%

3

At

lea

st 2

0%

of

the

na

tio

na

l p

lan

s co

mm

it

� N

ati

on

al

ac-

tio

n

pla

ns

to

imp

lem

en

t h

um

an

rig

hts

� A

nn

ua

l re

-p

ort

s o

n

the

im

ple

me

nta

-ti

on

of

the

In

-te

r-A

me

rica

n

pro

gra

m

for

the

p

rom

o-

tio

n o

f h

um

an

ri

gh

ts

an

d

ge

nd

er

eq

uit

y

an

d e

qu

alit

y

� C

ED

AW

an

d

Be

lem

do

P

ara

Re

po

rts

� A

na

lysi

s o

f re

po

rts

list

ed

� Se

rie

s o

f in

di-

cato

rs e

sta

b-

lish

ed

to

m

ea

sure

de

-g

ree

of

re-

po

rtin

g o

n

the

exe

rcis

e

of

hu

ma

n

rig

hts

An

nu

ally

(w

ill

vary

as

rep

ort

s b

eco

me

ava

il-a

ble

)

Pe

rma

ne

nt

Se-

cre

tari

at

of

the

In

ter-

Am

eri

can

C

om

mis

sio

n o

f W

om

en

(C

IM)

16 D

SD

wil

l co

ntr

ibu

te w

ith

on

e (

1)

init

iati

ve

17 D

ata

va

lid

ate

d a

nd

pro

vid

ed

by

DP

E 0

8/2

2/1

4

Page 9: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

6

Re

vis

ed

Ap

ril

15

, 2

01

5

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

50

00

Im

pro

ve

d e

ffe

ctiv

en

ess

of

the

OA

S i

n f

ulf

illi

ng

its

ma

nd

ate

to

su

p-

po

rt d

em

ocr

ati

c g

ov

ern

an

ce a

nd

sust

ain

ab

le e

con

om

ic g

row

th

� ��� P

erc

ep

tio

n

by

me

mb

er

sta

tes

an

d d

on

ors

of

the

ef-

fect

ive

ne

ss

of

OA

S/G

S in

de

live

rin

g

on

it

s

DG

/SE

G/G

en

de

r m

an

da

tes

� ��� #

o

f re

com

me

nd

ati

on

s ,

fro

m t

he

eva

lua

tio

n o

f th

e

Co

op

era

tio

n

Pla

n,

wh

ich

sho

w i

mp

rove

me

nt

in O

AS

pro

ject

ma

na

ge

me

nt∗

� ��� %

o

f a

ctiv

itie

s in

O

AS/

GS

tha

t in

clu

de

ge

nd

er

eq

uit

y,

rep

ort

ed

on

in

th

e A

nn

ua

l

Follo

w-u

p R

ep

ort

on

In

ter-

Am

eri

can

P

rog

ram

fo

r th

e

Pro

mo

tio

n

of

Wo

me

n’s

Hu

ma

n R

igh

ts a

nd

Ge

nd

er

Eq

uit

y a

nd

Eq

ua

lity

At

lea

st 5

0%

of

the

su

rve

yed

me

mb

er

sta

tes

an

d d

on

ors

co

nsi

de

r th

e O

AS

fair

ly e

ffe

ctiv

e1

8

0

6%

At

lea

st 5

5%

of

the

su

rve

yed

me

mb

er

sta

tes

an

d d

on

ors

co

nsi

de

r th

e O

AS

fair

ly e

ffe

ctiv

e

5

12

%

� M

em

be

r st

ate

s

� O

AS

Do

no

rs

� O

AS

Pro

ject

M

an

ag

em

en

t Sy

ste

m

� E

valu

ati

on

R

ep

ort

s fr

om

C

oo

p P

lan

s 2

00

8-1

1 a

nd

2

01

1-1

4

� R

ep

ort

s (i

n-

clu

din

g

SAP

EM

)

� A

nn

ua

l Fo

l-lo

w-u

p R

e-

po

rt o

n I

nte

r-A

me

rica

n

Pro

gra

m f

or

the

Pro

mo

-ti

on

of

Wo

me

n’s

H

um

an

Rig

hts

a

nd

Ge

nd

er

Eq

uit

y a

nd

E

qu

alit

y

� Su

rve

ys

� A

na

lysi

s o

f

Syst

em

Re

-

po

rtin

g

� A

na

lysi

s o

f

Eva

lua

tio

n

Re

po

rts

An

nu

ally

D

ep

art

me

nt

of

Pla

nn

ing

an

d

Eva

lua

tio

n (

DP

E)

Pe

rma

ne

nt

Se-

cre

tari

at

of

the

In

ter-

Am

eri

can

C

om

mis

sio

n o

f W

om

en

(C

IM)

Secr

eta

ria

t o

f E

x-te

rna

l Re

lati

on

s (S

ER

)

De

pa

rtm

en

t o

f In

tern

ati

on

al A

f-fa

irs

(DIA

)

∗ M

idte

rm :

Mo

dif

ied

in

dic

ato

r 1

8 M

idte

rm D

ata

; S

ER

/DIA

is c

on

du

ctin

g a

su

rve

y a

mo

ng

st M

em

be

r S

tate

s, O

bse

rve

rs a

nd

Do

no

rs u

sin

g t

he

fo

llo

win

g s

cale

: 5

= H

igh

ly E

ffe

ctiv

e /

4 =

Mo

stly

Eff

ect

ive

/ 3

= F

air

ly E

ffe

ctiv

e /

2 =

Ra

rely

Eff

ect

ive

/ 1

= N

ot

eff

ect

ive

Page 10: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

7

Re

vis

ed

Ap

ril

15

, 2

01

5

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

Imm

ed

iate

Ou

tco

me

s

11

00

Str

en

gth

en

ed

ab

ilit

ies

of

Ele

c-

tora

l B

od

ies

(EM

Bs)

in

co

un

trie

s

be

ne

fiti

ng

fr

om

O

AS

E

OM

s,

to

or-

ga

niz

e a

nd

ad

min

iste

r e

lect

ion

s, i

n-

corp

ora

tin

g

a

ge

nd

er

pe

rsp

ect

ive

into

th

eir

act

ivit

ies

an

d p

roce

sse

s

Co

un

try

Le

ve

l

� ��� P

erc

ep

tio

n b

y O

AS

EO

Ms

inte

rna

tio

na

l ob

serv

ers

of

the

vo

tin

g p

roce

ss o

n

Ele

ctio

n D

ay

wh

ere

th

e

OA

S co

nd

uct

s E

OM

s

� ��� N

um

be

r o

f w

om

en

pa

r-

tici

pa

tin

g in

po

llin

g s

ta-

tio

ns

as

pre

sid

en

ts

� ��� P

erc

en

tag

e o

f p

olli

ng

sta

-ti

on

s th

at

ha

d a

ll th

e e

s-se

nti

al m

ate

ria

ls t

o c

on

-d

uct

th

e e

lect

ion

� ��� P

erc

en

tag

e o

f p

olli

ng

sta

-ti

on

s th

at

gu

ara

nte

ed

th

e

secr

ecy

of

the

vo

te

BO

20

09

24

% v

ery

g

oo

d

CO

20

10

1st r

ou

nd

6%

V

ery

go

od

DR

20

08

: 5

1%

Ve

ry

go

od

ES

20

12

: 9

% v

ery

go

od

PY

20

10

: 5

0%

ve

ry

go

od

*

ES

20

12

: 6

7%

PY

20

10

: 5

7.1

4%

19*

BO

20

09

: 9

3%

CO

20

10

: 9

9%

DR

20

08

:10

0%

ES

20

12

: 1

00

%

PY

20

10

: 9

5%

*

BO

20

09

: 9

4%

CO

20

10

: 6

1%

DR

20

08

: 9

4%

ES

20

12

: 6

7%

PY

20

10

: 9

5%

*

20

% i

ncr

ea

se o

ve

r

the

pe

rce

nta

ge

ba

se-

lin

e d

ata

*

Ge

nd

er

Pa

rity

: 5

0%

or

mo

re w

om

en

wil

l

act

as

pre

sid

en

ts i

n

po

llin

g s

tati

on

s o

b-

serv

ed

*

1

00

% o

f p

oll

ing

sta

-

tio

ns

ob

serv

ed

*

10

0%

of

po

llin

g s

ta-

tio

ns

ob

serv

ed

*

� ��� E

OM

inte

rna

-

tio

na

l ob

-

serv

ers

� ��� E

OM

Re

po

rts

� ��� E

OM

Qu

es-

tio

nn

air

es

� ��� Q

ue

stio

n-

na

ire

An

aly

sis

An

nu

ally

D

ep

art

me

nt

of

Ele

cto

ral C

oo

p-

era

tio

n a

nd

Ob

-se

rva

tio

n (

DE

CO

)

19 B

ase

line

Da

ta is

no

t a

vaila

ble

fo

r B

O-C

O-D

R

Page 11: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

8

Re

vis

ed

Ap

ril

15

, 2

01

5

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

21

00

Str

en

gth

en

ed

ab

ilit

y o

f m

em

-

be

r st

ate

s to

de

sig

n a

nd

ad

op

t p

ub

-

lic

po

lici

es,

le

gis

lati

on

a

nd

re

gu

la-

tory

fra

me

wo

rks,

in

th

e a

rea

s o

f in

-

clu

siv

e

sust

ain

ab

le

eco

no

mic

gro

wth

, co

mp

eti

tiv

en

ess

, in

no

va

-

tio

n

an

d

MS

ME

s,

wit

h

a

pa

rtic

ula

r

em

ph

asi

s o

n

wo

me

n,

yo

uth

a

nd

vu

lne

rab

le g

rou

ps

Re

gio

na

l Le

ve

l

� #

Of

Pla

ns

of

Act

ion

in t

he

are

as

of

incl

usi

ve s

ust

ain

-

ab

le e

con

om

ic g

row

th,

com

pe

titi

ven

ess

, in

no

va-

tio

n,

an

d M

SME

s a

do

pte

d

by

me

mb

er

sta

tes

� ��� #

Of

Pla

ns

of

Act

ion

wh

ich

ad

dre

ss t

he

ne

ed

s o

f

wo

me

n,

you

th a

nd

vu

l-

ne

rab

le g

rou

ps

� ��� #

Of

coo

pe

rati

on

/s

ucc

ess

ful p

ract

ice

s e

x-ch

an

ge

d b

y n

etw

ork

m

em

be

rs∗

10

3

22

0

16

6

18

21

� ��� P

lan

s o

f a

c-

tio

n;

coo

p-

era

tio

n

pro

-

ject

s; n

ati

on

al

de

velo

pm

en

t

pla

ns;

le

ga

l

dra

fts;

p

ress

cove

rag

e

� ��� O

ffic

ial

re-

po

rts

fro

m

go

vern

me

nts

an

d

inte

rna

-

tio

na

l o

rga

ni-

zati

on

s in

-

clu

din

g

the

OA

S

� ��� Su

rve

ys;

pre

ss

cove

rag

e

� N

etw

ork

s P

roje

ct r

e-

po

rts

� ��� Li

st o

f p

art

ici-

pa

nts

� ��� D

ocu

me

nt

an

aly

sis

An

nu

ally

D

ep

art

me

nt

of

Eco

no

mic

an

d

Soci

al D

eve

lop

-m

en

t (D

ESD

)

Secr

eta

ria

t fo

r In

teg

ral D

eve

l-o

pm

en

t (S

ED

I)

∗ M

idte

rm:

Ind

ica

tor

bro

ug

ht

fro

m t

he

le

vel o

f o

utp

uts

*M

idte

rm D

ata

2

0 B

ase

line

RIA

C (

2)

pra

ctic

es

exc

ha

ng

ed

by

20

09

2

1 T

arg

et

RIA

C (

10

) E

-In

no

van

et

(5),

ST

EN

(2

) a

nd

CS

HN

(1

)

Page 12: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

9

Re

vis

ed

Ap

ril

15

, 2

01

5

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

22

00

In

cre

ase

d

aw

are

ne

ss

of

the

imp

ort

an

ce o

f re

spo

nsi

ble

bu

sin

ess

pra

ctic

es

am

on

g

ke

y

sta

ke

ho

lde

rs

(go

ve

rnm

en

ts,

pa

rlia

me

nta

ria

ns,

aca

de

mia

, a

nd

pri

va

te s

ect

or)

at

re-

gio

na

l a

nd

na

tio

na

l le

ve

ls

Re

gio

na

l Le

ve

l

� ��� #

Of

pa

rtn

ers

hip

s22 t

ha

t

pro

mo

te r

esp

on

sib

le

bu

sin

ess

pra

ctic

es

at

the

reg

ion

al l

eve

l

� ��� #

Of

pa

rtn

ers

hip

s th

at

pro

mo

te r

esp

on

sib

le

bu

sin

ess

pra

ctic

es

at

the

na

tio

na

l le

vel

� ��� P

erc

ep

tio

n o

f ke

y st

ake

-

ho

lde

rs o

f th

eir

aw

are

-

ne

ss o

f th

e im

po

rta

nce

of

resp

on

sib

le b

usi

ne

ss

pra

ctic

es *

� ��� #

Of

cap

aci

ty b

uild

ing

too

ls s

ha

red

th

rou

gh

th

e

ne

two

rk C

oo

pe

raN

et

1∗ ∗∗∗ 1

TB

C*

*

2

5∗ ∗∗∗

6*

TB

C*

*

8

� G

ove

rnm

en

ts

� P

riva

te S

ect

or

� In

stit

uti

on

s

� P

art

icip

an

t lis

t

� W

ork

sho

p r

e-

po

rts

� A

gre

em

en

ts

tha

t fo

rma

lize

p

art

ne

rsh

ips

� Su

rve

y A

na

ly-

sis

� P

roje

ct

Do

cum

en

ts

� Su

rve

y

� R

evi

ew

of

Pro

ject

D

ocu

me

nts

An

nu

ally

D

ep

art

me

nt

of

Eco

no

mic

an

d

Soci

al D

eve

lop

-m

en

t (D

ESD

)

Exe

cuti

ve O

ffic

e

of

the

Ext

ern

al

Re

lati

on

s S

ecr

e-

tari

at

23

00

In

cre

ase

d

cap

aci

ty

of

min

is-

trie

s/ e

xe

cuti

ng

ag

en

cie

s a

nd

le

gis

-

lati

ve

co

mm

itte

es

to p

rom

ote

so

un

d

ma

na

ge

me

nt

pra

ctic

es

rela

ted

to

do

me

stic

an

d i

nte

rna

tio

na

l b

usi

ne

ss

de

ve

lop

me

nt

Co

un

try

Le

ve

l

� ��� P

erc

ep

tio

n

of

ma

na

ge

rs

of

the

ir

ow

n

imp

rove

d

cap

aci

ty

an

d

cha

ng

es

of

pra

ctic

es

to

fulf

ill

the

ir

ma

nd

ate

s in

m

inis

teri

al/

exe

cuti

ng

ag

en

cie

s23

� ��� P

erc

ep

tio

n

of

leg

isla

tive

sta

ff

of

the

ir

ow

n

im-

pro

ved

ca

pa

city

a

nd

cha

ng

es

of

pra

ctic

es

to

fulf

ill

the

ir

ma

nd

ate

s in

leg

isla

tive

co

mm

itte

es

� ��� P

erc

ep

tio

n o

f st

ake

-

ho

lde

rs2

4 o

f q

ua

lity

of

serv

ice

s25 p

rovi

de

d b

y

min

istr

ies/

exe

cuti

ng

ag

en

cie

s

25

% h

av

e i

mp

rov

ed

ca

pa

city

**

20

% h

av

e i

mp

rov

ed

ca

pa

city

**

25

% o

f su

rve

ye

d

sta

ke

ho

lde

rs c

on

-si

de

r se

rvic

es

go

od

**

70

% h

av

e i

m-

pro

ve

d c

ap

aci

ty*

*

80

% h

av

e i

m-

pro

ve

d c

ap

aci

ty*

*

70

% s

urv

ey

ed

st

ak

eh

old

ers

co

n-

sid

er

serv

ice

s g

oo

d *

*

� ��� M

inis

trie

s a

nd

the

ir t

ech

ni-

cal t

ea

ms

� ��� Le

gis

lati

ve

com

mit

tee

s

� ��� St

ake

ho

lde

rs

in b

usi

ne

ss

an

d c

ivil

soci

-

ety

� ��� P

roje

ct

Do

cum

en

ts

� ��� In

terv

iew

s

wit

h a

uth

ori

-

tie

s a

nd

sta

keh

old

ers

� ��� Su

rve

ys

� ��� R

evi

ew

of

Pro

ject

Do

cum

en

ts

An

nu

ally

D

ep

art

me

nt

of

Eff

ect

ive

Pu

blic

M

an

ag

em

en

t (D

EP

M)

22 P

art

ne

rsh

ip is

de

fin

ed

as:

Co

llab

ora

tio

ns

be

twe

en

th

e O

AS

/CS

R p

rog

ram

wit

h R

eg

ion

al E

nti

tie

s (C

SR

org

an

iza

tio

ns,

NG

Os,

Go

vern

me

nts

, In

tern

ati

on

al I

nst

itu

tio

ns,

an

d P

riv

ate

Se

cto

r e

tc.)

∗*

Mid

term

Da

ta:

Da

ta c

olle

ctio

n m

eth

od

olo

gy

is t

o b

e v

eri

fie

d a

nd

re

vise

d b

y O

AS

/DP

E

∗ M

idte

rm D

ata

2

3 T

he

su

rve

y sc

ale

we

nt

fro

m v

ery

we

ak=

0,

we

ak=

25

%,

ad

eq

ua

te=

50

%,

stro

ng

=7

5%

an

d v

ery

str

on

g=

10

0%

. 2

4 S

take

ho

lde

rs:

25 S

erv

ice

s: T

BC

∗ M

idte

rm:

Ind

ica

tor

wa

s m

ove

d f

rom

th

e l

eve

l of

ou

tpu

ts

Page 13: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

10

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

� ��� #

of

reco

mm

en

da

tio

ns

imp

lem

en

ted

by

me

mb

er

sta

tes/

me

mb

ers

of

the

ME

CIG

EP∗

0

3

24

00

Im

pro

ve

d c

ap

aci

ty o

f m

em

be

r

sta

tes

to i

mp

lem

en

t se

cure

d t

ran

s-

act

ion

s re

form

, in

clu

din

g

the

p

ro-

mo

tio

n o

f e

qu

ita

ble

acc

ess

to

cre

dit

,

ba

sed

on

th

e O

AS

Mo

de

l La

w∗ ∗∗∗

Co

un

try

Le

ve

l

� ��� #

Of

me

mb

er

sta

tes

tha

t

de

cla

re2

6 c

om

mit

me

nt

to

a s

ecu

red

tra

nsa

ctio

n r

e-

form

� ��� #

Of

me

mb

er

sta

tes

tha

t

un

de

rta

ke2

7 p

roce

sse

s

for

a s

ecu

red

tra

nsa

ctio

n

refo

rm∗

� ��� Le

vel o

f u

nd

ers

tan

din

g b

y

law

ma

kers

28 o

f th

e li

nk

be

twe

en

se

cure

d t

ran

sac-

tio

ns

an

d a

cce

ss t

o c

red

it

0 2 0

4 3

60

% o

f su

rve

ye

d

law

ma

ke

rs h

av

e

an

im

pro

ve

d u

n-

de

rsta

nd

ing

29

� P

erm

an

en

t C

ou

nci

l an

d

oth

er

Org

an

s o

f th

e I

nte

r-A

me

rica

n S

ys-

tem

� IF

C D

oin

g

Bu

sin

ess

Re

-p

ort

� O

EC

D,

Wo

rld

B

an

k, I

DB

an

d

oth

er

mu

lti-

late

ral f

ina

n-

cia

l re

po

rts

� La

wm

ake

rs

� R

evi

ew

of

re-

po

rts

� Su

rve

ys

An

nu

ally

D

IL

∗ M

idte

rm :

mo

dif

ied

re

sult

sta

tem

en

t 2

6 D

ecl

are

is d

efi

ne

d a

s:

∗ M

idte

rm :

mo

dif

ied

in

dic

ato

r

27 U

nd

ert

ake

is d

efi

ne

d a

s:

∗ M

idte

rm :

mo

dif

ied

in

dic

ato

r

28 L

aw

ma

kers

are

re

pre

sen

ted

by:

2

9 U

niv

ers

e i

s d

efi

ne

d a

s:

Page 14: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

11

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

25

00

Im

pro

ve

d c

ap

aci

ty o

f m

em

be

r

sta

tes

to i

ncr

ea

se t

ran

spa

ren

cy a

nd

eq

uit

ab

le a

cce

ss t

o p

ub

lic

info

rma

-

tio

n

Co

un

try

Le

ve

l

� ��� #

of

me

mb

er

sta

tes

tha

t

de

cla

re3

0 c

om

mit

me

nt

to

refo

rm t

o in

cre

ase

tra

ns-

pa

ren

cy a

nd

eq

uit

ab

le a

c-

cess

to

pu

blic

in

form

a-

tio

n∗

� ��� #

of

me

mb

er

sta

tes

tha

t

un

de

rta

ke p

roce

ss t

o r

e-

form

2 2

6 4

� P

erm

an

en

t C

ou

nci

l an

d

oth

er

Org

an

s o

f th

e I

nte

r-A

me

rica

n S

ys-

tem

� C

ivil

soci

ety

o

rga

niz

ati

on

s,

Tra

nsp

are

ncy

In

tern

ati

on

al

� M

ed

ia r

e-

po

rts:

pri

nt

me

dia

, in

ter-

ne

t-b

ase

d

me

dia

s

� A

cce

ss t

o in

-fo

rma

tio

n

bo

die

s

� R

evi

ew

of

re-

po

rts

� Su

rve

ys

An

nu

ally

D

IL

31

00

In

cre

ase

d a

cce

ss b

y M

SM

Es

to

na

tio

na

l in

stit

uti

on

s th

at

pro

vid

e

serv

ice

s to

in

cre

ase

re

gio

na

l/

sub

-

reg

ion

al

com

pe

titi

ve

ne

ss,

pro

du

ctiv

-

ity

an

d a

cce

ss t

o e

xp

an

de

d m

ark

ets

Re

gio

na

l Le

ve

l/N

ati

on

al

Lev

el

� ��� #

of

targ

ete

d

inst

itu

tio

ns

pro

vid

ing

n

ew

a

nd

/or

imp

rove

d

serv

ice

s to

MSM

Es∗

� ��� #

of

bu

sin

ess

es

acc

ess

ing

serv

ice

s p

rovi

de

d

by

MSM

E

sup

po

rt

inst

itu

-

tio

ns

� ��� #

o

f co

op

era

tive

in

itia

-

tive

s31 u

nd

ert

ake

n a

mo

ng

na

tio

na

l in

stit

uti

on

s a

t

the

re

gio

na

l/su

b-r

eg

ion

al

leve

l

0 0 0

10

75

2

� A

nn

ua

l re

-p

ort

s b

y M

SME

su

p-

po

rt in

stit

u-

tio

ns

an

d

sta

keh

old

ers

su

rve

ys

� L

ists

of

pa

r-ti

cip

ati

ng

M

SME

s in

th

e

an

nu

al

sur-

veys

to

re

pre

-se

nta

tiv

es

of

pa

rtic

ipa

tin

g

MSM

Es

� M

on

ito

rin

g

rep

ort

s

� D

ocu

me

nt

an

aly

sis

� Su

rve

ys

� M

on

ito

rin

g

An

nu

ally

DE

SD

30 D

ecl

are

is d

efi

ne

d a

s:

∗ M

idte

rm :

mo

dif

ied

in

dic

ato

r

∗ M

idte

rm :

mo

dif

ied

in

dic

ato

r

31 A

co

op

era

tive

in

itia

tive

is d

efi

ne

d a

s:

Page 15: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

12

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

32

00

Str

en

gth

en

ed

ca

pa

city

of

go

v-

ern

me

nt

off

icia

ls

for

ne

go

tia

tio

n

an

d

imp

lem

en

tati

on

o

f tr

ad

e

ag

ree

me

nts

Re

gio

na

l/ N

ati

on

al

Lev

el

� ��� #

o

f tr

ain

ed

g

ove

rnm

en

t

off

icia

ls i

ncl

ud

ed

in

co

un

-

try/

re

gio

na

l d

ele

ga

tio

ns

resp

on

sib

le f

or

tra

de

ne

-

go

tia

tio

ns∗

� ��� #

o

f in

stit

uti

on

al,

le

gis

la-

tive

a

nd

re

gu

lato

ry

cha

ng

es

ide

nti

fie

d

by

be

ne

fici

ary

co

un

trie

s to

com

ply

w

ith

tr

ad

e

ag

ree

me

nt

ob

liga

tio

ns

0 0

60∗ ∗∗∗

32

20

� ��� M

ee

tin

g r

e-

po

rts;

an

nu

al

inst

itu

tio

na

l

rep

ort

s

� ��� In

ven

tori

es

of

req

uir

ed

cha

ng

es;

do

cum

en

ts

de

scri

bin

g i

n-

stit

uti

on

al

cha

ng

es

� ��� D

ocu

me

nt

an

aly

sis

An

nu

ally

D

ESD

DSD

33

00

In

cre

ase

d k

no

wle

dg

e b

y S

ME

s,

wo

rkin

g

ma

inly

in

th

e

extr

act

ive

sect

or,

of

CS

R a

nd

re

spo

nsi

ble

bu

si-

ne

ss

pra

ctic

es

wh

ich

e

nh

an

ce

pro

-

du

ctiv

ity

, co

mp

eti

tiv

en

ess

an

d m

ar-

ke

t a

cce

ss

Co

un

try

le

ve

l

� ��� Le

vel

of

un

de

rsta

nd

ing

of

sele

cte

d S

ME

s o

n C

SR a

s a

to

ol

for

pro

du

ctiv

ity,

co

mp

eti

tive

ne

ss

an

d

ma

rke

t a

cce

ss

� ��� #

Of

resp

on

sib

le b

usi

ne

ss

pra

ctic

es

un

de

rta

ken

b

y

tra

ine

d S

ME

s∗

30

% G

oo

d/

6%

Exce

lle

nt∗ ∗∗∗

0*

50

% G

oo

d/

25

% E

xce

lle

nt∗ ∗∗∗

17

5*

� Su

rve

y o

f SM

Es

� C

SR R

ep

ort

s

� C

ase

stu

die

s

� Su

rve

y

� P

re a

nd

po

st

wo

rksh

op

s su

rve

y

An

nu

ally

C

SR P

rog

ram

34

00

In

cre

ase

d k

no

wle

dg

e b

y c

om

-

me

rcia

l ju

dg

es

an

d o

the

r p

ub

lic

off

i-

cia

ls

to

en

forc

e

inte

rna

tio

na

l co

m-

me

rcia

l d

isp

ute

se

ttle

me

nt

an

d a

rbi-

tra

tio

n d

eci

sio

ns

rela

ted

to

tra

de

Co

un

try

Le

ve

l

� ��� #

Of

jud

ge

s th

at

fee

l th

ey

ha

ve in

cre

ase

d k

no

wl-

ed

ge

� ��� #

Of

pu

blic

off

icia

ls t

ha

t

fee

l th

ey

ha

ve i

ncr

ea

sed

kno

wle

dg

e

0∗ ∗∗∗ 0∗ ∗∗∗

54

13

� In

terv

iew

s

� Su

rve

ys

of

jud

ge

s a

nd

p

ub

lic

off

i-ci

als

� A

na

lysi

s o

f

surv

eys

An

nu

ally

D

IL

∗ M

idte

rm:

mo

dif

ied

in

dic

ato

r

∗ M

idte

rm:

ne

w d

ata

3

2 2

0 G

ove

rnm

en

t o

ffic

ials

tra

ine

d w

ill

be

tra

ine

d b

y D

SD

∗ M

idte

rm:

ne

w i

nd

ica

tor

∗ M

idte

rm:

ne

w d

ata

∗ M

idte

rm:

ne

w d

ata

∗ M

idte

rm:

ne

w d

ata

∗ M

idte

rm:

ne

w d

ata

Page 16: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

13

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

41

00

Im

pro

ve

d c

ap

aci

ty o

f m

em

be

r

sta

tes

to

ide

nti

fy

an

d

an

aly

ze

wo

me

n's

rig

hts

an

d g

en

de

r e

qu

ali

ty

con

cern

s a

nd

in

teg

rate

th

em

in

pu

b-

lic

po

lici

es

Na

tio

na

l Le

ve

l

� ��� #

Of

sect

ora

l pla

nn

ing

do

cum

en

ts t

ha

t re

fer

to

ge

nd

er

eq

ua

lity

con

cern

s

� ��� #

Of

sect

ora

l pla

nn

ing

do

cum

en

ts t

ha

t cl

ea

rly

de

dic

ate

fin

an

cia

l re

-

sou

rce

s to

act

ivit

ies

tha

t

sup

po

rt g

en

de

r e

qu

ali

ty

an

d/o

r w

om

en

’s r

igh

ts

� ��� #

Of

targ

ete

d c

ou

ntr

ies

rep

ort

ing

on

th

e i

mp

le-

me

nta

tio

n o

f a

gre

ed

com

mit

me

nts

on

wo

me

n’s

rig

hts

*

32

32

0∗ ∗∗∗

40

*

34

*

6

� E

xist

ing

pla

ns,

b

ud

ge

ts a

nd

re

po

rts

(to

e

sta

bli

sh

ba

seli

ne

)

� Fu

ture

pla

ns,

b

ud

ge

ts a

nd

re

po

rts

(to

m

on

ito

r ch

an

ge

)

� P

art

ne

r o

r-g

an

iza

tio

ns

� D

ocu

me

nt

an

aly

-si

s/Li

tera

ture

re

vie

w

An

nu

ally

(will

va

ry a

s re

po

rts

be

com

e a

vail-

ab

le)

CIM

42

00

En

ha

nce

d c

ap

aci

ty o

f m

em

be

r

sta

tes

to i

mp

lem

en

t B

ele

m D

o P

ara

an

d C

ED

AW

(G

en

. re

c. 1

8)

Re

gio

na

l Le

ve

l

� #

Of

Sta

tes

Pa

rty

to t

he

Co

nve

nti

on

(3

2)

rep

ort

ing

on

se

cto

ral p

lan

nin

g a

nd

bu

dg

eti

ng

do

cum

en

ts

tha

t in

dic

ate

sp

eci

fic

ac-

tivi

tie

s a

nd

re

sou

rce

s

(hu

ma

n a

nd

fin

an

cia

l re

-

sou

rce

s d

ed

ica

ted

to

) fo

r

ad

dre

ssin

g v

iole

nce

ag

ain

st w

om

en

33

� #

Of

Sta

tes

Pa

rty

to t

he

C

on

ven

tio

n (

32

) re

po

rtin

g

on

imp

lem

en

tati

on

of

com

mit

me

nts

de

rive

d

fro

m t

he

Be

lém

do

Pa

Co

nve

nti

on

, u

sin

g t

he

ad

-d

itio

na

l in

dic

ato

rs a

s p

art

o

f th

e M

ESE

CV

I p

ro-c

ess

13

0∗ ∗∗∗

19

16

(5

0%

) ∗ ∗∗∗

� E

xist

ing

pla

ns,

b

ud

ge

ts

� Fu

ture

pla

ns,

b

ud

ge

ts

� P

art

ne

r o

r-g

an

iza

tio

ns

� C

ED

AW

Re

-p

ort

s

� M

ESE

CV

I R

e-

po

rts

� D

ocu

me

nt

an

aly

sis

� Li

tera

ture

re

-vi

ew

Bia

nn

ua

lly

(will

va

ry a

s re

po

rts

be

-co

me

ava

il-a

ble

)

CIM

/OA

S

∗ ∗∗∗ M

idte

rm:

ne

w d

ata

3

3 M

idte

rm I

nd

ica

tor

Mo

dif

ied

∗ ∗∗∗ M

idte

rm:

Ne

w D

ata

∗ ∗∗∗ M

idte

rm:

Ne

w D

ata

Page 17: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

14

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

� #

Of

Sta

tes

Pa

rty

to t

he

Co

nve

nti

on

(3

2)

tha

t in

-

clu

de

sp

eci

fic

act

ivi-

tie

s/re

sou

rce

s fo

r vi

o-

len

ce a

ga

inst

wo

me

n i

n

na

tio

na

l bu

dg

ets

0

16

(5

0%

)

51

00

S

tre

ng

the

ne

d

pe

rfo

rma

nce

ma

na

ge

me

nt

cap

aci

ty

of

the

O

AS

,

thro

ug

h R

BM

an

d t

he

in

teg

rati

on

of

ge

nd

er

eq

ua

lity

in

p

rog

ram

s a

nd

pro

ject

s

� %

of

pro

ject

s w

hic

h u

se

an

RB

M f

ram

ew

ork

to

ma

na

ge

an

d r

ep

ort

on

pro

gre

ss

� %

of

OA

S p

roje

cts

tha

t in

-

corp

ora

te g

en

de

r e

qu

alit

y

in t

he

ir d

esi

gn

� %

of

OA

S p

roje

cts

tha

t in

-

corp

ora

te g

en

de

r e

qu

alit

y

in t

he

ir e

xecu

tio

n

� %

of

Sum

mit

Ma

nd

ate

s

on

wh

ich

th

ere

is R

BM

pri

nci

ple

s∗

17

%

2%

1%

0%

80

%

75

%

40

%

30

%

� P

roje

ct

do

cum

en

ts

� D

PE

Re

po

rt

on

Pro

gre

ss

of

Pro

ject

Im

-

ple

me

nta

tio

n

(RP

PI)

� Su

mm

it N

a-

tio

na

l Re

po

rts

� JS

WG

re

po

rts

on

Su

mm

it

imp

lem

en

ta-

tio

n

� SI

SCA

da

ta

� D

ocu

me

nt

an

aly

sis

� D

ata

an

aly

sis

(in

clu

din

g

com

pa

rati

ve

an

aly

sis

wit

h

pre

vio

us

Sum

mit

re

-

po

rtin

g)

An

nu

ally

D

PE

Sum

mit

s

52

00

Str

en

gth

en

ed

sy

ste

ms

wit

hin

the

OA

S t

o i

nte

gra

te,

mo

nit

or

an

d

ev

alu

ate

ge

nd

er

eq

ua

lity

as

a c

ross

-

cutt

ing

th

em

e i

n p

oli

cie

s, m

an

da

tes,

pro

ject

s a

nd

in

stit

uti

on

al

lev

el

re-

sult

s

� ��� %

of

OA

S m

an

da

tes

tha

t

inco

rpo

rate

ge

nd

er

eq

ua

l-

ity

as

a c

ross

-cu

ttin

g

the

me

� ��� %

of

inst

itu

tio

na

l le

vel r

e-

sult

s th

at

inco

rpo

rate

ge

nd

er

eq

ua

lity

as

a

cro

ss-c

utt

ing

th

em

e

0 0

50

%

20

%

� R

ep

ort

s fr

om

the

Ma

nd

ate

s

Ma

na

ge

me

nt

Syst

em

� D

ocu

me

nt

an

aly

sis

An

nu

ally

D

PE

∗ M

idte

rm:

Mo

dif

ied

In

dic

ato

r

Page 18: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

15

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

53

00

Str

en

gth

en

ed

OA

S c

ap

aci

ty t

o

eff

ect

ive

ly r

esp

on

d t

o e

me

rgin

g p

ri-

ori

tie

s (i

ncl

ud

ing

cr

ise

s)

in

the

re

-

gio

n

Co

un

try

le

ve

l

� ��� P

erc

ep

tio

n o

f th

e O

AS/

GS

of

the

qu

ali

ty o

f in

form

a-

tio

n a

vaila

ble

to

re

spo

nd

to e

me

rgin

g c

risi

s∗

0

At

lea

st 5

0%

of

the

OA

S/G

S D

eci

-si

on

Ma

ke

rs s

ur-

ve

ye

d c

on

sid

er

the

in

form

ati

on

u

sefu

l

� O

AS/

GS

De

ci-

sio

n M

ake

rs

� Su

rve

y

� A

na

lysi

s o

f Su

rve

ys

An

nu

ally

O

ffic

e o

f th

e S

ec-

reta

ry G

en

era

l

SER

54

00

S

tre

ng

the

ne

d

OA

S

tech

nic

al

cap

aci

ty

to

ob

serv

e

ele

cto

ral

pro

c-

ess

es

in t

he

re

gio

n w

ith

a f

ocu

s o

n

eq

ua

l p

art

icip

ati

on

� ��� P

erc

ep

tio

n o

f D

ep

uty

Ch

iefs

an

d G

en

era

l Co

or-

din

ato

rs o

f th

eir

ab

ilit

y to

inco

rpo

rate

co

mp

ara

tive

reco

mm

en

da

tio

ns

an

d

da

ta in

th

e f

orm

ula

tio

n o

f

EO

M r

ep

ort

s

� ��� %

of

EO

Ms

usi

ng

th

e

me

tho

do

log

y th

at

colle

ct

da

ta o

n b

arr

iers

to

pa

r-

tici

pa

tio

n in

ele

cto

ral

pro

cess

es

by

un

de

rre

pre

-

sen

ted

gro

up

s

� ��� N

um

be

r o

f O

AS

ob

serv

ers

or

coo

rdin

ato

rs c

ert

ifie

d

for

ele

cto

ral p

roce

sse

s in

the

re

gio

n∗

3.4

34 a

bil

ity

im

-p

rov

ed

0

0

4.6

ab

ilit

y i

m-

pro

ve

d

50

%∗ ∗∗∗

30

� ��� Su

rve

y to

De

pu

ty C

hie

f

an

d G

en

era

l

Co

ord

ina

tor

me

mb

ers

of

OA

S E

OM

tea

ms

� ��� E

OM

re

po

rts

� ��� A

na

lysi

s o

f

surv

eys

an

d

rep

ort

s

An

nu

ally

D

EC

O

∗ M

idte

rm:

Mo

dif

ied

In

dic

ato

r

34 P

lea

se n

ote

th

at

un

it m

ea

sure

fo

r th

is w

ou

ld b

e o

ver

a s

cale

fro

m 1

to

5…

∗ M

idte

rm:

Ne

w D

ata

Page 19: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

16

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

55

00

Im

pro

ve

d

con

sult

ati

on

w

ith

sta

ke

ho

lde

rs

reg

ard

ing

O

AS

p

ro-

gra

ms,

act

ivit

ies

an

d p

oli

cy m

ak

ing

pro

cess

es

Re

gio

na

l Le

ve

l

� ��� #

/% o

f m

em

be

r st

ate

s p

art

icip

ati

ng

in

vir

tua

l an

d

face

to

fa

ce m

ee

tin

gs

wit

h s

take

ho

lde

rs t

o d

e-

velo

p r

eco

mm

en

da

tio

ns

� ��� P

erc

ep

tio

n o

f st

ake

-h

old

ers

of

the

qu

alit

y o

r u

sefu

lne

ss o

f th

e c

on

sul-

tati

on

s *

� ��� #

of

reco

mm

en

da

tio

ns

fro

m s

take

ho

lde

rs in

-cl

ud

ed

in

th

e t

ech

nic

al

pro

po

sals

pre

sen

ted

by

the

OA

S/G

S to

Me

mb

er

Sta

tes∗

25

%3

5 p

art

icip

ate

3.4

av

era

ge

co

n-

sid

er

con

sult

ati

on

s

use

ful

20

0*

40

%3

6 p

art

icip

ate

4.0

37 a

ve

rag

e c

on

-si

de

r co

nsu

lta

-ti

on

s u

sefu

l

30

0*

� ��� U

ser

List

s/

Da

tab

ase

� ��� (C

on

ten

t fr

om

OA

S w

eb

site

,

SVC

an

d

Sum

mit

we

b-

site

� ��� R

ep

ort

s, r

e-

sou

rce

s a

nd

oth

er

inp

uts

fro

m s

take

-

ho

lde

rs

� ��� Su

rve

y

� ��� D

ocu

me

nt

an

aly

sis

� ��� In

terv

iew

s

wit

h s

take

-

ho

lde

rs

� ��� Su

rve

ys

of

use

rs o

f u

til-

ity/

ap

plic

ab

ili

ty O

AS

do

cum

en

ts

An

nu

ally

SE

R

Sum

mit

s

Ou

tpu

ts

11

10

Ca

pa

city

-bu

ild

ing

an

d p

rofe

s-

sio

na

l d

ev

elo

pm

en

t su

pp

ort

pro

-

vid

ed

to

all

EM

Bs

in p

oli

tica

l-

ele

cto

ral

fin

an

cin

g a

nd

ge

nd

er

ma

inst

rea

min

g

� ��� #

of

too

lkit

s p

rod

uce

d f

or

EM

Bs

to p

rom

ote

w

om

en

’s p

art

icip

ati

on

in

e

lect

ion

s a

nd

on

po

litic

al

fin

an

ce m

od

els

� ���

EM

Bs

pe

rce

ive

d v

alu

e o

f m

od

el l

eg

isla

tio

n o

n

po

-lit

ica

l e

lect

ora

l fin

an

cin

g

wit

h a

sp

eci

fic

ge

nd

er

fo-

cus

pro

vid

ed

to

Ca

rib

-b

ea

n c

ou

ntr

ies

� ��� P

erc

eiv

ed

use

fuln

ess

of

Ca

rib

be

an

EM

B a

nd

po

-lit

ica

l le

ad

ers

pa

rtic

ipa

tin

g

in r

eg

ion

al f

ora

of

revi

sed

m

od

el l

eg

isla

tio

n o

n p

o-

litic

al e

lect

ora

l fin

an

cin

g

tha

t in

corp

ora

tes

a g

en

-d

er

focu

s

0 0 0

2

30

% s

om

eh

ow

v

alu

ab

le*

30

% s

om

eh

ow

u

sefu

l*

� ��� O

AS/

EO

Ms

� ��� M

em

be

rs

of

EM

Bs

� ��� Se

min

ars

in

Ba

rba

do

s a

nd

Tri

nid

ad

an

d

To

ba

go

� ��� Su

rve

ys

� ��� A

na

lysi

s o

f

OA

S d

ocu

-

me

nts

� ��� A

na

lysi

s o

f

surv

eys

� ��� A

na

lysi

s o

f

do

cum

en

ts

fro

m s

em

i-

na

rs

An

nu

ally

D

EC

O

∗ M

idte

rm:

Mo

dif

ied

In

dic

ato

r

35 M

idte

rm D

ata

3

6 M

idte

rm D

ata

3

7 S

cale

: 1

-5 U

niv

ers

e o

f st

ake

ho

lde

rs T

BC

Page 20: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

17

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

11

20

Tra

inin

g/s

em

ina

rs/

ex

cha

ng

es

he

ld t

o s

ha

re l

ess

on

s le

arn

ed

re

-

late

d t

o e

lect

ion

s, i

ncl

ud

ing

le

sso

ns

pro

mo

tin

g w

om

en

’s p

art

icip

ati

on

in

ele

cto

ral

bo

die

s

� ��� #

O

f E

MB

s m

em

be

rs

pe

r ye

ar

pa

rtic

ipa

tin

g i

n t

rain

-in

gs/

se

min

ars

, d

isa

gg

re-

ga

ted

by

sex.

� ���

#

Of

inte

rna

tio

na

l e

x-ch

an

ge

s b

etw

ee

n t

he

OA

S

an

d

inte

rna

tio

na

l e

lect

ion

o

bse

rve

r in

stit

uti

on

s to

sh

are

m

eth

od

olo

gie

s,

sta

-ti

stic

s a

nd

re

com

me

nd

a-

tio

n

mo

nit

ori

ng

m

ech

a-

nis

ms

5

00

3

6

50∗ ∗∗∗

7

� ��� M

em

be

rs o

f E

MB

s

DE

CO

an

d

pa

rtn

er

or-

ga

niz

ati

on

s fr

om

th

e in

-te

rna

tio

na

l co

mm

un

ity

� ��� A

na

lysi

s o

f

eva

lua

tio

n

form

s

� ��� St

ati

stic

al r

e-

po

rts

of

pa

r-

tici

pa

tio

n

pro

vid

ed

by

the

po

rta

l

wh

ere

th

e

tra

inin

gs

are

off

ere

d.

� ��� P

ost

-tra

inin

g

Surv

ey

� ��� C

olle

ctio

n o

f

an

ecd

ota

l

evi

de

nce

by

em

ail

� ��� R

ep

ort

s p

re-

sen

ted

to

th

e

OA

S P

erm

a-

ne

nt

Co

un

cil

fro

m p

art

ici-

pa

tio

n in

EO

Ms

An

nu

ally

D

EC

O

11

30

S

tud

ies

dis

sem

ina

ted

to

a

ll

EM

BS

o

n

ho

w

to

stre

ng

the

n

the

ir

wo

rk t

o m

ak

e e

lect

ion

s m

ore

in

clu

-

siv

e

� ��� #

o

f st

ud

ies

pro

vid

ed

to

EM

Bs

on

st

an

da

rds

of

go

od

e

lect

ion

s a

nd

me

cha

nis

ms

for

en

ha

nc-

ing

vo

ter

pa

rtic

ipa

tio

n

0

2

� ��� D

EC

O p

ub

li-ca

tio

ns

� ��� A

na

lysi

s o

f

do

cum

en

ts

An

nu

ally

D

EC

O

∗ M

idte

rm:

Ne

w D

ata

* T

o b

e v

eri

fie

d

Page 21: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

18

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

11

40

Qu

ali

ty M

an

ag

em

en

t S

yst

em

s

(QM

S)

imp

lem

en

ted

a

nd

E

lect

ora

l

Ma

na

ge

me

nt

Ass

ura

nce

(E

MA

) d

e-

ve

lop

ed

to

ce

rtif

y e

lect

ora

l a

uth

ori

-

tie

s

� ��� #

of

QM

S im

ple

me

nte

d

� ��� #

of

EM

A d

eve

lop

ed

0 0

1 1

� ��� IS

O c

ert

ific

ate

� ��� Q

ua

lity

ma

n-

ua

l

� ��� M

inu

tes

of

the

me

eti

ng

s

of

the

wo

rk-

ing

gro

up

s o

f

the

ISO

Te

ch-

nic

al C

om

-

mit

tee

s

� ��� A

na

lysi

s o

f

reco

rds

(ce

r-

tifi

cate

s o

f

com

ple

tio

n

of

cou

rse

s)

� ��� A

na

lysi

s o

f

do

cum

en

ts:

qu

alit

y m

an

-

ua

l

An

nu

ally

D

EC

O

11

50

Ne

w t

ech

no

log

ies

wh

ich

ta

ke

into

co

nsi

de

rati

on

g

en

de

r e

qu

ali

ty

(wh

ere

a

pp

rop

ria

te)

ide

nti

fie

d

an

d

imp

lem

en

tati

on

fa

cili

tate

d

(in

clu

d-

ing

e-v

oti

ng

) in

ele

cto

ral

pro

cess

es

in m

em

be

r st

ate

s

� ��� #

o

f m

em

be

r st

ate

s in

wh

ich

n

ew

te

chn

olo

gie

s

are

su

pp

ort

ed

� ��� N

um

be

r o

f O

AS

Ele

cto

ral

rep

ort

s th

at

incl

ud

e G

en

-

de

r E

qu

alit

y C

on

sid

era

-

tio

ns

for

the

use

of

ne

w

tech

no

log

ies*

0 0

2 2

� ��� E

MB

s in

Me

mb

er

Sta

tes

� ��� A

na

lysi

s o

f

do

cum

en

ts

An

nu

ally

D

EC

O

11

60

T

ech

nic

al

coo

pe

rati

on

p

ro-

vid

ed

to

EM

Bs

on

se

ve

ral

ele

cto

ral

top

ics,

in

clu

din

g:

leg

al

refo

rm,

ge

o-

refe

ren

ce s

yst

em

s, e

lect

ora

l re

gis

try

au

dit

ing

, e

lect

ora

l ju

rid

ica

l ru

lin

gs,

de

cen

tra

liza

tio

n

of

the

v

ote

a

nd

pro

mo

tio

n

of

the

e

qu

al

pa

rtic

ipa

-

tio

n o

f w

om

en

an

d m

en

at

all

le

ve

ls

of

the

ele

cto

ral

pro

cess

� ��� #

of

EM

Bs

rece

ivin

g t

ech

-

nic

al c

oo

pe

rati

on

� ��� E

MB

p

erc

ep

tio

n

of

rele

-

van

ce

of

tech

nic

al

coo

p-

era

tio

n r

ece

ive

d

0 0∗ ∗∗∗

6

75

% h

igh

ly a

gre

e/

ag

ree

� ��� E

MB

s st

aff

me

mb

ers

an

d

Jud

ge

s o

f th

e

Ele

cto

ral

Tri

-

bu

na

ls

� ��� A

na

lysi

s o

f

pro

gre

ss

an

d

fin

al

Re

po

rts

of

the

te

chn

i-

cal

coo

pe

ra-

tio

n p

roje

cts

An

nu

ally

D

EC

O

21

10

OA

S D

ialo

gu

e o

f M

SM

E H

igh

-

Lev

el

Au

tho

riti

es

inst

itu

tio

na

lize

d a

s

an

h

em

isp

he

ric

foru

m

for

pu

bli

c

� #

O

f a

nn

ua

l O

AS

Dia

-lo

gu

es

of

MSM

E

Hig

h-

Leve

l A

uth

ori

tie

s m

ee

t-

0

3

� P

roje

ct r

e-

po

rts

� M

ee

tin

g r

e-

� D

ocu

me

nt

an

aly

sis

An

nu

ally

D

ESD

∗ M

idte

rm:

Ne

w D

ata

, N

um

be

r o

f E

MB

s T

BC

*M

idte

rm:

Ne

w I

nd

ica

tor

Page 22: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

19

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

po

lici

es

an

d

stra

teg

ies

for

MS

ME

de

ve

lop

me

nt

ing

s h

eld

� #

Of

me

mb

er

sta

tes

pa

r-ti

cip

ati

ng

in

m

ee

tin

gs

(dis

ag

gre

ga

ted

b

y su

b-

reg

ion

)

� %

Of

pa

rtic

ipa

nts

at

vice

-m

inis

teri

al l

eve

l

0 0

34

70

%

po

rts

21

20

S

up

po

rt

pro

vid

ed

to

h

igh

-

imp

act

M

SM

Es,

in

clu

din

g

wo

me

n-

led

MS

ME

s, p

ub

lic/

pri

va

te u

niv

ers

i-

tie

s a

nd

R&

D c

en

ters

(w

hic

h i

ncl

ud

e

go

ve

rnm

en

t-sp

on

sore

d R

&D

ce

nte

rs

an

d o

the

rs c

rea

ted

by

ass

oci

ati

on

s

of

MS

ME

s)

in

stra

teg

ic

eco

no

mic

sect

ors

� #

Of

MSM

E s

up

po

rt i

nst

i-tu

tio

ns

imp

lem

en

tin

g s

er-

vice

s ta

ilore

d t

o h

igh

im

-p

act

M

SME

s,

dis

ag

gre

-g

ate

d b

y co

un

try

� #

O

f m

en

a

nd

w

om

en

tr

ain

ed

to

pro

vid

e s

pe

cia

l-iz

ed

se

rvic

es

to

hig

h-

imp

act

MSM

Es

0 0

3

60

� P

roje

ct r

e-

po

rts

� Li

st o

f p

ar-

tici

pa

nts

� D

ocu

me

nt

an

aly

sis

An

nu

ally

D

ESD

21

30

Su

pp

ort

pro

vid

ed

to

me

mb

er

sta

tes

to f

aci

lita

te t

he

de

ve

lop

me

nt

of

the

p

oli

cy

fra

me

wo

rk

en

ab

lin

g

pu

bli

c-p

riv

ate

p

art

ne

rsh

ips

for

in-

no

va

tio

n

in

the

b

usi

ne

ss

en

vir

on

-

me

nt,

in

clu

din

g l

ice

nsi

ng

an

d t

ran

s-

fer

of

tech

no

log

y

� #

Of

tra

inin

g s

ess

ion

s p

ro-

vid

ed

to

me

mb

er

sta

tes

on

th

e d

ev

elo

pm

en

t o

f p

olic

y fr

am

ew

ork

s

� #

Of

tra

inin

g s

ess

ion

s p

ro-

vid

ed

to

pu

blic

/pri

vate

in

-st

itu

tio

ns

on

th

e d

eve

l-o

pm

en

t o

f p

olic

y fr

am

e-

wo

rks

0 0

2 1

� P

roje

ct r

e-

po

rts

� Li

st o

f p

ar-

tici

pa

nts

� D

ocu

me

nt

an

aly

sis

An

nu

ally

D

ESD

21

40

Su

pp

ort

pro

vid

ed

to

th

e I

nte

r-

Am

eri

can

Ne

two

rks

(RIA

C,

ST

EN

, In

-

ter-

Am

eri

can

E-S

ME

an

d I

nn

ov

ati

on

Ne

two

rk a

nd

Co

nsu

me

r S

afe

ty N

et-

wo

rk)

to u

nd

ert

ak

e t

he

ir m

an

da

tes

� #

Of

ne

two

rks’

go

vern

-m

en

t o

ffic

ials

an

d s

take

-h

old

er

rep

rese

nta

tive

s tr

ain

ed

in k

ey

sect

ora

l is-

sue

s, d

isa

gg

reg

ate

d b

y n

etw

ork

RIA

C:

4

E-I

nn

ov

aN

et:

N/A

ST

EN

: 0

CS

HN

: 6

0

RIA

C:

18

E

-In

no

va

Ne

t: N

/A

ST

EN

: 1

00

C

SH

N:

90

� P

roje

ct r

e-

po

rts

� Li

st o

f p

ar-

tici

pa

nts

� D

ocu

me

nt

an

aly

sis

An

nu

ally

SE

DI

22

10

M

ech

an

ism

s cr

ea

ted

to

ra

ise

aw

are

ne

ss o

f C

SR

pri

nci

ple

s a

mo

ng

pa

rlia

me

nta

ria

ns

in t

he

re

gio

n

� ��� #

Of

me

cha

nis

ms3

8 c

re-

ate

d t

o r

ais

e a

wa

ren

ess

o

f C

SR a

mo

ng

pa

rlia

me

n-

tari

an

s in

th

e r

eg

ion

3

5

� P

roje

ct

do

cum

en

ts

� P

arl

iam

en

-

� A

na

lysi

s o

f re

po

rts

� Su

rve

ys

An

nu

ally

D

ESD

38 M

ech

an

ism

s a

re d

efi

ne

d a

s w

ork

sho

ps

by

the

pro

gra

m

Page 23: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

20

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

� ��� C

rea

tio

n o

f ta

ilore

d

eva

lua

tio

n t

oo

l kit

s to

me

asu

re C

SR a

wa

ren

ess

am

on

g p

arl

iam

en

tari

an

s

0

3

tari

an

s

22

20

Ca

pa

city

bu

ild

ing

to

ols

de

ve

l-

op

ed

to

pro

mo

te r

esp

on

sib

le p

rac-

tice

s a

mo

ng

ke

y s

tak

eh

old

ers

of

the

Inte

r-A

me

rica

n

Co

op

era

tio

n

Ne

t-

wo

rk (

Co

op

era

Ne

t)

� ��� #

O

f ca

pa

city

b

uil

din

g

too

ls

de

velo

pe

d

thro

ug

h

the

ne

two

rk ∗

2

8

� P

roje

ct

do

cum

en

ts

� R

evi

ew

of

pro

ject

d

ocu

me

nts

An

nu

ally

SE

R

23

10

E

sta

bli

sh

a

kn

ow

led

ge

e

x-

cha

ng

e/d

ialo

gu

e

me

cha

nis

m

to

pro

mo

te

sou

nd

m

an

ag

em

en

t p

rac-

tice

s in

me

mb

er

sta

tes/

in t

he

re

gio

n

i.e

. In

ter-

Am

eri

can

C

oo

pe

rati

on

Me

cha

nis

m

for

Eff

ect

ive

P

ub

lic

Ma

na

ge

me

nt

(ME

CIG

EP

)

� ��� #

Of

gu

ide

s d

ev

elo

pe

d

by

ME

CIG

EP

� ��� #

Of

eff

ect

ive

pu

blic

ma

na

ge

me

nt/

succ

ess

ful

pra

ctic

es

exc

ha

ng

ed

39 b

y

me

mb

er

sta

tes/

me

mb

ers

of

the

ME

CIG

EP

6 0

30

12

� ��� P

roje

ct

do

cum

en

ts

� ��� R

evi

ew

of

pro

ject

do

cum

en

ts

An

nu

ally

D

EP

M

23

20

Te

chn

ica

l a

ssis

tan

ce p

rov

ide

d

for

the

im

ple

me

nta

tio

n o

f se

lect

ed

pro

ject

s re

qu

est

ed

by

OA

S m

em

be

r

sta

tes

in k

ey

are

as

of

pu

bli

c m

an

-

ag

em

en

t

� ��� #

Of

sele

cte

d p

roje

cts

init

iate

d i

n

m

em

be

r

sta

tes

in k

ey

are

as

of

pu

b-

lic m

an

ag

em

en

t40

� ��� %

Of

pro

ject

s w

hic

h in

te-

gra

te g

en

de

r e

qu

alit

y

pri

nci

ple

s

5 0

14

30

%4

1 o

f p

roje

cts

init

iate

d i

n m

em

-

be

r st

ate

s in

te-

gra

te G

E p

rin

ci-

ple

s

� ��� P

roje

ct

do

cum

en

ts

� ��� M

on

ito

rin

g

rep

ort

s o

f th

e

act

ivit

ies

exe

cute

d b

y

ea

ch p

roje

ct

� ��� G

ove

rnm

en

t

off

icia

ls a

nd

sta

keh

old

ers

� ��� A

na

lysi

s o

f

rep

ort

s

� ��� In

terv

iew

s

An

nu

ally

DE

PM

∗ M

idte

rm:

Ne

w I

nd

ica

tor

39 E

xch

an

ge

d i

s d

efi

ne

d a

s:

40 K

ey

Are

as

are

:

41 3

0%

of

the

se

lect

ed

pro

ject

s st

ate

d i

n I

nd

ica

tor

1,

the

refo

re 3

of

the

9 t

arg

et

pro

ject

s

Page 24: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

21

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

24

10

Te

chn

ica

l su

pp

ort

pro

vid

ed

to

me

mb

er

sta

tes

for

the

u

se

of

the

OA

S M

od

el

Law

on

Se

cure

d T

ran

sac-

tio

ns,

w

ith

th

e

pa

rtic

ipa

tio

n

of

in-

tern

ati

on

al

org

an

iza

tio

ns,

p

riv

ate

sect

or,

tra

de

ass

oci

ati

on

s a

nd

ta

kin

g

into

acc

ou

nt

the

fin

an

cia

l in

clu

sio

n

of

wo

me

n-o

wn

ed

SM

Es

� #

O

f St

ate

s co

nsi

de

rin

g

the

OA

S m

od

el

law

as

the

ba

sis

for

a s

ecu

red

tra

ns-

act

ion

re

form

� #

O

f p

art

icip

an

ts,

dis

ag

-

gre

ga

ted

by

inte

rna

tio

na

l

org

an

iza

tio

ns,

pri

vate

se

c-

tor,

tr

ad

e

ass

oci

ati

on

s,

pa

rtic

ipa

tin

g

in

the

co

n-

sid

era

tio

n

of

the

M

od

el

Law

as

the

ba

sis

for

a s

e-

cure

d t

ran

sact

ion

re

form

� %

O

f o

rga

niz

ati

on

s th

at

ad

voca

te

for

wo

me

n

ow

ne

d

bu

sin

ess

es

pa

r-

tici

pa

tin

g

in

the

co

nsi

d-

era

tio

n o

f th

e O

AS

Mo

de

l

Law

on

Se

cure

d T

ran

sac-

tio

n∗

0

0*

0%

4

80

20

%

� O

AS

me

eti

ng

rep

ort

s

� P

roje

ct r

e-

po

rts

� R

evi

ew

of

re-

po

rts

An

nu

ally

D

IL

25

10

Ass

ess

me

nt

of

the

co

mp

lia

nce

of

the

In

ter-

Am

eri

can

C

on

ve

nti

on

ag

ain

st

Co

rru

pti

on

co

nd

uct

ed

thro

ug

h

its

Fo

llo

w-u

p

Me

cha

nis

m

(ME

SIC

IC)

� #

O

f co

un

trie

s re

vie

we

d

for

com

plia

nce

du

rin

g t

he

Fou

rth

R

ou

nd

(2

01

2-

20

15

)

� %

Of

com

plia

nce

of

me

m-

be

r st

ate

s a

t th

e

he

mi-

sph

eri

c le

vel

5

42

2

2%

26

*

35

%

� R

esp

on

sib

le

bo

die

s in

co

un

trie

s u

n-

de

r re

vie

w

� C

ou

ntr

y le

gis

-la

tio

n a

nd

o

the

r re

gu

la-

tio

ns

� In

pu

t fr

om

ci

vil s

oci

ety

o

rga

niz

ati

on

s

� O

nsi

te v

isit

s b

y C

om

mit

-te

e o

f E

xpe

rts

me

mb

ers

an

d

Te

chn

ica

l Se

-cr

eta

ria

t

� Q

ue

stio

n-

na

ire

� A

na

lysi

s o

f

reco

rds

an

d

do

cum

en

ts

� O

bse

rva

tio

n

� In

terv

iew

s

Sem

i-a

nn

ua

lly

DLC

∗ M

idte

rm:

Mo

dif

ied

In

dic

ato

r

∗ M

idte

rm:

Mo

dif

ied

In

dic

ato

r

∗ M

idte

rm:

Da

ta

42 R

evi

sed

Da

ta*

Ne

w D

ata

Page 25: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

22

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

25

20

Te

chn

ica

l su

pp

ort

pro

vid

ed

fo

r

the

use

of

the

Mo

de

l In

ter-

Am

eri

can

Law

on

Acc

ess

to

Pu

bli

c In

form

ati

on

an

d i

ts G

uid

eli

ne

s w

ith

th

e p

art

ici-

pa

tio

n o

f g

ov

ern

me

nt

off

icia

ls,

po

l-

icy

m

ak

ers

a

nd

th

e

pri

va

te

sect

or

an

d c

ivil

so

cie

ty,

incl

ud

ing

wo

me

n’s

org

an

iza

tio

ns∗ ∗∗∗

� #

O

f St

ate

s co

nsi

de

rin

g

the

use

of

the

OA

S m

od

el

law

a

s th

e

ba

sis

for

re-

form

on

acc

ess

to

pu

blic

info

rma

tio

n∗

� #

O

f p

art

icip

an

ts,

dis

ag

-

gre

ga

ted

b

y e

xecu

tive

bra

nch

, le

gis

lati

ve b

ran

ch,

pa

rtic

ipa

tin

g i

n c

on

sid

era

-

tio

n

of

the

u

se

of

the

Mo

de

l La

w

on

a

cce

ss

to

pu

bli

c in

form

ati

on∗

� #

Of

civi

l so

cie

ty a

nd

pri

-

vate

se

cto

r o

rga

niz

ati

on

s

incl

ud

ing

w

om

en

’s

or-

ga

niz

ati

on

s p

art

icip

ati

ng

in

the

co

nsi

de

rati

on

o

f

the

use

of

the

Mo

de

l In

-

ter-

Am

eri

can

La

w

on

a

c-

cess

to

p

ub

lic

info

rma

-

tio

n∗

2 0 0

6

75

54

3

� O

AS

me

eti

ng

rep

ort

s

� P

roje

ct r

e-

po

rts

Re

vie

w o

f re

-

po

rts

An

nu

ally

D

IL

31

10

T

rain

-th

e-T

rain

ers

P

rog

ram

exe

cute

d,

tak

ing

in

to

acc

ou

nt

the

ne

ed

s o

f w

om

en

en

tre

pre

ne

urs

� #

O

f m

en

a

nd

w

om

en

tr

ain

ed

by

MSM

E s

up

po

rt

inst

itu

tio

ns

to p

rovi

de

as-

sist

an

ce t

o M

SME

s

� N

ee

ds

of

wo

me

n

en

tre

-p

ren

eu

rs

spe

cifi

cally

a

d-

dre

sse

d

in

curr

icu

la

of

tra

inin

g p

rog

ram

s

� P

erc

ep

tio

n

of

qu

alit

y

of

tra

inin

g b

y tr

ain

ee

s

0 0 0

30

0 (

M/F

)

10

0%

85

% s

ati

sfie

d

� Li

st o

f p

ar-

tici

pa

nts

in

tr

ain

ing

pro

-g

ram

s a

nd

o

nlin

e c

ou

rse

w

eb

site

� C

urr

icu

la o

f tr

ain

ing

pro

-g

ram

s

� P

ost

tra

inin

g

surv

ey

� D

ocu

me

nt

an

aly

sis

An

nu

ally

DE

SD

∗ M

idte

rm:

Re

sult

Sta

tem

en

t M

od

ifie

d

∗ M

idte

rm:

Mo

dif

ied

In

dic

ato

r

∗ M

idte

rm:

Mo

dif

ied

In

dic

ato

r

∗ M

idte

rm:

Mo

dif

ied

In

dic

ato

r

43 R

evi

sed

Da

ta

Page 26: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

23

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

32

10

T

rad

e-r

ela

ted

te

chn

ica

l a

ssis

-

tan

ce

(TR

TA

) p

rog

ram

fo

r g

ov

ern

-

me

nt

off

icia

ls r

esp

on

sib

le f

or

ne

go

-

tia

tin

g

an

d

imp

lem

en

tin

g

tra

de

ag

ree

me

nts

de

sig

ne

d a

nd

exe

cute

d

� #

Of

go

vern

me

nt

off

icia

ls

tra

ine

d

� #

Of

tra

de

-re

late

d i

nst

itu

-ti

on

s (M

inis

trie

s re

spo

n-

sib

le f

or

tra

de

an

d r

ela

ted

is

sue

s) a

ssis

ted

0 0

15

0

10

� Li

st o

f p

ar-

tici

pa

nts

an

d

ag

en

da

s o

f th

e t

rain

ing

p

rog

ram

� D

ocu

me

nts

sh

ow

ing

pro

-g

ress

in

im-

ple

me

nta

tio

n

of

tra

de

a

gre

em

en

ts

� D

ocu

me

nt

an

aly

sis

An

nu

ally

DE

SD

32

20

G

en

de

r se

nsi

tiv

e

cap

aci

ty

bu

ild

ing

pro

gra

m d

eli

ve

red

to

co

un

-

try

off

icia

ls f

or

the

su

sta

ina

ble

use

of

na

tura

l re

sou

rce

s (w

ate

r,

soil

,

lan

d,

ren

ew

ab

le

en

erg

y,

bio

div

er-

sity

) to

pro

mo

te t

rad

e o

pp

ort

un

itie

s

� #

Of

tra

inin

g t

oo

l ki

ts f

or

the

su

sta

ina

ble

u

se

of

na

tura

l re

sou

rce

s in

tra

de

pro

vid

ed

to

co

un

try

o

ffi-

cia

ls

� #

O

f co

un

try

off

icia

ls

(M/F

) tr

ain

ed

in

tr

ad

e

go

od

s a

nd

se

rvic

es

in L

AC

taki

ng

in

to

acc

ou

nt

the

sust

ain

ab

le

use

o

f re

-

sou

rce

s

3

40

1

5

60

1

� B

en

efi

cia

rie

s

� In

ter-

Am

eri

can

N

etw

ork

P

art

ne

r o

r-g

an

iza

tio

ns

� G

ove

rnm

en

t p

olic

y st

ate

-m

en

ts a

nd

d

ocu

me

nts

� G

ove

rnm

en

t st

ati

stic

al r

e-

po

rts

� R

ep

ort

s o

f In

-te

r-g

ove

rnm

en

tal

org

an

iza

tio

ns

� R

ep

ort

s o

f te

chn

ica

l as-

sist

an

ce a

nd

tr

ain

ing

s su

bm

itte

d b

y p

art

icip

ati

ng

g

ove

rnm

en

t o

ffic

ials

� A

na

lysi

s o

f re

cord

s a

nd

d

ocu

me

nts

� In

terv

iew

s w

ith

me

m-

be

rs o

f: I

nte

-g

rate

d W

ate

r R

eso

urc

es

Ne

two

rk;

In-

ter-

Am

eri

can

D

isa

ste

r M

iti-

ga

tio

n N

et-

wo

rk;

Inte

r-A

me

rica

n

Bio

div

ers

ity

Ne

two

rk;

En

-e

rgy

an

d c

li-

ma

te P

art

-n

ers

hip

of

the

Am

eri

cas

an

d E

nvi

ron

-m

en

tal l

aw

, P

olic

y a

nd

G

ove

rna

nce

N

etw

ork

re

-sp

ect

ive

ly,

ad

min

iste

red

b

y th

e O

AS-

DSD

� Fi

eld

re

-se

arc

h

� Li

tera

ture

re

-vi

ew

s

An

nu

ally

D

SD

Page 27: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

24

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

33

10

Tra

inin

g p

rov

ide

d t

o S

ME

s to

ad

op

t so

cia

lly

an

d e

nv

iro

nm

en

tall

y

resp

on

sib

le

bu

sin

ess

p

ract

ice

s a

nd

esp

eci

all

y g

en

de

r se

nsi

tiv

e p

ract

ice

s

� ��� #

of

SME

s tr

ain

ed

on

re

-

spo

nsi

ble

b

usi

ne

ss

pra

c-

tice

s in

ta

rge

ted

se

c-

tors

/co

un

trie

s

� ��� #

of

tra

inin

g m

od

ule

s fo

-

cuse

d o

n g

en

de

r e

qu

alit

y

for

SME

s

80

0

0

11

00∗ ∗∗∗

1

� Li

st o

f p

ar-

tici

pa

nts

� T

rain

ing

Cu

r-ri

cula

/ma

teri

als

� B

usi

ne

ss a

s-so

cia

tio

ns

� Lo

cal C

SR o

r-g

an

iza

tio

ns

� C

om

pa

nie

s a

nn

ua

l re

-p

ort

s

� D

ocu

me

nta

-ti

on

Re

vie

w

An

nu

ally

D

ESD

33

20

C

SR

co

mm

un

ity

o

f p

ract

ice

cre

ate

d t

o f

aci

lita

te k

no

wle

dg

e e

x-

cha

ng

e

� ��� C

SR

com

mu

nit

y o

f p

rac-

tice

cre

ate

d

� ��� #

of

me

mb

ers

pa

rtic

ipa

t-

ing

in

th

e C

SR c

om

mu

nit

y

of

pra

ctic

e

0 0

1

75∗ ∗∗∗

� P

ress

re

lea

se

� P

roje

ct m

on

i-to

rin

g r

ep

ort

s

� R

evi

ew

of

Me

dia

/Pre

ss

Re

po

rts

An

nu

ally

D

ESD

34

10

Tra

inin

g p

rov

ide

d t

o t

he

ju

di-

cia

ry a

nd

oth

er

pu

bli

c o

ffic

ials

in

th

e

ap

pli

cati

on

o

f in

tern

ati

on

al

com

-

me

rcia

l a

rbit

rati

on

an

d t

he

lo

cal

en

-

forc

em

en

t o

f fo

reig

n j

ud

gm

en

ts a

nd

arb

itra

l a

wa

rds

� #

o

f ju

dic

iary

m

em

be

rs

tra

ine

d

on

co

mm

erc

ial

arb

itra

tio

n

pro

ced

ure

s

an

d e

nfo

rce

me

nt

� #

o

f p

ub

lic

off

icia

ls

tra

ine

d o

n f

ore

ign

ju

dg

e-

me

nts

an

d a

rbit

ral a

wa

rds

� #

of

cou

ntr

ies

wh

ere

th

e

tra

inin

g

ha

s b

ee

n

rep

li-

cate

d b

y tr

ain

ed

off

icia

ls

0 0 0

75

*

15

4

� P

roje

ct r

e-

po

rts

� Su

rve

ys

of

ju-

dic

iary

me

m-

be

rs a

nd

pu

b-

lic o

ffic

ials

� R

evi

ew

of

re-

po

rts

An

nu

ally

D

IL

∗ M

idte

rm:

Ne

w D

ata

∗ M

idte

rm:

Ne

w D

ata

Page 28: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

25

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

41

10

Mo

nit

ori

ng

im

ple

me

nta

tio

n o

f

ag

ree

d

com

mit

me

nts

o

n

wo

me

n’s

rig

hts

un

de

rta

ke

n

� ��� #

o

f co

un

trie

s re

po

rtin

g

on

th

eir

eff

ort

s to

mo

ni-

tor

the

im

ple

me

nta

tio

n o

f

ag

ree

d

com

mit

me

nts

o

n

wo

me

n’s

rig

hts∗

0

3

� Fu

ture

C

ED

AW

re

-p

ort

s (t

ha

t in

corp

ora

te

the

ne

w

rig

hts

-ba

sed

in

dic

ato

rs)

� O

the

r m

on

i-to

rin

g r

ep

ort

s (t

ha

t in

corp

o-

rate

th

e n

ew

ri

gh

ts-b

ase

d

ind

ica

tors

)

� Sy

ste

m o

f in

-d

ica

tors

an

d

ba

seli

ne

in

-fo

rma

tio

n

pu

bli

she

d o

n

CIM

We

bsi

te

� D

ocu

me

nt

an

aly

sis

An

nu

ally

(a

s re

po

rts

be

-co

me

ava

il-a

ble

– f

re-

qu

en

cy v

ari

es

by

cou

ntr

y)

CIM

/OA

S

41

20

R

eg

ion

al

ass

ess

me

nt

of

Na

-

tio

na

l M

ach

ine

rie

s fo

r T

he

A

d-

va

nce

me

nt

of

Wo

me

n

un

de

rta

ke

n

an

d r

eco

mm

en

da

tio

ns

dis

sem

ina

ted

� ��� #

o

f co

un

trie

s th

at

re-

spo

nd

to

th

e

dia

gn

ost

ic

qu

est

ion

na

ire

a

nd

p

ar-

tici

pa

te i

n p

ers

on

al

inte

r-

vie

ws

� ��� D

eb

ate

o

n

reco

mm

en

da

-

tio

ns

dis

cuss

ed

d

uri

ng

CIM

A

sse

mb

ly

of

De

le-

ga

tes

(sc

he

du

led

fo

r fa

ll

20

15

)

0 0

8 1

� Q

ue

stio

n-

na

ire

re

-sp

on

ses

� A

ctio

n

pla

ns/

pro

gra

ms

� P

roje

ct p

ro-

po

sals

� C

IM A

sse

m-

bly

of

De

le-

ga

tes

me

et-

ing

ag

en

da

� C

IM A

sse

m-

bly

of

De

le-

ga

tes

Min

-u

tes

� D

ocu

me

nt

an

aly

sis

� Li

tera

ture

re

-vi

ew

� Q

ue

stio

n-

na

ire

s

An

nu

ally

C

IM/O

AS

∗ M

idte

rm:

Mo

dif

ied

In

dic

ato

r

Page 29: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

26

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

42

10

M

on

ito

rin

g

the

im

ple

me

nta

-

tio

n o

f th

e B

ele

m d

o P

ara

Co

nv

en

-

tio

n u

nd

ert

ak

en

� ��� N

um

be

r o

f co

un

trie

s p

ar-

tici

pa

tin

g in

th

e m

on

ito

r-

ing

pro

cess

usi

ng

th

e s

ys-

tem

of

rig

hts

-ba

sed

ind

i-

cato

rs a

nd

ba

selin

e in

-

form

ati

on

* ∗

0

1

0∗ ∗∗∗

� Fu

ture

Be

lem

d

o P

ara

re

-p

ort

s (t

ha

t in

corp

ora

te

the

ne

w

rig

hts

-ba

sed

in

dic

ato

rs)

� Sy

ste

m o

f in

-d

ica

tors

an

d

ba

seli

ne

in

-fo

rma

tio

n

pu

bli

she

d o

n

ME

SEC

VI

We

bsi

te

� D

ocu

me

nt

an

aly

sis/

lit

-e

ratu

re r

e-

vie

w

� Q

ue

stio

n-

na

ire

s

An

nu

ally

C

IM/O

AS

42

20

T

rain

ing

p

rov

ide

d

to

go

ve

rn-

me

nt

off

icia

ls

on

th

e

imp

lem

en

ta-

tio

n o

f B

ele

m d

o P

ara

� ��� N

um

be

r o

f tr

ain

ing

cou

rse

s d

eliv

ere

d f

or

the

mo

nit

ori

ng

o

f th

e

Be

lem

do

Pa

ra C

on

ven

tio

n∗

� ��� #

of

go

vern

me

nt

off

icia

ls

(M/F

) tr

ain

ed

in

th

e

mo

nit

ori

ng

o

f th

e

Be

lem

do

Pa

ra C

on

ven

tio

n

0 0

6

18

0∗ ∗∗∗

� M

an

ua

ls,

ag

en

da

s a

nd

lis

ts o

f p

ar-

tici

pa

nts

fro

m

tra

inin

g

cou

rse

s

Eva

lua

tio

n

qu

est

ion

na

ire

s fr

om

th

e t

rain

-in

g c

ou

rse

s

An

nu

ally

C

IM/O

AS

51

10

T

oo

ls

en

ha

nce

d

to

ma

na

ge

da

ta

on

m

an

da

tes,

e

xe

cute

d

re-

sou

rce

s, a

nd

ach

iev

ed

re

sult

s in

clu

d-

ing

ge

nd

er-

spe

cifi

c re

sult

s, a

nd

su

p-

po

rt

pro

vid

ed

to

fa

cili

tate

re

sult

s-

ba

sed

ma

na

ge

me

nt

by

OA

S/G

S

� Sy

ste

m

up

gra

de

d

to

link

exe

cute

d

bu

dg

et

an

d

ach

ieve

d r

esu

lts

� %

of

are

as

ad

vise

d o

n f

or-

mu

lati

ng

, ca

ptu

rin

g

an

d

cla

ssif

yin

g

resu

lts

at

the

thre

e

leve

ls

of

ou

tco

me

s,

incl

ud

ing

g

en

de

r sp

eci

fic

ou

tco

me

s w

hic

h

ha

ve

re-

vise

d r

esu

lts

0 0

1

10

0%

� B

ud

ge

t w

ith

info

rma

tio

n

ava

ilab

le o

n

exe

cute

d

bu

dg

et

an

d

ach

ieve

d r

e-

sult

s

� D

PE

Re

po

rt

on

Pro

gre

ss

of

Pro

ject

Imp

lem

en

ta-

tio

n (

RP

PI)

� D

ocu

me

nt

an

aly

sis

An

nu

ally

D

PE

∗ M

idte

rm:

Mo

dif

ied

In

dic

ato

r

∗ M

idte

rm:

Ne

w D

ata

∗ M

idte

rm:

Ne

w D

ata

Page 30: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

27

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

51

20

To

ols

an

d s

up

po

rt p

rov

ide

d t

o

OA

S/S

G

Sta

ff

to

faci

lita

te

resu

lts-

ba

sed

pro

ject

fo

rmu

lati

on

, in

clu

din

g

the

in

corp

ora

tio

n o

f g

en

de

r e

qu

ali

ty

resu

lts

in t

he

pro

ject

cy

cle

� U

pg

rad

ed

p

roje

ct

ma

n-

ag

em

en

t sy

ste

m i

ncl

ud

ing

mo

du

les

on

pro

ject

mo

ni-

tori

ng

, p

roje

ct c

ycle

ma

n-

ag

em

en

t a

nd

e

valu

ati

on

pro

cess

ma

de

ava

ilab

le t

o

OA

S/G

S St

aff

� #

of

OA

S/G

S St

aff

tra

ine

d

(M/F

) o

n

resu

lts-

ba

sed

pro

ject

m

an

ag

em

en

t,

in-

clu

din

g i

nco

rpo

rati

ng

ge

n-

de

r e

qu

alit

y in

pro

ject

s

� %

of

pro

ject

s re

gis

tere

d i

n

the

P

roje

ct

Ma

na

ge

me

nt

Syst

em

0

10

0

0

1

35

0

10

0%

� Sy

ste

m M

an

-

ua

l

� Li

sts

of

Pa

r-

tici

pa

nts

an

d

Ag

en

da

� Sy

ste

m r

e-

po

rt

� D

PE

Re

po

rt

on

Pro

gre

ss

of

Pro

ject

Imp

lem

en

ta-

tio

n (

RP

PI)

� D

ocu

me

nt

an

aly

sis

An

nu

ally

D

PE

51

30

SIS

CA

en

ha

nce

d t

o i

nte

gra

te

Inte

r-A

me

rica

n m

inis

teri

al

ma

n-

da

tes,

ge

nd

er

eq

ua

lity

re

late

d

ma

nd

ate

s, a

nd

to

all

ow

se

x d

isa

g-

gre

ga

ted

da

ta a

nd

im

pro

ve

me

nts

in

RB

M r

ep

ort

ing

fo

r m

em

be

r st

ate

s

� ��� #

o

f m

em

be

r st

ate

s

tra

ine

d

in

the

u

se

of

SISC

A

� ��� %

of

OA

S m

em

be

r st

ate

s

an

d

Join

t S

um

mit

W

ork

-

ing

Gro

up

me

mb

ers

usi

ng

SISC

A s

yste

m

� ��� #

of

Inte

r-A

me

rica

n m

inis

-

teri

al

p

roce

sse

s u

sin

g

SISC

A

2

10

%

0

20

60

%

4

� ��� Su

mm

it N

a-

tio

na

l Re

-

po

rts

� ��� JS

WG

re

po

rts

on

Su

mm

it

imp

lem

en

ta-

tio

n

� ��� SI

SCA

� ��� D

ocu

me

nt

an

aly

sis

An

nu

ally

Su

mm

its

Secr

e-

tari

at

52

10

M

an

da

tes

Ma

na

ge

me

nt

Da

-

tab

ase

a

nd

P

lan

nin

g

an

d

Co

ntr

ol

Sy

ste

m

up

da

ted

to

fa

cili

tate

th

e

foll

ow

-up

of

ge

nd

er

eq

ua

lity

ma

n-

da

tes

� G

en

de

r se

nsi

tiv

e

inst

itu

-ti

on

al

crit

eri

a

de

velo

pe

d,

test

ed

a

nd

im

ple

me

nte

d

to m

on

ito

r O

AS

ma

nd

ate

s

� %

o

f in

stit

uti

on

al

ma

n-

da

tes

cate

go

rize

d

ba

sed

o

n t

he

incl

usi

on

of

ge

nd

er

� %

o

f in

stit

uti

on

al

resu

lts

cate

go

rize

d b

ase

d o

n t

he

in

clu

sio

n o

f g

en

de

r

0 0 0

1

10

0%

10

0%

� Sy

ste

m M

an

-

ua

l

� M

MS

Re

po

rt

� D

PE

Re

po

rt

on

Pro

gre

ss

of

Pro

ject

Imp

lem

en

ta-

tio

n (

RP

PI)

� D

ocu

me

nt

an

aly

sis

An

nu

ally

D

PE

Page 31: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

28

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

52

20

Pro

ced

ure

s d

ev

elo

pe

d a

nd

sup

po

rt p

rov

ide

d t

o f

aci

lita

te t

he

inte

gra

tio

n o

f g

en

de

r e

qu

ali

ty c

on

-

sid

era

tio

ns

in O

AS

/SG

pro

gra

ms/

pro

ject

s

� ��� %

o

f te

chn

ica

l a

rea

s (d

e-

pa

rtm

en

ts)

pre

sen

tin

g

pro

ject

p

rop

osa

ls

sup

-

po

rte

d o

n i

nte

gra

tin

g g

en

-

de

r e

qu

ali

ty

in

pro

ject

form

ula

tio

n

an

d

mo

nit

or-

ing

(in

clu

din

g t

he

id

en

tifi

-

cati

on

of

ge

nd

er

sen

siti

ve

ind

ica

tors

)

� ��� %

o

f e

xte

rna

l p

roje

ct

eva

lua

tio

ns

coo

rdin

ate

d

by

the

DP

E w

hic

h i

nco

rpo

-

rate

a g

en

de

r e

qu

alit

y p

er-

spe

ctiv

e

in

the

ir

de

sig

n

an

d im

ple

me

nta

tio

n p

lan

17

%

10

0%

5

0%

10

0%

� P

roje

ct

do

cum

en

ts

� T

erm

s o

f R

ef-

ere

nce

fo

r

Eva

lua

tio

ns

� D

PE

Re

po

rt

on

Pro

gre

ss

of

Pro

ject

Imp

lem

en

ta-

tio

n (

RP

PI)

� ��� D

ocu

me

nt

an

aly

sis

An

nu

ally

D

PE

/CIM

53

10

Qu

ali

tati

ve

an

d q

ua

nti

tati

ve

too

ls,

info

rma

tio

n,

an

d a

na

lysi

s

ge

ne

rate

d a

nd

ap

pli

ed

to

im

pro

ve

SA

PE

M

� #

o

f O

AS/

GS

de

cisi

on

ma

kers

usi

ng

th

e S

AP

EM

me

cha

nis

m

� #

of

an

aly

tica

l p

rod

uct

s g

en

era

ted

(p

olit

ica

l b

rie

fin

gs

an

d

de

-b

rie

fin

gs)

2

40

7

10

0

� R

ep

ort

s

� M

ed

ia

� M

em

be

r st

ate

s

� O

ffic

e o

f SG

� O

AS

Secr

eta

r-ie

s

� SG

en

voys

� D

esk

off

ice

rs

� P

rese

nta

tio

ns

� Su

rve

ys

� A

na

lysi

s o

f re

po

rts

� In

terv

iew

s

� Fo

cus

gro

up

s

� A

na

lysi

s o

f su

rve

ys

� M

ed

ia m

on

i-to

rin

g

Sem

i-a

nn

ua

lly

DSD

SM

Off

ice

of

the

Se

c-re

tary

Ge

ne

ral

53

20

Re

com

me

nd

ati

on

s fr

om

pre

vi-

ou

s cr

isis

ma

na

ge

me

nt

an

d r

eso

lu-

tio

n c

ase

s co

nsi

de

red

by

OA

S/G

S

de

cisi

on

ma

ke

rs a

nd

en

vo

ys

du

rin

g

ne

w c

risi

s si

tua

tio

ns

in t

he

LA

C r

e-

gio

n

� P

erc

ep

tio

n

of

OA

S/G

S

de

cisi

on

ma

ke

rs a

nd

en

-

voys

o

n

the

u

sefu

lne

ss

of

the

re

com

me

nd

ati

on

s

0

At

lea

st 5

0 %

of

the

su

rve

ye

d

OA

S/G

S d

eci

sio

n

ma

ke

rs c

on

sid

er

the

re

com

me

nd

a-

tio

ns

use

ful

� O

AS/

GS

de

ci-

sio

n m

ake

rs

� E

nvo

ys

� Su

rve

ys

� A

na

lysi

s o

f Su

rve

ys

An

nu

ally

O

ffic

e o

f SG

Page 32: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

29

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

54

10

Tra

inin

g,

ob

serv

ati

on

of

un

de

r-

rep

rese

nte

d g

rou

ps

me

tho

do

log

y,

an

d d

ata

ba

ses

de

sig

ne

d a

nd

im

ple

-

me

nte

d f

or

OA

S E

lect

ora

l O

bse

rva

-

tio

n t

ea

ms

� #

of

da

tab

ase

s p

rod

uce

d

on

EO

M s

yste

ma

tic

da

ta

an

d

reco

mm

en

da

tio

ns

for

use

o

f D

EC

O/E

OM

sta

ff

� #

of

OA

S o

bse

rve

rs c

ert

i-

fie

d/t

rain

ed

o

n

the

me

tho

do

log

y fo

r o

bse

rv-

ing

e

lect

ion

s in

th

e

he

mis

ph

ere

� E

OM

ob

serv

ati

on

me

th-

od

olo

gy

tha

t m

ea

sure

s

the

e

qu

al

op

po

rtu

nit

y

for

pa

rtic

ipa

tio

n

of

un

-

de

rre

pre

sen

ted

g

rou

ps

in e

lect

ora

l pro

cess

es

0 0 0

1∗ ∗∗∗

10

0

1

� D

ata

ba

se r

e-

po

rts

� O

bse

rve

r tr

ain

ing

co

urs

e r

e-

po

rts

� D

EC

O p

ub

li-ca

tio

ns

� ��� A

na

lysi

s o

f

rep

ort

s a

nd

pu

bli

cati

on

s

An

nu

ally

DE

CO

55

10

Re

com

me

nd

ati

on

s fr

om

vir

-

tua

l a

nd

fa

ce-t

o-f

ace

co

nsu

lta

tio

ns

pre

sen

ted

to

OA

S m

em

be

r st

ate

s in

the

po

licy

-ma

kin

g p

roce

ss (

i.e

.

Su

mm

it I

mp

lem

en

tati

on

Re

vie

w

Gro

up

-SIR

G)

� ��� #

o

f p

rese

nta

tio

ns

ma

de

to O

AS

me

mb

er

sta

tes

by

sta

keh

old

ers

� ��� #

o

f Su

mm

it-r

ela

ted

re

c-

om

me

nd

ati

on

s fr

om

co

n-

sult

ati

on

s p

rese

nte

d

to

OA

S m

em

be

r st

ate

s fo

r

con

sid

era

tio

n

in

the

n

e-

go

tia

tio

n o

f Su

mm

it p

ro-

gra

ms

an

d m

an

da

tes

5 a

nn

ua

lly

15

0 a

nn

ua

lly

7 a

nn

ua

lly

20

0 a

nn

ua

lly

� ��� R

ep

ort

s, r

e-

sou

rce

s a

nd

oth

er

inp

uts

fro

m s

take

-

ho

lde

rs

� ��� M

ee

tin

g

ag

en

da

s a

nd

oth

er

off

icia

l

me

eti

ng

do

cum

en

ts

� ��� D

ocu

me

nt

an

aly

sis

An

nu

ally

SE

R a

nd

Su

mm

its

Secr

eta

ria

t

∗ M

idte

rm:

Ne

w D

ata

Page 33: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Pe

rfo

rma

nce

Me

asu

rem

en

t Fr

am

ew

ork

(P

MF)

30

R

ev

ise

d A

pri

l 1

5,

20

15

Ex

pe

cte

d R

esu

lts1

In

dic

ato

rs2

Ba

seli

ne

Da

ta

Ta

rge

ts3

Da

ta

So

urc

es

Da

ta

Co

lle

ctio

n

Me

tho

ds

Fre

qu

en

cy

R

esp

on

sib

ilit

y

55

20

Co

nsu

lta

tio

ns

wit

h a

ba

lan

ced

reg

ion

al

rep

rese

nta

tio

n o

f st

ak

e-

ho

lde

rs f

aci

lita

ted

to

pre

pa

re r

ec-

om

me

nd

ati

on

s, i

ncl

ud

ing

Ge

nd

er

sen

siti

ve

re

com

me

nd

ati

on

s to

be

pre

sen

ted

to

OA

S M

em

be

r S

tate

s

� ��� N

um

be

r o

f st

ake

ho

lde

rs

(in

stit

uti

on

s)

by

sub

re

-

gio

n

pa

rtic

ipa

tin

g

in

the

con

sult

ati

on

s h

eld

wit

hin

the

fra

me

wo

rk o

f th

e O

AS

po

litic

al p

roce

sse

s∗

� ��� #

of

Ge

nd

er

sen

siti

ve r

ec-

om

me

nd

ati

on

s p

rese

nte

d

to t

he

OA

S/G

S in

pre

pa

ra-

tio

n

to

the

O

AS/

GA

a

nd

min

iste

ria

l me

eti

ng

s*

N.A

me

rica

= 1

52

(2

8%

)

C.A

me

rica

(+

Me

x &

DR

) =

13

0 (

24

%)

S.A

me

rica

= 2

21

(4

0%

)

Ca

rib

be

an

= 2

6 (

5%

)

Oth

er

= 1

7 (

3%

)*

2

7/1

18

re

com

me

nd

a-

tio

ns

(23

%)*

N.A

me

rica

= 1

55

(27

%)

C.

Am

eri

ca (

+M

ex

&

DR

) =

13

0 (

22

%)

S.A

me

rica

= 2

50

(43

%)

Ca

rib

be

an

= 3

0 (

5%

) O

the

r =

17

(3

%)*

35

/15

0 r

eco

mm

en

-d

ati

on

s (2

3%

)*

� ��� A

ge

nd

as,

list

s

of

pa

rtic

i-

pa

nts

, re

-

po

rts

& r

ec-

om

me

nd

a-

tio

ns

fro

m

the

pre

pa

ra-

tory

me

eti

ng

s

� ��� C

om

pila

tio

ns

of

sta

ke-

ho

lde

r re

c-

om

me

nd

a-

tio

ns

an

d

de

cla

rati

on

s

an

d r

eso

lu-

tio

ns

ad

op

ted

by

OA

S

me

mb

er

sta

tes

� ��� A

na

lysi

s o

f

pre

pa

rato

ry

me

eti

ng

re

-

cord

s/d

ocu

m

en

ts

� ��� R

evi

ew

of

list

of

pa

rtic

i-

pa

nts

An

nu

ally

D

IA

∗ M

idte

rm:

Ne

w D

ata

1.

Fro

m L

og

ic M

od

el

2.

Ge

nd

er

an

d E

nvir

on

me

nt

wh

ere

po

ssib

le

3.

Incl

ud

ing

tim

e r

an

ge

(w

he

re p

oss

ible

)

Yo

u c

an

acc

ess

dte

rms

an

d d

efi

nit

ion

s to

he

lp y

ou

fill

ou

t th

is d

ocu

me

nt.

∗ ∗∗∗ M

idte

rm

Page 34: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS COOPERATION

PROJECT MANAGEMENT PLAN 2012-2014

July 31, 2012

Page 35: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

2

1. Introduction …………………………………………………………………………………………………………………………………..3

2. Project Design and Implementation ……………………………………………………………………………………………….5

2.1 Gender Equality Strategy……………………………………………………………………………………………………………….6

2.2 Reach-Beneficiaries and Intermediaries/Partners and Roles…………………………………………………………11

3. Project Management and Governance……………………………………………………………………………………………17

3.1 Team Structure, Roles and Responsibilities……………………………………………………………………………………18

4. Result-Based Monitoring, Evaluation and Reporting………………………………………………………………………..22

4.1 Monitoring and Evaluation Strategy…………………………………………………………………………………………….…23

4.2 Environmental Strategy………………………………………………………………………………………………………………….26

5. Communications Plan……………………………………………………………………………………………………………………….30

Annexes (Updated July 31, 2012)

Annex 1 – Logic Model

Annex 2- Performance Measurement Framework

Annex 3- Risk Register

Annex 4- Budget

Annex 5- 2012/2013 Annual Work plan by Immediate Outcome

Annex 6- Reporting Templates

Table of Contents

Page 36: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

3

Context and Rationale

As the region’s leading multilateral political forum, the Organization of American States (OAS) has been

entrusted by the Government of Canada through its Canadian International Development Agency (CIDA) to

carry out a series of programs and activities. Based on a regional approach the OAS thanks to the financial

support of CIDA (CDN $ 19.500.000). The OAS Cooperation Plan (Grant Arrangement), signed by the OAS/GS

and the Government of Canada on March 30th, 2012 is designed to:

- Strengthen national electoral systems and processes

- Improve standardized and harmonized policies and regulatory frameworks related to the business

environment

- Improve market access and participation in regional and global trade for member states

- Strengthen the application of human rights instruments related to gender equality by member

states

- Improve the institutional capacity of the OAS

Through a series demand driven programs and projects aimed to strengthen the institutional capacity of the

OAS member states, to better address and accomplish the goals established in their own national plans and

agendas.Using the comparative advantages of a regional organization, the OAS will undertake regional-level

and country-level capacity-building activities, as per demand and needs assessments, to address specific

sector gaps to:

Increase business development through standardized and harmonized policies and regulatory frameworks

Activities will include technical assistance for drafting and the adoption at country level of gender-sensitive

public policies and legislation for business development (especially for MSMEs); the promotion of public-

private partnerships that facilitate responsible business practices; technical assistance to address

management bottlenecks related to policy-making processes; the reform of secured transaction systems;

and measures to fight corruption and promote transparency.

Improve government and private sector capacity to access regional and global trade

The OAS will work with the private sector to modernize their production processes and marketing strategies

so they can capture a larger share of national, regional, and international markets. Training will be provided

to government officials and the judiciary on negotiating & implementing trade agreements; and on

understanding and applying international commercial arbitration procedures.

Strengthen national electoral systems and processes

Technical assistance will be provided to national Electoral Management Bodies to improve their

management practices, working towards ISO standard certification. (No international election observation

missions will be financed by this project).

1. INTRODUCTION

Page 37: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

4

Strengthen the application of human rights instruments related to gender equality

Technical assistance to national governments will focus on the development and adoption of public

policies, including budget instruments, which address social and economic issues affecting women; and

the implementation and monitoring of the “Belem do Para Convention” dealing with violence against

women.

Improve the effectiveness of the OAS in fulfilling its mandate

In keeping with Canada’s objective of strengthening key hemispheric partners, activities will include:

enhancing the OAS capacity to manage and budget for results, including gender-based programming and

results; monitoring and evaluation to better report on progress against results; increasing the quality and

timeliness of the OAS political analysis system; increasing the effectiveness of the OAS Good Offices

missions in the region to resolve political crises; improving the management and effectiveness of OAS

electoral observation missions, including gender based reporting; and facilitating consultations with

member states and stakeholders to increase their input into policy and decision making processes.

Structure

To support the proper execution of the OAS Cooperation Plan, a series of measures and actions must be

carried out to deliver upon the agreed results taking into account the Result Based Management

Programming (RBM) guidelines provided by CIDA. Among which includes the design of a Project

Management Plan (PMP) which will be a stand-alone document, describing how the development

initiative will be implemented and managed, the PMP includes the following:

Project Design and Implementation

Presents detailed information on the implementation of the gender strategy as well as an updated version

of the working documents (Performance Management Framework/PMF and Logic Model/LM) included

within the grant arrangement, as well an annual work plan, broken down by immediate outcomes.

Project Management and Governance

This section includes a proposed project management structure with the roles and responsibilities of the

OAS, also the roles of the project partners (institutions and local counterparts) and the composition of the

project steering committee with its roles and responsibilities as well.

Result-based Project Monitoring, Evaluation, Reporting

This section includes the activities and responsibilities to be carried out by the participating programs and

OAS core teams in the management structure according to the five work areas identified in the Project

Management Plan (PMP); planning, monitoring, reporting, evaluation and communication.

1. INTRODUCTION

Page 38: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

5

Updated Logic Model and Performance Management Framework

This set of working documents have become key tools for the OAS technical teams participating in the OAS

Cooperation Plan; for they have facilitated the structuring of result based activities. They also serve as one

of the monitoring instruments of the Department of Planning and Evaluation (DPE) as well as the main

guidelines for the Technical Secretariat.

As part of the OAS Cooperation plan these set of documents are in constant review and consideration by

the technical teams; the definition of Baselines and Targets have suffered minor updates (3100, 3200,

3220 and 5100). The majority of the programs rely on the initial disbursement to carry out sub-activities

such as surveys, studies, and diagnostics (See Annex 5 Annual Work plan) that will allow them to

determine the current numbers and goals for their projects, to be included as part of the Baselines and

Targets in the PMF.

The OAS monitoring teams (DPE/TS) have pressed for this information to be available in the following

weeks.

For the updated version of the LM See Annex- 1

For the updated version of the PMF See Annex- 2

Updated risks and risk mitigation responses

Revised versions of the OAS Cooperation Plan risk register are included yet the previously identified risks

remain:

Operational Risks

Operational risk 1: Human resources

Operational risk 2: Performance management

Operational risk 3: Information systems

Financial Risks

Financial risk 1: Funding

Financial risk 2: Budget execution/fiduciary

Financial risk 3: Contractual instrument

Development Risks

Development risk 1: Strategic direction and policy coherence

Development risk 2: Socio-political, economic, gender equality, etc.

Development risk 3: Institutional capacity and governance

Development risk 3: Natural disasters, environment, and health deterioration

Reputation Risks

Reputation risk 1: Reputation and stakeholder confidence

For the updated version of the Risk Register See Annex3

2. Project Design and Implementation

Page 39: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

6

OAS Cooperation Plan Gender Equality Strategy

Context

Gender mainstreaming has been a facet of the work of development organizations since the adoption of

the Declaration and Platform for Action of the Fourth World Conference on Women (Beijing, 1995).1 This

was reinforced two years later within the United Nations by the adoption of the ECOSOC Agreed

Conclusions on Gender Mainstreaming.2

Fifteen years later, progress on gender mainstreaming has been uneven, and is not well understood,

largely as a result of lack of attention to issues such as accountability, reporting and consistent monitoring

and evaluation. A number of international organizations, governments, donor organizations and other

bodies have made both general and specific commitments – adopted policies, action plans, guidelines,

conducted trainings, identified indicators and conducted five- and ten-year evaluations. Still we have the

idea that gender mainstreaming as a strategy has had little impact on the extent to which gender equality

and women’s rights are made explicit as development goals or as organizational priorities.

OAS and Gender Equality

Within the Organization of American States (OAS), ten years of work on gender mainstreaming – within

the framework of the Inter-American Program on the Promotion of the Human Rights of Women and

Gender Equity and Equality (IAP, 2000) and with the support of the Governments of various Member

States, Permanent Observers and other donors – have had some effect. There is a general level of

awareness within the organization of the importance of gender equality and women’s rights, and a

growing body of institutional knowledge and expertise within specific issue areas. However, there is still

significant confusion over the purpose of “gender mainstreaming,” how it is to be done and who is

responsible for it, with the result that efforts to take gender equality and women’s rights into account

remain sporadic, and largely dependent on the will of individual staff members.3

As the entity within the OAS charged with the implementation and follow-up of the IAP, the Inter-

American Commission of Women (CIM) has led organizational gender mainstreaming efforts over the last

decade, in close coordination with the OAS’ Department of Planning and Evaluation (DPE) - though in both

cases these efforts have been made with few human and financial resources and little capacity to provide

consistent follow-up or evaluation.

1 The Beijing Platform for Action highlights the mainstreaming of gender issues as a priority for each one of its 12 Critical Areas of Concern.

2 “Mainstreaming the gender perspective into all policies and programmes in the United Nations System:”

http://www.un.org/documents/ecosoc/docs/1997/e1997-66.htm 3 Bonder, G. and S. Huyer. “Knowledge baseline and needs assessment: OAS Gender Mainstreaming Programme.” Washington DC: Inter-American

Commission of Women, 2010.

2.1 Gender Equality Implementation Strategy

Page 40: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

7

Steps towards Gender Equality

Since 2007, more concrete progress has been made on gender mainstreaming within the OAS as a result

of the implementation of the OAS/CIDA Cooperation Plan 2008-2011. In particular, one of the specific

components of the programme, “Project 4.1: Incorporation of gender analysis and gender equity and

equality as crosscutting topics and objectives in all OAS programs,” contributed to:4

Building capacity on gender; a training needs assessment on gender equity and equality was conducted

with OAS staff to identify gaps in knowledge and opportunities for capacity development and, a training

workshop was developed and a guide for the integration of a gender perspective in policies, programs and

projects in the OAS was prepared and published. In addition, a more in-depth workshop was organized

with “gender facilitators” from different OAS departments, designated by their Department head as the

“focal point” for gender issues.

Developing gender indicators; as a result of this project led by the Department of Planning and Evaluation

(DPE), a module on gender indicators was designed and included within the Handbook on Mainstreaming

Gender Equality which was included in the OAS Project Cycle

Developing an online course; on gender mainstreaming in projects and policies was developed based on

the manual prepared for the workshops, as well as the above-mentioned manual on incorporating gender

in OAS projects, prepared by the DPE

Developing an online information system/community of practice; to foster dialogue and exchange of

information on gender mainstreaming in OAS work among the workshops participants and staff members,

the CIM established a virtual space “OAS Gender Community of Practice”.; and

Bringing a gender equality focus to the mandates of the OAS; CIM and DPE conducted a classification of

OAS mandates according to gender equality concerns and identified gaps in order to orient future policy

and advocacy work, and did follow-up work on specific priorities and gender-responsive language to the

Summit Implementation Review Group.

4 Evaluation of the OAS/CIDA Cooperation Plan 2008-2011: Final Report. Universalia Management Group, March 2012, p.38

2.1 Gender Equality Implementation Strategy

Page 41: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

8

Building on Lesson Learnt

At this juncture, ten years of organizational learning on gender mainstreaming, much of it gathered as a

result of the OAS/CIDA Cooperation Plan 2008-2011, have indicated that it is essential to broaden the

focus of gender mainstreaming efforts and the way in which they are implemented in order to generate

stronger, more sustainable and more effective organizational action on gender equality and women’s

rights in the Americas.

In addition to strengthening institutional capacity to implement results-based management, the OAS

Cooperation Plan 2012-2015 (CIDA 2) aims to reinforce the institutionalization of an effective response to

gender equality and women’s rights issues in the work of the Organization. In particular, the

implementation of the Plan will proceed from the understanding that it is not enough to make general

political commitments to these issues and then attempt to instill a basic understanding of them in lower-

level technical personnel who may or may not remain with the Organization. Building on the

achievements of the first OAS/CIDA Programme, the institutionalization of a gender equality and

women’s rights approach goes beyond these efforts and concentrates on building the capacity of the

institution to respond to the rights and demands of women in the Americas. The institutionalization of a

gender equality and women’s rights approach focuses in particular on following aspects:

- Building high-level political will, commitment and accountability

- An organizational understanding, and position, on gender equality and women’s rights

- Clear, and obligatory, policy, programming and project guidelines

- Consistent and open dialogue among staff, supported by capacity-development

- Space for evaluation and recognition of ongoing work, support and exchange of ideas

Please Note the evaluation of the OAS/CIDA Cooperation Plan 2008-2011 mentions:

All OAS staff members interviewed noted that the project encouraged OAS efforts to advance gender

mainstreaming within the OAS’s policies and programs. It reinforced gender mainstreaming as a

priority issue within the work of the organization. A greater willingness on the part of OAS departments

to incorporate gender dimensions and objectives into project documents, as well as a greater demand

from OAS staff for technical support have been observed.5

5 Ibid., p.39

2.1 Gender Equality Implementation Strategy

Page 42: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

9

Next Steps Gender Equality Strategy 2012-2014

For the OAS Cooperation Plan the following specific components will be carried out:

1. Inclusion of gender equality and women’s rights issues in all project profiles related to the

implementation of the OAS Cooperation Plan 2012-2015 (CIDA 2)

The OAS has institutionalized the integration of gender equality and women’s rights concerns into

its project approval and implementation process, to the extent that all project profiles are

evaluated by DPE, a project evaluation working group and finally by a Project Evaluation

Committee (PEC), that is composed of senior-level managers, from a gender equality and women’s

rights perspective. At the moment, the technical assistance for this process is provided by CIM

and DPE.

Using this formulation and approval process, all of the project profiles related to the OAS

Cooperation Plan 2012-2015 (CIDA 2) will be subject to evaluation by technical experts from CIM

and DPE in order to ensure that gender equality and women’s rights concerns are incorporated

into the problem analysis, project objectives, activities and indicators.

2. Inclusion of a gender equality and women’s rights component in the project reporting and follow-up

process

As part of the results-based management strategy applied to the OAS Cooperation Plan 2012-2015

(CIDA 2), each project will be required to periodically report on its implementation and the results

achieved. A specific template will be prepared by DPE in order to facilitate this process, on the

basis of the Performance Measurement Framework (PMF) agreed with CIDA.

The template will include a specific section on gender equality and women’s rights results, and

projects will be required to report, on the basis of the objectives, activities and indicators that

they set out in the beginning, on the extent to which the project has contributed to advancing

gender equality and women’s rights.

These specific gender equality results will then feed into the global annual reporting on the

implementation of the OAS Cooperation Plan 2012-2015 (CIDA 2). During the implementation of

the plan, attention will be given to the collection of information, the documentation of results and

the identification, at the evaluation stage, of challenges and lessons learned regarding gender

equality and women’s rights considerations in the context of the Plan.

2.1 Gender Equality Implementation Strategy

Page 43: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

10

3. Inclusion of gender equality results or “achievements” in the Plan’s communication strategy

The implementation of the OAS Cooperation Plan 2012-2015 (CIDA 2) will be accompanied by a

communication strategy that emphasizes the concrete results and impacts of the Plan. This

communication strategy will include a focus on the specific gender equality and women’s rights

results achieved through all of the Plan’s different projects – beyond those that are directly

related to these issues (Outcome 4000).

This will serve to emphasize both the Plan’s specific contribution to gender equality and women’s

rights goals in the hemisphere, as well as to strengthening the overall image of the OAS as an

organization that responds to women’s rights.

4. Strengthening commitment and accountability to gender equality and women’s rights issues

Finally, to the extent to which the OAS Cooperation Plan 2012-2015 (CIDA 2) strengthens the

OAS’s experience and utilization of results-based management principles and techniques, the Plan

will also strengthen the institutionalization of gender equality and women’s rights concerns in the

programmes and projects of the Organization, ideally providing the OAS with a series of good

practices that can be applied to cooperation with other donors, Members States and Permanent

Observers.

2.1 Gender Equality Implementation Strategy

Page 44: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

11

Intermediate Outcome 1000

Direct beneficiaries

- Electoral Authorities in the 34 Member States

- Department of Electoral Cooperation and Observation (DECO)/ OAS Staff

Indirect Beneficiaries

- Citizens of the 34 Member States

- General Secretariat of the OAS (Secretariat of Political Affairs, Department of Electoral

Cooperation and Observation)

- Groups that conduct research one electoral issues

* Information provided in OAS/CEP Project Profiles May 31, 2012

2.2 Reach-Beneficiaries and Intermediaries

Intermediaries and/or

Institutional Partners

Specific Role

International IDEA Co-organizer of events; the review of the agenda, the selection of high-level speakers and panels for

the development of topics and the declaration of principles. Substantive inputs on standards of

inclusive elections and coordination with the validation of same. In the Inter-American Electoral

Seminars, provides technical knowledge and experience on facilitating group learning, including the

presence in the Seminar of at least one member of the institution.

Université Laval, Quebec, CANADA Academic and methodological advising; design of statistical samples, development of protocols for

data gathering, input and cleansing of data, preparation of graphs and production of report on the

socio-demographic profile of voters.

Organization for Security and

Cooperation in Europe (OSCE)

Substantive inputs on standards for inclusive elections and coordination with the validation of same.

European Union Substantive inputs on standards for inclusive elections and coordination with the validation of same.

Inclusion of DECO staff in the trainings of specific members of the Core Group, information sharing

regarding European support to electoral technical cooperation projects in the Americas and

coordinating electoral observation activities when EOMs from both organizations are in the same

territory.

African Union Integration of OAS staff in their EOMs to observe the organizational and technical functioning of

those missions.

Office for Democratic Institutions

and Human Rights (ODIHR)-

Organization for Security and

Cooperation in Europe (OSCE)

Exchange of good practices in implementation of electoral observation, evaluation of EOMs, relations

and mechanisms of exchange with national observers, alternatives for mechanisms of subscription to

and tracking of the Declaration of Principles for International Observation.

Electoral Assistance Division of the

United Nations

Exchange of information regarding their experience in administering funds for national observation

groups and alternatives for mechanisms of subscription to and tracking of the Declaration of

Principles for International Observation.

Electoral Office of Jamaica Co-organizer of 2012 Inter-American Meeting of Electoral Management Bodies. Support in the

definition of topics and panelists. Logistical support for the organization of the event.

Instituto Federal Electoral de México Co-organizer of the Inter-American Electoral Seminars. Support in the definition of topics and in the

design of the contents of each edition of the Seminar. The Seminar is carried out within IFE’s

facilities, and the Institute covers the cost of lodging and meals for the participants as well as

providing logistical support for the organization of the event.

ISO 176 Committee Support in the production of an electoral standard.

Page 45: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

12

Intermediate Outcome 2000

Direct beneficiaries

- National and local governments and institutions with MSME development agendas.

- Small and medium enterprises (SMEs) mainly from the extractive sector

- Local CSR organizations, local business associations

- Large companies

- Parliamentarians

- OAS Member State (Cooperation Development Authorities/Agencies/Units) Technical Teams;

Program Managers/Specialists, International Cooperation Directors/Sub directors, South-South

Cooperation Units

Indirect Beneficiaries

- MSMEs, in particular women, youth and vulnerable groups with potential to benefit from their

participation in trade.

- Non-profit organizations

- Local communities

- South-South Cooperation Program of the Ibero-American General Secretariat (SEGIB)

- Special Unit of South Cooperation of UNDP

- Task Team of South-South Cooperation (TT-SSC)

2.2 Reach-Beneficiaries and Intermediaries

Intermediaries and/or Institutional Partners Specific Role

UN Economic Commission for Latin America and

the Caribbean (ECLAC)

Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the

Plans of Action.

CARICOM Secretariat Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the

Plans of Action.

OECS Secretariat Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the

Plans of Action.

Secretariat for Central American Economic

Integration (SIECA)

Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the

Plans of Action.

Foundation to Promote the Competitiveness of

Micro and Small Enterprise in Central America

(CENPROMYPE)

Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the

Plans of Action.

Andean Community Secretariat Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the

Plans of Action.

Latin American Economic System (SELA)

Permanent Secretariat

Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the

Plans of Action.

Inter American Commission on Women (CIM)

Secretariat

The CIM Secretariat has been consulted throughout the design of the

project and will continue to be so during the implementation phase.

National Mechanism for Women in Member States Participate as counterpart institutions as appropriate.

Association of Small Business Development

Centers (ASBDC)

Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the

Plans of Action.

Page 46: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

13

Intermediate Outcome 2000

Intermediaries and/or Institutional Partners Specific Role

Overseas Development Institute (ODI) Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the Plans

of Action.

Andean Development Corporation (CAF) Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the Plans

of Action.

Central American Bank for Economic Integration

(BCIE)

Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the Plans

of Action.

Caribbean Development Bank (CDB) Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the Plans

of Action.

Inter-American Development Bank (IADB) Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the Plans

of Action.

Caribbean Export Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the Plans

of Action.

Caribbean Association of Industry and Commerce

(CAIC)

Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the Plans

of Action.

National Institute of Science and Technology (NIST) Participate in the MSME Hemispheric and Regional Dialogues. Contribute

with technical and/or funding support for the implementation of the Plans

of Action.

Light Years IP Participate in the implementation of pilot projects.

Barrabés America Participate in the implementation of the online training programs.

International Intellectual Property Institute Provide support in the development of innovative industries clusters.

Pan American Development Foundation (PADF) Contribute funding and participate in the implementation of pilot projects.

Royal Caribbean International Participate in the implementation of pilot projects.

Riley Sloane, LLC Participate in the implementation of pilot projects with in-kind support

including technical assistance.

Asociación Interamericana de la Propiedad

Intelectual (ASIPI)

Participate in regional networks to disseminate and tailor available

updated high-quality information and training materials designed to

improve the productivity, innovation and export capacity of MSMEs.

Avina Potential partner in developing CSR projects in the recycling and water

sectors

UNIDO Potential partner in sharing the UNIDO Responsible entrepreneurs

achievement program (REAP) to provide training for trainers and

incorporate CSR within SMEs core business strategy

US Department of Commerce Potential partner in the training for trainers

Local CSR Organizations Potential partners in implementing CSR in local SMEs

The Caribbean Association of Industry and

Commerce

Potential partner in developing CSR projects in the Caribbean

Agencia presidencial de Cooperacion Internacional

de Colombia (APC)

Facilitates knowledge exchange activities led by CooperaNet

Ministry of Planning and Cooperation of Honduras Host s and facilitates dialogue activities led by CooperaNet

Community and Common Market (CARICOM) CARICOM represents Caribbean cooperation authorities in the activities

linked to development effectiveness led by CooperaNet

2.2 Reach-Beneficiaries and Intermediaries

Page 47: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

14

Intermediate Outcome 3000

Direct beneficiaries

- Government officials of OAS member states responsible for the negotiation and implementation

of trade agreements and for assisting businesses, including service providers, to access national,

regional and global markets

- MSMEs, in particular women, youth and vulnerable groups with potential to benefit from their

participation in trade.

Indirect Beneficiaries

- MSMEs, in Businesses and service providers with potential to benefit from access to national,

regional and global markets

Intermediaries and/or Institutional Partners Specific Role

CARICOM Secretariat, Office of Trade Negotiations

(OTN)

The OTN will participate in the elaboration of the

different studies related to CARICOM service providers

and will contribute with expert assistance to national

capacity building consultations of CARICOM States on

trade and innovation.

CARICOM Secretariat, EPA Implementation Unit The EPA Implementation Unit will contribute its

expertise to the preparation of the studies and will

facilitate proper coordination with beneficiary

countries.

Haiti’s Centre de Facilitation des Investissements

(CFI)

The CFI will the local counterpart for the organization of

the training course on investment and trade matters.

World Trade Organization (WTO) The WTO will be the co-organizer of the OAS/WTO

Advanced Trade Policy Course and will provide financial

and technical assistance.

Inter American Commission on Women (CIM)

Secretariat

The CIM Secretariat has been consulted throughout the

design of the project and will continue to be so during

the implementation phase.

National Mechanism for Women in Member States Participate as counterpart institutions as appropriate.

Academia Potential partners in the CSR community of practice

* Information provided in OAS/CEP Project Profiles May 31, 2012

2.2 Reach-Beneficiaries and Intermediaries

Page 48: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

15

Intermediate Outcome 4000

Direct beneficiaries

- National Mechanisms for the advancement of women, National statistics offices and other

entities involved in formulating and monitoring public policy on women’s rights and gender

equality.

Indirect Beneficiaries

- Women in the participating member states, who will benefit from increased awareness of and

a strengthened policy environment for their human rights.

Intermediaries and/or Institutional Partners Specific Role

Inter-American Commission on Human Rights

(IACHR)

The IACHR has produced a series of Guidelines for the

preparation of progress indicators in the area of

economic, social and cultural rights. These guidelines

and the participation of the IACHR will be an important

input into the identification of specific indicators to

measure the exercise of women’s political, economic,

social and cultural rights.6

United Nations Committee on the Elimination of all

Forms of Discrimination against Women (CEDAW)

The CEDAW Committee is the main body charged with

evaluating the implementation of CEDAW in UN

Member States. Their input to the development of

indicators, as well as their support for the utilization of

these indicators will be important to the success and

sustainability of the project.

Follow-up Mechanism to the Implementation of the

Belém do Pará Convention (MESECVI)

The MESECVI is the main bodies charged with

evaluating the implementation of the Belém do Pará

Convention in OAS Member States. Their input to the

development of indicators, as well as their support for

the utilization of these indicators will be important to

the success and sustainability of the project.

United Nations Statistics Division The input of the UN Statistics Division is important in

determining how to support specific indicators with

available data.

United Nations Economic Commission for Latin

America and the Caribbean

ECLAC maintains the Gender Equality Observatory of

Latin America and the Caribbean, which would be a

valuable platform for the promotion and utilization of

the information gathered, as well as an important input

in determining how to support specific indicators with

available data.

* Information provided in OAS/CEP Project Profiles May 31, 2012

6 See: IACHR. Guidelines for the preparation of progress indicators in the area of economic, social and cultural rights. Washington, DC: Inter-

American Commission on Human Rights/Organization of American States, 2008.

http://cidh.org/countryrep/IndicadoresDESC08eng/Indicadoresindice.eng.htm

2.2 Reach-Beneficiaries and Intermediaries

Page 49: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

16

Intermediate Outcome 5000

Direct beneficiaries

- Participating social actor organizations and individuals, including CSO, indigenous peoples,

youth, private sector, afro-descendants, think-tanks, and gender-based groups, among

others

- Summit host countries (Colombia, Panama) and other participating OAS member states

- Technical Secretariats of Inter-American Ministerials

- Civil society organizations and networks that work in the topics of the General Assemblies,

ministerial meetings and Permanent Council

- OAS Member States and General Secretariat that receive recommendations from

stakeholders

- OAS General Secretariat - areas working with projects and mandates, the Permanent

Council, the Committee on Budgetary and Administrative Affairs

Indirect Beneficiaries

- Summit National Coordinators

- Citizens of the region

- Joint Summit Working Group (JSWG)

- OAS Member States

Intermediaries and/or Institutional Partners Specific Role

Partner institutions of the Joint Summit Working

Group (JSWG): the IDB, ECLAC, PAHO, World Bank,

IICA, CAF, CABEI, CDB, IOM, ILO, and UNDP

The JSWG partners will be active participants in the

preparatory process for the Sixth Summit, including

interaction with the various civil society and social

actor participants. In particular, JSWG representatives

will serve as panelists and moderators for Policy

Roundtables and virtual consultations, providing key

technical support (background documents and subject

area expertise) and guidance to the dialogues. In

addition, JSWG partners attend all SIRG meetings to

provide technical support to OAS member states during

the negotiation of the main Summit documents.

Regional, sub regional and national networks of civil

society organizations (CSOs)

Special attention will be given to identifying and

engaging with thematic networks of civil society

organizations in order to reach a broader audience and

promote thematic representation in OAS-related

meetings.

* Information provided in OAS/CEP Project Profiles May 31, 2012

2.2 Reach-Beneficiaries and Intermediaries

Page 50: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

17

Methodology

The implementation of the OAS Cooperation Plan makes necessary the adoption of an organizational

structure that is flexible enough to allow several teams to perform and deliver simultaneously. The Project

Management Structure and Governance that has been adopted required the assignment of the following

series of roles and responsibilities:

A Technical Secretariat which serves as the technical counterpart to CIDA, composed of a Technical

Secretary and an Assistant, will be the technical counterpart to CIDA. In order to provide the managerial

necessities and the delivery that is expected of the different components of the program, as well as

providing operational planning, coordination, monitoring, follow-up and coaching, the Technical

Secretariat will be supported by the corresponding Secretariat for Administration and Finance and the

Secretariat for External Relations.

Five Core teams divided by Intermediate Outcome (1000, 2000, 3000, 4000, and 5000) formed by the OAS

Staff; in charge of the delivery of a given number of outputs.

Others; during the execution of the Cooperation Plan the participating units will be supported by a

number of departments of the SG/OAS:

- DFAMS: Department of Financial and Administration Management Services

- DPE: Department of Planning and Evaluation

- CIM or SECIM: Secretariat of the Inter-American Commission of Women

3 Project Management and Governance

Page 51: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

18

Phases and Tasks

The Program Management Plan (PMP) of the OAS Cooperation Plan includes a series of 6 phases;

planning, monitoring, reporting, evaluating and communicating for which a set of roles and tasks have

been assigned for the first year:

1. Planning

Develop a document which describes how the plan will be implemented and managed, based on CIDA

guidelines:

2. Monitoring

Ensure timely compliance of activities undertaken and outline progress towards results:

Roles and Tasks

Technical Secretariat Department of Planning and

Evaluation (DPE)

Department of Financial

and Administrative

Management Services

(DFAMS)

OAS Core Teams Comisión Interamericana

de Mujeres (CIM)

Draft monitoring strategy

tailored to CIDAs

guidelines

Identify/provide project

monitoring tools and

procedures

Define financial

monitoring tools

N/A N/A

Follow up & coaching

OAS teams

Carry out capacity building

activities related to RBM

N/A Participate in follow

up, coaching, and

capacity building

activities

Assess and support

follow up, coaching and

capacity building

activities related to

gender

Support collection of

monthly/quarterly

information linked to

targets/indicators

Validate monthly/quarterly

information linked to

targets/indicators

Generate monthly/

quarterly financial

reports

Provide

monthly/quarterly

information linked to

targets/indicators

(verbal reports)

Assess and support the

completion of

targets/indicators linked

to gender

3.1 Team Structure, Roles and Responsibilities

Roles and Tasks Technical Secretariat Department of Planning and

Evaluation (DPE)

Department of Financial

and Administrative

Management Services

(DFAMS)

OAS Core Teams Comision

Interamericana de

Mujeres (CIM)

Update Logic Model/PMF N/A N/A Provide Baseline Data

/PMF

N/A

Support project profile

collection

Coordinate and execute

project profile (CEP formats)

review, revision and

approval procedures

Supports review and

revision of project profiles

(CEP formats)

Formulate project

profiles (CEP formats)

Reviews and assess

the gender

component within

the project profiles

(CEP Formats)

Draft Annual Work Plan N/A N/A Provides information

regarding projects

annual work plan

N/A

N/A Verify gender strategies are

reflected in project profiles

N/A Provide gender sensitive

inputs

Draft Gender

Equality Strategy

Implementation Plan

Update Risk Register N/A Revise Risk Register N/A N/A

Draft piece on group of

beneficiaries &

intermediaries

Dissagregate/ provide

information of beneficiaries

& intermediaries from CEP

profiles

N/A Provide complimentary

information if needed

regarding beneficiaries

and intermediaries

N/A

Page 52: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

19

3. Reporting (Year 2 and 3)

Collection and presentation of the plans achieved results:

4. Evaluating (End of plan)

Internal/external result assessment:

Roles and Tasks

Technical Secretariat DPE DFAMS OAS Core

Teams

CIM

N/A Defines sample of projects to

be evaluated

N/A N/A N/A

N/A Coordinates in house

resources for internal

evaluation

N/A N/A N/A

5. Communicating

Publicize cooperation project achievements and provision of timely communications:

Roles and Tasks

Technical Secretariat DPE DFAMS OAS Core Teams CIM

Serve as CIDA counterparts N/A N/A N/A N/A

Carry out communication

plan deliverables

N/A N/A N/A N/A

Announce/present

information pertaining

achievements/breaking

news

N/A N/A Provide information regarding

achievements/breaking news

linked to activities supported by

CIDA funds

Provide information

regarding

achievements/breaking

news linked to gender

sensitive activities

Liaise with the Secretariat

of External Relations (SER)

to channel relevant

information

N/A N/A N/A N/A

3 Project Management and Governance

Roles and Tasks

Technical Secretariat DPE DFAMS OAS Core

Teams

CIM

Define Reporting Requirements

(Templates)

Review reporting

templates

Review reporting

templates

N/A Verifies gender

sensitive reporting

tools are included

within templates

Communicate monitoring work plan

(estimated dates, deliverables,

guidelines and tools)

Validate monitoring work

plan

N/A N/A N/A

Support development of reports

(assessment, recommendations, and

follow up) collection of

monthly/quarterly information linked

to targets/indicators

Verify consistency of

report content

Generate/Certify

Financial Reports

Provide reports Certify Gender

Related Results

Page 53: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

20

Additional support and Guidance to be provided by:

A Joint Steering Committee includes both directives from CIDA and from the SG/OAS

An Internal Steering Committee is the highest internal authority for the Cooperation Plan

Joint Project Steering Committee

The Joint Steering Committee for the OAS Cooperation Plan will provide leadership and advice regarding

the orientation and implementation of the different components of the Plan and the achievement of

outputs and outcomes.

The Joint Steering Committee will be made up of high level stakeholders and/or experts from both CIDA

and the SG/OAS. The Steering Committee will provide guidance on key issues such as objectives,

budgetary control, and decisions involving the program.

The OAS will establish an Internal Steering Committee that will be the Organization’s top decision-

making instance for the OAS Cooperation Plan.

Responsibilities

1. Review the overall management and implementation of the OAS Cooperation Plan;

2. Recommend to CIDA for approval, any necessary actions to address delays and/or challenges

towards the achievement of expected results;

3. Review the gender strategy specific to the OAS Cooperation Plan and its implementation;

recommend to CIDA for approval, any necessary actions to address delays and/or challenges;

4. Review and recommend to CIDA for approval the annual cost of the work plans;

5. Review and recommend to CIDA for approval the annual and final narrative and financial

reports;

6. Recommend to CIDA for approval possible reprogramming of activities;

7. Review the Terms of Reference of the “end-of-project” evaluation;

8. Review project assessments, monitoring, evaluation reports and recommendations regarding

possible corrective measures;

9. Review communication strategy initiatives and support their implementation.

3 Project Management and Governance

Page 54: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

21

Composition of the Joint Steering Committee

CIDA (2 to 3 representatives, depending on subject matter)

- Director, and\or

- Program Manager, and/or

- Senior Development Officer, and/or

- Technical Advisor

OAS (2 to 3 representatives, depending on the subject matter)

- Head of the Internal Steering Committee, and/or

- Member of the Internal Steering Committee

- Technical Secretary

- Core Team Manager(s)

Frequency of meetings of the Joint Steering Committee:

- The Joint Steering Committee will meet once a year (or more frequently, if

needed);

- If possible, the meeting will take place in one of the beneficiary countries to

facilitate knowledge sharing regarding project achievements

Internal Steering Committee

An Internal Steering Committee will be the OAS top decision-making instance for the “OAS

Cooperation Plan”. The members of the Internal Steering Committee will be the Secretary General,

who will delegate his authority on the Advisor to the Secretary General on Operational Management,

the Secretaries, and the Head of the Permanent Secretariat of the Inter-American Commission of

Women (SECIM). The Internal Steering Committee will be supported by a Technical Secretariat. The

main duties of the Internal Steering Committee will be to provide political counterpart to CIDA, and to

provide overall guidance and supervision to the program execution.

3 Project Management and Governance

Page 55: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

22

Monitoring and Evaluation (M&E) Strategy

The monitoring and evaluation strategy for the OAS Cooperation Plan will be based on the principles of

the Paris Declaration on Aid Effectiveness and the Accra Plan of Action, particularly in relation to managing

for results and accountability. The increased emphasis on managing for development results requires

than M&E be planned and consistently applied to the programs and projects the GS/OAS undertakes for

the benefit of the member states.

The Organization is in the process of institutionalizing a culture of results-based management (RBM) and

the implementation of the OAS Cooperation Plan is a key and integral part of that effort. Recognizing

some of the challenges stemming from the OAS-CIDA Plan I, there is a commitment at the highest level of

the Secretariat to build not only individual but mainly institutional capacity for implementing RBM at all

levels.

For the OAS Cooperation Plan this entails, among other aspects, using a results-based approach to M&E,

which goes beyond following activities and outputs and seeks to find out whether the expected results at

the level of immediate and intermediate outcomes are being achieved and the probability of contributing

to the ultimate outcome.

Results-based M&E emphasizes “continuous” monitoring, the participation of key stakeholders to the

extent possible and a focus on progress toward achieving results. Through continuous and systematic

monitoring the Secretariat will analyze the Plan’s performance in terms of efficiency and effectiveness

with a view to identify results and shortcomings and, when needed, to recommend corrective measures to

improve the likelihood of achieving the outcomes. This same approach will be used for analyzing the

performance of the projects financed by the Plan and that correspond to the level of outputs identified in

the Logic Model. While project monitoring remains a responsibility of the project teams, the SG/OAS, thru

the Department of Planning and Evaluation (DPE) and the Technical Secretariat of the Plan, will

periodically verify that the Logic Model outputs are being met, and that the chain of results established in

the logic model are what drives the Plan instead of individual activities.

4 Result-Based Project Monitoring, Evaluation and Reporting

Page 56: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

23

Main components of the M&E Strategy

Guidelines

The Logic Model and the Performance Measurement Framework (PMF) will be the central documents

guiding the M&E Strategy of the Plan. The indicators already identified in the PMF will be used to

measure achievement of results at the various levels. The areas of the organization responsible for the

outputs and outcomes will be required to report on the progress towards meeting the targets set.

In order to “operationalize” the implementation of the Plan, all areas responsible for the achievement of

specific outputs are required to prepare a project profile for the consideration of the Project Evaluation

Committee (PEC) of the Organization. The Department of Planning and Evaluation (DPE) will review that

the chain of results at the project level has been clearly established, that the beneficiaries are properly

identified, that a gender perspective has been incorporated (work done with the technical assistance of

the CIM), and that the activities and budget required to establish baselines and target are included.

Particular attention will be given to the relation to the immediate and intermediate outcomes of the Logic

Model. Work will also be done with the corresponding departments, when needed, to make sure that

baseline and targets for the outcomes are identified.

Tools and Process

Follow-up of the implementation progress at the project level will be done at various times during the

period of implementation of the Plan. A report on progress of project implementation will be required

and will be tied to disbursement of the resources. Once the project profile is approved by the PEC each

project will have access to 70% of the first year’s resources and the remaining 30% will be available after a

satisfactory progress report has been received and reviewed by DPE. Subsequent resources for the

second and the third year will also be made available in the same fashion and after a progress report has

been received.

A specific template has been prepared (Refer to Annex 6) in order to facilitate the process of reporting

and of collecting information to, first, assess the project’s performance and, second, to obtain the data for

the annual reporting on the implementation of the OAS Cooperation Plan. The template will collect data

on the progress made towards achieving the planned outputs using the performance data that has been

identified in the PMF. Therefore, information will be gathered at the project/output level on progress

during the reporting period; including progress towards achieving the targets identified in the PMF;

changes or reformulations including in the use of resources, if applicable; issues or challenges

encountered that could affect the achievement of the outcomes and sustainability; actions to be taken if

needed to enhance the likelihood of achieving the outcomes and lessons learned. As it is also expressed in

the gender strategy, a specific section on gender equality and women’s rights results is included, and

projects will be required to report, on the basis of the objectives, activities and indicators that they set out

in the beginning, on the extent to which the project has contributed to advancing gender equality and

women’s rights.

4.1 Monitoring and Evaluation Strategy

Page 57: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

24

On-site Monitoring

Onsite monitoring activities (counterpart/beneficiary interviews and follow up sessions) will be carried out

with the support of OAS high level representatives (GS/OAS Secretaries, Directors, Country

Representatives, and/or Program Coordinators). All onsite monitoring activities will be scheduled within

the OAS led events or missions7 to therefore favor whenever possible the synchronization of these

monitoring activities with GS/OAS travel plans. The exchanges will be facilitated by the Technical

Secretariat of the OAS Cooperation Plan and will be included within the reporting requirements of a

selection of programs.

Onsite monitoring activities will be scheduled starting Year 2 of the OAS Cooperation Plan (2013-2014)

and will concentrate on Intermediate Outcomes 1000, 2000, 3000 and 40008, which include within their

annual work plans a series of outputs focused on delivering in-country technical assistance through

trainings sessions, policy forums, and institutional strengthening programs within the OAS Member

States.

At least one onsite monitoring activity per year will be carried out within each of the selected

Intermediate outcomes, though whenever possible and if scheduling allows it additional activities may be

programmed.

Reporting

The information collected on the progress reports prepared by the project teams and reviewed by DPE for

consistency with the approved project profile, the Logic Model and the PMF will be complemented with

periodic meetings of the Plan Technical Secretariat with the project teams to gather information on

progress made on the achievement of the outcomes and/or identify issues that need action. The DPE,

supported by the Technical Secretariat, will prepare the annual reports which will, beside the data at the

project/output level, contain the following information: progress made during the reporting period

towards achieving the immediate and intermediate outcomes; performance of the outcome indicators

and progress towards meeting the targets set in the PMF; variances between actual and expected targets;

a brief explanation if unexpected outcomes take place or expected outcomes are not achieved; progress

made on advancing gender equality and women’s rights. The final report will also include information

regarding the achievement of the ultimate outcome. (Financial statements will accompany the annual

reports)

At the time of review of the project’s reports and during the periodic meetings, particular attention will be

given to assess the likelihood of achieving the outputs and outcomes established in the Logic Model and to

initiate corrective actions if there are factors preventing their achievements. Information on actions taken

will be included in the annual report.

7 Dates and places will be determined based on OAS staff travel plans

8 Activities linked to outcome 5000 are focused on OAS Institutional Building

4.1 Monitoring and Evaluation Strategy

Page 58: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

25

A final results evaluation of the Plan will be conducted by an external consultancy. As for the OAS-CIDA

Plan I, its key objective will be to evaluate the efficiency and effectiveness of the Cooperation Plan. It will

be required, among other aspects, to assess the achievement of the outcomes and the likelihood of

sustainability of the results, the extent to which the Plan contributed to advance gender equality, to

document lessons learned and to make recommendations, as appropriate, to improve the design,

management and implementation of similar future interventions.

In order to improve the evaluability of the Plan, during implementation emphasis will be given to the

identification of clearly stated results, the collection of data, as consigned above, on the performance of

the indicators at all levels, and to providing documentary evidence of the progress made. It is envisioned

that through systematic and periodic follow-up, a significant amount of the data needed for the evaluation

would have been collected by the end of the Plan’s execution period.

Reporting Requirements

See Reporting Templates Annex 6

4.1 Monitoring and Evaluation Strategy

Page 59: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

26

Context

“Fundamental changes in the way societies produce and consume are indispensable for achieving global

sustainable development…. Governments, relevant international organizations, the private sector and all

major groups should play an active role in changing unsustainable consumption and production patterns”

World Summit on Sustainable Development, Johannesburg Plan of Implementation

For over a decade the General Secretariat of the OAS (GS-OAS), through its Department of Sustainable

Development (DSD), has been supporting member States in the design and implementation of policies,

programs and projects oriented to integrate environmental priorities with poverty alleviation, and socio-

economic development goals, as to achieve sustainable development. Recent examples of these efforts

include the First and Second Inter-American Meeting of Ministers and High-Level Authorities on

Sustainable Development held in Santa Cruz de la Sierra, in 2006 and in Santo Domingo in 2010,

respectively;9, the General Assembly of the Organization held in 2008 which addressed the theme of

Energy for Development; and the Fifth Summit of the Americas held in Trinidad and Tobago in April 2009,

which addressed the themes of Environmental Sustainability and Energy Security. The GS-OAS has been

actively engaged with member States in initiatives in areas such as sustainable consumption and

production, environmental goods and services, sustainable trade, water resource management,

sustainable energy, sustainable forest management and sustainable communities, among other areas.

However, efforts regarding sustainable development, the environment, consumption and behavioral

patterns are becoming more critical as scientific evidence has confirmed that carbon dioxide and other

green house gas emissions (GGH) from human activities are causing significant changes in the earth’s

climate and that these changes carry significant implications for development, human health and

livelihoods.

Steps towards Greening the OAS

While the Organization of American States (OAS) continues to promote concerted action for sustainable

development in the hemisphere, the GS-OAS is seeking to ensure that the environmental footprint of its

own operations is minimized and that its facilities, operations and practices operate in a manner that is

consistent with its mission of achieving sustainable development in the Americas.

The OAS Greening Strategy consists of four steps: (1) performing an environmental assessment; (2)

establishing a General Coordinator for the program and focal points within each department of the

organization; (3) establishing internal policies; and (4) developing training materials to strengthen the

capacity of staff to implement the program.

9 The 41st regular session of the General Assembly of the Organization of American States (OAS) adopted a resolution on

sustainable development, including welcoming the UN Conference on Sustainable Development (UNCSD, or Rio+20) and

reiterating the full commitment of all countries in the region to its success.

4.2 Environmental Strategy

Page 60: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

27

The internal policies and practices being pursued include the following:

Procurement: promoting the procurement of environmentally-sound goods and services to be used

throughout its premises, by:

- Reviewing procurement rules to ensure that environmental sustainability is given an equal

weight in the procurement of goods and services

- Purchasing recycled, recyclable, and biodegradable, in particular paper

- Avoiding excessive packaging

- Avoiding the use of chlorofluorocarbon products (CFCs)

Sustainable Energy Consumption: increasing the use of energy from efficient and renewable sources and

reduces the aggregate consumption of energy in its premises, by;

- Purchasing and installing energy-efficient office and maintenance equipment including; sensor

lights and ENERGY STAR products

- Encouraging employees to reduce the use of energy at their work stations including by

turning off lights and computers when not needed

- Placing adhesive reminders: “Save Energy, Turn Lights Off”

- Maximizing the use of natural lighting during office hours

- Performing regular maintenance and cleaning of lamps and fixtures

- Establishing targets for reducing use of non-renewable energy (2% per year); and establish

targets for increasing use of renewable energies (12% per year)

- Exploring the possibility of participating in the USEPA Green Power Partnership

Consumption of paper: promoting the efficient use of paper and reduce consumption, by;

- Encouraging employees to print documents only when absolutely necessary;

- Purchasing multi-function printers and photocopiers with double-side printing capability

- Encouraging the use of used paper as draft paper

- Encouraging e-practices including electronic communication and record-keeping rather than

hard-copy records

- Increasing the capacity of the OAS to maintain electronic records

- Promoting paperless meetings of the main organs of the Organization such as the General

Assembly and meetings of the Permanent Council

Water: promote the efficient use of water resources and reduce consumption, by;

- Performing regular maintenance of water-use devices

- Responding to water leaks promptly

- Encouraging rational use of the resource by staff

- Subject to feasibility, install waterless equipment in facilities

- Retrofitting washrooms with water-saving devices

4.2 Environmental Strategy

Page 61: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

28

Recycling programs: promoting the development of a variety of programs aimed at recycling different

materials used in its premises, through;

- Establishing a recycling program including separation of recyclables from other forms of

solid waste;

- Ensuring an adequate number of containers for separated recyclables;

- Ensuring that bins are emptied and recycled appropriately;

- Preparing a two year recycling plan for paper aluminum, steel and tin cans and brown,

green and clear glass bottles and jars (Mandatory and subject to fines under the DC Solid

Waste Management and Multi- Material Recycling Act of 1988);

- Coordinating with the World Bank and IMF among other international organizations in the

area to maximize resources and efforts in this area;

- Hiring a licensed, registered recycling hauler to regularly pick up recyclables (Mandatory

and subject to fines under the DC Solid Waste Management and Multi- Material Recycling

Act of 1988) if the World Bank is not able to provide the service;

- Develop future programs for recycling various materials, including: Toner cartridges,

Mobile phones, Athletic shoes, Carpet and ceiling tiles, Paint, Office supplies, Fluorescent

tubes, Compact fluorescent lamps, Batteries, Lamp ballasts containing polychlorinated

biphenyls

Transport: promoting several actions to reduce and offset emissions related to staff transport for work-

related purposes by;

- Establishing greater incentives for staff to use public transportation, fuel-efficient vehicles

and car pooling for daily commute.

- Increasing facilities for bicycle racks and spaces

- Exploring the use of hybrid vehicles to replace current the fleet of vehicles as needed

- Exploring the use of off-setting carbon emissions generated through staff travel for official

missions through the establishment of a fund that will support the implementation of this

Greening of the OAS strategy

- Reducing the number of overseas missions through the use of satellite conferencing

facilities installed in the F-Street building

The OAS is exploring the establishment of a Greening Fund, using a carbon offset program derived from

staff travel for missions and other official business. It is envisaged that the cost of the environmental

damage caused by emissions from each official trip will be calculated using the mechanism explained

below and the cost will be contributed to the special fund in the same requisition created to purchase the

travel. The emissions will be offset through the different actions taken within the greening the OAS

strategy, supporting the transition to a lower carbon world.

The calculation method to be used was developed by ClimateCare, to determine precisely what amount is

necessary to offset emissions produced during travel10. A table for all most likely destinations will be

distributed for easy computation of the CO2 offset cost.

10

The mechanism works as follows: for long haul flights, take the average fuel burn figures for a Boeing 747 and an Airbus A340 as published by

the EU. Divide this by the average number of seats (not occupied seats) and also subtract the amount of freight carried by the average long haul

aircraft. Double the amount of CO2 emitted to take account of the enhanced atmospheric impacts of aviation. Then calculate the greater circle

distance between the airports in question. A similar method is used for short haul, except that a Boeing 737 is used as the reference aircraft. As an

example, this method shows that 2.41 tons of CO2 are caused by a round-trip flight for one person from Washington D.C. to Buenos Aires. The

cost to offset this CO2 is of US$36.16. Thus, when an OAS employee travels from Washington to Buenos Aires, the Organization will contribute

$36.16 to the Greening the OAS Fund

4.2 OAS Environmental Strategy

Page 62: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

29

Guidelines for Sound Environmental Practices within the OAS Cooperation Plan

It is not anticipated that the activities planned in the execution of the OAS Cooperation Plan will have a

negative impact on the environment. The majority of the activities/ outputs in the Plan focus on capacity

building and institutional strengthening, which can be classified as environmentally-neutral, while those

associated with the productive sectors such as industry, commerce and mining are fused with

environmentally beneficial activities such as those aimed at promoting environmentally sustainable trade

and economic development.

The OAS will monitor the environmental impact of the execution of a sample of outputs included in the

OAS Cooperation Plan, by reinforcing a set of practices included in the “Greening OAS Strategy11”. The

selected projects correspond to those directly associated with the productive sectors i.e. mining, and

tourism, as well as those which have opted for the use of Information and Communication Technology

(ICT/IT) solutions i.e. virtual meetings, videoconferences, virtual forums and therefore help to

minimize/prevent aviation-related carbon dioxide (CO2) emissions12.

The OAS Cooperation Plan will carry out yearly monitoring activities and provide data collection tools

(reporting templates). The following sample of outputs will include environmental inputs (narratives and

the tracking of Off-setting carbon emissions saved by substituting OAS staff and its key stakeholder’s air

travel with the use of Information and Communication Technology (ICT/IT) solutions13 within their yearly

reports:

2140: Support provided to the Inter-American Networks (RIAC, STEN, Inter-American E-SME and

Innovation Network and Consumer Safety Network) to undertake their mandates

3220: Capacity building program of country officials for the sustainable use of natural resources

(water, soil, land, renewable energy, biodiversity) developed in trade goods and services

executed, taking into account the different needs, ownership and uses of those resources with an

integrated gender balance perspective

3310: Training provided to SMEs to adopt socially and environmentally-responsible business

practices and especially gender sensitive practices

5510: Recommendations from virtual and face-to-face consultations presented to OAS member

states in the policy-making process (i.e. Summit Implementation Review Group-SIRG)

See Annex 10 (Environmental Reporting Template)

Further, the GS-OAS will, wherever possible during the implementation of the Plan, seek to encourage the

adoption of green practices by OAS beneficiary countries. Several OAS Member States are at various

stages of implementing green economy programs and strategies that incorporate many of the features of

the OAS Strategy. The OAS Cooperation Plan will also encourage e-practices (electronic

communication/reporting) and emphasize on electronic record-keeping rather than hard-copy records

11

OAS Greening Strategy http://oasconnect/Portals/0/HR/greeningtheoasstrategy.doc 12

For example, an Australian study has estimated that videoconferencing could avoid 2.4 million tonnes of national CO2

emissions, equivalent to 0.43% of the country’s total12

. 13

A limited sample of projects will provide Off Set carbon emissions data

4.2 OAS Environmental Strategy

Page 63: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

30

It is important to showcase the achievements and activities carried out within the OAS Cooperation Plan,

it is therefore of the interest of the OAS and the Government of Canada to use organizational mechanisms

in relevant occasions to publicize and communicate in relevant occasions using the organizational

mechanisms the results of this cooperation effort.

The objective, from a communications point of view, will be to inform all target audiences the completion

of important activities, the use of best practices, as well as the recognition of lessons learnt, working in

the context of the expected results of the OAS Cooperation Plan 2012-2014.

The target audiences will be the following:

- General Public

- OAS Permanent Missions

- CIDA country offices within OAS Member States

- Canadian Embassies

- Member State Local Counterparts (Institutions, Ministries, Local Governments, Civil Society

Organizations)

- OAS Cooperation Plan Development In-County Partners (e.g. UNDP)

- OAS Cooperation Plan Donors (USAID, IADB, IFC, WB, ECLAC, PAHO)

- OAS Cooperation Plan Technical CIDA Counterparts

The communication tools to be used by the SG/OAS through the Secretariat of External Relations and in

collaboration with the OAS Press and Communication Department will be the following:

- Press Releases: Distributed to a broad database that includes the Washington-based media

and the media elsewhere in the Hemisphere. These press releases and bulletins keep the

media abreast of the OAS’ daily meetings and activities.

- OAS Web Page: The “OAS News” web page offers a picture of the Organization’s most recent

activities and initiatives. In addition to news in brief and highlights, it also features

photographs and links to OAS-related articles that appear in newspapers around the region. It

is one of the most visited sites on the Organization’s portal.

- Multimedia Services: When available certain events and activities will count with webcast

broadcasting; in these cases, a link or copy will be circulated and/ or included within the

communication pieces.

- Social Media: Twitter, Facebook, Flickr, YouTube, vimeo are all OAS channels open to

disseminate any relevant news linked to the OAS Cooperation Plan.

- Publications: a final document with the OAS Cooperation Plan Achievements and Results

2012-2015 will be published by the end of the agreement.

5 Communications Plan

Page 64: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

OAS Cooperation Project Management Plan 2012-2014

31

Communications Focal Point

The Technical Secretariat of the OAS Cooperation Plan will receive support from the OAS Press and

Communication Department in the use of the aforementioned communications tools in order to showcase

and make public the support of the Canadian Government.

Frequency

The Technical Secretariat will collect the relevant inputs from the OAS core teams and will prepare every

semester an internal news bulletin with the different pieces of information that support the key messages.

Samples of Key Messages:

- Adoption of Gender-Sensitive public policies and legislation for business development

- Establishment of Public Private Partnerships that facilitate responsible business practices

- Completion of technical assistance activities linked to the main outcomes of the OAS

Cooperation Plan (trainings and workshops)

- Advances in the Implementation of the Belem Do Para Convention

5 Communications Plan

Page 65: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Joint Steering Committee for the OAS Cooperation Plan Year I & II

OAS Cooperation Plan Year I & II

OAS Main Building, Miranda Room February 28, 2013, Washington DC (10am-12pm)

Minutes of the Meeting

I. Participants

- Amb. Alfonso Quiñonez, Secretary for External Relations

- Mr. Sergio Martinez, Advisor, General Secretariat

- Mr. Ricardo Graziano, Director, Department of Planning and Evaluation

- Mr. Hector Arduz, Technical Secretariat of the OAS Cooperation Plan (TS/OAS)

- Ms. Emily Tangarife, Technical Secretariat of the OAS Cooperation Plan (TS/OAS)

- Mr. Brett Maitland, Counsellor, Alternative Representative, Permanent Mission of Canada to the OAS

- Ms. Charlotte McDowell, Alternate Representative, Permanent Mission of Canada to the OAS

- Ms. Laurenne Garneau, Program Manager, Inter-American Program, Geographic Program Branch, Americas

Directorate, Canadian International Development Agency (CIDA)

- Ms. Annick Amyot, Senior Development Officer, Strategic Analysis, Operations and Regional Programming

Division, Canadian International Development Agency (CIDA)

II. Introduction

The purpose of the joint steering committee is to provide guidance and feedback regarding the orientation and

implementation of the components of the OAS Cooperation Plan (CIDA II) and the activities being carried out for

year I (2012-2013).

1. Amb. Quiñonez initiated the joint steering committee welcome remarks and highlighted how this

cooperation exchange is an important and enriching exercise for the OAS and how it has become an

instrumental tool for the General Secretariat to achieve results.

2. Ms. Garneau, emphasized on how the decentralization of operations from CIDA headquarters in Ottawa

would surely allow the ongoing exercise to be even more enriching now that there was a role change,

specifically Mr. Maitland and Ms. McDowell from the Canadian mission to the OAS, will be now “leading”

the commitments of the OAS cooperation plan as well as having a closer engagement with their

counterparts.

III. Technical Secretariat Presentation

1. Amb. Quiñonez made a power point presentation (see annex 1) which included a make a brief overview of

the program’s life cycle which included the structure of the plan, and the time line for Year I. As well as a

series of preliminary conclusions and lessons learned drawn from the overall activities and exchanges led

by the TS/OAS in coordination with CIDA counterparts and the OAS technical teams. CIDA counterparts

were very interested in the preliminary conclusions and provided a series of recommendations and

requests for examples and/or additional elements that could provide a more detailed panorama of the

preliminary findings.

2. Mr. Ricardo Graziano provided an overview of the implementation of the Gender Equality Strategy, which

centered in the overall progress of the DPE and the Inter-American Commission for Women (CIM) in

carrying out monitoring activities that support the OAS technical teams in the implementation of Gender

Equality within their activities and programs.

Page 66: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Joint Steering Committee for the OAS Cooperation Plan Year I & II

OAS Cooperation Plan Year I & II

3. The TS closed the first half of the meeting with a presentation of the metrics for the program components,

which provided a diagnosis of the program components status based on the percentage of available data

(baselines and targets) for indicators at the outcome and output level. The presentation also included a

project status monitoring color coded system, which the TS uses to categorize/rate the outputs based on

the % of the budget executed and level of results attained. (see annex 2 “status report”)

4. Ms. Garneau mentioned the categorization system a very important tool that facilitates a visual

appreciation of the work done.

5. Ms. Amyot mentioned the current inventory of data as a positive achievement due to the early stage of

the program.

6. The TS/OAS presented additional information regarding partners and complementarities in aims to

provide inputs regarding other partner contributions (in-kind and financial) by a set of examples per

program component. This also served to showcase a series of next steps/activities for year II of the OAS

Cooperation Plan based on the calendar of events programmed by the technical teams.

7. Ms. Annick Amyot noted a few elements were needed (i.e. short narrative on activities) to make the

information available easier to trace and facilitate accountability.

IV. Closing Remarks

1. Ambassador Quiñonez finalized the TS presentation with a sample of communication mechanisms being

applied to engage the OAS technical team that have allowed the identification of the who, how and what

of the activities linked to the OAS Cooperation plan as well as the channels used by the TS to better inform

the CIDA counterparts. The OAS also announced the elaboration of an internal procedure that will

streamline communication on the initiatives.

2. Mr. Ricardo Graziano presented the last point on the joint steering committee agenda; section xiii, he

provided background information regarding the information request presented in June, 1, 2012, within

the executive committee of the OAS Cooperation plan. The presentation included a list of tasks linked to

the OAS review process led by the Committee on Administrative and Budgetary Affairs (CAAP) regarding a

series of obligations of the General Secretariat, which for information purposes was classified as: no

progress, some progress, and significant process.

3. Mr. Brett Maitland, highlighted usefulness of the joint steering committee as an informative platform that

allows Canada to draw from lessons learned as well as to see the influence of other donor practices that

can improve the development of the OAS cooperation plan in the future.

Page 67: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Joint Steering Committee for the OAS Cooperation Plan Year I & II

OAS Cooperation Plan Year I & II

V. Conclusions and Recommendations

Based on the interventions of both parties the following conclusions and tasks are to be taken into account in the

future steps regarding the main reporting commitments of the OAS Cooperation Plan Year I:

Financial

- Detailed financial information regarding the use of regular funds, and other donor contributions (in-kind

and financial) should be included in the preliminary and final reports

- In-kind contributions are to be quantified based on a specific methodology (exchange rates, technical

assistance rates etc.) and included within the financial reporting

- A cost analysis of the resources used in the tracking of results at the output level is suggested for a better

appreciation of the costs implicated in the monitoring of results

- A clear definition of the status report metrics ( what do we understand by % budget executed) is

suggested to better understand the financial concept used in the TS status report

- An additional filter at the budgetary level for fund execution by amounts used to cover salaries (OAS Staff)

Gender

- Tools for Gender Equality policy making are to be identified and included as part of the monitoring

exercises for gender mainstreaming i.e. Gender implementation survey follow up

- Provide % of outputs, technical areas incorporating Gender during the execution of the Cooperation Plan

Others

- Examples of other Donor good practices used as input for the development of the OAS Cooperation plan

as well as examples of regional institutions that elevate the impact of the program deliverables are to be

mentioned within the final reporting as part of the complementarities and contributions of other partners

- Knowledge sharing amongst donors is of great interest for Canada, it is suggested spaces for exchange can

be facilitated within the framework of the program

- Level of impact of the initiatives, results are to be labeled if developed at the regional or country level to

better evaluate the timeframe for results

- Develop an internal procedure for communications between the OAS and CIDA

- Final Report must include detailed information on the tasks linked to section xiii

Page 68: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Joint Steering Committee for the OAS Cooperation Plan Year I & II

OAS Cooperation Plan Year I & II

OAS Main Building, Miranda Room March 12, 2014 Washington DC (2pm-4pm)

Minutes of the Meeting

I. Participants

- Amb. Allan Culham, Permanent Representative, Permanent Mission of Canada to the OAS

- Amb. Alfonso Quiñonez, Secretary for External Relations

- Mr. Peter Quilter, Secretary for Administration and Finance

- Mr. Ricardo Dominguez, Advisor, General Secretariat

- Mr. Sergio Martinez, Advisor, General Secretariat

- Mr. Ricardo Graziano, Director, Department of Planning and Evaluation

- Ms. Maryse Roberts, Director, Department of Economic and Social Development

- Mr. Christopher Hernandez-Roy, Director, Department of Sustainable Democracy and Special Missions

- Ms. Hilary Anderson, Specialist, Inter-American Commission of Women (CIM)

- Mr. Brett Maitland, Counsellor, Alternative Representative, Permanent Mission of Canada to the OAS

- Ms. Charlotte McDowell, Alternate Representative, Permanent Mission of Canada to the OAS

- Ms. Susan Cummings, Alternate Representative, Permanent Mission of Canada to the OAS

- Mr. Hector Arduz, Technical Secretariat of the OAS Cooperation Plan (TS/OAS)

- Ms. Emily Tangarife, Technical Secretariat of the OAS Cooperation Plan (TS/OAS)

II. Introduction

The purpose of the joint steering committee is to provide guidance and feedback regarding the orientation and

implementation of the components of the OAS Cooperation Plan (CIDA II) and the activities being carried out for

year II (2013-2014). The meeting revolved around a power point presentation prepared by the Technical

Secretariat presented by various interlocutors (see annex 1).

- Mr. Dominguez initiated the joint steering committee by presenting a suggested agenda, the OAS-CP

program components, rationale, and management structure. During his intervention Mr. Dominguez

highlighted that the added value of the OAS resides in the organizations direct access to policy makers and

country led policy making exercises. Therefore the obtainment of results or changes in practices can be

assured in the long term.

- Emphasis was made on the levels of accountability and responsibility of the OAS-CP according to the level

of results for example OAS core teams are accountable at the level of outputs (completed activities) and

are responsible for reporting and monitoring at the level of immediate and/or intermediate outcomes.

Page 69: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Joint Steering Committee for the OAS Cooperation Plan Year I & II

OAS Cooperation Plan Year I & II

III. Technical Secretariat Presentation

- Mr. Arduz continued with the presentation with various subject matters, beginning with the current

project monitoring methodology in place i.e. semaphore (see annex 2) and the current status of the OAS-

CP components: Democracy, Business Environment, Access to Markets, Gender and Institutional

Strengthening emphasizing there are delays in financial execution and activities especially in the Gender

component, yet solutions are in place and the program is to succeed in its deliverables.

- Secondly in order to mitigate and address many of the challenges derived from the OAS-CP a recent

revision exercise of the Performance Measurement Framework (PMF) of the OAS-CP was carried out in

coordination with Ms. Marian Black (Canadian Program Specialist). This exercise was highlighted as very

fruitful, for a series of issues and actions have been implemented in order to enhance a Result Based

Management (RBM) perspective within the programs deliverables e.g. the addition of 14 new indicators.

- Thirdly and in response to the recommendations provided in the past Joint steering Committee (See

Annex 3) a general financial overview was presented in which the OAS-CP financial contribution was

compared with all other OAS funds and ICR which led to the fact that the investment of the Canadian

government represents the 4% of the total monetary contributions administered on a yearly basis by the

OAS. It was also noted that In-Kind contributions will not be captured during the timeline of the OAS-CP

for there is no systematic infrastructure that can facilitate the collection of relevant data.

- The Technical Secretariat intervention concluded with Lessons Learned, a total of six, were drawn from

Year II in which RBM Implementation, Program Ownership, Good Planning, Short Timeframes, Result

Measurement, and a Lower Number of Outputs are to be considered for future investments.

IV. Communications

- Amb. Quiñónez provided an overview of the communication efforts carried out by the Technical

Secretariat under his coordination, he presented of a communication guideline memo sent to the OAS

Core Teams providing instructions on how to acknowledge verbally and graphically the support of the

Canadian Government. He also highlighted how the elaboration of an activity calendar has improved the

awareness of the Canadian counterparts on the various events carried out within the OAS-CP.

- Emphasis was made on the current communication process; type of publics, messages and levels of

interaction amongst the stakeholders involved. In particular how these actions vary according to the type

of activity and connection of the OAS core teams with the target audiences.

- Enforcing the communication process is needed and is a work in progress, specially for other OAS

Secretariats, other Donors-Observers and all other Member State Representatives e.g. Whitehouse

delegations. It was also noted that the OAS website can serve as a channel for higher public recognition of

the OAS-CP and the role of the Canadian Government as an example of international cooperation.

Page 70: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Joint Steering Committee for the OAS Cooperation Plan Year I & II

OAS Cooperation Plan Year I & II

V. Others

Follow Up Section Xiii

- Mr. Graziano presented the current status of a series of tasks regarding the institutional efforts led by the

General Secretariat and/or the Member States in response to mandate/statutory obligations. The list of

tasks were labeled according to level of progress (no, some, and significant). Year 1 (2013) and Year II

(2014) of the OAS/CP were compared. It was highlighted that the actions carried out within the OAS-CP

have had a positive influence in the work being carried out by the Committee on Administrative and

Budgetary Affairs (CAAP).

- Amb. Quiñónez provided input regarding the tasks linked to the OAS fundraising strategy and mentioned

that the over 18MM raised in 2013 exceeded the 14MM raised in 2012 these results were included in a

report published by the Department of International Affairs (DIA) (copies were shared amongst meeting

participants).

VI. Closing Remarks

- Mr. Dominguez finalized the presentation on behalf of the Technical Secretariat with a few final

statements in which he mentioned how the OAS-CP is to be considered a milestone on the OAS path

towards Result Based Management and that all in all the OAS, based on the lessons learned and the

experience gained, is ready to face a new stage that leads to a second OAS-CP for 2015-2018.

- Amb. Culham thanked the Technical Secretariat and the OAS colleagues present for their efforts and

participation in the joint steering committee. He made emphasis that his own participation was a

testament to the importance of the OAS-CP to his government and the great deal of work behind it. He

remembered how back in 2012, during the Summit in Cartagena, Amb. Quiñónez announced that an

official press release confirmed the 19.5 M Canadian contribution to the OAS.

- He also mentioned that during a morning phone conference with program evaluators in Canada, it was

mentioned that there is interest in reviewing the multilateral cooperation efforts and how the 26 partners

which include the OAS are good reference for analyses.

- Amb. Culham pointed out that the final disbursement for Year III of the OAS-CP was approved on February

29, 2014 and that activities were expected to be completed by July 2015. He also introduced Ms.

Cummings a new Canadian representative, who’s main line of work will be the CAAP, he also suggested

that the present audience could serve as excellent counterparts.

- Mr. Maitland announced he would provide a few general verbal comments on the power point and

further on some in writing. This second joint steering committee had struck him thanks to the

improvement of these spaces of engagement. He acknowledged that good accounting is to be compared

with RBM. He was confident specific details were to be addressed in the full financial and narrative reports

of the OAS-CP for Year II.

- Mr. Maitland underscored that reports for Year II should provide a sense of the story being told beyond

the activities, how the program has steered toward the obtainment of the economic and development

results identified in the beginning i.e. immediate and intermediate outcomes. He emphasized that by

telling the story on what the impact of this investment will have, we talk about the results at the level of

changes not at the level of activities; it is a continuous number of changes, contributions that have led to

the results of the contribution.

Page 71: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Joint Steering Committee for the OAS Cooperation Plan Year I & II

OAS Cooperation Plan Year I & II

- Mr. Maitland concluded his general comments by noting that the monitoring system put in place is at the

same level of innovation of the Committee for Project Evaluation (CEP) for it allows tracking on what is

being done, till the extent it was recommended for the monitoring of the Spain fund.

- The current communication strategy has led to more opportunities for Canadian Ambassadors to

participate in the OAS-CP activities; a good example is the event being hosted by the Department of

Effective Public Management (DEPM) taking place in Panama. This is a measure of exposure at the

regional level as well as of the graphic logo of our organization in the printed materials.

- A new element, the table i.e. general financial overview, that shows the percentage of the investment in

the overall budget and resources; the 20% thresholds (See Annex 1 slide 19 for details) tell us something

we should discuss further on, what this stands? And how can we incorporate changes in this exercise?

(Details to be provided via email).

VII. Conclusions and Recommendations

The following five points should be taken into account for future investments and reporting tasks:

1. Future Investments; are not a guarantee, yet there are no remarks saying there will not be one.

We now have a new planning process for investments in order to streamline understanding for

officers in different stations. This has been labeled as MSI: (Management State of Investment)

whose fundamentals respond to: the Who? The What? What Subject? What is expected?

Collected in a short document (3-4 pages) that should serve as a basis for discussion e.g. markers,

potential countries to invest in etc. This will be an exercise due between summer and fall of the

current year.

2. Changes; as observed at Canada headquarters, new potential funding will need more capacity

building by the OAS/GS in order to take on board the achievement of results. In other words the

5000 component of the OAS/CP would be off the table.

3. Potential Projects; are to be more focused and planned, one of the changes or revolutions is to

identify what is the OAS niche and how can we make the best of restricted funding? In order to

not respond to needs, but to provide what makes more sense. For example: an Electoral

Strengthening Needs Assessment can lead to working with a country that is interested and will

commit to the investment and/or process.

4. Result Based Management; passing to an RBM culture is truly needed, in order to advance in a

result oriented path for the OAS.

5. Evaluation; kudos to the OAS/GS for the past evaluation of CIDA I and for it being published on its

website. We are not aware if an evaluation is programmed for this current OAS-CP. Despite that

the Canadian led evaluation will be carried out during Summer-Fall by contracting or outsourced

resources, moreover Charlotte and I will be in contact in order to consult the Terms of Reference

of the Evaluation with the OAS/GS.

Page 72: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Joint Steering Committee for the OAS Cooperation Plan Year I & II

OAS Cooperation Plan Year I & II

Others

- Mr. Martinez adverted that the OAS/GS is a few months from a change of institutional leadership; and

therefore it must be careful to not loose the pragmatic leadership for future investments. He also

mentioned how the OAS can benefit greatly with the help of Canada by persuading the US and/or other

major contributors to these exercises, for the message changes when it comes from Canada and not from

the OAS/GS, specifically on how these efforts can be translated to the CAAP.

- Amb. Culham pointed out that the presentation on section Xiii evidenced how various management issues

have been addressed demonstrating that the OAS/CP has been catalyst for institutional changes. In fact

discussions on human rights and how Canada has provided funding for the Core Business of the OAS/GS.

So how can Canada communicate the current efforts of the OAS/CP?

- Amb. Quiñónez recalled that there are publications from the former CIDA I and that they can be translated

in a more didactic material in order to inform internal audiences. As well as to remind all other member

states that each project is derived from a mandate, and that if we only had one mandate we could focus

on only one, yet we have 1,500 therefore we need to work on various areas.

- Amb. Culham recognized the need to communicate and “Show me the Money” and manifested his strong

interest in communicating and developing materials that can convey this message as well as lesson

learned from the OAS/CP.

- Mr. Dominguez closed the meeting by thanking the participants and emphasizing that the OAS is very

interested in continuity and that it should not be off the table.

Page 73: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

                                                 

                     Annual  Report  OAS  Cooperation  Plan    

Year  I  2012-­‐2013  

Page 74: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

2  

Table  of  Contents   Yr.  I          

Executive  Summary……………………………….4-­‐7  Introduction………4  Conclusions……….5  Lessons  Learned  &  Recommendations...6  Monitoring  Tools………………………….…7-­‐15    

I.  Financial  Report………………………………….16-­‐46  Interim  Financial  Statements  From  inception  to  March  31,  2013  

Schedule  A:  Cumulative-­‐Basic  Financial  Statements  Schedule  B:  Cumulative-­‐Budget  Execution  and  Statement  of  Changes  in  Fund  Balance  (at  the  intermediate  outcome  level)  Schedule  C:  Fiscal  Year  I-­‐Budget  Execution  (Detail  by  Output)  Schedule  D:  Fiscal  Year  I-­‐Statement  of  Changes  in  Fund  Balance  (Detail  by  Output)  Schedule  E:  Cumulative-­‐Statement  of  Execution  by  Object  of  Expenditure  (Detail  by  Output)  Schedule  F:  Cumulative-­‐Other  Sources  of  Financing  (Detail  by  Output)    Notes  to  the  Financial  Statements    

 Updated  Budget  (March  14,  2013)……………43-­‐44  Other  Donor  Contributions…………………………….45  Budget  Management……………………………………..45  Budget  Execution  by  Module……………………..….46  

                       

Table  of  Contents   Yr.  I  

Page 75: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

3  

Table  of  Contents   Yr.  I          

II.  Narrative  Report………………………………………….47-­‐87    

Project  Summary  -­‐  Rationale  &  Justification…48-­‐49  Success  Factors…………………………………………………50  Strategic  Partnerships………………………………….51-­‐52    Beneficiaries…………………….………………………….53-­‐55  

 Project  Management-­‐  Structure…………………………….…56-­‐57  

Governance………………………………………………………58  Management…………………………………..…………..59-­‐60  Communication………………………..…………….………..61  Environment………………………..……………………………62  

 Program  Performance  Assessment…………………..…….…63-­‐64                          Project  Progress  Status  Report………………………..65-­‐83                          Risk  Management…………………………………….….………84    Gender  Equality  Strategy…………………………………..……….85-­‐87    III.  Annexes…………………………………………………….88-­‐130    

1:  Performance  Measurement  Framework  PMF  (03/31/13)  2:  Logic  Model  LM  (03/31/13)  3:  Minutes  Joint  Steering  Committee    (03/12/13)    4:  Risk  Register  (03/31/13)  5:  Gender  Component  Analysis  6:  Communications  Memo    7:  Acronyms    

 

Page 76: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

4  

           The  Organization  of  American  States   (OAS)  has  been  entrusted  by   the  Government  of  Canada   through   its  Canadian   International  Development  Agency   (CIDA)   to   carryout   the   OAS   Cooperation   Plan   (OAS-­‐CP),   a   three   (3)   year   agreement   financed   by   CIDA   with   CDN   $19,500.000.   These  resources  contribute  to  the  development  of  a  series  of  programs  (37  outputs)  fostered  within  the  OAS.  

 The  programs  included  within  the  OAS-­‐CP  have  a  common  goal  of  strengthening  the  institutional  capacity  of  the  OAS  Member  States.  The  main  fields   of   intervention   of   the   OAS-­‐CP   are:   National   Electoral   Systems   and   Processes,   Policies   and   Regulatory   Frameworks   related   to   Business  Environment,  Market  Access  and  Regional  Trade,  Gender  Equality  Instruments,  and  the  Institutional  Capacity  of  the  OAS.    

 This  Annual  Report  for  Year   I   (2012-­‐2013)   is  prepared  by  the  Technical  Secretariat   (TS)  and  presents  the  programs  results  since   its   inception  on  March  31st,  2012  through,  March  31st,  2013.  This  report  is  composed  of  two  core  sources  of  information:  Financial  and  Narrative.      

 The  main  objective  of  this  Annual  Report  is  to  present  a  story  of  the  performance  of  the  OAS-­‐CP,  as  well  to  provide  complementary  information  regarding  other  aspects  of  annual  on-­‐going  implementation  of  the  agreement.  

 As  mentioned  the  Annual  Report  for  Year  I  is  composed  of  two  main  sections:      

I.  Financial;  presents   the  Basic  Financial  Statements  as  of  March  31,  2013,  produced  and  certified  by  the  OAS  Department  of  Financial  and  Administrative  Management  (DFAMS).    

II.  Narrative,  presents  a  technical  assessment  of  the  programs  components  based  on  the  performance  reports  of  the  OAS  programs  as  well  as  the  results  of   the  monitoring   instruments   implemented  by  the  TS   in  coordination  with  the  Department  of  Planning  and  Evaluation  (DPE)  of   the  OAS.                        

Introduction   Yr.  I  

Page 77: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

5  

       

 1. The  first  year  of  the  OAS  Cooperation  Plan  (OAS-­‐CP),  widely  known  as  CIDA  II  had  a  slow  start.  The  program  main  challenges  have  been  

with  design,  performance  management,  and  coordination  of  projects  and  programs.  Most  projects  have  undergone  lengthy  review  prior  to  approval.  

 2. Notwithstanding   Year   1   slow   start;   the   development   of   the  OAS-­‐CP   and   its   advance   towards   the   fulfillment   of  Outputs   and   eventually  

Outcomes   is   in   good   track.   From   a   financial   perspective,   as   of   31th   March   2013,   a   78%   of   our   budget   for   Year   I   has   been   executed.  Performance-­‐wise,  98%  of   the  necessary  baselines  are  already  available,   and  98%  of   targets  have  been   identified.   Furthermore  84%  of  those  technical  teams,  whose  performance  has  been  gauged,  have  attained  results  that  are  either  satisfactory  or  highly  satisfactory.    

 3. The  implementation  of  CIDA  II  builds  on  and  complements  other  donors’  efforts.  A  good  example  of  this  assertion  is  the  one  given  by  the  

managerial   tools   developed   for   the   Spanish   Fund   (modules   for   project   monitoring,   as   well   as   evaluation).   RBM   tools   (logic   models,  performance  measurement   frameworks,  and   risk  analyses)  are   crucial   for   the  monitoring  and  evaluation  of   the  projects  and  programs,  serving  as  a  compass  for  both  technical  teams  and  the  Technical  Secretariat.  The  institutionalization  of  RBM  tools  is  well  under  way  at  the  OAS.  

 4. Following  the  example  given  by  CIDA  I  financial  reporting,  frequent  information  (at  least  monthly  updates)  ensures  higher  accountability  

from  teams  and  partners  involved  in  the  execution  of  funds.    

5. As  stated  in  the  Gender  Equality  Strategy  for  CIDA  II  and  building  on  the  achievements  of  CIDA  I,  gender  equality  considerations  have  been  assigned  particular   importance  within   the  development  and   implementation  of   the  program.    A   total  of  25   (or  68%)  projects   include  a  substantive  gender  component,  concentrated  particularly  in  Modules  1000,  2000,  and  4000.    

 6. OAS  Staff/Core  Teams  are  more  involved  in  the  process  and  the  application  of  Result  Based  Management,  becoming  knowledgeable  of  the  

processes  as  well  as  of  the  use  of  the  monitoring  tools.    7. Linkage  is  stronger  between  the  activity  level  and  the  program  level,  the  program  level  and  the  institutional  reporting.  

 8. Results,  activities  and  results  are  all  more  closely  linked.    

 

Conclusions   Yr.  I  

Page 78: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                         

1. The  structural   influence  of  CIDA   II  and   its  methodological  platform  projects  a  positive   influence  on  other  OAS  programs  and  projects.  Furthermore,  it  provides  conceptual  support  and  a  different  value-­‐proposition  to  new  fund-­‐raising  efforts.  

 2. Developing  sufficiently  long  time  targets  to  achieve  is  needed  for  sustaining  ongoing  results.    3. Internal   communication   and   coordination   are   key   for   better   results   therefore   the   role   of   the   support   mechanisms   i.e.   Technical  

Secretariat  allow  the  technical  teams  to  focus  on  deliverables  and  address  donor  requests    4. Sustainability  requires  up-­‐front  planning,  supporting  partners  to  develop  capacity,  and  enable  knowledge  sharing  and  horizontal  learning  

and  support  mechanisms.        5. Efforts   need   to   be   combined   with   local   partners   as   well   as   local   and   regional   institutions   to   elevate   the   impact   of   the   programs  

deliverables  as  well  as  to  better  the  intervention  of  the  OAS  and  Canada.      6. Combining   resources   with   OAS   Member   States   (in-­‐kind   contributions)   or   other   partners   (Observer   Member   States,   other   agencies)  

improve  the  quality  of  the  interventions.      

7. Flexibility   in   the   development   of   program   goals   by   allowing   ongoing   adjustments   (variations   in   targets,   activities   and   programming)  allow  team  leaders  to  assess  challenges  in  the  short  term  and  take  corrective  actions  that  allows  the  result  to  not  be  altered.      

 8. The  organizational  commitment  with  result  based  management  needs  to  be  from  top  to  bottom.  The  effort  needed  to  carryout  result  

based   activities   must   not   be   underestimated   and   requires   strong   communication   efforts   as   well   as   the   engagement   of   various  stakeholders  within  the  OAS  to  deliver  results.  

 9. The   number   of   projects   that   substantively   address   gender   considerations   can   be   considered   a   positive   result   and   a   reflection  of   the  

collaboration   between   the   Inter-­‐American   Commission   of   Women,   the   Department   of   Planning   and   Evaluation   and   the   Technical  Secretariat.    This  result  suggests  that  with  a  strong,  high-­‐level  commitment  to  gender  equality  concerns,   it  will  be  possible  to  achieve  significant   institutional   results.     In   addition   to   strengthening   the   gender   component   of   CIDA   II,   the   exercise   of   including   gender  considerations  in  each  of  the  projects  has  contributed  to  strengthening  the  visibility  and  importance  of  gender  issues  in  the  OAS  as  an  organization.    

   

Lesson  Learned  &    Recommendations        Yr.  I  

Page 79: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

7  

         In  order  to  better  monitor  the  ongoing  performance  of  the  OAS-­‐CP  a  color  coded  system  has  been  designed  to  provide  executive  information  based  on  the  activity  reports  provided  by  the  OAS  Core  Teams  validated  by  DPE  as  well  as  financial  information  provided  by  DFMAS  on  the  level  of  execution1  with  the  following  guidelines:      1.Upon  Budget  Execution  (%Executed):                            2.Upon  Level  of  Results:                  

            1  Expenditures  plus  un-­‐liquidated  obligations  related  to  the  current  budgetary  year  in  USD.  Un-­‐liquidated  obligations  are  amounts  related  to  commitments  to  disburse  monies  for  the  procurement  of  goods  or  services  in  future  periods.  Such  amounts  represent  commitments  to  third  parties  at  the  end  of  the  respective  periods  and  are  anticipated  to  be  expended  in  subsequent  periods  in  the  completion  of  a  particular  program  or  activity.  This  amount  may  be  lower  in  subsequent  periods  as  de-­‐obligations  occur.  

Monitoring  Tools   Yr.  I  

 Less  than  40%  of  executed  

funds  

 Between  41%  and  50%  of  executed  funds  

There  are  no  elements  to  appreciate  the  work  done  

Few  elements  help  determine  the  work  done  

Some  elements  allow  us  to  appreciate  what  has  been  done  what  but  more  work  is  required  

Execution  of  activities  as    scheduled  

 Between  51%  and  70%  of  executed  funds  

 More  than  71%  of  the  executed  funds  

Figure  1:  Color  Coded  Monitoring  System  

Page 80: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

8  

 Project  Progress  Status  Reports    As  a  result  of  the  use  of  the  color  coded  monitoring  system  the  TS  elaborates  the  following  reports  that  allow  to  pin  point  the  stage  of  each  program  at  the  output  level  as  shown  from  here  on:      1000:  Strengthened  Implementation  of  elections,  focusing  on  gender  equality  considerations  in  targeted  countries      

Responsible   #  Output   Original  Appropriation  

(CAD)  

%  Executed  03/31/2013  

Results    03/31/2013    

Betilde  Muñoz  Maria  Teresa  Mellenkamp  Sara  Mia  Noguera    

SPA  1211-­‐1110-­‐Political  Electoral  Funding    Capacity-­‐building  and  professional  development  support  provided  to  all  EMBs  in  political-­‐electoral  financing  and  gender  mainstreaming  

 75,000  

   

Betilde  Muñoz  Maria  Teresa  Mellenkamp  Sara  Mia  Noguera  

SPA  1211-­‐1120-­‐Exchange  Lessons  Learned    Training/seminars/  exchanges  held  to  share  lessons  learned  related  to  elections,  including  lessons  promoting  women’s  participation  in  electoral  bodies

136,667      

 

Betilde  Muñoz  Maria  Teresa  Mellenkamp  Sara  Mia  Noguera  

SPA  1211-­‐1130-­‐Studies-­‐Inclusive  Elections  Studies  disseminated  to  all  EMBS  on  how  to  strengthen  their  work  to  make  elections  more  inclusive  

70,000    

 

Betilde  Muñoz  Maria  Teresa  Mellenkamp  Sara  Mia  Noguera  

SPA  1211-­‐1140-­‐Quality  Management  Control    Quality  Management  Systems  (QMS)  implemented  and  Electoral  Management  Assurance  (EMA)  developed  to  certify  electoral  authorities

80,000  

 

Betilde  Muñoz  Maria  Teresa  Mellenkamp  Sara  Mia  Noguera  

SPA  1211-­‐1150-­‐New  Technologies  Gender  New  technologies  which  take  into  consideration  gender  equality  (where  appropriate)  identified  and  implementation  facilitated  (including  e-­‐voting)  in  electoral  processes  in  member  states    

40,000    

Betilde  Munoz  Maria  Teresa  Mellenkamp  Sara  Mia  Noguera  

SPA  1211-­‐1160-­‐Technical  Cooperation  Electoral  Matters    Technical  cooperation  provided  to  EMBs  on  several  electoral  topics,  including:  legal  reform,  geo-­‐reference  systems,  electoral  registry  auditing,  electoral  juridical  rulings,  decentralization  of  the  vote  and  promotion  of  the  equal  participation  of  women  and  men  at  all  levels  of  the  electoral  process    

175,000  

 

 

Page 81: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

   2000:  Increased  progress  towards  implementation  of  policies  and  regulatory  frameworks  and  instruments  that  stimulate  sustainable  economic  growth,  particularly  in  areas  of  competitiveness,  innovation  and  MSMEs,  in  targeted  countries        

Responsable   #  Output   Original  Appropriation  

(CAD)  

%  Executed  03/12/2013  

Results    01/29/2013    

Maryse  Robert   SID  1211-­‐2110-­‐Dialogue  on  MSME  Policies    OAS  Dialogue  of  MSME  High-­‐Level  Authorities  institutionalized  as  an  hemispheric  forum  for  public  policies  and  strategies  for  MSME  development  

170,000      

Maryse  Robert   SID  1211-­‐2120-­‐Initiatives  to  support  MSMEs  Support  provided  to  high-­‐impact  MSMEs,  including  women-­‐led  MSMEs,  public/private  universities  and  R&D  centers  (which  include  government-­‐sponsored  R&D  centers  and  others  created  by  associations  of  MSMEs)  in  strategic  economic  sectors

 90,000    

 

Maryse  Robert   SID  1211-­‐2130-­‐Public  and  Private  Partnerships    Support  provided  to  member  states  to  facilitate  the  development  of  the  policy  framework  enabling  public-­‐private  partnerships  for  innovation  in  the  business  environment,  including  licensing  and  transfer  of  technology  

75,000      

Alexandra  Barrantes    

SID  1217-­‐2140-­‐Inter-­‐American  Collaborative  Networks    Support  provided  to  the  Inter-­‐American  Networks  (RIAC,  STEN,  Inter-­‐American  E-­‐SME  and  Innovation  Network  and  Consumer  Safety  Network)  to  undertake  their  mandates  

200,000      

Zakaria  El  Goumiri   SID  1212-­‐2210-­‐CSR  Awareness  Parliamentarians    Mechanisms  created  to  raise  awareness  of  CSR  principles  among  parliamentarians  in  the  region    

150,000      

Zakaria  El  Goumiri   SER  1202-­‐2220-­‐Awareness  CooperaNet    Capacity  building  tools  developed  to  promote  responsible  practices  among  key  stakeholders  of  the  Inter-­‐American  Cooperation  Network  (CooperaNet)  

89,500      

 

Less  than  40%    Between  41  and  50%    Between  51  and  70%  More  than  71%    

-­‐ There  are  no  elements  to  appreciate  the  work  done  

-­‐ Few  elements  help  determine  the  work  done  

-­‐ Some  elements  allow  us  to  appreciate  what  has  been  done  but  more  work  is  required  

-­‐ Execution  of  activities  as  scheduled    

Page 82: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

10  

 2000:  Increased  progress  towards  implementation  of  policies  and  regulatory  frameworks  and  instruments  that  stimulate  sustainable  economic  growth,  particularly  in  areas  of  competitiveness,  innovation  and  MSMEs,  in  targeted  countries  

     

Responsable   #  Output   Original  Appropriation  

(CAD)  

%  Executed  03/31/2013  

Results    03/31/2013    

Maria  Fernanda  Trigo    Milagros  Freyre    

 SPA  1215-­‐2310-­‐MEGICEP    Establish  a  knowledge  exchange/dialogue  mechanism  to  promote  sound  management  practices  in  member  states/in  the  region  i.e.  Inter-­‐American  Cooperation  Mechanism  for  Effective  Public  Management  (MECIGEP)    

 233,750  

   

Maria  Fernanda  Trigo    Milagros  Freyre  

SPA  1208-­‐2320-­‐Promote  Growth  Public  Sector  Technical  assistance  provided  for  the  implementation  of  selected  projects  requested  by  OAS  member  states  in  key  areas  of  public  management  

500,000      

Dante  Negro    

 SAJ  1203-­‐2410-­‐Secured  Transactions    Technical  support  provided  to  member  states  for  implementation  of  the  OAS   Model   Law   on   secured   transactions,   with   the   participation   of  international  organizations,  private  sector,  trade  associations  and  taking  into  account  the  financial  inclusion  of  women-­‐owned  SMEs

152,500      

 

Jorge  Garcia     SAJ  1204-­‐2510-­‐Follow  up  MESICIC    Assessment  of  the  compliance  of  the  Inter-­‐American  Convention  against  Corruption  conducted  through  its  Follow-­‐up  Mechanism  (MESICIC)

200,000      

Dante  Negro          

SAJ  1201-­‐2520-­‐Equitable  Access  to  Public  Info.    Technical  support  provided  for  the  implementation  of  the  Model  Inter-­‐American  Law  on  Access  to  Public  Information  and  its  Guidelines  with  the  participation  of  government  officials,  policy  makers  and  the  private  sector  and  civil  society,  including  women’s  organizations    

140,400    

 

 

-­‐ There  are  no  elements  to  appreciate  the  work  done  

-­‐ Few  elements  help  determine  the  work  done  

-­‐ Some  elements  allow  us  to  appreciate  what  has  been  done  but  more  work  is  required  

-­‐ Execution  of  activities  as  scheduled    

Less  than  40%    Between  41  and  50%    Between  51  and  70%  More  than  71%    

Page 83: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

11  

 3000:  Increased  opportunities  provided  by  member  states  to  businesses  to  access  national,  regional  and  global  markets  

 

Responsable   #  Output   Original  Appropriation  

(CAD)  

%  Executed  03/31/2013  

Results    03/31/2013    

Maryse  Robert      SID1211-­‐3110-­‐MSME  Training  the  Trainers  Train-­‐the-­‐Trainers  Program  executed,  taking  into  account  the  needs  of  women  entrepreneurs  

220,000      

Maryse  Robert   SID  1210-­‐3210-­‐TRTA  Program    Trade-­‐related  technical  assistance  (TRTA)  program  for  government  officials  responsible  for  negotiating  and  implementing  trade  agreements  designed  and  executed

250,000  

 

 

Claudia  D’windt        SID1207-­‐3220-­‐Capacity  Building  Sustainable  Use    Capacity   building   program   of   country   officials   for   the   sustainable   use   of  natural   resources   (water,   soil,   land,   renewable   energy,   biodiversity)  developed   in   trade   goods   and   services   executed,   taking   into   account   the  different  needs,  ownership  and  uses  of   those   resources  with  an   integrated  gender  balance  perspective

 90,000  

 

 

Zakaria  El  Goumiri     SID1212-­‐3310-­‐CSR  Training  for  SMEs    Training  provided  to  SMEs  to  adopt  socially  and  environmentally  responsible  business  practices  and  especially  gender  sensitive  practices

135,000    

 

Zakaria  El  Goumiri   SID1212-­‐3320-­‐CSR  Community  of  Practice    CSR  community  of  practice  created  to  facilitate  knowledge  exchange    

50,000    

 

Dante  Negro  Magaly  Mclean    

SAJ1202-­‐3410-­‐International  Commercial  Dispute  Settlement    Training  provided  to  the  judiciary  and  other  public  officials  in  the  application  of  international  commercial  arbitration  and  the  local  enforcement  of  foreign  judgments  and  arbitral  awards    

232,033    

 

 

-­‐ There  are  no  elements  to  appreciate  the  work  done  

-­‐ Few  elements  help  determine  the  work  done  

-­‐ Some  elements  allow  us  to  appreciate  what  has  been  done  but  more  work  is  required  

-­‐ Execution  of  activities  as  scheduled    

Less  than  40%    Between  41  and  50%    Between  51  and  70%  More  than  71%    

Page 84: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

12  

     4000:  Strengthened  application  of  human  rights  instruments  related  to  gender  equality,  i.e.  CEDAW  and  Belem  do  Para  by  member  states  

 

Responsible   #  Output   Original  Appropriation  

(CAD)  

%  Executed  03/31/2013  

Results    03/31/2013    

Hilary  Anderson      CIM1203-­‐4110-­‐Commitment  on  Women’s  Rights    Monitoring  implementation  of  agreed  commitments  on  women’s  rights  undertaken  

212,600      

Hilary  Anderson   CIM1203-­‐4120-­‐Reg.  Assessment  of  Mechanisms    Regional   assessment   of   National   Machineries   for   The   Advancement   of  Women  undertaken  and  recommendations  disseminated    

72,000      

Hilary  Anderson    CIM1202-­‐4210-­‐Women’s  Right    Monitoring   the   implementation   of   the   Belem   do   Para   Convention  undertaken  

233,000      

 

Hilary  Anderson   CIM1202-­‐4220-­‐Training  Government  Officials    Training  provided  to  government  officials  on  the  implementation  of  Belem  do  Para  

70,000    

 

   

-­‐ There  are  no  elements  to  appreciate  the  work  done  

-­‐ Few  elements  help  determine  the  work  done  

-­‐ Some  elements  allow  us  to  appreciate  what  has  been  done  but  more  work  is  required  

-­‐ Execution  of  activities  as  scheduled    

Less  than  40%    Between  41  and  50%    Between  51  and  70%  More  than  71%    

Page 85: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

13  

5000:  Improved  effectiveness  of  the  OAS  in  fulfilling  its  mandate  to  support  democratic  governance  and  sustainable  economic  growth    

Responsible   #  Output   Original  Appropriation  

(CAD)  

%  Executed  03/12/2013  

Results    01/29/2013    

Ricardo  Graziano     SAF1201-­‐5110-­‐Data  Mandate  &  Resource    Tools  enhanced  to  manage  data  on  mandates,  executed  resources,  and  achieved  results  including  gender-­‐specific  results,  and  support  provided  to  facilitate  results-­‐based  management  by  OAS/GS  

130,000        

Ricardo  Graziano   SAF1201-­‐5120-­‐Result  Based  Project  Tools  and  support  provided  to  OAS/SG  Staff  to  facilitate  results-­‐based  project  formulation,  including  the  incorporation  of  gender  equality  results  in  the  project  cycle

100,000      

Martin  Huenneke      SUM1201-­‐5130-­‐SISCA  Enhanced    SISCA   enhanced   to   integrate   Inter-­‐American   ministerial   mandates,  gender  equality   related  mandates,  and   to  allow  sex  disaggregated  data  and  improvements  in  RBM  reporting  for  member  states  

 94,494  

   

Ricardo  Graziano   SAF1201-­‐5210-­‐Mandates  Database  Control  System    Mandates  Management  Database  and  Planning  and  Control  System  updated  to  facilitate  the  follow-­‐up  of  gender  equality  mandates

60,000      

Ricardo  Graziano   SAF1201-­‐5220-­‐Procedures  to  Integrate  Gender      Procedures  developed  and  support  provided  to  facilitate  the  integration  of  gender  equality  considerations  in  OAS/SG  programs/  projects  

91,000      

Karen  Bozicovich       SPA  1210-­‐5310-­‐Political  Analysis  System    Qualitative  and  quantitative  tools,  information,  and  analysis  generated  and  applied  to  improve  SAPEM      

350,000      

   

 

-­‐ There  are  no  elements  to  appreciate  the  work  done  

-­‐ Few  elements  help  determine  the  work  done  

-­‐ Some  elements  allow  us  to  appreciate  what  has  been  done  but  more  work  is  required  

-­‐ Execution  of  activities  as  scheduled    

Less  than  40%    Between  41  and  50%    Between  51  and  70%  More  than  71%    

Page 86: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

14  

 5000:  Improved  effectiveness  of  the  OAS  in  fulfilling  its  mandate  to  support  democratic  governance  and  sustainable  economic  growth  

 Responsable   #  Output   Original  

Appropriation  (CAD)  

%  Executed  03/31/2013  

Results    03/31/2013    

Ricardo  Dominguez     OSG1201-­‐5320-­‐OAS  Emerging  Priorities  Recommendations  from  previous  crisis  management  and  resolution  cases  considered  by  OAS/GS  decision  makers  and  envoys  during  new  crisis  situations  in  the  LAC  region    

437,500      

Betilde  Munoz   SPA1216-­‐5410-­‐Underrepresented  Methodology    Training,  observation  of  underrepresented  groups  methodology,  and  databases  designed  and  implemented  for  OAS  Electoral  Observation  teams

163,333    

 

Martin  Huenneke      SUM1201-­‐5510-­‐Recommendations  from  Consultants      Recommendations  from  virtual  and  face-­‐to-­‐face  consultations  presented  to   OAS   member   states   in   the   policy-­‐making   process   (i.e.   Summit  Implementation  Review  Group-­‐SIRG)

 200,506    

 

Jorge  Sanin      SER1201-­‐5520-­‐Consultations  with  CSO’s    Consultations  with  a  balanced  regional  representation  of  stakeholders  facilitated,  and  gender  sensitive  recommendations  presented  to  OAS  member  states  and  General  Secretariat  in  preparation  of  General  Assemblies  and  ministerial  meetings.  

107,000  

 

 

           

-­‐ There  are  no  elements  to  appreciate  the  work  done  

-­‐ Few  elements  help  determine  the  work  done  

-­‐ Some  elements  allow  us  to  appreciate  what  has  been  done  but  more  work  is  required  

-­‐ Execution  of  activities  as  scheduled    

Less  than  40%    Between  41  and  50%    Between  51  and  70%  More  than  71%    

Page 87: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

15  

6  

21  

10  

0   5   10   15   20   25  

Red  

Orange  

Yellow  

Green  

Scores  of  the  Color  Coded  Monitoring  System  (at  the  Result  Level)     For  Year  I  of  the  OAS  /CP  the  majority  of  projects  at  the  level  of  Results  are  at  Yellow  with  a  57%,  followed  by  27%  at  Green  and  16%  at  Orange,  meaning  an  overall  positive  level  of  performance  at  the  level  of  outputs.        

             

                                             

                                       Table  1:  Year  I  Color  Coded  System  Tally    

Figure  2:  Outputs  and  Results        

   

Totals  

1000   2000   3000   4000   5000   PROGRAM  

$   RESULTS   $   RESULTS   $   RESULTS   $   RESULTS   $   RESULTS   $   RESULTS  

RED   2   -­‐   1   -­‐   -­‐   -­‐   3   -­‐   -­‐   -­‐   6   -­‐  

ORANGE   -­‐   2   1   1   1   -­‐   -­‐   1   2   2   4   6  

YELLOW   1   2   -­‐   8   1   4   1   1   2   6   5   21  

GREEN   3   2   9   2   4   2   -­‐   2   6   2   22   10  

Page 88: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

   

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

 

Financial.��This � section� provides � detailed� Basic � Financial � Statements � as � of �March� 31, � 2013: � ���

Financial    Yr. � I �

16

Page 89: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

17

Page 90: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule AOAS/CIDA Cooperation Plan ‐ Phase II Cumulative ‐ Basic Financial StatementsFrom inception (March 29, 2012) to March 31, 2013

I. STATEMENT OF CASH RECEIPTS AND PAYMENTS III. STATEMENT OF CONTRIBUTIONS

(in USD) Event date Percentage (in CAD) (in USD) Ex. RateAdd: receipts Actual receiptsContribution 13,058,538   2011‐2012 5‐Apr‐12 34.6% 6,602,565     6,648,439     0.9931         Transfers in ‐                     2012‐2013 22‐Mar‐13 33.3% 6,565,223     6,410,099     1.0242         Interest 48,510          67.9% 13,167,788   13,058,538  Other receipts ‐                    

Total receipts 13,107,048   Add: projected receipts2013‐2014 32.1% 6,332,212     6,182,038     1.0243         

Less: paymentsTransfers out ‐                     Total contribution as per agreement 100.0% 19,500,000   19,240,576  Return to donor ‐                       * Exchange rate as of 04/12/2013.Expenditures 4,104,156    Other payments ‐                     IV. STATEMENT OF EXPENDITURES AND OBLIGATIONS BY OBJECT OF EXPENDITURE

Total payments 4,104,156    

Increase/(decrease) in cash 9,002,892     A B C=A+BExpenditures Obligations Execution

By object classCash at beginning of period ‐                     Personnel contracts 976,022        289,430        1,265,452    Add: increase/(decrease) in cash 9,002,892     Non‐recurring personnel costs 1,000             ‐                     1,000            

Cash at end of period 9,002,892     Fellowships ‐                     ‐                     ‐                     Travel 727,299          66,348            793,646         Publications and documents 40,551          3,186             43,737         

II. STATEMENT OF FUND BALANCE Equipment, supplies and maintenance 64,458          4,576             69,034         Building and maintenance 12,032          123                12,156         

(in USD) Performance contracts 1,501,768     776,489        2,278,257    Cash at end of period 9,002,892     Indirect cost recovery 731,328        ‐                     731,328       Less: unliquidated obligations 1,140,655     Other expenses 49,698          503                50,201         

Fund balance at end of period 7,862,237     Total expenditures and obligations 4,104,156     1,140,655     5,244,811    

(in USD)

*

The accompanying notes form part of the financial statements 18

Page 91: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule BOAS/CIDA Cooperation Plan ‐ Phase II Cumulative ‐ Budget Execution and Statement of Changes in Fund BalanceFrom inception (March 29, 2012) to March 31, 2013 At the intermediate outcome level

I. BUDGET EXECUTION (INCEPTION TO DATE)

(in CAD)A B C D=B+C E F=D‐E G=E/D

Original Original Re‐ Modified Unobligated PercentageAppropriation Appropriation programming Appropriation Execution Appropriation Executed

By Outcome1000 1,560,000     1,540,729     ‐                      1,540,729      392,149        1,148,580     25%2000 6,885,000     6,783,286     ‐                      6,783,286      1,747,745     5,035,541     26%3000 2,555,000     2,524,438     ‐                      2,524,438      811,127        1,713,311     32%4000 1,515,000     1,497,134     ‐                      1,497,134      259,791        1,237,343     17%5000 4,625,000     4,568,623     ‐                      4,568,623      1,302,671     3,265,952     29%

17,140,000   16,914,210   ‐                      16,914,210     4,513,483     12,400,727   27%Program evaluation 215,000        209,903        ‐                      209,903         ‐                     209,903        0%Indirect cost recovery 2,145,000     2,116,463     ‐                      2,116,463      731,328        1,385,135     35%Unprogrammed Funds (plus interest income) ‐                     ‐                     48,510          48,510           ‐                     48,510          0%

Total 19,500,000   19,240,576   48,510          19,289,086     5,244,811     14,044,275   27%

II. STATEMENT OF CHANGES IN FUND BALANCE (INCEPTION TO DATE) III. APPROPRIATION, ALLOTMENT AND EXECUTION BY OUTCOME

A B C=A‐BAllotted to FundOutcomes Execution Balance

By Outcome1000 580,673        392,149        188,524       2000 2,022,297     1,747,745     274,552       3000 913,270        811,127        102,143       4000 412,992        259,791        153,201       5000 1,521,279     1,302,671     218,609       

5,450,511     4,513,483     937,029       Program evaluation ‐                     ‐                     ‐                    Indirect cost recovery 731,328        731,328        ‐                    Unprogrammed Funds (plus interest income) 6,925,208     ‐                     6,925,208    

Total 13,107,048   5,244,811     7,862,237    

(in USD)

(in USD)

1

2

3

4

5

6

7

8

1000 2000 3000 4000 5000Outcomes

(in m

illions of U

SD)

Modified AppropriationAllotted to OutcomesExecution

The accompanying notes form part of the financial statements 19

Page 92: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Fiscal Year 1 ‐ Budget Execution (Detail by Output)From inception (March 29, 2012) to March 31, 2013

SCHEDULE C

20

Page 93: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule COAS/CIDA Cooperation Plan ‐ Phase II Fiscal Year 1 ‐ Budget ExecutionFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

(in CAD)A B C D=B+C E F=D‐E G=(E‐D)/D H=E/D

PercentageOriginal Original Re‐ Modified Unobligated Executed Over

Appropriation Appropriation programming Appropriation Execution Appropriation Variance Mod. Approp.Outcome / Immediate Outcome / Output

100011001110‐Political Electoral Funding 75,000          75,521          ‐                      75,521           65,948          9,573             ‐13% 87%1120‐Exchange Lessons Learned 136,667        137,616        ‐                      137,616         122,655        14,961          ‐11% 89%1130‐Studies ‐ Inclusive Elections 70,000          70,486          (7,741)           62,745           5,347             57,398          ‐91% 9%1140‐Quality Management Control 80,000          80,556          7,741             88,297           83,673          4,624             ‐5% 95%1150‐New Technologies ‐ Gender 40,000          40,278          ‐                      40,278           7,027             33,250          ‐83% 17%1160‐Technical Cooperation Electoral Matters 175,000        176,216        ‐                      176,216         107,500        68,716          ‐39% 61%

Subtotal 1000 576,667        580,673        ‐                      580,673         392,149        188,524        ‐32% 68%

Total 1000 576,667        580,673        ‐                      580,673         392,149        188,524        ‐32% 68%

200021002110‐Dialogue on MSME Policies 170,000        171,181        ‐                      171,181         171,181        ‐                     0% 100%2120‐Initiatives to Support MSME 90,000          90,625          ‐                      90,625           68,428          22,198          ‐24% 76%2130‐Public and Private Partnerships  75,000          75,521          ‐                      75,521           53,657          21,864          ‐29% 71%2140‐Inter‐American Collaborative Networks 200,000        201,390        ‐                      201,390         199,570        1,820             ‐1% 99%

Subtotal 2100 535,000        538,717        ‐                      538,717         492,835        45,882          ‐9% 91%

22002210‐CSR Awareness Among Parliament 150,000        151,042        ‐                      151,042         138,215        12,827          ‐8% 92%2220‐Awareness COOPERANET 89,500          90,122          ‐                      90,122           69,366          20,756          ‐23% 77%

Subtotal 2200 239,500        241,164        ‐                      241,164         207,580        33,584          ‐14% 86%

23002310‐MECIGEP 111,500        112,275        112,946        225,221         167,389        57,832          ‐26% 74%2320‐Promote Growth Public Sector 400,000        402,779        110,848        513,627         509,208        4,419             ‐1% 99%2330‐Public Private Partnerships 222,250        223,794        (223,794)       ‐                      ‐                     ‐                     0% 0%

Subtotal 2300 733,750        738,848        ‐                      738,848         676,597        62,251          ‐8% 92%

24002410‐Secured Transactions 152,500        153,560        ‐                      153,560         54,987          98,573          ‐64% 36%

(in USD)

The accompanying notes form part of the financial statements 21

Page 94: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule COAS/CIDA Cooperation Plan ‐ Phase II Fiscal Year 1 ‐ Budget ExecutionFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

(in CAD)A B C D=B+C E F=D‐E G=(E‐D)/D H=E/D

PercentageOriginal Original Re‐ Modified Unobligated Executed Over

Appropriation Appropriation programming Appropriation Execution Appropriation Variance Mod. Approp.Outcome / Immediate Outcome / Output

(in USD)

25002510‐Follow‐up MESICIC 200,000        201,390        ‐                      201,390         246,973        (45,584)         23% 123%

2520‐Equitable Access to Public Information 140,400        141,375        ‐                      141,375         68,772          72,604          ‐51% 49%Subtotal 2500 340,400        342,765        ‐                      342,765         315,745        27,020          ‐8% 92%

Total 2000 2,001,150     2,015,054     ‐                      2,015,054      1,747,745     267,309        ‐13% 87%

300031003110‐MSME Training the Trainers 220,000        221,529        ‐                      221,529         218,070        3,459             ‐2% 98%

32003210‐TRTA Program 250,000        251,737        ‐                      251,737         251,737        ‐                     0% 100%3220‐Capacity Building Sustainable Use 90,000          90,625          ‐                      90,625           61,535          29,090          ‐32% 68%

Subtotal 3200 340,000        342,362        ‐                      342,362         313,272        29,090          ‐8% 92%

33003310‐CSR Training for SMEs 135,000        135,938        ‐                      135,938         135,919        19                  0% 100%3320‐CSR Community of Practice 50,000          50,347          ‐                      50,347           39,150          11,197          ‐22% 78%

Subtotal 3300 185,000        186,285        ‐                      186,285         175,069        11,216          ‐6% 94%

34003410‐Internal Communication Dispute Settlements 232,033        233,645        ‐                      233,645         104,716        128,930        ‐55% 45%

Total 3000 977,033        983,822        ‐                      983,822         811,127        172,695        ‐18% 82%

400041004110‐Commitments on Women's Rights 212,600        214,077        ‐                      214,077         82,008          132,069        ‐62% 38%4120‐Reg. Assessment of Mechanisms 72,000          72,500          ‐                      72,500           26,000          46,500          ‐64% 36%

Subtotal 4100 284,600        286,577        ‐                      286,577         108,008        178,569        ‐62% 38%

42004210‐Women's Right 233,000        234,619        ‐                      234,619         151,783        82,836          ‐35% 65%

*

* Temporary cash advance of USD 50,000.

The accompanying notes form part of the financial statements 22

Page 95: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule COAS/CIDA Cooperation Plan ‐ Phase II Fiscal Year 1 ‐ Budget ExecutionFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

(in CAD)A B C D=B+C E F=D‐E G=(E‐D)/D H=E/D

PercentageOriginal Original Re‐ Modified Unobligated Executed Over

Appropriation Appropriation programming Appropriation Execution Appropriation Variance Mod. Approp.Outcome / Immediate Outcome / Output

(in USD)

4220‐Training government officials 70,000          70,486          ‐                      70,486           ‐                     70,486          ‐100% 0%Subtotal 4200 303,000        305,105        ‐                      305,105         151,783        153,322        ‐50% 50%

Total 4000 587,600        591,683        ‐                      591,683         259,791        331,892        ‐56% 44%

500051005110‐Data Mandate & Resources 130,000        130,903        ‐                      130,903         141,591        (10,687)         8% 108%5120‐Results Based Project 100,000        100,695        ‐                      100,695         95,044          5,650             ‐6% 94%5130‐SISCA Enhanced 45,000          45,313          49,838          95,151           69,423          25,727          ‐27% 73%

Subtotal 5100 275,000        276,911        49,838          326,749         306,058        20,690          ‐6% 94%

52005210‐Mandates Database Control System 60,000          60,417          ‐                      60,417           60,417          ‐                     0% 100%5220‐Procedures to Integrate Gender 91,000          91,632          ‐                      91,632           91,632          ‐                     0% 100%

Subtotal 5200 151,000        152,049        ‐                      152,049         152,049        ‐                     0% 100%

53005310‐Political Analysis System 350,000        352,432        ‐                      352,432         311,639        40,792          ‐12% 88%5320‐OAS Emerging Priorities 437,500        440,540        ‐                      440,540         280,624        159,915        ‐36% 64%

Subtotal 5300 787,500        792,971        ‐                      792,971         592,264        200,708        ‐25% 75%

54005410‐Underrepresented Methodology 163,333        164,468        ‐                      164,468         82,460          82,008          ‐50% 50%

55005510‐Recommendations from Consultants 250,000        251,737        (49,838)         201,899         125,521        76,378          ‐38% 62%5520‐Consultations with CSO's 107,000        107,743        ‐                      107,743         44,318          63,425          ‐59% 41%

Subtotal 5500 357,000        359,480        (49,838)         309,643         169,840        139,803        ‐45% 55%

Total 5000 1,733,833     1,745,880     ‐                      1,745,880      1,302,671     443,209        ‐25% 75%

ICRIndirect Cost Recovery 726,282        731,328        ‐                      731,328         731,328        ‐                     0% 100%

The accompanying notes form part of the financial statements 23

Page 96: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule COAS/CIDA Cooperation Plan ‐ Phase II Fiscal Year 1 ‐ Budget ExecutionFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

(in CAD)A B C D=B+C E F=D‐E G=(E‐D)/D H=E/D

PercentageOriginal Original Re‐ Modified Unobligated Executed Over

Appropriation Appropriation programming Appropriation Execution Appropriation Variance Mod. Approp.Outcome / Immediate Outcome / Output

(in USD)

Unprogrammed FundsUnprogrammed Funds (plus interest income) ‐                     ‐                     48,510          48,510           ‐                     48,510          ‐100% 0%

Grand Total 6,602,565     6,648,439     48,510          6,696,950      5,244,811     1,452,139     ‐22% 78%

The accompanying notes form part of the financial statements 24

Page 97: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Fiscal Year 1 ‐ Statement of Changes in Fund Balance (Detail by Output)From April 1, 2012 to March 31, 2013

SCHEDULE D

25

Page 98: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule DOAS/CIDA Cooperation Plan ‐ Phase II Fiscal Year 1 ‐ Statement of Changes in Fund BalanceFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C D=B‐C E F=D‐E G=(C+E)/BPercentage

Modified Allotted to Cash Fund Executed OverAppropriation Outputs Expenditures Balance Obligations Balance Allotment

Outcome / Immediate Outcome / Output

100011001110‐Political Electoral Funding 75,521          75,521          63,688           11,834          2,260             9,574             87%1120‐Exchange Lessons Learned 137,616        137,617        122,655         14,962          ‐                     14,962          89%1130‐Studies ‐ Inclusive Elections 62,745          62,745          2,151              60,594          3,196             57,398          9%1140‐Quality Management Control 88,297          88,298          52,915           35,383          30,758          4,624             95%1150‐New Technologies ‐ Gender 40,278          40,278          4,429              35,848          2,598             33,250          17%1160‐Technical Cooperation Electoral Matters 176,216        176,216        87,129           89,087          20,371          68,716          61%

Subtotal 1000 580,673        580,673        332,966         247,707        59,183          188,524        68%

Total 1000 580,673        580,673        332,966         247,707        59,183          188,524        68%

200021002110‐Dialogue on MSME Policies 171,181        171,181        161,351         9,830             9,830             0                     100%2120‐Initiatives to Support MSME 90,625          90,438          13,559           76,879          54,869          22,010          76%2130‐Public and Private Partnerships  75,521          75,365          36,646           38,718          17,010          21,708          71%2140‐Inter‐American Collaborative Networks 201,390        201,390        171,490         29,899          28,079          1,820             99%

Subtotal 2100 538,717        538,373        383,047         155,326        109,788        45,538          92%

22002210‐CSR Awareness Among Parliament 151,042        151,042        74,617           76,425          63,598          12,827          92%2220‐Awareness COOPERANET 90,122          90,122          65,855           24,267          3,511             20,756          77%

Subtotal 2200 241,164        241,164        140,471         100,692        67,109          33,583          86%

23002310‐MECIGEP 225,221        225,291        89,389           135,903        78,000          57,902          74%2320‐Promote Growth Public Sector 513,627        513,557        423,731         89,826          85,478          4,349             99%

Subtotal 2300 738,848        738,848        513,119         225,729        163,478        62,251          92%

24002410‐Secured Transactions 153,560        153,560        39,774           113,785        15,212          98,573          36%

(in USD)

The accompanying notes form part of the financial statements 26

Page 99: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule DOAS/CIDA Cooperation Plan ‐ Phase II Fiscal Year 1 ‐ Statement of Changes in Fund BalanceFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C D=B‐C E F=D‐E G=(C+E)/BPercentage

Modified Allotted to Cash Fund Executed OverAppropriation Outputs Expenditures Balance Obligations Balance Allotment

Outcome / Immediate Outcome / Output

(in USD)

25002510‐Follow‐up MESICIC 201,390        251,390        205,015         46,374          41,958          4,416             98%2520‐Equitable Access to Public Information 141,375        98,963          51,666           47,297          17,106          30,191          69%

Subtotal 2500 342,765        350,352        256,681         93,671          59,064          34,607          90%

Total 2000 2,015,054     2,022,297     1,333,093      689,204        414,652        274,552        86%

300031003110‐MSME Training the Trainers 221,529        221,070        141,746         79,324          76,324          3,000             99%

32003210‐TRTA Program 251,737        251,737        162,890         88,847          88,847          ‐                     100%3220‐Capacity Building Sustainable Use 90,625          90,626          54,626           35,999          6,909             29,091          68%

Subtotal 3200 342,362        342,363        217,517         124,846        95,756          29,091          92%

33003310‐CSR Training for SMEs 135,938        135,938        103,218         32,720          32,701          19                  100%3320‐CSR Community of Practice 50,347          50,348          6,400              43,948          32,750          11,198          78%

Subtotal 3300 186,285        186,286        109,618         76,667          65,451          11,216          94%

34003410‐Internal Communication Dispute Settlements 233,645        163,552        91,247           72,304          13,468          58,836          64%

Total 3000 983,822        913,270        560,129         353,141        250,998        102,143        89%

400041004110‐Commitments on Women's Rights 214,077        148,968        52,008           96,960          30,000          66,960          55%4120‐Reg. Assessment of Mechanisms 72,500          50,450          ‐                      50,450          26,000          24,450          52%

Subtotal 4100 286,577        199,418        52,008           147,410        56,000          91,410          54%

42004210‐Women's Right 234,619        164,233        129,283         34,950          22,500          12,451          92%

* Temporary cash advance of USD 50,000.

*

The accompanying notes form part of the financial statements 27

Page 100: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule DOAS/CIDA Cooperation Plan ‐ Phase II Fiscal Year 1 ‐ Statement of Changes in Fund BalanceFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C D=B‐C E F=D‐E G=(C+E)/BPercentage

Modified Allotted to Cash Fund Executed OverAppropriation Outputs Expenditures Balance Obligations Balance Allotment

Outcome / Immediate Outcome / Output

(in USD)

4220‐Training government officials 70,486          49,340          ‐                      49,340          ‐                     49,340          0%Subtotal 4200 305,105        213,574        129,283         84,291          22,500          61,791          71%

Total 4000 591,683        412,992        181,291         231,701        78,500          153,201        63%

500051005110‐Data Mandate & Resources 130,000        130,903        93,457           37,446          48,134          (10,687)         108%5120‐Results Based Project 100,000        100,694        52,679           48,015          42,365          5,650             94%5130‐SISCA Enhanced 95,151          95,151          69,423           25,727          ‐                     25,727          73%

Subtotal 5100 325,151        326,748        215,559         111,189        90,499          20,690          94%

52005210‐Mandates Database Control System 60,417          60,417          39,891           20,526          20,526          0                     100%5220‐Procedures to Integrate Gender 91,632          91,632          19,294           72,339          72,339          ‐                     100%

Subtotal 5200 152,049        152,049        59,184           92,865          92,865          0                     0%

53005310‐Political Analysis System 352,432        352,431        279,702         72,729          31,937          40,792          88%5320‐OAS Emerging Priorities 437,500        308,378        238,301         70,077          42,323          27,753          91%

Subtotal 5300 789,932        660,809        518,003         142,806        74,260          68,545          90%

54005410‐Underrepresented Methodology 164,468        115,128        37,478           77,650          44,982          32,668          72%

55005510‐Recommendations from Consultants 201,899        201,899        118,125         83,774          7,396             76,378          62%5520‐Consultations with CSO's 107,743        64,646          17,000           47,646          27,318          20,328          69%

Subtotal 5500 309,643        266,545        135,125         131,420        34,715          96,706          64%

Total 5000 1,741,242     1,521,280     965,349         555,930        337,322        218,609        86%

The accompanying notes form part of the financial statements 28

Page 101: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule DOAS/CIDA Cooperation Plan ‐ Phase II Fiscal Year 1 ‐ Statement of Changes in Fund BalanceFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C D=B‐C E F=D‐E G=(C+E)/BPercentage

Modified Allotted to Cash Fund Executed OverAppropriation Outputs Expenditures Balance Obligations Balance Allotment

Outcome / Immediate Outcome / Output

(in USD)

ICRIndirect Cost Recovery 731,328        731,328        731,328         ‐                     ‐                     ‐                     100%

Unprogrammed FundsUnprogrammed Funds (plus interest income) 48,510          515,109        ‐                      515,109        ‐                     515,109        0%

Grand Total 6,692,312     6,696,950     4,104,156      2,592,794     1,140,655     1,452,138     78%

The accompanying notes form part of the financial statements 29

Page 102: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

From inception (March 29, 2012) to March 31, 2013

SCHEDULE ECumulative ‐ Statement of Execution by Object of Expenditure 

 (Detail by Output)

30

Page 103: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule EOAS/CIDA Cooperation Plan ‐ Phase II Cumulative ‐ Statement of Execution by Object of ExpenditureFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C = A + B

Expenditures ObligationsOutcome / Immediate Outcome / Output / Object of Expenditure

100011001110‐Political Electoral Funding

1 ‐ Personnel contracts 22,038           ‐                     22,038         8 ‐ Performance contracts 41,650           2,260             43,910         

Subtotal 1110 63,688           2,260             65,948         

1120‐Exchange Lessons Learned4 ‐ Travel 86,049           ‐                     86,049         5 ‐ Publications and documents 2,466              ‐                     2,466            6 ‐ Equipment, supplies and maintenance 7,873              ‐                     7,873            8 ‐ Performance contracts 24,292           ‐                     24,292         9 ‐ Other expenses 1,975              ‐                     1,975            

Subtotal 1120 122,655         ‐                     122,655       

1130‐Studies ‐ Inclusive Elections4 ‐ Travel 2,151              3,196             5,347            

1140‐Quality Management Control4 ‐ Travel 6,949              3,219             10,167         8 ‐ Performance contracts 45,966           27,540          73,506         

Subtotal 1140 52,915           30,758          83,673         

1150‐New Technologies ‐ Gender4 ‐ Travel 3,529              498                4,027            8 ‐ Performance contracts 900                 2,100             3,000            

Subtotal 1150 4,429              2,598             7,027            

1160‐Technical Cooperation Electoral Matters1 ‐ Personnel contracts 6,293              13,229          19,522         4 ‐ Travel 53,261           7,037             60,298         6 ‐ Equipment, supplies and maintenance 7,670              ‐                     7,670            8 ‐ Performance contracts 13,694           ‐                     13,694         

(in USD)

Total Execution

The accompanying notes form part of the financial statements 31

Page 104: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule EOAS/CIDA Cooperation Plan ‐ Phase II Cumulative ‐ Statement of Execution by Object of ExpenditureFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C = A + B

Expenditures ObligationsOutcome / Immediate Outcome / Output / Object of Expenditure

(in USD)

Total Execution

9 ‐ Other expenses 6,211              105                6,316            Subtotal 1160 87,129           20,371          107,500       

Subtotal 1100 332,966         59,183          392,149       

Total 1000 332,966         59,183          392,149       

200021002110‐Dialogue on MSME Policies

4 ‐ Travel 100,788         546                101,334       6 ‐ Equipment, supplies and maintenance 10,529           ‐                     10,529         8 ‐ Performance contracts 47,822           9,283             57,105         9 ‐ Other expenses 2,213              ‐                     2,213            

Subtotal 2110 161,351         9,830             171,181       

2120‐Initiatives to Support MSME4 ‐ Travel 5,159              3,969             9,128            8 ‐ Performance contracts 8,400              50,900          59,300         

Subtotal 2120 13,559           54,869          68,428         

2130‐Public and Private Partnerships 4 ‐ Travel 14,555           15,510          30,066         8 ‐ Performance contracts 3,500              1,500             5,000            9 ‐ Other expenses 18,591           ‐                     18,591         

Subtotal 2130 36,646           17,010          53,657         

2140‐Inter‐American Collaborative Networks4 ‐ Travel 42,353           8,007             50,361         5 ‐ Publications and documents 19,191           ‐                     19,191         8 ‐ Performance contracts 109,922         20,072          129,994       9 ‐ Other expenses 25                   ‐                     25                  

Subtotal 2140 171,490         28,079          199,570       

Subtotal 2100 383,047         109,788        492,835       

The accompanying notes form part of the financial statements 32

Page 105: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule EOAS/CIDA Cooperation Plan ‐ Phase II Cumulative ‐ Statement of Execution by Object of ExpenditureFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C = A + B

Expenditures ObligationsOutcome / Immediate Outcome / Output / Object of Expenditure

(in USD)

Total Execution

22002210‐CSR Awareness Among Parliament

4 ‐ Travel 23,698           898                24,596         8 ‐ Performance contracts 50,119           62,700          112,819       9 ‐ Other expenses 800                 ‐                     800                

Subtotal 2210 74,617           63,598          138,215       

2220‐Awareness COOPERANET4 ‐ Travel 10,684           311                10,995         6 ‐ Equipment, supplies and maintenance 1,272              ‐                     1,272            8 ‐ Performance contracts 53,750           3,100             56,850         9 ‐ Other expenses 149                 100                249                

Subtotal 2220 65,855           3,511             69,366         

Subtotal 2200 140,471         67,109          207,580       

23002310‐MECIGEP

1 ‐ Personnel contracts 12,913           64,118          77,032         4 ‐ Travel 9,072              882                9,954            5 ‐ Publications and documents 2,479              ‐                     2,479            6 ‐ Equipment, supplies and maintenance 35                   13,000          13,035         8 ‐ Performance contracts 64,889           ‐                     64,889         

Subtotal 2310 89,389           78,000          167,389       

2320‐Promote Growth Public Sector1 ‐ Personnel contracts 228,398         46,879          275,277       4 ‐ Travel 18,330           1,397             19,728         6 ‐ Equipment, supplies and maintenance 1,079              ‐                     1,079            8 ‐ Performance contracts 175,894         37,201          213,095       9 ‐ Other expenses 30                   ‐                     30                  

Subtotal 2320 423,731         85,478          509,208       

Subtotal 2300 513,119         163,478        676,597       

The accompanying notes form part of the financial statements 33

Page 106: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule EOAS/CIDA Cooperation Plan ‐ Phase II Cumulative ‐ Statement of Execution by Object of ExpenditureFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C = A + B

Expenditures ObligationsOutcome / Immediate Outcome / Output / Object of Expenditure

(in USD)

Total Execution

24002410‐Secured Transactions

4 ‐ Travel 2,388              253                2,641            6 ‐ Equipment, supplies and maintenance 2,486              1,460             3,946            8 ‐ Performance contracts 34,500           13,500          48,000         9 ‐ Other expenses 400                 ‐                     400                

Subtotal 2410 39,774           15,212          54,987         `

Subtotal 2400 39,774           15,212          54,987         

25002510‐Follow‐up MESICIC

1 ‐ Personnel contracts 205,015         41,958          246,973       

2520‐Equitable Access to Public Information4 ‐ Travel 6,100              107                6,207            5 ‐ Publications and documents 6,367              3,036             9,403            6 ‐ Equipment, supplies and maintenance 2,524              423                2,947            8 ‐ Performance contracts 35,045           13,500          48,545         9 ‐ Other expenses 1,630              40                  1,670            

Subtotal 2520 51,666           17,106          68,772         

Subtotal 2500 256,681         59,064          315,745       

Total 2000 1,333,093      414,652        1,747,745    

300031003110‐MSME Training the Trainers

4 ‐ Travel 16,728           3,936             20,664         8 ‐ Performance contracts 125,018         72,388          197,406       

Subtotal 3110 141,746         76,324          218,070       

Subtotal 3100 141,746         76,324          218,070       

The accompanying notes form part of the financial statements 34

Page 107: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule EOAS/CIDA Cooperation Plan ‐ Phase II Cumulative ‐ Statement of Execution by Object of ExpenditureFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C = A + B

Expenditures ObligationsOutcome / Immediate Outcome / Output / Object of Expenditure

(in USD)

Total Execution

32003210‐TRTA Program

4 ‐ Travel 64,910           67                  64,976         6 ‐ Equipment, supplies and maintenance 4,758              2                     4,760            7 ‐ Building and maintenance 5,000              ‐                     5,000            8 ‐ Performance contracts 87,310           88,778          176,088       9 ‐ Other expenses 913                 ‐                     913                

Subtotal 3210 162,890         88,847          251,737       

3220‐Capacity Building Sustainable Use4 ‐ Travel 38,546           909                39,455         6 ‐ Equipment, supplies and maintenance 64                   ‐                     64                  7 ‐ Building and maintenance 6,571              ‐                     6,571            8 ‐ Performance contracts 8,500              6,000             14,500         9 ‐ Other expenses 945                 ‐                     945                

Subtotal 3220 54,626           6,909             61,535         

Subtotal 3200 217,517         95,756          313,272       

33003310‐CSR Training for SMEs

4 ‐ Travel 16,304           3,688             19,992         6 ‐ Equipment, supplies and maintenance ‐                      1,980             1,980            8 ‐ Performance contracts 83,330           27,033          110,363       9 ‐ Other expenses 3,584              ‐                     3,584            

Subtotal 3310 103,218         32,701          135,919       

3320‐CSR Community of Practice8 ‐ Performance contracts 5,000              32,750          37,750         9 ‐ Other expenses 1,400              ‐                     1,400            

Subtotal 3320 6,400              32,750          39,150         

Subtotal 3300 109,618         65,451          175,069       

34003410‐Internal Communication Dispute Settlements

4 ‐ Travel 29,143           ‐                     29,143         

The accompanying notes form part of the financial statements 35

Page 108: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule EOAS/CIDA Cooperation Plan ‐ Phase II Cumulative ‐ Statement of Execution by Object of ExpenditureFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C = A + B

Expenditures ObligationsOutcome / Immediate Outcome / Output / Object of Expenditure

(in USD)

Total Execution

5 ‐ Publications and documents 5,109              150                5,259            6 ‐ Equipment, supplies and maintenance 8,361              242                8,604            8 ‐ Performance contracts 47,488           12,900          60,388         9 ‐ Other expenses 1,146              176                1,322            

Subtotal 3410 91,247           13,468          104,716       

Subtotal 3400 91,247           13,468          104,716       

Total 3000 560,129         250,998        811,127       

400041004110‐Commitments on Women's Rights

8 ‐ Performance contracts 52,008           30,000          82,008         

4120‐Reg. Assessment of Mechanisms8 ‐ Performance contracts ‐                      26,000          26,000         

Subtotal 4100 52,008           56,000          108,008       

42004210‐Women's Right

1 ‐ Personnel contracts 27,307           550                27,857         4 ‐ Travel 23,366           ‐                     23,366         5 ‐ Publications and documents 1,733              ‐                     1,733            8 ‐ Performance contracts 76,876           21,950          98,826         

Subtotal 4210 129,283         22,500          151,783       

Subtotal 4200 129,283         22,500          151,783       

Total 4000 181,291         78,500          259,791       

500051005110‐Data Mandate & Resources

1 ‐ Personnel contracts 81,957           43,751          125,708       2 ‐ Non‐recurring personnel costs 1,000              ‐                     1,000            

The accompanying notes form part of the financial statements 36

Page 109: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule EOAS/CIDA Cooperation Plan ‐ Phase II Cumulative ‐ Statement of Execution by Object of ExpenditureFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C = A + B

Expenditures ObligationsOutcome / Immediate Outcome / Output / Object of Expenditure

(in USD)

Total Execution

8 ‐ Performance contracts 10,500           4,383             14,883         Subtotal 5110 93,457           48,134          141,591       

5120‐Results Based Project1 ‐ Personnel contracts 26,020           34,365          60,385         8 ‐ Performance contracts 26,659           8,000             34,659         

Subtotal 5120 52,679           42,365          95,044         

5130‐SISCA Enhanced1 ‐ Personnel contracts 20,794           ‐                     20,794         8 ‐ Performance contracts 48,629           ‐                     48,629         

Subtotal 5130 69,423           ‐                     69,423         

Subtotal 5100 215,559         90,499          306,058       

52005210‐Mandates Database Control System

1 ‐ Personnel contracts 26,159           10,125          36,284         8 ‐ Performance contracts 13,732           10,401          24,133         

Subtotal 5210 39,891           20,526          60,417         

5220‐Procedures to Integrate Gender1 ‐ Personnel contracts 6,160              11,472          17,632         8 ‐ Performance contracts 13,133           60,867          74,000         

Subtotal 5220 19,294           72,339          91,632         

Subtotal 5200 59,184           92,865          152,049       

53005310‐Political Analysis System

1 ‐ Personnel contracts 150,563         ‐                     150,563       4 ‐ Travel 36,062           1,756             37,818         6 ‐ Equipment, supplies and maintenance 15,611           ‐                     15,611         8 ‐ Performance contracts 73,876           30,181          104,057       9 ‐ Other expenses 3,590              ‐                     3,590            

Subtotal 5310 279,702         31,937          311,639       

The accompanying notes form part of the financial statements 37

Page 110: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule EOAS/CIDA Cooperation Plan ‐ Phase II Cumulative ‐ Statement of Execution by Object of ExpenditureFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C = A + B

Expenditures ObligationsOutcome / Immediate Outcome / Output / Object of Expenditure

(in USD)

Total Execution

5320‐OAS Emerging Priorities1 ‐ Personnel contracts 61,303           6,950             68,253         4 ‐ Travel 111,490         9,611             121,101       5 ‐ Publications and documents 2,540              ‐                     2,540            6 ‐ Equipment, supplies and maintenance 2,196              6                     2,202            7 ‐ Building and maintenance 461                 123                585                8 ‐ Performance contracts 54,215           25,550          79,765         9 ‐ Other expenses 6,096              82                  6,178            

Subtotal 5320 238,301         42,323          280,624       

Subtotal 5300 518,003         74,260          592,264       

54005410‐Underrepresented Methodology

1 ‐ Personnel contracts 19,575           16,582          36,157         4 ‐ Travel 5,684              ‐                     5,684            5 ‐ Publications and documents 666                 ‐                     666                8 ‐ Performance contracts 11,553           28,400          39,953         

Subtotal 5410 37,478           44,982          82,460         

Subtotal 5400 37,478           44,982          82,460         

55005510‐Recommendations from Consultants

1 ‐ Personnel contracts 81,527           ‐                     81,527         6 ‐ Equipment, supplies and maintenance ‐                      463                463                8 ‐ Performance contracts 36,598           6,933             43,531         

Subtotal 5510 118,125         7,396             125,521       

5520‐Consultations with CSO's8 ‐ Performance contracts 17,000           27,318          44,318         

Subtotal 5500 135,125         34,715          169,840       

Total 5000 965,349         337,322        1,302,671    

The accompanying notes form part of the financial statements 38

Page 111: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule EOAS/CIDA Cooperation Plan ‐ Phase II Cumulative ‐ Statement of Execution by Object of ExpenditureFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C = A + B

Expenditures ObligationsOutcome / Immediate Outcome / Output / Object of Expenditure

(in USD)

Total Execution

ICRIndirect Cost Recovery 731,328         ‐                     731,328       

Grand Total 4,104,156      1,140,655     5,244,811    

The accompanying notes form part of the financial statements 39

Page 112: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

From inception (March 29, 2012) to March 31, 2013

SCHEDULE FCumulative ‐ Other Sources of Financing (Detail by Output)

40

Page 113: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Organization of American States Schedule FOAS/CIDA Cooperation Plan ‐ Phase II Cumulative ‐ Other Sources of FinancingFrom inception (March 29, 2012) to March 31, 2013 At the immediate outcome and output level

A B C D E=A+B+C+D

Outcome / Immediate Outcome / Output

200021002140‐Inter‐American Collaborative Networks 17,952           ‐                     ‐                     ‐                     17,952         

Total 2000 17,952           ‐                     ‐                     ‐                     17,952         

300031003110‐MSME Training the Trainers ‐                      6,241             ‐                     ‐                     6,241            

Total 3000 ‐                      6,241             ‐                     ‐                     6,241            

500053005310‐Political Analysis System ‐                      ‐                     5,326             ‐                     5,326            

55005520‐Consultations with CSO's ‐                      ‐                     ‐                     840                840                

Total 5000 ‐                      ‐                     5,326             840                6,166            

Grand Total 17,952           6,241             5,326             840                30,359         

* Includes applicable Indirect Cost Recovery (ICR).

Expenditures (in USD)

Total

Central American Bank of Economic Integration China Morocco

International Institute for Democracy and Electoral Assistance

*

The accompanying notes form part of the financial statements 41

Page 114: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

NOTES TO THE FINANCIAL STATEMENTSDepartment of Financial and Administrative Management Services

Financial Reporting and Administrative Coordination Section

1 Basis of preparation. The financial statements have been prepared under the cash basis of accounting and in accordance with GS/OAS financial rules and regulations. The accounting policies have been applied consistently throughout the period. A summary of GS/OAS financial rules and regulations may be found at:http://www.oas.org/legal/english/admmem/OAS_Financial_Handbook_for_Specific_Fund_Agreements_Feb_2008_Rev_3.doc

2 Audit of accounts. The OAS Board of External Auditors, consisting of three Members elected by the General Assembly, is entrusted with auditing all accounts, funds, and operations of the Organization as awhole on an annual basis with the assistance of an external auditing firm. The annual external audit is intended to provide a reasonable level of assurance that the financial statements are fairly stated in allmaterial respects. The auditing firm’s opinion on the financial statements is based on auditing procedures, which include a review of internal controls and selected tests of transactions and records. The audit ofall Specific Funds, including the accounts presented in this financial statement, is performed within this general context. In this regard, this project has not been subject to a specific audit but its transactionsand records may or may have not been selected for tests by the external auditing firm. The latest GS/OAS annual audit of accounts may be found at:http://scm.oas.org/pdfs/2012/CP28579E.pdf

3 Reporting currency. The functional currency of the GS/OAS is the United States dollar (USD). All financial transactions including financial statements are denominated in USD. If the contribution is madein a currency other than USD, it is converted to USD at the exchange rate of the day of the receipt of funds.

4 Award and reporting periods. Award period refers to the timeframe when expenditures and unliquidated obligations can be incurred as per donor agreement restrictions, if any. Reporting period refers to thetimeframe up to when unliquidated obligations are paid and/or when final adjustments are posted. The reporting period may extend beyond the award period as these circumstances arise.

5 Unliquidated Obligations. Unliquidated obligations are amounts related to commitments to disburse monies for the procurement of goods or services in future periods. Such amounts represent liabilitiesto third parties at the end of the respective periods and are anticipated to be expended in subsequent periods in the completion of a particular program or activity. This amount may be lower in subsequentperiods as deobligations occur.

6 Indirect Cost Recovery (ICR). Pursuant to OAS General Standards approved by its Member States and in accordance to Executive Order 07‐01, issued by the OAS Secretary General on May 29, 2007,the ICR rate for contributions is established at a minimum of 11% (Member States) or at a minimum of 12% (other donors) of the total contribution amount. Agreements signed prior to this policy aregrandfathered, thus each percentage of ICR may differ. As long as costs are not easily attributable to a particular activity, ICR partially defrays costs incurred in the administration of projects including, amongothers, the following products and services: planning, monitoring, review and evaluation of projects; resource mobilization services; financial management framework (e.g., financial manuals, handbooks,guidelines, and training); staff recruitment; overall administrative functions of the General Secretariat; legal and financial review of agreements; banking operations (e.g., receipt of funds, check emission,bank reconciliations); financial reporting; external audit coordination and representation; internal audits; setup and management of accounts; procurement of goods and services; recordingand processing of transactions; facilities and utilities; and general use office equipment and supplies (e.g., networks), etc. Specific ICR guidelines and procedures may be found at:http://www.oas.org/legal/english/admmem/ADMMEM116_ICR_Indirect_Cost_Recovery_GP.doc

7 Rounding. Totals may differ from the sum of individual figures shown due to rounding.

8 Fiscal year. This report has been prepared to reflect CIDA's fiscal year (April 1 to March 31).

9 Original Appropriations. Refers to the total level of resources planned for a particular output as reflected in the original budget. Amounts in USD are projected based on actual and projected receipts in CAD.

10 Reprogramming. Amounts reprogrammed from a particular output to another.

11 Modified Appropriations. The result of Original Appropriations plus any reprogramming amounts between outputs.

12 Execution. Expenditures plus unliquidated obligations.

13 Unobligated Appropriations. The result of Modified Appropriations minus execution (expenditures plus unliquidated obligations).

14 Allotment. Actual level of resources made available or advanced by the GS/OAS for execution.

42

Page 115: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

     

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

Updated  Budget    

43

Page 116: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

     

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

44

Page 117: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

   

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

Other  Donor  Contributions  �The � Technical � Secretariat, � following � up � on � remarks � made � during � the � Joint � Steering � Committee � Meeting � of � 28th � February � 2013, � concerning � the�desirability � that � external � in � kind � contributions � from � other � donors � should � be � presented � with � the � program’s � reports, � has � contacted � DFAMS � to �verify� the � procedure � that � should � be � followed � to � obtain � this � information. � DFAMS � has � confirmed� to� the � Technical � Secretariat � that � this � would� require � that � the � GS/OAS � receive � an� official � communication� (e.g. � pledge � letter) �from � each � donor� agency � (or� others)� specifying � the � amount� donated � to � the � program � (fair� market� value)� as � well � as � the � fiscal � year � as � to � which � the�contribution � applies. � The � Technical � Secretariat � will � endeavor � to � implement � this� procedure � in � the � first � few �months� of � Year � 2. ��  Budget  Management  �As � mentioned� earlier � in� this � report, � the � First � Year � of � the � OAS � Cooperation� Plan � has � had� a � slow � start � for � a � number � of � operational� reasons.� In � spite �of � this, � financially � speaking, � the � execution� of � the � approved� budget � can� be � deemed� satisfactory � and, � as � of � 31st � March � 2013, � 78% � of � funds � have �been� executed. ��The � two �main � reasons � for � the � slow � start � are � the � following: ��

1. Setting � up � the� supporting � structure� has � been � a� challenge, � especially � with � design, � performance� management, � and � coordination � of �projects � and� programs. � �

2. Most � projects � have � undergone � lengthy � review � prior � to � approval. ��Year � 2� starts � without � these � constraints � and � the � process � of� budget� execution � is � expected� to� be � fluid� and� effect �                  

45

Page 118: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)  

                                                 

46  

Budget  Execution  by  Module    At  a  more  detailed  level,  the  budget  implementation  by  Outcome  as  of  31st  March  2013  has  shown  the  following  results:    Component  

#  Description   Percentage  of  

Budget  Executed  Comments  

1000   Strengthen  national  electoral  systems  and  processes   68%   Uneven  performance  between  Outputs.  Improvement  foreseen  for  Year  2  

2000   Improve  standardized  and  harmonized  policies  and  regulatory  frameworks  related  to  the  business  environment  

87%   Satisfactory  performance.  Improvement  foreseen  for  Year  2  

3000   Improve  market  access  and  participation  in  regional  and  global  trade  for  member  states    

82%   Satisfactory  performance.  Improvement  foreseen  for  Year  2  

4000   Strengthen  the  application  of  human  rights  instruments  related  to  gender  equality  by  member  states  

44%   Extensive  preparatory  work  and  short-­‐term  staffing  problems  have  delayed  execution.  Situation  corrected.  Year  2  will  see  normal  execution.  

5000   Improve  the  institutional  capacity  of  the  OAS    

75%   Satisfactory  performance.  Improvement  foreseen  for  Year  2  

Table  3:  Budget  Execution  Analysis      

Page 119: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

47

                                                     

Narrative      This  section  provides  a  detailed  overview  of  the  programs  background,  context,  structure,  and  management  based  on  the  activities  carried  out  within  the  program.      

Narrative   Yr.  I  

Page 120: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

   Rationale  and  Justification    As   the   region’s   leading   multilateral   political   forum,   the   Organization   of   American   States   (OAS)   is   an   ideal   mechanism   for   cooperation   to  strengthen  democracy  and  governance,  to  foster  integral  development,  to  protect  human  rights,  to  promote  the  rule  of  law,  to  fight  poverty  and  inequality  and  to  maintain  peace.  The  development  priorities  of  the  Canadian  International  Development  Agency  (CIDA)  are  aligned  with  these  comparative  advantages  of  the  OAS  and  therefore  a  natural  partnership  has  been  imminent.      The  OAS-­‐CP  is  an  example  of  the  ongoing  collaborations  amongst  both  organizations.  The  OAS-­‐CP  serves  as  one  of  the  regional  mechanisms  sponsored  by  CIDA  to  strengthen  its  regional  cooperation  agenda  in  Latin  America  and  the  Caribbean.  The  OAS-­‐CP  was  designed  based  on  3  main  development  themes:    democracy,  economic  growth  and  human  rights.      The  activities  being  carried  out  within  the  OAS-­‐CP  are  driven  by  demand;  they  are  a  result  of  the  assessment  of  the  needs  and  requests  of  the  OAS  member  states,  hence  its  focus  on  strengthening  the  institutional  capacity  of  its  governments  so  they  can  better  address  and  accomplish  the  goals  established  in  their  own  national  plans  and  agendas.      The  priority  areas  in  which  the  programs  included  within  the  OAS-­‐CP  focus  their  efforts  have  been  identified  by  the  Member  states  through  political   dialogue.   The   results   of   these   dialogues   are   translated   into   mandates   that   serve,   as   the   priorities   of   the   organization   in   which  determine  the  nature  of  all  cooperation  agreements.      Mandates  along  with  in  country  consultations  led  to  the  identification  of  the  following  5  priority  areas  of  intervention  for  the  OAS-­‐CP:      Priority  Area  1:  Democracy  Expected  Immediate  Outcome:  “  Strengthened  Implementation  of  elections,  focusing  on  gender  considerations  in  targeted  countries”      Through  the  OAS-­‐CP  guidance  and  technical  support  is  provided  to  the  relevant  national  electoral  authorities  (Electoral  Management  Bodies)  focused  on   improving  electoral   systems  and  processes   in  member  states.  This   is  achieved   through   the  systematization  and   transfer  of  best  practices  as  well  as  with  the  development  of  specialized  reports  and  the  dispatch  of  observation  missions  to  the  field.      The  main  contributions  of  these  activities  are  the  strengthening  of  national  institutions,  transparency  and  accountability  is  increased,  conflict  management  is  enhanced  and  crises  are  reduced  in  the  region.  In  addition  awareness  is  raised  on  the  obstacles  that  women  encounter  to  fully  participate  in  electoral  processes  by  collecting  disaggregated  data  on  female  participation  in  elections,  which  serves  as  input  to  those  working  to  reduce  or  eliminate  the  barriers  that  women  encounter.  (No  International  election  observation  missions  are  being  financed  by  this  project)        

Project  Summary   Yr.  I  

Page 121: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

49  

Priority  Area  2:  Regulatory  Frameworks    Expected   Immediate   Outcome:   “   Increased   progress   towards   implementation   of   policies   and   regulatory   frameworks   and   instruments   that   stimulate  sustainable  economic  growth,  particularly  in  areas  of  competitiveness,  innovations  and  MSMES  in  targeted  countries”        By  promoting  policy  dialogue  and  facilitating  spaces  i.e.  specialized  networks  for  the  interaction  of  national  and  regional  authorities,  the  OAS-­‐CP   contributes   to   the   standardization   and   harmonization   of   policies   in   member   states   linked   to   the   business   environment.   The   activities  specifically   support   government   sectors   and   ministries   carrying   out   national   action   plans   for   the   improvement   of   regulatory   frameworks  supporting  the  MSME  sector,  as  well  as  by  providing  capacity  building  tools  for  improving  Corporate  Social  Responsibility,  Public  Management,  Financial  Inclusion,  Access  to  Credit  and  Access  to  Information.      Priority  Area  3:  Market  Access    Expected  Immediate  Outcome:  “Increased  opportunities  provided  by  Member  States  to  businesses  to  access  national,  regional  and  global  markets”      The  OAS  Cooperation  plan  focuses  on  improving  the  Member  States  market  access  and  the  participation  in  regional  and  global  trade  providing  a  national  capacity  building  activities  and  establishing  sub  regional  collaborations  with  MSME  support  institutions  to  promote  small  business  development.   These   activities   are   focused   on   boosting   innovation   and   competitiveness   in   the   LAC   region   by   increasing   the   technological  capacities  of  targeted  MSMEs,  as  well  as  systematizing  best  practices.  Furthermore  national  institutional  capacities  in  trade  dispute  settlement  and  arbitration  are  enhanced  through  training  sessions  for  public  officials  in  the  application  of  these  instruments  for  an  attractive  environment  for  international  trade.      Priority  Area  4:  Human  Rights    Expected   Immediate  Outcome:  “Strengthened  application  of  human   rights   instruments   related   to  gender  equality,   i.e.  CEDAW  and  BELEM  do  Para  by  Member  States”      Fostering  a  conducive  environment   for  sustainable  public  policies   that  address  women’s  rights  and  gender  equality   in   the  LAC  region   is   the  OAS-­‐CP  main  contribution  in  the  strengthening  of  the  application  of  human  rights  instruments  related  to  gender  equality   in  member  states.  Specifically,   through  the  OAS-­‐CP,   the   Inter-­‐American  Commission  of  Women  (CIM)  assesses  the  national  mechanisms   in  place  that  evaluate  the  exercise  of  women’s  rights  by  encouraging  policy  dialogue  and  exchange  of  good  practices  as  well  as  assisting  countries  in  implementing  measures  to  reduce  violence  against  women.    Priority  Area  5:  OAS  Institutional  Capacity    Expected  Immediate  Outcome:  “Improved  Effectiveness  of  the  OAS  in  fulfilling  its  mandate  to  support  democratic  governance  and  sustainable  economic  growth”    Activities  under  this  priority  area  are  focused  on  improving  the  effectiveness  of  the  OAS  in  order  for  the  Organization  to  fulfill  its  mandate  to  support   democratic   governance   and   sustainable   economic   growth.     As   well   as   strengthening   the   performance   management   capacity   by  promoting  the  use  of  Result  Based  Management  Instruments  as  well  as  integrating  gender  equality  as  a  cross-­‐cutting  theme  within  the  OAS.    Supplementary   tasks   centers   on   communicating   the   work   of   the   OAS   to   its   various   stakeholders   through   inclusive   channels   i.e.   Summits  Implementation  Review  Group  (SIRG).  

Page 122: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

50  

Success  Factors    We  define  Success  Factors   (SFs)  as   the  key  areas  where   things  must  go   right   for   the   successful  achievement  of   the  program’s  outputs  and  outcomes.  If  results  in  these  areas  are  not  adequate,  the  organization's  efforts  will  be  less  than  satisfactory.    The  OAS  Cooperation  Plan  has  completed  its  first  year  of  activities  and  at  this  stage;   it   is  possible  to  identify  a  small  number  of  SFs  that  are  considered  key  for  the  future  performance  of  the  program:          

Key  Areas   Comment  § Relevance   The  OAS-­‐CP  is  demand-­‐driven  and  is  organized  around  specific  Outcomes,  reinforcing  the  

relevance  of  the  different  Program’s  components  § Sustainability   Connected  with   the  provision  of   successful   delivery   and   the   ability   to  bring   about   clear  

results  and  skill-­‐transfer    § Strong  distribution  network   The   hemispherical   geographical   presence   that   brings   the   OAS   to   every   corner   of   the  

Americas  is  an  important  asset  § Provision  of  differentiated  projects  and  

Innovation  The  capacity   to  provide  services   that  are  unique  given  the  specific  characteristics  of   the  OAS  as  a  political  organization  

§ Quality  and  Timely  Action  in  Delivery     The   ability   to   attain   above-­‐average   standards   in   project   implementation   and   obtaining  results    

§ Member  States  satisfaction   Being   able   to   obtain   the   planned   outcomes   and   achieving   recognition   as   a   service’s  provider    

§ Effectiveness   and   appropriateness   of  resource  utilization  

The  essential  necessity  of  practicing  a  sound  and  flexible  Financial  Management  

Table  4:  Success  Factors                          

Page 123: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

51  

Strategic  Partnerships    The   expected   results   of   the   OAS-­‐CP   within   the   five   priority   areas   cannot   be   achieved   solely   by   the   efforts   sponsored   by   OAS   and   CIDA.  Therefore   coordination   with   other   partner   institutions   including   the   agencies   of   the   United   Nations,   the   Inter-­‐American   system   and  international  financial   institutions,  have  been  key  to  improve  effectiveness  and  avoid  the  duplication  of  efforts.    Establishing  partnerships  at  the  national   and   regional   level   is   one  of   the  main   components  of   the  work  plans  of   the   technical   teams   leading   the   initiatives   carried  out  during  Year  I.      The  OAS  technical   teams  are  continuously  working  towards  this  objective  by  coordinating   joint  programs,  participating   in  regional  and  high  level  meetings,  inviting  partners  to  participate  in  OAS  meetings  as  well  as  promoting  the  exchange  of  best  practices,  new  findings  and  reports  by:        

-­‐ Developing  and  strengthening  strategic  alliances  with  selected  priority  multilateral  and  regional  institutional  partners  and  donors;  -­‐ Carrying  out  joint  activities  in  key  areas  with  selected  priority  multilateral  and  regional  institutional  partners;  and  -­‐ Coordinating  and  promoting   institutional  knowledge  and   institutional  relations  among  the  OAS  secretariats  and  multilateral  and  

regional  institutional  partners.     Other  priority  partners  are  universities  and  non-­‐governmental/civil  society  organizations  that  actively  participate  within  the  OAS-­‐CP  (A  total  of  143  CSO  representatives  participated  during  activities  of  Year  I).     In   addition   the  National   institutions   also   serve   as   key   partners   for   the   implementation  of   the  OAS-­‐CP   technical   teams   (ministries,   national  planning  offices,  cooperation  agencies  and  sectorial  secretariats,  among  others).  These  national  authorities  act  as  main  liaisons  for  the  design  and  development  of  the  activities.      Below  are  a  few  examples  of  the  most  relevant  partners  by  priority  area  for  Year  I:      Democracy    

-­‐ The   Central   Electoral   Board   of   the   Dominican   Republic   and   the   Superior   Tribunal   of   Electoral   Justice   of   Paraguay   have  established   a   cooperation   agreement   to   support   the   Paraguay   Electoral   Management   Body   to   implement   a   digital   system   to  transmit  preliminary  electoral  results.    

-­‐ The   African   Development   Union   as   an   electoral   observation   institution   will   share   methodologies   with   other   LAC   countries  regarding  electoral  processes.  

         

Page 124: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

52  

Regulatory  Frameworks    

-­‐ The  University   of   California   Davis   (UC   Davis)   co-­‐sponsored   10   scholarships   for   government   officials   to   carryout   a   course   on  Promoting  Innovation:  Licensing  Academy  in  Intellectual  Property  and  Technology  Commercialization,  June  4-­‐13,  2012.  

 -­‐ The  Ministry  of  Economy,  Industry  and  Commerce  (MEIC)  of  Costa  Rica  will  host  the  first  meeting  of  InnovaNet  one  of  the  Inter-­‐

American  Networks  of  the  OAS  on  April  24-­‐25  of  2013.    

-­‐ The  Central  American  Forum  of  presidents  of   the   legislative  powers  of  Central  America  and   the  Caribbean  FOPREL   agreed   to  lead  the  awareness  campaign  on  CSR  amongst  parliamentarians  at  the  sub  regional  level  through  resolution  drafted  in  October  9,  2012.  

 -­‐ The  Organisation  for  Economic  Cooperation  and  Development  (OECD)  will  support  the  activities  linked  to  the  promotion  of  the  

role   of   the   private   sector   within   cooperation   agendas   for   development   promoted   through   the   Inter-­‐American   Cooperation  Network    

 -­‐ The  Latin  American  Parliaments  (Parlatino),  a  regional  organism  integrated  by  the  national  parliaments  of  Latin  America  will  serve  

as  the  regional  platform  for  the  promotion  of  the  Model  Inter-­‐American  Law  on  Access  to  Public  Information.    Market  Access    

 -­‐ The   UN  Global   Compact  has   partnered  with   the   CSR   program   to   distribute   a   regional   survey   on   the   role   of   the   SMEs   in   the  

extractive  sector  in  five  targeted  countries.      

-­‐ The  Centre  for  the  Promotion  of  Micro  and  Small  Enterprises   in  Central  America,  CENPROPYME  will  design  and  implement   in  coordination  with  the  OAS/MSME  program  a  train  the  trainer  program  to  improve  the  competitiveness  of  women  entrepreneurs  through  the  use  of  ICTs.  

                   

Page 125: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

53  

Beneficiaries  in  Numbers      The  main  beneficiaries  of   the  OAS/CP  are  the  34  OAS  Member  States  yet  based  on  the  available   information   for  Year   I   the  OAS/CP  we  can  provide  a  more  detailed  panorama  of  the  programs  impact:        

 

 

               

     

                             

Approximately  191  Activities  of  technical  cooperation  have  been  carried  out  by  the  OAS/CP.

35%  

32%  

26%  

10%  

Regional  Focus  of  the    OAS/CP  Acbvibes    

Central  America    Caribbean  

South  America  

Central  American  Countries  with  a  35%  our  the  main  recipients  of  the  technical  cooperation  delivered  through  the  OAS/CP  

38  

85  

31  

17   20  

0  10  20  30  40  50  60  70  80  90  

Total  Acfvifes  carried  out  (Events,  trainings,  dialogues)  in  coordinafon  with  OAS  MS:    

Num

ber  o

f  Acbvibe

s    

Total  Acbvibes  Year  I  

1000  

2000  

3000  

4000  

5000  

Figure  4:  Total  Activities  Year  1  

Figure  5:  Activities  per  Region  

Page 126: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

54  

275  

902  

241  

51  

172  

0   200   400   600   800   1000  

1000  

2000  

3000  

4000  

5000  

Acbvity  Parbcipants    

Outcomes  

#  of  Individuals  

 Direct  beneficiaries  of  the  OAS/CP  during  Year  I:                                      

   *Disaggregated  Data  Gender  by  Outcome  (available  data)      

11%  

89%  

Democracy  

Women  

Men  

Over  1,600  individuals  have  directly  benefited/  participated  in  the  activities  of  the  OAS/CP  

54%  

46%  

Business  Environment  

Women  

Men    48%  

52%  

Access  to  Markets  

Women  

Men    

Figure  6:  Total  Participants  Year  I  

Figure  7:  Disaggregated  Data  by  Gender  and  Component    

Page 127: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

55  

 Detailed  Beneficiaries    1000  

- Electoral  Authorities  in  the  34  Member  States  - Department  of  Electoral  Cooperation  and  Observation  (DECO)/  OAS  Staff  

 2000  

- National  and  local  governments  and  institutions  with  MSME  development  agendas.  - Small  and  medium  enterprises  (SMEs)  mainly  from  the  extractive  sector  - Local  CSR  organizations,  local  business  associations,  Large  Companies    - Parliaments  and  Councils    - OAS  Member  State  (Cooperation  Development  Authorities/Agencies/Units)  Technical  Teams;  Program  Managers/Specialists,  

International  Cooperation  Directors/Sub  directors,  South-­‐South  Cooperation  Units      3000      

- Government  officials  of  OAS  member  states  responsible  for  the  negotiation  and  implementation  of  trade  agreements  and  for  assisting  businesses,  including  service  providers,  to  access  national,  regional  and  global  markets      

- MSMEs,  in  particular  women,  youth  and  vulnerable  groups  with  potential  to  benefit  from  their  participation  in  trade.  4000    

- National  Mechanisms  for  the  advancement  of  women,  National  statistics  offices  and  other  entities  involved  in  formulating  and  monitoring  public  policy  on  women’s  rights  and  gender  equality.  

 5000      

- Participating  social  actor  organizations  and  individuals,  including  CSO,  indigenous  peoples,  youth,  private  sector,  afro-­‐descendants,  think-­‐tanks,  and  gender-­‐based  groups,  among  others  

- Summit  host  countries  (Colombia,  Panama)  and  other  participating  OAS  member  states  - Technical  Secretariats  of  Inter-­‐American  Ministerial    - Civil  society  organizations  and  networks  that  work  in  the  topics  of  the  General  Assemblies,  ministerial  meetings  and  Permanent  

Council  - OAS  Member  States  and  General  Secretariat  that  receive  recommendations  from  stakeholders  - OAS  General  Secretariat  -­‐  areas  working  with  projects  and  mandates,  the  Permanent  Council,  the  Committee  on  Budgetary  and  

Administrative  Affairs      

Page 128: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

56  

     Structure    The  execution  of  the  results  linked  to  the  OAS-­‐CP  is  an  institutional  effort.  The  program  has  a  total  of  37  outputs,  led  by  8  secretariats  and  an  average  of  40  specialists  (OAS  Staff)  coordinating  activities  and  tasks  linked  to  the  program,  for  details  on  the  programs  distribution  please  see  table  below:                          

 Table  5:  Component  per  Areas  

                               

OAS  Cooperation  Plan   Program  Components  Area  In  Charge/Core  Teams     1000   2000   3000   4000   5000  

Secretariat  for  Political  Affairs  (SPA)     X   X       X  Executive  Secretariat  for  Integral  Development  (SEDI)       X   X      Secretariat  of  Legal  Affairs  (SLA)       X   X      Secretariat  for  External  Relations  (SER)             X  Secretariat  of  Administration  and  Finance  (SAF)             X  Inter-­‐American  Commission  of  Women  (CIM)           X    Summit  of  the  Americas  Secretariat  (SUM)             X  Office  of  the  Secretariat  General  (OSG)             X  Total:  37  Outputs   6   11   6   4   10  

Project  Management   Yr.  I  

Page 129: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

57  

   The  implementation  of  the  OAS  Cooperation  Plan  makes  necessary  the  adoption  of  an  organizational  structure  that  is  flexible  enough  to  allow  several  teams  to  perform  and  deliver  simultaneously.  The  Project  Management  Structure  and  Governance  that  has  been  adopted  required  the  assignment  of  the  following  series  of  roles  and  responsibilities:      A  Technical  Secretariat  which  serves  as   the   technical  counterpart   to  CIDA,  composed  of  a  Technical  Secretary  and  an  Assistant,  will  be   the  technical  counterpart  to  CIDA.  In  order  to  provide  the  managerial  necessities  and  the  delivery  that  is  expected  of  the  different  components  of  the  program,  as  well   as  providing  operational  planning,   coordination,  monitoring,   follow-­‐up  and  coaching,   the  Technical   Secretariat  will   be  supported  by  the  corresponding  Secretariat  for  Administration  and  Finance  and  the  Secretariat  for  External  Relations.    A  group  of  Five  Core  teams  divided  accordinging  to  there  area  of  intervention  under  each  Intermediate  Outcome  (1000,  2000,  3000,  4000,  and  5000)  formed  by  the  OAS  Staff;  in  charge  of  the  delivery  of  a  given  number  of  outputs.      Others;  during  the  execution  of  the  Cooperation  Plan  the  participating  units  will  be  supported  by  a  number  of  departments  of  the  SG/OAS:    

- DFAMS:  Department  of  Financial  and  Administration  Management  Services  - DPE:  Department  of  Planning  and  Evaluation  - CIM  or  SECIM:  Secretariat  of  the  Inter-­‐American  Commission  of  Women    

                                 

Page 130: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

58  

 Governance        To  support  the  proper  execution  of  the  OAS  Cooperation  Plan,  a  series  of  measures  and  actions  are  currently  being  carried  out  to  meet  the  agreed   results   taking   into   account   the   Result   Based   Management   Programming   (RBM)   guidelines   provided   by   CIDA.   Consequently   the  following   tailored   processes   for   the   governance   and  management   of   the   program  have   been   implemented,   please   see   diagram  below   for  details:        

                                                       

Figure  8:  Governance  Structure  

Page 131: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

59  

Management    The  Management  of  the  OAS  Cooperation  Plan  relies  on  the  centralization  of  support  and  the  development  of  a  series  of  follow-­‐up  activities  (coaching  sessions,  reminders,  information  requests)  carried  out  by  the  TS  and  the  DPE.  To  facilitate  the  governance  of  the  OAS-­‐CP  a  Program  Management   Plan   (PMP)   has   been   designed   and   put   in   place   begginning   Year   I.   The   PMP   is   carried   out   in   coordination  with   the  OAS/GS  relevant  departments  and  with  the  help  of  the  core  teams,  the  plan  is  composed  by  the  following  actions:    

1.  Planning    A  Project  Management  Plan  (PMP)  was  developed  to  provide  guidelines  on  how  the  OAS-­‐CP  is  to  be  carried  out  and  managed,  based  on  CIDA  guidelines  (PMP).    2.  Monitoring  The  Logic  Model  and  the  Performance  Measurement  Framework  (PMF)  are  the  central  documents  guiding  the  Monitoring  Strategy  of  the  OAS-­‐CP.  The  indicators  identified  in  the  PMF  are  used  to  measure  achievement  of  results  at  the  various  levels.  The  core  teams  are  responsible  for  the   outputs   and   outcomes,   and   are   required   to   report   on   the   progress   towards  meeting   the   targets   set.   In   order   to   “operationalize”   the  implementation  of  the  OAS-­‐CP,  areas  responsible  for  the  achievement  of  specific  outputs  were  required  to  present  a  project  profile  for  the  consideration   of   the   Project   Evaluation  Committee   (PEC)   of   the  OAS/GS.  Upon   approval   the  DPE   validated   that   the   chain   of   results   at   the  project  level  was  clearly  established,  that  the  beneficiaries  were  properly  identified,  that  a  gender  perspective  had  been  incorporated  (work  done  with  the  technical  assistance  of  the  CIM),  and  that  the  activities  and  budget  required  to  establish  baselines  and  target  are  included  and  carried  out.  Particular  attention  has  been  given  to  the  relation  to  the  immediate  and  intermediate  outcomes  of  the  Logic  Model.    3.  Reporting    Once  the  project  profile  was  approved  by  the  PEC  each  project  received  70%  of  the  first  year’s  resources  and  the  remaining  30%  was  disbursed  upon   the   satisfactory  completion  of  a  Report  on  Progress  of  Project   Implementation   (RPPI)   validated  by   the  DPE.  The  RPPIs  are  developed  based   on   the   approved   template   by   CIDA   in   order   to   facilitate   the   process   of   reporting   and   of   collecting   information   to,   first,   assess   the  project’s  performance  and,  second,  to  obtain  the  data  for  the  annual  reporting  on  the  implementation  of  the  OAS  Cooperation  Plan.    

The  RPPIs  presents  data  on  the  progress  made  towards  achieving  the  planned  outputs  using  the  performance  data  that  has  been  identified  in  the  PMF.  Therefore,  the  information  gathered  at  the  project/output  level  on  progress  during  the  reporting  period;  includes  progress  towards  achieving   the   targets   identified   in   the   PMF;   changes   or   reformulations   including   the   use   of   resources,   if   applicable;   issues   or   challenges  encountered  that  could  affect  the  achievement  of  the  outcomes  and  sustainability;  actions  to  be  taken  if  needed  to  enhance  the  likelihood  of  achieving  the  outcomes  and  lessons  learned.    As  it  is  also  expressed  in  the  gender  strategy,  a  specific  section  on  gender  equality  and  women’s  rights  results  is  included,  and  projects  are  required  to  report,  on  the  basis  of  the  objectives,  activities  and  indicators  that  they  set  out  in  the  beginning  of  the  OAS-­‐CP,  on  the  extent  to  which  the  project  has  contributed  to  advancing  gender  equality  and  women’s  rights.  

This  information,  together  with  the  financial  reports  provided  by  DFAMS,  is  the  input  from  which  the  Technical  Secretariat  produces  executive  information   for   the  Executive  Committee  as  well  as  detailed  status   reports.   It   is  also  one  of   the  main  sources  of   information   for   the  Year   I  Annual  Report.    

Page 132: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

60  

4.  Evaluating  A  final  results  evaluation  of  the  Plan  will  be  conducted  by  an  external  consultancy;  this  assessment  is  programmed  to  take  place  by  the  end  of  the  Year  III  (2014-­‐2015)  of  the  OAS  Cooperation  Plan.      5.  Communicating    This   is  an  ongoing  task  led  by  the  TS  focused  on  engaging  the  OAS  Core  Teams  and  facilitating  exchanges  that  allow  the  collection  of  timely  information  as  well  as  the  publicizing  of  the  results  of  the  OAS-­‐CP  to  key  stakeholders.  Examples  of  this  exercise  are  weekly  reminders  sent  by  the  TS  mainly  on  about  to-­‐do  and  general  recommendations.  This  channel  allows  a  frequent  interaction  with  the  teams  as  well  as  a  day-­‐to-­‐day  guidance  on  the  OAS-­‐CP.  (See  the  Communications  section  for  detailed  information)    Additional  support  and  Guidance  is  provided  by:    

-­‐ A  Joint  Steering  Committee  includes  both  directives  from  CIDA  and  from  the  SG/OAS    

-­‐ An  Executive  Steering  Committee  is  the  highest  internal  authority  for  the  Cooperation  Plan      The  Timeframe  for  the  Monitoring  Activities  of  Year  I  can  be  detailed  in  the  following  diagram:    

   

3/1/2012 5/31/2013

1-Apr-12 1-Jul-12 1-Oct-12 1-Jan-13 1-Apr-13

15 May, 2013Final Report Y1

28-Feb-13Steering Committee

15-Mar-13Preliminary Report Y1

1-Apr-12 - 31-Mar-13OAS Cooperation Plan Year 1

1-Oct-12Monitoring

31-Mar-13Monitoring

29-Mar-12Grant Arrangement

30-Apr-12 - 15-Aug-12Profile Presentation & PEC Approval

OAS Cooperation Plan – Timeline Year 1

Figure  9:  Monitoring  Diagram  

Page 133: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

61  

Communication    In   order   to   publicize   and   inform   all   target   audiences   the   completion   of   activities   derived   from   the   program   the   OAS   has   entrusted   the  Secretariat   for  External  Relations   (SER)   to   support   the  Technical   Secretariat   in   the   implementation  of  a   series  of   communication  guidelines  (See  Annex  6:  Communication  Memo)  at   the   institutional   level.   These  guidelines   are   to  be   carried  out  by   the  OAS  Core  Teams   in  order   to  organize   the  public   information   shared   through   the  official   channels   i.e.  OAS  press  department   as  well   as   the   information  provided   to   the  OAS/CP  beneficiaries  and  counterparts.      Additionally  the  Canadian  counterparts  will  have  access  to  timely  information,  which  can  serve  as  input  to  liaise  with  other  potential  partners  as   well   as   to   showcase   the   results   of   the   OAS/CIDA   partnership.     The   TS   will   veil   for   the   implementation   of   the   guidelines   whose   main  objectives  are:    

- Provide  information  on  future  events  carried  out  thanks  to  the  financial  support  of  the  OAS/CP  - Acknowledge  publicly  the  financial  support  of  the  Canadian  Government  through  Canadian  International  Development  Agency  (CIDA)  - Assure  the  correct  use  of  the  CIDA  institutional  image  i.e.  logos  in  printed  materials  and  online  media    - Promote  the  participation  of  local  Canadian  counterparts  in  the  activities  i.e.  workshops,  dialogues  etc.    - Liaise  with  the  Canadian/CIDA  counterparts  in  a  streamlined  manner    

Weekly   reminders   sent   by   the   TS   to   the   Core   Teams   complement   the   communication   guidelines   and   allow   the   participating   teams   to   be  informed  of  day-­‐to-­‐day  information  i.e.  reporting  deadlines,  recent  developments  among  others.    

                               

Page 134: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

62  

Environment      It  was  anticipated  since  the  inception  of  the  OAS-­‐CP,  all  activities  linked  to  the  plan  would  not  have  a  negative  impact  on  the  environment.  For  example   the   vast   majority   of   outputs   in   the   Plan   focus   on   capacity   building   and   institutional   strengthening,   which   are   classified   as  environmentally  neutral.  Even  though  a  set  of  outputs  are  associated  with  the  productive  sectors  such  as  industry,  commerce  and  mining,  they  are   fused   with   environmentally   beneficial   activities   such   as   those   aimed   at   promoting   environmentally   sustainable   trade   and   economic  development.      As  part  of  the  activities  for  Year  I  of  the  OAS-­‐CP,  the  environmental  impact  of  the  execution  of  a  sample  of  outputs  included  in  the  OAS  has  been  monitored,  and  reinforced  with  the  promotion  of  the  use  of  a  few  practices  drawn  from  the  “Greening  OAS  Strategy1”.  For  Example  the  TS  have  made  it  mandatory  that  all  reporting  documentation  be  submitted  in  electronic  form.      In  order  to  provide  inputs  regarding  the  environmental  impact  of  the  OAS-­‐CP,  a  group  of  projects  in  particular  have  been  selected  based  on  their  direct   link  to  specific  productive  sectors   i.e.  mining,  and  tourism,  or   if  they  have  opted  for  the  use  of   Information  and  Communication  Technology   (ICT/IT)   solutions   i.e.   virtual   meetings,   videoconferences,   and   virtual   forums   within   their   implementation.   Therefore   help   to  minimize/prevent  aviation-­‐related  carbon  dioxide  (CO2)  emissions2.    The  Sample  of  Projects  is:      

2140:  Inter-­‐American  Networks  (RIAC,  STEN,  Inter-­‐American  E-­‐SME  and  Innovation  Network  and  Consumer  Safety  Network)      3220:  Capacity  building  program  of  country  officials  for  the  sustainable  use  of  natural  resources  (water,  soil,  land,  renewable  energy,  biodiversity)  developed  in  trade  goods  and  services  executed    3310:  Training  provided  to  SMEs  to  adopt  socially  and  environmentally  responsible  business  practices      5510:  Recommendations   from  virtual  and   face-­‐to-­‐face  consultations  presented   to  OAS  member   states   in   the  policy-­‐making  process  (i.e.  Summit  Implementation  Review  Group-­‐SIRG)  

 This   sample  of  outputs  will   include  environmental   inputs   (narratives  and   the   tracking  of  Off-­‐setting  carbon  emissions   saved  by   substituting  OAS  staff  and  its  key  stakeholder’s  air  travel  with  the  use  of  Information  and  Communication  Technology  (ICT/IT)  solutions3  within  their  yearly  reports  beginning  Year  II  of  the  OAS-­‐CP.         1  OAS  Greening  Strategy  http://oasconnect/Portals/0/HR/greeningtheoasstrategy.doc    2  For  example,  an  Australian  study  has  estimated  that  videoconferencing  could  avoid  2.4  million  tonnes  of  national  CO2  emissions,  equivalent  to  0.43%  of  the  country’s  total2.   3  A  limited  sample  of  projects  will  provide  Off  Set  carbon  emissions  data    

Page 135: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

63  

         Result  Based  Management  (RBM)  is  integral  in  assessing  the  program  performance  of  the  OAS  Cooperation  Plan  for  Year  I,  therefore  a  look  at  its  two  main  instruments  the  Logic  Model  (LM)  and  the  Performance  Management  Framework  (PMF)  allows  us  to  analyze  the  current  status  of  the  program.  This  set  of  working  documents  serves  as  a  compass  for  the  core  teams  activities.  As  well  as  for  the  monitoring  activities  led  by  DPE  and  the  TS.    The  programs  structure   for  Year   I   from  a  Result  based  approach  can  be  appreciated  based  on   the  available  data   (baselines  and   targets)  by  indicator  within  the  PMF  (see  table  below):                          The  available  data  allows  us  to  see  how  activities  during  Year  I  have  been  focused  in  collecting  primary  data  through  i.e.  surveys,  diagnosis,  etc.,  as  the  first  step  in  setting  realistic  goals  for  the  individual  projects.  As  a  result  at  the  Output  level,  100%  of  the  data  is  available,  followed  by   the   Immediate   Outcomes   at   a   92%,   closing   with   a   57%   at   the   Intermediate   level.   The   low   percentage   at   the   Intermediate   Level   is   a  consequence  of  the  early  stage  of  the  program.      The   LM   and   PMF   are   considered   “living”   documents   for   planned   goals   can   change   overtime.   Therefore   as   part   of   the   flexibility   in   the  development  of  the  programs  goals,  these  documents  are  open  to  be  modified  by  the  OAS  technical  teams.  Edits  are  submitted  in  writing  to  the  TS  and  DPE,  which  together  evaluate  the  rationale  behind  the  potential  changes  and  its  validity.  In  order  to  assure  the  edits  do  not  alter  the  stated  results  at  the  intermediate  or  immediate  level.  Any  changes  in  budget  are  also  coordinated  and  approved  by  the  DFAMS.      During   the   execution  of   Year   I   a   series   of  minor   edits   at   the  Output   Level   (2310-­‐2320-­‐2330-­‐5130-­‐5510)   have  been  applied   to   the   LM   (See  Annex   #   2)   and   PMF   (See   Annex   #1).   The   rationale   behind   the   programmatic   changes   is   mainly   based   on   lessons   learned   from   previous  executions  or  changes  in  the  program’s  priorities.      

    BASELINES   INDICATORS   TARGETS  #   %  Available   %  

Pending  #   %  Available   %  

Pending  #   %  

Available  %  

Pending  

Intermediate  Outcomes  

7   57   43   14   100   -­‐   6   57   43  

Immediate  Outcomes  

35   92   8   38   100   -­‐   35   92   8  

Outputs   79   100   -­‐   80   100   -­‐   77   100   -­‐  

Table  6:  Available  Data  03/31/13  

Program  Performance  Assessment   Yr.  I  

Page 136: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

64  

Additional  Assessment  Tools        In  order  to  in  order  to  provide  detailed  information  on  the  development  results  at  the  level  of  outputs  of  the  OAS-­‐CP  an  additional  document  labeled  Project  Progress  Status  Report   (PPSR)  has  been  created  by   the  TS.  This   supplementary  document   to   the  LM  and  PMF   is  elaborated  based  on  the  information  included  in  the  Report  on  Progress  of  Project  Implementation  (RPPI)  presented  periodically  by  the  OAS  Core  Teams.      The  PPSR  showcases  the  activities  and/or  groundwork  being  carried  out  in  line  with  each  of  the  program  components.  The  report  also  includes  actual  data  by  indicator  that  shows  detailed  progress  as  well  as  highlights  of  events,  tasks,  or  deliverables  met  by  March  31,  2013.        The  information  collected  in  the  Project  Progress  Status  Report  allows  us  to  assess  the  developments  taking  place  in  the  field.  When  reviewing  this  information  please  take  into  account:      

§ The  time-­‐consuming  review  and  approval  that  all  projects  went  through  in  the  first  few  months  of  Year  I;  § The  slow  progress  that  initially  marked  the  process  of  defining  baselines  and  targets;    § The  changed  project  management  that  required  and  requires  that  Teams  focus  on  interconnected  actions  and  their  results  instead  of  

stand-­‐alone  activities.    Having  said  that,  it  is  also  important  to  point  out  that  the  degree  of  progress  that  has  been  reached  on  average  is  satisfactory,  because  it  has  provided  the  groundwork  to  create  the  necessary  conditions  for  success  in  the  project  as  a  whole.  From  a  technical  standpoint  it  is  possible  to  rate  Year  I  as  satisfactory  and  to  forecast  Year  II  as  very  good,  thanks  to  the  work  that  has  been  developed  so  far.  The  previous  assertions  are  easier  to  share  by  reviewing  the  tables  included  in  the  next  pages:                                      

Page 137: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

65  

Project  Progress  Status  Reports    

Expected  Results11   Indicators2   Baseline  Data  

Actual    Data2   Targets   Notes/  Highlights  3  

Outputs  1110  Capacity-­‐building  and  professional  development  support  provided  to  all  EMBs  in  political-­‐electoral  financing  and  gender  mainstreaming      

 

  #  of  toolkits  produced  for  EMBs  to  promote  women’s  participation  in  elections  and  on  political  finance  models    

   EMBs  perceived  value  of  model  legislation  on      political  electoral  financing  with  a  specific  gender  focus      provided  to  Caribbean  countries  

   Perceived  usefulness  of  Caribbean  EMB  and  political  leaders  participating  in  regional  for  a  of  revised  model  legislation  on  political  electoral  financing  that  incorporates  a  gender  focus            

 

 0        0        04  

 0        0        0  

 2        

30%        

30%  

  Data   collection   on   gender   and   political   financing   is  complete.   Data   is   currently   being   systematized   to   then  proceed  to  the  design  of  the  toolkit.  It  is  expected  to  have  the  first  draft  of  both  toolkits  by  June  2014.    

  In   preparing   the   inter-­‐regional   comparative   study   on  elections   including   men   and   women’s   political-­‐electoral  participation,   DECO/OAS   has   signed   an   agreement   with  the   Observatoire   Politique   de   l’Amérique   Latin   et   des  Caraïbe  (OPALC)  of  Science  Po  University.  

  Baseline  data  will  be  obtained  at  a  meeting  of  Caribbean  EMBs   in   the   second   trimester   of   2013,   supporting  documentation  has  been  presented.    

 

1120  Training/seminars/  exchanges  held  to  share  lessons  learned  related  to  elections,  including  lessons  promoting  women’s  participation  in  electoral  bodies      

  #  Of  EMBs  members  per  year  participating  in  trainings/  seminars,  disaggregated  by  sex.  

     #  of  international  exchanges  between  the  OAS  and  international  election  observer  institutions  to  share  methodologies,  statistics  and  recommendation  monitoring  mechanisms      

 

 500          3    

 580  

(11%  F  /89%  M)  

   4  

 800          7  

Two  trainings/Seminars  have  taken  place  in  2012:      VIII   Interamerican   Meeting   of   Electoral   Management  Bodies   (EMBs)   entitled   “Strengthening   Electoral  Processes  in  the  Hemisphere”  was  held  in  Montego  Bay,  Jamaica,  from  September  18  to  19,  2012.    

One  International  exchange  has  been  completed:        At  the  7th  Implementation  Meeting  on  the  Declaration  of  Principles   for   International   Election   Observation   hosted  by  the  National  Democratic  Institute  (NDI).  

  A   second   exchange   is   in   process   with   the   African  Development  Union    

1  As  included  in  the  OAS  Cooperation  Plan  PMF    2  As  included  in  the  OAS  Cooperation  Plan  PMF    3    Available  data  based  on  the  completed  activities  by  03/31/13   4  New  Data    

Page 138: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

66  

Expected  Results11   Indicators2   Baseline  Data  

Actual    Data2   Targets   Notes/  Highlights  3  

1130   Studies  disseminated   to   all   EMBS  on   how   to   strengthen  their   work   to   make  elections  more  inclusive    

  #  of   studies   provided   to   EMBs  on  standards  of  good  elections  and  mechanisms  for  enhancing    voter  participation    

 

   0  

 0  

 2  

  OAS/DECO   and   University   of   Laval   are   working   on   the  preparation  of   a   study  on   the   socio-­‐demographic   profile  of  the  voters  in  Central  America.    

   6  Electoral  Management  Bodies   in  Central  America  have  answered  a  survey.  

   OAS/DECO   staff   members   and   the   Research   Chair   on  Democracy   and   Parliamentary   Institutions   of   the  University  of   Laval  visited   the  Electoral  Tribunal  of  Costa  Rica  in  order  to  collect  data  on  electoral  participation  and  also   information   on   the   activities   carried   out   by   the  Supreme   Electoral   Tribunal   to   promote   electoral  participation.    

1140   Quality  Management   Systems  (QMS)   implemented   and  Electoral   Management  Assurance   (EMA)  developed   to   certify  electoral  authorities    

  #  of  QMS  implemented    #  of  EMA  developed    

0  0  

0  0  

1  1  

  GS/OAS  is  currently  convening  and  facilitating  discussions  at  the  international  level  for  the  potential  approval  of  an  ISO  Electoral  International  Norm,  ISO  17581.  

  Approval   of   the   International   ISO   Electoral   Standard   is  pending.   Meeting   of   Central   ISO   Committee   scheduled  for  May  2013.  

  In   progress   QMS   in   the   Central   Electoral   Board-­‐Dominican   Republic);   3   stages   in   the   implementation  process   have   been   completed   a   total   of   250   public  officials   have   been   trained   in   "Understanding,   Analysis  and   Implementation   of   the   ISO   17582   /   ISO   9001:2008  Requirements  &  Process  Management"  

1150   New   technologies  which   take   into  consideration   gender  equality   (where  appropriate)   identified  and   implementation  facilitated   (including   e-­‐voting)   in   electoral  processes   in   member  states    

  #   of   member   states   in   which  new   technologies   are  supported  

  Degree   to   which   gender  equality  data  is  being  captured  by   appropriate   new  technologies  

0      0  

21      

25%*  

2      

100%  

  Mexico;   The   Institute   of   Elections   and   Citizen  Participation  of  the  State  of  Jalisco  

  Colombia;   Advisory   Commission   for   the   incorporation,  implementation   and   design   of   technologies   for  information   and   communication   in   the   electoral  process",  

  Systems  implemented  to  date  (1)  captures  the  respective  gender  equality  data  

 

1  Target  has  been  reached    *  Means  of  Verification  (MOV)  have  been  requested  by  DPE    

Page 139: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

67  

Expected  Results11   Indicators2   Baseline  Data  

Actual    Data2   Targets   Notes/  Highlights  3  

1160   Technical  cooperation   provided   to  EMBs  on   several   electoral  topics,   including:   legal  reform,   geo-­‐reference  systems,   electoral   registry  auditing,  electoral  juridical  rulings,  decentralization  of  the  vote  and  promotion  of  the   equal   participation   of  women   and   men   at   all  levels   of   the   electoral  process    

  #   of   EMBs   receiving   technical  cooperation    

  EMB   perception   of   relevance  of   technical   cooperation  received  

     

0    

54%  

2    

54%    

6    

75%  positive  

Two  Technical  Assistance  programs  are  in  progress:    

  1.   Paraguay   (preliminary   results   transmission,   overseas  voting);  2.  Grenada  (voter’s  registry),    

 

 

Expected  Results1   Indicators2  Baseline    

Data  

Actual  3  Targets   Notes/Highlights    

Outputs      2110   OAS   Dialogue   of   MSME  High-­‐Level   Authorities  institutionalized   as   an  hemispheric   forum   for   public  policies   and   strategies   for  MSME  development        

  #   of   annual   OAS   Dialogues   of  MSME   High-­‐Level   Authorities  meetings  held  

   #  of  member  states  participating  in   meetings   (disaggregated   by  sub-­‐region  

   %of   participants   at   vice-­‐ministerial  level  

0      0      

 0  

1      

244      

 70%  

3      

34      

 70%  

  The   II   Inter-­‐American   Dialogue   of   High-­‐Level  MSME   Authorities:   Public   Policies   to   Promote  Competitiveness,   Innovation   and  Internationalization   of   MSMEs,   organized   by   the  Department  of  Economic  Development,  Trade  and  Tourism  of  the  OAS),  was    held  on  September  10-­‐11,  2012  in  New  Orleans,  United  States.    

  As  a  result  of  the  Inter-­‐American  Dialogue  of  High-­‐Level   MSME   Authorities   an   Action   Plan   was  identified   to   strengthen  and  give   continuity   to   the  efforts  of  countries  regarding  policies  and  programs  to   support   the   MSME   sector   and   to   horizontal  cooperation  initiatives  

1  As  included  in  the  OAS  Cooperation  Plan  PMF      2  As  included  in  the  OAS  Cooperation  Plan  PMF  3  Available  data  based  on  the  completed  activities  by  03/31/13  4  24  total  (Central  America  6,  Caribbean  10,  South  America  7,  North  America  1)  

Page 140: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

68  

Expected  Results1   Indicators2  Baseline    

Data  

Actual  3  Targets   Notes/Highlights    

2120   Support   provided   to  high-­‐impact  MSMEs,   including  women-­‐led   MSMEs,  public/private  universities  and  R&D   centers   (which   include  government-­‐sponsored   R&D  centers  and  others  created  by  associations   of   MSMEs)   in  strategic  economic  sectors      

  #   of   MSME   support   institutions  implementing   services   tailored  to   high   impact   MSMEs,  disaggregated  by  country  

   #  of  men  and  women   trained   to  provide   specialized   services   to  high-­‐impact  MSMEs    

 0          0  

 0          0  

 3      

 60  

  A  partnership  has  been  established  with  the  Centre  for   the   Promotion   of  Micro   and   Small   Enterprises  in  Central  America  –  CENPROMYPE,   to  design  and  implement  a  training  of  trainers  program  with  the  purpose   of   improving   the   competitiveness   of  women  entrepreneurs  through  the  use  of  ICTs.  

  A   final   MOU   is   currently   being   drafted;   training  activities  are  scheduled  to  begin  in  March  2013.      

 

2130   Support   provided   to  member   states   to   facilitate  the  development  of  the  policy  framework   enabling   public-­‐private   partnerships   for  innovation   in   the   business  environment,   including  licensing   and   transfer   of  technology    

  #  of  training  sessions  provided  to  member   states   on   the  development   of   policy  frameworks  

  #  of  training  sessions  provided  to  public/private  institutions  on  the  development   of   policy  frameworks  

 

0        0  

1        0    

2        1  

  10   government   officials   (5   women   and   5   men)  were   trained   on   how   to   use   intellectual   property  (IP)   tools   to   facilitate   technology  commercialization,  through  the  course  “Promoting  Innovation:   Licensing   Academy   in   Intellectual  Property  and  Technology  Commercialization,  “held  at  the  University  of  California  Davis  from  June  4-­‐13,  2012.      

 2140   Support   provided   to   the  Inter-­‐American   Networks  (RIAC,  STEN,  Inter-­‐American  E-­‐SME   and   Innovation   Network  and   Consumer   Safety  Network)   to   undertake   their  mandates  

  #  of  cooperation/successful  practices  exchanged  by  network  members  

   #  of  networks’  government  officials  and  stakeholder  representatives  trained  in  key  sectoral  issues,  disaggregated  by  network  

 

2      2  

67*12        

562*3  

18          

10  

  52   for   RIAC   (16   countries,   2   institutions   116  participants   from   31   countries   at   RIAC   meeting  from   2,686   assisting   at   the   Americas  Competitiveness  Forum  

  E-­‐Innovanet;   the   Ministry   of   Economy,   Industry  and  Commerce  (MEIC)  of  Costa  Rica  agreed  to  host  the  first  meeting  of  the  Central  American  region  of  Innovanet   in  San  Jose,  Costa  Rica,  on  April  24  and  25,  2013,  on  occasion  of  SME  week  in  Costa  Rica.  

  RIAC   members   approved   the   2013   action   Plan  which  provides  a  number  of  specific  activities  to  be  carried   out   as   coordinated   by   the   Chair   Pro  Tempore,   Panama,   with   the   support   of   the  Technical  Secretariat  (OAS).    

  The   RIAC   action   plan   is   aimed   at   the  implementation   of   the   10   principles   of  competitiveness   approved   in   the   Consensus   of  Santo  Domingo  in  2012.  There  is  a  specific  principle  

1  RIAC:  52,E-­‐InnovaNet:  5,  STEN:  6,  CSHN:  4  2  Targets  have  been  exceeded 3  RIAC:  116,  E-­‐Innovanet:  N/A,  STEN:  426,CSHN:  120

Page 141: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

69  

Expected  Results1   Indicators2  Baseline    

Data  

Actual  3  Targets   Notes/Highlights    

dealing  with  social  inclusion  and  gender  equity  (#8).  Panama   selected   as   the   main   theme   for   2013  infrastructure  and  technology  

2210   Mechanisms   created   to  raise   awareness   of   CSR  principles   among  parliamentarians  in  the  region  

  #  of  mechanisms  created  to  raise  awareness   of   CSR   among  parliamentarians  in  the  region  

  Creation   of   tailored   evaluation  tool   kits   to   measure   CSR  awareness   among  parliamentarians    

3      0    

3      2  

5      3  

  As  a  result  of  a  dialogue-­‐workshop”  A  vision  of  CSR  from  Congress”  held  on  Oct.  9,  2012  in  Nicaragua.  The   Legislative   Secretaries   of   the   Parliamentarian  Commissions   of   Nicaragua   and   FOPREL   members  drafted  a  resolution  that  promotes  the  inclusion  of  CSR  within  the  government  agendas  

   A   tailored   tool   kit   has   been   developed   for  Nicaragua    

 

2220   Capacity   building   tools  developed   to   promote  responsible   practices   among  key   stakeholders   of   the   Inter-­‐American   Cooperation  Network  (CooperaNet)    

 

  #   of   capacity   building   tools  shared  through  the  network    

 

 2    

   3  

 8  

One  tool  has  been  developed  till  date  hosted  within  a  new  website  www.cooperanet.org:      ECoopeX;  an  online  catalogue  of  OAS  projects  and  programs    

 

 

Page 142: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

70  

Expected  Results1   Indicators   Baseline  Data  

Actual     Targets2   Notes/Highlights  

Outputs      2310  Establish  a  knowledge  exchange/dialogue  mechanism  to  promote  sound  management  practices  in  member  states/in  the  region  i.e.  Inter-­‐American  Cooperation  Mechanism  for  Effective  Public  Management  (MECIGEP)  

  #  of  guides  developed  by  MECIGEP  

   #  of  effective  public  

management/successful  practices  exchanged  by  member  states/members  of  the  MECIGEP    

   #  of  recommendations  

implemented  by  member  states/members  of  the  MECIGEP      

 

6        0          0  

9        7          0  

30        

12          3  

  3   countries   guides   have   been   developed   and   have  undergone  peer  review;  Peru,  Colombia  and  Dominican  Republic.  An  additional  3  are  in  process.    

   Seven   public   management   projects   have   been  exchanged;   (1)   Project   Management   Model   for  Innovation   in   Mexico’s   Public   Service,   (2)   State  Transformation   in   Jamaica:   Asses   and   further   change,  (3)  Institutions’  Modernization  and  Taxation  Practices  as  basic   condition   for  Good  Governance,   (4)  Office  of   the  Procurement   Ombudsman’s   Mandate   within   the  Canadian   Federal   System,   (5)   Public   Sector  Transformation  in  Jamaica:  Realities  and  Challenges,  (6)  Compliance   management   methodology   at   the   central  government   of   Chile,   (7)   Information   Technology   in  Public  Management  of  Colombia    

 

1  As  included  in  the  OAS  Cooperation  Plan  PMF      2  Available  data  based  on  the  completed  activities  by  03/31/13

Page 143: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

2320  Technical  assistance  provided  for  the  implementation  of  selected  projects  requested  by  OAS  member  states  in  key  areas  of  public  management    

 

  #   of   selected   projects  initiated   in               member  states  in  key  areas  of  public  management  

  %   of   projects   which  integrate   gender   equality  principles  

 

 5    0  

   

818      

25%  

 14    

50%      

  Three   selected   projects   are   being   initiated;   (1)  Transparent   and   Efficient   Municipalities,   (2)  Promote   Transparency   and   Access   to   Public  Information,   (3)   Strengthen   civil   registry   entities  in  Belize,  Saint  Lucia,  and  Saint  Kitts  and  Nevis    

   A  workshop  and  bilateral  working  meetings  with  a  gender  specialist   focused  on   the   implementation  of   a   gender   strategy   by   promoting   a   common  understanding   amongst   the   personnel   of   the  department  of  public  management  took  place  on  October  16-­‐17,  2012    

   As   a   result   of   the   Gender   consultations   the  project   will   include:   (i)   diagnosis   of   gender  balance   in   public   institutions   at   national   and  municipal  level,  which  will  include  but  not  limited  to:  a)  targets  for  the  representation  of  women;  b)  equal   access   to   training   opportunities,   c)   equal  opportunities/pay;  and  d)  development  of  gender  equality   mechanisms;   and   (ii)   recommendations  to   incorporate   the   findings   from   the   diagnosis  into  their  strategic  planning/formation  process.  

 

18 Means  of  Verifications  (MOV)  have  been  requested  by  DPE

Page 144: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

72  

2410  Technical  support  provided  to  member  states  for  implementation  of  the  OAS  Model  Law  on  secured  transactions,  with  the  participation  of  international  organizations,  private  sector,  trade  associations  and  taking  into  account  the  financial  inclusion  of  women-­‐owned  SMEs  

  #  of   States   considering  OAS  model   law   as   the   basis   for  reform  

   #   of   participants,  disaggregated   by  international   organizations,  private   sector,   trade  associations,  participating  in  the   implementation   of   the  Model  Law    

   %   of   organizations  

participating   in   the  implementation   of   the  Model   Law   that   advocate  for   women-­‐owned  businesses  

 

 0              

12                  

0%    

0          

13            

0%      

   

 4        

80%    (9-­‐10  

participants)        

20%  (min  two)  

     The  first  seminar  for  OAS  member  states’  capacity  to   implement   secured   transactions   reform   (STR),  on  OAS  STR  will  be  held  between  June  and  August  2013.  Trainings  will  center  on  how  the  OAS  Model  Law  and   its  Model  Registry  Regulations   can  help  OAS  member  states  meet  their  specific  needs  for  ease   of   access   to   equitable   credit   and   build  institutions  for  the  future.    

   Activities   are   currently   being   carried   out   to  procure   co-­‐sponsors   for   the   country   reform  processes  through  the  OAS  missions    

 

2510   Assessment   of   the  compliance   of   the   Inter-­‐American   Convention  against   Corruption  conducted   through   its  Follow-­‐up   Mechanism  (MESICIC)      

  #   of   countries   reviewed   for  compliance   during   the  Fourth  Round  (2012-­‐2015)  

  %  of  compliance  of  member  states   at   the   hemispheric  level    

 

 2819        

22%  

 5    

22%  

 31    

35%    

  Five   of   the   31   countries   scheduled   for   review  within   the   MESICIC   framework   (Fourth   Round)  have   been   reviewed   for   compliance   with   the  Inter-­‐American   Convention   against   Corruption  (IACAC)  and  the  corresponding  reports  have  been  published.     These   countries   comprised   the   first  group  to  be  reviewed  (Brazil,  Bolivia,  El  Salvador,  Mexico  and  Paraguay).      

     

19  28  OAS  Member  States  are  scheduled  to  be  reviewed  between  2012-­‐2015  the  program  aims  to  include  in  addition  3  more  countries  in  round  four  of  the  MESISIC    

Page 145: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

73  

2520   Technical   support  provided   for   the  implementation   of   the  Model   Inter-­‐American  Law   on   Access   to   Public  Information   and   its  Guidelines   with   the  participation   of  government   officials,  policy   makers   and   the  private   sector   and   civil  society,   including  women’s  organizations  

  #  of   States   considering  OAS  model   law   as   the   basis   for  reform  

   #   of   participants,  disaggregated   by   executive  branch,   legislative   branch,  private   sector   and   civil  society,   participating   in   the  implementation   of   the  Model  Law    

   #   of   civil   society  organizations   participating  in   the   implementation   of  the   Model   Law   that   are  women’s  organizations    

 

2  

 

 

0  

 

 

 

 

 

0  

020      

0      

     

0    

6        

75              

10  

  A   database   on   access   to   public   information   was  created.    It  covers  broad  themes  such  as  political  documents  approved  by  the  OAS  especially  those  related   to   the  General   Assembly,   Summit   of   the  Americas  and  Meetings  of  Ministers  of   Justice  or  Other   Ministers   or   Attorneys   General   of   the  Americas  (REMJAs)  and  internal  legislation  

   Consultations   are   being   made   with   the   Alianza  Regional   para   la   Libertad   de   Expresion   e  Información,   Latin   America’s   leading   NGO   on  access   to   public   information,   composed   of   24  organizations  from  19  Latin-­‐American  countries.    

   

 

20  Information  provided  is  undergoing  review    

Page 146: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

74  

 

Expected  Results1   Indicators   Baseline  

Data  Actual21    

Targets3  Notes/Highlights22    

 

Outputs  3110   Train-­‐the-­‐Trainers   Program  executed,   taking   into  account   the   needs   of  women  entrepreneurs  

  #  of  men  and  women  trained  by  MSME  support   institutions   to   provide  assistance  to  MSMEs    

  Needs   of   women   entrepreneurs  specifically   addressed   in   curricula   of  training  programs      

   

  Perception   of   quality   of   training   by  trainees  

 

0  

   0  

     0  

160          

100%*          

85%*  

300  (M/F)        

100%        

80%23  

  With   the   support   of   CENPROPYME   a   training  program   prepared   196   technical   advisors   and  consultants   based   on   the   small   business  development   centers   in   6   countries   of   the  Central   American   region   (Belize,   El   Salvador,  Honduras,   Guatemala,   Nicaragua   and   Panama)  to  provide  support  for  women  entrepreneurs  

   The   curriculum   is   aimed   at   women  entrepreneurs   in   existing   MSME   support  institutions  

   In   partnership   with   Barrabes   Consulting   Firm,  The   Cave   school   of   Business   (CHSB)   of   the  University   of   West   Indies   and   the   OAS  educational   portal   of   the   Americas   an   online  course   on   the   use   of   internet   and   social  media  for   MSMEs   was   developed   and   is   being  delivered    

 3210   Trade-­‐related  technical   assistance  (TRTA)   program   for  government   officials  responsible   for  negotiating   and  implementing   trade  agreements   designed  and  executed      

  #  of  government  officials  trained      #   of   trade-­‐related   institutions  (Ministries   responsible   for   trade   and  related  issues)  assisted  

0    0    

13624    4  

150    

10  

  As   a   result   of   the   national   capacity   building  consultation,   there   was   agreement   on  approaches   to   ongoing   negotiations   and  willingness   to   engage   in   the   national   process  going   forward.   Funding   was   provided   to   cover  travel  expenses  of  the  expert.  

   Capacity   building   consultations   with   other  CARICOM  countries  will  proceed  during  the  next  reporting  period.  

 

21  As  included  in  the  OAS  Cooperation  Plan  PMF    22  Data  based  on  the  activities  carried  out  by  03/31/13  23  Target  has  been  exceeded    24  Means  of  Verifications  (MOV)  have  been  requested  by  DPE  

Page 147: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

75  

Expected  Results1   Indicators   Baseline  

Data  Actual21    

Targets3  Notes/Highlights22    

 3220  Capacity  building  program   of   country  officials   for   the  sustainable   use   of  natural   resources  (water,   soil,   land,  renewable   energy,  biodiversity)  developed   in   trade  goods   and   services  executed,   taking   into  account   the   different  needs,   ownership   and  uses   of   those  resources   with   an  integrated   gender  balance  perspective  

     #   of   training   tool   kits   for   the  sustainable   use   of   natural   resources  in  trade  provided  to  country  officials  

     #  of  country  officials  (M/F)  trained  in  trade  goods  and  services  in  LAC  taking  into   account   the   sustainable   use   of  resources   and   a   gender   balance  perspective  

 

 3        

401  

 0    

 412    

 

5  

 

 

601    

   OAS-­‐DSD   increased   the   capacity   of   4   OAS  member   state   government   officials   (2   officials  from   the   Ministry   of   Environment   of   Peru;   1  official  from  the  Ministry  of  Environment  of  the  Dominican   Republic;   and   1   official   from   the  delegation   of   Costa   Rica),   amongst   an   array   of  others   from  around   the  world.  With   regards   to  sex-­‐disaggregated   data,   3   officials   were   female  and  1  was  male.  

 

3310   Training  provided   to   SMEs   to  adopt   socially   and  environmentally  responsible   business  practices   and  especially   gender  sensitive  practices  

  #   of   SMEs   trained   on   responsible  business   practices   in   targeted  sectors/countries  

   #   of   training   modules   focused   on  

gender  equality  for  SMEs    

 800        0  

870      

   0    

 1050  

     1  

  A   first   training   session   was   carried   out     in    Tegucigalpa  Honduras  on  February  7-­‐8th    

  A  second  training  session  “Awareness  to  Action:  How  to  Implement  CSR  in  SMEs  was  carried  out”  March  18  and  19,  2013  in  Quito,  Ecuador  

   A  partnership  with  Global  Compact  to  distribute  the   survey   to   relevant   organizations   in   Global  Compact’s   network   and   gather   information   on  SMEs   in   the   extractive   sector   from   the   five  countries   that   the   Program   targets   (Ecuador,  Guatemala,  Mexico,  Uruguay,  and  Panama)  

 3320   CSR   community  of   practice   created   to  facilitate   knowledge  exchange    

  CSR  community  of  practice  created  

  #  of  members   participating   in   the  CSR  community  of  practice  

 

0    0    

0    

0  

1    5  

  For   the   creation   of   the   Inter-­‐American  Community   for   Social   Responsibility   the  OAS/CSR   team   is   currently   working   with   an  independent  contractor  to  develop  the  platform  

  A   series   of   bilateral   exchanges   with   local   and  regional   CSR   institutions   are   in   progress   to  define  community  members  

 

Page 148: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

76  

Expected  Results1   Indicators   Baseline  

Data  Actual21    

Targets3  Notes/Highlights22    

 3410   Training  provided   to   the  judiciary   and   other  public   officials   in   the  application   of  international  commercial  arbitration   and   the  local   enforcement   of  foreign  judgments  and  arbitral  awards  

  #   of   judiciary   members   trained   on  commercial  arbitration  procedures  and  enforcement  

 

  #   of   public   officials   trained   on   foreign  judgements  and  arbitral  awards  

   #  of  countries  where  the  training  has  been  replicated  by  trained  officials  

 

 0      0        0  

0      

0      

0    

 25      

15        4  

 As  part  of  the  preliminary  research  on  enforcement  of  foreign  judgments  and  arbitral  awards,  DIL  has  prepared  three  working  documents:  

-­‐ Analysis  of  the  contours  of  international  commercial  arbitration  and  the  particular  advantages  of  using  these  alternative  dispute  resolution  proceedings.    

-­‐ Convenciones  sobre  arbitraje  comercial  internacional  y  reconocimiento  y  ejecución  de  sentencias  extranjeras  en  el  sistema  Interamericano.  

-­‐ Purpose  and  scope  of  the  Inter-­‐American  Conventions,  the  recognition  and  enforcement  of  foreign  arbitral  awards  under  the  Inter-­‐American  conventions  

 

 

Page 149: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

77  

Expected  Results25   Indicators   Baseline  Data  

Actual26   Targets   Notes/Highlights    

Outputs      4110  Monitoring  implementation  of  agreed   commitments   on   women’s  rights  undertaken      

  #   of   countries   reporting   on  implementation  of  commitments  

  Establishment   of  monitoring  mechanism  which  includes  baseline  and  indicators  

0    0  

0    

127    

3    1  

  In   collaboration   with   national  mechanisms,  permanent  missions  to  the   OAS   and   OAS   national   offices,  conduct   a   regional   consultation   and  analysis   in   order   to   determine   the  participating   countries:   Brazil,   Costa  Rica,   Guatemala,   Jamaica,   Peru,  Trinidad  and  Tobago  

 

4120   Regional   assessment   of  National   Machineries   for   The  Advancement   of   Women  undertaken   and   recommendations  disseminated      

  #   of   countries   that   respond   to   the  diagnostic   questionnaire   and   participate  in  personal  interviews  

 

  Debate   on   recommendations   discussed  during  CIM  Assembly  of  Delegates      

 

 0          0  

628  

   0  

 

 6        1  

  The   6   participating   countries:   Brazil,  Costa   Rica,   Guatemala,   Jamaica,  Peru,   Trinidad   and   Tobago,  responded   to   the   questionnaire   and  interviews    

   Country  profiles  are  being  finalized      

4210   Monitoring   the  implementation   of   the   Belem   do  Para  Convention  undertaken  

  #   of   countries   reporting   on  implementation  of  commitments  

   Establishment   of  monitoring  mechanism  

which  includes  baseline  and  indicators  

 0          0  

 0      0  

 3          1  

    A   consultation   and   analysis   was  

carried   out   and   the   participating  countries   defined:   Argentina,  Colombia,   Ecuador,   Guatemala,  Jamaica  and  Paraguay    

   Review  and  assessment  of  existing  

efforts   to   monitor   and   evaluate  the  exercise  of  women’s  right  to  a  life   free   of   violence,   including   a  mapping   of   actors   in   each  participating   country,   was  conducted   and   will   serve   as   the  basis   for   the   establishment   of  monitoring  mechanisms.  

  An  international  expert  group  was  

25  As  included  in  the  OAS  Cooperation  Plan  PMF    26  Data  based  on  activities  completed  by  03/31/13 27  Additional  Means  of  Verifications  (MOV)  have  been  requested  by  DPE  28  Target  has  been  reached    

Page 150: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

78  

Expected  Results25   Indicators   Baseline  Data  

Actual26   Targets   Notes/Highlights    

hosted   in   Mexico   City   on  November   12th   to   14th   2012   to  discuss  the  assessment  results  and  draft   a   proposal   for   a   unified  methodology   and   indicators   to  monitor   the   implementation   of  the   Belem   does   Para   Convention  and   CEDAW   General  Recommendation  12.  

  A   Communications   strategy   to  raise   awareness   of   the   Belem   do  Para   Convention   is   in   progress  through  online  media  and  printed  materials.  

 4220   Training   provided   to  government   officials   on   the  implementation  of  Belem  do  Para  

  #  of  government  officials  (M/F)  trained  in  resource  allocation  

  %   of   countries   that   include   specific  activities/resources   for   violence   against  women  in  national  budgets    

0        

53%    

0      

53%      

80M/80F        

64%      

         An  analysis  of  the  extent  to  which  countries   incorporate   specific  resources   to  activities  on  violence  against   women   and   will   serve   as  the   basis   for   capacity-­‐building   on  gender-­‐budgeting   to   address  violence  against  women.  

     

                         

Page 151: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

79  

 

Expected  Results29   Indicators  Baseline    

Data  

Actual30  Targets  

Notes/Highlights  

 

Outputs      5110   Tools   enhanced   to  manage   data   on  mandates,   executed  resources,   and   achieved  results  including  gender-­‐specific   results,   and  support   provided   to  facilitate   results-­‐based  management  by  OAS/GS  

 

  System   upgraded   to   link  executed   budget   and   achieved  results  

   %   of   areas   advised   on  formulating,   capturing   and  classifying   results   at   the   three  levels   of   outcomes,   including  gender  specific  outcomes  which  have  revised  results    

0          0  

0      

 0    

1          

100%  

       Project   has   advanced   in   preparing   the   input  necessary   to   obtain   this   output.   This   includes   the  following   developments   necessary   to   link   the  executed  budget  and  achieved  results:  

  Mandates   have   been   updated  &   organized  under   groups  of  mandates   and   includes   all  mandates  up  to  2012  

  Work   is   being   carried   out   to   prepare   an  excel  version  of  the  results-­‐based  budget    

  Information   on   execution   of   specific   funds  for  2011  is  available    

   5120   Tools   and   support  provided   to   OAS/SG  Staff  to  facilitate  results-­‐based   project  formulation,   including  the   incorporation   of  gender   equality   results  in  the  project  cycle  

  Upgraded   project   management  system   including   modules   on  project   monitoring,   project  cycle   management   and  evaluation   process   made  available  to  OAS/GS  Staff  

   #  of  OAS/GS  Staff   trained  (M/F)  on   results-­‐based   project  management,   including  incorporating  gender  equality  in  projects    

   %   of   projects   registered   in   the  Project  Management    System    

 

0              

100            0    

0    

     

119        

   

 95%  

1              

350            

100%    

  DOITS  is  in  the  process  of  finalizing  the  module  on  project   formulation,   is  scheduled  to  be  completed  and  launched  by  2013.  

   DOITS  has  been  working  in  collaboration  with  DPE  on   the   development   of   the   project   cycle  management/  administration  module.    

   Workflow  and  process   charts  have  been  prepared  to  guide  the  development  of  the  system    

 

5130  SISCA  enhanced  to  integrate  Inter-­‐American  ministerial  mandates,  gender  equality  related  mandates,  and  to  allow  sex  disaggregated  data  and  improvements  in  

  #   of   member   states   trained   in  the  use  of  SISCA  

  %   of   OAS   member   states   and  Joint   Summit   Working   Group  members  using  SISCA  system  

  #   of   Inter-­‐American  ministerial    processes  using    SISCA  

2  

 

10%  

 

0  

2      

10%    0    

20    

60%    

4  

 

  Ongoing   exchanges   with   OAS   member   state   and  JSWG   members   to   facilitate   their   reporting   on  Summit   commitments,   providing   guidance   on  improving   reporting   and   as   such   contributing  towards   the   stated   target   of   increasing   the  percentage   of   countries   and   JSWG   partners  utilizing  SISCA.    

29  As  included  in  the  OAS  Cooperation  Plan  PMF  30  Data  based  on  activities  completed  by  03/31/13

Page 152: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

80  

Expected  Results29   Indicators  Baseline    

Data  

Actual30  Targets  

Notes/Highlights  

 RBM  reporting  for  member  states  

 

 

5210   Mandates  Management   Database  and   Planning   and  Control   System  updated   to   facilitate  the  follow-­‐up  of  gender  equality  mandates    

 

  Gender   sensitive   institutional  criteria   developed,   tested   and  implemented   to   monitor   OAS  mandates    

   %   of   institutional   mandates  categorized   based   on   the  inclusion  of  gender    

     %   of   institutional   results  categorized   based   on   the  inclusion  of  gender    

 

0          0        0  

0  

     

0      

0  

1            

100%      

100%  

  The   development   of   gender   sensitive   institutional  criteria  to  monitor  OAS  mandates  work   is  ongoing  on   a   first   draft   of   criteria   and   the   process   of  internal  review  by  the  DPE  in  consultation  (CIM)  is  scheduled   to   take  place   in   the   last  quarter  of   this  year.   It   is   anticipated   that   finalizing   the   criteria  may   take   a   few   additional  months.   However,   this  will   not   disrupt   the   timeframe   for   accomplishing  this  output  in  any  significant  way.    

 

5220  Procedures  developed  and  support  provided  to  facilitate  the  integration  of  gender  equality  considerations  in  OAS/SG  programs/  projects  

  %   of   technical   areas  (departments)   supported   on  integrating   gender   equality   in  project   formulation   and  monitoring   (including   the  identification   of   gender  sensitive  indicators)  

   %   of   external   project  

evaluations   coordinated   by   the  DPE  which  incorporate  a  gender  equality   perspective   in   their  design  and  implementation  plan  

 

 17%              

100%  

 17%        

     0  

   

50%                    

100%  

  The   projects   review   processes   are   ongoing,  constant   technical   support   is  provided   to   the  OAS  technical   teams   regarding   project   formulation,  including   projects   funded   by   the   current   CIDA  Cooperation  Plan  in  terms  of  the  support  provided  to   the   areas   in   the   formulation   of   projects   as  presented  in  the  project  profiles.    

   External  evaluations  are  not  planned  for  Year  1      

5310  Qualitative  and  quantitative  tools,  information,  and  analysis  generated  and  applied  to  improve  SAPEM    

  #   of   OAS/GS   decision  makers  using  the  SAPEM  mechanism  

   #   of   analytical   products  generated   (political   briefings  and  de-­‐briefings)  

             

 2        

40  

 7    

14931  

 7      

100  

  Users  of   SAPEM  have  been  expanded   to   five:   two  Directors   of   SPA   (Department   of   Electoral  Cooperation  and  Observation  and  Department   for  Effective   Public   Management);   the   SG’s   Chief   of  Staff   and   SG’s   advisors   (2).   Consequently,   the  target,   i.e.   reaching   a   total   of   7   users,   has   been  achieved.    

   As  input  to  develop  the  analytical  products  a  series  

31  Target  has  been  exceeded    

Page 153: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

81  

Expected  Results29   Indicators  Baseline    

Data  

Actual30  Targets  

Notes/Highlights  

 of   contract   opinion   poll   services   have   been  commissioned   for   Ecuador,   Paraguay,   Venezuela,  Honduras,   Guatemala,   El   Salvador,   Nicaragua,  Costa  Rica,  Panama  and  Dominican  Republic.    

   For   Central   American   countries   the   work   is   being  carried  out  by  CID-­‐Gallup  

   Two   presentations   or   de-­‐briefings   were   prepared  for   the   Secretary   General   and   the   Chief   of   Staff.  Venezuela   and   Honduras   were   the   countries  chosen.   Both   presentations   included   a   general  overview   of   the   political,   social   and   economic  situation,   stakeholder’s   analysis,   prospective  analysis  and  recommendations  for  action.    

   

5320  Recommendations  from  previous  crisis  management  and  resolution  cases  considered  by  OAS/GS  decision  makers  and  envoys  during  new  crisis  situations  in  the  LAC  region  

  Perception   of   OAS/GS  decision   makers   and   envoys  on   the   usefulness   of   the  recommendations  

0   0   50%   Recent   country   crisis   situations   assessed   by   the  OAS/GS:    Paraguay:  

-­‐ Congress   impeachment   of   President  Fernando  Lugo    

El  Salvador:  -­‐ The   Establishment   of   a   Technical  

Coordinating   Committee   through   the  Ministry   of   Security   and   Justice   formally  appointed   by   the   President   to   coordinate  the   voluntary   surrender   of   weapons   by  local  gangs.    

-­‐ Signing  of  a  peace  pact  amongst  governing  political  parties.        

Bolivia:  -­‐ Consultation   amongst   the   69   indigenous  

communities  affected  and/  or  benefiting  by  the   construction   of   Section   II   of   the   Villa  Tunari-­‐San  Ignacio  de  Moxos  road  

 Honduras:  

-­‐ Evaluation  of  the  National  Security  System  -­‐ The   founding   of   a   Commission   to   Reform  

Public  Security  (CRPS)    

Page 154: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

82  

Expected  Results29   Indicators  Baseline    

Data  

Actual30  Targets  

Notes/Highlights  

 Suriname:  

-­‐ Establishment   of   Truth   and   Conciliation  Mission    

 5410  Training,  observation  of  underrepresented  groups  methodology,  and  databases  designed  and  implemented  for  OAS  Electoral  Observation  teams  

  #   of   databases   produced   on  EOM   systematic   data   and  recommendations   for   use   of  DECO  EOM  staff  

  #   of   OAS   observers   certified  on   the   methodology   for  observing   elections   in   the  hemisphere  

  EOM  observation  methodology  that  measures  the  equal  opportunity  for  participation  of  underrepresented  groups  in  electoral  processes    

   

 0      0          0  

 0        0            0    

 2      

100          1    

  Electoral   Database   Applications   requirements   and  DOIT   User   Need   Specification   studies   conducted  and  the  development  of  a  prototype  is  in  progress    

   A   survey   on   the   perception   of   Deputy   Chiefs   and  General  Coordinators  of  their  ability  to  incorporate  comparative   recommendations   and   data   in   the  formulation  of  OAS/EOM  reports  was  designed  and  implemented   in  order  to  gather  baseline  data  and  to   monitor   and   evaluate   the   development   of   the  database  

   OAS/DECO   signed   an   agreement   with   the  University   of   Salamanca   (USAL),   Iberoamerican  Institute,   with   a   view   towards   establishing   a  relationship   of   institutional   collaboration   and  whose   first   main   activity   is   the   design,  development   and   implementation   of   a   Summer  School   on   International   Electoral   Observation.  OAS/DECO   along   with   USAL   developed   the  curriculum,   concluded   the   design   of   the   program,  and  opened  the  invitation  for  all  interested  parties  to  apply  

   

5510  Recommendations  from  virtual  and  face-­‐to-­‐face  consultations  presented  to  OAS  member  states  in  the  policy-­‐making  process  (i.e.  Summit  Implementation  Review  Group-­‐SIRG)  

  #   of   presentations   made   to  OAS   member   states   by  stakeholders  

  #   of   Summit-­‐related  recommendations   from  consultations  presented  to  OAS  member   states   for  consideration   in   the  negotiation   of   Summit  programs  and  mandates  

   

5  annually        

150  annually    

5        

150      

7  annually    

 

200  annually  

   A  virtual  forum  entitled  “Connecting  the  Americas:  Promoting   Partnerships   to   Promote   Social  Inclusion  and  Equity”  is  currently  being  held  via  the  Summit   Virtual   Community.     The   results   of   this  forum,  including  specific  recommendations,  will  be  compiled   into   a   report   and   presented   to   OAS  member  states  at  the  next  meeting  of  the  Summit  Implementation   Review   Group   (late   2012/early  2013).   These   recommendations   will   contribute  towards   the   overall   target   amount   set   for   the  project.  

  A  second  virtual  consultation  entitled,  “Connecting  the   Americas:   Advancing   Partnerships   for   Action  

Page 155: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

83  

Expected  Results29   Indicators  Baseline    

Data  

Actual30  Targets  

Notes/Highlights  

                   

on   Energy,   the   Environment,   and   Infrastructure”,  was   conducted   by   the   Summit   of   the   Americas  Secretariat  and  the  OAS  Department  of  Sustainable  Development,   with   support   from   the   OAS  Department  of   International  Affairs   from  March  5  to   15,   2013.   The   virtual   consultation   had  participants   from   18   countries,   15   of  whom  were  from   OAS   member   states   and   who   made   more  than   175   comments,   proposals   and   contributions  to  this  topic  

   A  Report  from  the  Virtual  Form  held  from  October  9   to   November   4,   2012)   is   currently   available:  Connecting   The   Americas:   Advancing   Partnerships  To   Promote   Social   Inclusion   And   Equity   In   The  Americas    

 5520  Consultations  with  a   balanced   regional  representation   of  stakeholders   facilitated,  and   gender   sensitive  recommendations  presented   to   OAS  member   states   and  General   Secretariat   in  preparation   of   General  Assemblies   and  ministerial  meetings.    

  %   of   preparatory   meetings  facilitated  by  GS/OAS  held  with  stakeholders   in   the   framework  of   OAS   political   processes   (i.e.  OAS   General   Assembly,  Permanent   Council,   ministerial  meetings,   and   Summit   of   the  Americas)  

  #   of   stakeholder  recommendations   proposed  for   inclusion   in   the   OAS  declarations  and  resolutions    

 

  %  of  participation  of  Caribbean  stakeholders  in  consultations  

   %   of   recommendations,   on   a  

yearly   basis,   which   include  gender  equality  principles      

 

100%              

100%        

   

17%        

2%      

100%32                

100%          

   

17%          

2%          

100%              

100%              

25%        

 10%  

  In  preparation  for  the  10th  Hemispheric  Forum  with  Civil   Society   and   Social  Actors,   the  Department  of  International   Affairs   has   developed   a   draft  program   and   proposes   to   hold   the   Forum   in  Guatemala   City   in   early   March   2013,   in   order   to  engage   a   greater   number   of   civil   society  organizations   from   Central   America   and   the  Caribbean,   bearing   in   mind   that   the   host   of   the  next  General  Assembly  will  be  Guatemala  and  that  Panama  will  host  the  7th  Summit  of  the  Americas  in  2015.    

   The  Forum  will  focus  on  the  main  topic  of  the  43rd  OAS   General   Assembly,   which   has   not   yet   been  announced  by  the  Government  of  Guatemala,  and  will   also   focus   on   follow-­‐up   to   the   6th   Summit   of  the   Americas’   mandates,   as   well   as   initiate   the  preparatory  process  leading  up  to  the  7th  Summit.  

 

32  Information  undergoing  review  

Page 156: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

84  

           The  Risk  Register  has  been  reviewed  and  updated.  The  Risk  Register  for  Year  2  shows  no  modifications,  as  the  OAS  strategic  outlook  and  the  risks  it   faces   have   not   changed.     The   risks   previously   defined   continue   to   be   at   the   same   level   the   highest   scored   (L:   2   I:   3)   being   at   the   level   of  development  for  the  whole  program  at  the:      

- Socio-­‐Political,  Economic,  Gender  Equality,  etc.    Risk  that  expected  results  may  be  affected  by  Member  States’  vulnerabilities  related  to  their  political  situation,  the  economy,  socio-­‐cultural  issues,  security,  conflict,  gender  equality,  etc.  

 For  details  please  see  Annex  4:  Risk  Register    

                                           

Risk  Management   Yr.  I  

Page 157: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

85  

         Within  the  framework  of  the  Inter-­‐American  Program  on  the  Promotion  of  the  Human  Rights  of  Women  and  Gender  Equity  and  Equality  (IAP,  2000)  and  with  the  support  of  the  Governments  of  various  Member  States,  Permanent  Observers  and  other  stakeholders,  the  OAS  Cooperation  Plan   (OAS-­‐CP),   is   moving   forward   towards   its   objective   to   reinforce   the   institutionalization   of   an   effective   response   to   gender   equality   and  women’s  rights  issues  in  the  work  of  the  Organization.      In  adopting  the  IAP,  OAS  Member  States  and  the  General  Secretariat  committed  to  formulating  public  policies,  strategies,  and  proposals  aimed  at   promoting  women's   human   rights   and   gender   equality   in   all   spheres   of   public   and   private   life   and   to   systematically   integrating   a   gender  perspective   in  all  organs,  organizations,  and  entities  of   the   inter-­‐American  system.    Consequently,   the   Inter-­‐American  Commission  of  Women  (CIM)  and  the  Department  of  Planning  and  Evaluation  (DPE)  of  the  OAS  have  collaborated  closely  in  providing  support  to  the  various  entities  of  the  OAS   that   are   participating   in   the  OAS-­‐CP   in   order   to   ensure   that   each   project  within   the   program   adequately   and   effectively   addresses  gender  considerations  in  both  design  and  implementation.    In  this  sense,  the  Gender  Equality  Strategy  for  the  OAS  Cooperation  Plan  2012-­‐2015  (CIDA  2)  contains  the  following  specific  sections:    

1. Inclusion  of  gender  equality  and  women’s  rights  issues  in  all  project  profiles  related  to  the  implementation  of  the  OAS-­‐CP   2. Inclusion  of  a  gender  equality  and  women’s  rights  component  in  the  project  reporting  and  follow-­‐up  process    3. Inclusion  of  gender  equality  results,  or  “achievements”  in  the  OAS-­‐CP’s  communication  strategy    4. Strengthening  commitment  and  accountability  to  gender  equality  and  women’s  rights  issues  

                     

         

                                                               Gender  Strategy   Yr.  I  

Page 158: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

86  

 Gender    For  Year   I  of   the  OAS-­‐CP  the   first  section  has  been  completed  by  using  the   formulation  and  approval  process  of   the  OAS’  Project  Evaluation  Committee,  all  of  the  projects  related  to  the  OAS-­‐CP  were  subject  to  evaluation  by  technical  experts  from  CIM  and  DPE  in  order  to  ensure  that  gender  equality  and  women’s  rights  concerns  were  incorporated  into  the  problem  analysis,  project  objectives,  activities  and  indicators.    As  a  result  of  this  process,  a  total  of  25  (or  67.6%)  projects  include  a  substantive  gender  component,  concentrated  particularly  in  modules  1000,  2000,  and  4000:        

           

                                                                                                                                                                                                                                                                                                       Table  7:  Gender  Component  by  Output    As  the  implementation  of  the  OAS-­‐CP  moves  forward  and  we  start  to  see  more  concrete  results  from  each  of  the  individual  projects,  it  will  be  possible   to   highlight   specific   gender   equality   results   and   develop   an   idea   of   the   extent   to   which   the   initial   investment   of   time   and   other  resources  in  mainstreaming  a  gender  perspective  in  the  OAS-­‐CP  has  paid  off  in  terms  of  concrete  benefits  to  women.  In  this  sense,  the  CIM  and  the  DPE  will   continue   to   provide   support   to   the   preparation   of   progress   reports   and   other   project  materials   in   order   to   ensure   that   gender  equality  results  are  identified  and  highlighted  in  both  project  activities  and  reporting.                        

         Number  of  Projects  with  a  Gender  Component  (GC)    1110-­‐1160   5   83%  2110-­‐2520   7   64%  3110-­‐3410   3   50%  4110-­‐4220   4   100%  5110-­‐5520   6   60%  

Total   25   67.57%  

 

Page 159: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  Year  I  (2012-­‐2013)

                                                 

87  

 Additional  Gender  Analysis      From  a  purely  quantitative  point  of  view,  the  Gender  Component  (GC)  is  present  in  almost  70%  of  the  projects  included  under  the  OAS-­‐CP.  This  varies  from  the  totally  gender  focused  Module  4000,  with  a  100%  presence,  to  the  50%  presence  in  Module  3000.    This   analysis   has   been   refined   introducing   four   categories   that   provide   a   better   understanding   of   the   degree   or   intensity   of   the   Gender  Component  taking  into  account  if  the  GC  is  stated  within  the  level  of  results  and/or  included  as  part  of  the  indicators:  (For  details  see  Annex  5)              

   Table  8:  Gender  Component  Scale  

      1000   2000   3000   4000   5000   Average  Intermediate   3.00   1.00   0.00   3.00   2.00   1.80  Immediate   3.00   3.00   0.00   3.00   1.20   2.04  Output     1.33   0.64   1.00   3.00   1.20   1.43  

 Table  9:  Gender  Component  Rating  

 The  degree  in  which  the  Gender  Component  is  present  varies  accordingly  to  the  areas  of  intervention  of  the  OAS-­‐CP,  certain  areas  as  Democracy  (1000)   and   Institutional   Capacity   Building   (5000)   allow   the  programs   to   address  Gender   related   issues   in   a  more   conducive   environment   i.e.  elevating  the  participation  of  women  in  democracy  through  Electoral  Observation  Systems  and  Assessments.  Or  building   institutional  capacity  for  the  monitoring  of  Gender  related   issues  within  OAS  programs  and  mandates  by  providing  monitoring  tools  and  capacity  building  activities  the  Core  Teams.      The  GC  seems  less  strong  in  areas  as  Regulatory  Frameworks  (2000)  and  Market  Access  (3000)  due  to  their  focus  in  trade,  business,  and  MSMEs,  topics  in  which  the  GC  is  promoted  through  policy  dialogues  and  trainings  provided  through  local  and  regional  institutions.  The  OAS-­‐CP  overall  rating   is   reinforced   by   the   focus   of   Human   Rights   (4000)   whose   efforts   are   exclusive   to   Gender   Equality   through   the   strengthening   and  implementation  of   the  Convention  on   the  Elimination  of   all   Forms  of  Discrimination  against  Women  CEDAW  and  Belem  do  Para  by  Member  States.        

Measurement  Scale  Gender  Component  (GC)  3   2   1   0  

High  GC   Med  GC   Low  GC   No  GC  

Page 160: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Annual  Report  OAS  Cooperation  Plan  

 

Year  2                2013-­‐2014  

   

1

Page 161: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

     I.  Executive  Summary    II.  Financial  Reports  (From  Inception  March  29,  2012  Until  March  31,  2014)    Schedule  A:  Summarized  Financial  Reports    Schedule  B:  Overview  of  Budget  Execution  and  Fund  Balance    Schedule  C:  Combined  Budget  Execution  for  All  Years    Schedule  D:  Budget  Execution  by  Year    Schedule  E:  Statement  of  Execution  by  Object  of  Expenditure    Schedule  F:  Other  Sources  of  Financing    Notes  to  the  Financial  Reports      III.  Narrative  Report  Year  2  Progress  General  Program  Overview  

Democracy  Business  Environment  Access  to  Markets  Gender  OAS  Institutional  Strengthening    

 IV.  Program  Management  

Gender  Communications  Risk  Management  

 V.  Annexes    

1. Performance  Measurement  Framework  (PMF)  (03/31/2014)  2. Logic  Model  (LM)  03/31/2014)  3. Minutes  Joint  Steering  Committee  (03/12/2014)  4. Risk  Register  (03/31/2014)  5. OAS  Communications  Memo    6. List  of  Acronyms    

Table  of  Contents                      2012-­‐2014  

 

Yr.  2  

2

Page 162: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

                                     

         I.  Executive  Summary      This  section  provides  background  information,  a  short  introduction  as  well  as  lessons  learned,  monitoring  tools  and  the  overall  performance  of  the  program.  

Executive  Summary                      2012-­‐2014  

 

Yr.  2  

3

Page 163: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

       The  Organization  of  American  States   (OAS)  was  entrusted  by  the  Government  of  Canada  through  the  former  Canadian   International  Development  Agency  (CIDA),  merged  in  2012  with  the  Department  of  Foreign  Affairs,  Trade  and  Development  Canada  (DFATD)  to  carry  out  the  OAS  Cooperation  Plan  (OAS/CP).    The  OAS  Cooperation  Plan  (OAS/CP  or  CIDA  II)  is  a  three  (3)  year  agreement  initiated  on  31st  March  2012  financed  by  the  Government  of   Canada  with   CAD   19,500.000.     These   resources   contribute   to   the   development   of   a   series   of   programs   (including   a   total   of   37  outputs)  fostered  within  various  secretariats  and  departments  of  the  OAS.    The   programs   included  within   the  OAS/CP   share   the   common   goal   of   strengthening   the   institutional   capacity   of   the  OAS  Member  States.  The  program  works  in  five  fields  of  intervention:    

• National  Electoral  Systems  and  Processes;  

• Policies  and  Regulatory  Frameworks  related  to  Business  Environment;    

• Market  Access  and  Regional  Trade;  

• Gender  Equality  Instruments  and;  

• The  Institutional  Capacity  of  the  OAS.    

In  compliance  with  the  reporting  commitments  of  the  OAS/CP  an  annual  report  is  prepared  and  delivered  by  the  Technical  Secretariat  (TS)   of   the   OAS/CP.   This   reporting   is   possible   by   the   inputs   provided   by   the   Department   of   Planning   and   Evaluation   (DPE),   the  Department   of   Financial   and   Administrative  Management   Services   (DFAMS),   and   the   Permanent   Secretariat   of   the   Inter-­‐American  Commission  of  Women  (CIM).  Their  detailed  files  and  internal  follow-­‐up  reports  allow  a  narrow  scrutiny  of  the  operational  and  financial  evolution  of  the  program.  Also  through  the  intervention  of  the  DPE  the  program  benefits  with  expert  technical  support  in  the  subject  of  Results  Based  Management   (RBM),  and  at   the   same   time  all   communications  matters  are   supported  by   the  Secretariat   for  External  Relations  (SER).              

Background                      2012-­‐2014  

 

Yr.  2  

4

Page 164: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

         The  First  Report   (Year  1)  was  presented  on  15th  May  2013;   the  document   included   the  programs’   results   since   its   inception  on  31st  March  2012  through  31st  March  2013.      This   Second  Report   (Year   2)   serves   as   a   continuation   of   the   reporting   efforts   and   presents   the   Financial   and  Narrative   information  delivered  by  the  completed  activities  as  of  31st  March  2014.      The  main  objective  of  the  Annual  Reports  is  to  present  a  story  of  the  performance  of  the  OAS/CP,  as  well  to  provide  complementary  information  regarding  other  aspects  of  the  year-­‐to-­‐year  implementation  of  the  agreement.  As  mentioned  the  Annual  Report  for  Year  2  is  composed  of  two  main  sections:  Financial  and  Narrative.        Readers   are   advised   to   read   initially   this   Executive   Summary   as   it   contains   a   general   outlook   of   the   report   that   permits   a   better  understanding  of  the  more  detailed  sections.      The  Financial  Significance  of  the  Program    An  exercise  prepared  by  DFAMS  allows  us  to  appreciate  the  contribution  of  the  OAS/CP  when  compared  with  the  OAS  Regular  Fund,  ICR,  and  Specific  Fund.  The  exercise  shows  that  over  the  Fiscal  Years  of  2012,  2013,  and  2014  the  OAS/CP  represents  4  %  ($18.85MM  over  a  total  of  $469.09MM)  of  the  total  OAS  contributions  (Regular  Funds,  ICR,  and  Specific  Funds).    As  far  as  the  relevance  of  this  Program  to  the  different  areas  of  the  OAS  is  concerned  it  is  important  to  point  out  that  up  to  six  units  receive  more  than  20%  of  their  Total  Annual  Budget  from  the  OAS-­‐CP:    29.6%  Secretariat  of  International  Law    25.1%  Summits  Secretariat  23.9%  Department  of  Economic  &  Social  Development  22.9%  Permanent  Secretariat  of  the  Inter-­‐American  Commission  of  Women    21.7%  The  Department  for  Effective  Public  Management  21.5%  The  Department  of  Planning  and  Evaluation    There  are  6  other  areas  that  receive  less  than  20%  of  their  budget  from  the  OAS  Cooperation  Plan.    

Background                      2012-­‐2014  

 

Yr.  2  

5

Page 165: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

         This  report  for  the  second  year  of  the  OAS  Cooperation  Plan  (or  CIDA  II)  reflects  important  facts  for  the  Organization:    

• The  program,  as  mentioned  on  the  Second  Joint  Steering  Committee  Meeting,   that   took  place  on  12th  March  2014,   is  literally  “halfway  across  the  river”,  advancing  towards  a  culture  of  results  management.  

• There  is  no  doubt  that  CIDA  II  is  to  be  considered  a  milestone  on  the  OAS  path  to  results  

• Direct  engagement  within  National  Policy-­‐Making  Processes  continues  to  be  the  OAS’s  key  to  sustainable  results  

   Having  said  that,  performance  so  far  has  ample  potential  for  improvement,  and  even  though  most  OAS  Teams  have  made  great  efforts  in   order   to   perform   adequately,   results   have   been   limited   in  many   cases.   The   results   can   be   appreciated   in   the   tables   and   graphs  included  further  on  in  this  Executive  Summary.    The  implementation  of  an  RBM  program  entails,  from  our  experience,  the  application  of  frequent  follow  up.  In  this  sense,  an  important  highlight  of  Year  2  was  the  Measurement  Exercise  as  of  30th  September  2014,  including  both  Output  Results  and  Financial  Execution.  This  exercise  provided   indications  of   the  challenges   faced  by  our  Core  Teams  and  their   reporting,  where  means  of  verification  were  frequently  absent  and  where  progress  according  to  plan  was  quite  variable  among  the  different  projects  of  the  program.    Another  important  highlight  of  Year  2  was  the  PMF  Assessment  and  Adjustment  Exercise  that  took  place  in  January  2014.  This  exercise,  supported  by  Ms.  Marian  Black,  a  Canadian  expert  that  helped  the  Technical  Secretariat  in  the  design  of  the  original  PMF  (Annex  1),  has  been  fundamental  in  order  to  fine-­‐tune  our  current  PMF.  As  Mrs.  Black  said  in  her  report,  the  exercise  was  undertaken  at  “…exactly  the  correct  time  to  take  stock  of  progress  achieved  to  date  and  to  take  corrective  action  to  ensure  that  expected  results  can  be  achieved”.    The  PMF  Assessment  and  Adjustment  Exercise  allowed  us  to  reach  conclusions  of  consequence  for  the  Program  that  is  presented  later  in  this  section.  It  is  necessary  to  underline  the  fact  that  the  PMF  has  now  the  same  amount  of  results  it  had  at  the  end  of  year  1,  but  more  indicators  (148  instead  of  134).  This  adjustment  has  resulted  in  greater  demands  and  an  increased  workload  for  our  Core  Teams.            

Introduction  2012-­‐2014  

 

Yr.  2  

6

Page 166: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

Lessons  Learned  2012-­‐2014  

 

Yr.  2            Lesson  1:  RBM  IS  A  DEMANDING  PRACTICE  The  institutional  Learning  Curve  is  steep.  Core  Teams  require  reinforcing  their  project  management  skills  as  well  as  RBM  fundamentals.  Project  reporting  requires  that  Core  Teams  include  RBM-­‐certified  staff    Lesson  2:  HIGHER  PROGRAM  OWNERSHIP  NEEDED    Functional   rapport   between   Directors   and   Team   Leaders   needs   reinforcing.   In   general,   a   higher   program   ownership   at   the   top  executive  level  is  needed  in  order  to  fortify  the  technical  and  financial  commitments  of  the  OAS-­‐CP      Lesson  3:  GOOD  PLANNING  BRINGS  BETTER  RESULTS  Projects  with  higher  levels  of  achievement  are  those  who  have  an  established,  planned  policy  engagement  and  dialogue  with  partners,  and  clear  statements  of  expected  results    Lesson  4:  SHORT  TIMEFRAMES  EQUALS  LESS  IMPACT  Thirty-­‐six  months  is  not  a  sufficient  time  frame  in  which  to  expect  major  transformations.  On  top  of  that,  it  is  not  easy  to  show  results.    Lesson  5:  PROJECT  DESIGN  MUST  INCLUDE  INDICATORS    Project  Design  must  include  quantitative  and  qualitative  indicators  prior  to  analysis,  evaluation,  and  approval    Lesson  6:  LESS  PROJECTS,  IMPROVED  OUTCOMES    A  new  OAS  Cooperation  Plan  (CIDA  III)  should  include  a  lower  number  of  components  and  projects,  i.e.  reducing  the  number  of  Outputs  and  avoiding  a  project  matrix  that  is  too  heterogeneous      Lesson  7:  A  RISK  MANAGEMENT  STRUCTURE  IS  IMPORTANT  The  identification  of  risks  and  development  of  a  risk  mitigation  strategy  at  the  initiative  level  would  enhance  flexibility  and  allow  the  teams  to  make  informed  decisions  in  managing  risks    Lesson  8:  NOT  REACHING  TARGETS  CAN  TEACH  POSITIVE  THINGS  Team  members  must  know  that  bad  results  frequently  provide  evidence  to  see  that  additional  resources/support  are  required  in  order  to  achieve  the  expected  results    

7

Page 167: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

Structure  2012-­‐2014  

 

Yr.  2  

Table  1:  Program  Distribution  per  Area  

       Program  Structure    The  development  of  activities  and  programs  fostered  within  the  OAS  Cooperation  Plan  are  part  of  an  institutional  effort.  The  program  is  composed  of  37  outputs,  carried  under  17  projects,  with  over  300  sub  activities  and  tasks.  This  work  is  divided  amongst  eight  of  the  OAS   Secretariats   and   an   average   of   40   Specialists   (OAS   Staff  Members)  working   together   to   comply  with   the   set   goals.   A   detailed  distribution  per  program  component  shows  the  wide  organizational  range  that  characterizes  CIDA  II:                                                      

8

Page 168: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

Performance  2012-­‐2014  

 

Yr.  2    Project  Status  Monitoring  System  for  Outputs        In  order  to  better  monitor  the  ongoing  performance  of  the  OAS-­‐CP  a  color  coded  system  also  known  as  “  the  semaphore”  has  been  designed  to  provide  executive  information  based  on  the  activity  reports  provided  by  the  OAS  Core  Teams  validated  by  DPE  as  well  as  financial  information  provided  by  DFMAS  on  the  level  of  execution1  with  the  following  guidelines:                                            CIDA  II’s  semaphore  provides  a  quick  idea  of  the  Program’s  financial  and  operational  performance.                                                                                                                          1  Expenditures  plus  un-­‐liquidated  obligations  related  to  the  current  budgetary  year  in  USD.  Un-­‐liquidated  obligations  are  amounts  related  to  commitments  to  disburse  monies  for  the  procurement  of  goods  or  services  in  future  periods.  Such  amounts  represent  commitments  to  third  parties  at  the  end  of  the  respective  periods  and  are  anticipated  to  be  expended  in  subsequent  periods  in  the  completion  of  a  particular  program  or  activity.  This  amount  may  be  lower  in  subsequent  periods  as  de-­‐obligations  occur.  

Table  2:  Semaphore  Criteria  

9

Page 169: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

Performance  2012-­‐2014  

 

Yr.  2    Median  Achievement  by  Component      As  of  31  March  2104,  Yellow  “Some  Elements  allow  us  to  appreciate  what  has  been  done  but  more  work  is  required”  predominates  in  Year  2,  showing  that  some  progress  has  been  verified  but  targets  are  still  to  be  reached.                                                                          

         

         

         

         

         

Table  3:  Median  Achievement  Outcome  

10

Page 170: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

Performance  2012-­‐2014  

 

Yr.  2      Financial  Execution  by  Component      As  of  31  March  2104,  in  general  terms  Year  2’s  execution  tends  to  be  slow  (Between  51%  and  71%):        

                                                   

               

         

         

         

         

         

Table  4:  Outcome  Financial  Execution  

11

Page 171: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

!

! RED$ ORANGE$ YELLOW$ GREEN$ Totals$

1000$ "! 2! 3! 1! 6!

2000$ "! 1! 9! 1! 11!

3000$ "! 1! 3! 2! 6!

4000$ "! 4! "! "! 4!

5000$ "! 4! 3! 3! 10!

Totals$ "! 12! 18! 7! 37!

(%)$ "! 33! 48! 19! 100!

Table  5:  Output  Performance  by  Component  

Performance  2012-­‐2014  

 

Yr.  2    

     Output  Performance  by  Component  (in  figures  and  percentages)    This  table  breaks  down  the  general   information  shown  earlier  and  illustrates  the  predominance  of  yellow  marks  given  to  almost  half  the  outputs  included  in  the  OAS/CP.  It  shows  as  well  the  fact  that  green  marks  have  only  been  given  to  7  outputs,  i.e.  19%  of  the  total.            

                                                                 

12

Page 172: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

Performance  2012-­‐2014  

 

Yr.  2    

     

Performance  per  Component  (Graphic)                                                      These  percentages  showcase  an  irregular  performance  for  this  component,  one  of  the  two  most  homogeneously  composed  in  the  program.        

Democracy  1000:  Strengthened  implementation  of  elections,  focusing  on  gender  equality  considerations  in  targeted  countries  

 

Graph  1:  Performance  1000  

13

Page 173: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

Business  Environment  2000:  Increased  progress  towards  implementation  of  policies  and  regulatory  frameworks  and  instruments  that  stimulate  sustainable  economic  growth,  particularly  

in  areas  of  competitiveness,  innovation  and  MSMEs,  in  targeted  countries    

 

Performance  2012-­‐2014  

 

Yr.  2  

Graph  2:  Performance  2000  

     Performance  per  Component  (Graphic)                                                                  These  percentages  show  a  heterogeneous  component  that  is  delivering  results,  but  more  work  needs  to  be  done  in  order  to  perform  successfully.      

14

Page 174: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

Access  to  Markets  3000:  Increased  opportunities  provided  by  Member  States  to  businesses  to  access  national,  regional  

and  global  markets    

 

Graph  3:  Performance  3000  

Performance  2012-­‐2014  

 

Yr.  2          Performance  per  Component  (Graphic)                                                        These  percentages  correspond  to  a  heterogeneous  component  that  has  had  a  mixed  performance.      

15

Page 175: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

Gender  4000:  Strengthened  application  of  human  rights  instruments  related  to  gender  equality,  i.e.  CEDAW  and  Belem  do  Para  by  Member  States  

 

Graph  4:  Performance  4000  

Performance  2012-­‐2014  

 

Yr.  2          Performance  per  Component  (Graphic)                                                          These  percentages  showcase  a  component  that  can  do  better.  This  is  one  of  the  two  most  homogeneously  composed  components  in  the  program.      

16

Page 176: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

Graph  5:  Performance  5000  

OAS  Institutional  Strengthening  5000:  Improved  effectiveness  of  the  OAS  in  fulfilling  its  mandate  to  support  democratic  governance  and  sustainable  economic  growth  

   

Assessment    2012-­‐2014  

 

Yr.  2            Performance  per  Component  (Graphic)                                                      These  percentages  showcase  an  irregular  performance  for  this  heterogeneous  component.        

17

Page 177: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

Assessment    2012-­‐2014  

 

Yr.  2  

Table  6:  PMF  Adjustments  

     Performance  Measurement  Framework  (PMF)    Assessment  and  Adjustment  Exercise    This  exercise  took  place  on  29-­‐30  January  2014.  Our  main  conclusions  were  as  follows:  

• Adjustments/tweaks  to  the  result  statements  have  not  altered  the  comprehensive  approach  of  the  program  in  its  areas  of   intervention.  The  edits  have  allowed  the  link  between  activities  and  results  to  be  more  transparent  and  rational  by  including  key  words,  or  actions  that  better  describe  the  work  plans  being  executed.    

• Eliminating  a  few  indicators  will  increase  accountability,  in  particular  by  allowing  projects  to  deliver  within  their  scope.    

• The  inclusion  of  new  indicators  enhances  the  coherence  of  the  program  by  facilitating  the  collection  of  data,  allowing  for  a  better  monitoring  and  evaluation  of  the  impact  of  the  program.    

• The  reinforcement  of  data  collection  methods  for  qualitative  data  is  a  work-­‐in-­‐progress  so  as  to  validate  the  quality  and  levels  of  satisfaction  of  the  intervention  of  our  Core  Teams  within  their  publics  of  interest.    

 

An  inventory  of  the  approved  edits  are  listed  below:                                  

Edits  and  /or  Improvements  to  the  OAS-­‐CP  PMF   Total  

Edits  and  improved  drafting   15  

New  Indicators   8  

Indicators  Deleted   5  

Indicators  Assigned  to  New  Level     2  

Verification  of  Missing  Data  (Baselines  and/or  Target)   6  

Methodology  Changes  for  Data  Improvement     15  

18

Page 178: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

Assessment    2012-­‐2014  

 

Yr.  2  

Table  7:  Issues  and  Solutions  

     PMF  Assessment  and  Adjustment  Exercise  (continued)      

Summary  of  Issues  and  Solution    

Issue   Solution  

1.  Lack  of  Available  Data  at  the  Level  of  Outcomes;  not  being  able  to  determine  baselines  and  targets  for  the  qualitative  indicators    

A  series  of  coaching  sessions  have  been  provided,  recommendations  and  materials  have  been  provided  to  reinforce  data  collection.    

2.  Limited  access  to  data  sources  and  resources;  delayed  collection  of  missing  data  as  well  as  lack  of  comprehension  in  the  “how  to”    

Missing  data  to  be  labeled  “midterm”  and  noted  according  to  its  date  of  collection  and  measurement;  therefore  qualitative  indicators  at  the  level  of  outcomes  are  to  be  measured  during  Year  2  and  3  of  the  OAS-­‐CP.    

3.  Incorrect  Levels  of  Result  Measurement;  lack  of  clarity  in  what  the  projects  deliverables  were  to  be,  prior  to  the  actual  execution  of  the  program  

A  few  indicators  have  been  promoted  to  higher  levels  with  the  same  shape  and  form,  allowing  the  program  to  showcase  behavioral  changes  and  a  higher  level  of  impact.    

4.  Poor  Connection  between  activities  and  results  due  to  the  diversity  and  high  number  of  projects  contributing  to  one  result.  Accountability  hard  to  determine  amongst  the  contributing  teams.    

Additional  indicators  have  been  included  as  well  as  “better”  phrasing  of  the  result  statements    

               

19

Page 179: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

Table  8:  RBM  in  numbers  

Financial    

 

Yr.  2        The  OAS  Cooperation  Plan’s  Result  Based  Management  Structure  in  Numbers                                                      

  Year  1  #  Results  

Year  1  #  Indicators  

Year  2  #  Results  

Year  2  #  Indicators  

Ultimate  Outcome  

1   2   1   2  

Intermediate  Outcomes  

5   14   5   15  

Immediate  Outcomes  

17   38   17   49  

Outputs   37   80   37   82  

Totals   60   134   60   148  

20

Page 180: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

 

Annual  Report  OAS  Cooperation  Plan  Year  2  (2013-­‐2014)  

   

               II.  Financial  Reports  (From  Inception  March  29,  2012  Until  March  31,  2014)    Schedule  A:  Summarized  Financial  Reports    Schedule  B:  Overview  of  Budget  Execution  and  Fund  Balance    Schedule  C:  Combined  Budget  Execution  for  All  Years    Schedule  D:  Budget  Execution  by  Year    Schedule  E:  Statement  of  Execution  by  Object  of  Expenditure    Schedule  F:  Other  Sources  of  Financing    Notes  to  the  Financial  Reports    

21

Page 181: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

Informal De-Briefing Meeting

OAS-Canada Cooperation Plan Year 3, Friday June 26, 2015

Discussion Points:

- General Overview ( OAS/Canada Cooperation plan highlights per component)

- Program Observations

- External evaluation draft work plan /timeframe

- Next Steps ( Current tasks and upcoming activities)

- Conclusions

Page 182: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

2

Component Overview

I. Democracy

Strengthened Implementation of Elections, focusing on Gender Equality considerations in Targeted

Countries

The electoral management program is carried out by the Department of Electoral Cooperation and

Observation under the Secretariat for Political Affairs. Efforts are focused on the improvement of national and

regional electoral systems and processes by providing technical assistance and tailored tools/mechanisms to

improve transparency and accountability within political processes.

The Main Beneficiaries of these efforts are the national electoral authorities (Electoral Management Bodies –

EMBs). These institutions and their personnel are trained, assisted and provided with instruments that allow

them to streamline national electoral processes, implement international quality standards and improve

women’s participation in national and local elections.

The main highlights between April 2014 and 2015 are:

- The Ninth Inter-American Meetings of Electoral Management hosted in coordination with the

electoral authorities of Peru; Jurado Nacional de Elecciones and the Oficina Nacional de Procesos

Electorales. Twenty-Two Member States participated and a total of 665 EMB officers have been

trained within these meetings. Sixty-Eight within this last one. The Target set within the OAS/CP has

been met.

- As part of a series of studies to be developed and provided to the targeted EMBs. A socio-

demographic profile of voters in Central America was published:

http://www.oas.org/es/sap/docs/deco/EstudioParticipacionCA2015_s.pdf

- The Creation of an OAS-Sponsored Electoral Accreditation Body for Certification of Electoral

Authorities in ISO Electoral Standard is progressing rapidly. On May 15th

, the GS/OAS signed Executive

Order 14-011 officially creating the Office of the International Accreditation Body (IEAB) within DECO.

The Executive Order describes the key mandates and functions of the IEAB. Therefore In order to

manage accreditation, authorization, certification and training functions a web platform is currently

being developed: www.oas-ieab.org it will be the principal interface through which clients and

electoral bodies communicate with the IEAB. It is expected that the website will go “live” in June 2015,

for use by electoral bodies and any other organizations working with the IEAB.

- Dominican Republic Junta Central Electoral was awarded the ISO 9001 Quality Management

Certificate on March 25th

, 2015. The Junta Central Electoral plans to certify against the new electoral

standard, ISO/TS 17582:2014 in June of 2015, employing the services of a certification body accredited

by the OAS International Electoral Accreditation Body.

- Two Technical Cooperation programs for EMBs were delivered:

Bolivia – Recommendation to improve the accuracy of the cleaning and updating procedures of

eligible voter’s part of the biometric electoral registry managed by the Plurinational Electoral

Organ (EPO) in Bolivia in preparation for the March 2015 Elections

Argentina- – Cooperation project with the Electoral National Court (CNE) of Argentina to make

recommendations for the future implementation of a Quality Management System and the

certification of electoral processes using technology under international standards.

1 Available at http://www.oas.org/legal/english/gensec/EXOR1401.pdf

Page 183: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

3

Component Overview

II. Business Environment

Increase progress toward the implementation of policies, regulatory frameworks and instruments that

stimulate sustainable economic growth. Particularly in the areas of; competitiveness and innovation

focused on the development of micro, medium and small enterprises (MSMEs).

The Business Environment Component has multiple implementers; activities under this topic are carried out

by the Secretariat for Integral Development (SEDI) the Secretariat for Legal Affairs (SLA) and the Secretary for

Political Affairs (SPA). All areas share the common objective of strengthening in-country capacities by fostering

spaces for dialogue, and providing peer review mechanisms.

The targeted beneficiaries for the activities under this component are government officials, public ministry

personnel and MSME staff, which are provided with capacity building tools and spaces (workshops and online

courses) that reinforce their knowledge and capacity to design, standardize, and harmonize development

policies which in the long term serve as enablers for business development.

The main highlights between April 2014 and 2015 are:

- The IV Inter-American Dialogue of High-Level MSME Authorities “Public Policies to Enhance the

Competitiveness, Innovation and Internationalization of Micro, Small and Medium Enterprises

(MSMEs)” The meeting took place on April 16-17, 2015 at the OAS headquarters in Washington D.C.

(Third edition)

- The adaptation and implementation in El Salvador of a Small Business Development Center model

from the United States, with the support of the Regional Center for MSME Promotion (CENPROMYPE)

was made possible thanks to the ongoing support provided through the series of Inter-American

Dialogue of High-Level MSME Authorities.

- Costa Rica, Guatemala, & Honduras and their respective MSME support institutions hosted workshops

focused on implementing tailored services to high impact MSMEs an additional 125 individuals

participated surpassing the set target (60) with a total of over 250 trainees.

- Over 200 participated in training sessions for the consideration of the Model Law as the basis for a

secured transaction reform; sessions were delivered in El Salvador, Peru and Jamaica. The set target

(80) has been surpassed.

- As part of the ongoing technical support in public management (a total of 17 projects have been

delivered till date) is the implementation and design of Paraguay’s Secretariat of Public Function (SPF).

The SPF is responsible for the promotion of Process Management implementation and its automation,

organizational development, and coordinating capacity building activities among beneficiary

institutions.

- The Inter-American Cooperation Mechanism for Effective Public Management (MECIGEP) has drafted

an additional three country guides for The Bahamas, Honduras and Panama (still under review), a total

of 21 Guides have been completed for OAS Member States.

- Twenty-Six Countries have been were reviewed and assessed in the compliance of the Inter-American

Convention against Corruption conducted through its Follow-up Mechanism (MESICIC). The fifth and

final group includes: Venezuela, The Bahamas, the United States, Antigua and Barbuda, and St. Kitts

and Nevis.

Page 184: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

4

Component Overview

III. Access to Markets

Increased opportunities provided by Member States to businesses in order to access national, regional and

global markets.

The Access to Markets Component is mainly carried out by the Secretariat for Integral Development (SEDI)

along with the Secretariat for Legal Affairs (SLA) which focuses in capacity building on commercial/trade

related dispute settlement. All efforts have the common objective of increasing the participation of its

targeted Member States (Special emphasis in the Caribbean) in regional and global trade. By providing

technical assistance for the improvement of the services provided as well as dialogue spaces to improve the

frameworks that govern their Trade/MSMEs policies. The role of the national institutions for Micro, Small and

Medium Enterprises (MSMEs) is reinforced.

The Main beneficiaries of these efforts are government/public officials judiciary members and MSME

personnel, which are mainly participate with on-site and virtual training on; responsible business practices,

use of natural resources, commercial arbitration, entrepreneurship as well as trade agreements.

The main highlights between April 2014 and 2015 are:

- As part of the national consultations held in Barbados in June 2014 and studies developed on the

market opportunities. Particularly for Exporting Education Services from CARIFORUM; a Cooperation

Agreement between the OAS General Secretariat and Caribbean Export Development Agency was

signed. This regional agency has been tasked with increasing the competitiveness of the Caribbean

countries by providing export development and investment promotion services.

- Upon the request of the government of The Bahamas an additional study “Inserting the Bahamas into

Global Value Chains” was developed. The findings and policy recommendations stemming from the

study have been shared with government officials responsible for the promotion of services exports.

- Over a 1100 individuals (+200) including high-level representatives, MSME personnel and Public

officials participated in over 10 events i.e. CSR workshops, Business Forums, Train the Trainer

Programs as well as direct technical assistance activities provided to institutions.

- Two additional workshops on the use of the application of international commercial arbitration have

been delivered. For a total of 76 judges and 16 public officers trained, these are actively working

within Judicial System. A fourth workshop is scheduled in the Caribbean in the upcoming weeks.

- A train-the-trainers pilot course with the Belize Trade and Investment Development Service

(BELTRAIDE) was designed and implemented, this Customer-Service Job Preparedness Training will

help provide meaningful employment in the tourism industry in preparation for the 2015-2016

season.

- The Third Americas Competitiveness Exchange on Innovation and Entrepreneurship in the United

States and Mexico was carried out from April 19 to 24, 2015. Amongst its highlights is the launch of a

Design and Support Center for Small Businesses of the Textile sector. Implemented through the

Competitiveness and Entrepreneurship Program of the State of Hidalgo. Leaders of the State of

Hidalgo, Mexico, participated in the first Americas Competitiveness Exchange and modeled their

Design Center on the innovation centers presented within the forum.

Page 185: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

5

Component Overview

IV. Gender

Strengthened application of human rights instruments related to gender equality at the national (Belem do

Para) and at the regional level CEDAW (Machineries for the Advancement of Women) by Member States.

The Gender Component is carried out by the Inter-American Commission for Women (CIM). Efforts are aimed

at fostering a more conducive environment for sustainable public policies that address women’s rights and

gender equality in the region. By assessing the national mechanisms and providing technical assistance as well

as spaces for police dialogue and the exchange of best practices on reducing violence against women.

The main beneficiaries of these efforts are the women’s national authorities and institutions, which are

provided with assessment tool (indicators) and materials (action plans) that serve as enablers for the correct

implementation and compliance of the national and regional instruments i.e. Belem do Para and CEDAW.

The main highlights between April 2014 and 2015 are:

- Four Hundred and Four Government officials have been trained in the in monitoring of the Belem do

Para Convention (+224) in the last year, a total of 8 training sessions have been delivered.

- From May 14th

to 16th

2014, the Hemispheric Forum “Prevention of violence against women: Good

practices and proposals for the future” was held in Pachuca, Mexico.

- 13 good practices in using education and communication for the prevention of violence that were

presented during the Forum were added to the new virtual platform: www.belemdopara.org The

information from 2010 and 2014 has also been used to create a monitoring tool on this platform

which will be updated with the results of future reports and circulated to OAS member states, civil

society organizations and other relevant stakeholders.

- An ongoing communication strategy for raising awareness of the Belém do Pará Convention and its

Follow-up Mechanism and CEDAW (General Recommendations 12 and 19) was developed and is

supported by the following social media tools:

- CIM Facebook (https://www.facebook.com/ComisionInteramericanaDeMujeres) account

- MESECVI Twitter account (https://twitter.com/MESECVI)

- A Blog (http://dialogocim.org/) that regularly publishes information about the Belém do

Pará Convention and the MESECVI

- A series of collaboration agreements have been signed with the Supreme Courts of Argentina, Costa

Rica, El Salvador and Mexico. An agreement has also been signed with the National Gender

Commission of the Judicial Branch of Colombia and the Ombudsperson for Audiovisual

Communication.

- Similar agreements are also being negotiated with Supreme Courts of Guatemala and Puebla, Mexico

in order to strengthen the application of gender justice and with Universidad Externado and the

National Institute for Women and Development (ISDEMU) of El Salvador in order to strengthen

general collaboration on the issue of violence against women. The agreements include collaborative

activities such as training with justice sector and other officials in the application of the Belém do Pará

Convention at the national level.

Page 186: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

6

Component Overview

V. Institutional Strengthening

Improved effectiveness of the OAS in fulfilling its mandate to support democratic governance and

sustainable economic growth

The Institutional Strengthening component is carried out by various areas due to its crosscutting nature and its

focus on carrying out initiatives geared towards strengthening the internal performance and management

capacity of the institution. By improving consultation amongst OAS stakeholders, increasing efficiency in

project execution, promoting the use of Result Based Management (RBM) as well as elevating the integration

of gender equality principles.

The main beneficiaries of the work carried out are OAS stakeholders: staff, high level decision makers,

observers, donors as well as other development actors’ e.g. civil society organizations. These target audiences

participate actively in the use of systems, tools and forums aimed at collecting recommendations and

providing inputs in policy making processes e.g. Summit of the Americas.

The main highlights between April 2014 and 2015 are:

- Political analysis mechanisms such as the SAPP and tools have expanded their audience i.e. Electoral

Chiefs and Deputy Chiefs (+15 users). A total of 225 briefings and presentations were prepared

(quadrupled since the inception). Venezuela, Guatemala and Honduras registered the highest number

of analytical products followed by El Salvador and Ecuador.

- Over 145 OAS Observers have been trained (+75) and certified in observation methodology based on

collected in-house practices. Online training for Electoral Observers also continues to be in high

demand, on March 25, 2015, DECO launched the call for applications for the second edition. The

Virtual Campus received 225 applications from 21 OAS member countries and Spain. The course is

currently in session and is scheduled to end on June 22, 2015.

- Electoral observation recommendation are now part of the institutional memory of the organization,

the electoral team has collected the recommendations of 221 electoral observation mission deployed

by the OAS since 1962. The online database is available (internally) at: www.oas.org/EOMdatabase

- Online Project Systems (Formulating and Reporting Module) are now functioning. OAS staff and all

other actors involved in project design (DPE, DFAMS, and CIM) are now interacting through a platform

that’s allows all participants to communicate, revise and provide inputs.

- 100% of the projects submitted to the Project Evaluation Committee (PEC) for consideration, totaling

700 projects registered in the Project Management System as well as 86 project managers registered

users in the system

- Over 600 OAS staff personnel have been trained (+300) in the use of RBM principles i.e. design of logic

models, project monitoring, reporting and the incorporation of gender perspectives.

- Institutional Gender mainstreaming continues to advance; gender is now part of project formulation;

OAS mandates are categorized based on the inclusion of gender; and three new external program

evaluations have included elements related to the incorporation of gender in the terms of reference.

Page 187: PMP /OAS Cooperation Plan 2012-2013 I - VII... · 2015. 7. 21. · PMP /OAS Cooperation Plan 2012-2013 LOGIC MODEL (LM) JULY 31, 2012 Annex 1-Logic Model Ultimate Outcome Improved

7

Observations

- Follow up practices are limited; teams tend to overlook the need to carry out activities that assess

how their deliverables are used and or relevant once the program ends.

- Stronger connection within the logical framework is needed; association between activities, outputs,

outcomes and impact needs reinforcement on an ongoing basis during the project execution phases.

Projects tend to stray from what is stated within the monitoring tools i.e. Performance Measurement

Framework (PMF).

- Knowledge sharing within the program levels can be limited; better communication amongst the

different areas is needed in order to better connect activities with outcomes.

- Connecting activities with impacts is challenging; once short and medium term goals are achieved,

projects seize to aim for higher results i.e. immediate and intermediate outcomes

- Programs do not prioritize benefit sustainability; actions that can contribute to the continuity/value

of the projects are limited and are not taken into account in the design phase of the projects.

- Improvement in measurements and techniques is needed; program managers struggle with carrying

out data collection exercises, selecting means of verification and maintaining uniformity in their

audiences.

- Political dependence requires flexibility; projects linked to high level political processes e.g. Summits

require the incorporation of alternative lines of actions that allow the redefinition of priorities and

adaptation as the regional scenarios evolve.


Recommended