+ All Categories
Home > Documents > POE Testbed Build Instructions Version 2local.brookings.k12.sd.us/pltw/POE VEX Testbed Build... ·...

POE Testbed Build Instructions Version 2local.brookings.k12.sd.us/pltw/POE VEX Testbed Build... ·...

Date post: 31-Oct-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
11
POE Testbed Build Instructions Version 2 Project Lead The Way © and Carnegie Mellon Robotics Academy © / For use with VEX ® Robotics Systems POE Testbed Build Instructions Version 2 1 SHAFT COLLAR 8 BATTERY STRAP 1 SLOTTED ANGLE 1 DELRIN BEARING 3 2 WIRE MOTOR (269) 2 3 WIRE MOTOR (SERVO) 1 SPACER 4 2.75” WHEEL 2 84 TOOTH GEAR 1 1/2” STANDOFF 2 2” STANDOFF 2 BATTERY 1 GREEN LED LIGHT 1 FLASHLIGHT 1 MOTOR CONTROLLER 2 BASEPLATE 1 VEX CORTEX 1 SCREW, 8/32” x 3/4” LONG 10 SCREW, 8/32” x 1/2” LONG 16 SCREW, 6/32” x 3/4” LONG 3 SCREW, 6/32” x 1/2” LONG 3 NUT, 8-32 26 BUMP SWITCH 1 LIMIT SWITCH 1 LINE TRACKER 1 POTENTIOMETER 1 ENCODER 1 ULTRASONIC RANGE FINDER 1 LIGHT SENSOR 1 2” DRIVE SHAFT 5 36 TOOTH GEAR 2 MATERIALS QUANTITY MATERIALS QUANTITY PARTS LIST
Transcript
Page 1: POE Testbed Build Instructions Version 2local.brookings.k12.sd.us/pltw/POE VEX Testbed Build... · 2012. 2. 14. · should partner with another team of 2 to test components. 6/32”

POE Testbed Build Instructions Version 2

Project Lead The Way © and Carnegie Mellon Robotics Academy © / For use with VEX® Robotics Systems POE Testbed Build Instructions Version 2 • 1

SHAFT COLLAR 8BATTERY STRAP 1SLOTTED ANGLE 1DELRIN BEARING 32 WIRE MOTOR (269) 23 WIRE MOTOR (SERVO) 1SPACER 42.75” WHEEL 284 TOOTH GEAR 11/2” STANDOFF 22” STANDOFF 2BATTERY 1GREEN LED LIGHT 1FLASHLIGHT 1MOTOR CONTROLLER 2

BASEPLATE 1VEX CORTEX 1SCREW, 8/32” x 3/4” LONG 10SCREW, 8/32” x 1/2” LONG 16SCREW, 6/32” x 3/4” LONG 3 SCREW, 6/32” x 1/2” LONG 3NUT, 8-32 26BUMP SWITCH 1LIMIT SWITCH 1LINE TRACKER 1POTENTIOMETER 1ENCODER 1ULTRASONIC RANGE FINDER 1LIGHT SENSOR 12” DRIVE SHAFT 536 TOOTH GEAR 2

MATERIALS QUANTITY MATERIALS QUANTITY

PARTS LIST

Page 2: POE Testbed Build Instructions Version 2local.brookings.k12.sd.us/pltw/POE VEX Testbed Build... · 2012. 2. 14. · should partner with another team of 2 to test components. 6/32”

POE Testbed Build Instructions Version 2

Project Lead The Way © and Carnegie Mellon Robotics Academy © / For use with VEX® Robotics Systems POE Testbed Build Instructions Version 2 • 2

x4 x4

3/4”

Base Plate Cortex

x2x2

1/2”

Bump Switch

Note: Unless otherwise stated, the screw size is 8/32”

Page 3: POE Testbed Build Instructions Version 2local.brookings.k12.sd.us/pltw/POE VEX Testbed Build... · 2012. 2. 14. · should partner with another team of 2 to test components. 6/32”

POE Testbed Build Instructions Version 2

Project Lead The Way © and Carnegie Mellon Robotics Academy © / For use with VEX® Robotics Systems POE Testbed Build Instructions Version 2 • 3

x2 x2

1/2”

Limit Switch

x1 x1

1/2”

Line Tracker

Page 4: POE Testbed Build Instructions Version 2local.brookings.k12.sd.us/pltw/POE VEX Testbed Build... · 2012. 2. 14. · should partner with another team of 2 to test components. 6/32”

POE Testbed Build Instructions Version 2

Project Lead The Way © and Carnegie Mellon Robotics Academy © / For use with VEX® Robotics Systems POE Testbed Build Instructions Version 2 • 4

x2 x2

3/4”

Potentiometer

x2 x2

1/2”

Encoder

Page 5: POE Testbed Build Instructions Version 2local.brookings.k12.sd.us/pltw/POE VEX Testbed Build... · 2012. 2. 14. · should partner with another team of 2 to test components. 6/32”

POE Testbed Build Instructions Version 2

Project Lead The Way © and Carnegie Mellon Robotics Academy © / For use with VEX® Robotics Systems POE Testbed Build Instructions Version 2 • 5

x2x2

1/2”

Note: Only one ULTRASONIC RANGE FINDER & LIGHT SENSOR per 4 students. Students should partner with another team of 2 to test components.

Ultrasonic Range Finder

x1x1

1/2”

Light Sensor

Page 6: POE Testbed Build Instructions Version 2local.brookings.k12.sd.us/pltw/POE VEX Testbed Build... · 2012. 2. 14. · should partner with another team of 2 to test components. 6/32”

POE Testbed Build Instructions Version 2

Project Lead The Way © and Carnegie Mellon Robotics Academy © / For use with VEX® Robotics Systems POE Testbed Build Instructions Version 2 • 6

x2 x2 x236 Tooth Gear 2” Drive Shaft Shaft Collar

x2 x2

1/2”

Battery Strap

Page 7: POE Testbed Build Instructions Version 2local.brookings.k12.sd.us/pltw/POE VEX Testbed Build... · 2012. 2. 14. · should partner with another team of 2 to test components. 6/32”

POE Testbed Build Instructions Version 2

Project Lead The Way © and Carnegie Mellon Robotics Academy © / For use with VEX® Robotics Systems POE Testbed Build Instructions Version 2 • 7

x3 x3

3/4”

Delrin BearingSlotted Angle

x2 x2x2 x2 x2 x2

6/32” x 1/2” 6/32” x 3/4”

2-Wire Motor (269) 2” Drive Shaft Small Spacer Shaft Collar

Page 8: POE Testbed Build Instructions Version 2local.brookings.k12.sd.us/pltw/POE VEX Testbed Build... · 2012. 2. 14. · should partner with another team of 2 to test components. 6/32”

POE Testbed Build Instructions Version 2

Project Lead The Way © and Carnegie Mellon Robotics Academy © / For use with VEX® Robotics Systems POE Testbed Build Instructions Version 2 • 8

x2 x22.75” Wheel Shaft Collar

x1 x1x1 x1 x13-Wire Motor (Servo) 2” Drive Shaft Small Spacer Shaft Collar

Note: Only one 3-WIRE (SERVO) MOTOR per 4 students. Students should partner with another team of 2 to test components.

6/32” x 1/2” 6/32” x 3/4”

Page 9: POE Testbed Build Instructions Version 2local.brookings.k12.sd.us/pltw/POE VEX Testbed Build... · 2012. 2. 14. · should partner with another team of 2 to test components. 6/32”

POE Testbed Build Instructions Version 2

Project Lead The Way © and Carnegie Mellon Robotics Academy © / For use with VEX® Robotics Systems POE Testbed Build Instructions Version 2 • 9

x2x1

3/4”

x184 Tooth Gear 1/2” Standoff

x1x1Small Spacer Shaft Collar

Page 10: POE Testbed Build Instructions Version 2local.brookings.k12.sd.us/pltw/POE VEX Testbed Build... · 2012. 2. 14. · should partner with another team of 2 to test components. 6/32”

POE Testbed Build Instructions Version 2

Project Lead The Way © and Carnegie Mellon Robotics Academy © / For use with VEX® Robotics Systems POE Testbed Build Instructions Version 2 • 10

x2x2

1/2”

2” Standoff

x2

1/2”

Page 11: POE Testbed Build Instructions Version 2local.brookings.k12.sd.us/pltw/POE VEX Testbed Build... · 2012. 2. 14. · should partner with another team of 2 to test components. 6/32”

POE Testbed Build Instructions Version 2

Project Lead The Way © and Carnegie Mellon Robotics Academy © / For use with VEX® Robotics Systems POE Testbed Build Instructions Version 2 • 11

Line FollowerPotentiometerLight Sensor

Limit SwitchBump SwitchEncoder(lower)

Encoder(upper)

Ultrasonic (in)

Ultrasonic (out)

Green LED

Left MotorRight MotorFlashlight

Servo Motor

Motor Controller (x2)

Battery

Green LED

Flashlight

This side will connect to

motor.

This side will connect to

Cortex


Recommended