+ All Categories
Home > Documents > Pohang Accelerator Laboratory POSTECH

Pohang Accelerator Laboratory POSTECH

Date post: 19-Jan-2016
Category:
Upload: niran
View: 72 times
Download: 0 times
Share this document with a friend
Description:
Pohang Accelerator Laboratory POSTECH. PLS Power Supply control and upgrade plan. EPICS collaboration meeting 2004 Dec 8 - 10 , 2004 RICOTTI, Tokai, JAPAN. Pohang Accelerator Laboratory Kiman Ha, M.Y.Oh, J.H Kim, J.M Kim and J.H Choi [email protected]. - PowerPoint PPT Presentation
Popular Tags:
17
Pohang Accelerator Laborato ry POSTECH EPICS Collaboration Meeting 2004 @ RICOTTI, Tok ai, JAPAN EPICS collaboration meeting 2004 Dec 8 - 10 , 2004 RICOTTI, Tokai, JAPAN Pohang Accelerator Laboratory Kiman Ha, M.Y.Oh, J.H Kim, J.M Kim and J.H Choi [email protected] PLS Power Supply control and upgrade plan
Transcript
Page 1: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

EPICS collaboration meeting 2004 Dec 8 - 10 , 2004 RICOTTI, Tokai, JAPAN

Pohang Accelerator LaboratoryKiman Ha, M.Y.Oh, J.H Kim, J.M Kim and J.H Choi

[email protected]

PLS Power Supply control and upgrade plan

Page 2: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

Outline

-Status of orbit feedback-Present status of power supply control-Digital power supply upgrade plan-Hardware review and test result-Summary

Page 3: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

Orbit feedback status

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

-Orbit feedback operation started for user service in November

-Orbit stability with feedback(RMS)

- short term (1 hour) : < 1 m

- long term (12 hours) : < 3 m

-Both V and H corrector PS’s are involved for feedback

Page 4: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

Present PS upgrade status

-Upgrade status.Kept vertical Orbit Stability less then 3 m by f

eedback operation.Replaced 22 sets of Corrector PS and their Con

trol system in September

-EPICS Control and embedded controller.Collaboration with BESSY-II (Ralph, Ingo) and

Kristi(SLAC) .Same as BESSY-II, 24Bit DAC Controller.CANbus field bus with EPICS IOC.Event System for PS time synchronization

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

Page 5: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

Next plan of power supply upgrade

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

-Requirements of corrector PS

.Fast Corrector control system(>1kHz)

.Vertical PS need 20bit of step resolution

.Horizontal PS need 16bit step resolution

-2005, will replace all vertical PS

. 2ppm step resolution

. +/-10ppm long term stability

-Feed-forward for ID gap changed

.Install steering magnet

.+/-5A 16bit 1kHz bandwidth PS

Page 6: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

Fast Control System requirement

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

-PS : >1kHz BW, > 18bit output resolution

- 1 to 5kHz set point

-Event system synchronization

>BPM measurement

>PS control trigger

-Fast beam position and feedback algorithm processing

Page 7: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

Background of Digital PS development

-Implementation of modern power converter technology.Resent DSP&FPGA show very powerful performance

-Requirements of beam physicists for orbit stabilization .Slow, fast, and epics based robust control system

-High speed control applications: >4kHz-High output resolutions: >18bit-Low cost and small number of hardware components

.Reduce error source

.Easy maintenance

Page 8: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

Digital Controller Advantage

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

-Modern digital technology(DSP, FPGA,ADC)

-Cost effective and precise power supply

-High flexibility and modularity

-High functionality

-Built in all functions for PS

.Current regulator(PI, feed forwarder)

.Direct PWM generation

.Fast control port

.Analog, Digital I/O

Page 9: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

Analog- Digital- Converter

8 Analog Input

2 Analog Output

DSP-controller incl. FPGA

16 Bit Digital Out

8 bit Digital Input

1 RS232

1 Fiber optics

Digital Control Unit

Page 10: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

Block diagram of Controller Card without software functions

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPANFrom PSI Lukas

Securitycontroller

(Watchdog)

24 V

5 VBU

S

SHARCDSP

ADSP-21065L

SRAM2 MBit

FLASH EPROM8 MBit

Flags, IRQs, Reset

EPROMFPGA

CLOCK60/30/20MHz

Control-IO serial link

RS 232

PowerInverter SectionAnalog & Digital

Signal

Feedback PWM

PWM signal

PWM synchronisation

SoC / SPARE / ADC clock (200 kHz)

ServicePC

SPORT 1 (serial port)

SPORT 0 (serial port)

PowerMonitor

Reset

PWMgenerator

IO-controller

ADC/DACCard

Trigger /Reset /Interrupt

Backplane

D SUB 15

ControlSystem(EPICS)

optic

FPGA

fast optical input for Trigger /Reset /Interrupt

DCDC

otherDSP

ControllerCards

Analog Sig.

JTAG

digital Input / Output

optic

Timer

Page 11: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

Prototype of Digital PS for PLS

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

FilterIGBT driver

DCCT

Power Stack

DSP

RS232

ADC

Optical fiber for EPICS interface

.+/-100A

.DC 30V

Page 12: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

IOC control test

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

Fiber optics

VIPC664 TM

Digital PS

IOC

Test panel

Page 13: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

IOC and PS configuration

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

VMECPU

Carrier module TM module

PSIP-A

IP-B

IP-C

IP-D

Optical fiber link

MVME5110

VIPC664-TM

Event trigger

CH1

CH2

PS

PS 1PS 1

PS 8PS 8

PS 2PS 2

EVR

Page 14: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

Control hardware components

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

VIPC664-TM

IP2TM

Page 15: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

Step response test

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

55.0A55.0001

55.0002

+55.0003

55.000555.0004

55.0A

Step response @55(A), 100uA step(1ppm)

1ppm @ full range

V*10 is Amps

Page 16: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

Summary

-The PLS orbit feedback operation is based on EPICS control system.-CANbus IOC and control are working well without any problem

-Satisfactory result of prototype Digital controlled PS -Next Digital PS will be operated for orbit feedback

-This high performance PS technology will be helpful for our new project, 4th generation PAL-XFEL

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

Page 17: Pohang Accelerator Laboratory POSTECH

Pohang Accelerator LaboratoryPOSTECH

Overview

EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN

PLS(Pohang Light Source) has successfully upgraded storage ring straight section 20bit power supplies and control system for global orbit feedback operation in collaboration with BESY-II.

Now we are looking for EPICS based fast control system and cost effective precise digital controlled power supply in collaboration with PSI and DIAMOND.

I will present the current status of PLS global orbit feedback system, and experimental results of 1ppm resolution digital controlled power supply for the next upgrade of PLS.


Recommended