PROJECT SUMMARY 2013 - 2015 Ihwan Suryadi – Project Engineer Jan. 2016
Transcript
Page 1: porject summary

PROJECT

SUMMARY

2013 - 2015 Ihwan Suryadi – Project Engineer

Jan. 2016

Page 2: porject summary

InformationSite Survey

Cost EstimateProject Control

Maintenance Design

Page 3: porject summary

Chart of Annual Tasks

2013 2014 2015

Equipment $368,000.00 $214,800.00 $571,000.00

Facility $175,000.00 $218,000.00 $1,049,700.00

$368,000.00 $214,800.00

$571,000.00

$175,000.00 $218,000.00

$1,049,700.00 FACILITY & EQUIPMENT VALUE

20132014

2015

76

15

4 5 7

FACLITY & EQUIPMENT QTY

Equipment Facility

32%

18%

18%

14%

7% 11%

AREA DEPLOYMENT

East Indonesia Kalimantan

Sumatra Java

HO Mining

Page 4: porject summary

Project List 2013

NO AREA BRANCH TITLE START END COST CATEGORIES STATUS

1 East Indonesia Soroako Dyno control repair 2/16/2013 6/16/2013 $ 10,000.00 Equipment Done

2 Kalimantan Kariangau Grit blast asset transfer 2/20/2013 7/20/2013 $ 65,000.00 Facility Done

3 Sumatera Pekanbaru Dyno achor base replacement 3/4/2013 5/3/2013 $ 3,000.00 Equipment Done

4 East Indonesia Makassar Overlay Ashpalt 4/10/2013 7/9/2013 $ 45,000.00 Facility Done

5 East Indonesia Makassar Loading & unloading ramp 6/10/2013 9/8/2013 $ 15,000.00 Facility Done

6 Java BSD New Hose Reel 8/20/2013 11/18/2013 $ 90,000.00 Equipment Done

7 Java BSD

Dyno control upgrade include

control valve, penn valve, load cell &

rewiring cable

2/15/2013 7/15/2013 $ 25,000.00 Equipment Done

8 Kalimantan Kariangau785 Rear Axle Group Remove &

Install Tool 6/20/2013 TBD $ 20,000.00 Equipment Cancelled

9 Kalimantan Kariangau20 Tones Capacities Rotator

Welding Frame 9/24/2013 12/23/2013 $ 200,000.00 Equipment Cancelled

10 Kalimantan Kariangau Air Compressor Repair 9/29/2013 11/28/2013 $ 20,000.00 Equipment Done

11 East Indonesia Makassar New Concrete Yard 10/18/2013 1/16/2014 $ 50,000.00 Facility Cancelled

TOTAL $ 543,000.00 543,000.00

Page 5: porject summary

NO AREA BRANCH TITLE START END COST CATEGORIES STATUS

1 Kalimantan Samarida Downdraft Table Fabrication 1/6/2014 5/6/2014 $ 3,800.00 Equipment Done

2 Mining Batu HijauTrakindo Engineering - Facility

Development2/20/2014 TBD $ 130,000.00 Facility Cancelled

3 Sumatera Pekanbaru FIP Test Bench Repair 3/6/2014 7/4/2014 $ 6,000.00 Equipment Done

4 East Indonesia Makassar New Hose Room 3/10/2014 TBD $ 21,000.00 Facility Cancelled

5 East Indonesia Luwuk Part Counter Standard 3/15/2014 TBD $ 12,000.00 Facility Cancelled

6 East Indonesia SorongNew Air Compressor 4.1 m3/hours

@10 bar3/20/2014 TBD $ 15,000.00 Equipment Cancelled

7 East Indonesia Sorong Office Relayout 3/25/2014 6/23/2014 $ 30,000.00 Facility Done

8 East Indonesia Jayapura New Genset 22 kVA 6/20/2014 8/19/2014 $ 10,000.00 Equipment Done

9 Mining Kuala Kencana Dyno Upgrade to DX3012 9/24/2014 12/23/2014 $ 100,000.00 Equipment Done

10 HO SOS Jakarta Installation Piping for GC Machine 9/29/2014 11/28/2014 $ 10,000.00 Facility Done

11 Sumatera Palembang Dyno Room Upgrade 10/18/2014 1/16/2015 $ 95,000.00 Equipment Done

TOTAL $ 432,800.00

Project List 2014

432,800.00

Page 6: porject summary

NO AREA BRANCH TITLE START END COST CATEGORIES STATUS

1 Sumatera PalembangReplacement Power Supply for

Dyno Control on SCC Module1/5/2015 2/19/2015 $ 2,000.00 Equipment Done

2 Sumatera Palembang Dyno Configuration 1/16/2015 2/5/2015 $ 1,000.00 Equipment Done

3 Java BSDDyno Problem (load cell

replacment)1/19/2015 2/18/2015 $ 1,500.00 Equipment Done

4 East Indonesia Soroako Telecomunication Tower 2/23/2015 TBD $ 15,000.00 Facility Waiting IO

5 KalimantanCRC

SamarindaDowndraft table 1/5/2015 3/6/2015 $ 5,000.00 Equipment Done

6 Sumatera PalembangUpgraded dyno control include PCI

card 6229, UPS & cable 3/23/2015 6/21/2015 $ 10,000.00 Equipment Done

7 Sumatera Pekanbaru Neoprene ball 3/24/2015 4/23/2015 $ 200.00 Equipment Done

8 East Indonesia Sorong Direction sign 3/31/2015 4/30/2015 $ 2,000.00 Facility Done

9 Mining Kuala Dyno Problem (repair FMU) 4/6/2015 4/16/2015 $ 6,000.00 Equipment Done

10 Java BSDDyno Problem (unstable control

valve)4/17/2015 4/19/2015 $ 3,000.00 Equipment Done

11 HO HO Asset Dispose ex Jakarta Branch 4/20/2015 5/20/2015 $ 15,000.00 Facility Done

12 Kalimantan Balikpapan Rough Train Crane 60 Ton 6/5/2015 TBD $ 500,000.00 Equipment Waiting IO

13 Java Surabaya New Warehouse 6/10/2015 TBD $ 345,000.00 Facility Waiting IO

14 Sumatera Pekanbaru PM Platform for Multidocker 385 7/5/2015 TBD $ 200,000.00 Equipment Waiting IO

15 Mining Batu Hijau Welding Truck 8/5/2015 TBD $ 115,000.00 Equipment Waiting IO

16 East Indonesia Kendari Genset 13.5 kVA 9/10/2015 11/9/2015 $ 10,000.00 Equipment Waiting IO

17 HO HO Service Truck Standard 9/29/2015 12/28/2015 $ 10,000.00 Equipment Waiting IO

18 Mining Batu Hijau SOS Facility Upgrade 10/8/2015 1/6/2016 $ 90,000.00 Facility On Progress

19 Kalimantan Kariangau TUE Facility Upgrade 10/10/2015 3/8/2016 $ 230,000.00 Facility On Progress

20 East Indonesia Sorong Office Re-layout 11/30/2015 3/9/2016 $ 55,000.00 Facility Waiting PR

21 Java BSD Dyno Problem (repair FMU) 12/1/2015 12/2/2015 $ 1,000.00 Equipment Done

22 East Indonesia SoroakoDyno Problem (load cell

replacment)12/15/2015 3/14/2016 $ 4,000.00 Equipment Done

TOTAL $ 1,620,700.00

Project List 2015

1,620,700.00

Page 7: porject summary

SOS LAB Facility Upgrade

Figure

Location : Batu Hijau

Cost : $90,000.-

Time Line : Oct 2015 – Mar 2016

Scope of Work : Lab room expansion, office re-layout, additional Lab equipment, fresh air

conditioning, mechanical & electrical works (piping lines, rack storage & electrical panel).

Obstacle : Different material standard between NNT and Trakindo

Vendor : PT TGTN

Current Condition On progress On progress

Project Description

Page 8: porject summary

Workshop Facilities UpgradeProject Description

Figure

Location : Balikpapan

Cost : $230,000.-

Time Line : 6 Month

Scope of Work : Sub Structure, Crane Retrofit, Civil works (bollard, demarcation line,

compressor shelter, security post & fencing), Office Fit Out, Signage, Mechanical & Electrical

Works (piping lines, air compressor, safety equipment & electrical panel).

Vendor : TBD

Current Condition Plan Condition

Page 9: porject summary

Dyno Problem (Reparation Fuel Measurement Unit)

Project Description

Figure

Location : Kuala Kencana Timika

Cost : $6,000.-

Time Line : Apr 2015

Scope of Work : Checked software configuration & DAQ hardware condition

Obstacle : While checked default cabling is wrong connected and one of cable is not

installed

Before Troubleshooting After

Page 10: porject summary

Multidocker 385 PM PlatformProject Description

Figure

Location : Pekanbaru

Cost : $200,000.-

Time Line :TBD

Scope of Work : Design, cost estimate and project control

Obstacle : PM activity should be provide, size of platform & lubrication equipment

Plan

Page 11: porject summary

Dyno Upgrade DX3010-DX3012Project Description

Figure

Location : Kuala Kencana

Cost : $100,000.-

Time Line : Sept 2014

Scope of Work : Determine capacity of equipment, bill of material, installation, site

commissioning and testing

Page 12: porject summary

Dynamometer SystemsData Acquisition & Control

Thermocouple

Speed sensor

Pressure sensor

Engine CoolingThrottleControl

Strain gage

EngineControl Valve

UniversalJoint Shaft

Analog Output

Analog Input

Absorbent

Page 13: porject summary

Conveyor Casting

Page 14: porject summary

Performance Plan

Support

- Encourage sales- Fast response service

Maintenance- Maintenance program- Maintenance repair

- Interactive communication - Sharing product knowledge - Professional serving

Engineering - Design drive package- Engineering solution

Project- Cost estimate - Project control

Relationship

Page 15: porject summary

Thank [email protected]