PORT OF LUANDA, ANGOLA
PORT OF LUANDA HARBOUR
Unicargas QuayDedicated to RORO
SogesterContainer Terminal
SonilsSonangol Intergrated Logistc Services
Oil Service Center
5MContainer
& Gen.Cargo Terminal
General Cargo Terminal - Multiterminais
Equipment (Nr of Units and max Lifting capacity)Forklifts:1 x 37 tons2 x 10 tons4 x 7 tons2 x 5 tons2 x 3 tonsTugmaster and Tractors4 x 35 – 40 tons4 x 36 – 40 tonsGoosnecks(Number of units and Safe Work load)4 x 60 tonsMisc (as Reach Stacker or Mobile Crane)4 x 45 tons3 Mobiles cranes 30 Tons / 40 Tons & 80 Tons
Area: 80.000 m2Berths: 5Quay length: 900 metersDraft : 100 meters at 5.5 m
800 meters at 10.0 mGate hour : 24Warehousing area : 246 675 meters
Multipurpose Terminal: Unicargas
Equipment (Nr of Units and max Lifting capacity)Forklifts:1 x 37 tons3 x 12 tons3 x 7 tons6 x 3 tonsTugmaster and Tractors15 x 30 tons
2 x 45 tons2 x 60 tons
Goosnecks(Number of units and Safe Work load)2 x 60 tonsMisc (as Reach Stacker or Mobile Crane)18 x 45 tons3 Mobiles cranes 30 Tons / 40 Tons & 80 Tons
Area: 178.641 m2Berths: 3Quay length: 536 metersDraft : 10.0 metersGate hour : 24Warehousing area : 10.500 m2
SOGESTER CONTAINER TERMINAL
Berths: 3Quay length: 560 metersDraft : 12.0 metersGate hour : 24
Equipment (Nr of Units and max Lifting capacity)Forklifts:4 x 37 tons3 x 12 tons3 x 7 tons2 x 5 tonsTractors: 9Mobile Harbor Cranes: 2Reach Stackers or Mobile Crane : 10Reefer plugs: 400
5M Terminal: Container & General Cargo