Date post: | 09-Mar-2016 |
Category: |
Documents |
Upload: | laura-garcia-carbajosa |
View: | 218 times |
Download: | 0 times |
PO
RTF
OLI
O
Laura García Carbajosa.
“Choose a job you love, and you will never
have to work a day in your life.”
― Confucius
PERSONAL PORTFOLIO
PERSONAL INFO 4
PREVIOUS WORK IN SPAIN 6
MULTI-STOREY BUILDING 8
REFURBISHMENT OF THE OLD HORSENS PRISON 9
Technical Architecture
2010 2009 2008 2011 2007
Elementary
profiency
Mother tongue Professional working
profiency
In learning process
WO
RK
SH
OPS, C
ON
FEREN
CES
, C
OU
RSES
Course on Computer-Aided Design with AutoCAD2010 Valladolid University. Spain Basic Course on Accessibility for Disabled People. Accessibility to physical security, removal of architectural barriers, urban and transport European University Miguel de Cervantes. Spain
Participating at the Intensive Erasmus IP Project. Erasmus RenoPass-CoDe 2013 “Passive House Design and Construction– Renovation” Instituto Politécnico de Leiria. Portugal Course on Photography Youth Association “El Parque”. Spain Official Qualification as Animator YMCA School Leisure. Spain
LANGUAGE SKILLS
SOFTWARE SKILLS PER
SO
NA
L IN
FORM
ATI
ON
FUTURE PLANS
Name: Laura García Carbajosa
Date of birth: 26th April 1989
Nationality: Spanish
Current Address:
Kollegievænget 24– 232.
8700 Horsens (Denmark)
Email:
Blog: http://dilosindecirlo.tumblr.com/
Mobile: (0045) 91 19 53 86
(0034) 652 19 81 70
Technical Architecture
2013
JOBS, V
OLU
NTE
ERIN
G, C
OLL
ABO
RA
TIO
NS
2012
6 years volunteering at “NGO Entreculturas” including a
month in a developing country (Nicaragua). 2007-2012
4 years as Animator in summer camps. 2007-2010
2 years as Primary Education private teacher. 2011/12
Shop assistant in a toyshop. 2009
Labor camp in Germany. 2010
Schwarzkopf model. 2009
Stewardess. 2011/12
Collaboration in the organization of events. UEMC, 2011
2014
My main goal for the near future is to gain as much knowledge and experience as possible from
my constructing architect degree and also from the other projects I am involved.
Also I expect to find a practical placement where I can implement everything I have learnt so far
while also I improve my skills and know the way in which architecture firms work.
In the long term I wish to finish my education at VIA University College and continue with a master
program.
Laura García Carbajosa Architectural Technology and
Construction Management
PREVIOUS WORK IN SPAIN Family Housing in Hungary. Subject: Projects
Final Project. Single dwelling in Escalona, Toledo. Spain
MULTI-STOREY BUILDING
MATERIALS
Standard approved materials are used when
designing the buildings. The outer layer of the
exterior wall is made out of a clay bricks,
which makes the buildings well appearing in
the neighbourhood and gives almost free of
maintainance facade. The common access route
for each building consists of a staircase and
elevator.
We choose white plaster for wall finish of the
common access route in order to create a warm
and attractive atmosphere. When designing
the prefabricated cocnrete staircase we took in
consideration the standart staircase measure-
ments so that the construction costs would be
reduced.
Østergade 120, 8700 Horsens
Østergade 120, 8700 Horsens
Refurbishment of the old Horsens Prison CONCEPT/ IDEA STEP 1: The old building The main requirements:
The establishment of a new main entrance, including reception, ticket sale, souvenir shop, administration, tourist information, café, depots .
Administration and offices at 1. Floor. Energy optimization and sustainable solutions An elevator must be incorporated into the project with access
to all floors. The connected parking areas must be arranged with parking
areas for bus and for disabled people. STEP 2: The courtyards One of these courtyards will be used to develop the cafe. This place can be accessible by the outside (accessibility for disabled peoples) or by the reception (visitors) For the second courtyard the client have the choice and can think to cre-ate a playground, some temporary exhibitions or an outdoor cinema for the visitors.
STEP 3: The towers The main particularity of this building is the two towers overlooking the main entrance of the prison. They will be transforming with big windows to give a better luminosity in the 1st floor. STEP 4: Accessibility One elevator can be used by the disabled peoples to have access on the shop, museum or the internal bar. The cafe, the shop, the tourist information will be with free access.
DESIGN COMPETITION 2013 2ND PRIZE
Basement First floor
Groundfloor