Possible Run 10 plan based on 25 Nov Revised Plan. Run10, 25 cryo-weeks (my guesses after Jan 12) Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings! Dec. 5, beam setup in RHIC begins. Dec 16, 20 hr unplanned Maintenance day - PowerPoint PPT Presentation
Popular Tags:
28
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings! Dec. 5, beam setup in RHIC begins. Dec 16, 20 hr unplanned Maintenance day Dec 20 (AM)-21(PM), blizzard 09 shut us down Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late) Dec 31 (midnight-store 11340), Machine (and PHENIX?) Physics declared s=200 GeV/n Au- Au Jan 2 (midnight) STAR in Physics Mode Jan 8 (0600) PHENIX in Physics Mode Jan 12, Rebucketing not yet routine, stochastic cooling still to come. Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on Mar. 11, End 10 week s = 200 GeV/n Run, begin s = 62.4 GeV/n setup Mar. 13, Begin 4 week s = 62.4 GeV/n run Apr. 10, End 4 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup Apr. 12, Begin 1.5 week s = 39 GeV/n run Apr 18-22, Satogata is away Apr. 23, End 1.5 week s = 39 GeV/n Run, begin s = 7.7 GeV/n setup Apr. 25, Begin 4 week s = 7.7 GeV/n run May 20, End 4 week s = 7.7 GeV/n Run, begin s = 5.0 GeV/n setup May 23, End 4 week s = 7.7 GeV/n Run, begin s = 5.0 GeV/n setup May 23 – 28 IPAC (Kyoto) May 25, begin 0.5 week beam studies at s = 5 GeV/n and n ~ 0.67 - – 25 CRYO WEEK This is it unless we have $’s to run longer – revisit in March May 29, end 0.5 week studies May 31, begin s = 11.5 GeV/n for STAR Jun 15, end 2 week s = 11.5 GeV/n run Jun 15 , Begin Cryo Warm-up Jun 16, Warm-up complete, Run 10 ends – 28.2 CRYO WEEKS
Transcript
Page 1: Possible Run 10 plan based on 25 Nov Revised Plan

Possible Run 10 plan based on 25 Nov Revised Plan

• Run10, 25 cryo-weeks (my guesses after Jan 12)

– Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to 4.5K complete in both rings!– Dec. 5, beam setup in RHIC begins.– Dec 16, 20 hr unplanned Maintenance day– Dec 20 (AM)-21(PM), blizzard 09 shut us down– Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late)– Dec 31 (midnight-store 11340), Machine (and PHENIX?) Physics declared s=200 GeV/n Au-Au– Jan 2 (midnight) STAR in Physics Mode– Jan 8 (0600) PHENIX in Physics Mode– Jan 12, Rebucketing not yet routine, stochastic cooling still to come.– Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on– Mar. 11, End 10 week s = 200 GeV/n Run, begin s = 62.4 GeV/n setup– Mar. 13, Begin 4 week s = 62.4 GeV/n run– Apr. 10, End 4 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup– Apr. 12, Begin 1.5 week s = 39 GeV/n run– Apr 18-22, Satogata is away– Apr. 23, End 1.5 week s = 39 GeV/n Run, begin s = 7.7 GeV/n setup– Apr. 25, Begin 4 week s = 7.7 GeV/n run– May 20, End 4 week s = 7.7 GeV/n Run, begin s = 5.0 GeV/n setup– May 23, End 4 week s = 7.7 GeV/n Run, begin s = 5.0 GeV/n setup – May 23 – 28 IPAC (Kyoto)– May 25, begin 0.5 week beam studies at s = 5 GeV/n and n ~ 0.67 - – 25 CRYO WEEK– This is it unless we have $’s to run longer – revisit in March– May 29, end 0.5 week studies– May 31, begin s = 11.5 GeV/n for STAR– Jun 15, end 2 week s = 11.5 GeV/n run– Jun 15 , Begin Cryo Warm-up– Jun 16, Warm-up complete, Run 10 ends – 28.2 CRYO WEEKS

Page 2: Possible Run 10 plan based on 25 Nov Revised Plan

0

1000

2000

3000

4000

5000

6000

7000

0 1 2 3 4 5 6 7 8 9 10

mb-1

Weeks of Physics collisions

Run 10 100 x 100 GeV/n Au Delivered Luminosity

MinMaxSTAR-PhysicsPHENIX-PhysicsMachine (PHENIX ZDC)

as of 1 Feb, through store 11595PHENIX Goal*

PHENIX Minimum Goal*

STAR Goal

* With 20 cm sigma IR diamond

Page 3: Possible Run 10 plan based on 25 Nov Revised Plan

0

200

400

600

800

1000

1200

1400

1600

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5

mb-1

Weeks of Physics collisions

Run 10 100 x 100 GeV/n Au Delivered Luminosity

MinMaxSTAR-PhysicsPHENIX-PhysicsMachine (PHENIX ZDC)

as of 1 Feb , through store 11595

Page 4: Possible Run 10 plan based on 25 Nov Revised Plan

0

20

40

60

80

100

120

140

160

0 1 2 3 4 5 6 7 8 9 10

mb-1

/day

Weeks of Physics collisions

Run 10 100 x 100 GeV/n Au Delivered Luminosity per day

Min

Max

STAR

PHENIX

Yellow Transverse Stochastic Cooling onRebucketing ~on (22 Jan)

as of 1 Feb, through store 11595

Page 5: Possible Run 10 plan based on 25 Nov Revised Plan

71.3

178.9

588.6

359.5

72.4

179.4

599.7

358.8

80.3 43.0 107.2 76.2

0

100

200

300

400

500

600

700

800

12/31 to 1/07

1/08 to 1/14

1/15 to 1/21

1/22 to 1/28

period

inte

grat

ed lu

mni

osity

[mb^

-1]

0

24

48

72

96

120

Run 10 (AuAu) -- Integrated Luminosity by week

hour

s pe

r wee

k at

sto

re

Phenix STAR (lumi) hours at store

thru store 11573ending 20:28 28 January Goal

Min

Max

Page 6: Possible Run 10 plan based on 25 Nov Revised Plan

Last three fills

Page 7: Possible Run 10 plan based on 25 Nov Revised Plan

Last three fills

PHENIX ~ at trigger rate limit

Page 8: Possible Run 10 plan based on 25 Nov Revised Plan

Last three fills

Page 9: Possible Run 10 plan based on 25 Nov Revised Plan

Through 1/31/10

RHIC Cryo Operations FY09-10

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

-30 -10 10 30 50 70 90 110 130 150 170 190

Days since beginning of Run

MW

RHIC Cryo 10

RHIC Cryo 09

Page 10: Possible Run 10 plan based on 25 Nov Revised Plan

Through 1/31/10

RHIC Operations FY09-10

0.00

5.00

10.00

15.00

20.00

25.00

30.00

-30 -10 10 30 50 70 90 110 130 150 170 190

Days since beginning of Run

MW

CAD P ower 09

CAD P ower 10

Page 11: Possible Run 10 plan based on 25 Nov Revised Plan

Future Topics• Toward Smaller beta* - new quad triplets – D. Trbojevic

Page 12: Possible Run 10 plan based on 25 Nov Revised Plan

Archive

Page 13: Possible Run 10 plan based on 25 Nov Revised Plan

Ring Bunches/Cycles

Avg Bunch in RHIC (10^6 ions)

Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC

Blue 56/56 909 0.836 1.056 0.963 0.992 0.828

Yellow 56/56 990 0.971 1.085 0.962 0.959 0.970

Injected Beam Statistics for Fill number 11340Started filling RHIC: Thu Dec 31 22:51:52 2009, Fill complete: Thu Dec 31 22:59:50 2009, Minutes to fill: 7

31 Dec 1st Physics Store

Ring Bunches/Cycles

Avg Bunch in RHIC (10^6 ions)

Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC

Blue 68/68 1031 0.906 1.053 0.964 1.001 0.892

Yellow 68/68 991 0.938 1.050 0.964 0.993 0.934

Injected Beam Statistics for Fill number 11370Started filling RHIC: Tue Jan 5 03:22:19 2010, Fill complete: Tue Jan 5 03:32:02 2010, Minutes to fill: 9

5 Jan Physics Store

Ring Bunches/Cycles

Avg Bunch in RHIC (10^6 ions)

Avg Efficiency

XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC

Blue 111/28 1160 0.936 1.036 0.961 1.000 0.940

Yellow 111/28 1150 0.917 1.034 0.960 0.991 0.932

Injected Beam Statistics for Fill number 11493Started filling RHIC: Tue Jan 19 12:20:17 2010, Fill complete: Tue Jan 19 12:25:12 2010, Minutes to fill: 4Newfill time: Tue Jan 19 12:09:38 2010, Minutes from newfill to accramp: 16

17Jan Physics Store

Page 14: Possible Run 10 plan based on 25 Nov Revised Plan

26 Jan-2 Feb

Page 15: Possible Run 10 plan based on 25 Nov Revised Plan

26 Jan-2 Feb

Page 16: Possible Run 10 plan based on 25 Nov Revised Plan

26 Jan-2 Feb

Page 17: Possible Run 10 plan based on 25 Nov Revised Plan

5 June 07 17

(w/o stochactic cooling)1.02 x 109 /bunch

0.97 x 109 /bunch

Run 7 Fill 8878 Injected Beam Statistics from ELOGBlue = 103 bunches 1.04x109/bunchYellow= 103 bunches 1.13x109/bunch

Page 18: Possible Run 10 plan based on 25 Nov Revised Plan

5 June 07 18

Store 8849 (w/stochactic cooling)1.02 x 109 /bunch

0.97 x 109 /bunch

Run 7 Fill 8849 Injected Beam Statistics from ELOGBlue = 103 bunches 1.23x109/bunchYellow= 103 bunches 1.15x109/bunch

Page 19: Possible Run 10 plan based on 25 Nov Revised Plan

5 June 07 19

Run7 AuAu ZDC rates with and without stochastic cooling, with equal initial Au ions/bunch in each ring

0

5,000

10,000

15,000

20,000

25,000

30,000

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00

Time (hours)

ZDC

(Hz)

ZDC 25 May Store 8849 w/ stochastic cooling

ZDC 30 May Store 8878 w/o stochastic cooling

Poly. (ZDC 30 May Store 8878 w/o stochasticcooling)Poly. (ZDC 25 May Store 8849 w/ stochasticcooling)

Physics ON

Loss in 3 hrs= 3.1= 3.7

Page 20: Possible Run 10 plan based on 25 Nov Revised Plan

Physics production or beam studies weekssNN (GeV) 25-cryoweek run 27-cryoweek run

200 10 1062.4 4 439 1.5 1.527 0 018 0 0

11.5 @ STAR 0 27.7 4 4

Beam studies @ 5 GeV and @ n 0.67

0.5 0.5

Revised Run 10 Plan, Nov 25, 2009

Page 21: Possible Run 10 plan based on 25 Nov Revised Plan

Run 10 Au-Au Goals11/19/09

• STAR– s = 200 GeV/n

• Luminosity Sampled/Delivered = 2/4 nb-1

• 250M Central Events• 300M Min-bias events

• PHENIX– s = 200 GeV/n

• Luminosity Recorded/Delivered = 1.4/>6 nb-1

• Minimum Goal: – Luminosity Recorded/Delivered = 1.1/3.9 nb-1

Page 22: Possible Run 10 plan based on 25 Nov Revised Plan

Run 03 Run 04 Run 05 Run 06 Run 07 Run 08 Run 09 Run 100

1

2

3

4

5

6

7

8

9

Time from start of 4.5 deg cooldown to Physics

Run 10 Actual

Goal

Actual

Wee

ks to

Phy

sics

Page 23: Possible Run 10 plan based on 25 Nov Revised Plan

Run 7

Fill 8544

Page 24: Possible Run 10 plan based on 25 Nov Revised Plan

BNL Energy Cost

$(20)

$-

$20

$40

$60

$80

$100

$120O

ct-0

0

Oct

-01

Oct

-02

Oct

-03

Oct

-04

Oct

-05

Oct

-06

Oct

-07

Oct

-08

Oct

-09

Oct

-10

$/M

Whr

Billed Cost/MWhrWithout Balanced BillingBalanced Billing ProjectionRHIC ONAGS SEB/FEBNSRL

Through 30 Nov 09

Page 25: Possible Run 10 plan based on 25 Nov Revised Plan

– Oct. 5, N2 scrubbing– Oct. 30, Temp. Control devices in and ready

(required for 45 K wave cooldown).– Nov. 2, 45 K wave begins.– Nov. 12, AGS Testing.– Nov. 12-13, APEX Workshop – Nov. 16, beam setup in Booster and AGS– Nov. 16-20, RHIC Dry Run – Nov 22, Beam extracted from AGS to W dump

Run 10 Setup

Page 26: Possible Run 10 plan based on 25 Nov Revised Plan

Wednesday midnight

Thursday midnight

Page 27: Possible Run 10 plan based on 25 Nov Revised Plan

http://www.bnl.gov/cad/esfd

AGS-Booster-Tandem/Linac Startup

RHIC Cryo Cooldown to 45 deg K

RHIC Cryo Cooldown/Warm-up

RHIC Cryo Operation

RHIC Cryo off

RHIC STAR & PHENIX

RHIC Research with s = 200 GeV /n AuAu

RHIC Research with s = 8-62 GeV /n AuAu

Beam Studies at s = 5 GeV /n AuAu

NSRL (NASA Radiobiology)

Shutdown (RHIC)

C-A Operations-FY10

Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 2010

6 Jan 10

setup with beams in both rings As Run/Planned

Sep

concurrent with RHIC

ramp up luminosity

21 Sep

≥ 25 weeks

1 Dec

20 Nov

setup as required

10 weeks physics

End Date TBD

10 weeks

NSRL Schedule TBD

25 cryo weeks

25 Cryo Weeks