Power System. Supply Reliability and Performance Pledges. Tariff. Why talk to CLP ?. How Can CLP Help?. Contact Us. FAQ. Back to main page. Power System. Generation CLP has 3 generation plants located in the New Territories and 2 located on the Mainland. - PowerPoint PPT Presentation
Popular Tags:
13
Power System Supply Reliability and Performance Pledges Tariff Why talk to CLP ? FAQ How Can CLP Help? Contact Us
Transcript
Page 1: Power System

Power System

Supply Reliability and Performance Pledges

Tariff

Why talk to CLP?

FAQ

How Can CLP Help?

Contact Us

Page 2: Power System

Power System

Generation

CLP has 3 generation plants located in the New Territories and 2 located on the Mainland.

CLP and Hong Kong Electric’s (HEC) networks are interconnected to back up each other in cases of emergency.

This means that there are no less than 6 supply sources to the CLP network at any point in time.

Back to main page

Page 3: Power System

Power System Transmission Network

CLP’s transmission system is connected to Hong Kong Electric’s and to the China Southern Power Grid via transmission circuits.

This connection safeguards CLP customers from any major power loss during cases of emergency.

Back to main page

Page 4: Power System

Distribution Network

CLP’s distribution network is based on 11kV Closed Ring supply system.

This ensures that there is enhanced supply security.

This arrangement also provides substantial cost saving for data center operators trying to achieve n+1 supply reliability through cost avoidance.

Power System Back to main page

Page 5: Power System

Supply Reliability and Performance PledgeBack to main page

PledgeTargets 2011

Results 2010

Reliability of electricity supply

99.99 %

3 days advance notice of planned outage

99 % ☺

Average arrival time for loss of supply inspection

36 minute

s

Average supply restoration time after fault outage

2 hrs ☺

Connect and supply within same day after satisfactory installation inspection

99.95% ☺

Answer emergency service hotline within 9 seconds

90% ☺

Page 6: Power System

CLP’s tariff is amongst the lowest in the world for its level of reliability. In addition to being one of the lowest cost our tariff has the following features :

Simple Structure – Data center operators have a choice of 3 simple tariff types, 2 of which are “time of use” based. Charges are based on actual demand and actual consumption.

Transparent – All components of the tariff are published.

Stable – CLP tariff is reviewed once per annum enabling customers budget certainty.

Tariff Back to main page

Page 7: Power System

Robust Network – 99.99% reliability

Dedicated staff with technical and business skills to provide your data center electricity solutions

Stable Tariff – Tariff is reviewed once per annum enabling customers certainty of budget

Cares for the environment

Why talk to CLP Power? Back to main page

Page 8: Power System

CLP can help data center customers as follows

Location selection Works interface – your internal

installation and CLP’s installation

Fast track power supply Project Management Asset purchase and installation Post installation asset

maintenance Post installation energy

management

Working with CLP Power Back to main page

Page 9: Power System

CLP has a dedicated team to handle all data center electricity supply enquiries. You may reach the team at the address provided below.

Address: 7/F Shumshuipo center, No. 215 Fuk Wa Street

Or you may send in your enquiry email to

[email protected]

Working with CLP PowerBack to main page

Page 10: Power System

Q1: What is the supply lead time for the provision of electricity supply?

Answer: The supply lead time will depend on the potential data center site and the requested electricity demand. It will also depend on CLP’s works programmes and other customer projects. CLP can provide the estimated supply lead time within a few days of notification of the location and the loading.

Frequently Asked Questions (FAQ)Back to main page

Q2: Can CLP fast track power supply?

Answer : CLP will endeavour to fast track energisation and supply depending on load demand and commitments on uptake. We encourage you to speak to our team dedicated to handling all enquiries on data center power supply.

Page 11: Power System

Q3: How can CLP maintain reliability levels at 99.99 % when it is the only supplier?

Answer: It is not necessary for power supply to be sourced from two different generation companies for it to be more reliable. CLP strength lies in its network. With any electricity utility supply system, most power disturbances originate from the network i.e due to accidental cable damage, lightning etc. CLP’s robust network is able to eliminate any disturbances before it affects customers.

Frequently Asked Questions (FAQ) Back to main page

Q4: How does the interconnection between CLP, HEC and Guangdong Power Grid work?

Answer: HEC supports CLP and vice versa in case of any power supply emergency. CLP purchases a portion of its power supply for its customers from Guangdong Daya Bay Nuclear Power Station.

Page 12: Power System

Frequently Asked Questions (FAQ) Back to main page

Q5: Given CLP’s system connectivity with Hong Kong and Guangdong can a data center operator claim to be a tier 4 data center?

Answer: The data center "tier" definitions were developed by data center professionals. It is not for CLP to determine whether a data center operator can claim to be a tier 4 data center based on CLP’s supply network.

We can advise though, that CLP’s network can obtain power from multiple supply sources, 3 from power stations located in the New Territories and 2 on the Mainland. In addition, CLP and HEC back-up each other through the interconnection in case of a power supply emergency.

Whether the data center operators conclude the above as being a dual or multiple source will depend on their interpretation of a “Tier 4” data center.

Page 13: Power System

Frequently Asked Questions (FAQ) Back to main page

Q6: Are CLP electricity tariff rates negotiable?

Answer: CLP’s tariff rates are fixed and all components are transparent. Customers may apply for the rate that is appropriate to their actual consumption. CLP’s tariff is amongst the most competitive in comparison with other world class cities. Our tariff table is available at https://www.clponline.com.hk/myBusiness/CustomerService/TariffOverview/Pages/Default.aspx

Our dedicated data center team will be happy to advise you on the most appropriate tariff for your load.