+ All Categories
Home > Documents > Power System And Technical Issues In South Korea -...

Power System And Technical Issues In South Korea -...

Date post: 11-Jul-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
21
1 Power System And Technical Issues In South Korea Presented by Prof. Jong-Keun Park School of Electrical Engineering Seoul National University
Transcript
Page 1: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

1

Power System And Technical Issues In South Korea

Presented by

Prof. Jong-Keun Park

School of Electrical EngineeringSeoul National University

Page 2: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

2

Presentation Topics

1.Statistics of electric power in South Korea

2. Electricity transmission network of South Korea

3. Technical issues

Page 3: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

3

1. Statistics of electric power in South Korea

1.1 History of Power System

1961 Foundation of Korea Electric Power Company1975 Construction of the first 345kV Sin Yoe Soo

transmission line running 93km between Yoe soo Power Plant and Sin Nam Won substation

1979 Installation of Dual On Line Real Time Computer in head office for Automatic Frequency Control(A.F.C)and Economic Load Dispatch(E.L.D)

Page 4: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

4

1981 Start up of the first SCADA system in Seoul Power Transmission Department

1988 Department establishment of Energy Management System(E.M.S)

1993 Construction of the first 345kV underground Transmission Line running between Mi Geum and Seong Dong in the Eastern area of Seoul

1997 300MW High Voltage Direct Current Link between Cheju Island and Mainland

2001 The first 765kV transmission line planned to be energized

Page 5: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

5

1.2 Gross Power Generation

Page 6: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

6

1.3 Fuel Consumption for Generation

Page 7: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

7

1.4 Installed Generating Capacity

Page 8: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

8

1.5 Power Supply and Demand

Page 9: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

9

1.6 Power capacity & reserve ratio and

long term load forecast

Page 10: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

10

2. Electricity transmission network

of South Korea

345kV lines

- major network

154kV or 66kV lines

- local systems

- most 66kV lines

being removed or replaced

Constructing 765kV

Page 11: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

11

2.1 KEPCO Substation and Underground Transmission

345kV Indoor Substation and Underground Transmission Line

- other 345kV indoor Substations are

under construction

- operation of two 345kV indoor GIS

Substations, in April 1997

Page 12: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

12

2.2 KEPCO RCC SCADA(as of '98 data)

SCADA Major Function

- Supervisory

- Remote Control

- Telemetering

- Event Logging

- Report Generation

- Dispatcher Training Function

- Data Link

Page 13: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

13

2.3 765kV project

Construction of 765kV facilities– to meet the rapidly increasing power demand in and around the capital area

– 3 transmission lines, 2 substations

C onstruction P lan

Length(km ) C om pletion(year)765kV

O perating(year)

Tangjin T/P ∼ Sin Sosan S/S 40 1998 2001

Sin Sosan S/S ∼ Sin A nsong S/S 137 1999 2001

Sin Taebaek S/S ∼ Sin G apyong S/S 157 1999 2004

Sin Ansong S/S ∼ Sin G apyong S/S 75 2005 2005

Sin Nam w on S/S ∼ Sin Jincheon S/S 200 @ 2003 @ 2010

Transm ission Line

Step Ⅰ

Step Ⅱ

Page 14: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

14

2.4 Substation Capacity

0

10,000

20,000

30,000

40,000

50,000

60,000

(M VA)

1980 1990 1991 1992 1993 1994 1995 1996

year

Substation capacity (M VA)

345kV154kVU nder 66kV

Page 15: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

15

3. Technical issues

3.1 Technical issues in KEPCO system

Fault Current- large scale power plant + multiple connection

large fault current

bus separation

reliability getting worse

- present condition

• 345kV : bus separation - 6 places

154kV b ti 50 l

Page 16: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

16

Circuit breaker capacity

50/31.5(kA)63/40(kA)50(kA)Capacity

154 kV345 kV765 kV

Fault current calculation result

year

avg.(kA) excess bus avg.(kA) excess bus avg.(kA) excess bus

345kV bus 30 - 31 6 33 7

154kV bus 23 8 24 25 25 27

2001 2005 2010

limit : 345kV(40kA), 154kV(50kA)

Page 17: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

17

Countermeasure

- install larger capacity circuit breaker

345kV(63kA), 154kV(50kA)

- considering series reactor installation

Hwaseong, Pukpusan S/S, Yongheong TP etc.

Page 18: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

18

Metropolitan area security problem- present condition

• load concentrated in metropolitan area (42% of total load)

• reactive power loss increased for large power transfer in long-distance line

- investigating the upper limit of northward

flow 43,465 MW (average power factor:91%)

9,926 MWAsan T/L tripped

0.95 p.u.10,886 MWNormal operation

Northward flow limitCase

Page 19: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

19

Transient Stability- load composition

56.22 %8.27 %35.51 %Reactive power

35.22 %12.73 %52.05 %Real power

Constant impedance

Constant power

Constant power

- contingency condition

• 3 phase fault, major 345 kV T/L 2 line tripped

• fault duration : 6 cycle

• simulation time : 5 sec

Page 20: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

20

Characteristics of AC or DC interconnection

AC interconnection

- less expensive than DC interconnection

- limitation of interconnection between

different frequencies

- disadvantage of system protection

DC interconnection

- construction cost is much higher than the

one of AC interconnection

- advantage of system protection- advantage of long distance

Page 21: Power System And Technical Issues In South Korea - Nautilusnautilus.org/wp-content/uploads/2015/06/jkpark2.pdf · 2015. 9. 14. · 2.3 765kV project Construction of 765kV facilities

21

3.2 Electric power system interconnection between South and North Korea

Advantages of interconnection- plant capacity savings

- emergency power interchange

- spinning reserve savings

- interchange due to diversity

Problems of interconnection

- trouble in stability problem

- difficulty in power flow control, frequency

control


Recommended