Risk Mitigation Project Cargo –
Checklist for Success
[7-29% Logistics Cost]
By Marc Kerr
Risk Mitigation Project Cargo
Feasibility Study
Risk Mitigation Project Cargo
• Feasibility Study
– Route Survey: Taking into account
• All points of entry
• Hubs and transhipment points
• Physical Challenges and Restrictions
Risk Mitigation Project Cargo
Third World Pitfalls
Risk Mitigation Project Cargo
• Third World Pitfalls
– Corruption:
• FCPA
• European Union
• Australian Law etc
Risk Mitigation Project Cargo
• Third World Pitfalls
– HSE:
• All workers – including vendors/sub-contractors
• Governing Law / Statutes pertaining to employee
rights
Risk Mitigation Project Cargo
• Third World Pitfalls
– Government Regulations (or the lack thereof !):
• Curfews/strikes
• Customs and excise
• Certification of Equipment
Risk Mitigation Project Cargo
Factors for Success
Risk Mitigation Project Cargo
• Freight Forwarder
– Engineering Interface (client) :
• Reduced Costs
• Reduced Physical Challenges
Risk Mitigation Project Cargo
• Freight Forwarder
– Contractor Vetting:
• Client requirements
• Regulatory Requirements
• Safety
Risk Mitigation Project Cargo
• Human Assets
– Right people with the right skill sets
– Training
– Local Content
Risk Mitigation Project Cargo
Methodology S R E D I M
• Select
• Research
• Examine
• Develop
• Implement
• Maintain
Risk Mitigation Project Cargo
• Methodology (SREDIM)
–Select: Focus on area of concern
• Route Survey
• Engineering
Risk Mitigation Project Cargo
• Methodology (SREDIM)
–Research:
• Look at all options
• Possible Pitfalls
• Scheduling
Risk Mitigation Project Cargo
• Methodology (SREDIM)
–Examine:
• Discuss with relevant stakeholder what needs to be
achieved bearing in mind the research data
Risk Mitigation Project Cargo
• Methodology (SREDIM)
–Develop
• Matrix
• Contingency Planning
• Options Planning
Transport Infrastructu
re / Facilities
Transport Equipment
Transport Planning & Execution
Lifting- & Handling
Equipment
Risk Mitigation Project Cargo
• Methodology (SREDIM)
– Implement:
• Execute the plan
• Schedule
• Methodology
Risk Mitigation Project Cargo
• Methodology (SREDIM)
–Maintain
• Monitor
• Adapt
** REMARK: Based on industry experience – Not quantified