A Feasibility Study on
Waste Management Recycling Project
Project overview
A feasibility study has commenced for the objective
of determining whether or not the company should
start a project waste management
Project justification
We limited the scope of our analysis to Erbil/Kurdistan
because of no competition at the market.
Project objective
The project objective is to establish a high quality
company for waste management recycling in
Erbil/Kurdistan
Project benefits
Extension of landfill life-time
cost savings from reduced waste transportation to landfill
cost savings from avoided waste disposal at landfill
Creation of new jobs
Revenue from the sale of compost
Strategy
Our company’s strategy for waste management refers to
prevention, re-use and recovery, optimization of final
disposal, and regulation strategic guidelines for the
management of waste in Kurdistan region
Strategy “WASTE HIERARCHY”
The best option
The worst option
Executive
committee
Company staff
Municipal
government
Project manager
and team
Contractor/
suppliers
Community at
large
Environmental feasibility
Our staff has up-to-date knowledge of local, regional and
international environmental regulations and has
participated in the policy formulation process for
national and regional environmental management
standards
Marketing Feasibility for Recycling waste
Management
We study marketing for recycling through use in
many different settings, including public health
and national safety.
The Marketing Mix: The 4Ps
The 3RS of Marketing
Research
Response
Result
Quality Management
ACT
Plan
DO
CHECK
Social Feasibility
The aim of this part of the Project
Feasibility Study is to analysis
the project’s social data in terms
of social opportunities and risk
associated with achieving t
he project’s overall objectives.
Risk management
The aim of this section of the Project Feasibility Study
is to analysis project’s risks and opportunities in terms
of the achieving the project’s overall objectives.
Conclusion
As a result of the marketing, social, environmental
and risk management study. therefore it has been
determined that while this project is national in
scope, it is feasible from a all perspective. The
risks have been identified and assessed, which has
been determined the project risk classification is
medium.
We recommend that the project is feasible .