+ All Categories
Home > Documents > Practical Applications and Novel EOR...

Practical Applications and Novel EOR...

Date post: 29-Mar-2018
Category:
Upload: hakhuong
View: 229 times
Download: 5 times
Share this document with a friend
27
Jaime Almeida Practical Applications and Novel EOR Methods
Transcript
Page 1: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

Jaime Almeida

Practical Applicationsand Novel EOR Methods

Page 2: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 2

Typical IOR/EOR Project Workflow

Project ManagementScreening for EOR methods.

Screening based in reservoir propertiesPredictive models Dynamic simulation

Laboratory investigationWettability, Relative permeabilitySwelling test, MMP, MECSWTT (Single Well Tracer Test) SorRock-Fluid compatibility test

Pilot testPilot design Pilot implementationPilot MonitoringReservoir and EOR parameter calibration.

Field Plan implementationFull field simulation after model calibration with pilot test.Economic analysis

Page 3: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 3

Project Life Cycle (Front-End Loading)

Initialization (Pre-FEL)

Visualization

Conceptualization

Definition

Execution

Operation

FrontFront--End Loading (FEL)End Loading (FEL)

Value Identification Value Realization

Page 4: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 4

FEL applied to an EOR projectScenario analysis and Design Optimization, South America (National Oil Company) using DMS

1800 MMSTB oilfield under decline, Evaluate 4 potential scenarios for enhanced recovery and compare with base case. Optimize design parameters for water alternating gas scenario.

SITUATION

CHALLENGE

TOOLS

VALUE ADDED BY DMS

Identify an optimal recovery scenario based on an economic objective function (NPV). Rapidly optimize the design parameters for the WAG scenario using distributed computation (for DMS) with a combined spreadsheet model.

• Fast determination optimal recovery scenario based on NPV using distributed computation.

• Optimized WAG ratio, cycle length, injection rate, number of cycles.

• DMS ( with distributed computing)

• VIP

• EXCEL (proprietary economics)

• SPOTFIRE ( Data visualization package)

WAG OptimizationScenario Analysis

Optimum design

Best scenario

NPV Vs. RF

Page 5: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 5

Page 6: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 6

Screening criteria for EOR Methods

Page 7: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 7

Steam/Polymer/Surfactant

Surfactant/Polymer/CO2

CO2/Polymer/Hydrocarbon/Surf. CO2/Hydrocarbon

Nitrogen/Hydrocarbon

Polymer degradation limit

Thermal limit

0

1000

2000

3000

4000

5000

6000

0 10 20 30 40 50 60

ºAPID

epth

(m)

Steam

Polymer

CO2

HydrocarbonN2

Combustion

Hot Water

Miscellar/PolymerSurfactant

Waterflooding

Screening for IOR/EOR methods

Page 8: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 8

Steam/Polymer/Surfactant

Surfactant/Polymer/CO2

CO2/Polymer/Hydrocarbon/Surf. CO2/Hydrocarbon

Nitrogen/Hydrocarbon

Polymer degradation limit

Thermal limit

0

1000

2000

3000

4000

5000

6000

0 10 20 30 40 50 60

ºAPI

Dep

th (m

)

Steam

Polymer

CO2

HydrocarbonN2

Combustion

Hot WaterMiscellar/Polymer

Surfactant

Waterflooding

What is missing?•Reservoir heterogeneity

•Relative permeability/rock wettability

•Reservoir geometry

•Minimum Miscible Pressure (MMP)

•Minimum Miscible Enrichment (MME)

Screening for IOR/EOR methods

Page 9: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 9

Screening for IOR/EOR methods

Predictive modelsDOE Predictive models

Steamflood, In-situ Combustion, Polymer, Chemical Flood, CO2 Miscible Flood, Infill, Single-Well Chemical TracerCO2 Prophet and other commercial software

SINTEF Petroleum Research CO2 predictive model (2007).EOR RATE MODEL (2008) (*)

CorrelationsComputer methods of Screening

MAESTRO™SelectEOR™ (ALBERTA RESEARCH COUNCIL) (2009)

(*) Source: Danish Energy Agency

Page 10: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 10

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.0

SW

KR

W /

KR

OW

Wettability effect in Sor

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.0

SW

KR

W /

KR

OW

Residual Oil Saturation

Sorw=100-90=10%

Target for EOR after Waterflooding

Strong water wet system

Residual Oil Saturation

Sorw=100-70=30%

Target for EOR after Waterflooding

What is the target oil for EOR?

Page 11: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 11

Conformance Control Solutions DUAL FLOW HORIZONTAL WELL DESIGN

Well Oil (QL= 1,000 bbl/day)

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

Apr/2004

May/2005Jul/2

006Aug

/2007Sep/

2008Nov/2

009Dec/2

010Feb/

2012Mar/20

13Apr/2

014

Time (m/y)

Wel

l Oil

Pro

duct

ion

Tota

l (bb

l)

Qw = 0 bbl/dQw = 500 bbl/dQw = 1000 bbl/dQw = 1500 bbl/dQw = 2000 bbl/dQw = 2500 bbl/dQw = 3000 bbl/d

Temperature 65 to 160 oC

Page 12: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 12

σLpk

Nc ΔΔ

=

Importance of capillary number in defining EOR

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.00E-08 1.00E-07 1.00E-06 1.00E-05 1.00E-04 1.00E-03 1.00E-02 1.00E-01 1.00E+00

Nc

Sor(

EOR

)/Sor

w

Dombroski & BrownellFosterTaberDu PreyGupta

Wetting

Nonwetting

Page 13: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 13

Effect on reducing interfacial tension

Source: Bardon & Longeron SPE 7609

Page 14: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 14

wro

orw

kk

owM

μμ

λλ

==

Effect of mobility ratio in Sweep efficiency

Page 15: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 15

Laboratory investigationWettability, Relative permeabilitySwelling test, MMP, MMESWTT (Single Well Tracer Test) for Sor estimationRock-Fluid compatibility test

•Slim tube test

•Rising Bubble method

•Vanishing interfacial tension

Page 16: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 16

MMP CorrelationsPure CO2

YearHolm and Josendal 1974 T MWC5+Cronquist 1977 T MWC5+ C1Yellin and Metcalfe 1980 TJohnson and Pollin 1981 T MWC7+Glaso 1985 T MWC7+ C2-C6Alston 1985 T C1N2 C2-C4,CO2Yuan et al. 2004 T MWC7+ C2-C6Shokir 2007 T MWC5+ C1N2 C2-C4,H2S,CO2

CO2 with ImpuritiesYear

Johnson and Pollin 1981 Gas compositionSebastian et al 1985 Gas compositionYuan et al. 2004 T MWC7+ C2-C6 Gas compositionShokir 2007 T MWC7+ C2-C6 Gas composition

N2 and lean gas YearFiroozabadi and Aziz 1986 T MWC7+ C2-C5

Hydrocarbon gas YearKuo 1985 T MWC5+

Parameters

Parameters

Gas composition

Parameters

Parameters

Estimation based on EOS calculations (T, compositions oil and gas).

Page 17: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 17

Shokir method

Linear regression MethodsAlternating Conditional Expectation (ACE) Algorithms

JPSE, 58 (2007) 173-185

Page 18: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 18

0 2000 4000 6000X

-15100

-15000

-14900

-14800

-14700

-14600

-14500

-14400

-14300

-14200

-14100

ELE

V

AQS0.550.50.450.40.350.30.250.20.15

Run: wf-5sowsWaterflood (5-spot, original well spacing)Model 2 (24 Layer 3D)

WCE

WLWWater SaturationGrid Plane j=6

WRW

t = yr 2003.55 yrs Waterflooding

API = 16o

API = 8o

API = 4o

j=1

j=6

j=1k=12

0

500

1000

1500

2000

Y

AQS0.550.50.450.40.350.30.250.20.15

Run: wf-5sowsWaterflood (5-spot, original well spacing)Model 2 (24 Layer 3D)

WLW

Water Saturation

WRW

t = yr 2003.55 yrs Waterflooding

WCEGrid Plane K=12

J=1

Pilot project design

Reservoir parametersDepth 4421 mThickness 213 mPorosity 8 - 12 %Permeability 10-150 mDOil Gravity 26 APITemperature 146 CInitial pressure 791 BARBubble point pressure 267 BARMMP 499 BARRes. Pressure 506 BAR

Page 19: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 19

Cross section study results

2000 2005 2010 2015 2020 2025 2030YEAR

0.15

0.2

0.25

0.3

0.35

0.4

0.45

0.5

0.55

0.6

0.65

Oil

Rec

over

y(f

ract

ion

OO

IPw

ithA

PI>

8o)

0.15

0.2

0.25

0.3

0.35

0.4

0.45

0.5

0.55

0.6

0.65

5-spot-owsoriginal well spacing 5spt with infill 9-spot with infill

gas inj5-spt if9-spt if

5-spt ows wf

9-spt if wf

9-spt if wag

5-spt if wf

5-spt if wag

gas inj5-spt ows

5-spt ows wag

WaterfloodGas Injection1:1 WAG

Page 20: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 20

r, ft

elev

atio

n

0 100 200 300 400 500

-14800

-14700

-14600

-14500

-14400

InjectWaterat10,400psi Initial60dayswaterinjection GasSaturation

31m 50m 75m 150mRUNwbprf360halfcycle

r, ft

elev

atio

n

0 100 200 300 400 500

-14800

-14700

-14600

-14500

-14400 AQSAT0.60.550.50.450.40.350.30.25

InjectWaterat10,400psi

Sw=Swi=.14

WaterSaturation31m 50m 75m 150m

.2cut-off

r,ft

elev

atio

n

0 100 200 300 400 500

-14800

-14700

-14600

-14500

-14400

PRESSURE900089008800870086008500840083008200810080007900780077007600750074007300720071007000

InjectWaterat10,400psi

Pressure(psi)31m 50m 75m 150m

presentation/wbprf3-xs.lay

r,ft

elev

atio

n

0 100 200 300 400 500

-14800

-14700

-14600

-14500

-14400 HCSAT0.80.750.70.650.60.550.50.450.40.350.30.250.20.15

InjectWaterat10,400psi

So=Sorw=.34 So=Soi=.86

OilSaturation31m 50m 75m 150m

Pilot test monitoring

Injector•Production Profile Log (PLT)

•Down Hole P and T measurements

•Water chemical tracer

•Gas Chemical tracer

Observation well•Production Profile Log (PLT)

•Down Hole P and T measurements

•Saturation logs

Tracers

Fluorbenzoic acid (Water)

Perfluorcarbon Hydrocarbon (Gas)

WAG Pilot Project Design

Page 21: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 21

Monitoring

The Weyburn Monitoring Project

3D- 3component and 3D-9 component geophysical survey

•Vertical Seismic Profiling (VSP) from surface to horizontal well

•Cross-well seismic between parallel

•Horizontal wells

•Single horizontal well seismic

Source: K. Brown et al, Role of Enhanced Oil Recovery in carbon Dioxide Sequestration the Weyburn Monitoring Project, a case Study

Page 22: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 22

Novel EOR Technology

Integration of CO2 storage and EOR

Toe to heel air injection THAI™ (CAPRI)

Solvent Vapour Extraction (SVX)

Page 23: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 23

Source: Gulraiz Khan, M.Sc. Dissertation 2009.

Integration of CO2 storage and EOR

Page 24: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 24

Integration of CO2 storage and EOR

Source: DOE/NETL Feb 2008

Page 25: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 25

THAI™ is a new combustion process

Toe to heel air injection (THAI) is a new method of extracting oil from heavy oil deposits which may have significant advantages over existing methods. The method was developed by Malcolm Greaves of the University of Bath and has been patented by Petrobank.

Page 26: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

© 2009 Halliburton. All Rights Reserved. 26

Solvent Vapour Extraction (SVX)

Source: Petroleum Technology Research Centre (PTRC) JIVE Program

JIVE said: For every billion barrels of oil produced by SVX instead of SAGD:

•85 millions tones of CO2 prevented form entering the atmosfere

•400 millions barrels of fresh water saved

•1.65 trillion cubit feet of natural gas not burned

Page 27: Practical Applications and Novel EOR Methodsmemberfiles.freewebs.com/50/69/68186950/documents...Typical IOR/EOR Project Workflow Project Management Screening for EOR methods. Screening

Recommended