+ All Categories
Home > Documents > Preparation for LHC beam: ATLAS

Preparation for LHC beam: ATLAS

Date post: 15-Feb-2016
Category:
Upload: kishi
View: 24 times
Download: 0 times
Share this document with a friend
Description:
Preparation for LHC beam: ATLAS. W. H. Bell Université de Genève. Overview. Swiss ATLAS Participants Hardware Contributions Commissioning First Beam Cosmic Rays Physics Program Standard Model Beyond the Standard Model Conclusions and Outlook. Swiss ATLAS. DPNC - Geneva. LHEP - Bern. - PowerPoint PPT Presentation
Popular Tags:
15
Preparation for LHC beam: ATLAS W. H. Bell Université de Genève CHIPP Plenary - 2009/08/24
Transcript
Page 1: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24

Preparation for LHC beam: ATLAS

W. H. BellUniversité de Genève

Page 2: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 2

Overview• Swiss ATLAS

– Participants– Hardware Contributions

• Commissioning– First Beam– Cosmic Rays

• Physics Program– Standard Model– Beyond the Standard Model

• Conclusions and Outlook

Page 3: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 3

Swiss ATLASProf. A. G. ClarkProf. A. Blondel

Prof. M. PohlDr. L. Rosselet, Dr. X. Wu

Dr. D. Ferrere, Dr. S. Gadomski

Dr. W. H. Bell, Dr J. Garcia NavarroDr. S. Gonzalez Sevilla, Dr. A. Hamilton

Dr M. Keil, Dr A. Lister, Dr B. Martin dit Latour, Dr G. Pásztor

Dr P. Urquijo

A. A. Abdelalim, G. Alexandre, M. Backes, E. Berglund,

F. Bucci, V. DaoC. Mora Herrera, S. Nektarijevic

A. Robichaud-Vöronneau

F. Cadoux, D. La Marra

Prof. A. EreditatoProf. Emeritus K. Pretzl

PD Dr. H. BeckPD Dr. M. Weber

Dr. S. Haug , Dr. K. KordasDr. E. Cogneras

C. Topfel, C. Borer, A. BattagliaN. Venturi, V. Gallo

I. Badhrees, T. KrukerJ. Casutt, N. N., N. N.

DPNC - Geneva LHEP - Bern

Page 4: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 4

The ATLAS Experiment

Readout Electronics for Calorimeter Geneva

Semiconductor Tracker Geneva

Superconductor and Casings for Barrel Toroid Coil Bern and Geneva

Physics and Computing

Tracker Support Structure Geneva

TDAQ - Trigger and DataflowBern and Geneva

Bern and Geneva

Online and Offline SoftwareBern and Geneva

Page 5: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 5

First Beam Event

2008/09/10 10:19

2x109 protons at 450GeV hit closed tertiary collimators.

Page 6: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 6

Commissioning with Cosmics• Commission detector,

hardware and software event selection.

• Calibration and alignment studies.

• 1-700Hz of cosmic muons selected

• ~ 5M cosmics selected with software track trigger.

Page 7: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 7

Software Trigger• Responsible for PCs running

online software based trigger. (Bern)

• Training collaborators to monitor online selection algorithms. (Bern)

• Debugging online software selection algorithms. (Geneva)

• Developing new software algorithms for online data selection. (Geneva)

Pixel alignment with cosmic data

residualsbefore alignment

residualsafteralignment

MC (perfect detector)

Residuals: distance between fittedtrack and hits in the individual layers

Page 8: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 8

2009-2010 Physics1. Early measurements

• Minimum Bias (Geneva)• J/ψ e+e- (Geneva)• E/γ performance (Bern/Geneva)

2. Medium term• W+Jets, Top physics (Bern/Geneva)• Direct photons (Geneva)• Trigger studies for new physics searches (Bern/Geneva)

3. End of 2010 run - early discoveries?• SUSY (Bern/Geneva)• Excited Electrons (Geneva)• Heavy Ion Physics (Geneva)

Page 9: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 9

Early MeasurementsInner Detector Space Points

Minimum Bias Trigger Scintillators

Cerenkov Detector (LUCID)

Zero degree calorimeter (ZDC)8.3 ∞Tracking Efficiency

Trigger StrategyMinimum Bias J/ψ e+e-

ET/pT

E/γ performance

ATLASWork in ProgressV. Gallo

Page 10: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 10

W+JetsMedium TermDirect Photons

Trigger studies for SUSY Searches

ATLAS Work in ProgressT. Kruker

Studying (multi)-jet signatures.

Page 11: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 11

SUSY SearchesJets + ET

miss

√s = 10 TeV 200 pb-1

Jets + ETmiss + lepton

11

Page 12: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 12

SUSY Searches

systematicsincluded

˜ g ~ 0.75 TeV

˜ q ~ 0.75 TeV

200 pb-1

Discovery reach in the m0-m½ plane Light Stop Cross Section

Signal selection and background

rejection as a function of 3-jet

threshold ATLAS work in progressE. Cogneras

m0 (GeV)

Page 13: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 13

New Physics: Excited Electrons

Reco. meγ me*=1TeV, Λ= 5TeV

1200pbLdt

• Gauge Mediated decay modes: • ν + W 2 j + or l +• e + γ : most promising channel• e + Z e +2 j or e + 2 l

missTE

missTE

e e*

q q

e e*

q q

ATLASWork in ProgressA. Abdelalim

ATLASWork in ProgressA. Abdelalim

Page 14: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 14

Heavy Ion Physics• Global variable measurements

– dN/dη, dET/dη, Elliptic Flow, Azimuthal distributions

• Jet measurement and jet quenching• Quarkonia suppression

x

z

y

Directly linked to Quark Gluon Plasma

Page 15: Preparation for LHC beam: ATLAS

CHIPP Plenary - 2009/08/24 15

Conclusions & Outlook• Detector operational

– Selected beam splashes, beam halo from first beam– Large scale cosmic running with active hardware and

software trigger selection– Preparing detector and trigger selection for physics

running.• Wide range of physics analyses for 2009/2010 data.

– Physics commissioning, SM measurements, and BSM at end of run.

• Looking forward to first collisions!


Recommended