Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc. 5-1 Mantel, Meredith, Shafer, and Sutton Copyright John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976 United States Copyright Act without express permission of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information herein. 5 – Scheduling the Project
Transcript
Page 1: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Prepared byScott M. Shafer,

Updated by William E. Matthews and

Thomas G. Roberts, William Patterson University

Copyright 2007 John Wiley & Sons, Inc. 5-1

Mantel, Meredith, Shafer, and Sutton

Copyright John Wiley & Sons, Inc.

All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976 United States Copyright Act without express permission of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information herein.

5 – Scheduling the Project

Page 2: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Late 1950s

• Program Evaluation and Review Technique (PERT)• U.S. Navy, Booz-Allen Hamilton, and Lockeheed Aircraft

• Probabilistic activity durations

• Critical Path Method (CPM)• Dupont De Nemours Inc. developed the method

• Deterministic activity durations

Copyright 2007 John Wiley & Sons, Inc. 5-2

Page 3: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Activity• task or set of tasks• uses resources

Event• state resulting from completion of one or more activities• consumes no resources or time• predecessor activities must be completed

Milestones• events that mark significant progress

Network• diagram of nodes and arrows• used to illustrate technological relationships

Path• series of connected activities between two events

• Critical Path• set of activities on a path that if delayed will delay completion of

project Critical Time

• time required to complete all activities on the critical pathCopyright 2007 John Wiley & Sons,

Inc. 5-3

Page 4: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Activities on Arrows (AOA) Network Activities on Nodes (AON) Network

Copyright 2007 John Wiley & Sons, Inc. 5-4

Page 5: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2007 John Wiley & Sons, Inc. 5-5

Page 6: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2005 John Wiley & Sons, Inc. 5-6

Page 7: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2007 John Wiley & Sons, Inc. 5-7

Page 8: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2007 John Wiley & Sons, Inc. 5-8

Page 9: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2007 John Wiley & Sons, Inc. 5-9

Page 10: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2007 John Wiley & Sons, Inc. 5-10

Latest Start Time (LST) – Earliest Start Time (EST) = Slack Latest Finish time (LFT) – Earliest Finish time (EFT) = Slack

Page 11: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2007 John Wiley & Sons, Inc. 5-11

Page 12: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2007 John Wiley & Sons, Inc. 5-12

Page 13: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2007 John Wiley & Sons, Inc. 5-13

22

E

6

)(Var

6

)(

6

)4(T

ab

ab

bma

Page 14: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Task will be a or lower 5 percent of the time Task will be b or greater 5 percent of the time

Copyright 2007 John Wiley & Sons, Inc. 5-14

3.3

)( ab

Task will be a or lower 10 percent of the time Task will be b or greater 10 percent of the time

6.2

)( ab

Page 15: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2007 John Wiley & Sons, Inc. 5-15

2

)(

D

Z

=NORMDIST(D,,,TRUE)

Note: NORMDIST is a function within Excel when using the spreadsheet method

Page 16: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2005 John Wiley & Sons, Inc. 5-16

Page 17: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2005 John Wiley & Sons, Inc. 5-17

2 ZD

NORMINV(probability,,,TRUE)Note: NORMMINV is a function within Excel when using the spreadsheet method

Page 18: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Similarity• Both must enumerate the alternative path

Difference• Traditional statistics assume path

interdependence while simulation does not

Copyright 2007 John Wiley & Sons, Inc. 5-18

Page 19: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2007 John Wiley & Sons, Inc. 5-19

Page 20: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2007 John Wiley & Sons, Inc. 5-20

Page 21: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Copyright 2007 John Wiley & Sons, Inc. 5-21

Finish of Activity A to start of Activity B linkage (F to S) Start of Activity B to start of Activity C linkage (S to S) Finish of Activity A to finish of Activity B linkage (F to F) Start of Activity A to finish of Activity A linkage (S to F)

Page 22: Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.

Combines flowgraphs, probabilistic networks, and decision trees

Allows loops back to earlier events and probabilistic branching

Copyright 2007 John Wiley & Sons, Inc. 5-22