UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 88756 CR 597 OVER THE RICE RIVER ST. LOUIS COUNTY ____ ___ ____ SEPTEMBER 19, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423
Transcript
Page 1: PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY ... · PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423 . MINNESOTA DEPARTMENT

UNDERWATER BRIDGE INSPECTION REPORT

STRUCTURE NO. 88756

CR 597

OVER THE

RICE RIVER

ST. LOUIS COUNTY ____

___ ____

SEPTEMBER 19, 2012

PREPARED FOR THE

MINNESOTA DEPARTMENT OF TRANSPORTATION

BY

COLLINS ENGINEERS, INC.

JOB NO. 7423

Page 2: PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY ... · PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423 . MINNESOTA DEPARTMENT

MINNESOTA DEPARTMENT OF TRANSPORTATION UNDERWATER BRIDGE INSPECTION

REPORT SUMMARY:

The substructure units inspected at Bridge No. 88756, the North Abutment and Bent 1,

were found to be in fair condition, with only minor defects of structural significance. The

timber piles were typically sound with random splitting extending from the pile cap down

up to 4 feet. Pile A of Bent 1 had a 1 inch wide by 8 inch deep split extending from the

pile cap down 2.5 feet. The timber around the split was unsound and a hollow core was

visible through the split with an estimated 15 percent loss of pile section. The south

cross-brace at Bent 1 exhibited heavy decay on the upstream end.

INSPECTION FINDINGS:

(A) The channel bottom material typically consisted of gravel and sandy silt with a

maximum probe rod penetration of 6 inches.

(B) The timber piles were typically sound with random splits up to 1/8 inch wide

extending from the pile cap down up to 4 feet.

(C) Pile A of Bent 1 had a 1 inch split extending from the pile cap down 2.5 feet with

up to 8 inches of penetration. The pile was unsound along the length of the split.

A hollow core was visible though the crack, with an estimated 15 percent loss of

pile section.

(D) Pile E of Bent 1 had a 1/4 inch split extending from the pile cap down 2 feet with

up to 2 inches of penetration.

(E) The south cross-brace at Bent 1 exhibited heavy decay on the upstream end with

up to 40 percent loss of section. The deterioration has yet to significantly affect

the Pile E connection.

Page 3: PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY ... · PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423 . MINNESOTA DEPARTMENT

RECOMMENDATIONS:

(A) Repair Pile A of Bent 1 by splicing/posting in a new upper 5 feet of the member

or by another method such as a structural jacket.

(B) Reinspect the submerged substructure at the normal maximum recommended

(NBIS) interval of sixty (60) months.

Inspection Team Leader:

Nicholas R. Triandafilou, P.E.

Page 4: PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY ... · PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423 . MINNESOTA DEPARTMENT

MINNESOTA DEPARTMENT OF TRANSPORTATION

UNDERWATER BRIDGE INSPECTION

1. BRIDGE DATA

Bridge Number: 88756

Feature Crossed: Rice River

Feature Carried: CR 597

Location: St. Louis County

Bridge Description: The superstructure consists of a timber deck supported by steel

I-beams. The superstructure is supported by two abutments

consisting of five 12-inch-diameter timber piles and a pile bent

consisting of five 12-inch-diameter timber piles.

2. INSPECTION DATA

Professional Engineer Diver: Nicholas R. Triandafilou, P.E.

Dive Team: Marc B. Parker, Clay G. Brookins

Date: September 19, 2012

Weather Conditions: Cloudy, 60o F

Underwater Visibility: 1 foot

Waterway Velocity: None/Negligible

Page 5: PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY ... · PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423 . MINNESOTA DEPARTMENT

3. SUBSTRUCTURE INSPECTION DATA

Substructure Inspected: The North Abutment and Bent 1

General Shape: The North Abutment consists of five timber 12-inch-diameter piles with

a 12 inch by 12 inch timber pile cap. The backwall and wingwalls were

comprised of 3 inch by 12 inch timber boards. Bent 1 consisted of five

timber 12-inch-diameter piles with a 12 inch by 12 inch timber pile cap

and two 3 inch by 12 inch diagonal cross-brace boards.

Maximum Water Depth at Substructure Inspected: Approximately 3.0 feet.

4. WATERLINE DATUM

Water Level Reference: Top of the pile cap at the downstream end of Bent 1.

Water Surface: The waterline was approximately 5.3 feet below the reference.

Waterline Elevation 94.7.

5. NBIS CODING INFORMATION (Minnesota specific codes are used for 92B and 113)

Item 60: Substructure: Code 5

Item 61: Channel and Channel Protection: Code 6

Item 92B: Underwater Inspection: Code B/09/12

Item 113: Scour Critical Bridges: Code K/12

Bridge is scour critical because abutment or pier foundation is rated as unstable due to

observed scour at bridge site.

Yes X No

Page 6: PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY ... · PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423 . MINNESOTA DEPARTMENT

6. STRUCTURAL ELEMENT CONDITION RATING

Item

# Element Description Quantity Unit

Conditions

1 2 3 4 5

206 Timber Piles 15 EA 10 4 1 0 n/a

216 Timber Abutment 20 LF 20 20 0 23 n/a

361 Scour 1 EA 1 0 0 n/a n/a

985 Slopes and Slope Protection 1 EA 0 0 1 n/a n/a

Page 7: PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY ... · PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423 . MINNESOTA DEPARTMENT

Photograph 1. Overall View of Structure, Looking Northeast

Photograph 2. View of the North Abutment, Looking Northwest.

Page 8: PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY ... · PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423 . MINNESOTA DEPARTMENT

Photograph 3. View of Bent 1, Looking Southeast.

Photograph 4. View of the Split in Pile A of Bent 1, Looking Northeast.

Page 9: PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY ... · PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423 . MINNESOTA DEPARTMENT

Photograph 5. View of the Timber Decay in the South Cross-Brace at Bent 1, Looking

Northwest.

Page 10: PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY ... · PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423 . MINNESOTA DEPARTMENT
Page 11: PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY ... · PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423 . MINNESOTA DEPARTMENT
Page 12: PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY ... · PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423 . MINNESOTA DEPARTMENT

MINNESOTA DEPARTMENT OF TRANSPORTATION

OFFICE OF BRIDGES AND STRUCTURES

DAILY DIVING REPORT

INSPECTORS: Collins Engineers, Inc. DATE: September 19, 2012

ON-SITE TEAM LEADER: Nicholas R. Triandafilou, P.E.

BRIDGE NO: 88756 WEATHER: Cloudy, 60o F

WATERWAY CROSSED: Rice River

DIVING OPERATION: X SCUBA SURFACE SUPPLIED AIR

OTHER

PERSONNEL: Marc B. Parker, Clayton G. Brookins

EQUIPMENT: Commercial Scuba, Probe Rod, Camera, Hand Tools

TIME IN WATER: 1:30 P.M.

TIME OUT OF WATER: 2:00 P.M.

WATERWAY DATA: VELOCITY None/Negligible

VISIBILITY 1 foot

DEPTH 3.0 feet maximum

ELEMENTS INSPECTED: The North Abutment and Bent 1

REMARKS: Overall, the substructure units inspected underwater were found to be in fair

condition, with only minor defects of structural significance. The timber piles were

typically sound with random splitting extending from the pile cap down up to 4 feet. Pile

A of Bent 1 had a 1 inch wide by 8 inch deep split extending from the pile cap down 2.5

feet. The timber around the split was unsound and a hollow core was visible through the

split with an estimated 15 percent loss of pile section. The south cross-brace at Bent 1

exhibited heavy decay on the upstream end.

FURTHER ACTION NEEDED: X YES NO

Repair Pile A of Bent 1 by splicing/posting in a new upper 5 feet of the member or by

another method such as a structural jacket.

Reinspect the submerged substructure at the normal maximum recommended (NBIS)

interval of sixty (60) months.

Page 13: PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY ... · PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO. 7423 . MINNESOTA DEPARTMENT

MINNESOTA DEPARTMENT OF TRANSPORTATION OFFICE OF BRIDGES AND STRUCTURES UNDERWATER INSPECTION CONDITION RATING FORM BRIDGE NO. 88756 INSPECTION DATE September 19, 2012 INSPECTORS Collins Engineers, Inc. NOTE: USE ALL APPLICABLE CONDITION ON-SITE TEAM LEADER Nicholas R. Triandafilou, P.E. DEFINITIONS AS DEFINED IN THE MINNESOTA WATERWAY CROSSED Rice River RECORDING AND CODING GUIDE INCLUDING

GENERAL, SUBSTRUCTURE, CHANNEL AND PROTECTION, AND CULVERTS AND WALL DEFINITIONS TO COMPLETE THIS FORM.

CONDITION RATING

SUBSTRUCTURE

CHANNEL

GENERAL

UN

IT R

EFE

RE

NC

E N

O.

UNIT DESCRIPTION

MA

XIM

UM

DE

PTH

OF

WA

TER

P

ILIN

G

CO

LUM

NS

, SH

AFT

S,

OR

FA

CE

S*

FOO

TIN

GS

D

ISP

LAC

EM

EN

T f O

THE

R (B

RA

CE

, BA

CK

WA

LL)

OV

ER

ALL

SU

BS

TRU

CTU

RE

C

ON

DIT

ION

CO

DE

* S

CO

UR

E

MB

AN

KM

EN

T E

RO

SIO

N

EM

BA

NK

ME

NT

PR

OTE

CTI

ON

O

THE

R (D

RIF

T/D

EB

RIS

) O

VE

RA

LL C

HA

NN

EL

&

PR

OTE

CTI

ON

CO

ND

ITIO

N

CO

NC

RE

TE

STE

EL

TIM

BE

R

LOS

S O

F S

EC

TIO

N

PR

EV

IOU

S R

EP

AIR

OR

M

AIN

TEN

AN

CE

O

THE

R

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

North Abutment 0.4’

6

N

N

N

7

6

N

N

6

N

6

N

N

6

N

N

N

Bent 1 2.8’

5

N

N

N

5

5

N

N

6

N

6

N

N

5

5

N

N

*UNDERWATER PORTION ONLY REMARKS: Overall, the substructure units inspected underwater were found to be in fair condition, with only minor defects of structural significance. The timber piles were

typically sound with random splitting extending from the pile cap down up to 4 feet. Pile A of Bent 1 had a 1 inch wide by 8 inch deep split extending from the pile cap down 2.5 feet. The timber around the split was unsound and a hollow core was visible through the split, with an estimated 15 percent loss of pile section. The south cross-brace at Bent 1 exhibited heavy decay on the upstream end.

NOTES: ATTACH SKETCHES AS NEEDED, IDENTIFY REMARK BY REFERRING TO UNIT REFERENCE NO. AND REMARK NO.