English
ENGINEERINGENGINEERING
CONSTRUCTION
CIVIL WORKS
MAINTENANCE
INVESTIGATION
2
AREMA i f f i l hAREMA is a group of professionals who arestriving to improve the environment throughhigh quality, well-executed projects.
fUse of the latest technology, our ownresearch, environmental quality andmanagement systems, continual training,commitment to internationalization, dealing
ll h l d dpersonally with our clients and respondingquickly to their needs all form part of ourformula for success.
We hope that we will have an opportunity towork with you on the exciting challenge ofpreserving our surroundings.
3
INDEX• The Company
• Field of performancee o pe o a ce
• Products
• Technologygy
• References
• Contact information and branch offices
4
THE COMPANYCompany specializing in designing, constructing and running water treatment
THE COMPANYGeneral Information g g
plants.
Professionals qualified in many different fields with extensive knowledge and solid fields with extensive knowledge and solid experience.
Experience in producing urban and d l l industrial water treatment plants,
drinking-water installations, recycling water and desalinisation.
Founded in 1995, the company has developed more than 600 projects in Spain, the rest of Europe, America and Africa.
Certified to be contracted for state projects.
5
THE COMPANYCommitments
To use of the latest environmental technology.gy
To look for ways to save and to recycle, and for energyffi iefficiency.
To find the best long-term solutions.o t e best o g te so ut o s.
To guarantee the solutions proposed.
6
THE COMPANYTHE COMPANYCategory awarded by the Spanish Ministry of Economics and Treasury
Group K: MiscellaneousK-8 E: Design & Construction in Water Treatment Plants.g
Group O: Conservation and maintenance of property.O-4 D: Conservation an comprehensive maintenance of water installations.
Group E: HydraulicsE 1 E S l d l bi
p
E-1 E: Supply and plumbing.E-4 E: Ditches and drainage.E-5 E: River banks and channelling defences.E 7 E N ifi h d li j tE-7 E: Non-specific hydraulic projects.
7
THE COMPANYTHE COMPANYCategory awarded by the Spanish Ministry of Economics and Treasury
Group I: Electrical installationsI-1 B: Lighting and illumination.I-5 C: High voltage transformation and distribution centres.I-6 D: Low voltage distribution.I 8 C El i i ll iI-8 C: Electronic installations.I-9 D: Non-specific electrical installations.
Group J: Mechanical installationsJ-5 D: Non-specific mechanical installations.
8
THE COMPANYTHE COMPANYCertifications
EUROPEAN QUALITY ASSURANCE
Quality ManagementSystem QualificationUNE EN ISO 9001UNE - EN - ISO 9001
7583 - E
Enviromental ManagementSystem Qualification
UNE - EN - ISO 140017583 E7583 - E
Health & Safety ManagementHealth & Safety ManagementSystem Qualification
OHSAS 180017583 - E
9
7583 E
FIELD OF PERFORMANCEFIELD OF PERFORMANCEEngineering
We offer our experience to
g g
organizations wanting to develop water-related projects.
We have thorough knowledge of the problems associated with the product, with the market and with the latest trends in technology.
We are not connected to a manufacturer, We are not connected to a manufacturer, so we can offer independent advice in our clients’ best interests.
10
FIELD OF PERFORMANCEFIELD OF PERFORMANCEProject Managementj g
Selection of equipments and management of purchasing.Selection of equipments and management of purchasing.
Development of civil works.
P d i f l Production of control programmes.
Assembly and start-up.
Comprehensive management of projects, with extensive experience in international turn-key projects.
11
FIELD OF PERFORMANCEFIELD OF PERFORMANCECivil works
Carrying out civil works
Our own fleet of machinery
Carrying out civil works
y
Option for the clientto supervise the civilto supervise the civilwork if they prefer
12
FIELD OF PERFORMANCEFIELD OF PERFORMANCEMaintenance
Maintenance of installations, including Ongoing advisory Training programmes for
i linstallations, including those not built by
AREMA.support. operating personnel.
13
FIELD OF PERFORMANCEFIELD OF PERFORMANCEResearch
Development of our own products through: Research + Development + Innovation( )(R+D+i).
Participation in programmes organized by the “Centro para el Desarrollo Tecnológico Industrial”(Centre for Industrial Technological Development).
Incorporation of new technology and on-going staff training. g
14
PRODUCTSPRODUCTSRegeneration of urban waterg
Pioneer in EU to the Project for the Regeneration of Urban Waste Water to refill the water table and combat salt water intrusion in aquifer.
Regeneration of 20.000 m3/day.
15
PRODUCTSPRODUCTSRegeneration of industrial waterRegeneration of industrial water
Carried out one of the biggest textile Carried out one of the biggest textile industrial water regeneration project in Europe. Regeneration of 12.500 m3/day. g y
Installation which treats dirty water so it can be reused, using a tertiary treatment which comprises sand filtration, ultra-filtration and reverse osmosis.
Re-use of industrial water to preserve the Tordera River.
16
PRODUCTSPRODUCTSDesalinisationDesalinisation
Desalinisation Société Algerienne du Chl (S hl ) Al i
17
Chlore (Soachlore) Algeria.Producing ultra-pure water.
AgullanaLímits de la Jonquera
PRODUCTSPRODUCTSWaste-water treatment plants for small towns
Castellar de N’Hug Tous 18
VilalbaArtesa de Segre
PRODUCTSPRODUCTSWaste-water treatment plants for medium-sized towns
Deltebre Ascó 19
La UniónSanta Maria de Palautordera
PRODUCTSPRODUCTSWaste-water treatment plants for large towns
La RodaPiedras Negras (Mexico) 20
Meat industryFood industry
PRODUCTSPRODUCTSIndustrial water treatment plants
Hydrocarbon recovery servicesSlaughter house
21
PRODUCTSPRODUCTSHydraulic projects
Construction of the new pump station for the waste-water treatment plant in Igualadathe waste-water treatment plant in Igualada(Barcelona)
Increase in capacity to 3.000 m3/hour (72.000 p y (m3/day.)
22
PRODUCTSPRODUCTSDrinking water supply and pipes
Sector BarcelonaSector El Prat
Construction of the second phase of the hydraulic barrier to combat salt water intrusion in the Delta de Llobregat, production, transport and injection wells.
Sector BarcelonaSector El Prat
g , p , p j
The treatment process comprises micro-filtration, ultra-filtration, reverse osmosis and ultra violet disinfection.
23
The installation’s treatment capacity is 20.000 m3/day.
PRODUCTS Transportation of water from the waste-PRODUCTSDrinking water supply and pipes
water treatment plant in Prat de Llobregat, regenerated by the tertiary treatment, to be injected into the Delta de Llobregat water table.de Llobregat water table.
Construction of 11 injection wells, each 72 metres deep.
Installation of 10 km of high-density polyethylene piping, between 200 and 400 mm in diameter.
Construction of 16 multi-parametric control piezometres to transmit data immediatelyimmediately.
12 horizontal tunnels excavated by remote-control, measuring between 160 gand 400 mm in diameter, totalling 2,153 metres.
800 m long tunnel passed under the River
24
800 m long tunnel passed under the River Llobregat.
TECHNOLOGYTECHNOLOGYDesign criteria
High efficiency systems using diffusers.
Reduction of hydraulic losses.
Elimination of nutrients in the biological tank Elimination of nutrients in the biological tank, controlled with O2 and Rx probes.
Reduction in civil works through not using Reduction in civil works through not using anoxyc chambers.
25
TECHNOLOGYTECHNOLOGYControl Systems
Complete control of the process
y
p pthrough probes and PLC, and our own design of control programmes.
System of alarm management, sending text messages and pre-recorded messages.recorded messages.
System of graphic control, like Scada, and maintenance reports.p
Telemetric systems to send information by GSM, integration
i h i i li d with existing centralized systems.
26
TECHNOLOGYTECHNOLOGYWaste-water treatment plants for small towns of less than 5,000 inhabitants
Construction of settling tanks using our own PRVF moulds with diameters between 2.30 m and 9.00 m, with a 56º slope and a polished finish 9.00 m, with a 56 slope and a polished finish inside, and the option of stainless steel cones.
Technology sufficient for installations in towns of up to 5 000 inhabitants with the possibility to up to 5,000 inhabitants, with the possibility to install two cones in the same tank.
Very compact installations which can be round, square or oval.square or oval.
Elimination of nutrients in the tank, controlled by O2 and Rx probes.
Reduction in civil works, which are only necessary for the biological tank.
High energy efficiency and low consumption.
27
g gy y p
Totally automatic.
TECHNOLOGYTECHNOLOGYTechnology to eliminate nitrates from drinking water supplies
We represent K-Nord ®, which produces the technology to eliminate nitrates from drinking water supplies.
Technology to eliminate nitrates through biological systems.
Low costs compared with other technology: 0,12 €/m3 (RO, EDR, EDI, etc.).Low costs compared with other technology: 0,12 €/m (RO, EDR, EDI, etc.).
Quick supply.
Easy maintenance.
Easy to transport.
Minimal civil works.
28
TECHNOLOGYTECHNOLOGYBiological compact plant with mobile bed
Capacity to treat water in a 40 feet shipping container for 1,000 inhabitants.
Technology based on the development of biofilms on plastic supports.
Operates on large quantities of biological contaminants.
Low energy consumption.
Easy maintenance.y
Easy to transport.
Minimal civil worksMinimal civil works.
No odours.
C d d l
29
Compact and modular.
REFERENCESFinished projects
Project Contracted by Developed in Starting date Completion date Observations
Riudarenes Construcciones Rubau Girona 09/1995 05/1996 WWTP with extended aeration
El Sosiego FCC Barcelona 11/1995 02/1996 WWTP with extended aeration
Procsa Zunfer Pontevedra 12/1995 04/1996 WWTP with extended aeration
Velilla del Rio Carrión Sato Palencia 01/1996 02/1997 WWTP with extended aeration
Consell Sato Balearic Islands 03/1996 02/1997WWTP with extended aeration and sludge
treatment
Ecoimsa Ecoimsa Barcelona 06/1996 08/1996WWTP with extended aeration and
physical-chemical treatment
Enguera Egevasa Valencia 06/1996 03/1998WWTP with extended aeration and sludge
treatment
Gines Navarro Slautherhouse in Barbastro
Gines Navarro Construcciones
Huesca 07/1996 07/1996 WWTP with extended aeration
Dodro Corsan Pontevedra 09/1996 10/1996 WWTP with extended aeration
El M ll El T 10/1996 02/1997 WWTP h d d
30
Els Muntells Elsan Tarragona 10/1996 02/1997 WWTP with extended aeration
REFERENCESFinished projects
Project Contracted by Developed in Starting date Completion date Observations
Enlargement of Telde Canaragua Las Palmas 02/1997 04/1997 WWTP with extended aeration
Pinofranqueado OCP Cáceres 02/1997 08/1997 Drinking water plant
La Goba Copcambra Girona 03/1997 09/1997 WWTP with extended aeration
Bussot Lubasa Alicante 04/1997 05/1997WWTP with biological treatment, bio-
cylinders and treatment of sludge
Ceramica Saloni Becsa Castellón 05/1997 08/1997 WWTP compact
Soriguerola Junta Plan Soriguerola Girona 06/1997 11/1997 WWTP with extended aeration
Congelados y Derivados, S.A.
Congelados y Derivados, S.A.
León 09/1997 04/1998 Reverse osmosis
Construcciones Hispano Oliva Nova
Construcciones Hispano Germanas
Alicante 09/1997 09/1998 WWTP with extended aeration
Negreira Covsa A Coruña 10/1997 08/1998WWTP for biogical treatment in carrousel
and sludge treatment
B l l D ó d Có d b Có d b 11/1997 12/1998WWTP with extended aeration and
31
Belalcazar Diputación de Córdoba Córdoba 11/1997 12/1998WWTP with extended aeration and
elimination of nutritious
REFERENCESFinished projects
Project Contracted by Developed in Starting date Completion date Observations
Temisas Canaragua Las Palmas 12/1997 05/1998 WWTP with extended aeration
Vielha Isolux Wat Lleida 01/1998 05/1998 WWTP with extended aeration
Carballeda de Avia Construcciones Alea Ourense 01/1998 08/1998 WWTP with extended aeration
Salinas Lubasa Alicante 01/1998 02/1999WWTP with extended aeration and physical-
chemical treatment
Esterri d'Aneu Agència Catalana de l'Aigua Lleida 02/1998 08/1998 WWTP with extended aeration
Catalana de Polimers Catalana de Polimers Barcelona 02/1998 11/1998WWTP with extended aeration and physical-
chemical treatment
Xunqueira de Ambia Elsan Ourense 03/1998 06/1998 WWTP with extended aeration
WWTP with extended aeration and Santa Maria de Palautordera Agència Catalana de l'Aigua Barcelona 03/1998 08/1998
WWTP with extended aeration and elimination of nutrients
Santomera Obrascon Murcia 04/1998 04/1999 WWTP with extended aeration
V ll d E V l 05/1998 08/1998 WWTP h d d Vallada Egevasa Valencia 05/1998 08/1998 WWTP with extended aeration
32
REFERENCESFinished projects
Project Contracted by Developed in Starting date Completion date Observations
Cuartel Colmenar Viejo Tremesa Madrid 06/1998 08/1998 WWTP with extended aeration
Tous Lubasa Valencia 06/1998 05/1999 WWTP with extended aeration
Sslautherhouse in Burriana Luis Batalla, S.A. Castellón 07/1998 11/1998WWTP with extended aeration and physical-
chemical treatment
Industrial estate Sant PereMolanta
Sugemesa Grupo Gallina Blanca
Barcelona 08/1998 12/1998 Industrial water with biological treatmet
Casinos Egevasa Valencia 08/1998 03/1999WWTP with biological filter and sludge
treatment
Begonte Construcciones Alea Lugo 08/1998 04/1999 WWTP with extended aeration
Castro Caldelas Construcciones Alea Ourense 08/1998 06/1999 WWTP with extended aeration
Viladrau VidraViladrau -VidraFolgueroles - La Guixa
Agència Catalana de l'Aigua Girona 08/1998 06/1999 WWTP with extended aeration
Enlargement ofRafelguaraf - L'Enova
Egevasa Valencia 08/1998 09/1999 WWTP with extended aeration
Carlet Obrascon Valencia 08/1998 10/1999 WWTP with extended aeration
33
REFERENCESFinished projects
Project Contracted by Developed in Starting date Completion date Observations
WWTP Valparaiso Proinosa Tarragona 01/1999 02/1999 Pump station
Linyola Agència Catalana de l'Aigua Lleida 01/1999 07/2001 WWTP with extended aeration
WWTP Flix Edar Flix Ute Tarragona 03/1999 03/1999 Ferric chloride dosage
Slautherhouse in Mahón Ganados Pellicer Balearic Islands 06/1999 08/1999 WWTP with extended aeration
Llanos del Espinar Diputación de Córdoba Córdova 06/1999 12/1999 WWTP with extended aeration
Tales – Sueras Lubasa Castellón 06/1999 12/1999 WWTP with extended aeration
Cabanes Lubasa Castellón 06/1999 01/2000 WWTP with extended aeration
C i ió E l d A Piedras Negras
Comisión Estatal de Aguas y Saneamiento - Estado de
CoahuilaMexico 07/1999 12/2000
WWTP with extended aeration. elimination of nutrients
La UniónRegión de Murcia
Consejería de Medio Murcia 07/1999 06/2001 WWTP with extended aerationLa Unión Consejería de Medio Ambiente Agricultura y Agua
Murcia 07/1999 06/2001 WWTP with extended aeration
34
REFERENCESFinished projects
Project Contracted by Developed in Starting date Completion date Observations
Bertamirans Isolux Wat A Coruña 08/1999 09/1999 WWTP with extended aeration
La Roda Junta de Castilla La Mancha Albacete 08/1999 11/1999 WWTP with extended aeration
Servitint Servitint Alicante 10/1999 06/2000industrial water treatment plant with
extended aeration
Dos Torres Diputación de Córdoba Córdoba 11/1999 05/1999WWTP with extended aeration and
elimination of nutrients
Intamasa Corviam Teruel 01/2000 04/2000 Industrial treatment plant
La Restinga Canaragua Sta. Cruz de Tenerife 03/2000 04/2000 WWTP with extended aeration
Enlargement of La Bisbald’Empordà
Agència Catalana de l'Aigua Girona 03/2000 04/2000 Pre-treatment
San Felipe A.C.S. Las Palmas 03/2000 09/2000 WWTP with extended aeration
Sardina A.C.S. Las Palmas 04/2000 10/2000 WWTP with extended aeration
T bInstituto Colombiano de
C l bi 09/2000 12/2000 WWTP ith t d d tiTurbacoBienestar Familiar
Colombia 09/2000 12/2000 WWTP with extended aeration
35
REFERENCESFinished projects
Project Contracted by Developed in Starting date Completion date Observations
Soachlore MostaganemSociété Algérienne du
ChloreAlgeria 09/2000 12/2000 Reverse osmosis and demineralisation
El Puente – BogotáInstituto Colombiano de
Bienestar FamiliarColombia 01/2001 06/2001 WWTP with extended aeration
Enlargement ofCunit – Cubelles
Agència Catalana de l'Aigua Tarragona 05/2001 12/2001 Improvements in WWTP
Méntrida, Torre de Esteban Hambrán, Portillo de Toledo and Santa Cruz de Retamar
Junta de Comunidades de Castilla - La Mancha
Toledo 09/2001 01/20034 sewage-treatment plants with extended
aeration
WWTP Bahamonde Construcciones Alea Lugo 10/2001 11/2001 Construction of pumping stations
Cala GaldanaSorea - Antonio Gomila
UteBalearic Islands 11/2001 07/2002
WWTP with extended aeration and elimination of nutrients
WWTP i h d d i d Deltebre Agència Catalana de l'Aigua Tarragona 02/2002 12/2002
WWTP with extended aeration and elimination of nutrients
Enlargement of Martorell Agència Catalana de l'Aigua Barcelona 03/2002 12/2003 WWTP by activated sludge
MontoroGestión de Infraestructuras
de Andalucia (G.I.A.S.A.) Córdoba 06/2002 01/2003
Sewage system and WWTP with extended aeration
36
REFERENCESFinished projects
Project Contracted by Developed in Starting date Completion date Observations
Collectors at Viladrau and Folgueroles
Agència Catalana de l'Aigua Girona 07/2002 11/2001 Sewage system
Terciary Treatment - La Unión
Región de Murcia-Consejería de Medio
Ambiente Agricultura y AguaMurcia 07/2002 12/2002
System of de filtration and re-use of water for agricultural porpoises
El Chaparral Eurodepuración Cadiz 09/2002 11/2002 WWTP with extended aerationp p
WWTP and general collector El Mujal in Navàs
Agència Catalana de l'Aigua Barcelona 12/2002 03/2003 Decantation well and biological
WWTP San Miguel Grupo Mahou - San Miguel Burgos 02/2003 04/2003 Pumping station
Castellar de N'Hug Agència Catalana de l'Aigua Barcelona 09/2003 10/2004 WWTP with extended aeration
Improvement work at WWTP i Vill
Generalitat Valenciana Epsar Alicante 09/2003 07/2005 Aerated lagoonWWTP in Villena
p g
Artesa de Segre Agència Catalana de l'Aigua Lleida 11/2003 10/2004 WWTP with extended aeration
WWTP and collectors Junta de Andalucia -C j í d M di Mál 03/2004 03/2005 A i d l d
AlcaucínConsejería de Medio
AmbienteMálaga 03/2004 03/2005 Activated sludge
37
REFERENCESFinished projects
Project Contracted by Developed in Starting date Completion date Observations
WWTP and collector of la Agullana
Agència Catalana de l'Aigua Girona 05/2004 10/2004 Green filter
Glaxo Smith KlineBoudouaou
Glaxo Smith Kline Algeria 09/2004 01/2005 WWTP with extended aeration
Improvements in the WWTP of Igualada, Òdena, Santa
Agència Catalana de l'Aigua Barcelona 11/2004 12/2005 Construction of a new pre-treatmentMargarida de Montbui and Vilanova del Camí.
Agència Catalana de l Aigua Barcelona 11/2004 12/2005 Construction of a new pre-treatment
Opuntia Rafael Jubindo Sta. Cruz de Tenerife 04/2005 08/2005 WWTP with extended aeration
WWTP and collector of Els Limits
Agència Catalana de l'Aigua Girona 06/2005 01/2006 Activated sludge
Connection work at Cerdanya neighborhood to
the general collector of Agència Catalana de l'Aigua Barcelona 06/2006 06/2007 Collectors and pumping
gCastellar de N'Hug
WWTP and collector township high Ascó
Agència Catalana de l'Aigua Tarragona 04/2007 04/2008Activated sludge with elimination of
nutrients
WWTP and collectors of V ll lb S
Agència Catalana de l'Aigua Barcelona 08/2007 08/2008Activated sludge with elimination of
Villalba SaserraAgència Catalana de l Aigua Barcelona 08/2007 08/2008
nutrients
38
REFERENCESFinished projects
Project Contracted by Developed in Starting date Completion date Observations
Construction of a new pump station in the WWTP of
ÒIgualada, Òdena, Santa Margarita de Montbuiand Vilanova del Camí
Agència Catalana de l'Aigua Barcelona 10/2007 01/2008 Enlargement WWTP
Tertiary Treatment of the regeneration of the textil Agència Catalana de l'Aigua Barcelona 11/2007 03/2008
Filtration, ultrafiltration, reverse osmosis, regeneration of the textil
industry of FibracolorAgència Catalana de l Aigua Barcelona 11/2007 03/2008
de-carbonation
Llanos de Arinade Dbocan Sta. Cruz de Tenerife 02/2008 09/2008 WWTP with extended aeration
L J H l M l à S C d T f 02/2008 09/2008 WWTP h d d La Jaquita Hoteles Melià Sta. Cruz de Tenerife 02/2008 09/2008 WWTP with extended aeration
Urbanifisation Más Moregons Construcciones Caler Tarragona 04/2008 05/2008 WWTP with extended aeration
Rehabilitation of the WWTP Govern se les Illes Balears - Refurbishment of aeration system. New
Rehabilitation of the WWTP Es Mercadal
Agència Balear de l'Aigua i de la Qualitat Ambiental
Balearic Islands 04/2008 08/2008 pre-treatment. Installation of sludgedehydratation
WWTP at Sant Cornelli de Cercs core
Agència Catalana de l'Aigua Barcelona 04/2008 09/2008Activated Sludge with elimination of
nutrients
Emptied of Lagoon of UTE Fangs Abrera Barcelona 06/2008 12/2008 Remodelation of drain lagoon
p gdrainages in E.T.A.P. Abrera
UTE Fangs Abrera Barcelona 06/2008 12/2008 Remodelation of drain lagoon
39
REFERENCESFinished projects
Project Contracted by Developed in Starting date Completion date Observations
Palmeiro in Xove Xunta de Galicia Lugo 06/2008 06/2009 WWTP with extended aeration
Jina SC Prometal Romania 07/2008 06/2009 WWTP with extended aeration
Sura Mica SC Prometal Romania 07/2008 12/2009 WWTP with extended aeration
Installation of the reserve for the guarentee of the
suministration of regenerated water against the saline
intrusion to the aquifer of B Ll b
Agència Catalana de l'Aigua Barcelona 10/2008 06/2010Ultrafiltration, reverse osmosi, deep
inyection wells
Baix LlobregatCollector net to supply
purified water to the injection wells and
piezometres
Agència Catalana de l'Aigua Barcelona 10/2008 06/2010Collectors D.450 to supply the wells for
the hydraulic barrier
Citromil Citromil Murcia 02/2009 05/2009 Anaerobic Digestor
Rehabilitation of Lagoon UTE Potabilizadora Barcelona 03/2009 05/2009 Remodelation of drain lagoon
Camping Zmar Astramatic Portugal 04/2009 09/2009 WWTP with extended aeration
40
REFERENCESProject Contracted by Developed in Starting date Completion
date Observations
Finished projects
date
Can Ram Copisa Barcelona 05/2009 12/2009 WWTP with extended aeration
WWTP and collectors at high Sant Pere Sacarrera
Agència Catalana del Agua Barcelona 05/2009 01/2011Activated Sludge with elimination of
nutrientshigh Sant Pere Sacarrera nutrients
Renovation and extension of WWTP in Vacarisses
Agència Catalana del Agua Barcelona 11/2009 01/2011 Extension of WWTP by MBR System
Rosia SC Prometal Romania 11/2009 10/2012 WWTP with extended aeration
Sports center Bell-lloc Incasol Lleida 01/2012 12/2012 Sports center
Lyulyakovo Municipality of Ruen Bulgaria 06/2012 12/2012 WWTP with extended aeration
Taphco Ltd. Softal Algeria 10/2012 12/2012 Chemical line treatment
Installations Idiada Energy Enginyeria Tarragona 12/2012 01/2013 Deposit Wet Handling
Beclean (Cluj-Napoca) Aquabis Romania 06/2012 10/2013DWTP Potable Water Treatment, 90.000
inhabitants
Glaxosmithkline - LPALaboratoire Pharmaceutique
AlgerienAlgerie 09/2013 02/2014
Industrial Water treatment & Domestic Water Treatment
Feldru Aquabis Romania 10/2013 05/2015 WWTP with extended aeration
Krichim Krichim Municipality Bulgaria 01/2014 10/2014WWTP with extended aeration 41
REFERENCESCurrent projects
Project Contracted by Developed in Starting date Completion date Observations
Richis SC Prometal Romania 11/2009 -- WWTP with extended aeration
Biertan SC Prometal Romania 11/2009 -- WWTP with extended aeration
Arpas SC Prometal Romania 11/2009 -- WWTP with extended aeration
Byala Slatina Municipality of Byala Slatina Bulgaria 10/2013 -- WWTP with extended aeration
Radenvo Municipality of Radenvo Bulgaria 02/2014 -- WWTP with extended aeration
Vill d N t S ñ D WWTP ith t d d tiVillas de Nuestra Señora De la Asunción
GENERA Mexico 07/2015 --WWTP with extended aeration
Villas de Nuestra Señora De la Asunción
GENERA Mexico 10/2015 -- Water recycling installation (UF+RO) by aquifer deep injection. 50 lps
Villas de Nuestra Señora De la Asunción
GENERA Mexico 10/2015 --Control points and piezometers network
Chichimeco INAGUA Mexico 12/2015 --WWTP with extended aeration
42
REFERENCESMaintenance
Water treatment plant of: Client Final contractor Type of treatment Starting date Completion
date
Velilla UTE Sato Arema Junta de Castilla y León extended aeration 03/1988 03/1999
Esterri d’Aneu UTE Comapa – Arema Junta de Sanejamentextended Aeration and elimination of
nutritious and phosphorus03/1988 03/1999
Santa Maria de Palautordera
UTE Oshsa – Arema Junta de Sanejamentextended Aeration and elimination of
nutrients and phosphorus01/1999 06/2000
NegreiraConstrucciones Obras y
Viales, S.A.Xunta de Galicia extended aeration 05/1999 02/2000
Vidrà UTE Osona Agència Catalana de l'Aigua extended aeration 09/1999 10/2000
Folgueroles UTE Osona Agència Catalana de l'Aigua extended aeration 01/2000 12/2000
La Roda UTE La RodaJunta de Comunidades de
Castilla - La Manchaextended Aeration and elimination of
nutrients01/2000 12/2007
Piedras NegrasAguas Depuradas, S.A.
(Adesa)
Comisión Estatal de aguas y saneamiento – CEAS Coahuila - Mexico
extended Aeration and elimination of nutrients
01/2000 12/2019
Viladrau UTE Osona Agència Catalana de l'Aigua extended aeration 05/2000 05/2001Viladrau UTE Osona Agència Catalana de l Aigua extended aeration 05/2000 05/2001
43
REFERENCESMaintenance
Water treatment plant of: Client Final contractor Type of treatment Starting date Completion
date
Xunqueira ElsanXunta de Galicia
Cons. Medio Ambienteextended aeration 07/2000 07/2001
Linyola Agència Catalana de l'Aigua Agència Catalana de l'Aigua extended aeration 01/2001 01/2002
La Guixa UTE Osona Agència Catalana de l'Aigua extended aeration 02/2001 01/2002
Martorell Agència Catalana de l'Aigua Agència Catalana de l'Aiguaextended Aeration and elimination of
nutrients01/2002 12/2004
Deltebre Agència Catalana de l'Aigua Agència Catalana de l'Aiguaextended Aeration and elimination of
nutrients12/2002 04/2004
La UniónEntidad Regional de
Saneamiento y Depuración (Esamur)
Región de Murcia. Consejería de Medio
Ambiente
extended Aeration and elimination of nutrients
01/2003 05/2004
El Mojal Agència Catalana de l'Aigua Agència Catalana de l'AiguaPrimary tretament with clarifying well
and biological filter05/2003 05/2004
and biological filter
WWTP of: Méntrida, Torre de Esteban
Hambrán, Portillo de Toledo and Santa Cruz
d R
Junta de Comunidades de Castilla - La Mancha
Junta de Comunidades de Castilla - La Mancha
extended Aeration and elimination of nutrients
10/2003 03/2010
de Retamar
44
REFERENCESMaintenance
Water treatment plant of: Client Final contractor Type of treatment Starting date Completion
date
Agullana Agència Catalana de l'Aigua Agència Catalana de l'Aiguaextended Aeration and elimination of
nutrients12/2004 12/2006
Artesa de Segre Agència Catalana de l'Aigua Agència Catalana de l'Aiguaextended Aeration and elimination of
nutrients01/2005 12/2006
Castellar de N'Hug Agència Catalana de l'Aigua Agència Catalana de l'Aiguaextended Aeration and elimination of
nutrients05/2005 05/2006
Límits de La Jonquera Agència Catalana de l'Aigua Agència Catalana de l'Aiguaextended Aeration and elimination of
nutrients02/2007 02/2008
Terciary treatment toregenerate industrial water
at FibracolorAgència Catalana de l'Aigua Agència Catalana de l'Aigua
Filtration, ultrafiltration, reverse osmosis, de-carbonatatión
03/2008 06/2011at Fibracolor
Barrier against the sea water intrusion. First phase
water table of BaixLlobregat
Agència Catalana de l'Aigua Agència Catalana de l'AiguaUltrafiltration, reverse osmosi, deep
inyection wells08/2008 05/2010
Vilalba Sasserra Agència Catalana de l'Aigua Agència Catalana de l'Aiguaextended Aeration and elimination of
nutrients and phosphorus11/2008 11/2009
WWTP at Sant Corneli de Cercs core
Agència Catalana de l'Aigua Agència Catalana de l'Aiguaextended Aeration and elimination of
nutrients and phosphorus01/2012 12/2012
WWTP d ll t t t d d A ti d li i ti f WWTP and collectors at high Sant Pere Sacarrera
Agència Catalana de l'Aigua Agència Catalana de l'Aiguaextended Aeration and elimination of
nutrients and phosphorus03/2012 03/2013
4545
CONTACT Avda Meridiana 350, 14 B 08027 Barcelona, Spain
INFORMATIONd b h ffi
Tel: (+34) 93 418 47 88Fax: (+34) 93 417 01 87
[email protected]://www arema comand branch offices http://www.arema.com
W l t d i f ll i t iWe are also represented in following countries:
Algeria
Bulgaria
Colombia
México
RomaniaRomania