Corporate P resentation TSXV: MGR Building sustained corporate value through expertise in responsible mining. April 2019
Transcript
Page 1: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

Corporate Presentation

TSXV: MGRBuilding sustained corporate value through

expertise in responsible mining.April 2019

Page 2: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 2TSX-V: MGR

The information contained in this presentation is provided by Magna Gold Corp.

(“Magna” or the “Company”) for informational purposes only and does not constitute

an offer to issue or arrange to issue, or the solicitation of an offer to issue, securities of

Magna or other financial products. The information contained herein is not investment

or financial product advice and is not intended to be used as the basis for making an

investment decision. The views, opinions and advice provided in this presentation

reflect those of the individual presenters, and are provided for information purposes

only. The presentation has been prepared without taking into account the investment

objectives, financial situation or particular needs of any particular person. No

representation or warranty, express or implied, is made as to the fairness, accuracy,

completeness or correctness of the information, opinions and conclusions contained

in this presentation. To the maximum extent permitted by law, none of Magna nor its

directors, officers, employees or agents, nor any other person accepts any liability,

including, without limitation, any liability arising out of fault or negligence, for any loss

arising from the use of the information contained in this presentation.

Except for statements of historical fact, this presentation contains certain "forward-

looking information" within the meaning of applicable securities laws. Forward-looking

information is frequently characterized by words such as "plan", "expect", "project",

"intend", "believe", "anticipate", "estimate" and other similar words, or statements

that certain events or conditions "may" or "will" occur. Forward-looking statements

are based on the opinions and estimates of management at the date the statements

are made, and are subject to a variety of risks and uncertainties and other factors

that could cause actual events or results to differ materially from those anticipated in

the forward-looking statements, including, among others, the accuracy of mineral

grades and related assumptions, inherent operating risks, planned expenditures,

proposed exploration and development at the Mercedes Property, operating and

economic aspects of the Mercedes Property. Magna undertakes no obligation to

update forward-looking information if circumstances or management's estimates or

opinions should change except as required by law. The reader is cautioned not to

place undue reliance on forward-looking statements.

This presentation does not constitute an offer to sell or the solicitation of an offer to

buy shares in the United States, or in any other jurisdiction in which such an offer

would be illegal. Magna shares may not be offered or sold in the United States absent

registration under the United States Securities Act of 1933, as amended or an

available exemption under such Act. This presentation includes disclosure of scientific

and technical information, as well as information in relation to the calculation of

resources, with respect to the Mercedes Property. Magna’s disclosure of mineral

resource information is governed by National Instrument 43-101 – Standards of

Disclosure for Mineral Projects (“NI 43-101”) under the guidelines set out in the

Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) Standards on

Mineral Resources and Mineral Reserves, adopted by the CIM Council, as may be

amended from time to time by the CIM (“CIM Standards”). There can be no

assurance that mineral resources will ultimately be converted into mineral reserves.

Mineral resources are not mineral reserves and do not have demonstrated economic

viability.

This presentation may include the terms “indicated” and “inferred” resources. U.S.

persons are advised that while such terms are recognized and required by Canadian

regulations, the U.S. Securities and Exchange Commission does not recognize them.

“Inferred Resources” have a great amount of uncertainty as to their existence and as

to their economic and legal feasibility. It cannot be assumed that all or any part of an

inferred resources will ever be upgraded to a higher category. Under Canadian rules,

estimates of inferred resources may not form the basis of feasibility or other

economic studies. U.S. persons are cautioned not to assume that all or any part

indicated resources will ever be converted into reserves. U.S. persons are also

cautioned not to assume that all or any part of an inferred mineral resource exists, or

is economically or legally mineable.

Forward Looking Statement

Page 3: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 3

➢Magna Gold Corp is a mineral exploration company focused on acquiring,

exploring and developing quality properties in Mexico with potential for the

discovery of significant gold – silver deposits.

➢ Our primary strength is in our team of highly experienced mining

professionals. We have a proven track record of developing properties in

Mexico from discovery to production on budget and on time.

➢ Our growth strategy is to acquire early or advanced stage mineral deposits

through our extensive network of contacts and consolidate these properties

enhancing shareholder value.

➢ Magna will initiate low capex, low cost operations early in the life of the

project to internally fund the advancement of the resources in the acquired

districts while minimizing shareholder dilution.

About Us

Page 4: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 4

Capital Structure

Capital Structure

Shares Outstanding 35,413,184

Warrants Nil

Options (avg. price $0.10) 200,000

Fully Diluted Shares 35,613,184

Magna Gold Corp

Listing / Symbol TSXV : MGR

52 Week Hi-Lo $0.45/$0.20

Current Price $0.40

Cash Position(1) $4,174,269

Notable and Major Shareholders

Institutional - US Global Investors- Delbrooke Capital- Eric Sprott- Medalist Capital

45.38%

Retail 35.81%

Management/Board 18.81%

(1) Cash as at April 30, 2019

45.38%

35.81%

18.81%

Magna Capital Structure

(by Common Share held)

Institutional Retail Management/Board

Page 5: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 5

Francisco Arturo Bonillas Zepeda

Chief Executive Officer, Secretary and Director

Mr. Bonillas is a Mexican citizen and has over 39 years of experience in the Mexican

mining and exploration industry. He is the former President and co-founder of Alio

Gold Inc., formerly Timmins Gold Corp. (“Alio”). During his 10-year tenure with

Timmins, he oversaw its transition from exploration and development to mid-tier

gold producer, and guided it to several years of positive reserve and resource

growth, throughput and production. He is currently Director of Telson Mining

Corporation (formerly Telson Resources Inc.) whose securities trade on the TSXV.

Alex Tsakumis

Director

Over 25 years of investment experience with private and public companies.

Served as VP of Corporate Development at Timmins Gold Corp for nine years,

where he played a pivotal role in the development of the corporation from a

junior exploration to a production company. Wide experience in capital

formation and management and growth of listed companies.

Miguel Ángel Soto y Bedolla

Vice President of Exploration

Mr. Soto is a Mexican citizen and has over 40 years of experience in the Mexican

mining and exploration industry, including over 25 years as senior executive of

several exploration companies; he is widely recognized as one of the top mining

professionals in Mexico. He was a co-founder of Timmins Gold Corp, where he

was responsible for a four-fold increase of the San Francisco’s gold resource

from 611 Koz to 2.4 Moz. Mr. Soto is an active member of the US Society of

Economic Geologists. In 2018 he was awarded the prestigious Ostotakani award

given to distinguished leaders in the Mexican mining industry.

Colin Sutherland

Director

Mr. Sutherland has been a Chartered Professional Accountant since 1997. He

was previously the President of McEwen Mining Inc., a mining company listed

on the TSX and the New York Stock Exchange, from January 2016 to

November 2016, and the Managing Director and Chief Executive Officer of

Archipelago Resources Plc, a company listed on the Australian Securities

Exchange, from March 2012 to December 2015. He has held senior financial

and executive roles with Timmins Gold Corp., Capital Gold Corporation,

Nayarit Gold Inc. and Aurico Gold Inc.

Management and Board of Directors

Page 6: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 6

Mercedes Project

Agnico Eagle

Alamos Gold

Agnico Eagle

Frisco Group

Hochschild

Minera Alamos

Page 7: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 7

Previous exploration work includes two

phases of drilling:

❑ In 1996 Compañia Minera Fernanda

S.A. de C.V. completed 15 Reverse

Circulation holes for a total

1,018m, all within La Lamosa

target.

❑ In 2008 Norma Mines S.A. de C.V.

completed 10 core drill holes in the

property for a total of 1,113m. Of

those, 6 holes totaling 760.5m were

done within La Lamosa target.

Both drill programs confirmed good gold

intersections associated to broad high

sulphidation epithermal type extense

alteration within volcanic rocks.

History of the Mercedes Property

NI 43-101 Technical Report dated August 12, 2018

Page 8: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 8

Location and Infrastructure

➢ Infrastructure and support services are available

to the project as Federal Highway 16 passes

through the western portion of the claims.

➢ Electricity, mail/phone services available in Yécora.

➢ Electrical line (C.F.E) passes through the property

as it parallels Highway 16.

➢ Water available in the region but not within the

surface claim area.

➢ Accommodation available at Yécora and in the

nearby village of Santa Ana.

➢ 43 km from Alamos Gold’s Mulatos Gold Mine (3

Moz Au) and 40 km from Agnico Eagle’s La India

Gold Mine (1 Moz Au). Adjacent to Minera Alamos’

Santana and Santa Rosa projects.

NI 43-101 Technical Report dated August 12, 2018

Page 9: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 9

Regional and Local Geology❑ Mercedes project shows high

sulphidation epithermal minerali-

zation typical of important

discoveries in the region.

❑ Located toward the western edge of the

Sierra Madre and predominantly

underlain by intrusive rocks,

granodiorite-monzonite plutonic rocks

and quartz feldspar porphyry dykes

and stocks exposed by erosion of

intermediate and felsic volcanic

packages of the Lower and Upper

Volcanic sequences.

❑ The thick volcanic sequences are

characteristic of the region and form

much of the Sierra Madre Occidental.

Outcrop in key areas of the property

are strongly altered, brecciated

intrusives and some propylitically

altered volcanics.

❑ Zoned assemblages of silica, phyllic,

argillic and distal propylitic alteration

are recognized (same geology as

Mulatos and La India mines).

Page 10: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 10

Magna controls a total of 1,239 hectares in

the Mercedes Project.

➢ Acquired 646 hectares for a total price of

$250,000.

➢ Staked 248 hectares directly.

➢ Signed an exploration and option to purchase

agreement for 345 hectares under the following

deal terms:

❑ Four-year contract ending September 20,

2022.

❑ Total cash payments of US $1.5 M

distributed in 4 years, half of total payable

on month 48.

❑ 3% NSR capped at US $3.5 M. Magna Gold

maintains the right to buy back all of the

NSR at a total price of US $1.5 M within the

first 3 years after commencement of

commercial production.

Land Position

Total Land Position:

1,239 Ha

Page 11: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 11

Mineral Targets

❑ Project is situated on a 20 km long regional

mineralized trend hosting some important

exploration targets as well as numerous old

relevant mining works.

❑ The current and only drilled zone in Las Mercedes

Project is the “La Lamosa Hill”, a prominent,

highly oxidized red ridge, visible from the

highway. There are 4 visible additional targets

similar in size and alteration within the claims.

❑ There are two known old mining works within the

claims: Mina del Oro and Las Marias.

❑ These Gold and Silver targets all show textures

and alteration consistent with high sulphidation

epithermal mineralization. Zoned assemblages of

silica, phyllic, argillic and distal propylitic

alteration are recognized.

3.1 g/t Au3.4 g/t Au

4.8 g/t Au5.6 g/t Au

0.40 g/t Au

0.7 g/t Au

Lamosa Hill – open pit targetHistorical Drilling

2,131 m, 25 holes, mostmineralized from surface

Mina del Oro(old Works)

Las Marias mine(old Works)

NOTE:Nochebuenas, Las Marias and Mina del Oro targets are mineralizedzones identified by SGM (Mexican Geological Survey)

0.53 g/t Au 0.47 g/t Au

Page 12: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 12

Historical

Drilling Map

La Lamosa

Target

Page 13: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 13

Cross

Section

NE 025

La Lamosa

Target

Page 14: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 14

Cross

Section

NE 150

La Lamosa

Target

Page 15: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 15

Cross

Section

NE 175

La Lamosa

Target

Page 16: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 16

RC Hole No. DipFrom(m)

To(m)

Width(m)

Aug/t

Agg/t

YRC-1-1 0.00 30.00 30.00 0.620 4.0

Include 17.00 28.00 11.00 0.980 4.2

YRC-1-2 21.00 32.00 11.00 0.720 1.6

YRC-2 0.00 9.00 9.00 0.650 26.9

and 54.00 64.00 10.00 0.900 3.6

YRC-3 22.00 68.00 46.00 0.600 33.1

Include 22.00 37.00 15.00 0.490 12.7

YRC-4 0.00 60.00 60.00 0.520 22.2

Or 0.00 20.00 20.00 0.890 16.7

Or 0.00 40.00 40.00 0.660 19.8

YRC-5 19.00 25.00 6.00 0.640 8.0

YRC-6 2.00 32.00 30.00 2.390 7.2

Include 9.00 22.00 13.00 4.260 7.5

Include 17.00 22.00 5.00 8.510 15.4

YRC-7 0.00 48.00 48.00 1.440 36.3

Include 0.00 35.00 35.00 1.840 48.1

Include 0.00 27.00 27.00 2.000 57.1

YRC-8 0.00 19.00 19.00 0.310 16.8

YRC-9 28.00 38.00 10.00 1.320 94.6

YRC-10 0.00 59.00 59.00 0.640 28.9

Include 49.00 59.00 10.00 1.030 24.6

YRC-11 0.00 38.00 38.00 2.420 37.3

Include 11.00 32.00 21.00 3.520 55.0

Include 26.00 28.00 2.00 17.770 297.8

YRC-12 0.00 18.00 18.00 0.440 10.5

YRC-13 0.00 54.00 54.00 1.200 39.9

Include 7.00 24.00 17.00 3.370 136.1

Include 10.00 15.00 5.00 6.180 281.0

YRC-14 0.00 86.00 86.00 0.650 136.1

Include 28.00 33.00 5.00 3.250 109.1

Drill Holes

Mineral

Intersections,

Historical

Drilling

Summary of 1996

RC drilling

program

Page 17: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 17

Drill Holes

Mineral

Intersections,

Historical

Drilling

Summary of 2008

DD drilling

program

Core Hole No. DipLenght

(m)From(m)

To(m)

Width(m)

Aug/t

Agg/t

MER08-01 -70° 165.0 0.00 144.00 144.00 0.484 12.61

Include 0.00 17.00 17.00 0.943 3.02

Include 17.00 32.00 15.00 1.050 13.60

Include 51.00 80.00 29.00 0.888 8.28

Include 59.00 64.00 5.00 1.476 1.40

Include 85.00 87.00 2.00 0.533 19.60

Include 136.00 137.00 1.00 0.990 2.40

MER08-2 -60° 133.5 0.00 113.00 113.00 0.370 10.70

Include 25.00 30.00 5.00 1.063 18.52

Include 26.00 27.00 1.00 3.320 15.00

Include 43.50 56.00 12.50 0.511 30.02

64.00 68.00 4.00 0.400 4.70

72.00 77.00 5.00 0.592 20.30

84.00 89.00 5.00 0.416 5.73

Include 106.00 113.00 7.00 0.839 9.65

MER08-03 -60° 137.0 0.00 57.00 57.00 1.135 13.7

Include 11.00 24.00 13.00 1.319 21.74

Include 11.00 12.00 1.00 1.910 223.51

Include 33.00 57.00 24.00 1.770 16.93

Include 34.00 36.00 2.00 11.845 48.18

Include 38.00 39.00 1.00 1.700 147.87

Include 38.00 43.00 5.00 1.618 4.28

Include 54.00 57.00 3.00 1.677 10.23

MER08-04 -65° 153.0 60.00 61.05 1.50 0.050 121.5

MER08-05 -65° 83.0 25.5 28.5 3.00 0.005 84.7

Page 18: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 18

Rock Chip

Sampling on

Surface

> >

< <

Page 19: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 19

Sample#ID

Samplenumber

Length(m)

Au Ag Cu Pb

ppm ppm ppm ppm

1 135753 1.0 5.560 89.0 18 3,700

2 135726 1.2 0.836 5.0 36 71

3 135727 1.5 0.866 23.0 38 101

4 135728 1.5 1.165 36.0 20 95

5 135729 2.0 2.650 114.0 36 278

6 135730 1.9 1.755 13.0 14 41

7 135732 1.2 1.185 13.0 13 91

8 135733 0.9 0.881 8.0 9 90

9 135734 1.3 1.315 3.0 8 172

10 135735 1.2 0.899 2.0 9 100

11 135736 2.0 0.511 2.0 23 97

12 135737 1.6 1.000 3.0 16 266

13 135742 1.2 3.770 1.0 7 1,210

14 135743 1.5 0.506 4.0 8 607

15 135744 1.2 0.517 6.0 21 710

16 135745 1.5 1.675 5.0 16 261

17 135747 2.0 1.210 5.0 18 467

18 135749 1.2 0.578 3.0 12 611

19 135750 1.4 0.622 4.0 15 299

20 135754 2.0 1.260 23.0 22 329

21 135759 1.5 0.533 2.0 17 95

22 135760 1.5 1.280 1.0 24 103

23 135761 1.5 0.712 0.5 31 119

24 135764 1.5 0.801 3.0 13 342

25 135768 1.5 1.475 4.0 281 476

26 135771 2.0 1.140 17.0 126 541

Average: 1.5 1.33 15.0 33 434

SampleNo.

Length(m)

Au ppb

Ag ppm

Cu ppm

Pb ppm

986063 1.0 821 40.8 21.1 619.7

986064 2.0 185 100.0 >10,000 28.7

986065 5.0 179 1.0 118.5 140.0

986066 10.0 648 2.3 83.2 158.0

986067 8.0 1,375 5.9 23.4 493.0

986068 8.0 475 5.6 8.1 298.6

986069 10.0 561 17.5 18.8 416.2

986070 6.0 1,634 14.6 14.1 786.1

986071 6.0 549 8.8 12.4 603.9

986072 1.2 2,072 57.7 45.8 6,921.9

986073 3.0 94 3.7 61.1 513.5

986074 0.7 195 8.2 85.0 >10,000

986075 2.0 136 4.0 22.7 395.5

986076 1.0 51 0.5 14.0 824.5

986077 1.0 12 0.2 35.4 38.6

986078 1.0 44 0.7 22.2 2,193.1

Average: 4.1 564 17.0 39.1 962.1

NOTE:▪ Left Table: Surface rock chip sampling by Agnico

Eagle assayed by ALS Minerals (dated report in April11, 2017).

▪ Right Table: Surface rock chip sampling by DaleBrittliffe assayed by ACME Labs.

Surface Rock Chip Sampling in 2017 and 2018

Page 20: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 20

Exploration Budget for the Mercedes Property(Mapping, Prospecting and Core Drilling Program)

Weeks 4 8 12 16 20

Concept Qty Item Unit Cost$ US

WorkDays/Hours

Month 1 Month 2 Month 3 Month 4 Month 5 TOTAL

Geologist Sr. Project Mgr Day

Resource Geologist ** 1 Day 500 15 5,000 2,500 7,500

Senior Geologist 1 Day 300 22 6,600 9,000 6,600 9,000 6,600 37,800

Project Geologist 1 Day 200 22 4,400 6,000 4,400 6,000 4,400 25,200

Geologist Junior 1 Day 120 22 2,640 3,600 2,640 3,600 2,640 15,120

Technician (Field Supervision) 1 Day 50 30 1,500 1,500 1,500 1,500 1,500 7,500

Labor 6 Persons 30 30 5,400 5,400 5,400 5,400 5,400 27,000

Drafting ArcGIS-ACAD * 1 Persons 80 30 2,400 2,400 2,400 2,400 2,400 12,000

Access and Drill Site Prep (Dozer) 1 Hour 75 200 7,500 7,500 15,000

Assaying (rock chip samples) 200 Sample 38 3,750 3,750 7,500

Reverse Circulation Drilling 2,000 meters 60 60,000 60,000 120,000

Assaying Reverse Circulation Samples 1,400 Samples 38 26,600 26,600 53,200

Core Drilling 750 meters 120 90,000 90,000

Assaying Core drilling 750 Samples 38 28,500 28,500

Camp (foods, & Accomodation) 1 $/month 1,500 1 1,500 1,500 1,500 1,500 1,500 7,500

Vehicles-Truck rental 2 $/day 90 22 3,960 5,400 3,960 5,400 3,960 22,680

Gasoline Lump $/day 35 22 1,540 2,100 1,540 2,100 1,540 8,820

Geochemical Stds, Blanks 200 Samples 20 4,000 4,000

Consumables (bags, markers, etc.) 1 Lump 1,000 1 1,000 1,000 2,000

Saw core, blades, tags, etc. 1 Lump 7,500 6,000 1,500 7,500

Acquisition GVMapper 1 Software 15,000 15,000

Acquisition tablets for logging and mapping 2 Pieces 1,500 3,000 3,000

Office Compilation/QA & QC Database 1 Day 300 10 3,000 3,000 6,000

Consumables (bags, markers, etc.) 1 Lump 1,000 1 1,000 1,000 2,000

Saw core, blades, tags, etc. 1 Lump 7,500 6,000 1,500 7,500

Grand US$ 522,820

Total CA$ 697,093

Page 21: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 21

Exploration Program for the Mercedes Property

ITEM Time

(week)

Month 1 Month 2 Month 3 Month 4 Month 5 Month 6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

IP, Permits, Surface Contracts, Water, etc. 2

Meetings for analysis of advances 1

Topography Survey, update of Datum 4

Geology and sampling on La Lamosa Hill 4

Prospecting other targets within the property 5

Accesing the property, preparing drill sites 3

Reverse Circulation Drilling 4

Reception of assays 4

Process of information, geology, assays, etc. 5

Core Drilling 5

Database and QA & QC Full-time

Data Interpretation Full-time

Technical Report 3

Environmental remediation Full-time

Page 22: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 22

Photo Gallery

Page 23: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 23

View From Lamosa Hill to Hermosillo – Yecora Highway

Page 24: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 24

Plate 3: Oxidized targets southwest of Lamosa Hill Plate 4: View from Lamosa Hill looking to Northeast

showing additional targets

Aerial View of Targets

Page 25: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 25

Rock Chip Sampling Across Main Mineralized Zone at Lamosa Hill

Page 26: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 26

Historical Drilling Access Road at the North Side of Lamosa Hill

Page 27: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 27

Plate 7: Silicified intrusive breccia. White clays andjarosite are visible in the lower half of the photo.

Plate 8: Hand sample – silicified intrusive breccia Plate 9: outcropping on southern face of hillside

showing vuggy silica

Plate 10: Drilhole at the Lamosa Hill Plate 11: Detail of outcrop along Lamosa Hill Plate 12: View of the exposures along of the South

side of La Lamosa Hill

Page 28: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 28

Plate 13: Vertical BX structure potential feeder Plate 15: volcanic rocks outcrop argillized and silicified zones

Plate 14: detailed view of andesite rock with silica - clay alteration

Page 29: Presentación de PowerPoint - Magna€¦ · 43 km from Alamos Gold’sMulatos Gold Mine (3 Moz Au) and 40 km from Agnico Eagle’sLa India Gold Mine (1 Moz Au). Adjacent to Minera

TSX-V: MGR MAGNA GOLD CORPORATE PRESENTATION | APRIL 2019 29

Thank you

Arturo BonillasPresident and CEO

390 Bay Street St 806

Toronto, Ontario, Canada

M5H 2Y2

Telephone: +52 (662) 310 0326

Mobile: +52 1 (662) 257 1902

[email protected]

magnagoldcorp.com

For More Information Contact:

Blvd. Paseo de las Quintas 123, Local 101

Hermosillo, Sonora, México

CP 83247


Recommended