+ All Categories
Home > Documents > Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley,...

Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley,...

Date post: 27-Sep-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
82
Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil Site Design Group November 18, 2014
Transcript
Page 1: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Kaatz, Binkley, Jones & Morris Architects, Inc.Oliver, Little, Gipson Engineering, Inc.

Civil Site Design Group

November 18, 2014

Page 2: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Sumner County SchoolsProposed Building ProgramPresentation – November 18, 2014

Page 3: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Critical IssuesGrowth  

Portable Classrooms 60 Portable Classrooms in Use

Aging InfrastructureHVAC ReplacementRoof ReplacementDoor and Window ReplacementSite Drainage Issues

27177

27588

27835

28115

28508

28705

27000

27200

27400

27600

27800

28000

28200

28400

28600

28800

2009‐2010 2010‐2011 2011‐2012 2012‐2013 2013‐2014 2014‐2015

Total Enrollment 2009‐2015

Page 4: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

2012 Project List - StatusThe projects listed below were proposed or underway in April 2012:

Complete Addition to Station Camp High SchoolComplete Reroof Rucker Stewart MiddleComplete Reroof Ellis Middle In Construction Addition and HVAC renovation to Hendersonville HSIn Construction  Addition to Gallatin High School In Construction  Dr. William Burrus Elementary School at Drakes Creek

Still Proposed Renovation to Beech High SchoolStill Proposed Renovation to White House High SchoolStill Proposed Addition to Clyde Riggs ElementaryStill Proposed Addition to Guild ElementaryStill Proposed Addition to Hawkins Middle

Page 5: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Current ProjectsClassroom/Secure Entrance Addition and HVAC Renovation to Hendersonville HS:

The total project is approximately 65% complete and on schedule.

Page 6: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Current ProjectsClassroom Addition to Gallatin High School:

The new secure vestibule is complete in the existing building.The total project is approximately 50% complete and on schedule.

Page 7: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Current ProjectsNew Dr. William Burrus Elementary School at Drakes Creek

Site work is nearly complete with footings and floor slab underway.The total project is approximately 20% complete and on schedule.

Page 8: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Proposed Building Program

Renovations and Additions:Beech High SchoolWhite House High SchoolClyde‐Riggs ElementaryGuild ElementaryHawkins MiddleJack Anderson ElementaryStation Camp MiddleNannie Berry ElementaryWatt Hardison ElementaryWalton Ferry ElementaryGeorge Whitten ElementaryGene Brown ElementaryVena Stuart Elementary

Page 9: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Proposed Building Program

HVAC Upgrades:Rucker Stewart Middle SchoolEllis Middle SchoolMadison Creek ElementaryBeech Elementary

Reroofing:Gallatin High SchoolIndian Lake ElementaryHoward Elementary

Door and Window Upgrades:Madison Creek ElementaryHB Williams ElementaryShafer Middle SchoolWhite House Middle SchoolBenny Bills ElementaryWestmoreland High SchoolWestmoreland Middle School

Page 10: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Beech High SchoolGeneral Info:Enrollment: 1,285Core Capacity: 1,600Portables:0Original Construction: 1979

Sprinkled: PartialExisting area: 184,200/67,508 sfNew area: 2,000 sf

Page 11: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Beech High SchoolProposed Scope:New architectural entrance for main building with secured accessNew secure entrance to annex with secure and accessible walkway to main buildingNew roof for main buildingRenovate restroomsNew science lab caseworkNew floor/baseNew ceiling and lightsNew paintNew elevator in main buildingRenovate auditorium (lights, seats, finishes, stage floor, curtains)Replace exterior doors in main building and annexReplace existing water source heat pumpsElectrical upgrades

Page 12: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Beech High School

Secure, accessible pedestrian bridge between Beech HS and Annex Building

Proposed new secure entrance to Beech HS

Page 13: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Beech High School

Schematic Floor Plan

Page 14: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Beech High School

Enlarged floor plan of new secure entrance and administrative suite

Page 15: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Beech High School

Schematic Site Plan showing secure entrances and accessible walkways

Page 16: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Beech High SchoolPreliminary Budget:Architectural Renovation:New Construction/Renovation:HVAC and Electrical:Site Development:Pedestrian Bridge:New Roof:Contingency:Preliminary Construction Budget:

Site Survey:Geotechnical:FM Review:KBJM Architects:OLG Engineers:Civil Site:Preliminary Soft Costs:

Total Preliminary Project Budget:

$7,372,000$540,000

$1,400,000$550,000$500,000

$1,500,000$300,000

$12,162,000

$5,000$5,000

$20,000$442,100$140,000$26,000

$638,100

$12,800,100

Page 17: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

White House High SchoolGeneral Info:Enrollment: 893Core Capacity: 1,100Portables:0Original Construction: 1975

Sprinkled: PartialExisting area: 124,015/90,171 sfNew area: N/A

Page 18: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

White House High SchoolScope:Replace ice‐build HVAC systemReplace gym bleachersReplace doors and hardwareNew science lab caseworkAdditional security cameras (interior/exterior)New flooring and baseNew ceiling and lightsNew paintRenovate restroomsAddress sewer smell in Locker RoomElectrical upgradesHVAC Controls

Page 19: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

White House High School

Schematic Floor Plan

Page 20: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

White House High SchoolPreliminary Budget:Architectural Renovation: $4,960,000Systems Renovation: $2,000,000Contingency: $   200,000Preliminary Construction Budget: $7,160,000

FM Review: $     20,000KBJM Architects: $   188,000OLG Engineers: $   150,000Civil Site Design Group: $     20,000   Preliminary Soft Costs: $   378,000

Total Preliminary Project Budget: $7,538,000

Page 21: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Clyde Riggs Elementary SchoolGeneral Info:Enrollment: 236Core Capacity: 480Classroom Capacity: 390

Portables: 3  After school (YMCA)SpeechHeadstart Storage

Original Construction: 1952Sprinkled: NoExisting area: 41,235 sfNew area: 2,500sf

Page 22: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Clyde Riggs Elementary SchoolScope:New LibraryRenovate old library for classroom, speech and expanded admin.Renovate Cafeteria (moisture issue; floor cracks)Add casework storage to each classroomReplace tile floorsClean/repair terazzo floors in restroomsPaintRenovate restroomsReplace lightingEnclose walkway between main building and playroomAbate asbestos (separate project)Replace translucent window unitsAdd/rework parkingNew chair lift at stairRenovate main electrical room/book storageUpgrade electrical service if neededCovered walk from back hallway to playroom and headstart buildingReplace remaining classroom HVAC/BardHVAC Controls

Page 23: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Clyde Riggs Elementary School

Schematic Floor Plan

Page 24: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Clyde Riggs Elementary School

Schematic Site Plan

Page 25: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Clyde Riggs Elementary SchoolPreliminary Budget:

New Construction: $   450,000Architectural Renovation: $1,650,000Systems Renovation: $   380,000Site Development: $   380,000Contingency: $     60,000Preliminary Construction Budget: $2,920,000

Site Survey: $        5,000Geotechnical: $        5,000FM Review: $        5,000KBJM Architects: $      90,000OLG Engineers: $      35,000Civil Site: $      21,000Preliminary Soft Costs: $    161,000

Total Preliminary Project Budget: $3,081,000

Page 26: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Guild Elementary SchoolGeneral Info:Enrollment: 670Core Capacity: 520Classroom Capacity: 540

Portables: 9  2nd Grade3rd GradeSp. Ed.Sp. Ed.ELL4th GradeTitle 1ArtMusic

Original Construction: 1955Sprinkled: NoExisting area: 65,330 sfNew area: 20,400sfProposed Core: 840Proposed Classroom Capacity:780 

Page 27: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Guild Elementary School

Scope:12 classrooms; restrooms; storageStanding seam metal roof to match existingExpand kitchen/cafeteriaNew loop drive and site circulationNew sidewalks and canopy from back of expanded cafeteriaNew sports floor for existing playroomElectrical service relocation

Page 28: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Guild Elementary School

Schematic Floor Plan

Page 29: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Guild Elementary School

Schematic Site Plan showing additions, new site circulation and loop drive

Page 30: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Guild Elementary SchoolBudget:

New Construction:Kitchen Equipment:Renovation:Site Development:Contingency:Preliminary Construction Budget:

Site Survey:Geotechnical:FM Review:KBJM Architects:OLG Engineers:Civil Site:Furniture:Technology:Preliminary Soft Costs:

Total Preliminary Project Budget:

$2,750,000$   500,000$   250,000$1,400,000$   150,000$5,050,000

$       5,000$       5,000$       7,500$   172,500$     45,000$     35,000$     93,000$     84,000$   447,000

$5,497,000

Page 31: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Hawkins Middle SchoolGeneral Info:Enrollment: 492Core Capacity: 500Classroom Capacity: 500

Portables: 4  ChorusGiftedEnglishSocial Studies

Original Construction: 1988Sprinkled: YesExisting area: 72,210 sfNew area: 11,000sfProposed Core: 800Proposed Classroom Capacity: 650 

Page 32: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Hawkins Middle SchoolScope:4 new classrooms; restrooms; storage2 new science labsExpanded kitchenNew sidewalks and canopy from back of new classroomsAdditional parking (see site plan)HVAC Controls, Replace zone controlsRemaining HVAC to be replaced

Page 33: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Hawkins Middle School

Schematic Floor Plan

Page 34: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Hawkins Middle School

Schematic Site Plan showing addition, canopies and new parking

Page 35: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Hawkins Middle SchoolBudget:

New Construction:Kitchen Equipment:Renovation:Site Development:Contingency:Preliminary Construction Budget:

Site Survey:Geotechnical:FM Review:KBJM Architects:OLG Engineers:Civil Site:Furniture:Technology:Preliminary Soft Costs:

Total Preliminary Project Budget:

$1,480,000$   500,000$   450,000$   870,000$   100,000$3,400,000

$       5,000$       5,000$       4,500$     86,000$     45,000$     39,000$     46,500$     42,000$   273,000

$3,673,000

Page 36: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Jack Anderson ElementaryGeneral Info:Enrollment: 710Core Capacity: 875Classroom Capacity: 685

Portables: 1 PTO Office

Original Construction: 1999Sprinkled: YesExisting area: 71,770 sfNew area: 6,500sfProposed Core: UnchangedProposed Classroom Capacity: 865 

Page 37: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Jack Anderson ElementaryScope:6 new classrooms with standing seam metal roof to match existingUpgrade exterior HM doors/frames to aluminumRework site circulation for better traffic flowNew Heat Exchanger/Fluid CoolerReplace boiler

Page 38: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Jack Anderson Elementary

Page 39: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Jack Anderson Elementary

Schematic Site Plan showing addition, expanded canopy and new site circulation

Page 40: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Jack Anderson ElementaryBudget:

New Construction:Renovation:Site Development:Contingency:Preliminary Construction Budget:

Site Survey:Geotechnical:FM Review:KBJM Architects:OLG Engineers:Civil Site:Furniture:Technology:Preliminary Soft Costs:

Total Preliminary Project Budget:

$   875,000$   475,000$   600,000$     50,000$2,000,000

$       5,000$       5,000$       3,500$     43,000$     35,000$     22,000$     46,000$     42,000$   201,500

$2,201,500

Page 41: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Station Camp MiddleGeneral Info:Enrollment: 759Core Capacity: 840Classroom Capacity: 645

Portables: 3  MathSocial StudiesSpeech/Language

Original Construction: 2003Sprinkled: PartialExisting area: 103,780 sfNew area: 24,000sfProposed Core: 1,000Proposed Classroom Capacity: 945 

Page 42: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Station Camp MiddleScope:12 new classrooms; restrooms; storage; Asst. Prin. officeStanding seam metal roof to match existingNew Kitchen; expanded cafeteria and grease interceptorRework drives and parking (see site plan)Replace exterior doors (not classroom doors)Grade play area between middle and elementary schoolsAdd small covered pavilion for play areaRework/expand existing geothermal fields

Page 43: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Station Camp Middle

Schematic Floor Plan

Page 44: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Station Camp Middle

Schematic Site Plan showing addition, new parking, drives and play area

Page 45: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Station Camp MiddleBudget:

New Construction:Kitchen Equipment:Renovation:Site Development:Contingency:Preliminary Construction Budget:

Site Survey:Geotechnical:FM Review:KBJM Architects:OLG Engineers:Civil Site:Furniture:Technology:Preliminary Soft Costs:

Total Preliminary Project Budget:

$3,645,000$   500,000$     20,000$1,200,000$   235,000$5,600,000

$       5,000$       5,000$       9,000$   196,000$     45,000$     38,000$     93,000$     84,000$   475,000

$6,075,000

Page 46: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Nannie Berry ElementaryGeneral Info:Enrollment: 614Core Capacity: 750Classroom Capacity: 540

Portables: 2GuidanceMusic

Original Construction: 1963Sprinkled: NoExisting area: 73,098 sfNew area: 8,000sfProposed Core: UnchangedProposed Classroom Capacity: 750 

Page 47: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Nannie Berry ElementaryScope:6 classrooms; restrooms; storage with standing seam metal roof to match existingNew HVAC Controls

Page 48: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Nannie Berry Elementary

Schematic Floor Plan

Page 49: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Nannie Berry Elementary

Schematic Site Plan showing new addition

Page 50: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Nannie Berry ElementaryBudget:

New Construction:Renovation:Site Development:Contingency:Preliminary Construction Budget:

Site Survey:Geotechnical:FM Review:KBJM Architects:OLG Engineers:Civil Site:Furniture:Technology:Preliminary Soft Costs:

Total Preliminary Project Budget:

$1,080,000$   100,000$   400,000$     50,000$1,630,000

$       5,000$       5,000$       3,000$     33,500$     20,000$     28,000$     46,500$     42,000$   183,000

$1,813,000

Page 51: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Watt Hardison ElementaryGeneral Info:Enrollment: 492Core Capacity: 560Classroom Capacity: 435

Portables: 4 5th GradeDaycareMusicSpecial Ed.

Original Construction: 1955Sprinkled: NoExisting area: 47,842 sfNew area: 6,500sfProposed Core: UnchangedProposed Classroom Capacity: 555 

Page 52: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Watt Hardison ElementaryScope:6 new classrooms with standing seam metal roof to match existingNew parking in back; rework parking in frontAdd hot water to Gymnasium/CDCReplace floor drains in KitchenAddress existing site drainage issuesRADON vent‐Match existing systemHVAC controlsNew Heat Exchanger/Fluid CoolerElectrical upgradesBoiler Replacement

Page 53: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Watt Hardison Elementary

Schematic Floor Plan

Page 54: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Watt Hardison Elementary

Schematic Site Plan showing addition and new parking/drives.

Page 55: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Watt Hardison ElementaryBudget:

New Construction:Renovation:Site Development:Contingency:Preliminary Construction Budget:

Site Survey:Geotechnical:FM Review:KBJM Architects:OLG Engineers:Civil Site:Furniture:Technology:Preliminary Soft Costs:

Total Preliminary Project Budget:

$   877,500$   585,000$   650,000$     62,500$2,175,000

$       5,000$       5,000$       3,500$     30,000$     40,000$     39,000$     46,500$     42,000$   211,000

$2,386,000

Page 56: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Walton Ferry ElementaryGeneral Info:Enrollment: 463Core Capacity: 660Classroom Capacity: 400

Portables: 7 5th Grade5th Grade5th Grade5th GradeMusicArtELL/Search

Original Construction: 1972Sprinkled: NoExisting area: 53,500 sfNew area: 10,000sfProposed Core: UnchangedProposed Classroom Capacity: 530 

Page 57: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Walton Ferry ElementaryScope:8 new classrooms; restrooms; storage; TWA with standing seam metal roof to match existingAdd sidewalks and canopies to connect to new loop driveRenovate RestroomsReplace grease interceptorChiller ReplacementFan Coil & AHU ReplacementNew HVAC ControlsElectrical Upgrades

Page 58: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Walton Ferry Elementary

Schematic Floor Plan

Page 59: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Walton Ferry Elementary

Schematic Site Plan showing addition, loop drive

Page 60: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Walton Ferry ElementaryBudget:

New Construction:Renovation:Site Development:Contingency:Preliminary Construction Budget:

Site Survey:Geotechnical:FM Review:KBJM Architects:OLG Engineers:Civil Site:Furniture:Technology:Preliminary Soft Costs:

Total Preliminary Project Budget:

$1,350,000$   850,000$   700,000$   100,000$3,000,000

$       5,000$       5,000$       6,000$     64,000$     60,000$     26,000$     62,000$     56,000$   284,000

$3,284,000

Page 61: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

George Whitten ElementaryGeneral Info:Enrollment: 435Core Capacity: 660Classroom Capacity: 400

Portables: 6 4th Grade5th GradeMusicTitle IGuidanceELL

Original Construction: 1974Sprinkled: NoExisting area: 53,500 sfNew area: 14,500sfProposed Core: UnchangedProposed Classroom Capacity: 550 

Page 62: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

George Whitten ElementaryScope:9 classrooms; restrooms; storage with standing seam metal roof to match existingNew loop drive with additional parkingHVAC ControlsFan Coil & AHU replacementElectrical upgrades

Page 63: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

George Whitten Elementary

Schematic Floor Plan

Page 64: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

George Whitten Elementary

Schematic Site Plan showing addition, new drives/parking.

Page 65: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

George Whitten ElementaryBudget:

New Construction:Renovation:Site Development:Contingency:Preliminary Construction Budget:

Site Survey:Geotechnical:FM Review:KBJM Architects:OLG Engineers:Civil Site:Furniture:Technology:Preliminary Soft Costs:

Total Preliminary Project Budget:

$1,950,000$   660,000$   450,000$   100,000$3,160,000

$       5,000$       5,000$       6,250$     78,000$     55,000$     25,000$     69,750$     63,000$   307,000

$3,467,000

Page 66: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Gene Brown ElementaryGeneral Info:Enrollment: 459Core Capacity: 600Classroom Capacity: 450

Portables: 4Special Ed.ELLMath LabYMCA

Original Construction: 1955Sprinkled: NoExisting area: 55,088 sfNew area: 5,800sfProposed Core: UnchangedProposed Classroom Capacity: 530 

Page 67: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Gene Brown ElementaryScope:4 classrooms; restrooms and storageAddress drainage issue at front parking

Page 68: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Gene Brown Elementary

Schematic Floor Plan

Page 69: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Gene Brown ElementaryBudget:

New Construction:Renovation:Site Development:Contingency:Preliminary Construction Budget:

Site Survey:Geotechnical:FM Review:KBJM Architects:OLG Engineers:Civil Site:Furniture:Technology:Preliminary Soft Costs:

Total Preliminary Project Budget:

$    783,000$      20,000$    180,000$      50,000$ 1,033,000

$       5,000$       5,000$       4,000$     30,000$     14,000$       8,000$     31,000$     28,000$   125,000

$1,158,000

Page 70: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Vena Stuart ElementaryGeneral Info:Enrollment: 692Core Capacity: 875Classroom Capacity: 700

Portables: 35th GradeELLTitle I

Original Construction: 1999Sprinkled: YesExisting area: 71,864 sfNew area: 4,200sfProposed Core: UnchangedProposed Classroom Capacity: 800 

Page 71: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Vena Stuart ElementaryScope:4 new classrooms with standing seam metal roof to match existingUpgrade exterior HM doors/frames to aluminumReplace Existing Heat Exchanger & CoolerBoiler Replacement

Page 72: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Vena Stuart Elementary

Schematic Floor Plan

Page 73: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Vena Stuart ElementaryBudget:

New Construction:Renovation:Site Development:Contingency:Preliminary Construction Budget:

Site Survey:Geotechnical:FM Review:KBJM Architects:OLG Engineers:Civil Site:Furniture:Technology:Preliminary Soft Costs:

Total Preliminary Project Budget:

$    570,000$    850,000$      45,000  $      50,000$ 1,515,000

$       5,000$       5,000$       2,500$     34,750     $     35,000$       6,000  $     31,000$     28,000$   147,250

$1,662,250

Page 74: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

HVAC Upgrades Rucker Stewart Middle School: $650,000 (Phase I)

Replace ChillerEliminate Ice StorageConvert System to 2‐way ValuesChange Pump Drives to VFD & Controls

Ellis Middle School: $1,900,000 (Phase III)Replace Existing BoilerAdd Gym HVAC & Electrical UpgradeReplace HVAC (2‐pipe) with WSHPReplace existing pneumatic HVAC controls

Madison Creek Elementary: $550,000 (Phase III)Replace Existing Heat Exchanger & CoolerBoiler Replacement

Beech Elementary: $1,400,000 (Phase III)Replace Existing Fluid CoolerBoiler ReplacementReplace Existing WSHP UnitsHVAC Controls (Currently Programmable Thermostats)

Page 75: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Reroofing Gallatin High School: $500,000Indian Lake Elementary: $500,000Howard Elementary: $900,000

Door and Window UpgradesMadison Creek Elementary: $350,000 per schoolHB Williams ElementaryShafer Middle SchoolWhite House Middle SchoolBenny Bills ElementaryWestmoreland High SchoolWestmoreland Middle School

Page 76: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Building Program Summary

The proposed building program will impact a total of 26 schools in Sumner County and will eliminate 100% of the portables currently in use as a classroom.

Total portables in use: 60Eliminated through classroom additions: 51Remaining portables will be eliminated through reallocation ofexisting space.

The proposed building program will also address all current capital maintenance projects.

Page 77: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Building Program Budget

Renovation/Additions: $54.6M

HVAC and Electrical Upgrades: $4.5M

Reroofing: $1.9M

Door and Window Upgrades: $2.5M

Land and Infrastructure: $6M

Total Program Budget: $69.5M

Page 78: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Proposed Phase I

Renovation to Beech HSRenovation to White House HSAddition to Clyde Riggs ElementaryAddition to Guild ElementaryAddition to Hawkins MiddleAddition to Jack Anderson ElementaryHVAC Upgrade to Rucker Stewart MiddleLand/Infrastructure

Total budget for Phase I:  $41.4M

Page 79: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Proposed Phase II

Addition to Station Camp MiddleAddition to Nannie Berry ElementaryAddition to Watt Hardison ElementaryAddition to Walton Ferry ElementaryAddition to George Whitten ElementaryAddition to Gene Brown ElementaryAddition to Vena Stuart Elementary

Total budget for Phase II:  $19.8M

Page 80: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Proposed Phase III

Aging Infrastructure:HVAC and Electrical UpgradesReroofingDoor and Window Upgrades

Total budget for Phase III: $8.3M

Page 81: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Timeline

Page 82: Presentation 11-18-2014 - boarddocs.comfile/Presentation_11-… · 18/11/2014  · Kaatz, Binkley, Jones & Morris Architects, Inc. Oliver, Little, Gipson Engineering, Inc. Civil ...

Land/Infrastructure


Recommended