+ All Categories
Home > Documents > Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author:...

Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author:...

Date post: 15-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
40
Presentation August 20, 2013
Transcript
Page 1: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Presentation August 20, 2013

Page 2: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

St. Vital Transmission ComplexStakeholder Workshop

WELCOME!Manitoba Hydro

9:00am to 1:50pm

Page 3: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Purpose of Workshop

• Share current project information– Including outcomes of the Route Selection process

• Understand local issues and concerns• Obtain stakeholder feedback on the route

selection process• Discuss site-specific concerns

– Mapping exercises• Discuss appropriate mitigation measures to

address local issues

Page 4: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Workshop Agenda

1. Introduction – 10 min. – Participants– Project Description– Deliverables

2. Background – 1 hr.– Outline of Route Selection Process (EPRI)– Outcomes to Date – Alternative Routes – Environmental Assessment Process– Public Engagement Process– Property Acquisition– Project Schedule– Questions

Page 5: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Workshop Agenda

• Refreshment Break /Grouping – 15 min.3. Breakout Discussion/Map Exercise – 2 hr. 15 min.

– Discuss local Issues and Concerns – Discuss /Identify Opportunities and Constraints

• Engineering • Environmental • Socio-economic

– Determine Route Preferences • Apply the above to Alternative Route Maps

• Lunch - 15 min. 4. Summary – 45 min.

– Group Presentations – Dot-mocracy Exercise

5. Wrap up – 5 min.

Page 6: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

1. Introduction 9:00 to 9:10am

1.1 Manitoba Hydro/Consultant Project Team 1.2 Stakeholders/Workshop Participants 1.3 Project Description1.4 Deliverables1.5 Transmission Line Development Process

Page 7: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

1.1 Manitoba Hydro Project Team

• Project Coordination – Manitoba Hydro• Route Selection – Photo Science, Inc/MH• Stakeholder & Public Engagement –

AECOM/MH• Environmental Assessment – Stantec/MH• Mapping – Stantec

– Working in tandem

Page 8: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

1.2 Stakeholder Workshop

• Representation – Agriculture – Business and Industry – including Trappers – Environment – Provincial and Groups– Health, Education and Policing – including EMS– Infrastructure– Municipal – RMs, Towns and Cities

• Invited through interviews, telephone calls, letters and emails– Some representatives participated in EPRI Workshops

Page 9: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

1.3 Project:• St. Vital Station to La Verendrye Station– On an existing Manitoba Hydro right-of-way south

of Winnipeg - the Southern Loop– Will enable the Winnipeg electrical network to

withstand severe outages; improve system performance during normal operation, and promote the reliability of the power system in southern Manitoba

• St. Vital Station to Letellier Station– Required to address load and voltage concerns in

the South Central area of Manitoba due to load growth

1.3 Project: Two New 230kV Transmission Lines

Page 10: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

1.4 Deliverables

• Environmental Assessment Report – Assessment of a Preferred Route– Environmental (including Socio-economic) Impacts– Record of Stakeholder and Public Engagement– Provincial Review

Page 11: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

1.5 Transmission Line Development Process

ProjectNeed

SSEA

EIS Filed

Regulatory Approval

Final Design & Property Agreements

Construction

Monitoring and Follow-Up

Current Project – Site Specific Environmental Assessment

Start to Finish

Page 12: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

2. Background 9:10 to 10:10am

2.1 Route Selection Process2.2 Environmental Assessment Process2.3 Public Engagement

~ Results to Date

2.4 Property Acquisition 2.5 Schedule 2.6 Questions

Page 13: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

2.1 Route Selection Process

• Macro Corridor and Study Area Identification• Alternative Corridor Identification (Natural,

Built, Engineering & Simple Average) • Alternative Route Selection and Review• Preferred Route Determination

Page 14: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

SSEA: Site Selection & Environmental Assessment

SSEA

Route Selection

Stakeholder and Public Engagement

Environmental Assessment

Regional Siting Criteria and Suitability

Study Area Determination

Alternate Corridors

Alternate Routes

Preferred Route

Page 15: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Route Selection Methodology

• Macro Corridor and Study Area Identification• Alternative Corridor Identification

– Engineering, Natural Environment and Built Environment Considerations

– Simple Average and Composite Corridor

• Alternative Route Selection and Review• Preferred Route Determination

Page 16: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

The EPRI-GTC Methodology Funnel

Page 17: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Macro Corridor Identification

• Identifies broad areas with least environmental and community impacts

• Identifies start and end points of the project, and one central point

• Used to define the outer boundaries/limits of Project Study Area

• Based on available provincial GIS data sets

Page 18: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Marco-Corridor and Study Area

The top 5% of the best possible connections within the project area form the macro corridors

Page 19: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Alternative Corridor Identification

Page 20: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

• External and internal stakeholders determine the relative suitability of different features for routing a transmission line

• This is focused on a regional scale, prior to application on a specific project

• Examples of features include:

Engineering Natural Built

• Slope• Paralleling existing

infrastructure• Span-ability of water

bodies

• Wetlands• Grasslands• Critical habitat• National parks

• Agricultural • Recreational trails• Historic sites• View-shed

Alternative Corridor Identification

Page 21: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Alternative Corridor Identification

• Examples of external stakeholders– Trappers Association– Manitoba Conservation and Water Stewardship– Manitoba Infrastructure and Transportation– Manitoba Local Government– MAFRI– Manitoba Aerial Applicators– Manitoba Food and Rural Initiatives– Ducks Unlimited Canada– Keystone Agricultural Producers– Trails Association – Manitoba Nature Conservancy

Page 22: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Stakeholder Input

• External and internal stakeholder feedback and contribution was incorporated into the Routing Methodology

• Stakeholders identified features and suitability values, as well as relative weightings for routing based on Engineering, Natural and Built Environment perspectives

• This input was used to determine the Alternative Corridors within which Alternative Routes could be drawn

Page 23: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Engineering,Natural andBuilt Environment Features (Criteria), with Scores (1-9)and Weightings

Areas of Least Preference

Engineering Natural Built

Page 24: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Alternative Corridor Identification

Weights and relative suitability values are applied to features (or criteria), such as roads, wetlands and forests; or distances from buildings and different slope classifications.

The less suitable a feature is, the less likely a corridor will be mapped over that feature.

Page 25: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Alternative Corridor Identification

• Areas of Least Preference are also determined• Some examples include:

Engineering Natural Built

• Non span-able water bodies

• Active Mines and quarries

• Wildlife refuge• Ecological reserves• National parks• Provincial Parks

• Federal heritage sites• Airports• Known archeological

sites

Page 26: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Alternate Corridor - Engineering

Developed by placing five–times (5:1:1) emphasis on engineeringconsiderations

Page 27: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Alternate Corridor – Natural

Developed by placing five–times emphasis on natural considerations

Page 28: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Alternate Corridor – Built

Developed by placing five–times emphasis on built considerations

Page 29: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Alternate Corridor - Composite

All corridors combine into a Composite Corridor

Page 30: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Further Data Gathering

• Additional data collection for the Route Selection process occurs once corridors are developed

• This includes existing sources of data, windshield surveys and site visits

Page 31: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Alternative Route Selection

Page 32: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Alternative Route Selection

• Multiple routes are developed within the Alternative Corridors

• Developed by project team taking into account all information gathered to date

Buildings

Page 33: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Review of Alternative Routes

• Public and Stakeholders provide input into the Alternative Routes through various avenues, including:– Workshops– Open Houses– Meetings with project team members– Manitoba Hydro Project Website

Page 34: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

• An Alternative Route Evaluation Model is used to determine the relative strengths and weaknesses of each route

Alternative Route Selection

Best

Page 35: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Alternative Routes Determined

Page 36: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Preferred Route Selection

Page 37: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Preferred Route Selection

• Expert judgment is used to determine the Final Preferred Route– Takes into account feedback from Round One

engagement and preliminary assessment information

• Round Two Public Open Houses will provide public feedback on the Final Preferred Route

from stakeholders at routing phase and in public and aboriginal engagement

Page 38: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Route Selection - Conclusion

With the help of stakeholder input, expert judgment and internal expertise, a balanced, transparent and defendable Final Preferred Route is developed.

Page 39: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

EPRI-GTC* Methodology

• Stakeholder Calibration• Siting Criteria – Stakeholders identify/refine and provide relative

suitability values (modified Delphi process to gain consensus)– Engineering Stakeholders – infrastructure co-location – Natural Environment Stakeholders – natural areas considerations– Built Environment Stakeholders – land use issues

• Stakeholders provide relative importance /weights (analytical hierarchy process)

• Computer-generated corridor models– GIS data, moving from general to specific

• Models for each of the above criteria (5:1:1)• Models with Equal weighting • Combination Model

• Expert Judgment (Internal Stakeholders)*Electric Power Research Institute-Georgia Transmission Corp.

Page 40: Presentation August 20, 2013 - Manitoba Hydro · Appendix D Background Presentation Part 1 Author: Manitoba Hydro Subject: St. Vital Transmission Complex Project Environmental Assessment

Benefits of EPRI Process

• Objective – Based on clear identification of criteria by stakeholders– Values and weights developed during the process are

applied to geographic information– As the area of interest becomes more focused and

defined, data becomes more detailed and accurate • Consistent

– Algorithms provide replicable results • Defensible

– Understanding “what” is required and “how” to do it before determining “where” to put it


Recommended