21
P R O J E C T IRS HOUSING COMPLEX, ON PLOT NO. 6, 7 & 8 AT ULWE NODE, NAVI MUMBAI. PROJECT BY SHAH CONSTRUCTION CO. 24/A, Shree Laxmi Nivas, M. G. Road, Ghatkopar (West), Mumbai 400 086 Now Renamed as
Transcript
Page 1: Presentation-IRS Housing Project

P R O J E C T

IRS HOUSING COMPLEX, ON PLOT NO. 6, 7 & 8

AT ULWE NODE, NAVI MUMBAI.

PROJECT BY

SHAH CONSTRUCTION CO.24/A, Shree Laxmi Nivas, M. G. Road, Ghatkopar (West), Mumbai 400 086

Now Renamed as

Page 2: Presentation-IRS Housing Project

LOCATION PLAN

Page 3: Presentation-IRS Housing Project

LOCATION – I : PLOT NO. 6, 7 & 8, LOCATION – II : PLOT NO. 80 & 81, LOCATION– III : Plot No. 78, 79, 82, 83 & 41.

Page 4: Presentation-IRS Housing Project

DESIGN PROCESS...............

Page 5: Presentation-IRS Housing Project

B R I E F :

1. Wing A & B Stilt + 10 Stories, 4 flats per floor, Total number of flats 80 nos.

2. Wing C Stilt + 4 Stories, 2 flats per floor, Total number of flats 8 nos. OR up to Utilization of 1.50 F.S.I. Whichever is higher. (With provision to consumed 2.00 F. S. I. in future).

3. Total 88 nos. of flats in Wing A, B & C.

4. Each flat 1007.00 sq. ft. of Carpet area, 3 bedrooms with three toilets.

5. Gymnasium, Society Office and Meeting Room at Basement Floor Level.

6. Entrance lobby at stilt level.

7. Party terrace with gents & ladies toilets & pantry in Wing A & B.

8. Elec. Substation, Generator room & Security cabin at ground level. 9. Refuge floor on 4th, 6th & 8th floor.

Page 6: Presentation-IRS Housing Project
Page 7: Presentation-IRS Housing Project

L A Y O U T P L A N

SUB STATION

GENERATOR ROOMUG TANK,PUMP ROOM &RAIN WATER HARVESTING TANK

SECURITY - 1

SECURITY - 2

Page 8: Presentation-IRS Housing Project

BASEMENT FLOOR PLAN – ALT. - 1BASEMENT FLOOR PLAN

WING - C

WING - A WING - B

Page 9: Presentation-IRS Housing Project

TYPICAL FLOOR PLAN(1st, 3rd, 5th, 7th AND 9th)

Page 10: Presentation-IRS Housing Project

TYPICAL FLOOR PLAN(2nd, AND 10th )

Page 11: Presentation-IRS Housing Project

TYPICAL FLOOR PLAN(4th, 6th, AND 8th)

Page 12: Presentation-IRS Housing Project

TERRACE FLOOR PLAN

Page 13: Presentation-IRS Housing Project

Post Occupation Plan(8 Entrance Doors )

Page 14: Presentation-IRS Housing Project

WING – C (provision to consume 2.00 F. S. I. in future).

WING - C

WING - AWING - B

Page 15: Presentation-IRS Housing Project

On Gudipadva

Both IRS (Mumbai) & Integrated Spaces Ltd.

Jointly organized a BHOOMI-POOJAN

at Ulwe Node Site for IRS tower I & II.

Page 16: Presentation-IRS Housing Project
Page 17: Presentation-IRS Housing Project
Page 18: Presentation-IRS Housing Project
Page 19: Presentation-IRS Housing Project
Page 20: Presentation-IRS Housing Project

MOU Signed by IRS (Mumbai) Housing Society for IRS Tower being constructed by Integrated Spaces Ltd.

MOU

Floor wise Carpet & Built-up Area For Building Wing A proposed on Plot No.6,7&8 along with landing cost to the Flat Purchaser

Spread Sheet

Page 21: Presentation-IRS Housing Project

P R O J E C T

IRS TOWER - I

IRS HOUSING COMPLEX, ON PLOT NO. 6, 7 & 8

AT ULWE NODE, NAVI MUMBAI.

P R O J E C T B Y

Thank You.


Recommended