BYDEBASISH GHOSH
FINANCE+MARKETINGROLL NO. -09010003
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 3/20
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 4/20
` It is the critical infrastructure on which the socio-economic development of the country depends.
` The demand of power in India is enormous and is
growing steadily.` Resources for power generation are unevenly
dispersed across the country.
` Electricity is considered key driver for targeted 8 to
10% economic growth of India.
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 5/20
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 6/20
` Growth of Power Sector infrastructure in Indiasince its Independence has been noteworthymaking India the third largest producer of
electricity in Asia.` Generating capacity has grown manifold from
1,362 MW in 1947 to 113,506 MW (as on30.09.2004).
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 7/20
INSTALLED CAPACITY GROWTH (MW)
Year Thermal Hydro Nuclear Total
March 1992 48,086 19,194 1,785 69,065
March 1993 50,749 19,576 2,005 72,330
March 1994 54,369 20,379 2,005 76,753
March 1995 58,113 20,833 2,225 81,171
March 1996 60,083 20,986 2,225 83,294
March 1997 61,877 21,642 2,225 85,744
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 8/20
` Per capita consumption of electricity is expectedto rise to over 1000 kilowatt hours per annum(kwh/ annum) in next 10 years from present level
of 580 kwh.` Compare this against over 10,000 kwh/ annum in
the developed countries!
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 9/20
` The availability of power has increased butdemand has consistently outstripped supply andsubstantial energy & peak shortages of 7.1% &
11.2% prevail in India.` The urban-rural dichotomy in supply- as per
Census 2001, only about 56% of households haveaccess to electricity, with the rural access being
44% and urban access about 82%.`
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 10/20
ENERGY SHORTAGE
Year Demand
(billion kWh)
Available
(billion kWh)Shortfall (%)(billion kWh)
1990-91 267.632 246.560 21.072 7.87
1991-92 288.974 266.432 22.542 7.80
1992-93 305.266 279.824 25.442 8.33
1993-94 323.252 299.494 23.758 7.35
1994-95 352.260 327.281 24.979 7.09
1995-96 389.721 354.045 35.676 9.15
1996-97 413.490 365.900 47.590 11.51
2000-01 507.216 467.400 39.816 7.8
2003-04 559.264 519.398 39.866 7.1
PEAKING SHORTAGE (in MW)
Year Demand Available Shortfall (%)
1990-91 44,005 37,171 6,834 15.53
1991-92 48,035 39,027 9,008 18.79
1992-93 52,805 41,984 10,821 20.49
1993-94 54,875 44,830 10,045 18.31
1994-95 57,530 48,066 9,464 16.45
1995-96 60,981 49,836 11,145 18.28
1996-97 63,853 52,376 11,477 17.97
2000-01 74,872 65,628 9,244 12.3
2003-04 84,574 75,066 9,508 11.2
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 11/20
` The Indian government has set the goal of adding90,000 MW of additional electric generation capacityby 2012.
` Uk-based Hinduja Group, which already operatesseveral power plants in the country, has pledged $15billion towards the addition of 10,000 MW of capacityover the next several years.
` In order to improve efficiency standards, the EnergyConservation Act was passed in 2002, whichestablished the Bureau of Energy Efficiency and has
sought to promote efficient use of energy and labelingof energy-intensive products.
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 12/20
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 13/20
` India¶s largest power company.` NTPC was set up in 1975 to accelerate power
development in India.` NTPC ranked 317th in the µ2009, Forbes Global 2000¶
ranking of the World¶s biggest companies.` Total installed capacity of the company is 30, 644MW (including JVs) with 15 coal based and 7 gasbased stations, located across the country.
` NTPC has been operating its plants at high efficiencylevels. Although the company has 18.79% of the totalnational capacity it contributes 28.60% of total power generation due to its focus on high efficiency.
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 14/20
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 15/20
NO. OF PLANTS CAPACITY (MW)
NTPC Owned
Coal 15 24,395
Gas/Liquid Fuel 7 3,955
Total 22 28,350
Owned By JVs
Coal & Gas 4 2,294
Total 26 30,644
REGION COAL GAS TOTAL
Northern 7,035 2,312 9,347
Western 6,360 1,293 7,653
Southern 3,600 350 3,950
Eastern 7,400 - 7,400
JVs 814 1,480 2,294
Total 25,209 5,435 30,644
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 16/20
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 17/20
` NETRA (NTPC Energy Technologies and Research Alliance) shall be the harbinger of research, technologydevelopment and scientific services in the domain of electric power within NTPC.
` NETRA shall not only provide scientific services to power
stations but also resolve the haunting efficiency, reliability,availability and environment related requirements throughinnovation and technology development.
` NETRA shall have four distinct µverticals¶ for Research,Technology Development, Scientific Services andInfrastructure.
` The µverticals¶ shall be suitably interlinked with each other in order to enable seamless work flow right from concept tocommissioning.
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 18/20
Area of Utilisation Quantity (in Million Tons)
Cement Industries 7.04
Ready Mix Concrete 0.33
Asbestos 0.20
Clay Ash/ Fly Ash Bricks 1.64
Land Fill 5.74
Ash Dyke Raising 6.24
Road/ Embankments 1.30
Mine Filling 1.14
Agriculture 0.002
Export 0.73
Others 0.02
Total 24.40
8/6/2019 presentation on ntpc by debjit
http://slidepdf.com/reader/full/presentation-on-ntpc-by-debjit 19/20
` Coal based capacity of around 53000 MW.
` 10000 MW through gas.
` 9000 MW through Hydro generation.` 2000 MW from nuclear sources.
` Around 1000 MW from Renewable EnergySources (RES).