CASE STUDY TEAM 3 GRZEGORZ SWIATKOWSKI ELIAS TEFADE TAURAN BLAGGAN VASILEIOS KARKANTZOS SHOAIB AHMAD
Transcript
Page 1: Presentation - Team 3

CASE STUDY TEAM 3GRZEGORZ SWIATKOWSKI

ELIAS TEFADE

TAURAN BLAGGAN

VASILEIOS KARKANTZOS

SHOAIB AHMAD

Page 2: Presentation - Team 3

Bradford Beck Catchment Area

Page 3: Presentation - Team 3

Area Division

Page 4: Presentation - Team 3

CONTROLLING FROM SOURCE @ UPSTREAM SOAKWAY PIT AND WATER BUTT

Water Butt

Capacity of each butt = 0.7 m3

Applying for 1,000 houses, 3 set per

house = 3,000 pcs

Total capacity = 630 m3

Est. Cost = £30,000.00

Soakaway Pit

Size – 40 x 4 x 2.5

Capacity = 5 * 400 m3

Est. Cost = £100,000.00

Proposed residential area with Water Butt

Page 5: Presentation - Team 3

INFILTRATION BASIN & SWALES

Infiltration Basin

Ranging 0.5 m – 3.0 m deep

Drain half stored runoff in 48 hrs.

Capacity = 900 m3

Est. Cost = £585,000.00

Swales

Help in removing polluting solids

through infiltration, trap organic

mineral

Capacity = 500 m3

Integrated with wildlife habitat

Page 6: Presentation - Team 3

GREEN ROOF & WATER RESERVOIR

Green Roof

Total Volume = Roof Thickness * Roof

Areas = 0.002 m * 3360 m2 = 67.2

m3

Est. Cost = £672,000.00

Underground Water Reservoir

Est. Size = 20 x 9 x 4 = 640 m3

Serves as temporary water treatment

tank

Est. Cost = £150,000.00 to

£255,000.00

Existing Pitched Roof

Water Reservoir

Page 7: Presentation - Team 3

UNIVERSITY CAMPUS DEVELOPMENT

Features:

Green Area by the Beck

Solar Panels

Resting Area

University Campus Building

Est. Cost = £80 million

Page 8: Presentation - Team 3

WESTHOLME PARK

Features:

Pool/Pond

Café/Restaurant

Bike Rental

Est. Cost = £3.5 million

Page 9: Presentation - Team 3

FLOOD WARNING SYSTEM

System comprises of sensors which

measure the increase in velocity and

rising water levels

Sensors are connected to the

speakers that currently exist in the

town

Cleaning the Bradford Beck

Estimated Cost £350,000.00

Page 10: Presentation - Team 3

North Complex Development

Features:

• Multipurpose Sports Centre

• Amphitheatre

• Children Care Facilities

• Youth Centre

• Restaurants

• Cafés

• Bars

• Retail

• Park

Page 11: Presentation - Team 3

Video slide (removed due to excessive size)

Page 12: Presentation - Team 3

North Park• Estimated cost:

Opening Beck = 10 million

Retail Buildings = 3 * 40 million

Sports Centre = 40 million

Park, Amphitheatre and Planting = 30 million

• Estimated footfall = 5,000 people per day

• Estimated revenue = £200 million spent per year

Page 13: Presentation - Team 3

VALLEY ROAD PARKLandscaping Work

Features:

Open up culvert, provide accessibility to

the river

Creation of pond

Reservoir to control flow of water

Permeable pavement

Vegetation

Walkway, bicycle way

Picnic

River crossings

Estimated Cost: 20 million

Page 14: Presentation - Team 3

Video slide (removed due to excessive size)

Page 15: Presentation - Team 3

CULTURAL CENTRE

Location: between Hamm Strasse and Singleton street

Features:

Refurbishment of listed building, turn it to a multi-purpose cultural centre

Creation of wetland for the purpose of the cultural centre and vegetation to improve visibility and store water

Permeable pavement

Water fountain

Estimated cost: 10 million

Page 16: Presentation - Team 3

DEVELOPMENT OF BECK @ DOWNSTREAM

Area of development = 35,100

m2

Area of existing beck = 633 m2

Demolition Cost @ 19 per m2

for 12,600 m2 = £240,000

Beck to be extended

surrounded by greenery (park)

Cycle and walkway paths

running along Canal Road and

onto the Park

Beck to either contain a Water

Storage System or a Meander

Canal

Page 17: Presentation - Team 3

WATER STORAGE POOLMEANDER CANAL

Both techniques are able to

slow down the speed of water flow

Capacity of extended beck = 2,140

m2

Area of pool = 30 m x 20 m = 600 m2

Capacity of water storage = 1,200 m3

Est. Cost of pool = £500,000.00

Est. Cost to meander the canal =

£350,000

Est. Cost of open green space =

£62,200

Total Cost inc Demolition = £800,000

Page 18: Presentation - Team 3

Our areas for development follow water drop path to include integrated water cycle

The designs create Broadway from University to Queen’s Road and further to Shipley

Water features take under account changing climate to provide safety for citizens and goods

Green areas, so widely included in the designs, create habitat for nature and bring whole communities together

Proposed developments will attract investors and make Bradford retail centre connected to water

Page 19: Presentation - Team 3

THANK YOU FOR YOUR TIME

DO YOU HAVE ANY QUESTIONS?