DTE SCHOOL PRPJECT REPORT

PREPARED BY

ZAFAR ALI BBATTI

GOVT. HIGH SCHOOL 539/EB VEHARI

As you know that each and every official from top to bottom are taking part in UPE ,Our worthy Secretary School Education / Progrmme Director DSD and senior officials have been allotted a District for improvement,PD DSD directed all of you to participate in this national cause through DTEs . This task must be taken as Project manner namely DTE School project. Each DTE will select one school having the following defficiencies :Enrollment is less than 20 / 30 %Poor PEC result less that 20 to 30 %Poor Educational environementPoor community participationPoor school managementThis school will be monitored with the collaboration of Disctrict Education Management i.e AEOs/Dy DEOs and decide the quality of work and improvementThe best DTE will be declared on 1-6-2014Please help DTE to remove the deffieciences with your visionary efforts and convert your school in to the best DTE schools with the following:Enrollment of school should be 50% increased from the date of startand copy of Dakhil and Kharge may be made ,picture of school before and after may be ensured.Make good educational environment with low cost, no cost material ,walls should be decorated ,Ground should be decorated with national Flag ,boundary wall should be decorated with colured flages ,students competition in sports.Make school management good with discipline ,students uniform,cleanliness, home task should be checked , teachers diaries may be updated.Community participation may be ensured with old students , political REPs , get donation for schools improvement and give them ownershipMove forward for national cause and serve the nation-Regards

INSTRUCTION GIVEN BY DSD ABOUT DTE SCHOOL PROJECT

DEFFIECIENCES OF SCHOOL BEFORE DOPTING

POOR PEC RESULT 2014 - 32% POOR EDUCATIONAL ENVIORNMENT POOR COMMUNITY PARTICIPATION POOR SCHOOL MANAGEMENT LOW COST NO COST MATERIAL NOT DISPLAYD NO SPORTS ACTIVITIES IN SCHOOL SCHOOL COUNCLE WAS NOT INTERESTED IN

SCHOOL LACK OF PLANTATION

OBJECTIVES

To Enhance Enrollment To Create Good Educative

Environment To Improve Quality EducationTo Develop Confidence Of The

Society On Govt. SchoolsEducation For All

To Create Friendly Atmosphere In Schools

TE & DTE MEETINGS WITH SCHOOL STAFF AND SCHOOL COUNCLE

INCREASE IN INROLLMENT ACCORDING TO UPE TARGET

FUND RASING

SCHOOL DECORATION

IMPROVEMENT IN SCHOOL MANAGMENT

EDUCATIONAL ENVIRONMENT WITH LOW COST NO COST MATERIAL

SCHOOL CLEANLINESS

CLEANLINESS OF STUDENTS UNIFORM

WRITING ON BOUNDARY WALL

SCHOOL DECORATION WITH NATIONAL AND COLOURFUL FLAGS

SPORTS ACTIVITIES

TEACHERS DAIRY & STUDENTS HOMEWORK CHECKING

COMMUNITY PARTICIPATION

PLANTATION

STEPS TAKEN FOR IMPROVEMENT OF SCHOOL

IMPROVEMENT OF SCHOOL AFTER 10 DAYS

• TE & DTE MEETINGS WITH SCHOOL STAFF AND SCHOOL COUNCLE (Impressive)

• INCREASE IN INROLLMENT ACCORDING TO UPE TARGET ( 43% increase 10 students inrolled from 19.5.14 to 30.5.14)

• FUND RASING ( good effort from DTE and Teachers)• SCHOOL DECORATION ( good)• IMPROVEMENT IN SCHOOL MANAGEMENT ( Satisfactory)• EDUCATIONAL ENVIRONMENT WITH LOW COST NO COST MATERIAL

( Excellent)• SCHOOL CLEANLINESS ( Good)• CLEANLINESS OF STUDENTS UNIFORM ( Good)• WRITING ON BOUNDARY WALL ( Satisfactory)• SCHOOL DECORATION WITH NATIONAL AND COLOURFUL FLAGS (

Good) • SPORTS ACTIVITIES ( Satisfactory)• TEACHERS DAIRY & STUDENTS HOMEWORK CHECKING (

Satisfactory)• COMMUNITY PARTICIPATION ( Average)

COMPARATIVE PICTORIAL VIEW OF SCHOOL BEFORE AND AFTER

ADOPTING SCHOOL

Main Gate

Before

Main Gate

After

Boundary Walls

Before

AfterBoundary Walls

Class Rooms Before

Class rooms After

Walls after display with low cost no cost material

Ground Before

After

Before

After

Galary

Cleanliness of uniform

Before

After

CTSC 13

GHS 539


Recommended