+ All Categories
Home > Documents > Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy...

Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy...

Date post: 04-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
47
FIG-HELSINKI MAY 2017 1 / 47
Transcript
Page 1: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 1 / 47

Presented at th

e FIG W

orking Week 2017,

May 29 - June 2, 2

017 in Helsinki, F

inland

Page 2: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 2 / 47

SHORT HISTORY of GDLRC

MINISTRY OF

ROYAL REGISTRY

ORGANISATION

ESTABLISMENT

OF PRIVATE

PROPERTY AND

LAND

REGISTRY

LAW ON DEFINING

AND MANAGING OF

ASSESTS AND REAL

PROPERTIES

(1st CADASTRE LAW)

RE-

STRUCTURE

RE-

ORGANISATION

OF GDLRC

GENERAL

DIRECTORATE OF

LAND REGISTRY

AND CADASTRE

Page 3: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 3 / 47

FIRST CADASTRAL MAP IN TURKIYE-1913

Page 4: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 4 / 47

DUTIES & AUTHORIZATION

Register, update and service of land registery

Cadastre of homeland

Photogrammetric map production and geodetic activities

Land information system

Cooperation with international organisations on related areas

Licenced Survey and Cadastral Engineering Offices

Real estate brokerage activities

Coordination with other public institutions and organizations

Page 5: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 5 / 47

MAIN AREAS OF ACTIVITY of GDLRC

LAND REGISTRY

CADASTRE

GEO-INFORMATI

CS

Page 6: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 6 / 47

GEOINFORMATICS SERVICES

• GNSS RTK Network (TUSAGA-Aktif / CORS-Tr)

• Photogrammetric mapping & Orthophoto production.

Page 7: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 7 / 47

Page 8: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 8 / 47

CORS-Tr Stations-146

Distance between stations 80-100 Km.’s

Page 9: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 9 / 47

CORS-Tr Stations

Erzurum-Meteoroloji

Iğdır-TKGM Kabinet Viranşehir-Meteor.

Siirt-Meteoroloji

Page 10: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 10 / 47

CORS-Tr Control Center Ankara – GDLRC

Page 11: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 11 / 47

Network RTK Working Principle

CONTROL

CENTER

146 STATIONS

ROVER

x,y,z,t

VP

N+

AP

N

2005.0 Epok

Page 12: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 12 / 47

http://www.tusaga-aktif.gov.tr

User Web Service

Page 13: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 13 / 47

http://www.tusaga-aktif.gov.tr

User Web Service

Page 14: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 14 / 47

CORS-Tr Usage Map – 2016

Page 15: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 15 / 47

0

1000

2000

3000

4000

5000

6000

GDLRC PRIVATE

COMP.

PUBLIC INST. LICENSED

SURVEYORS

MUNICIPALI

TIES

UNIVERCITIE

S

GNSS 660 5733 1061 423 985 106

Total # Users; 8.968

CORS-Tr Operating/Users

Daily total number of users (mean) :2400

Simultaneus maximum number of users:840

Page 16: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 16 / 47

CORS-Tr Accuracy Checks

PERIOD Nr of

POINTS

RMS (m.)

EAST NORTH HEIGHT

2009 808 0,039 0,042 0,090

2014-1 723 0,045 0,039 0,078

2015-1 743 0,033 0,035 0,047

2015-2 701 0,029 0,027 0,058

2016-1 725 0,032 0,031 0,051

2016-2 697 0,029 0,028 0,046

2 times QC Checks every year ...

Page 17: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 17 / 47

CORS-Tr Operating / Prices

SERVICE TYPE DATA TYPE Price

(VAT INC.) EXPLANATION

FIRST

SUBSCRIPTION - 50 USD Once

RTK Services

Network-RTK 35 USD Monthly

250 USD Annual

Network-

DGPS 17 USD Monthly

RINEX Data RINEX 1 s 0.17 USD Station/Hour

RINEX 30 s FREE Station/Day

Page 18: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 18 / 47

CORS-Tr Operating/User support

Page 19: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 19 / 47

CORS-Tr and GIS Integration

Page 20: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 20 / 47

On-line Orthometric Height Value

Page 21: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 21 / 47

In order to complete first cadastre, 1/5000 scaled base map production has

been carried out at 480.000 Km2 area after 1955 by photogrammetric method

...

Digital Orthophoto production has been started after 2007 for cadastral

renovation and update works for the purposes of decision-support, quality

control and establishing legal basis ..

PHOTOGRAMMETRIC MAP&ORTHOPHOTO PRODUCTION

Page 22: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 22 / 47

Orthophoto Map – Usage at Cadastre

Page 23: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 23 / 47

Orthophoto Map – Usage at Cadastre

Page 24: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 24 / 47

Orthophoto Map – Usage at Cadastre

Page 25: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 25 / 47

Orthophoto Map Production Process

Page 26: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 26 / 47

Aerial Image Acquisition

Aerial photography services for aerial image acquisition are provided

by 2 aircrafts equipt with digital aerial camera in GDLRC

Page 27: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 27 / 47

Orthophoto Map Production Situation

15-30-50 cm GSD

Page 28: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 28 / 47

Orthophoto Maps - Web Services (WMS)

Ortho image– Delivery

1.75 USD / Km2

http://harita.tkgm.gov.tr

Page 29: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 29 / 47

Scanning of aerial photographs taken for the production of 1/5.000 scale ST maps in the

480,000 Km2 area available in the GDLRC archive and the production of B/W

Orthophoto using the obtained digital images. It was completed in 2015.

KAYSERİ 2002

KAYSERİ 2011

ADANA 1963

KAYSERİ 2014

KAYSERİ 2010

ORTHOPHOTO PRODUCTION FROM B/W AERIAL ARCHIVE

PHOTOGRAPHS

Page 30: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 30 / 47

CADASTRE SERVICES

• First Cadastre is completed

• Cadastre Renovation works in progress

• Forest Cadastre in progress

• Military security zones are measured

• Licenced Cadastre Offices (195)

Page 31: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 31 / 47

INITIAL CADASTRE OF TURKEY (CURRENT)

TOTAL UNITS COMPLETED BEFORE 2003

2003-2015 IN PROGRESS PROBLEMATIC

52.049 38.796 12.781 107 365

0

500

1000

1500

2000

2500

3000

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

349 398 679

2005

2715 2622

2268

668 430

331 151 144 15 6

INITIAL CADASTRE

• ARIP PROJECT

Page 32: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 32 / 47

CADASTRAL RENOVATION

TKMP PROJECT

In 4671 units, 4.808.032 parcels

REVOLVING FUND RESORCES

In 1190 units 1.229.543 parcels

TOTAL

In 5861 units 6.037.575 parcels

AF PROJECT

4.6 Millions parcels

Page 33: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 33 / 47

TAKBİS IS ONE OF THE BASIC E-GOVERNMENT PROJECT AIMING TO

TRANSFORM SERVICES OF GDLRC IN TO A UNIQUE DATABASE

Land Registry and Cadastre Information System-TAKBIS

Page 34: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 34 / 47

TAKBİS (Land Registry and Cadastre Information System)

Page 35: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 35 / 47

Since 06 October 2010, e-

Goverment application of GDLRC

has been published and TAKBİS

data has been served to citizens

via e-Goverment gateway.

(www.turkiye.gov.tr)

E-Gov Applications

Page 36: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 36 / 47

Users Of TAKBIS

BANKS

MINISTRY OF FINANCE

TREASURY

PIPE LINE

TELECOM

MINISTRY OF

AGRICULTURE

ELECTRICITY

MINISTRY

OF TRANSPORTATION

MINISTRY OF FOREST.

MINISTRY OF PUBLIC WORKS

UNDERSECRETARY OF

COLLECTIVE RESIDENCE

MUNICIPALIIES

CITIZEN

GENERAL DIRECTORATE OF

NATIONAL REAL ESTATE.

MINISTRY OF

JUSTICE

MERNİS

Central demographic

information system

Page 37: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 37 / 47

E-parcel Inquıry

Page 38: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 38 / 47

LAND REGISTRY SERVICES

• Legal bases from Turkish Constitution and Civil Code

• Land Registry is under state guaranty without any excuse

• 8.3 Millions transactions at 2106

Page 40: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 40 / 47

E-removal of Mortgage

Ziraat Bankası, İş Bankası , Akbank

Page 41: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 41 / 47

E-Payment of Fees

Page 42: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 42 / 47

Exchange Bank Applicaton

Page 43: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 43 / 47

Land Registry Transactions Outside the Jurisdiction

Area and Abroad

• Doing Land Registry Transaction from every LR office

• Doing Land Registry Transaction in Turkish Embasy in Berlin-Germany

...

Page 44: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 44 / 47

REVOLVING FUND

• Active since 1992

• Cost recovery ...

• Main purpose is;

To collect fee from the land registry and cadastre services, to make

expenditures for the services in line with the annual demands and

needs of the Institution.

Page 45: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 45 / 47

NEAR FUTURE PLANS

• 3D City Models

• 3D Cadastre

• Improve TAKBIS

Page 46: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 46 / 47

6-11 May 2018, Istanbul, Turkiye

www.fig.net/fig2018

Let’s meet in

Istanbul

Page 47: Presented at the FIG Working Week 2017,May 29 - …FIG-HELSINKI –MAY 2017 16 / 47 CORS-Tr Accuracy Checks PERIOD Nr of POINTS RMS (m.) EAST NORTH HEIGHT 2009 808 0,039 0,042 0,090

FIG-HELSINKI –MAY 2017 47 / 47

Thank you… SEDAT BAKICI

Head of Geoinformatics Department

: [email protected]

: +90.532.6978521

: +90.312.4631050

: 39o.8562, 32o.8465


Recommended