+ All Categories
Home > Documents > Previously Evaluated Alternatives Out of Corridor October 2005.

Previously Evaluated Alternatives Out of Corridor October 2005.

Date post: 27-Mar-2015
Category:
Upload: cole-allen
View: 216 times
Download: 0 times
Share this document with a friend
Popular Tags:
8
Previously Evaluated Alternatives “Out of Corridor” October 2005
Transcript
Page 1: Previously Evaluated Alternatives Out of Corridor October 2005.

Previously EvaluatedAlternatives

“Out of Corridor”October 2005

Page 2: Previously Evaluated Alternatives Out of Corridor October 2005.
Page 3: Previously Evaluated Alternatives Out of Corridor October 2005.
Page 4: Previously Evaluated Alternatives Out of Corridor October 2005.
Page 5: Previously Evaluated Alternatives Out of Corridor October 2005.
Page 6: Previously Evaluated Alternatives Out of Corridor October 2005.
Page 7: Previously Evaluated Alternatives Out of Corridor October 2005.
Page 8: Previously Evaluated Alternatives Out of Corridor October 2005.

Alt. Description Comments Meets

P & N

Further

Study

Scenario 3000

Hwy 140 Extension Extend Hwy 140 west to I-5s

NO NO

Scenario 3001

White City / Table Rock with Table Rock I-5 Interchange

Improves Table Rock Rd with a new interchange at I-5

NO NO

Scenario 3002

Hwy 140 Extension with N-S Roadway Improvements

Extends Hwy 140 W to I-5; improves Table Rock Rd., Vilas Rd (east), Coker Butte & Foothills Pkwy.

NO NO

Scenario 3003

Hwy 140 Extension with N-S Roadway Improvements and Hwy 62 Connection to Biddle

Same as #3002 with improved connections to Biddle Rd.

NO NO

Scenario 3004

I-5 Bypass Route Re-routes I-5 east of Hwy 62

NO NO

Out of Corridor Alternatives


Recommended